RESERVOIR KARANG ASAM TANJU

URAIAN

RESERVOIR :
BETON K-125

BETON K-225 :
LANTAI t = 40 CM, TERMASUK BALOK 30/50 DIBAWAH LANTAI

DINDING t = 30 CM
KELEBIHAN KOLOM 35/35 PADA DINDING, TEBAL 5 CM
(13 x 3 + 4) = 43 KOLOM

KOLOM UTAMA DIDALAM RESERVOIR UKURAN 35 x35 CM

BALOK 30/55 DIHITUNG SEBAGAI RING BALK 30 x 40 CM

BETON PLAT ATAP TEBAL 15 CM


BETON PLAT ATAP TEBAL 15 CM, RUANG KONTROL
BETON KOLOM 15 x 15 CM x 4 BH, RUANG KONTROL

WATER STOP UNTUK DINDING 2 TAHAP

BANGUNAN RUANG PENGATUR DISTRIBUSI & R. KONTROL

BETON PONDASI RUMAH PERPIPAAN


BETON SLOOF 20 x 30

BETON KOLOM UTAMA 35 x 35 ELV. +71,3, JMLH 8 KOLOM


BETON KOLOM UTAMA 35 x 35 ELV. +75,32, JMLH 8 BH
BETON KOLOM UTAMA 20 x 35 ELV. +72,08, JMLH 2 BH

BETON RING BALK 20 x 30, ELV. 75,2 (B - 4)

BETON RING BALK 20 x 30, ELV. 75,2 (B - 1)

BETON RING BALK 20 x 30, ELV. 75,2 (B - 3)

BETON RING BALK 20 x 30, ELV. 78,44 (B - 5)

BETON RING BALK 20 x 30, ELV. 78,44 (B - 2)

BETON RING BALK 20 x 30, ELV. 78,44 (B - 3)


BETON RING BALK 20 x 40, ELV. 75,365 (B - 3) TERAS
BETON RING BALK 25 x 50, ELV. 75,365 (B - 2) TERAS

BETON PLAT ATAP ELV. 78,44, TEBAL 15 CM

BETON PLAT KARPORT ELV. 75,365, TEBAL 15 CM (TERAS)

BETON K-175 UNTUK LANTAI DALAM BANG. R. DISTRIBUSI TEBAL 10 CM

PAS. BATU SEKAT BAK RESERVOIR :


- DALAM BAK RESERVOIR TEBAL 1/2 BT, (H = 4,10 M, B = 3 M = 22 bh)

PAS. POND.BATU BELAH 1 : 4 UTK RUANG DISTRIBUSI :


- PANJANG KELILING (7,5 x 2) + 9 - 2,7 = 21,30 M, TINGGI 2,0 M, TEBAL RATA-
RATA = (0,4 +0,8)/2 = 0,60 M

PAS. TALUD DARI PAS BATU KALI 1 : 4 UTK PENAHAN TANAH :


- PANJANG MASUK KE RUMAH POMPA 12,0 M KIRI DAN KANAN 12,0 M,
TOTAL 24,0 M, TINGGI 5,03 M, TANGGA TENGAH 6,0 M, TINGGI 2,5M

KEPALA PIU
KABUPATEN MAARA ENIM

PURYADI, ST
Nik. 4945 0362 005
PERHITUNGAN VOLUME PEKERJAAN REVIEW DESAIN
ARANG ASAM TANJUNG ENIM KAPASITAS 1300 M3

DIMENSI

PANJANG LEBAR TEBAL VOLUME


31.40 13.60 0.10 42.704

31.40 13.60 0.40 170.816


121.40 0.30 0.05 1.821
TOTAL VOLUME 172.637

PANJANG TINGGI TEBAL VOLUME


117.40 4.00 0.30 140.880

0.35 172.00 0.05 3.010


TOTAL VOLUME 143.890

TINGGI Area 35 x 35 JUMLAH VOLUME


4.00 0.12 22.00 10.780

Ukuran 0,30 Ukuran 0,40 JMLH PANJANG VOLUME


0.30 0.40 299.90 35.988

PANJANG LEBAR TEBAL JUMLAH


30.60 12.80 0.15 -
3.00 3.00 0.15 3
11.20 0.15 0.15 3
TOTAL VOLUME

PANJANG LEBAR
183.60 51.20 - -

Volume
TINGGI 0,40 Volume 125 x 30 JUMLAH
35 x 125
0,30 & 0,10 0.47 0.08 8
Ukuran 0,20 Ukuran 0,30 JMLH PANJANG VOLUME
0.20 0.30 16.50 0.990

TINGGI Area 35 x 35 JUMLAH VOLUME


8.49 0.12 8 8.322
2.60 0.12 8 2.548
3.29 0.07 2 0.460
TOTAL VOLUME 11.330

Ukuran 0,20 Ukuran 0,30 JMLH PANJANG VOLUME


0.20 0.30 54.00 3.240
Ukuran 0,30 Ukuran 0,40 JMLH PANJANG VOLUME
0.30 0.25 24.60 1.845
Ukuran 0,20 Ukuran 0,40 JMLH PANJANG VOLUME
0.20 0.25 13.25 0.663
Ukuran 0,12 Ukuran 0,40 JMLH PANJANG VOLUME
0.20 0.25 46.30 2.315
Ukuran 0,25 Ukuran 0,50 JMLH PANJANG VOLUME
0.25 0.35 73.30 6.414
Ukuran 0,20 Ukuran 0,40 JMLH PANJANG VOLUME
0.20 0.25 8.00 0.400
0.20 0.25 4.60 0.230
0.20 0.25 4.20 0.210
TOTAL VOLUME 15.316

PANJANG LEBAR TEBAL VOLUME


12.15 11.00 0.15 20.048
5.40 3.15 0.15 2.552
TOTAL VOLUME 22.599

PANJANG LEBAR TEBAL VOLUME


9.00 7.50 0.10 6.750

PANJANG TINGGI JUMLAH VOLUME


3.00 4.10 22 270.600

PANJ. KELILING TINGGI TBL RT-2 VOLUME


21.30 2.00 0.60 25.560

PANJANG TINGGI TIINGGI VOLUME


30.00 5.03 2.50 64.020

KONSULTAN,
PT. DESERCO DEV. SERVICES

Ir. DIGDO H. SOEBARDJO


TEAM LEADER
KETERANGAN

VOLUME
58.752
4.050
0.756
63.558

234.800

VOLUME
4.424
ATAS = 0,30 M, BAWAH
= 0,80 M SETINGGI =
0,70 M
ATAS = 0,30 M, BAWAH
= 0,80 M SETINGGI =
0,70 M

KONTRAKTOR,

DIREKTUR
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)

BILL OF QUANTYTI (BQ)


PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 1
Harga
Volume Jumlah Harga
No. Uraian Pekerjaan Sat. Satuan (Rp)
(Rp)
I PEKERJAAN PERSIAPAN
1. Pekerjaan Persiapan, mobilisasi/demobilisasi personil dan peralatan Ls 1.00
2. Direksi Keet 4 x 5m ( Kantor Lapangan Sementara) dan gudang lapangan 4 x 4m m² 36.00
3. Request & Shop Drawing (Gambar Kerja), Laporan Proyek, Dokumentasi dan Asbuilt Drawing. Ls 1.00
Pembersihan dengan sikat kawat dan disiram air, pengikatan titik simpul besi dan perapian kembali dari besi lantai, dinding dan
4. Ls 1.00
kolom reservoir
5. Pengamanan Lokasi Proyek dan Jaga malam Bln 6.00
6. Pembuatan Rambu-rambu lalulintas Bh 1.00
7. Pembuatan papan nama proyek Bh 1.00
8. Pembuatan JMF beton dan pengetesan kubus beton Ls 1.00
9. Biaya retribusi daerah untuk perizinan yang berkaitan dengan pelaksanaan proyek (IMB, dll) Ls 1.00
SUB TOTAL I
II. PEKERJAAN TANAH
1 Galian Tanah untuk Sloop Jalan Masuk m³ 23.25
2 Urugan tanah termasuk meratakan dan pemadatan m³ 301.70
3 Buangan tanah sisa urugan keluar lokasi m³ 270.00
SUB TOTAL II
III. PEKERJAAN PASANGAN BATU KALI DAN PENGUATAN LAHAN
1 Susunan Batu Kosong untuk Ruang Operasi Distribusi m3 3.04
2 Pasangan pondasi batu belah 1 : 4. Untuk Ruang Operasi Distribusi m3 25.56
3 Pasangan talud dari pasangan batu kali 1 : 4 untuk penahan tanah m3 55.62
4 Pasangan Batu Muka m² 180.90
SUB TOTAL III
IV. PEKERJAAN BETON
A Pekerjaan Beton untuk Bangunan Reservoir
1 Beton K 125 untuk lantai kerja tebal 10 cm pada rumah perpipaan m³ 8.14
Pekerjaan Beton Struktur dengan mutu beton K-225 tanpa Pembesian untuk masing-masing pekerjaan yang ditentukan pada Gbr
2
Kerja termasuk Pasang dan bongkar Bekisting, untuk :
- Beton Pondasi Lantai =/= 40 cm m³ 172.64
- Beton Kolom utama dengan ukuran 35 x 35 cm m³ 10.78
Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar Kerja Dengan mutu beton
3
K.225. termasuk Pembesian, Pasang dan Bekisting, untuk :
- Beton Dinding =/= 30 cm m³ 84.91
- Beton Ring Balok dengan ukuran 30 x 40 cm m³ 35.99
- Beton Plat atap =/= 15 cm m³ 63.56
- Pekerjaan Water Stop m' 191.40
B Pekerjaan Beton untuk Bangunan Ruang Pengatur Distribusi & R. Kontrol
1 Urugan Pasir Basah dipadatkan untuk lantai Ruang pengatur Distribusi =/= 10 Cm m³ 7.14
Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar Kerja Dengan mutu beton
2
K.225. termasuk Pembesian, Pasang dan Bekisting, untuk :
- Beton Kolom utama dengan ukuran 35 x 35 cm m³ 9.37
- Beton Ring Balok dengan ukuran 30 x 52 cm m³ 15.32
- Beton Plat atap =/= 12 cm m³ 22.60
3 - Beton K.175 untuk Lantai dalam bangunan =/= 10 cm dengan T.Tunggal m³ 6.75
SUB TOTAL IV
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
BILL OF QUANTYTI (BQ)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 3
Harga
Volume Jumlah Harga
No. Uraian Pekerjaan Sat. Satuan (Rp)
(Rp)
V. PEKERJAAN PASANGAN
A Pekerjaan Pasangan untuk Bangunan Reservoir
1 Pasangan Bata Camp. 1 : 2 untuk dinding sekat Pengarah Aliran m² 281.60
2 Pasangan plester untuk dinding sekat dengan tebal 1,5 cm Camp.1 : 2 m² 563.20
3 Plesteran untuk meratakan bagian beton yang kurang rata m² 422.64
4 Pekerjaan acian m² ###
B Pekerjaan Pasangan untuk Bangunan Ruang Pengatur Distribusi & R. Kontrol
1 Pasangan Bata Camp. 1 : 4 untuk dinding m² 192.10
2 Plesteran dinding =/= 1,5 cm, camp 1 : 4 m² 384.20
3 Plesteran untuk meratakan bagian beton yang kurang rata m² 240.13
4 Pemasangan Rooster Keramik ukuran 20x20 cm m² 11.04
5 Pekerjaan acian m² 676.79
SUB TOTAL V
VI. PEKERJAAN KUSEN, PINTU DAN KACA
1 Kuzen pintu utama Tipe I termasuk Daun Pintu ( sesuai dengan Gambar Kerja ) Bh 1.00
2 Kuzen pintu utama Tipe II termasuk Daun Pintu ( sesuai dengan Gambar Kerja ) Bh 1.00
3 Kuzen bouven light Tipe IV ( sesuai dengan Gambar Kerja ) Bh 13.00
SUB TOTAL VI
VII. PEKERJAAN LABURAN / CAT
1 Pekerjaan Cat tembok ( Warna sesuai petunjuk Direksi ) termasuk acian dan plamir m2 676.79
2 Cat kayu/besi, termasuk menie kuzen m2 26.51
3 Cat bitumen untuk atap Reservoir, atap Ruang Kontrol dan Atap Pengatur Distribusi m2 592.34
SUB TOTAL VII
VIII. PEKERJAAN PENERANGAN
1 Lampu TL 1 x 60 titik 5.00
2 Lampu pijar 40 w titik 4.00
3 Sakelar Ganda titik 4.00
4 Penyambungan Daya dari PLN Ls 1.00
SUB TOTAL VIII
IX PEKERJAAN PIPA DAN ACCESSORIES
(Termasuk pengadaan & pemasangan)
1 INLET
- Pipa dengan Flange ganda dia ¢ 12" panjang 200 cm Bh 1.00
- Pipa dengan Flange ganda dia ¢ 12" panjang 140 cm Bh 2.00
- Pipa dengan Flange ganda dia ¢ 12" panjang 130 cm Bh 1.00
- Pipa dinding dengan Flange ganda dia ¢ 12" panjang 80 cm Bh 2.00
- Pipa dengan Flange ganda dia ¢ 12" panjang 60 cm Bh 2.00
- Tee All flange ¢ 12" x ¢ 12" x ¢ 12" Bh 2.00
- Gate valve ¢ 12" 10 K Bh 2.00
- Bend 90º All Flange ¢ 12" Bh 5.00
- Bend 90º dengan Flange tunggal ¢ 12" Bh 2.00
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
BILL OF QUANTYTI (BQ)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 4
Harga
Volume Jumlah Harga
No. Uraian Pekerjaan Sat. Satuan (Rp)
(Rp)
IX PEKERJAAN PIPA DAN ACCESSORIES
(Termasuk pengadaan & pemasangan)
2 PIPA PELUAP
- Pipa dengan Flange ganda dia ¢ 10" panjang 200 cm Bh 2.00
- Pipa dinding dengan Flange ganda dia ¢ 10" panjang 80 cm Bh 2.00
- Pipa dengan Flange ganda dia ¢ 10" panjang 600 cm Bh 4.00
- Bend 90º dengan flange ganda ¢ 10" Bh 2.00
- Bend 90º dengan flange tunggal ¢ 10" Bh 2.00
3 PIPA PENGURAS
- Pipa dinding dengan Flange tunggal ¢ 6" panjang 100 cm Bh 2.00
- Pipa dengan Flange ganda ¢ 6" panjang 600 cm Bh 2.00
- Pipa dengan Flange ganda ¢ 6" panjang 300 cm Bh 2.00
- Bend 90º dengan flange tunggal ¢ 6" Bh 2.00
- Gate valve ¢ 6" 10 K Bh 2.00
4 PIPA OUTLET
- Pipa Steel Penghubung dari Reservoir Ke Pipa Hidder (Pipa Hisap) dengan Flange ganda
diameter ¢ 12" panjang 80 cm Bh 2.00
- Screner ¢ 12" Unit 2.00
- Gate valve ¢ 12" 10 K Bh 2.00
- Tee All flange ¢ 24" x ¢ 24" x ¢ 12" Bh 2.00
- Pipa Steel dengan flange ganda ¢ 24" panjang 400 cm (Untuk pipa Hyder) Bh 1.00
- Flange buta ¢ 24" Bh 2.00
- Tee All flange ¢ 24" x ¢ 24" x ¢ 14" Bh 2.00
- Pipa Steel dengan flange ganda ¢ 14" panjang 40 cm Bh 3.00
- Pipa Steel dengan flange ganda ¢ 14" panjang 100 cm Bh 2.00
- Pipa Steel dengan flange ganda ¢ 14" panjang 350 cm Bh 2.00
- Tee All flange ¢ 14" x ¢ 14" x ¢ 14" Bh 4.00
- Bend 90º All Flange ¢ 14" Bh 8.00
- Gate valve ¢ 14" 10 K Bh 6.00
- Dismantling Join (Dresser Coupling) ¢ 14" Bh 2.00
-
- Watermeter ¢ 14" Bh 2.00
SUB TOTAL IX
X PEKERJAAN LAIN-LAIN
1 Pekerjaan tangga monyet dari stenlis steel ( R. Kontrol ) Bh 8.00
2 Pekerjaan tangga Spiral Tinggi 6,0 m diameter 1500 mm Bh 1.00
3 Pekerjaan Pagar pengaman dari stenlis steel m 10.60
4 Pekerjaan pengetesan dan Desinfeksi LS 1.00
5 Saluran Kabel, Saluran Air termasuk Tutup saluran dari Besi D.10 mm m' 18.00
6 Pekerjaan Saluran Drainase diluar Bangunan dari Pasangan Batu Kali m' 50.00
7 Pekerjaan Pagar Pengaman dari pasangan batu bata pembatas mesjid dengan Reservoir m' 48.00
8 Pekerjaan Pagar Pengaman dari Kawat Duri m' 69.00
9 Pekerjaan Pagar Depan m' 10.00
10 Pekerjaan Pintu Pagar Bh 1.00
11 Pekerjaan pemasangan paving block termasuk Pas. Batu Bata untuk Ikatan m2 91.00
12 Pemeliharaan jalan masuk arah kemesjid dan pengembalian kekondisi semula dengan perbaikan aspal LS 1.00
13 Pemeliharaan halaman mesjid kekondisi semula dengan adukan 1:3:5 dan diaci, t = 5 cm m2 22.20
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
BILL OF QUANTYTI (BQ)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011 HALAMAN 1

