Sei sulla pagina 1di 2

Atlas Copco Underground drill rigs

Boomer S1D series rigs


Transport instruction

WARNING! Risk area when moving the rig!

2m
2m

2m
2m
1250 0160 00

Lifting

Max 45° Max 15°

Locking device applied


1250 0202 14

Always apply the locking device before lifting!


CAUTION! Be very careful when strapping and lifting the rig!
The lift must be done through the centre of gravity so the rig is balanced
during lifting.
Atlas Copco Underground drill rigs
Boomer S1D series rigs
Transport instruction

Transport position
1250 0183 35

Booms must be laid down and supported by floor for transport!

Boomer Length [m] Width [m] Height [m] Weight [ton]


S1D 8.6 - 11.4 1.75 2.1 - 2.8 10 - 13

Securing the load


1250 0225 80

Securing points

CAUTION! Make sure all hatches and plates are closed.


9852 2000 01

Atlas Copco Rock Drills AB


ÖREBRO, Sweden
© Atlas Copco Rock Drills AB, 2007. All rights reserved