Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
BAHAN
ALAT
ANALISA
DATA PENDUKUNG PERHIT
RESERVOIR KARANG
No.
B
C.
D.
E.
KEPALA PIU
KABUPATEN MAARA ENIM
PURYADI, ST
Nik. 4945 0362 005
DATA PENDUKUNG PERHITUNGAN VOL
RESERVOIR KARANG ASAM TANJU
URAIAN
RESERVOIR :
BETON K-125
BETON K-225 :
LANTAI t = 40 CM, TERMASUK BALOK 30/50 DIBAWAH LANTAI
DINDING t = 30 CM
KELEBIHAN KOLOM 35/35 PADA DINDING, TEBAL 5 CM
(13 x 3 + 4) = 43 KOLOM
KEPALA PIU
KABUPATEN MAARA ENIM
PURYADI, ST
Nik. 4945 0362 005
PERHITUNGAN VOLUME PEKERJAAN REVIEW DESAIN
ARANG ASAM TANJUNG ENIM KAPASITAS 1300 M3
DIMENSI
PANJANG LEBAR
183.60 51.20 - -
Volume
TINGGI 0,40 Volume 125 x 30 JUMLAH
35 x 125
0,30 & 0,10 0.47 0.08 8
Ukuran 0,20 Ukuran 0,30 JMLH PANJANG VOLUME
0.20 0.30 16.50 0.990
KONSULTAN,
PT. DESERCO DEV. SERVICES
VOLUME
58.752
4.050
0.756
63.558
234.800
VOLUME
4.424
ATAS = 0,30 M, BAWAH
= 0,80 M SETINGGI =
0,70 M
ATAS = 0,30 M, BAWAH
= 0,80 M SETINGGI =
0,70 M
KONTRAKTOR,
DIREKTUR
KABUPATEN DAERAH MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP)
Jumlah Harga
No. KETERANGAN (Rp)
TOTAL HALAMAN 2
TOTAL HALAMAN 3
TOTAL HALAMAN 3
SUB TOTAL
PPN 10%
H. Mirza Jaya, SE P u r y a d i, ST
NIP. 070 022 930 NIK. 49 450 362 005
PEMERINTAH DAERAH KABUPATEN MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT - IBRD No. 7730 ID
DAFTAR HARGA SATUAN UPAH, BAHAN DAN
DANA APBD PEMDAKAB MUARA ENIM TA. 2011
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
II. B A H A N
A. BATU - BATUAN
1 Batu Kali
a Batu Bulat Utuh M³ 180,000.00
b Batu Belah 15/20 M³ 180,000.00
b Batu Pecah 7/10 M³ 200,000.00
c Batu Pecah 5/7 M³ 220,000.00
d Batu Pecah 3/5 M³ 200,000.00
e Batu Pecah 2/3 M³ 230,000.00
f Batu Pecah 1/2 M³ 240,000.00
g Split Pecah M³ 225,000.00
2 Kerikil
a Kerikil Beton M³ 180,000.00
b Kerikil Timbun (Timbunan Pilihan) M³ 80,000.00
c Sirtu M³ 76,500.00
3 Pasir
a Pasir Pasang M³ 90,000.00
b Pasir beton M³ 90,000.00
c Pasir Urug M³ 65,000.00
d Tanah Timbun M³ 40,000.00
427346257.xls 21
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
IV BAHAN KAYU
1 Kayu Klas I : Papan (Jati) M³ 4,427,500.00
Balok M³ 4,427,500.00
1 Kayu Papan Klas I M³ 3,500,000.00
(Kelas I ) Balok M³ 3,000,000.00
2 Kayu Klas II : Papan M³ 4,175,000.00
Balok M³ 4,175,000.00
3 Kayu Klas III : Papan M³ 2,755,500.00
( Kelas III ) Balok M³ 2,755,500.00
4 Kayu Bekisting : Papan M³ 2,087,000.00
( Kelas IV ) Balok M³ 2,087,000.00
5 Kayu batang kelapa M1 4,000.00
6 Kayu api M³ 250,000.00
7 Kayu Pancang / Dolken / Cerucuk Gelam Btg 10,000.00
8 Bambu dia 6 - 8 cm Btg 10,000.00
Bahan Besi/Beton