Jumlah Harga
No. KETERANGAN (Rp)

TOTAL HALAMAN 2

TOTAL HALAMAN 3

TOTAL HALAMAN 3

SUB TOTAL

PPN 10%

Harga Penawaran dalam angka

Harga Penawaran dalam huruf

Muara Enim, …..….- …….. - 2011

Mengetahui / Menyetujui, Project Implementation Unit (PIU)


Direktur Utama PDAM Lematang Enim Urban Water Supply and Sanitation Project (UWSSP)

H. Mirza Jaya, SE P u r y a d i, ST
NIP. 070 022 930 NIK. 49 450 362 005
PEMERINTAH DAERAH KABUPATEN MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT - IBRD No. 7730 ID
DAFTAR HARGA SATUAN UPAH, BAHAN DAN
DANA APBD PEMDAKAB MUARA ENIM TA. 2011
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

I. DAFTAR UPAH PEKERJA


Kepala tukang Hari 70,000.00
Tukang kayu Hari 65,000.00
Tukang Batu Hari 65,000.00
Tukang Cat Hari 65,000.00
Tukang Listrik Hari 65,000.00
Tukang besi Hari 65,000.00
Tukang Pipa Hari 65,000.00
Tukang Masak Aspal Hari 65,000.00
Tukang Beronjong Hari 65,000.00
Pekerja Tak Terlatih Hari 45,000.00
Pekerja Terlatih Hari 50,000.00
Mandor Hari 50,000.00
Penjaga Malam Hari 45,000.00
Operator Hari 60,000.00
Pembantu Operator Hari 50,000.00
Mekanik Hari 55,000.00
Pembantu Mekanik Hari 45,000.00
Sopir Hari 45,000.00
Kernet Hari 35,000.00
Juru Ukur Hari 250,000.00
Juru Hitung Hari 200,000.00
Juru Gambar Hari 200,000.00

II. B A H A N
A. BATU - BATUAN
1 Batu Kali
a Batu Bulat Utuh M³ 180,000.00
b Batu Belah 15/20 M³ 180,000.00
b Batu Pecah 7/10 M³ 200,000.00
c Batu Pecah 5/7 M³ 220,000.00
d Batu Pecah 3/5 M³ 200,000.00
e Batu Pecah 2/3 M³ 230,000.00
f Batu Pecah 1/2 M³ 240,000.00
g Split Pecah M³ 225,000.00

2 Kerikil
a Kerikil Beton M³ 180,000.00
b Kerikil Timbun (Timbunan Pilihan) M³ 80,000.00
c Sirtu M³ 76,500.00

3 Pasir
a Pasir Pasang M³ 90,000.00
b Pasir beton M³ 90,000.00
c Pasir Urug M³ 65,000.00
d Tanah Timbun M³ 40,000.00

427346257.xls 21
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

III BATU BATA


1. 1 Batu bata Bh 850.00
Paving Block tipe UNI Bh 2,500.00
2. 1 Semen PC ( 50 Kg ) Zak 58,000.00
2 Semen Putih ( 50 Kg ) Zak 85,000.00

IV BAHAN KAYU
1 Kayu Klas I : Papan (Jati) M³ 4,427,500.00
Balok M³ 4,427,500.00
1 Kayu Papan Klas I M³ 3,500,000.00
(Kelas I ) Balok M³ 3,000,000.00
2 Kayu Klas II : Papan M³ 4,175,000.00
Balok M³ 4,175,000.00
3 Kayu Klas III : Papan M³ 2,755,500.00
( Kelas III ) Balok M³ 2,755,500.00
4 Kayu Bekisting : Papan M³ 2,087,000.00
( Kelas IV ) Balok M³ 2,087,000.00
5 Kayu batang kelapa M1 4,000.00
6 Kayu api M³ 250,000.00
7 Kayu Pancang / Dolken / Cerucuk Gelam Btg 10,000.00
8 Bambu dia 6 - 8 cm Btg 10,000.00

V TRIPLEK / PLYWOOD / BAHAN LANGIT-LANGIT


1 Tebal 3 mm Lbr 35,000.00
2 Tebal 4 mm Lbr 55,000.00
3 Tebal 6 mm Lbr 70,000.00
4 Multiplek 9 mm Lbr 110,000.00
5 Lamberzering Btg 20,000.00
6 Eternit Asbes 1 m X 1 m Lbr 28,000.00
8 Gipsum Panel 9 mm ( 1.2m X 2.4m ) Lbr 96,300.00
11 Lies Profil 3x3, 5x400 Btg 15,000.00

VI BAHAN BESI / KAWAT


a. Kawat Berduri Rol 95,000.00
b. Kawat Beton Kg 15,000.00
c. Kawat Nyamuk M2 12,000.00
d. Kawat Beronjong ( Digalvano ) Kg 9,000.00
e. Kawat Harmonika Kg 20,000.00
f Roll door M2 650,000.00

Bahan Besi/Beton
1 Besi Beton Kg 10,000.00
2 Besi Kanal C Kg 9,000.00
3 Besi Siku Kg 9,000.00
4 Besi Strip Kg 12,000.00
5 Pagar BRC panjang = 2,40 Meter tinggi = 1,50 m Lb 275,000.00
6 Plat Alumunium Kg 30,000.00
7 Flexible PVC Waterstop h=250 mm m' 25,000.00
Bahan Paku dan Moer Baut
1 1 1/2 " Kg 20,000.00
2 ( 2 - 5 )" Kg 20,000.00
3 Paku Seng ( 1 1/2 - 1 )" RRC Kg 25,000.00
4 Paku hak panjang 15 cm Kg 48,300.00

427346257.xls 22
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

5 Duk Angker Bh 5,400.00


6 Dyna bolt dia. 10 mm Bh 20,000.00
Alat Penggantung dan Kunci
1 Engsel besi Bh 15,000.00
2 Gembok Bh 30,000.00
3 Klem dan baut pagar Bh 6,000.00
4 Paku kait Bh 15,000.00

VII BAHAN ATAP


- Seng BJLS 0,20 x 3' x 6' bd 9 Lbr 40,000.00
- Atap Asbes Gelombang Lbr 52,000.00
- Genteng keramik Bh 14,200.00
- Nok genteng keramik Bh 20,000.00
- Seng plat Lbr 65,000.00
Atap Seng Warna :
- Genteng Metal ( Polycolor ) 0,30 cm Lbr 33,000.00
- Atap aluminium tbl 0.55 Lbr 65,000.00
- Aluminium Foil Rol 80,000.00
- Ijuk Ikat 7,500.00

VIII BAHAN LANTAI / DINDING


Keramik warna gelap
- ukuran 20 x 20 cm M2 42,250.00
- ukuran 30 x 30 cm M2 48,300.00
- ukuran 40 x 40 cm M2 60,000.00

Keramik warna terang


- ukuran 20 x 20 cm M2 66,300.00
- ukuran 30 x 30 cm M2 67,600.00
- ukuran 40 x 40 cm M2 42,000.00

Keramik Dinding
- ukuran 20 x 25cm M2 55,500.00
- ukuran 20 x 30 cm M2 55,000.00
Keramik 11 x 11 cm M2 40,000.00
- Walpaper M2 520,000.00

Ubin
- Ubin PC abu-abu M2 44,000.00
- Ubin Warna M2 45,000.00
- Karpet M2 150,000.00
- Parquet Jati M2 250,000.00
- Poselin M2 42,250.00
- Rooster Beton 20 x 20 cm Bh 5,520.00

IX BAHAN KACA
Kaca Polos
- Tebal 3 mm M2 77,000.00
- Tebal 5 mm M2 89,700.00
- Tebal 6 mm M2 106,500.00

Raiben
- Tebal 3 mm M2 78,000.00
- Tebal 5 mm M2 126,500.00

427346257.xls 23
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Kaca Es
- Tebal 3 mm M2 78,000.00
- Tebal 5 mm M2 101,500.00

Kaca Naco Polos


- ( 15 X 90 ) cm + rangka Bh 150,000.00

X PENGGANTUNG / PENGUNCI
Kunci Pintu Tanam
- Merk Jangkar 9702 RRC/692 LD Set 51,000.00
- Jangkar 746 Set 39,000.00
- Merk Ciga Brown 5404 Set 74,000.00
- Merk Ciga Brown 5009 Set 107,000.00
- Kunci Mandili 450 Itali Set 144,500.00
- Kunci Antik A/C Itali Set 166,000.00
- Kunci Antik SES Set 130,000.00
- Kunci Sanghai 9702 LD Set 98,000.00
- Grendel Antik 2 Set 23,000.00
- Tarikan Antik Jendela Set 39,000.00
- Engsel Nylon Set 22,000.00
- Engsel Lokal Set 12,000.00
- Kait angin Set 6,500.00
- Pegangan pintu Set 130,000.00

XI BAHAN CAT
- Platone Cat Tembok Kg 15,000.00
- Dulux Cat Tembok Kg 35,000.00
- Rimatek Dempol Tembok Kg 9,500.00
- Platone Cat Besi/cat kayu Kg 35,000.00
- Multi Seal Cat Seng Kg 32,500.00
- Plemer Kayu - wa Kg 17,500.00
- Plamir Tembok Kg 17,500.00
- Meni Kayu - wa Kg 19,500.00
- Meni Besi - wa Kg 19,500.00
- Residu Ltr 6,500.00
- Minyak Cat Ltr 25,000.00
- Aspal Kg 8,500.00
- Teak Oil Ltr 8,000.00
- Cat Dasar TL Kg 11,500.00
- Lem kayu Ltr 6,500.00
- Kuas (ukuran sedang) Bh 7,500.00
- Amplas lbr 2,500.00

XII BAHAN SANITAIR


Urinoir
- Merk KIA Type EX RAPI (1273A010) Bh 178,500.00
- Merk KIA Type DX RAPI (1273A010) Bh 243,000.00
- Merk Toto Bh 450,000.00
- Merk Campion Bh 195,000.00
- Kran air Bh 26,000.00
- Seal tape Bh 13,000.00

427346257.xls 24
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Closed Duduk
- Manual Bh 975,000.00
- Otomatis Bh 2,275,000.00

Closed Jongkok
- Warna Tua Klas D Bh 143,000.00
- Warna Tua Klas A Bh 422,500.00

Closed Jongkok
- Klas C Bh 175,500.00
- Klas B Bh 195,000.00

Bak fiber
- voll 0.3 M3 Bh 260,000.00
- voll 1 M3 Bh 650,000.00

Bak Cuci
- Bak cuci stainles steel Bh 325,000.00
- Waterdrain + aksesoris Set 97,500.00

Wastafel Komplek
- Klas B Bh 590,000.00
- Klas A Bh 615,000.00

XIV BAHAN PIPA


Pipa GI Medium
Standard SNI 07-0039-1987
1 Diameter Nominal 800 mm M' 1,294,700.00
2 Diameter Nominal 700 mm M' 1,128,600.00
3 Diameter Nominal 600 mm M' 965,900.00
4 Diameter Nominal 500 mm M' 704,800.00
5 Diameter Nominal 450 mm M' 544,700.00
6 Diameter Nominal 400 mm M' 483,600.00
7 Diameter Nominal 350 mm M' 422,400.00
8 Diameter Nominal 300 mm M' 395,800.00
9 Diameter Nominal 250 mm M' 352,000.00
10 Diameter Nominal 200 mm M' 318,000.00
11 Diameter Nominal 150 mm M' 241,300.00
12 Diameter Nominal 100 mm M' 124,800.00
13 Diameter Nominal 75 mm M' 85,800.00
14 Diameter Nominal 50 mm M' 46,200.00
15 Diameter Nominal 40 mm M' 39,500.00
16 Diameter Nominal 25 mm M' 27,600.00
17 Diameter Nominal 18 mm M' 13,200.00
18 Diameter Nominal 12 mm M' 14,400.00

Pipa PVC (RRJ)


ISO Standard SNI 06.0084-2002 Class S-8 Bar
1 Diameter Nomina300 M' 628,156.00
2 Diameter Nomina250 M' 413,639.00
3 Diameter Nominal 200 mm M' 226,600.00
4 Diameter Nominal 150 mm M' 146,200.00
5 Diameter Nominal 100 mm M' 68,400.00
6 Diameter Nominal 75 mm M' 46,700.00
7 Diameter Nominal 50 mm M' 32,800.00

427346257.xls 25
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Tee all flange GIP


1 Diameter Nominal 600 x 200 mm Bh 8,071,000.00
2 Diameter Nominal 500 x 200 mm Bh 5,653,000.00
3 Diameter Nominal 450 x 200 mm Bh 4,672,000.00
4 Diameter Nominal 400 x 200 mm Bh 3,836,000.00
5 Diameter Nominal 350 x 200 mm Bh 3,072,000.00
6 Diameter Nominal 300 x 200 mm Bh 2,399,000.00
7 Diameter Nominal 250 x 100 mm Bh 1,636,000.00
8 Diameter Nominal 200 x 200 mm Bh 1,345,000.00
9 Diameter Nominal 200 x 150 mm Bh 1,236,000.00
10 Diameter Nominal 200 x 100 mm Bh 1,145,000.00
11 Diameter Nominal 200 x 75 mm Bh 1,127,000.00
12 Diameter Nominal 200 x 50 mm Bh 1,091,000.00
13 Diameter Nominal 150 x 150 mm Bh 854,000.00
14 Diameter Nominal 150 x 100 mm Bh 763,000.00
15 Diameter Nominal 150 x 75 mm Bh 745,000.00
16 Diameter Nominal 150 x 50 mm Bh 709,000.00
17 Diameter Nominal 100 x 100 mm Bh 473,000.00
18 Diameter Nominal 100 x 75 mm Bh 454,000.00
19 Diameter Nominal 100 x 50 mm Bh 418,000.00

All Flanged Bend 90 degree ( GIP )


1 Diameter Nominal 600 mm Bh 4,868,000.00
2 Diameter Nominal 500 mm Bh 4,128,000.00
3 Diameter Nominal 450 mm Bh 3,274,000.00
4 Diameter Nominal 400 mm Bh 2,576,000.00
5 Diameter Nominal 350 mm Bh 1,950,000.00
6 Diameter Nominal 300 mm Bh 1,438,000.00
7 Diameter Nominal 250 mm Bh 1,039,000.00
8 Diameter Nominal 200 mm Bh 697,000.00
9 Diameter Nominal 150 mm Bh 441,000.00
10 Diameter Nominal 125 mm Bh 327,000.00
11 Diameter Nominal 100 mm Bh 242,000.00
12 Diameter Nominal 75 mm Bh 185,000.00

All Flanged Bend 45, 22, 1/2 ; 11, 1/4 degree ( GIP )
1 Diameter Nominal 600 mm Bh 5,352,000.00
2 Diameter Nominal 500 mm Bh 3,615,000.00
3 Diameter Nominal 450 mm Bh 2,911,000.00
4 Diameter Nominal 400 mm Bh 2,332,000.00
5 Diameter Nominal 350 mm Bh 1,800,000.00
6 Diameter Nominal 300 mm Bh 1,753,000.00
7 Diameter Nominal 250 mm Bh 1,252,000.00
8 Diameter Nominal 200 mm Bh 845,000.00
9 Diameter Nominal 150 mm Bh 532,000.00
10 Diameter Nominal 125 mm Bh 391,000.00
11 Diameter Nominal 100 mm Bh 282,000.00
12 Diameter Nominal 75 mm Bh 219,000.00
13 Diameter Nominal 63 mm Bh 156,000.00
14 Diameter Nominal 50 mm Bh 141,000.00

427346257.xls 26
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Bend Socket / Spigot 90 degree (PVC)


1 Diameter Nominal 250 mm Bh 802,000.00
2 Diameter Nominal 200 mm Bh 525,000.00
3 Diameter Nominal 150 mm Bh 347,000.00
4 Diameter Nominal 125 mm Bh 262,000.00
5 Diameter Nominal 100 mm Bh 177,000.00
6 Diameter Nominal 75 mm Bh 114,000.00
7 Diameter Nominal 63 mm Bh 89,000.00
8 Diameter Nominal 50 mm Bh 63,000.00

Bend Socket / Spigot 45 degree (PVC)


1 Diameter Nominal 250 mm Bh 772,000.00
2 Diameter Nominal 200 mm Bh 505,000.00
3 Diameter Nominal 150 mm Bh 334,120.00
4 Diameter Nominal 125 mm Bh 252,000.00
5 Diameter Nominal 100 mm Bh 171,000.00
6 Diameter Nominal 75 mm Bh 110,000.00
7 Diameter Nominal 63 mm Bh 85,000.00
8 Diameter Nominal 50 mm Bh 61,000.00

