WHAT IS DVC ?
DVC (Damodar Valley Corporation)a legacy to the
people of India, emerged as a culmination of attempts
made over a whole century to control the wild and
erratic Damodar river. The river spans over an area of
24,235  km2 covering the states of Jharkhand
(Dhanbad, Bokaro, Hazaribagh, Koderma, Giridih,
Chhatra, Palamau, Rachi, Lohardaga and Doomka) &
West Bengal (Burdwan , Hooghly, Howrah, Bankura and
Purulia).
OBJECTIVES/PURPOSE :
 FLOOD CONTROL.

 IRRIGATION.
 WATER SUPPLY- INDUSTRIAL AND DOMESTIC.
 NAVIGATION & DRAINAGE.
 GENERATION, TRANSMISSION AND DISTRIBUTION OF
ELECTRICAL ENERGY.
 AFFORESTATION AND CONTROL OF SOIL EROSION.
 PROMOTION OF PUBLIC HEALTH, AGRICULTURE,
INDUSTRIAL, ECONOMIC AND GENERAL WELL BEING IN
THE VALLEY.
LANDMARKS ACHIEVED :
 
 DVC- FIRST MULTIPURPOSE RIVER VALLEY PROJECT BY THE GOVT. OF INDIA.
 DVC- ORGANIZATION GENERATING POWER THROUGH THREE SOURCES- COAL, WATER AND
LIQUID FUEL.
 FIRST UNDERGROUND HYDEL STATION- MAITHON.
 BTPS- NATION’S BIGGEST THERMAL POWER PLANT IN THE 50’S OF THE LAST CENTURY
 BTPS BOILERS- FIRST TO BURN UNTAPPED LOW-GRADE COAL IN PULVERIZED FUEL
FURNACES.
 CTPS- THE FIRST RE-HEAT UNITS IN INDIA, UTILIZING HIGH STEAM PARAMETER.
 MTPS- FIRST OF ITS KIND IN EASTERN INDIA WITH TUBE MILLS IN SERVICE FOR ZERO
REJECT. DIRECT IGNITION OF PULVERIZED COAL (DIPC) SYSTEM FOR REDUCING OIL
CONSUMPTION IN THE BOILER.
-: DVC Infrastructure At A Glance :-
DVC COMMAND AREA 24,235 SQ. KMS
POWER MANAGEMENT
TOTAL INSTALLED
2796.5 MW
CAPACITY
THERMAL POWER FIVE CAPACITY 2570
STATIONS MW
THREE CAPACITY 144
HYDEL POWER STATIONS
MW
ONE CAPACITY 82.5
GAS TURBINE STATION
MW
AT 220 KV– 11 NOS.
SUB-STATIONS AND
AT 132 KV– 33 NOS.
RECEIVING STATIONS
AT 33 KV– 16 NOS.
220 KV– 1500 CKT
KMS 
TRANSMISSION LINES 132 KV– 3415 CKT
KMS
DVC POWER PLANTS AT A GLANCE

NAME LOCATION CAPACITY


THERMAL
BOKARO 'B' DIST .- BOKARO 630 MW
STATE – JHARKHAND (3 X 210 MW)
CHANDRAPURA DIST .- BOKARO 890 MW
STATE – JHARKHAND (3 X 130 MW)
+
(2 X 250 MW)
DURGAPUR DIST .- BARDDHAMAN 350 MW
STATE - WEST BENGAL (1X140 MW)
+
(1X210 MW)
MEJIA DIST .- BANKURA 2340 MW
STATE - WEST BENGAL (4 X 210 MW) 
+
(2 X 250 MW)
+
(2 X 500 MW)
DSTPS DIST .- BARDHAMAN 1000 MW
STATE - WEST BENGAL (2 X 500 MW)
KTPS DIST .- KODERMA 500 MW
STATE – JHARKHAND (1 X 500 MW)
TOTAL THERMAL 5710 MW
NAME LOCATION EXISTING CAPACITY

HYDEL
TILAIYA RIVER - BARAKAR 4 MW 
DIST .- HAZARIBAGH (2 X 2 MW)
STATE – JHARKHAND
MAITHON RIVER - BARAKAR 63.2 MW
DIST .- BURDHAMAN (2 X 20 MW)
STATE - WEST BENGAL +
(1 X 23.2 MW)
PANCHET RIVER - DAMODAR 80 MW
DIST .- DHANBAD (2 X 40 MW)
STATE – JHANKHAND
TOTAL HYDEL 147.2 MW

GRAND TOTAL (THERMAL + HYDEL) 5857.2 MW


DAMS
MAITHON DAM
KEY OBJECTIVES
WATER
NAVIGATIO SUPPLY TO
FLOOD GENERATION OF IRRIGATIO N& INDUSTRIE
CONTOL ELECTRIC POWER N S AND
DRAINAGE
DOMESTIC
S

Maithon Hydel

• MAITHON HYDEL POWER STATION (MHPS) IS LOCATED ON THE RIVER


BARAKAR.
• FIRST UNDERGROUND POWER STATION.
• GENERATING CAPACITY OF 60 MW.
• MHPS -1000 FEET BELOW THE WATER LEVEL.