1 Besi Beton Kg 10,000.00
2 Besi Kanal C Kg 9,000.00
3 Besi Siku Kg 9,000.00
4 Besi Strip Kg 12,000.00
5 Pagar BRC panjang = 2,40 Meter tinggi = 1,50 m Lb 275,000.00
6 Plat Alumunium Kg 30,000.00
7 Flexible PVC Waterstop h=250 mm m' 25,000.00
Bahan Paku dan Moer Baut
1 1 1/2 " Kg 20,000.00
2 ( 2 - 5 )" Kg 20,000.00
3 Paku Seng ( 1 1/2 - 1 )" RRC Kg 25,000.00
4 Paku hak panjang 15 cm Kg 48,300.00
427346257.xls 22
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
Keramik Dinding
- ukuran 20 x 25cm M2 55,500.00
- ukuran 20 x 30 cm M2 55,000.00
Keramik 11 x 11 cm M2 40,000.00
- Walpaper M2 520,000.00
Ubin
- Ubin PC abu-abu M2 44,000.00
- Ubin Warna M2 45,000.00
- Karpet M2 150,000.00
- Parquet Jati M2 250,000.00
- Poselin M2 42,250.00
- Rooster Beton 20 x 20 cm Bh 5,520.00
IX BAHAN KACA
Kaca Polos
- Tebal 3 mm M2 77,000.00
- Tebal 5 mm M2 89,700.00
- Tebal 6 mm M2 106,500.00
Raiben
- Tebal 3 mm M2 78,000.00
- Tebal 5 mm M2 126,500.00
427346257.xls 23
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
Kaca Es
- Tebal 3 mm M2 78,000.00
- Tebal 5 mm M2 101,500.00
X PENGGANTUNG / PENGUNCI
Kunci Pintu Tanam
- Merk Jangkar 9702 RRC/692 LD Set 51,000.00
- Jangkar 746 Set 39,000.00
- Merk Ciga Brown 5404 Set 74,000.00
- Merk Ciga Brown 5009 Set 107,000.00
- Kunci Mandili 450 Itali Set 144,500.00
- Kunci Antik A/C Itali Set 166,000.00
- Kunci Antik SES Set 130,000.00
- Kunci Sanghai 9702 LD Set 98,000.00
- Grendel Antik 2 Set 23,000.00
- Tarikan Antik Jendela Set 39,000.00
- Engsel Nylon Set 22,000.00
- Engsel Lokal Set 12,000.00
- Kait angin Set 6,500.00
- Pegangan pintu Set 130,000.00
XI BAHAN CAT
- Platone Cat Tembok Kg 15,000.00
- Dulux Cat Tembok Kg 35,000.00
- Rimatek Dempol Tembok Kg 9,500.00
- Platone Cat Besi/cat kayu Kg 35,000.00
- Multi Seal Cat Seng Kg 32,500.00
- Plemer Kayu - wa Kg 17,500.00
- Plamir Tembok Kg 17,500.00
- Meni Kayu - wa Kg 19,500.00
- Meni Besi - wa Kg 19,500.00
- Residu Ltr 6,500.00
- Minyak Cat Ltr 25,000.00
- Aspal Kg 8,500.00
- Teak Oil Ltr 8,000.00
- Cat Dasar TL Kg 11,500.00
- Lem kayu Ltr 6,500.00
- Kuas (ukuran sedang) Bh 7,500.00
- Amplas lbr 2,500.00
427346257.xls 24
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
Closed Duduk
- Manual Bh 975,000.00
- Otomatis Bh 2,275,000.00
Closed Jongkok
- Warna Tua Klas D Bh 143,000.00
- Warna Tua Klas A Bh 422,500.00
Closed Jongkok
- Klas C Bh 175,500.00
- Klas B Bh 195,000.00
Bak fiber
- voll 0.3 M3 Bh 260,000.00
- voll 1 M3 Bh 650,000.00
Bak Cuci
- Bak cuci stainles steel Bh 325,000.00
- Waterdrain + aksesoris Set 97,500.00