Bend Socket / Spigot 22,5 degree (PVC)


1 Diameter Nominal 250 mm Bh 757,000.00
2 Diameter Nominal 200 mm Bh 495,560.00
3 Diameter Nominal 150 mm Bh 328,000.00
4 Diameter Nominal 125 mm Bh 248,000.00
5 Diameter Nominal 100 mm Bh 167,000.00
6 Diameter Nominal 75 mm Bh 108,000.00
7 Diameter Nominal 63 mm Bh 84,000.00
8 Diameter Nominal 50 mm Bh 60,000.00

Bend Socket / Spigot 11,25 degree (PVC)


Diameter Nominal 250 mm Bh 661,400.00
1 Diameter Nominal 200 mm Bh 432,810.00
2 Diameter Nominal 150 mm Bh 286,300.00
3 Diameter Nominal 125 mm Bh 216,200.00
4 Diameter Nominal 100 mm Bh 146,100.00
5 Diameter Nominal 75 mm Bh 94,000.00
6 Diameter Nominal 63 mm Bh 73,100.00
7 Diameter Nominal 50 mm Bh 52,100.00

Flange Socket PVC


1 Diameter Nominal 350 mm Bh 584,000.00
2 Diameter Nominal 300 mm Bh 517,000.00
3 Diameter Nominal 250 mm Bh 430,600.00
4 Diameter Nominal 200 mm Bh 281,800.00
5 Diameter Nominal 150 mm Bh 186,400.00
6 Diameter Nominal 125 mm Bh 140,700.00
7 Diameter Nominal 100 mm Bh 95,100.00
8 Diameter Nominal 75 mm Bh 61,200.00
9 Diameter Nominal 63 mm Bh 47,600.00
10 Diameter Nominal 50 mm Bh 33,900.00

427346257.xls 27
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Giboult joint untuk PVC / Steel


1 Diameter Nominal 200 mm Bh 928,800.00
2 Diameter Nominal 150 mm Bh 550,400.00
3 Diameter Nominal 125 mm Bh 447,200.00
4 Diameter Nominal 100 mm Bh 330,250.00

Flange Ring GIP


1 Diameter Nominal 600 mm Bh 521,000.00
2 Diameter Nominal 500 mm Bh 415,000.00
3 Diameter Nominal 400 mm Bh 345,000.00
4 Diameter Nominal 350 mm Bh 299,000.00
5 Diameter Nominal 300 mm Bh 253,000.00
6 Diameter Nominal 250 mm Bh 182,000.00
7 Diameter Nominal 200 mm Bh 138,000.00
8 Diameter Nominal 150 mm Bh 99,000.00
9 Diameter Nominal 100 mm Bh 76,000.00
10 Diameter Nominal 75 mm Bh 50,000.00

Gate Valve 10 K Iron Gate Valve


1 Diameter Nominal 600 mm Bh 34,550,000.00
2 Diameter Nominal 500 mm Bh 22,981,000.00
3 Diameter Nominal 450 mm Bh 20,677,000.00
4 Diameter Nominal 400 mm Bh 15,914,000.00
5 Diameter Nominal 350 mm Bh 11,412,000.00
6 Diameter Nominal 300 mm Bh 8,009,000.00
1 Diameter Nominal 250 mm Bh 4,816,000.00
1 Diameter Nominal 200 mm Bh 3,350,000.00
2 Diameter Nominal 150 mm Bh 2,251,000.00
4 Diameter Nominal 100 mm Bh 1,099,000.00
5 Diameter Nominal 75 mm Bh 890,000.00

427346257.xls 28
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Butterfly valve PN 10
1 Diameter Nominal 75 mm Bh 763,000.00
2 Diameter Nominal 100 mm Bh 1,123,000.00
3 Diameter Nominal 150 mm Bh 1,684,500.00
4 Diameter Nominal 200 mm Bh 2,246,000.00
5 Diameter Nominal 250 mm Bh 4,211,250.00
6 Diameter Nominal 300 mm Bh 5,053,500.00
7 Diameter Nominal 350 mm Bh 5,895,750.00
8 Diameter Nominal 400 mm Bh 6,738,000.00
9 Diameter Nominal 450 mm Bh 8,422,500.00
10 Diameter Nominal 500 mm Bh 10,107,000.00
11 Diameter Nominal 600 mm Bh 15,722,000.00

Dresser coupling
1 Diameter Nominal 200 mm Bh 599,000.00
2 Diameter Nominal 250 mm Bh 824,000.00
3 Diameter Nominal 300 mm Bh 1,423,000.00
4 Diameter Nominal 350 mm Bh 2,022,000.00
5 Diameter Nominal 400 mm Bh 2,846,000.00
6 Diameter Nominal 450 mm Bh 3,670,000.00
7 Diameter Nominal 500 mm Bh 4,119,000.00
8 Diameter Nominal 600 mm Bh 6,216,000.00
Air Valve
1 Diameter Nominal 100 mm M' 4,500,000.00
2 Diameter Nominal 75 mm M' 3,200,000.00

Rabber Packing
1 Diameter Nominal 300 mm Bh 38,000.00
2 Diameter Nominal 250 mm Bh 35,400.00
3 Diameter Nominal 200 mm Bh 32,500.00
4 Diameter Nominal 150 mm Bh 21,800.00
5 Diameter Nominal 125 mm Bh 15,200.00
6 Diameter Nominal 100 mm Bh 8,200.00
7 Diameter Nominal 75 mm Bh 5,200.00

Reducer PVC
1 Diameter Nominal 250 x 200 mm Bh 510,000.00
2 Diameter Nominal 250 x 100 mm Bh 376,400.00
3 Diameter Nominal 200 x 150 mm Bh 335,200.00
4 Diameter Nominal 200 x 100 mm Bh 269,800.00
5 Diameter Nominal 200 x 75 mm Bh 245,500.00
6 Diameter Nominal 200 x 50 mm Bh 226,000.00
7 Diameter Nominal 150 x 100 mm Bh 201,500.00
8 Diameter Nominal 150 x 75 mm Bh 177,200.00
9 Diameter Nominal 150 x 50 mm Bh 157,700.00
10 Diameter Nominal 100 x 75 mm Bh 111,900.00
11 Diameter Nominal 100 x 50 mm Bh 92,400.00
12 Diameter Nominal 75 x 50 mm Bh 68,100.00

427346257.xls 29
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Reducer all Flange GIP


1 Diameter Nominal 300 x 250 mm Bh 1,993,100.00
2 Diameter Nominal 250 x 200 mm Bh 1,558,300.00
3 Diameter Nominal 250 x 100 mm Bh 1,150,000.00
4 Diameter Nominal 200 x 150 mm Bh 1,024,000.00
5 Diameter Nominal 200 x 100 mm Bh 824,500.00
6 Diameter Nominal 200 x 75 mm Bh 750,200.00
7 Diameter Nominal 200 x 50 mm Bh 690,600.00
8 Diameter Nominal 150 x 100 mm Bh 615,800.00
9 Diameter Nominal 150 x 75 mm Bh 541,500.00
10 Diameter Nominal 150 x 50 mm Bh 481,900.00
11 Diameter Nominal 100 x 75 mm Bh 342,000.00
12 Diameter Nominal 100 x 50 mm Bh 282,300.00

Baut dia. 5/8'' x 3'' Bh 3,250.00


Baut dia. 3/4'' x 3'' Bh 3,000.00
Baut dia. 3/8'' x 3'' Bh 2,750.00

Water Meter
1 Diameter Nominal 12 mm Bh 157,000.00
2 Diameter Nominal 18 mm Bh 209,000.00
3 Diameter Nominal 25 mm Bh 311,000.00
4 Diameter Nominal 40 mm Bh 503,000.00
5 Diameter Nominal 50 mm Bh 2,345,000.00
6 Diameter Nominal 75 mm Bh 3,671,000.00
7 Diameter Nominal 100 mm Bh 4,535,000.00
8 Diameter Nominal 150 mm Bh 9,287,000.00
9 Diameter Nominal 200 mm Bh 13,822,000.00
10 Diameter Nominal 250 mm Bh 19,869,000.00
11 Diameter Nominal 300 mm Bh 33,043,000.00
12 Diameter Nominal 350 mm Bh 47,081,000.00
13 Diameter Nominal 400 mm Bh 65,655,000.00
14 Diameter Nominal 450 mm Bh 85,308,000.00
15 Diameter Nominal 500 mm Bh 94,810,000.00
16 Diameter Nominal 600 mm Bh 142,539,000.00

Pipa PE
PE 100 PN. 8 SDR 21

OD = 450 407.00 ID m 1,797,400.00


OD = 355 324.80 ID m 1,225,800.00
OD = 315 288.00 ID m 965,500.00
OD = 280 256.20 ID m 769,800.00
OD = 250 228.60 ID m 609,000.00
OD = 225 205.80 ID m 498,300.00
OD = 200 182.80 ID m 394,900.00
OD = 180 164.60 ID m 318,700.00

Flange long Spigot dengan Coupler ( Butt fusion Sistems )


1 Diameter Nominal 450 mm Bh 15,797,000.00
2 Diameter Nominal 250 mm Bh 3,762,000.00
3 Diameter Nominal 200 mm Bh 2,973,500.00
4 Diameter Nominal 180 mm Bh 1,339,500.00

XV SEWA PERALATAN
Sewa mesin Las Hk 150,000.00

427346257.xls 30
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.

Harga Genset 7.5 KVA Buah 150,000,000.00


Harga Pompa 3 PK Buah 15,000,000.00
Harga Butt Welding Machine Buah 100,000,000.00
Sewa Alat Ukur Theodolite Tenol Hk 250,000.00
Sewa Alat meter Ukur @ 50 meter Hk 50,000.00
Sewa Komputer Hk 100,000.00
Sewa Printer Hk 100,000.00
Sewa Damtruk Hk 450,000.00
Sewa Mesin Gilas Bulan 4,500,000.00
Sewa mesin las Hk 150,000.00
Sewa Jack Hammer Bulan 5,400,000.00
Sewa mesin lbor Hk 200,000.00

XVI BAHAN TAMBAHAN


Bensin Liter 4,500.00
Solar Liter 4,500.00
Oli SAE 100 Liter 25,000.00
Minyak Gardan Liter 20,000.00
Gemuk Liter 15,000.00
Minyak bekisting Liter 8,000.00
Air m3 1,500.00
Chlorin Kg 11,000.00

Catatan : Khusus material galian golongan C sudah termasuk retribusi


: Belum termasuk PPn

427346257.xls 31
PEMERINTAH DAERAH KABUPATEN MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP) - IBRD No. 7730 ID
ANALISA HARGA SATUAN
DANA APBD PEMDAKAB MUARA ENIM TA. 2011

KELOMPOK I (SNI 03-2835-2002 )

I 1. Analisa Pembersihan lapangan /M2


UPAH :
0.1000 Hk Pekerja Rp. 45,000.00 Rp. 4,500.00
0.0500 Hk Mandor Rp. 50,000.00 Rp. 2,500.00 Rp. 7,000.00
Jumlah Rp. 7,000.00

Dibulatkan Rp. 7,000.00


4 Analisa Pasangan Bowplank tiap-tiap 1 M'
UPAH :
0.1000 Hk Tukang kayu Rp. 65,000.00 Rp. 6,500.00
0.0100 Hk Kepala Tukang Rp. 70,000.00 Rp. 700.00
0.1000 Hk Pekerja Rp. 45,000.00 Rp. 4,500.00
0.0050 Hk Mandor Rp. 50,000.00 Rp. 250.00 Rp. 11,950.00
BAHAN :
0.0070 M3 Kayu Papan 3/20 Rp. 2,087,000.00 Rp. 14,609.00
0.0120 M' kayu 5/7 Rp. 2,087,000.00 Rp. 25,044.00
0.0200 Kg Paku biasa 2"-5" Rp. 20,000.00 Rp. 400.00 Rp. 40,053.00
Jumlah Rp. 52,003.00

Dibulatkan Rp. 52,003.00


I 6 analisa pembuatan Direksi Keet (Kantor Lapangan Sementara) /M2
UPAH :
2.0000 Hk Tukang kayu Rp. 65,000.00 Rp. 130,000.00
1.0000 Hk Tukang kayu Rp. 65,000.00 Rp. 65,000.00
2.0000 Hk Pekerja Rp. 45,000.00 Rp. 90,000.00
0.3000 Hk Kepala tukang Rp. 70,000.00 Rp. 21,000.00
0.0500 Hk Mandor Rp. 50,000.00 Rp. 2,500.00 Rp. 308,500.00
BAHAN :
1.2500 Btg Kayu pancang/Dolken Rp. 10,000.00 Rp. 12,500.00
0.1800 M3 Kayu Rp. 4,175,000.00 Rp. 751,500.00
0.8500 Kg Paku biasa Rp. 20,000.00 Rp. 17,000.00
1.1000 Kg Besi Strip Rp. 20,000.00 Rp. 22,000.00
35.0000 Kg Semen Pc (50 Kg) Rp. 1,160.00 Rp. 40,600.00
0.1000 M3 Pasir beton Rp. 90,000.00 Rp. 9,000.00
0.1500 M3 Koral beton Rp. 180,000.00 Rp. 27,000.00
30.0000 bh Bata Merah Rp. 850.00 Rp. 25,500.00
2.0000 bh Kaca Nako Rp. 20,000.00 Rp. 40,000.00
0.0800 bh Kaca polos Rp. 77,000.00 Rp. 6,160.00
0.0600 lbr Plywood 4mm Rp. 55,000.00 Rp. 3,300.00
0.2500 Lbr Seng BJLS 0,20 x 3' x 6' bd 9 Rp. 40,000.00 Rp. 10,000.00
0.1500 bh Kunci tanam Rp. 51,000.00 7,650.00
0.1500 m3 Pasir pasang Rp. 90,000.00 13,500.00 Rp. 985,710.00
Jumlah Rp. 1,294,210.00

Dibulatkan Rp. 1,294,000.00


I 8 analisa Bongkaran beton bertulang/M3
UPAH :
6.6670 Hk Pekerja Rp. 45,000.00 Rp. 300,015.00
0.3330 Hk Mandor Rp. 50,000.00 Rp. 16,650.00 Rp. 316,665.00
Jumlah Rp. 316,665.00

Dibulatkan Rp. 316,700.00


I 10 Analisa Galian Tanah Biasa dalam 1 meter / M3
UPAH :
0.4000 Hk Pekerja Rp. 45,000.00 Rp. 18,000.00
0.0400 Hk Mandor Rp. 50,000.00 Rp. 2,000.00 Rp. 20,000.00
Jumlah Rp. 20,000.00

Dibulatkan Rp. 20,000.00

Analisa Karang Asam Tj. Enim 2011


( 32 )
I 11 Analisa Galian Tanah Biasa dalam 2 meter / M3
UPAH :
0.5260 Hk Pekerja Rp. 45,000.00 Rp. 23,670.00
0.0520 Hk Mandor Rp. 50,000.00 Rp. 2,600.00 Rp. 26,270.00
Jumlah Rp. 26,270.00

Dibulatkan Rp. 26,270.00


I 12 Analisa Galian Tanah Biasa dalam 3 meter/ M3
UPAH :
0.7350 Hk Pekerja Rp. 45,000.00 Rp. 33,075.00
0.0730 Hk Mandor Rp. 50,000.00 Rp. 3,650.00 Rp. 36,725.00
Jumlah Rp. 36,725.00

Dibulatkan Rp. 36,725.00


I 16 Analisa Urugan kembali/M3
UPAH :
0.1920 Hk Pekerja Rp. 45,000.00 Rp. 8,640.00
0.0190 Hk Mandor Rp. 50,000.00 Rp. 950.00 Rp. 9,590.00
Jumlah Rp. 9,590.00

Dibulatkan Rp. 9,590.00


I 17 Analisa pemadatan tanah/M3
UPAH :
0.5000 Hk Pekerja Rp. 45,000.00 Rp. 22,500.00
0.0500 Hk Mandor Rp. 50,000.00 Rp. 2,500.00 Rp. 25,000.00
Jumlah Rp. 25,000.00

Dibulatkan Rp. 25,000.00


I 18 Analisa Angkutan Tanah Jarak 30 meter tanah/M3
UPAH :
0.5160 Hk Pekerja Rp. 45,000.00 Rp. 23,220.00
0.0516 Hk Mandor Rp. 50,000.00 Rp. 2,580.00 Rp. 25,800.00
Jumlah Rp. 25,800.00

