Group 1

QUESTIONS
1. Services ancillary to the supply of the Goods, such as transportation and insurance, and
any incidental services, such as installation, commissioning, provision of technical
assistance, training, and other such obligations of the Supplier covered under the Contract.

Answer: The Services

2. A scheme or arrangement between two or more Bidders, with or without the knowledge
of the Procuring Entity, designed to establish bid prices at artificial, non-competitive levels.

Answer: Collusive Practices

3. Involves all activities related to the monitoring of suppliers, contractors and service
providers’ performance in the fulfillment of their contractual obligations, and to ensure
appropriate actions are taken to promptly remedy any deficiencies observed in contract
implementation, scope or terms and conditions.
Answer: Contract administration

4. A written agreement, enforceable by law, between a procuring entity and a supplier,


contractor or service provider for the provision of goods, works and services.
Answer: Contract

5. What is the main cause of human suffering and loss?


Answer: Occupational accidents and diseases

6. Based on statistics about how many percent are suffering from work related illness?
Answer: 4%

7. What is the most important considerations that you should take before any construction
project gets underway?
Answer: Health and safety

8. It is the proposed procedures for inspection during construction.


Answer: Plans and Specification

9. It is define as the fixed-price contracts.


Answer: Competitive bid contracts
10. It is known as a single price for all the works is agreed before the works begin.
Answer: Lump-sum

11. It includes all labor, material, equipment, overhead, and profit attributable to that
scope of work.
Answer: Unit Price

12. One or more items must be evaluated, scored to determine which entity will be awarded
the contract.
Answer: negotiated contract

13. How many division in the contstruction contract?


Answer: 2
14. The organization purchasing the Goods, as named in the SCC.
Answer: The Procuring Entity

15. It is the price payable to the Supplier under the Contract for the full and proper
performance of its contractual obligations.
Answer: Contract Price

16. It is harming or threatening to harm, directly or indirectly, persons, or their property to


influence their participation in a procurement process, or affect the execution of a
contract.
Answer: Coercive Practices

17. Involves all activities related to the monitoring of suppliers, contractors and service
providers’ performance in the fulfillment of their contractual obligations, and to ensure
appropriate actions are taken to promptly remedy any deficiencies observed in contract
implementation, scope or terms and conditions.
Answer: Contract administration
18. Generally concludes with a final inspection and acceptance of the goods, works or services
prior to the completion date or termination of the contract.
Answer: Contract administration

19. How many workers dying each year from work-related accidents, and diseases?
Answer: 2 million

20. What does ILO stand for?


Answer: International Labor Organization

21. Offer to set a price by an individual or business for a product or service or a


demand that something be done.
Answer: Bidding

22. It is conducted by the government, to clarify and/or explain any of the


requirements, terms, conditions and specifications stipulated in the bid
documents.
Answer: Pre-bid Conferences

23. The concerned office/agency/corporation shall conduct a rebidding with re-


advertisement of the project when no bids are received, or without re-
advertisement.
Answer: Failure of Bidding

24. To analyze and verify, whenever applicable, the required bank commitment to
provide a credit line to the bidder in the amount specified and over the period
stipulated in the Instructions to Bidders, to ensure that the bidder can sustain
the operating cash flow of the transaction.
Answer: Evaluation of financial capability

25. To determine compliance of the goods/product with the required


specifications.
Answer: Evaluation of technical capacity
26. To determine the lowest calculated responsive bid, the BAC shall, within thirty
(30) days from the determination of the lowest calculated bid, conduct a post
qualification of the bidder with the lowest calculated bid
Answer: Post qualification of the Lowest Calculated Bid

27. According to ________________, over 80 percent of construction site fatalities are the
result of negligence or a lack of appropriate safety measures.
Answer: American Institute of Architects
28. These are worn anytime work operations can cause foreign objects getting into the eye
such as during welding, cutting, grinding, nailing (or when working with concrete and/or
harmful chemicals or when exposed to flying particles).
Answer: Safety glasses or face shields

29. All the supplies, equipment, machinery, spare parts, other materials and/or general
support services which the Supplier is required to provide to the Procuring Entity under
the Contract.
Answer: The Goods

30. The place or places named in the SCC.


Answer: The Project Site