Wastafel Komplek
- Klas B Bh 590,000.00
- Klas A Bh 615,000.00
427346257.xls 25
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
All Flanged Bend 45, 22, 1/2 ; 11, 1/4 degree ( GIP )
1 Diameter Nominal 600 mm Bh 5,352,000.00
2 Diameter Nominal 500 mm Bh 3,615,000.00
3 Diameter Nominal 450 mm Bh 2,911,000.00
4 Diameter Nominal 400 mm Bh 2,332,000.00
5 Diameter Nominal 350 mm Bh 1,800,000.00
6 Diameter Nominal 300 mm Bh 1,753,000.00
7 Diameter Nominal 250 mm Bh 1,252,000.00
8 Diameter Nominal 200 mm Bh 845,000.00
9 Diameter Nominal 150 mm Bh 532,000.00
10 Diameter Nominal 125 mm Bh 391,000.00
11 Diameter Nominal 100 mm Bh 282,000.00
12 Diameter Nominal 75 mm Bh 219,000.00
13 Diameter Nominal 63 mm Bh 156,000.00
14 Diameter Nominal 50 mm Bh 141,000.00
427346257.xls 26
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
427346257.xls 27
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
427346257.xls 28
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
Butterfly valve PN 10
1 Diameter Nominal 75 mm Bh 763,000.00
2 Diameter Nominal 100 mm Bh 1,123,000.00
3 Diameter Nominal 150 mm Bh 1,684,500.00
4 Diameter Nominal 200 mm Bh 2,246,000.00
5 Diameter Nominal 250 mm Bh 4,211,250.00
6 Diameter Nominal 300 mm Bh 5,053,500.00
7 Diameter Nominal 350 mm Bh 5,895,750.00
8 Diameter Nominal 400 mm Bh 6,738,000.00
9 Diameter Nominal 450 mm Bh 8,422,500.00
10 Diameter Nominal 500 mm Bh 10,107,000.00
11 Diameter Nominal 600 mm Bh 15,722,000.00
Dresser coupling
1 Diameter Nominal 200 mm Bh 599,000.00
2 Diameter Nominal 250 mm Bh 824,000.00
3 Diameter Nominal 300 mm Bh 1,423,000.00
4 Diameter Nominal 350 mm Bh 2,022,000.00
5 Diameter Nominal 400 mm Bh 2,846,000.00
6 Diameter Nominal 450 mm Bh 3,670,000.00
7 Diameter Nominal 500 mm Bh 4,119,000.00
8 Diameter Nominal 600 mm Bh 6,216,000.00
Air Valve
1 Diameter Nominal 100 mm M' 4,500,000.00
2 Diameter Nominal 75 mm M' 3,200,000.00
Rabber Packing
1 Diameter Nominal 300 mm Bh 38,000.00
2 Diameter Nominal 250 mm Bh 35,400.00
3 Diameter Nominal 200 mm Bh 32,500.00
4 Diameter Nominal 150 mm Bh 21,800.00
5 Diameter Nominal 125 mm Bh 15,200.00
6 Diameter Nominal 100 mm Bh 8,200.00
7 Diameter Nominal 75 mm Bh 5,200.00
Reducer PVC
1 Diameter Nominal 250 x 200 mm Bh 510,000.00
2 Diameter Nominal 250 x 100 mm Bh 376,400.00
3 Diameter Nominal 200 x 150 mm Bh 335,200.00
4 Diameter Nominal 200 x 100 mm Bh 269,800.00
5 Diameter Nominal 200 x 75 mm Bh 245,500.00
6 Diameter Nominal 200 x 50 mm Bh 226,000.00
7 Diameter Nominal 150 x 100 mm Bh 201,500.00
8 Diameter Nominal 150 x 75 mm Bh 177,200.00