Dibulatkan Rp. 25,800.00


I 19 Analisa Angkutan Pembuangan tanah / Barangkal / m3
UPAH :
30 Hari Sopir Rp. 45,000.00 Rp. 1,350,000.00
30 Hari Kernet Rp. 35,000.00 Rp. 1,050,000.00
120 Hari Pekerja Rp. 45,000.00 Rp. 5,400,000.00
30 Hari Mandor Rp. 50,000.00 Rp. 1,500,000.00 Rp. 9,300,000.00
ALAT BANTU :
270 Liter Solar Rp. 4,500.00 Rp. 1,215,000.00
14 Liter Oli Rp. 25,000.00 Rp. 337,500.00
5 Liter Minyak Gardan Rp. 20,000.00 Rp. 100,000.00
5 Liter Gemuk Rp. 15,000.00 Rp. 75,000.00
1 Bulan Sewa Dump Truck 5 - 6 m3 Rp. 11,250,000.00 Rp. 11,250,000.00 Rp. 12,977,500.00
Jumlah Rp. 12,977,500.00
450 Dengan jarak angkut 20 - 30 Km dalam 1 bulan dapat membuang
1 Biaya pembuangan Dibulatkan Rp. 12,977,500.00
1 Biaya pembuangan Rp. 28,839.00
I 20 Analisa urugan pasir/M3
UPAH :
0.3000 Hk Pekerja Rp. 45,000.00 Rp. 13,500.00
0.0100 Hk mandor Rp. 50,000.00 Rp. 500.00 Rp. 14,000.00
BAHAN :
1.2000 M3 Pasir urug Rp. 65,000.00 Rp. 78,000.00 Rp. 78,000.00
Jumlah Rp. 92,000.00

Dibulatkan Rp. 92,000.00

Analisa Karang Asam Tj. Enim 2011


( 33 )
I 21 Analisa Pagar pengaman dari Seng/M2
UPAH :
0.600 Hk Tukang kayu Rp. 65,000.00 Rp. 39,000.00
0.300 Hk Pekerja Rp. 45,000.00 Rp. 13,500.00
0.090 Hk Kepala tukang Rp. 70,000.00 Rp. 6,300.00
0.050 Hk Mandor Rp. 50,000.00 Rp. 2,475.00 Rp. 61,275.00
BAHAN :
0.80 Lbr Seng Gelombang BJLS 0,20 (tegak) Rp. 40,000.00 Rp. 32,000.00
0.01 M3 Kayu Kls IV Rp. 2,087,000.00 Rp. 12,522.00
0.70 Kg Paku biasa Rp. 20,000.00 Rp. 14,000.00 Rp. 58,522.00
Jumlah Rp. 119,797.00

Dibulatkan Rp. 119,797.00


KELOMPOK II ( SNI 03-2836-2002 )

II 4 Analisa pas.Pondasi batu kali, 1 Pc ; 4 Ps/M3


UPAH :
1.5000 Hk Pekerja Rp. 45,000.00 Rp. 67,500.00
0.6000 Hk Tukang batu Rp. 65,000.00 Rp. 39,000.00
0.0600 Hk kepala tukang Rp. 70,000.00 Rp. 4,200.00
0.0750 Hk mandor Rp. 50,000.00 Rp. 3,750.00 Rp. 114,450.00
BAHAN :
1.1000 M3 Batu belah 15/20 Rp. 180,000.00 Rp. 198,000.00
163.0000 Kg Semen Pc ( 50 Kg) Rp. 1,160.00 Rp. 189,080.00
0.5200 M3 Pasir Pasang Rp. 90,000.00 Rp. 46,800.00 Rp. 433,880.00
Jumlah Rp. 548,330.00

Dibulatkan Rp. 548,330.00


II 5 Analisa pas.Pondasi Batu Kosong/ astampang batu kali/M3
UPAH :
0.7800 Hk Pekerja Rp. 45,000.00 Rp. 35,100.00
0.3900 Hk Tukang batu Rp. 65,000.00 Rp. 25,350.00
0.0390 Hk kepala tukang Rp. 70,000.00 Rp. 2,730.00
0.0390 Hk mandor Rp. 50,000.00 Rp. 1,950.00 Rp. 65,130.00
BAHAN :
1.2000 M3 Batu belah 15/20 Rp. 180,000.00 Rp. 216,000.00
0.3000 M3 Pasir Urug Rp. 65,000.00 Rp. 19,500.00 Rp. 235,500.00
Jumlah Rp. 300,630.00

Dibulatkan Rp. 300,630.00


II 6 Analisa pas.Pondasi Batu Bronjong batu belah/M3
UPAH :
0.7800 Hk Pekerja Rp. 45,000.00 Rp. 35,100.00
0.3900 Hk Tukang batu ` Rp. 65,000.00 Rp. 25,350.00
0.0390 Hk kepala tukang Rp. 70,000.00 Rp. 2,730.00
0.0390 Hk mandor Rp. 50,000.00 Rp. 1,950.00 Rp. 65,130.00
BAHAN :
1.2000 M3 Batu belah 15/20 Rp. 180,000.00 Rp. 216,000.00
2.0000 Kg kawat ikat bronjong Rp. 9,000.00 Rp. 18,000.00
20.0000 Kg Kawat Beronjong (Digalvano) Rp. 9,000.00 Rp. 180,000.00 Rp. 414,000.00
Jumlah Rp. 479,130.00
Dibulatkan Rp. 479,130.00
II 7 Analisa pas.Paving Block/m2
UPAH :
0.3300 Hk Pekerja Rp. 45,000.00 Rp. 14,850.00
0.0330 Hk Tukang batu ` Rp. 65,000.00 Rp. 2,145.00
0.0363 Hk kepala tukang Rp. 70,000.00 Rp. 2,541.00
0.0200 Hk mandor Rp. 50,000.00 Rp. 998.25 Rp. 20,534.25
BAHAN :
0.1000 M3 Pasir Urug Rp. 65,000.00 Rp. 6,500.00
0.0400 M3 Pasangan Batu pengikat Rp. 548,330.00 Rp. 21,933.20
41.0000 Buah Paving Block tipe UNI Rp. 2,500.00 Rp. 102,500.00 Rp. 130,933.20
Jumlah Rp. 151,467.45

Dibulatkan Rp. 151,467.00

Analisa Karang Asam Tj. Enim 2011


( 34 )
II 10 Satuan Pekerjaan : 1 M' Saluran pembuang dari pas. Batu belah 1 : 4, 50 x 80 cm
MATERIAL :
1.2000 m3 Galian tanah Rp. 20,000.00 Rp. 24,000.00
0.2400 m3 Urugan tanah Rp. 9,590.00 Rp. 2,301.60
0.9600 m3 Buangan tanah Rp. 25,800.00 Rp. 24,768.00
0.4700 m3 Pasangan batu belah 1 : 4 Rp. 548,330.00 Rp. 257,715.10
2.1000 m2 Plesteran 1 : 4 dalam + topi Rp. 29,132.00 Rp. 61,177.20 Rp. 369,961.90
Jumlah Rp. 369,961.90

Dibulatkan Rp. 369,962.00


II 11 Satuan Pekerjaan : 1 M' Saluran Drainase dari pas. Beton, 60 x Dlm 80 cm
MATERIAL :
0.8100 m3 Galian tanah Rp. 20,000.00 Rp. 16,200.00
0.0900 m3 Urugan pasir Rp. 92,000.00 Rp. 8,280.00
0.8100 m3 Pembuangan sisa galian Rp. 25,800.00 Rp. 20,898.00
0.5220 m3 Pekerjaan Beton K. 125 Rp. 616,210.00 Rp. 321,661.62
62.6400 Kg Pekerjaan Pembesian Rp. 11,598.50 Rp. 726,530.04
1.0560 m2 Bekisting Rp. 170,645.50 Rp. 180,201.65 Rp. 1,273,771.31
Jumlah Rp. 1,273,771.31

Dibulatkan Rp. 1,273,771.00


II 12 Satuan Pekerjaan : 1 M' Saluran Air/Drainase dari pas. Beton, 30 x Dlm 40 cm
MATERIAL :
0.0750 m3 Galian tanah Rp. 20,000.00 Rp. 1,500.00
0.0500 m3 Urugan pasir Rp. 92,000.00 Rp. 4,600.00
0.0750 m3 Pembuangan sisa galian Rp. 25,800.00 Rp. 1,935.00
0.0480 m3 Pekerjaan Beton K. 125 Rp. 616,210.00 Rp. 29,578.08
2.0000 Kg Pekerjaan Pembesian Rp. 11,598.50 Rp. 23,197.00
0.2500 m2 Bekisting Rp. 170,645.50 Rp. 42,661.38
5.2700 Kg Besi Tutup saluran D.10 mm Rp. 11,598.50 Rp. 61,124.10
10.8400 Kg Besi L.60.60.6 Rp. 13,932.81 Rp. 151,031.63
150.0 cm2 Biaya Pengelasan Rp. 1,953.73 Rp. 293,059.84 Rp. 608,687.02
Jumlah Rp. 608,687.02

Dibulatkan Rp. 608,687.00


II 13 Satuan Pekerjaan : 1 m' Pekerjan pembuatan Keermeer penahan tanah
MATERIAL :
2.0000 m3 Galian tanah Rp. 20,000.00 Rp. 40,000.00
0.5000 m3 Urugan tanah Rp. 9,590.00 Rp. 4,795.00
1.5000 m3 Buangan tanah Rp. 25,800.00 Rp. 38,700.00
1.2500 m3 Pasangan batu belah 1 : 4 Rp. 548,330.00 Rp. 685,412.50
1.0000 m Sulingan dari pipa PVC 1 1/2 " Rp. 32,800.00 Rp. 32,800.00
0.5000 m2 Plesteran 1 : 4 dalam + topi Rp. 29,132.00 Rp. 14,566.00
1.0000 Ls Perapihan Rp. 20,000.00 Rp. 20,000.00 Rp. 836,273.50
Jumlah Rp. 836,273.50

Dibulatkan Rp. 836,274.00


KELOMPOK III ( SNI 03-2837-2002 )

III 1 Analisa pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps/M2


UPAH :
0.3200 Hk Pekerja Rp. 50,000.00 Rp. 16,000.00
0.1000 Hk Tukang batu Rp. 65,000.00 Rp. 6,500.00
0.0100 Hk kepala tukang Rp. 70,000.00 Rp. 700.00
0.0150 Hk mandor Rp. 50,000.00 Rp. 750.00 Rp. 23,950.00
BAHAN :
70.0000 Bh Bata merah 5x11x22cm Rp. 850.00 Rp. 59,500.00
18.9500 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 21,982.00
0.0380 M3 Pasir pasang Rp. 90,000.00 Rp. 3,420.00 Rp. 84,902.00
Jumlah Rp. 108,852.00

Dibulatkan Rp. 108,852.00

Analisa Karang Asam Tj. Enim 2011


( 35 )
III 2 Analisa pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps/M2
UPAH :
0.3200 Hk Pekerja Rp. 50,000.00 Rp. 16,000.00
0.1000 Hk Tukang batu Rp. 65,000.00 Rp. 6,500.00
0.0100 Hk kepala tukang Rp. 70,000.00 Rp. 700.00
0.0150 Hk mandor Rp. 50,000.00 Rp. 750.00 Rp. 23,950.00
BAHAN :
70.0000 Bh Bata merah 5x11x22cm Rp. 850.00 Rp. 59,500.00
11.5000 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 13,340.00
0.0430 M3 Pasir pasang Rp. 90,000.00 Rp. 3,870.00 Rp. 76,710.00
Jumlah Rp. 100,660.00

Dibulatkan Rp. 100,660.00


III 3 Analisa plesteran 1 Pc " 2 Ps, tebal 15 mm/M2
UPAH :
0.2000 Hk Pekerja Rp. 50,000.00 Rp. 10,000.00
0.1500 Hk Tukang batu Rp. 65,000.00 Rp. 9,750.00
0.0150 Hk kepala tukang Rp. 70,000.00 Rp. 1,050.00
0.0100 Hk mandor Rp. 50,000.00 Rp. 500.00 Rp. 21,300.00
BAHAN :
8.5200 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 9,883.20
0.0170 M3 Pasir pasang Rp. 90,000.00 Rp. 1,530.00 Rp. 11,413.20
Jumlah Rp. 32,713.20

Dibulatkan Rp. 32,713.00


III 4 Analisa plesteran 1 Pc " 4 Ps, tebal 15 mm/M2
UPAH :
0.2000 Hk Pekerja Rp. 50,000.00 Rp. 10,000.00
0.1500 Hk Tukang batu Rp. 65,000.00 Rp. 9,750.00
0.0150 Hk kepala tukang Rp. 70,000.00 Rp. 1,050.00
0.0100 Hk mandor Rp. 50,000.00 Rp. 500.00 Rp. 21,300.00
BAHAN :
5.2000 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 6,032.00
0.0200 M3 Pasir pasang Rp. 90,000.00 Rp. 1,800.00 Rp. 7,832.00
Jumlah Rp. 29,132.00

Dibulatkan Rp. 29,132.00


III 6 Analisa Water Proofing Dalam/Udara/M2
UPAH :
0.2500 Hk Pekerja Rp. 50,000.00 Rp. 12,500.00
0.1200 Hk Tukang batu Rp. 65,000.00 Rp. 7,800.00
0.0120 Hk kepala tukang Rp. 70,000.00 Rp. 840.00
0.0015 Hk mandor Rp. 50,000.00 Rp. 75.00 Rp. 21,215.00
BAHAN :
2.4000 Kg Bahan Water Proofing Luar Rp. 2,125.00 Rp. 5,100.00
2.5000 Kg Bahan Pelapis Rp. 8,500.00 Rp. 21,250.00 Rp. 26,350.00
Jumlah Rp. 47,565.00

Dibulatkan Rp. 47,565.00


III 7 Analisa Acian/M2
UPAH :
0.1500 Hk Pekerja Rp. 50,000.00 Rp. 7,500.00
0.0100 Hk Tukang batu Rp. 65,000.00 Rp. 650.00
0.0080 Hk kepala tukang Rp. 70,000.00 Rp. 560.00
0.0080 Hk mandor Rp. 50,000.00 Rp. 400.00 Rp. 9,110.00
BAHAN :
3.2500 Kg Semen Rp. 1,160.00 Rp. 3,770.00 Rp. 3,770.00
Jumlah Rp. 12,880.00

Dibulatkan Rp. 12,880.00

Analisa Karang Asam Tj. Enim 2011


( 36 )
KELOMPOK IV ( SNI 03-3434-2002 )
IV 6 Analisa pasang konstruksi kuda-kuda kayu borneo/M3
UPAH :
4.0000 Hk Pekerja Rp. 50,000.00 Rp. 200,000.00
12.0000 Hk Tukang kayu Rp. 65,000.00 Rp. 780,000.00
1.2000 Hk kepala tukang Rp. 70,000.00 Rp. 84,000.00
0.2000 Hk mandor Rp. 50,000.00 Rp. 10,000.00 Rp. 1,074,000.00
BAHAN :
1.1000 M3 Kayu bornio balok Rp. 3,000,000.00 Rp. 3,300,000.00
0.8000 Kg paku biasa 2" - 5" Rp. 20,000.00 Rp. 16,000.00
15.0000 Kg Besi strip Rp. 12,000.00 Rp. 180,000.00 Rp. 3,496,000.00
Jumlah Rp. 4,570,000.00
`
Dibulatkan Rp. 4,570,000.00
IV 11 Analisa pasang lisplang ukuran 3x20 cm, kayu surian/M'
UPAH :
0.1000 Hk Pekerja Rp. 50,000.00 Rp. 5,000.00
0.2000 Hk Tukang kayu Rp. 65,000.00 Rp. 13,000.00
0.0250 Hk kepala tukang Rp. 70,000.00 Rp. 1,750.00
0.0050 Hk mandor Rp. 50,000.00 Rp. 250.00 Rp. 20,000.00
BAHAN :
0.0072 M3 Kayu surian,papan Rp. 4,427,500.00 Rp. 31,878.00
0.0500 Kg paku biasa 2" - 5" Rp. 20,000.00 Rp. 1,000.00 Rp. 32,878.00
Jumlah Rp. 52,878.00

Dibulatkan Rp. 52,878.00


KELOMPOK V ( MERUJUK PADA SNI 03-2445-1991, SNI 03-2495-1991 )
V 1 Analisa pembesian dengan besi polos atau besi ulir/Kg
UPAH :
0.0070 Hk Pekerja Rp. 50,000.00 Rp. 350.00
0.0070 Hk Tukang besi Rp. 65,000.00 Rp. 455.00
0.0007 Hk kepala tukang Rp. 70,000.00 Rp. 49.00
0.0003 Hk mandor Rp. 65,000.00 Rp. 19.50 Rp. 873.50
BAHAN :
1.0500 Kg Besi beton Rp. 10,000.00 Rp. 10,500.00
0.0150 Kg Kawat beton Rp. 15,000.00 Rp. 225.00 Rp. 10,725.00
Jumlah Rp. 11,598.50

Dibulatkan Rp. 11,599.00


V 2 Mengerjakan Baja WF/INP/CNP
UPAH :
0.0230 Hk Pekerja Rp. 50,000.00 Rp. 1,150.00
0.0132 Hk Tukang besi Rp. 65,000.00 Rp. 858.00
0.0132 Hk Tukang las Rp. 65,000.00 Rp. 858.00
0.0007 Hk mandor Rp. 65,000.00 Rp. 45.50 Rp. 2,911.50
BAHAN :
1.0100 Kg Besi Profil Rp. 9,000.00 Rp. 9,090.00
0.0171 Kg Kawat Las Harmonika Rp. 20,000.00 Rp. 342.00 Rp. 9,432.00
ALAT BANTU :
0.0007 Hk Sewa mesin las Rp. 392,743.00 Rp. 274.92 Rp. 274.92
Jumlah Rp. 12,618.42