MAITHON HYDEL POWER


STATION
220 KV KALYANESHWARI
TRAINING AT SUBSTATION
CENTRAL LOAD DISPATCH
ON
OVERVIEW
Power Generation
 Entrusted with the responsibilities of
providing the vital input power for industrial
growth in the resource rich Damodar Valley
region, DVC has been practically operating as a
pioneer, using latest available technologies to
supply bulk power at reasonable rates to
the major industries.

 DVC has maintained its lead role in the


eastern region by adopting itself to the
challenges of time and technology during the
course of last 59 years. DVC has been generating
and transmitting power since 1953 and has
succeeded not only in meeting the needs of
consumers but has also helped to increase the
demand of power which itself is an index of
development.
MAITHON HYDEL POWER STATION
Maithon Hydal Power Station is
located on the river Barakar 12.9
km above its confluence with the
Damodar near the border of
Dhanbad and Burdwan districts of
the state of Jharkhand and West
Bengal respectively. The unique
feature of this hydal power station
is that it is located underground in
the left bank of the river and is the
first of its kind in India. The Power
station has a total generating
capacity of 60 MW with 3 units of
20 MW each.
How Hydropower Works
WATER TURBINE:
water turbines are used to convert
the energy of falling water into mechanical
energy.
 PENSTOCK:
It is a closed conduit which connects the fore bay or surge tank to the scroll
case of the turbine.
Maithon Hydel Station At A Glance
1. Drainage area 2430 sq . mile
2. Inflow(maximum) 2500 cusec
3. Annual rainfall(max) 70 inch
4. Annual rainfall(avg.) 30.5 inch
5. Area design 28400 al
6. Length of back water 15 miles
7. Major reservoir level 86-500h
8. Gross strong capacity 104,0000 Al H
9. Flood control reservoir 440000 Al H
10. Monsoon storage capacity 496000 Al H
11. Estimated cost of station 4.71 crores
20 Mw Generator Specification
1. Simmens Sehuckert,Germany
2. 3PH,generator no.D73445
3. Type-PFL 670/47-34
4. Y11,000 volt,1310/1525amp
5. RPM-176.6
6. KVA-25000/29000
7. P.F-0.8 const.
Excitor Specification
1. V: 295/330/445
2. A: 465/505/700
Main Excitor
1. DC GEN. NO-D39408
2. TYPE-GV 441/36
3. V-310,333,500
4. RPM-176.6
SINGLE LINE DIAGRAM OF HYDEL POWER STATION
MEASURING INSTRUMENT USED –

• ENERGY METER - To measure the energy


transmitted energy meters are fitted to the panel to
different feeders the energy transmitted is recorded
after one hour regularly for it MWHr, meter is
provided
• WATTMETERS - It is attached to each feeder to
record the power exported from DVC.
• FREQUENCY METER - To measure the frequency at
each feeder there is the provision of analog or
digital frequency meter.
•FREQUENCY METER - To measure the frequency at each feeder
there is the provision of analog or digital frequency meter.

•VOLTMETER - It is provided to measure the phase to phase


voltage .It is also available in both the analog and digital frequency
meter.

•AMMETER - It is provided to measure the line current. It is also


available in both the forms analog as well as digital.

•MAXIMUM DEMAND INDICATOR - There are also


mounted the control panel to record the average
power over successive predetermined period

•MVAR METER - It is to measure the reactive power


of the circuit
GENERATED POWER
ELECTRIC POWER
TRANSMISSION
ELECTRIC-POWER TRANSMISSION IS THE BULK TRANSFER
OF ELECTRICAL ENERGY, FROM GENERATING POWER PLANTS
TO ELECTRICAL SUBSTATION LOCATED NEAR DEMAND
CENTERS.

HAT IS AN ELECTRIC SUBSTATION?


A SUBSTATION IS A PART OF AN ELECTRICAL GENERATION, TRANSMISSION
AND DISTRIBUTION SYSTEM. SUBSTATIONS TRANSFORM VOLTAGE FROM
HIGH TO LOW, OR THE REVERSE, USING STEP-UP OR STEP-DOWN
TRANSFORMERS.