9 Diameter Nominal 150 x 50 mm Bh 157,700.00
10 Diameter Nominal 100 x 75 mm Bh 111,900.00
11 Diameter Nominal 100 x 50 mm Bh 92,400.00
12 Diameter Nominal 75 x 50 mm Bh 68,100.00
427346257.xls 29
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
Water Meter
1 Diameter Nominal 12 mm Bh 157,000.00
2 Diameter Nominal 18 mm Bh 209,000.00
3 Diameter Nominal 25 mm Bh 311,000.00
4 Diameter Nominal 40 mm Bh 503,000.00
5 Diameter Nominal 50 mm Bh 2,345,000.00
6 Diameter Nominal 75 mm Bh 3,671,000.00
7 Diameter Nominal 100 mm Bh 4,535,000.00
8 Diameter Nominal 150 mm Bh 9,287,000.00
9 Diameter Nominal 200 mm Bh 13,822,000.00
10 Diameter Nominal 250 mm Bh 19,869,000.00
11 Diameter Nominal 300 mm Bh 33,043,000.00
12 Diameter Nominal 350 mm Bh 47,081,000.00
13 Diameter Nominal 400 mm Bh 65,655,000.00
14 Diameter Nominal 450 mm Bh 85,308,000.00
15 Diameter Nominal 500 mm Bh 94,810,000.00
16 Diameter Nominal 600 mm Bh 142,539,000.00
Pipa PE
PE 100 PN. 8 SDR 21
XV SEWA PERALATAN
Sewa mesin Las Hk 150,000.00
427346257.xls 30
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
427346257.xls 31
PEMERINTAH DAERAH KABUPATEN MUARA ENIM
PERUSAHAAN DAERAH AIR MINUM LEMATANG ENIM
URBAN WATER SUPPLY AND SANITATION PROJECT (UWSSP) - IBRD No. 7730 ID
ANALISA HARGA SATUAN
DANA APBD PEMDAKAB MUARA ENIM TA. 2011
13 1 m3 Beton K 225 untuk Kolom dengan Besi 149 Kg/m3 beton (termasuk bekisting) Rp. 5,367,886.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 12,5 m2 bekisting untuk Kolom 12.50 x 205,418.00 Rp. 2,567,725.00
- 149 kg besi / m3 beton untuk kolom 149.00 x 11,599.00 Rp. 1,728,251.00
-1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
14 1m3 Beton K 225 untuk Lantai Pondasi dengan Besi 78 Kg/m3 beton (termasuk bekisting) Rp. 2,650,432.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 5 m2 bekisting untuk Lantai 5.00 x 134,760.00 Rp. 673,800.00
- 78 kg besi / m3 beton untuk kolom 78.00 x 11,599.00 Rp. 904,722.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
15 1m3 Beton K 225 untuk Dinding dengan Besi 110 Kg/m3 beton (termasuk bekisting) Rp. 4,054,260.00
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 10 m2 bekisting untuk Dinding 10.00 x 170,646.00 Rp. 1,706,460.00
- 110 kg besi / m3 beton untuk kolom 110.00 x 11,599.00 Rp. 1,275,890.00
-1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
17 1m3 Beton K 225 untuk Atap dengan Besi 114 Kg/m3 beton (termasuk bekisting) Rp. 4,153,882.50
- 1 m3 beton Mutu K 225 1.00 x 871,910.00 Rp. 871,910.00
- 6,5 m2 bekisting untuk Atap 6.50 x 270,721.00 Rp. 1,759,686.50