Dibulatkan Rp. 12,618.00


V 3 Mengerjakan Baja L/Siku
UPAH :
0.0230 Hk Pekerja Rp. 50,000.00 Rp. 1,150.00
0.0132 Hk Tukang besi Rp. 65,000.00 Rp. 858.00
0.0132 Hk Tukang las Rp. 65,000.00 Rp. 858.00
0.0007 Hk mandor Rp. 65,000.00 Rp. 45.50 Rp. 2,911.50
BAHAN :
1.0340 Kg Besi Siku Rp. 9,000.00 Rp. 9,306.39
0.0150 Kg Plat Penyambung Rp. 12,000.00 Rp. 180.00
0.0630 Kg Kawat Las Harmonika Rp. 20,000.00 Rp. 1,260.00 Rp. 10,746.39
ALAT BANTU :
0.0007 Hk Sewa mesin las Rp. 392,743.00 Rp. 274.92 Rp. 274.92
Jumlah Rp. 13,932.81

Dibulatkan Rp. 13,933.00

Analisa Karang Asam Tj. Enim 2011


( 37 )
V 4 Analisa pasang bekisting untuk pondasi dan sloof/M2
UPAH :
0.3000 Hk Pekerja Rp. 50,000.00 Rp. 15,000.00
0.2600 Hk Tukang kayu Rp. 65,000.00 Rp. 16,900.00
0.0260 Hk kepala tukang Rp. 70,000.00 Rp. 1,820.00
0.0050 Hk mandor Rp. 65,000.00 Rp. 325.00 Rp. 34,045.00
BAHAN :
0.0450 M3 Kayu bekisting/klas IV Rp. 2,087,000.00 Rp. 93,915.00
0.3000 Kg Paku biasa 2"-5" Rp. 20,000.00 Rp. 6,000.00
0.1000 Lt Minyak bekisting Rp. 8,000.00 Rp. 800.00 Rp. 100,715.00
Jumlah Rp. 134,760.00

Dibulatkan Rp. 134,760.00


V 5 Analisa pasang bekisting untuk Kolom.M2
UPAH :
0.6600 Hk Pekerja Rp. 50,000.00 Rp. 33,000.00
0.3300 Hk Tukang kayu Rp. 65,000.00 Rp. 21,450.00
0.0300 Hk kepala tukang Rp. 70,000.00 Rp. 2,100.00
0.0060 Hk mandor Rp. 65,000.00 Rp. 390.00 Rp. 56,940.00
BAHAN :
0.0200 M3 Kayu bekisting/klas IV Rp. 2,087,000.00 Rp. 41,740.00
0.4000 Kg Paku biasa 2"-5" Rp. 20,000.00 Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 8,000.00 Rp. 1,600.00
0.0150 M3 Balok kayu bekisting/Klas IV Rp. 2,087,000.00 Rp. 31,305.00
0.4167 Lb Multiplek 9 mm Rp. 110,000.00 Rp. 45,833.33
2.0000 Btg Dolken kayu Rp. 10,000.00 Rp. 20,000.00 Rp. 148,478.33
Jumlah Rp. 205,418.33

Dibulatkan Rp. 205,418.00


V 6 Analisa pasang bekisting untuk Balok/M2
UPAH :
0.6600 Hk Pekerja Rp. 50,000.00 Rp. 33,000.00
0.3300 Hk Tukang kayu Rp. 65,000.00 Rp. 21,450.00
0.0330 Hk kepala tukang Rp. 70,000.00 Rp. 2,310.00
0.0330 Hk mandor Rp. 65,000.00 Rp. 2,145.00 Rp. 58,905.00
BAHAN :
0.0400 M3 Kayu bekisting/klas IV Rp. 2,087,000.00 Rp. 83,480.00
0.4000 Kg Paku biasa 2"-5" Rp. 20,000.00 Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 8,000.00 Rp. 1,600.00
0.0180 M3 Balok kayu bekisting/Klas IV Rp. 2,087,000.00 Rp. 37,566.00
0.3500 lbr Multiplek 9 mm Rp. 110,000.00 Rp. 38,500.00
8.0000 Btg Dolken kayu Rp. 10,000.00 Rp. 80,000.00 Rp. 249,146.00
Jumlah Rp. 308,051.00

Dibulatkan Rp. 308,051.00


V 7 Analisa pasang bekisting untuk dinding/M2
UPAH :
0.3200 Hk Pekerja Rp. 50,000.00 Rp. 16,000.00
0.3300 Hk Tukang kayu Rp. 65,000.00 Rp. 21,450.00
0.0330 Hk kepala tukang Rp. 70,000.00 Rp. 2,310.00
0.0060 Hk mandor Rp. 65,000.00 Rp. 390.00 Rp. 40,150.00
BAHAN :
0.0450 M3 Kayu bekisting/klas IV Rp. 2,087,000.00 Rp. 93,915.00
0.4000 Kg Paku biasa 2"-5" Rp. 20,000.00 Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 8,000.00 Rp. 1,600.00
0.0015 M3 Balok kayu bekisting/Klas IV Rp. 2,087,000.00 Rp. 3,130.50
0.0350 lbr Multiplek 9 mm Rp. 110,000.00 Rp. 3,850.00
2.0000 Btg Dolken kayu Rp. 10,000.00 Rp. 20,000.00 Rp. 130,495.50
Jumlah Rp. 170,645.50

Dibulatkan Rp. 170,646.00

Analisa Karang Asam Tj. Enim 2011


( 38 )
V 8 Analisa pasang Bekisting Lantai/Atap/M2
UPAH :
0.6600 Hk Pekerja Rp. 50,000.00 Rp. 33,000.00
0.3330 Hk Tukang kayu Rp. 65,000.00 Rp. 21,645.00
0.0333 Hk kepala tukang Rp. 70,000.00 Rp. 2,331.00
0.0333 Hk mandor Rp. 65,000.00 Rp. 2,164.50 Rp. 59,140.50
BAHAN :
0.0400 M3 Kayu bekisting/klas IV Rp. 2,087,000.00 Rp. 83,480.00
0.4000 Kg Paku Campur Rp. 20,000.00 Rp. 8,000.00
0.2000 Ltr Minyak bekisting Rp. 8,000.00 Rp. 1,600.00
0.3500 Lb Multiplek 9 mm Rp. 110,000.00 Rp. 38,500.00
8.0000 Btg Dolken kayu Rp. 10,000.00 Rp. 80,000.00 Rp. 211,580.00
Jumlah Rp. 270,720.50

Dibulatkan Rp. 270,721.00


V 10 Analisa membuat beton tumbuk ,1 Pc : 3 Ps : 5 Kr/M3
UPAH :
1.6500 Hk Pekerja Rp. 50,000.00 Rp. 82,500.00
0.2750 Hk Tukang batu Rp. 65,000.00 Rp. 17,875.00
0.0280 Hk kepala tukang Rp. 70,000.00 Rp. 1,960.00
0.0830 Hk mandor Rp. 65,000.00 Rp. 5,395.00 Rp. 107,730.00
BAHAN :
218.0000 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 252,880.00
0.5200 M3 Pasir beton Rp. 90,000.00 Rp. 46,800.00
0.8700 M3 Koral beton Rp. 240,000.00 Rp. 208,800.00 Rp. 508,480.00
Jumlah Rp. 616,210.00

Dibulatkan Rp. 616,210.00


V 11 Analisa membuat beton dengan mutu K 175/M3
UPAH :
1.6500 Hk Pekerja Rp. 50,000.00 Rp. 82,500.00
0.2750 Hk Tukang batu Rp. 65,000.00 Rp. 17,875.00
0.0280 Hk kepala tukang Rp. 70,000.00 Rp. 1,960.00
0.0830 Hk mandor Rp. 65,000.00 Rp. 5,395.00 Rp. 107,730.00
BAHAN :
376.0000 Kg Semen Pc ( 50 Kg) Rp. 1,160.00 Rp. 436,160.00
0.7600 M3 Pasir beton Rp. 90,000.00 Rp. 68,400.00
1.0290 M3 Koral beton Rp. 240,000.00 Rp. 246,960.00 Rp. 751,520.00
Jumlah Rp. 859,250.00

Dibulatkan Rp. 859,250.00


V 12 Analisa membuat beton dengan mutu K 225/M3
UPAH :
1.6500 Hk Pekerja Rp. 50,000.00 Rp. 82,500.00
0.2750 Hk Tukang batu Rp. 65,000.00 Rp. 17,875.00
0.0280 Hk kepala tukang Rp. 70,000.00 Rp. 1,960.00
0.0830 Hk mandor Rp. 65,000.00 Rp. 5,395.00 Rp. 107,730.00
BAHAN :
388.0000 Kg Semen Pc ( 50 Kg) Rp. 1,160.00 Rp. 450,080.00
0.6980 M3 Pasir beton Rp. 90,000.00 Rp. 62,820.00
1.0470 M3 Koral beton Rp. 240,000.00 Rp. 251,280.00 Rp. 764,180.00
Jumlah Rp. 871,910.00

Dibulatkan Rp. 871,910.00


V 13 Analisa pembongkaran bekisting /M3
UPAH :
4.0000 Hk Pekerja Rp. 50,000.00 Rp. 200,000.00

Jumlah Rp. 200,000.00


Dibulatkan Rp. 200,000.00

13 1 m3 Beton K 225 untuk Kolom dengan Besi 149 Kg/m3 beton (termasuk bekisting) Rp. 5,367,886.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 12,5 m2 bekisting untuk Kolom 12.50 x 205,418.00 Rp. 2,567,725.00
- 149 kg besi / m3 beton untuk kolom 149.00 x 11,599.00 Rp. 1,728,251.00
-1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

14 1m3 Beton K 225 untuk Lantai Pondasi dengan Besi 78 Kg/m3 beton (termasuk bekisting) Rp. 2,650,432.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 5 m2 bekisting untuk Lantai 5.00 x 134,760.00 Rp. 673,800.00
- 78 kg besi / m3 beton untuk kolom 78.00 x 11,599.00 Rp. 904,722.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

15 1m3 Beton K 225 untuk Dinding dengan Besi 110 Kg/m3 beton (termasuk bekisting) Rp. 4,054,260.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 10 m2 bekisting untuk Dinding 10.00 x 170,646.00 Rp. 1,706,460.00
- 110 kg besi / m3 beton untuk kolom 110.00 x 11,599.00 Rp. 1,275,890.00
-1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

Analisa Karang Asam Tj. Enim 2011


( 39 )
16 1m3 Beton K 225 untuk Balok dengan Besi 136 Kg/m3 beton (termasuk bekisting) Rp. 5,729,884.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 10 m2 bekisting untuk Balok 10.00 x 308,051.00 Rp. 3,080,510.00
- 136 kg besi / m3 beton untuk Balok 136.00 x 11,599.00 Rp. 1,577,464.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

17 1m3 Beton K 225 untuk Atap dengan Besi 114 Kg/m3 beton (termasuk bekisting) Rp. 4,153,882.50
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 6,5 m2 bekisting untuk Atap 6.50 x 270,721.00 Rp. 1,759,686.50
- 114 kg besi / m3 beton untuk Balok 114.00 x 11,599.00 Rp. 1,322,286.00
- pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

18 1m3 Beton K 175 untuk Lantai dengan Besi 73 Kg/m3 beton (termasuk bekisting) Rp. 2,988,861.00
- 1 m3 beton Mutu K 175 1.00 x 859,250.00 Rp. 859,250.00
- 4 m2 bekisting untuk Lantai 4.00 x 270,721.00 Rp. 1,082,884.00
- 73 kg besi / m3 beton untuk Balok 73.00 x 11,599.00 Rp. 846,727.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

19 1m3 Beton K 175 untuk Balok dengan Besi 136 Kg/m3 beton (termasuk bekisting) Rp. 5,529,674.00
- 1 m3 beton Mutu K 175 1.00 x 859,250.00 Rp. 859,250.00
- 10 m2 bekisting untuk Balok 10.00 x 289,296.00 Rp. 2,892,960.00
- 136 kg besi / m3 beton untuk Balok 136.00 x 11,599.00 Rp. 1,577,464.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00

KELOMPOK VI ( SNI 03-3436-2002 )

VI 1 Analisa pasang atap asbes gelombang(2.5x0.92m)x5 mm/M2


UPAH :
0.1400 Hk Pekerja Rp. 50,000.00 Rp. 7,000.00
0.0750 Hk Tukang kayu Rp. 65,000.00 Rp. 4,875.00
0.0080 Hk kepala tukang Rp. 70,000.00 Rp. 560.00
0.0080 Hk mandor Rp. 50,000.00 Rp. 400.00 Rp. 12,835.00
BAHAN :
0.5000 Lbr Asbes gelombang Rp. 52,000.00 Rp. 26,000.00
0.1200 Kg Paku Rp. 25,000.00 Rp. 3,000.00 Rp. 29,000.00
Jumlah Rp. 41,835.00

Dibulatkan Rp. 41,835.00

Analisa Karang Asam Tj. Enim 2011


( 40 )
VI 6 Analisa pasang nok seng/M'
UPAH :
0.1500 Hk Pekerja Rp. 50,000.00 Rp. 7,500.00
0.0700 Hk Tukang kayu Rp. 65,000.00 Rp. 4,550.00
0.0080 Hk kepala tukang Rp. 70,000.00 Rp. 560.00
0.0060 Hk mandor Rp. 50,000.00 Rp. 300.00 Rp. 12,910.00
BAHAN :
0.3000 Lbr Seng plat t- 4 mm Rp. 65,000.00 Rp. 19,500.00
0.0400 Kg Paku biasa 1/2"-1" Rp. 20,000.00 Rp. 800.00 Rp. 20,300.00
Jumlah Rp. 33,210.00

Dibulatkan Rp. 33,210.00


KELOMPOK VII ( SNI 03-2838-2002 )

VII 1 Analisa Memasang Loteng Triplek Tebal 4 mm + rangka kayu borneo / M2


UPAH :
0.2700 Hk Pekerja Rp. 50,000.00 Rp. 13,500.00
0.4000 Hk Tukang Kayu Rp. 65,000.00 Rp. 26,000.00
0.0400 Hk Kepala Tukang Rp. 70,000.00 Rp. 2,800.00
0.0135 Hk Mandor Rp. 50,000.00 Rp. 675.00 Rp. 42,975.00
BAHAN :
0.0230 M3 Kayu bornio balok Rp. 3,000,000.00 Rp. 69,000.00
0.0600 Kg Paku 2"-5" Rp. 20,000.00 Rp. 1,200.00
0.3900 Lbr Triplek tebal 4 mm Rp. 55,000.00 Rp. 21,450.00 Rp. 91,650.00
Jumlah Rp. 134,625.00

Dibulatkan Rp. 134,625.00


VII 5 List plafond dari kayu/M'
UPAH :
0.0500 Hk Pekerja Rp. 50,000.00 Rp. 2,500.00
0.0500 Hk Tukang kayu Rp. 65,000.00 Rp. 3,250.00
0.0050 Hk Kepala tukang Rp. 70,000.00 Rp. 350.00
0.0030 Hk Mandor Rp. 50,000.00 Rp. 150.00 Rp. 6,250.00
BAHAN :
1.1000 M' list kayu profil Rp. 15,000.00 Rp. 16,500.00
0.0100 Kg Paku Rp. 20,000.00 Rp. 200.00 Rp. 16,700.00
Jumlah Rp. 22,950.00

Dibulatkan Rp. 22,950.00


KELOMPOK VIII ( MERUJUK PADA SK SNI-S 06-1989-F )

VIII 2 Analisa memasang kloset jongkok/buah


UPAH :
1.0000 Hk Pekerja Rp. 50,000.00 Rp. 50,000.00
1.5000 Hk Tukang batu Rp. 65,000.00 Rp. 97,500.00
1.5000 Hk Kepala tukang Rp. 70,000.00 Rp. 105,000.00
0.1600 Hk Mandor Rp. 50,000.00 Rp. 8,000.00 Rp. 260,500.00
BAHAN :
1.0000 Bh Kloset Jongkok Rp. 195,000.00 Rp. 195,000.00
6.0000 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 6,960.00
0.0100 M3 Pasir Pasang Rp. 90,000.00 Rp. 900.00 Rp. 202,860.00
Jumlah Rp. 463,360.00

Dibulatkan Rp. 463,360.00


VIII 5 Analisa memasang bak mandi fiber voll 0.3 M3/buah
UPAH :
1.8000 Hk Pekerja Rp. 50,000.00 Rp. 90,000.00
2.7000 Hk Tukang batu Rp. 65,000.00 Rp. 175,500.00
0.5400 Hk Kepala tukang Rp. 70,000.00 Rp. 37,800.00
0.1100 Hk Mandor Rp. 50,000.00 Rp. 5,500.00 Rp. 308,800.00
BAHAN :
1.0000 Bh Bak fiber Rp. 260,000.00 Rp. 260,000.00
1.0000 Ls Perlengkapan Rp. 26,000.00 Rp. 26,000.00 Rp. 286,000.00
Jumlah Rp. 594,800.00

