1. Entity Profile
Borrower Profile
Postal Code :
City
State
Name
Designation
Phone No.
Mobile No.
After entering the above details, press the Add button. This will add the record as shown below. You can add as
many records as are required.
ADD
Status of Business Plan / FRP (Consultant Appointed / Prepared and submitted to Government
For approval / in place )
Click the Save button to save the above details. Then click the Next button to go to the next form.
Edit Save Next
Name
Designation Email ID
Address Phone No
Fax No
City Mobile No
State PIN
Application No:
3. Project Type / Water Source / Installed Capacity
Project Type
Type of Project *
Storage
ROR/Pondage
Canal Drop
Purpose of Project *
Purely Power
Multipurpose
Source of Water *
Name of the River
River Basin
Installed Capacity
Total Energy(GWH)
N.B. : Total Energy(GWh)= Annual Energy (Firm) (GWh) + Secondary / Seasonal Energy (GWh)
Fill as Applicable
Fill as Applicable
S Unit No. Gross Head (m) Net Head (m) Type of Turbine **
No
1
N.B. : In case same for all units, please fill for one unit only
7. Status of Clearances/Inter-State Issues
Statutory & Other Clearances
*State govt., Central govt., CERC, SERC, CEA, State Pollution Board, MoEF, Others
Inter-State Issues
Financing Plan
A. Equity
Total Equity(A) :
B. Debt
Total Debt(B) :
C. Grant
Total (A + B + C):
Application No: 162
A. Equity
S Financial Equity
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Amount Exch. Rate Eqv. Amount (Rs. in
(Millions) Crores)
(Rs. in
Crores)
Total Equity (A ) :
B. Debt
S Financial Debt
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Amount Exch. Rate Eqv. Amount (Rs. in
(Millions) Crores)
(Rs. in
Crores)
Total Debt (B ) :
C. Grant
S Financial Grant
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Total Exch. Rate Eqv. Amount (Rs. in
(Rs. in (Rs. in Crores)
Crores) Crores)
Total (A + B + C):
Phasing of Balance Expenditure
A. Equity
S Financial Equity
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Amount Exch. Rate Eqv. Amount (Rs. in
(Millions) Crores)
(Rs. in
Crores)
Total Equity (A ) :
B. Debt
S Financial Debt
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Total Exch. Eqv. Amount (Rs. in
(Rs. in Rate Crores)
(Rs. in Crores)
Crores)
Total Debt (B ) :
C. Grant
S Financial Grant
No Year
INR Component Foreign Currency Component Total
(Rs. in Crores) Currency Total Exch. Eqv. Amount (Rs. in
(Rs. in Rate Crores)
(Rs. in Crores)
Crores)
Total (A + B + C):
Application No: 162
10. Implementation Schedule
Implementation Schedule Details
(MM/YYYY)
1 Coffer Dam
Diversion
Structure
Dams &
Dykes/Spill
way
Water
Conductor
System
P.H. Building
Tail Racer
Hydro-
Mechanical
Works
Generating
Equipment
EOT Crane
Switch Yard
Structure
Switch Yard
Equipment
Construction Power *
Approach Roads *
Others
Procurement Procedure
Cost of generation at bus bar (Rs. /Unit ) in 1st Full Year of generation * :
Tariff Details
Tariff at bus bar (Rs. /Unit ) for 1st Year of Full Generation * :
N.B. : Please upload / send details of calculation of cost of generation and Tariff with assumptions.
Application No: 162
13. Evacuation plan & Marketing arrangement
Evacuation Plan
*Single, Double
O&M
Self Others
*Government, Private
**Agriculture, Forest, Barren
S No Ownership Type of Required Land Acquired Balance land to Remarks (if any)
of Land* Land** (Acres) (Acres) be acquired
by(MM/YYYY)
1 Government Forest 200 100 12/2005
Details of R & R
Families Affected
Persons Affected
hereby declare that the information given herein is true and correct to the best of my/our knowledge
and belief in connection with the aforesaid Hydro Generation Loan.