Sei sulla pagina 1di 2

REPUBLIC OF THE PHILIPPINES

Department of Education
REGION V
SCHOOLS DIVISION OF SORSOGON
PILAR III DISTRICT

BRIGADA ESKWELA 2019


CONSOLIDATED REPORT ON SCOPE OF WORK

S C O P E OF W O R K
REPAIR OF CLASSROOMS Repair/ Construction of Toilets Repair/ Construction of New Improvements/ Beautifications/
(Pls. indicate the number of classroom/s and the (indicate the number of toilets) Handwashing Facilities Landscaping/ Learners’ Kiosk
(pls. indicate the number of (specify the specific project/s) STATUS OF Over-all
Type of Building)
facilities)
TOTAL PROJECT Percentage
New Lear- PROJ. (New/On- of
QTY. QTY. QTY. QTY.
SPECIFIC PROGRAM OF WORKS of of hand-
Improve- ning COST going/ Completion
of of
Type of (Write 1 if applicable) PROJECT PROJECT hand- washing PROJECT ments/ Kiosks PROJECT
Completed)
COST toilets toilets COST washing facilities COST COST
Building No. of to be to be
Beauti- and
facilities to be
based on Class- repair cons- to be constructed
fications/ others
NSBI rooms ed tructed repaired Landscaping
Report Roof
Covering Ceilings Walls Floors Electri- Doors &
& cals Windows
Structure
ARMY 2 1 1 1 1 1 1 50,000 2 4 30,000 7 50,000 CONSTRUCT 17,800
TYPE ION OF
BUILDING PATHWAY
CGMA 1 1 2 70,270 CONCRETE 126,754
FENCE
KALAHI 3 1 1 1 1 10,000 LANDSPING 20,000
WATSAN 1 1 1 65,000 1 3,700 STAGE 63,215
FEEDING 1 1 1 1 1 1 DIRECTORY 27,554
CENTER
DEPED 1 19 1 2 1 23,797 1 21,612. 1 1,055 CONSTRUCT 9,945
STANDAR 50 ION OF
D BENCHES
BLSB 2 1 4 3,822 FLOWER 9,394
BOX
RP-US 7 2 1 2 1 813,138 1 3,000 2 1 105,00 WOODEN 34,890
0 FENCE
DEPED 4 1 1 1 1 1 1 PAINTING 10,784
(7X9) OF
CLASSROO
M
RAMOS 1 1 1 1 1 SCHOOL 57,000
SIGNAGE(ST
AND
LETTER)
DEPED 1 1 1 1 1 REPAIR OF 7,000
(7X7) SCHOOL
SIGNAGE
PHIL 200 2 1 2 2 25,000 CONSTRUCT 60,000
ION OF
READING
KIOSK
JOL 1 15,000 WATSAN 3,700
SPEDAC 1 FEEDING 65,000
CENTER
AFP 1 GULAYAN 20,000
SA
PAARALAN
FVR 2000 5 3 1 1 52,040
PSIP 3
PLED 1
ARROYO 1 1 1 1 5,000
TYPE
IMELDA 3 1 3,000

42 25 10 11 10 13 13 323,742.13 3 5 54,612.50 4 8 159,755 692,791


TOTAL

Instructions: This template on the scope of work is to be accomplished by the School PF Coordinator with the assistance of the School B.E. Coordinator AFTER CONDUCTING THE PHYSICAL
FACILITIES AND MAINTENANCE NEEDS ASSESSMENT. This will be the basis for determining the actual accomplishment of the school, district and division for Brigada Eskwela 2018.

Prepared by: Noted by: Received by:

LYN M. ROMERO BEVELYN C. CARAMOAN, Ed.D BERNARDINO D. ESTRADA


District B.E. Coordinator EPS II/OIC-PSDS SEPS-SGOD, SOCMOBNET
Division ASP/ B.E. Coordinator

Potrebbero piacerti anche