Dibulatkan Rp. 594,800.00

Analisa Karang Asam Tj. Enim 2011


( 41 )
VIII 8 Analisa memasang 1 buah bak kontrol (45x45)cm tinggi 50 cm
UPAH :
1.4200 Hk Pekerja Rp. 50,000.00 Rp. 71,000.00
0.4730 Hk Tukang batu Rp. 65,000.00 Rp. 30,745.00
0.0470 Hk Kepala tukang Rp. 70,000.00 Rp. 3,290.00
0.0710 Hk Mandor Rp. 50,000.00 Rp. 3,550.00 Rp. 108,585.00
BAHAN :
25.0000 Bh Batu bata Rp. 850.00 Rp. 21,250.00
77.0000 Kg Semen Pc(50 kg) Rp. 1,160.00 Rp. 89,320.00
0.1300 M3 Pasir pasang Rp. 90,000.00 Rp. 11,700.00
0.0200 M3 Batu kerikil Rp. 80,000.00 Rp. 1,600.00
2.6000 Kg Besi beton Rp. 10,000.00 Rp. 26,000.00
0.0900 M3 Pasir beton Rp. 90,000.00 Rp. 8,100.00 Rp. 157,970.00
Jumlah Rp. 266,555.00

Dibulatkan Rp. 266,555.00


KELOMPOK IX ( MERUJUK PADA SNI 03-3436-1994, SNI 03-2445-1991 )
IX 5 Analisa pasang terali besi trip 2 x 0.003 /M2
ALAT BANTU :
76.0000 Cm2 Pekerja pengelasan Rp. 1,953.73 Rp. 148,483.65 Rp. 148,483.65
BAHAN :
10.0400 Kg Besi trip 2 x 3 Rp. 12,000.00 Rp. 120,480.00 Rp. 120,480.00
Jumlah Rp. 268,963.65

Dibulatkan Rp. 268,964.00


XI 3 Analisa pasang lantai keramik (30 x 30)/M2
UPAH :
0.6200 Hk Pekerja Rp. 50,000.00 Rp. 31,000.00
0.3500 Hk Tukang batu Rp. 65,000.00 Rp. 22,750.00
0.0350 Hk Kepala tukang Rp. 70,000.00 Rp. 2,450.00
0.0300 Hk Mandor Rp. 50,000.00 Rp. 1,500.00 Rp. 57,700.00
BAHAN :
10.0000 Bh Keramik 30 x 30 Rp. 6,760.00 Rp. 67,600.00 Rp.
11.3800 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 13,200.80 Rp.
0.0420 M3 Pasir pasang Rp. 90,000.00 Rp. 3,780.00 Rp.
1.5000 Kg Semen warna Rp. 2,125.00 Rp. 3,187.50 Rp. 87,768.30
Jumlah Rp. 145,468.30

Dibulatkan Rp. 145,468.00


XI 5 Analisa pasang lantai keramik (20 X 20)/M2
UPAH :
0.6000 Hk Pekerja Rp. 50,000.00 Rp. 30,000.00
0.4500 Hk Tukang batu Rp. 65,000.00 Rp. 29,250.00
0.0450 Hk Kepala tukang Rp. 70,000.00 Rp. 3,150.00
0.0300 Hk Mandor Rp. 50,000.00 Rp. 1,500.00 Rp. 63,900.00
BAHAN :
25.0000 Bh Keramik 20 X 20 Rp. 2,652.00 Rp. 66,300.00 Rp.
9.3000 Kg Semen Pc (50 kg) Rp. 1,160.00 Rp. 10,788.00 Rp.
0.0180 M3 Pasir pasang Rp. 90,000.00 Rp. 1,620.00 Rp.
1.5000 Kg Semen warna Rp. 2,125.00 Rp. 3,187.50 Rp. 81,895.50
Jumlah Rp. 145,795.50

Dibulatkan Rp. 145,796.00

Analisa Karang Asam Tj. Enim 2011


( 42 )
XI 7 Analisa pas.Dinding dan Lantai Keramik 11 x 11 cm /M2
UPAH :
0.6300 Hk Pekerja Rp. 50,000.00 Rp. 31,500.00
0.3100 Hk Tukang batu ` Rp. 65,000.00 Rp. 20,150.00
0.0470 Hk kepala tukang Rp. 70,000.00 Rp. 3,290.00
0.0494 Hk mandor Rp. 50,000.00 Rp. 2,467.50 Rp. 57,407.50
BAHAN :
81.0000 Buah Keramik 11 x 11 cm Rp. 493.83 Rp. 40,000.00
9.4000 Kg Semen PC Rp. 1,160.00 Rp. 10,904.00
0.0240 m3 Pasir pasang Rp. 90,000.00 Rp. 2,160.00
0.9400 Kg Semen Warna Rp. 2,125.00 Rp. 1,997.50 Rp. 55,061.50
Jumlah Rp. 112,469.00

XI 8 Analisa pas.Dinding Pasang Rooster Beton 20 x 20 cm /M2 Dibulatkan Rp. 112,469.00


UPAH :
0.8400 Hk Pekerja Rp. 50,000.00 Rp. 42,000.00
0.2800 Hk Tukang batu ` Rp. 65,000.00 Rp. 18,200.00
0.0560 Hk kepala tukang Rp. 70,000.00 Rp. 3,920.00
0.0588 Hk mandor Rp. 50,000.00 Rp. 2,940.00 Rp. 67,060.00
BAHAN :
25.0000 Buah Rooster Beton 20 x 20 cm Rp. 5,520.00 Rp. 138,000.00
5.0000 Kg Semen PC Rp. 1,160.00 Rp. 5,800.00
0.0180 m3 Pasir pasang Rp. 90,000.00 Rp. 1,620.00
0.5000 Kg Semen Warna Rp. 2,125.00 Rp. 1,062.50 Rp. 146,482.50
Jumlah Rp. 213,542.50

Dibulatkan Rp. 213,543.00


XII 2 Analisa pengecatan bidang kayu baru 3 kali cat/M2
UPAH :
0.0700 Hk Pekerja Rp. 50,000.00 Rp. 3,500.00
0.1050 Hk Tukang cat Rp. 65,000.00 Rp. 6,825.00
0.0040 Hk Kepala tukang Rp. 70,000.00 Rp. 280.00
0.0025 Hk Mandor Rp. 50,000.00 Rp. 125.00 Rp. 10,730.00
BAHAN :
0.2000 Kg Cat meni Rp. 19,500.00 Rp. 3,900.00
0.1500 Kg Plemir Rp. 17,500.00 Rp. 2,625.00
0.1700 Kg cat dasar Rp. 15,000.00 Rp. 2,550.00
0.3500 Kg cat penutup Rp. 35,000.00 Rp. 12,250.00 Rp. 21,325.00
Jumlah Rp. 32,055.00

Dibulatkan Rp. 32,055.00


XII 3 Analisa pengecatan bidang dinding Tembok lama/M2
UPAH :
0.0280 HK Pekerja Rp. 50,000.00 Rp. 1,400.00
0.0420 HK Tukang cat Rp. 65,000.00 Rp. 2,730.00
0.0042 HK Kepala tukang Rp. 70,000.00 Rp. 294.00
0.0025 HK Mandor Rp. 50,000.00 Rp. 125.00 Rp. 4,549.00
BAHAN :
0.1200 Kg cat dasar Rp. 15,000.00 Rp. 1,800.00
0.1000 Buah Kuas (ukuran sedang) Rp. 7,500.00 Rp. 750.00
0.1800 Kg cat penutup Rp. 35,000.00 Rp. 6,300.00 Rp. 8,850.00
Jumlah Rp. 13,399.00

Dibulatkan Rp. 13,399.00


XII 4 Analisa pengecatan bidang Tembok baru 3 kali cat/M2
UPAH :
0.0700 HK Pekerja Rp. 50,000.00 Rp. 3,500.00
0.1050 HK Tukang cat Rp. 65,000.00 Rp. 6,825.00
0.0040 HK Kepala tukang Rp. 70,000.00 Rp. 280.00
0.0025 HK Mandor Rp. 50,000.00 Rp. 125.00 Rp. 10,730.00
BAHAN :
0.0800 Kg Plemir Tembok Rp. 9,500.00 Rp. 760.00
1.0000 m2 Acian Rp. 12,880.00 Rp. 12,880.00
0.1000 Buah Kuas (ukuran sedang) Rp. 7,500.00 Rp. 750.00
0.1700 Kg cat dasar Rp. 15,000.00 Rp. 2,550.00
0.3500 Kg cat penutup Rp. 35,000.00 Rp. 12,250.00 Rp. 29,190.00
Jumlah Rp. 39,920.00

Dibulatkan Rp. 39,920.00

Analisa Karang Asam Tj. Enim 2011


( 43 )
XII 5 Analisa pengecatan Meni dan Cat Besi/M2
UPAH :
0.0700 Hk Pekerja Rp. 50,000.00 Rp. 3,500.00
0.1050 Hk Tukang cat Rp. 65,000.00 Rp. 6,825.00
0.0040 Hk Kepala tukang Rp. 70,000.00 Rp. 280.00
0.0025 Hk Mandor Rp. 50,000.00 Rp. 125.00 Rp. 10,730.00
BAHAN :
0.2000 Kg Menie Besi Rp. 19,500.00 Rp. 3,900.00
0.3500 Kg Cat Besi Rp. 35,000.00 Rp. 12,250.00
0.1000 Bh Buah Kuas (ukuran sedang) Rp. 7,500.00 Rp. 750.00
0.0500 m Amplas Rp. 2,500.00 Rp. 125.00
0.0430 Kg Minyak Cat Rp. 25,000.00 Rp. 1,075.00 Rp. 18,100.00
Jumlah Rp. 28,830.00

Dibulatkan Rp. 28,830.00


KELOMPOK XIII

XIII 1 PEKERJAAN BIAYA SEWA ALAT MESIN POMPA 3 PK


Jenis Alat : Pompa 3 Pk
1.1 Harga Pompa termasuk PPN 10 % Rp. 15,000,000 Rp. 16,500,000.00
10 % Nilai Sisa 10 % Harga Pompa Rp. 16,500,000 1,650,000.00
Harga Depresiasi Rp. 14,850,000
- Usia Alat 3 Tahun, 2100 Jam / Tahun
- Suku Bunga 18 % / Tahun
- Pajak 15 % x 18 % = 2.7 % ( Total 18 % + 2.7 % = 20.7 % )
- Biaya Pemilikan
- Depresiasi = 2100 x 3 Th 0.000159 Rp. 14,850,000.00 Rp. 2,357.14
- Suku Bunga + Pajak 0.00002857 Rp. 16,500,000.00 Rp. 471.43
- Biaya Operasi
- Bahan Bakar : 30 % x 3 0.9 4,500.00 4,050.00
- Bahan Pelumas : 1.5 % x 3 0 25,000.00 1,125.00
- Bahan Reparasi : 18.75 % / 2100 (H.Pompa ternasuk PPn/2100) 0.2 7,051.28 1,322.12
- Biaya Perlengkapan Ls 649.71
- Biaya Operator 0.2 60,000.00 10,000.00
- Biaya per Jam 19,975.40
- Biaya per Hari ( selama 8 jam kerja ) 8 19,975.40 159,803.19

Dibulatkan Rp. 159,803.00


XIII 2 PEKERJAAN BIAYA SEWA ALAT GENSET 7.5 KVA
1.1 Buah H. Genset termasuk PPN 10 % Rp. 150,000,000 Rp. 165,000,000.00
10 % Nilai Sisa 10 % Harga Genset Rp. 165,000,000 16,500,000.00
Harga Depresiasi Rp. 148,500,000
- Usia Alat 5 Tahun, 2100 Jam / Tahun
- Suku Bunga 18 % / Tahun
- Pajak 15 % x 18 % = 2.7 % ( Total 18 % + 2.7 % = 20.7 % )
- Biaya Pemilikan
- Depresiasi = 2100 x 5 Th 0.000095 Rp. 148,500,000.00 Rp. 14,142.86
- Suku Bunga + Pajak 0.00002857 Rp. 165,000,000.00 Rp. 4,714.29
- Biaya Operasi
- Bahan Bakar : 30 % x 3 0.9 4,500.00 4,050.00
- Bahan Pelumas : 1.5 % x 3 0 25,000.00 1,125.00
- Bahan Reparasi : 18.75 % / 2100 (H.Genset ternasuk PPn/2100) 0.2 70,512.82 13,221.15
- Biaya Perlengkapan Ls 1,839.62
- Biaya Operator 0.2 60,000.00 10,000.00
- Biaya per Jam 49,092.91
- Biaya per Hari ( selama 8 jam kerja ) 8 49,092.91 392,743.30

Dibulatkan Rp. 392,743.00

Analisa Karang Asam Tj. Enim 2011


( 44 )
XIII 2 PEKERJAAN BIAYA SEWA BUTT WELDING MACHINE
1.1 Buah H. Genset termasuk PPN 10 % Rp. 100,000,000 Rp. 110,000,000.00
10 % Nilai Sisa 10 % Harga B.Welding Rp. 110,000,000 11,000,000.00
Harga Depresiasi Rp. 99,000,000
- Usia Alat 5 Tahun, 2100 Jam / Tahun
- Suku Bunga 18 % / Tahun
- Pajak 15 % x 18 % = 2.7 % ( Total 18 % + 2.7 % = 20.7 % )
- Biaya Pemilikan
- Depresiasi = 2100 x 5 Th 0.000095 Rp. 99,000,000.00 Rp. 9,428.57
- Suku Bunga + Pajak 0.00002857 Rp. 110,000,000.00 Rp. 3,142.86
- Biaya Operasi
- Bahan Pelumas : 1.5 % x 3 0 25,000.00 1,125.00
- Bahan Reparasi : 18.75 % / 2100 (H.B.Welding ternasuk PPn/2100) 0.2 47,008.55 8,814.10
- Biaya Perlengkapan Ls 993.91
- Biaya Operator 0.2 60,000.00 10,000.00
- Biaya per Jam 33,504.44
- Biaya per Hari ( selama 8 jam kerja ) 8 33,504.44 268,035.53

Dibulatkan Rp. 268,036.00


KELOMPOK XV
XV 1 Satuan Pekerjaan : 1 Cm Pengelasan dengan las listrik
UPAH :
0.0060 Hk Pekerja Rp. 50,000.00 Rp. 300.00
0.0090 Hk Tukang Besi Rp. 65,000.00 Rp. 585.00
0.0040 Hk Kepala Tukang Besi Rp. 70,000.00 Rp. 280.00
0.0025 Hk Mandor Rp. 50,000.00 Rp. 125.00 Rp. 1,290.00
BAHAN :
40 0.00367 Liter Solar Rp. 4,500.00 Rp. 16.50
0.0080 Kawat Las Rp. 20,000.00 Rp. 160.00 Rp. 176.50
ALAT BANTU :
0.0005 Hk Sewa mesin las Rp. 150,000.00 Rp. 78.13
0.0010 Hk Sewa Genset Rp. 392,743.00 Rp. 409.11 Rp. 487.23
Jumlah Rp. 1,953.73

Dibulatkan Rp. 1,954.00


XV 2 Satuan Pekerjaan : 1 M' Water stop dari Flexible PVC lebar 250 mm
UPAH :
0.5500 Hk Pekerja Rp. 50,000.00 Rp. 27,500.00
0.0550 Hk Tukang batu Rp. 65,000.00 Rp. 3,575.00
0.0030 Hk Mandor Rp. 50,000.00 Rp. 150.00 Rp. 31,225.00
BAHAN :
1.0000 m Flexible PVC Waterstop lebar 250 mm Rp. 25,000.00 Rp. 25,000.00
Jumlah Rp. 56,225.00

Dibulatkan Rp. 56,225.00

XV 3 Satuan Pekerjaan : Pemagaran 2,40 Meter pagar BRC, t = 1,50 m

MATERIAL :
0.1280 m3 Galian tanah Rp. 20,000.00 Rp. 2,560.00
0.0427 m3 Urugan tanah Rp. 9,590.00 Rp. 409.49
0.0853 m3 Buangan tanah Rp. 25,800.00 Rp. 2,200.74
0.0960 m3 Beton camp. 1 : 3 : 5 Rp. 616,210.00 Rp. 59,156.16
4.0000 m Pipa GI dia 40 mm untuk tiang Rp. 39,500.00 Rp. 158,000.00
1.0000 lbr P. BRC t = 1,50 m sesuai sfesifikasi teknis Rp. 275,000.00 Rp. 275,000.00
6.0000 bh Klem dan baut pagar Rp. 13,750.00 Rp. 82,500.00
2.0000 bh Tutup tiang pagar Rp. 6,875.00 Rp. 13,750.00
1.0000 ls Pek.pem. pagar termasuk potong dan las Rp. 45,000.00 Rp. 45,000.00
1.0000 m2 Pengecatan pagar Rp. 28,830.00 Rp. 28,830.00 Rp. 667,406.39
Jumlah Rp. 667,406.39