- 114 kg besi / m3 beton untuk Balok 114.00 x 11,599.00 Rp. 1,322,286.00
- pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
18 1m3 Beton K 175 untuk Lantai dengan Besi 73 Kg/m3 beton (termasuk bekisting) Rp. 2,988,861.00
- 1 m3 beton Mutu K 175 1.00 x 859,250.00 Rp. 859,250.00
- 4 m2 bekisting untuk Lantai 4.00 x 270,721.00 Rp. 1,082,884.00
- 73 kg besi / m3 beton untuk Balok 73.00 x 11,599.00 Rp. 846,727.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
19 1m3 Beton K 175 untuk Balok dengan Besi 136 Kg/m3 beton (termasuk bekisting) Rp. 5,529,674.00
- 1 m3 beton Mutu K 175 1.00 x 859,250.00 Rp. 859,250.00
- 10 m2 bekisting untuk Balok 10.00 x 289,296.00 Rp. 2,892,960.00
- 136 kg besi / m3 beton untuk Balok 136.00 x 11,599.00 Rp. 1,577,464.00
- 1 M3 pembongkaran bekisting 4.00 x 50,000.00 Rp. 200,000.00
MATERIAL :
0.1280 m3 Galian tanah Rp. 20,000.00 Rp. 2,560.00
0.0427 m3 Urugan tanah Rp. 9,590.00 Rp. 409.49
0.0853 m3 Buangan tanah Rp. 25,800.00 Rp. 2,200.74
0.0960 m3 Beton camp. 1 : 3 : 5 Rp. 616,210.00 Rp. 59,156.16
4.0000 m Pipa GI dia 40 mm untuk tiang Rp. 39,500.00 Rp. 158,000.00
1.0000 lbr P. BRC t = 1,50 m sesuai sfesifikasi teknis Rp. 275,000.00 Rp. 275,000.00
6.0000 bh Klem dan baut pagar Rp. 13,750.00 Rp. 82,500.00
2.0000 bh Tutup tiang pagar Rp. 6,875.00 Rp. 13,750.00
1.0000 ls Pek.pem. pagar termasuk potong dan las Rp. 45,000.00 Rp. 45,000.00
1.0000 m2 Pengecatan pagar Rp. 28,830.00 Rp. 28,830.00 Rp. 667,406.39
Jumlah Rp. 667,406.39
MATERIAL :
0.1600 m3 Galian tanah Rp. 20,000.00 Rp. 3,200.00
0.0533 m3 Urugan tanah Rp. 9,590.00 Rp. 511.47
0.1067 m3 Buangan tanah Rp. 25,800.00 Rp. 2,752.00
0.1600 m3 Beton camp. 1 : 3 : 5 Rp. 616,210.00 Rp. 98,593.60
4.0000 m Pipa GI dia 100 mm untuk tiang Pintu Rp. 124,800.00 Rp. 499,200.00
11.0000 m Pipa GI dia 40 mm rangka pintu Rp. 39,500.00 Rp. 434,500.00
4.0000 bh Knee GI dia. 40 mm Rp. 20,000.00 Rp. 80,000.00
1.6670 lbr P. BRC t = 1,50 m sesuai sfesifikasi teknis Rp. 275,000.00 Rp. 458,425.00
2.0000 bh Tutup tiang pintu Rp. 14,000.00 Rp. 28,000.00
2.0000 bh Roda pintu sesuai gambar Rp. 28,000.00 Rp. 56,000.00
1.0000 ls Pek.pem. pintu termasuk potong dan las Rp. 120,000.00 Rp. 120,000.00
1.5000 m2 Pengecatan pintu Rp. 28,830.00 Rp. 43,245.00 Rp. 1,824,427.07
` Jumlah Rp. 1,824,427.07
UPAH :
0.3000 Hk Pekerja Rp. 50,000.00 Rp. 15,000.00
0.0300 Hk Tukang Besi Rp. 65,000.00 Rp. 1,950.00
0.0330 Hk Kepala Tukang Besi Rp. 70,000.00 Rp. 2,310.00
0.0363 Hk Mandor Rp. 50,000.00 Rp. 1,815.00 Rp. 21,075.00
MATERIAL :
0.1120 m3 Galian tanah Rp. 20,000.00 Rp. 2,240.00