Dibulatkan Rp. 667,406.00


Harga satuan Pekerjaan Pemagaran BRC /m' Rp. 278,086.00

Analisa Karang Asam Tj. Enim 2011


( 45 )
XV 4 Satuan Pekerjaan : 1 Unit pintu pagar BRC L = 4.00 m, t = 1,50 m

MATERIAL :
0.1600 m3 Galian tanah Rp. 20,000.00 Rp. 3,200.00
0.0533 m3 Urugan tanah Rp. 9,590.00 Rp. 511.47
0.1067 m3 Buangan tanah Rp. 25,800.00 Rp. 2,752.00
0.1600 m3 Beton camp. 1 : 3 : 5 Rp. 616,210.00 Rp. 98,593.60
4.0000 m Pipa GI dia 100 mm untuk tiang Pintu Rp. 124,800.00 Rp. 499,200.00
11.0000 m Pipa GI dia 40 mm rangka pintu Rp. 39,500.00 Rp. 434,500.00
4.0000 bh Knee GI dia. 40 mm Rp. 20,000.00 Rp. 80,000.00
1.6670 lbr P. BRC t = 1,50 m sesuai sfesifikasi teknis Rp. 275,000.00 Rp. 458,425.00
2.0000 bh Tutup tiang pintu Rp. 14,000.00 Rp. 28,000.00
2.0000 bh Roda pintu sesuai gambar Rp. 28,000.00 Rp. 56,000.00
1.0000 ls Pek.pem. pintu termasuk potong dan las Rp. 120,000.00 Rp. 120,000.00
1.5000 m2 Pengecatan pintu Rp. 28,830.00 Rp. 43,245.00 Rp. 1,824,427.07
` Jumlah Rp. 1,824,427.07

Dibulatkan Rp. 1,824,427.00

XV 5 Satuan Pekerjaan : Pemagaran dari Kawat Duri /m'

UPAH :
0.3000 Hk Pekerja Rp. 50,000.00 Rp. 15,000.00
0.0300 Hk Tukang Besi Rp. 65,000.00 Rp. 1,950.00
0.0330 Hk Kepala Tukang Besi Rp. 70,000.00 Rp. 2,310.00
0.0363 Hk Mandor Rp. 50,000.00 Rp. 1,815.00 Rp. 21,075.00
MATERIAL :
0.1120 m3 Galian tanah Rp. 20,000.00 Rp. 2,240.00
0.1120 m3 Buangan tanah Rp. 25,800.00 Rp. 2,889.60
0.1120 m3 Beton K.175 Rp. 859,250.00 Rp. 96,236.00
1.1200 m2 Bekisting Rp. 134,760.00 Rp. 150,931.20
15.0000 m Kawat Berduri Rp. 4,750.00 Rp. 71,250.00
6.0000 bh Klem dan baut pagar Rp. 6,000.00 Rp. 36,000.00
18.5364 Kg Tiang Besi L.60.60.6 Rp. 13,932.81 Rp. 258,264.09
1.0000 ls Pek.pem. pagar termasuk potong dan las Rp. 31,000.00 Rp. 31,000.00
1.2000 m2 Pengecatan pagar Rp. 28,830.00 Rp. 34,596.00 Rp. 683,406.89
Jumlah Rp. 683,406.89

Dibulatkan Rp. 683,407.00


Harga satuan pekerjaan pemagaran Kawat Duri /m' Rp. 227,802.00
XV 6 Satuan Pekerjaan : Pemagaran Dari Pas, Bata dan anak pagar dari Besi L.60.60.6
UPAH :
0.3000 Hk Pekerja Rp. 50,000.00 Rp. 15,000.00
0.0300 Hk Tukang Besi Rp. 65,000.00 Rp. 1,950.00
0.0330 Hk Kepala Tukang Besi Rp. 70,000.00 Rp. 2,310.00
0.0363 Hk Mandor Rp. 50,000.00 Rp. 1,815.00 Rp. 21,075.00
MATERIAL :
0.1120 m3 Galian tanah Rp. 20,000.00 Rp. 2,240.00
0.1120 m3 Buangan tanah Rp. 25,800.00 Rp. 2,889.60
0.0400 m3 Pasir Urug Rp. 92,000.00 Rp. 3,680.00
0.0560 m3 Beton K.175 Rp. 859,250.00 Rp. 48,118.00
56.00 Kg Pekerjaan Besi Beton Rp. 11,598.50 Rp. 649,516.00
0.4000 m2 Bekisting Rp. 134,760.00 Rp. 53,904.00
0.8000 m2 Pasangan Batu Bata Rp. 100,660.00 Rp. 80,528.00
1.6000 m2 Pekerjaan plesteran Rp. 29,132.00 Rp. 46,611.20
27.1000 Kg Anak pagar Besi L.60.60.6 Rp. 13,932.81 Rp. 377,579.07
1.2000 m2 Pekerjaan Pengecatan Rp. 39,920.00 Rp. 47,904.00 Rp. 1,312,969.87
Jumlah Rp. 1,312,969.87

Dibulatkan Rp. 1,312,970.00


Harga satuan pekerjaan pemagaran/m' Rp. 437,657.00

Analisa Karang Asam Tj. Enim 2011


( 46 )
XV 9 Satuan Pekerjaan : 6 M' handrailing dari pipa GI dia 40 mm dan 25 mm, t = 80 cm
UPAH :
1.2000 Hk Pekerja Rp. 50,000.00 Rp. 60,000.00
0.0540 Hk Mandor Rp. 50,000.00 Rp. 2,700.00 Rp. 62,700.00
MATERIAL :
10.500 m Pipa GI dia 40 mm Rp. 39,500.00 Rp. 414,750.00
5.700 m Pipa GI dia 25 mm Rp. 27,600.00 Rp. 157,320.00
2.600 Kg Plat besi t = 5 mm u. dudukan Rp. 12,618.42 Rp. 32,807.89
20.000 Bh Dyna bolt dia. 10 mm Rp. 20,000.00 Rp. 400,000.00
244.92 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 478,508.11
1.768 m2 Pekerjaan Pengecatan Rp. 28,830.00 Rp. 50,967.32 Rp. 1,534,353.33
Jumlah Rp. 1,597,053.33

Dibulatkan Rp. 1,597,053.00


Harga satuan pekerjaan handrailing/m' Rp. 266,176.00

XV 12 Analisa ( Satu ) Unit Septick Tank Kap. 25 Orang lengkap peresapan ( Uk. 1.10 x 2.20 x 1,70 M' )
9.0000 M3 Galian Tanah Rp. 26,270.00 Rp. 236,430.00
2.2500 M3 Urugan kembali 1/4 Eks Galian Rp. 9,590.00 Rp. 21,577.50
1.4000 M3 Pas. Bata 1 : 2 Rp. 108,852.00 Rp. 152,392.80
11.5000 M3 Plesteran 1 : 2 Rp. 32,713.20 Rp. 376,201.80
0.2000 M3 Beton Tumbuk 1:2:3 Rp. 616,210.00 Rp. 123,242.00
0.3500 M3 Beton Bertulang 1:2:3 Rp. 616,210.00 Rp. 215,673.50
60.0000 Kg Pembesian Rp. 11,598.50 Rp. 695,910.00
1.6000 m2 Bekisting Rp. 134,760.00 Rp. 215,616.00
1.0000 M3 Kerikil Saringan Rp. 80,000.00 Rp. 80,000.00
2.0000 M3 Pasir Saringan Rp. 90,000.00 Rp. 180,000.00
5.0000 M' Pipa PVC dia 4" Rp. 68,400.00 Rp. 342,000.00
3.0000 M' Pipa GIP 2" Rp. 46,200.00 Rp. 138,600.00
1.0000 Bh TEE 2" Rp. 9,000.00 Rp. 9,000.00
2.0000 Bh Keni 2" Rp. 12,000.00 Rp. 24,000.00
7.0000 Ikat Ijuk Rp. 7,500.00 Rp. 52,500.00
Jumlah Rp. 2,863,143.60

Dibulatkan Rp. 2,863,144.00

XV 14 Satuan Pekerjaan : 1 Unit Gutter dari plat Alumunium t = 8 mm / meter


UPAH :
0.4500 Hk Pekerja Rp. 50,000.00 Rp. 22,500.00
0.2250 Hk Tukang Besi Rp. 65,000.00 Rp. 14,625.00
0.0300 Hk Mandor Rp. 50,000.00 Rp. 1,500.00 Rp. 38,625.00
MATERIAL :
8.13 Kg Besi siku 90.90.9 Rp. 9,000.00 Rp. 73,170.00
3 Buah Anker Rp. 5,400.00 Rp. 16,200.00
21.78 Kg Plat Alumunium t = 8 mm Rp. 30,000.00 Rp. 653,400.00 Rp. 742,770.00
ALAT BANTU :
59.4 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 116,051.70 116,051.70
Jumlah Rp. 897,446.70

Dibulatkan Rp. 897,447.00


XV 15 Satuan Pekerjaan : 1 Unit Alat ukur Civoletti dari plat Alumunium t = 8 mm / meter
UPAH :
0.2500 Hk Pekerja Rp. 50,000.00 Rp. 12,500.00
0.1250 Hk Tukang Besi Rp. 65,000.00 Rp. 8,125.00
0.0170 Hk Mandor Rp. 50,000.00 Rp. 850.00 Rp. 21,475.00
MATERIAL :
29.28 Kg Besi siku 90.90.9 Rp. 9,000.00 Rp. 263,520.00
13 Buah Mour Baut termasuk paking Rp. 5,400.00 Rp. 70,200.00
24.2 Kg Plat Alumunium t = 8 mm Rp. 30,000.00 Rp. 726,000.00 Rp. 1,059,720.00
Jumlah Rp. 1,081,195.00

Dibulatkan Rp. 1,081,195.00


XV 16 Satuan Pekerjaan : 1 Unit Grill penutup Flokulator 1 x 1 meter
MATERIAL :
43.36 Kg Besi siku 60.60.6 Rp. 9,000.00 Rp. 390,240.00
37.44 Kg Besi beton dia. 16 mm Rp. 10,000.00 Rp. 374,400.00
4 Buah Anker Rp. 5,400.00 Rp. 21,600.00
144 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 281,337.45 Rp. 1,067,577.45
Jumlah Rp. 1,067,577.45

Dibulatkan Rp. 1,067,577.00

Analisa Karang Asam Tj. Enim 2011


( 47 )
XV 17 Satuan Pekerjaan : 1 Unit Grill penutup Filter 1 x 0.62 meter
MATERIAL :
34.69 Kg Besi siku 60.60.6 Rp. 9,000.00 Rp. 312,210.00
29.64 Kg Besi beton dia. 16 mm Rp. 10,000.00 Rp. 296,400.00
4 Buah Anker Rp. 5,400.00 Rp. 21,600.00
134 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 261,800.13 Rp. 892,010.13
Jumlah Rp. 892,010.13

Dibulatkan Rp. 892,010.00


XV 18 Satuan Pekerjaan : 1 Unit Pintu air dari papan Jati
MATERIAL :
4.62 Kg Besi siku 30.30.3 Rp. 9,000.00 Rp. 41,580.00
0.02 m3 Papan Jati Rp. 4,427,500.00 Rp. 88,550.00
0.2 Kg Paku Rp. 20,000.00 Rp. 4,000.00
24 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 46,889.58 Rp. 181,019.58
Jumlah Rp. 181,019.58

Dibulatkan Rp. 181,020.00


XV 19 Satuan Pekerjaan : 1 Unit Saringan Sampah
MATERIAL :
78.05 Kg Besi siku 60.60.6 Rp. 9,000.00 Rp. 702,450.00
22.608 Kg Besi Plat tebal 4 mm Rp. 12,000.00 Rp. 271,296.00
6 Buah Anker Rp. 5,400.00 Rp. 32,400.00
720 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 1,406,687.25 Rp. 2,412,833.25
Jumlah Rp. 2,412,833.25

Dibulatkan Rp. 2,412,833.00


XV 20 Satuan Pekerjaan : 1 Unit Pintu air penstock untuk BAK FLOKULASI
MATERIAL : 200
36.86 Kg Besi siku 60.60.6 Rp. 9,000.00 Rp. 331,740.00
20.096 Kg Besi Plat tebal 4 mm Rp. 12,000.00 Rp. 241,152.00
88.8 Kg Besi beton dia. 60 mm Rp. 9,000.00 Rp. 799,200.00
1.2 m Pipa GIP ¢ 200 mm Rp. 318,000.00 Rp. 381,600.00
6 Buah Anker Rp. 5,400.00 Rp. 32,400.00
2.00 buah Loose flange dia. 250 mm Rp. 253,000.00 Rp. 506,000.00
502.86 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 982,447.96 Rp. 3,274,539.96
Jumlah Rp. 3,274,539.96

Dibulatkan Rp. 3,274,540.00


XV 1 Satuan Pekerjaan : 1 Unit Pintu air penstock untuk BAK FILTRASI
MATERIAL : 200
58.54 Kg Besi siku 60.60.6 Rp. 9,000.00 Rp. 526,860.00
20.096 Kg Besi Plat tebal 4 mm Rp. 12,000.00 Rp. 241,152.00
133.2 Kg Besi beton dia. 60 mm Rp. 9,000.00 Rp. 1,198,800.00
1.2 m Pipa GIP ¢ 200 mm Rp. 318,000.00 Rp. 381,600.00
24 Buah Anker Rp. 5,400.00 Rp. 129,600.00
2.00 buah Loose flange dia. 250 mm Rp. 253,000.00 Rp. 506,000.00
754.29 Cm2 Pekerjaan Pengelasan Rp. 1,953.73 Rp. 1,473,672.92 Rp. 4,457,684.92
Jumlah Rp. 4,457,684.92

Dibulatkan Rp. 4,457,685.00


VIII 6 Analisa memasang Boxes Water meter
UPAH :
1.5000 M3 Galian Tanah Rp. 26,270.00 Rp. 39,405.00
0.3750 M3 Urugan kembali 1/4 Eks Galian Rp. 9,590.00 Rp. 3,596.25
3.6000 m2 Pas. Bata 1 : 2 Rp. 108,852.00 Rp. 391,867.20
3.6000 M3 Plesteran 1 : 2 Rp. 32,713.20 Rp. 117,767.52
0.8100 M3 Beton Tumbuk 1:2:3 Rp. 616,210.00 Rp. 499,130.10
0.5920 M3 Beton Bertulang 1:2:3 Rp. 616,210.00 Rp. 364,796.32
110.0000 Kg Pembesian Rp. 11,598.50 Rp. 1,275,835.00
1.0000 m2 Bekisting Rp. 134,760.00 Rp. 134,760.00
1.0000 Unit Tutup Boxes Rp. 892,010.13 Rp. 892,010.13
Jumlah Rp. 3,719,167.52

Dibulatkan Rp. 3,719,168.00

Analisa Karang Asam Tj. Enim 2011


( 48 )
PEKERJAAN BORING STRAUS PILE
( Sampai kedalaman 6 m, dengan diameter lubang bor 8 " )

1 HK Sewa Alat Bor Rp. 200,000.00 Rp. 200,000.00


1 HK Sewa mesin pompa Rp. 159,803.00 Rp. 159,803.00
1 HK Master Bor Rp. 60,000.00 Rp. 60,000.00
1 HK Pembanrtu master bor Rp. 45,000.00 Rp. 45,000.00
3 HK Pekerja Rp. 45,000.00 Rp. 135,000.00
1 Ls Biaya Perlengkapan dan bahan penunjang Rp. 29,990.15 Rp. 29,990.15
Total biaya 629,793.15
Biaya pengeboran / meter dalam 104,965.53
PEKERJAAN PENGECORAN STRAUS PILE
6 m Pipa jambang ND 200 mm Rp. 226,600.00 Rp. 1,359,600.00
0.125 HK Sewa mesin pompa Rp. 159,803.00 Rp. 19,975.38
0.13 m3 Beton, dengan mutu beton K. 225 Rp. 871,910.00 Rp. 109,611.54
14 Kg Pekerjaan Pembesian Rp. 11,598.50 Rp. 162,379.00
0.250 HK Kepala Tukang Batu Rp. 70,000.00 Rp. 17,500.00
1.500 HK Tukang Batu Rp. 65,000.00 Rp. 97,500.00
4.500 HK Pekerja Rp. 45,000.00 Rp. 202,500.00
1 Ls Alat bantu Rp. 58,949.05 Rp. 58,949.05
Total biaya Rp. 2,028,014.97
Biaya Kontruksi / meter dalam Rp. 355,496.75
PEKERJAAN THRUST PAL (Permeter dala Rp. 460,462.27

Dibulatkan Rp. 460,462.00

Analisa Karang Asam Tj. Enim 2011


( 49 )
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)

RENCANA ANGGARAN BIAYA (Engineer's Estimate)


PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 2
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Sat. (Rp)
Volume (Rp)
I PEKERJAAN PERSIAPAN
1. Pekerjaan Persiapan, mobilisasi/demobilisasi personil dan peralatan Ls 4,000,000.00 1.00 4,000,000.000
2. Direksi Keet 4 x 5m ( Kantor Lapangan Sementara) dan gudang lapangan 4 x 4m m² 1,294,000.00 36.00 46,584,000.000
3. Request & Shop Drawing (Gambar Kerja), Laporan Proyek, Dokumentasi dan Asbuilt Drawing. Ls 4,500,000.00 1.00 4,500,000.000
Pembersihan dengan sikat kawat dan disiram air, pengikatan titik simpul besi dan perapian kembali
4. Ls 2,500,000.00 1.00 2,500,000.000
dari besi lantai, dinding dan kolom reservoir
5. Pengamanan Lokasi Proyek dan Jaga malam Bln 1,500,000.00 6.00 9,000,000.000
6. Pembuatan Rambu-rambu lalulintas Bh 200,000.00 1.00 200,000.000
7. Pembuatan papan nama proyek Bh 500,000.00 1.00 500,000.000
8. Pembuatan JMF beton dan pengetesan kubus beton Ls 15,000,000.00 1.00 15,000,000.000
9. Biaya retribusi daerah untuk perizinan yang berkaitan dengan pelaksanaan proyek (IMB, dll) Ls 10,000,000.00 1.00 10,000,000.000
SUB TOTAL I 92,284,000.000
II. PEKERJAAN TANAH
1 Galian Tanah untuk Sloop Jalan Masuk m³ 20,000.00 23.25 465,000.000
2 Urugan tanah termasuk meratakan dan pemadatan m³ 34,590.00 301.70 10,435,803.000
3 Buangan tanah sisa urugan keluar lokasi m³ 28,839.00 270.00 7,786,530.000
SUB TOTAL II 18,687,333.000
III. PEKERJAAN PASANGAN BATU KALI DAN PENGUATAN LAHAN
1 Susunan Batu Kosong untuk Ruang Operasi Distribusi m3 300,630.00 3.04 913,915.200
2 Pasangan pondasi batu belah 1 : 4. Untuk Ruang Operasi Distribusi m3 548,330.00 25.56 14,015,314.800
3 Pasangan talud dari pasangan batu kali 1 : 4 untuk penahan tanah m3 548,330.00 55.62 30,498,114.600
4 Pasangan Batu Muka m² 72,508.20 180.90 13,116,733.380
SUB TOTAL III 58,544,077.980
IV. PEKERJAAN BETON
A Pekerjaan Beton untuk Bangunan Reservoir
1 Beton K 125 untuk lantai kerja tebal 10 cm pada rumah pompa m³ 616,210.00 8.14 5,018,722.345
Pekerjaan Beton Struktur dengan mutu beton K-225 tanpa Pembesian untuk masing-masing
2
pekerjaan yang ditentukan pada Gambar Kerja termasuk Pasang dan bongkar Bekisting, untuk :
- Beton Pondasi Lantai =/= 40 cm m³ 1,745,710.00 172.64 301,374,137.270
- Beton Kolom utama dengan ukuran 35 x 35 cm m³ 3,639,635.00 10.78 39,235,265.300
- Beton Dinding dengan =/= 30 cm m³ 2,778,370.00 66.09 183,622,473.300

Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar
3
Kerja Dengan mutu beton K.225. termasuk Pembesian, Pasang dan bongkar Bekisting, untuk :

- Beton Dinding =/= 30 cm m³ 4,054,260.00 84.91 344,247,216.600


- Beton Ring Balok dengan ukuran 30 x 40 cm m³ 5,729,884.00 35.99 206,207,065.392
- Beton Plat atap =/= 15 cm m³ 4,153,882.50 63.56 264,012,463.935
- Pekerjaan Water Stop m' 56,225.00 191.40 10,761,465.000
B Pekerjaan Beton untuk Bangunan Ruang Pengatur Distribusi & R. Kontrol
1 Urugan Pasir Basah dipadatkan untuk lantai Ruang pengatur Distribusi =/= 10 Cm m³ 92,000.00 7.14 656,880.000

Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar
2
Kerja Dengan mutu beton K.225. termasuk Pembesian, Pasang dan bongkar Bekisting, untuk :

- Beton Kolom utama dengan ukuran 35 x 35 cm m³ 5,367,886.00 9.37 50,297,413.893


- Beton Ring Balok dengan ukuran 30 x 52 cm m³ 5,729,884.00 15.32 87,760,335.815
- Beton Plat atap =/= 12 cm m³ 4,153,882.50 22.60 93,873,590.618
3 - Beton K.175 untuk Lantai dalam bangunan =/= 10 cm dengan T.Tunggal m³ 2,988,861.00 6.75 20,174,811.750
SUB TOTAL IV 1,607,241,841.218
TOTAL 1,776,757,252.198
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
RENCANA ANGGARAN BIAYA (Engineer's Estimate)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 3
Harga Satuan
Volume Jumlah Harga
No. Uraian Pekerjaan Sat. (Rp) (Rp)
V. PEKERJAAN PASANGAN
A Pekerjaan Pasangan untuk Bangunan Reservoir
1 Pasangan Bata Camp. 1 : 2 untuk dinding sekat Pengarah Aliran m² 108,852.00 281.60 30,652,723.200
2 Pasangan plester untuk dinding sekat dengan tebal 1,5 cm Camp.1 : 2 m² 32,713.00 563.20 18,423,961.600
3 Plesteran untuk meratakan bagian beton yang kurang rata m² 31,077.35 422.64 13,134,531.204
4 Pekerjaan acian m² 12,880.00 1,051.18 13,539,198.400
B Pekerjaan Pasangan untuk Bangunan Ruang Pengatur Distribusi & R. Kontrol
1 Pasangan Bata Camp. 1 : 4 untuk dinding m² 100,660.00 192.10 19,336,786.000
2 Plesteran dinding =/= 1,5 cm, camp 1 : 4 m² 29,132.00 384.20 11,192,514.400
3 Plesteran untuk meratakan bagian beton yang kurang rata m² 29,132.00 240.13 6,995,321.500
4 Pemasangan Rooster Keramik ukuran 20x20 cm m² 213,543.00 11.04 2,357,514.720
5 Pekerjaan acian m² 12,880.00 676.79 8,717,055.200
SUB TOTAL V 124,349,606.224
VI. PEKERJAAN KUSEN, PINTU DAN KACA
1 Kuzen pintu utama Tipe I termasuk Daun Pintu ( sesuai dengan Gambar Kerja ) Bh 5,000,000.00 1.00 5,000,000.000
2 Kuzen pintu utama Tipe II termasuk Daun Pintu ( sesuai dengan Gambar Kerja ) Bh 3,000,000.00 1.00 3,000,000.000
3 Kuzen bouven light Tipe IV ( sesuai dengan Gambar Kerja ) Bh 500,000.00 13.00 6,500,000.000
SUB TOTAL VI 14,500,000.000
VII. PEKERJAAN LABURAN / CAT
1 Pekerjaan Cat tembok ( Warna sesuai petunjuk Direksi ) termasuk acian dan plamir m2 39,920.00 676.79 27,017,456.800
2 Cat kayu/besi, termasuk menie kuzen m2 32,055.00 26.51 849,778.050
3 Cat bitumen untuk atap Reservoir, atap Ruang Kontrol dan Atap Pengatur Distribusi m2 41,835.00 592.34 24,780,543.900
SUB TOTAL VII 52,647,778.750
VIII. PEKERJAAN PENERANGAN
1 Lampu TL 1 x 60 titik 150,000.00 5.00 750,000.000
2 Lampu pijar 40 w titik 100,000.00 4.00 400,000.000
3 Sakelar Ganda titik 100,000.00 4.00 400,000.000
4 Penyambungan Daya dari PLN Ls 3,500,000.00 1.00 3,500,000.000
SUB TOTAL VIII 5,050,000.000
IX PEKERJAAN PIPA DAN ACCESSORIES
(Termasuk pengadaan & pemasangan)
1 INLET
- Pipa dengan Flange ganda dia ¢ 12" panjang 200 cm Bh 1,806,000.00 1.00 1,806,000.000
- Pipa dengan Flange ganda dia ¢ 12" panjang 140 cm Bh 1,510,000.00 2.00 3,020,000.000
- Pipa dengan Flange ganda dia ¢ 12" panjang 130 cm Bh 1,461,000.00 1.00 1,461,000.000
- Pipa dinding dengan Flange ganda dia ¢ 12" panjang 80 cm Bh 1,215,000.00 2.00 2,430,000.000
- Pipa dengan Flange ganda dia ¢ 12" panjang 60 cm Bh 1,116,000.00 2.00 2,232,000.000
- Tee All flange ¢ 12" x ¢ 12" x ¢ 12" Bh 2,399,000.00 2.00 4,798,000.000
- Gate valve ¢ 12" 10 K Bh 17,100,000.00 2.00 34,200,000.000
- Bend 90º All Flange ¢ 12" Bh 1,438,000.00 5.00 7,190,000.000
- Bend 90º dengan Flange tunggal ¢ 12" Bh 1,185,000.00 2.00 2,370,000.000

SUB TOTAL IX (1) 59,507,000.000


TOTAL 256,054,384.974
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
RENCANA ANGGARAN BIAYA (Engineer's Estimate)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 4
Harga Satuan
Volume Jumlah Harga
No. Uraian Pekerjaan Sat. (Rp) (Rp)
IX PEKERJAAN PIPA DAN ACCESSORIES
(Termasuk pengadaan & pemasangan)
2 PIPA PELUAP
- Pipa dengan Flange ganda dia ¢ 10" panjang 200 cm Bh 1,509,000.00 2.00 3,018,000.000
- Pipa dinding dengan Flange ganda dia ¢ 10" panjang 80 cm Bh 1,215,000.00 2.00 2,430,000.000
- Pipa dengan Flange ganda dia ¢ 10" panjang 600 cm Bh 9,112,500.00 4.00 36,450,000.000
- Bend 90º dengan flange ganda ¢ 10" Bh 1,039,000.00 2.00 2,078,000.000
- Bend 90º dengan flange tunggal ¢ 10" Bh 857,000.00 2.00 1,714,000.000
3 PIPA PENGURAS
- Pipa dinding dengan Flange tunggal ¢ 6" panjang 100 cm Bh 660,000.00 2.00 1,320,000.000
- Pipa dengan Flange ganda ¢ 6" panjang 600 cm Bh 2,436,000.00 2.00 4,872,000.000
- Pipa dengan Flange ganda ¢ 6" panjang 300 cm Bh 1,421,000.00 2.00 2,842,000.000
- Bend 90º dengan flange tunggal ¢ 6" Bh 342,000.00 2.00 684,000.000
- Gate valve ¢ 6" 10 K Bh 5,780,000.00 2.00 11,560,000.000
4 PIPA OUTLET
- Pipa Steel Penghubung dari Reservoir Ke Pipa Hidder (Pipa Hisap) dengan Flange ganda
diameter ¢ 12" panjang 80 cm Bh 1,593,000.00 2.00 3,186,000.000
- Screner ¢ 12" Unit 2,399,000.00 2.00 4,798,000.000
- Gate valve ¢ 12" 10 K Bh 17,100,000.00 2.00 34,200,000.000
- Tee All flange ¢ 24" x ¢ 24" x ¢ 12" Bh 8,071,000.00 2.00 16,142,000.000
- Pipa Steel dengan flange ganda ¢ 24" panjang 400 cm (Untuk pipa Hyder) Bh 6,782,000.00 1.00 6,782,000.000
- Flange buta ¢ 24" Bh 781,500.00 2.00 1,563,000.000
- Tee All flange ¢ 24" x ¢ 24" x ¢ 14" Bh 8,071,000.00 2.00 16,142,000.000
- Pipa Steel dengan flange ganda ¢ 14" panjang 40 cm Bh 1,173,000.00 3.00 3,519,000.000
- Pipa Steel dengan flange ganda ¢ 14" panjang 100 cm Bh 1,484,000.00 2.00 2,968,000.000
- Pipa Steel dengan flange ganda ¢ 14" panjang 350 cm Bh 5,194,000.00 2.00 10,388,000.000
- Tee All flange ¢ 14" x ¢ 14" x ¢ 14" Bh 3,072,000.00 4.00 12,288,000.000
- Bend 90º All Flange ¢ 14" Bh 1,950,000.00 8.00 15,600,000.000
- Gate valve ¢ 14" 10 K Bh 23,500,000.00 6.00 141,000,000.000
- Dismantling Join (Dresser Coupling) ¢ 14" Bh 1,423,000.00 2.00 2,846,000.000
- Watermeter ¢ 14" Bh 47,081,000.00 2.00 94,162,000.000
SUB TOTAL IX 432,552,000.000
X PEKERJAAN LAIN-LAIN
1 Pekerjaan tangga monyet dari stenlis steel ( R. Kontrol ) Bh 2,585,000.00 8.00 20,679,999.960
2 Pekerjaan tangga Spiral Tinggi 6,0 m diameter 1500 mm Bh 10,620,000.00 1.00 10,619,999.997
3 Pekerjaan Pagar pengaman dari stenlis steel m 250,454.00 10.60 2,654,812.400
4 Pekerjaan pengetesan dan Desinfeksi LS 20,000,000.00 1.00 20,000,000.000
5 Saluran Kabel, Saluran Air termasuk Tutup saluran dari Besi D.10 mm m' 550,388.00 18.00 9,906,984.000
6 Pekerjaan Saluran Drainase diluar Bangunan dari Pasangan Batu Kali m' 311,768.00 50.00 15,588,400.000
7 Pekerjaan Pagar Pengaman dari pasangan batu bata pembatas mesjid dengan Reservoir m' 437,657.00 48.00 21,007,536.000
8 Pekerjaan Pagar Pengaman dari Kawat Duri m' 227,802.00 69.00 15,718,338.000
9 Pekerjaan Pagar Depan m' 430,313.00 10.00 4,303,130.000
10 Pekerjaan Pintu Pagar Bh 1,808,864.00 1.00 1,808,864.000
11 Pekerjaan pemasangan paving block termasuk Pas. Batu Bata untuk Ikatan m2 151,467.00 91.00 13,783,497.000
12 Pemeliharaan jalan masuk arah kemesjid dan pengembalian kekondisi semula dengan perbaikan aspa LS 6,000,000.00 1.00 6,000,000.000
13 Pemeliharaan halaman mesjid kekondisi semula dengan adukan 1:3:5 dan diaci, t = 5 cm m2 616,210.00 22.20 13,679,862.000
SUB TOTAL X 155,751,423.357
TOTAL 588,303,423.357
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
RENCANA ANGGARAN BIAYA (Engineer's Estimate)
PEKERJAAN : PEMBUATAN RESERVOIR KARANG ASAM KAPASITAS 1300 M3
LOKASI : KARANG ASAM - TANJUNG ENIM
PAKET : MWSC1.2-B
BEBAN DANA : APBD PEMDA KAB. MUARA ENIM
TAHUN ANGGARAN : 2011
HALAMAN 1
Jumlah Harga
No. KETERANGAN (Rp)

TOTAL HALAMAN 2 1,776,757,252.198

TOTAL HALAMAN 3 256,054,384.974

TOTAL HALAMAN 4 588,303,423.357

SUB TOTAL 2,621,115,060.528

PPN 10% 262,111,506.053

Harga Penawaran Total Dalam Angka dibulatkan 2,883,227,000.00

Harga Penawaran Dalam Huruf : Dua milyar Delapan ratus delapan puluh tiga juta dua ratus dua puluh tujuh ribu rupiah.-

Muara Enim, …..….- …….. - 2011

Mengetahui / Menyetujui, Project Implementing Unit (PIU)


Direktur Utama PDAM Lematang Enim Urban Water Supply and Sanitation Project (UWSSP)

H. Mirza Jaya, SE P u r y a d i, ST
NIP. 070 022 930 NIK. 49 450 362 005
SURVEY TGL 3 JUNI 2011

Reservoir Kapasitas 1300 M3 di Karang Asam Tanjung Enim :

- Pemeliharaan Jalan Masuk ke arah mesjid dan pengembalian ke kondisi semula yang digunakan
dalam pelaksanaan Reservoir Kapasitas 1300 M3 di Karang Asam Tanjung Enim.
- Panjang = 119,00 M
- Lebar rata-rata = 3,00 M
- Pemeliharaan jalan masuk arah kemesjid dan pengembalian kekondisi semula dengan perbaikan aspal
- Pemeliharaan halaman Mesjid ukuran 24x18,5m kekondisi semula dengan adukan plesteran 1:3:5, tebal 5 cm.

- Pelaksanaan pagar dari pasangan batu bata pada sisi mesjid sepanjang 48,00 M
- Pelaksanaan pagar kawat berduri keliling pembatas tanah PDAM sepanjang 69,00 M