0.1120 m3 Buangan tanah Rp. 25,800.00 Rp. 2,889.60
0.1120 m3 Beton K.175 Rp. 859,250.00 Rp. 96,236.00
1.1200 m2 Bekisting Rp. 134,760.00 Rp. 150,931.20
15.0000 m Kawat Berduri Rp. 4,750.00 Rp. 71,250.00
6.0000 bh Klem dan baut pagar Rp. 6,000.00 Rp. 36,000.00
18.5364 Kg Tiang Besi L.60.60.6 Rp. 13,932.81 Rp. 258,264.09
1.0000 ls Pek.pem. pagar termasuk potong dan las Rp. 31,000.00 Rp. 31,000.00
1.2000 m2 Pengecatan pagar Rp. 28,830.00 Rp. 34,596.00 Rp. 683,406.89
Jumlah Rp. 683,406.89
XV 12 Analisa ( Satu ) Unit Septick Tank Kap. 25 Orang lengkap peresapan ( Uk. 1.10 x 2.20 x 1,70 M' )
9.0000 M3 Galian Tanah Rp. 26,270.00 Rp. 236,430.00
2.2500 M3 Urugan kembali 1/4 Eks Galian Rp. 9,590.00 Rp. 21,577.50
1.4000 M3 Pas. Bata 1 : 2 Rp. 108,852.00 Rp. 152,392.80
11.5000 M3 Plesteran 1 : 2 Rp. 32,713.20 Rp. 376,201.80
0.2000 M3 Beton Tumbuk 1:2:3 Rp. 616,210.00 Rp. 123,242.00
0.3500 M3 Beton Bertulang 1:2:3 Rp. 616,210.00 Rp. 215,673.50
60.0000 Kg Pembesian Rp. 11,598.50 Rp. 695,910.00
1.6000 m2 Bekisting Rp. 134,760.00 Rp. 215,616.00
1.0000 M3 Kerikil Saringan Rp. 80,000.00 Rp. 80,000.00
2.0000 M3 Pasir Saringan Rp. 90,000.00 Rp. 180,000.00
5.0000 M' Pipa PVC dia 4" Rp. 68,400.00 Rp. 342,000.00
3.0000 M' Pipa GIP 2" Rp. 46,200.00 Rp. 138,600.00
1.0000 Bh TEE 2" Rp. 9,000.00 Rp. 9,000.00
2.0000 Bh Keni 2" Rp. 12,000.00 Rp. 24,000.00
7.0000 Ikat Ijuk Rp. 7,500.00 Rp. 52,500.00
Jumlah Rp. 2,863,143.60
Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar
3
Kerja Dengan mutu beton K.225. termasuk Pembesian, Pasang dan bongkar Bekisting, untuk :
Pekerjaan Beton Bertulang / Struktur untuk masing-masing pekerjaan yang ditentukan pada Gambar
2
Kerja Dengan mutu beton K.225. termasuk Pembesian, Pasang dan bongkar Bekisting, untuk :
Harga Penawaran Dalam Huruf : Dua milyar Delapan ratus delapan puluh tiga juta dua ratus dua puluh tujuh ribu rupiah.-
H. Mirza Jaya, SE P u r y a d i, ST
NIP. 070 022 930 NIK. 49 450 362 005
SURVEY TGL 3 JUNI 2011
- Pemeliharaan Jalan Masuk ke arah mesjid dan pengembalian ke kondisi semula yang digunakan
dalam pelaksanaan Reservoir Kapasitas 1300 M3 di Karang Asam Tanjung Enim.
- Panjang = 119,00 M
- Lebar rata-rata = 3,00 M
- Pemeliharaan jalan masuk arah kemesjid dan pengembalian kekondisi semula dengan perbaikan aspal
- Pemeliharaan halaman Mesjid ukuran 24x18,5m kekondisi semula dengan adukan plesteran 1:3:5, tebal 5 cm.
- Pelaksanaan pagar dari pasangan batu bata pada sisi mesjid sepanjang 48,00 M
- Pelaksanaan pagar kawat berduri keliling pembatas tanah PDAM sepanjang 69,00 M
RESER
VOIR
KAP. 1300
M3
MESJID