ELEMENTS OF A SUBSTATION A:PRIMARY POWER LINES' SIDE B:SECONDARY


POWER LINES' SIDE 1.PRIMARY POWER LINES 2.GROUND WIRE 3.OVERHEAD LINES
4.TRANSFORMER FOR MEASUREMENT OF ELECTRIC VOLTAGE 5.DISCONNECT
SWITCH 6.CIRCUIT BREAKER 7.CURRENT TRANSFORMER 8.LIGHTNING ARRESTER
9.MAIN TRANSFORMER 10.CONTROL BUILDING 11.SECURITY FENCE 12.SECONDARY
220KV KALYANESWARI SUB-STATION
220KV SYSTEM (12 BAYS)

220KV LINES: -
1) L#228(KALYANESWARI-MTPS)
2) L#229(KALYANESWARI-MTPS)
3) L#203(KALYANESWARI-CTPS)
4) L#204(KALYANESWARI-CTPS)
5) L#217(KALYANESWARI-PGCIL, PITHAKARI)
6) L#218(KALYANESWARI-PGCIL, PITHAKARI)

AUTOTRANSFORMERS: -
BUS COUPLER: - 02 NOS.
BUS TIE BAY:-01NO. • ATR#1CGL MAKE 150MVA, 220KV/132KV
• ATR#2 CGL MAKE 150MVA, 220KV/132KV
• ATR#3 BHEL MAKE 150MVA, 220KV/132KV

132KV SYSTEM (11 BAYS)

132KV LINES: - AUTOTRANSFORMERS: -


1) L# 18(KLN-KLP)
2) L# 19KLN-KLP) 1) ATR#1CGL MAKE 150MVA, 220KV/132KV
3) L# 68(MHS-KLN) 2) ATR#2 CGL MAKE 150MVA, 220KV/132KV
4) L# 69(MHS-KLN) 3) ATR#3 CGL MAKE 150MVA, 220KV/132KV
5) MAL-IMPEX FDR (CD – 61MVA) TWO WINDING TRANSFORMERS:-
1) 50 MVA, 132/33KV, APEX MAKE.
2) 31.5MVA, 132/33KV, TELK MAKE.
BUS COUPLER: - 01 NO.
33KV SYSTEM
NAME OF THE CONSUMERS:
1) IMPEX STEEL (PVT) LTD.(CD-7.0MVA) SUBSTATIO
2) HIRA CONCUST STEEL PVT LTD (CD-7.0MVA) N
3) CITY ALLOYS PVT. LTD. (CD-3.0MVA)
4) BMA STAINLESS LIMITED (CD-12.0MVA)
5) JAGDAMBA ISPAT PVT LIMITED (CD-3.0MVA)
6) MAA LILORI ISPAT LTD. (CD- 3.0MVA)
SWITCHYA CONTROL
7) CHHABRA ISPAT PVT. LTD.(CD – 8MVA)
RD BUILDING
SUBSTATION PARTS AND EQUIPMENT

OUTDOOR
 SWITCHYARD
INCOMING & OUTGOING LINES
 BUSBARS
 POWER TRANSFORMERS AND MEASUREMENT TRANSFORMERS
 INSULATORS
 CIRCUIT-BEAKERS & ISOLATORS
 LIGHTNING ARRESTORS
 GALVANISED STEEL STRUCTURES FOR TOWERS & EQUIPMENT SUPPORTS.
 ROADS, RAILWAY TRACK, CABLE TRENCHES
 PLCC EQUIPMENT INCLUDING LINE TRAP, TUNING UNIT, COUPLING CAPACITOR, ETC.
 STATION EARTHING SYSTEM COMPRISING GROUND MAT, RISERS, AUXILIARY MAT,
EARTHING STRIPS, EARTHING SPIKES & EARTH ELECTRODES.
 CONTROL CABLES FOR PROTECTION AND CONTROL

CONTROL BUILDING
IN EVERY SUB-STATION CERTAIN SUPERVISION, CONTROL AND PROTECTION FUNCTIONS
ARE NECESSARY. SO A CONTROL BUILDING/CONTROL ROOM IS REQUIRED. THE RELAY
AND PROTECTION PANELS AND CONTROL PANELS ARE INSTALLED IN THE CONTROL
ROOM.

CONTROL IN SUB-STATION ARE OF TWO CATEGORIES.


1. NORMAL ROUTINE OPERATION BY OPERATORS COMMAND.
2. AUTOMATIC OPERATION BY ACTION OF PROTECTIVE RELAYS AND CONTROL SYSTEM
FUNCTIONS OF CONTROL ROOM
1. ALARM FUNCTIONS
2. CONTROL AND INDICATION
3. DATA COLLECTION, RECORDING,
TRANSFORMERS
DISPLAY PRESENT IN KALYANESHWARI SUBSTATION
150 MVA 220/132KV AUTO-TRANSFORMER
Make –BHEL No Load Voltage HV (Kv)-230
Year of manufacture: 2003 No Load Voltage IV (Kv)- 138
Type of cooling: ONAN/ONAF/OFAF No Load Voltage LV (Kv)-6.9
Rating HV & LV (VA)- 75/ 105/ 50 Line Current HV (Amps)-188.5/263.9/377.0
( 50%/75%/100%) Line Current LV (Amps)- 314.2/439.8/628.3
Rating LV - 10/ 14/20 Line Current LV (Amps)- 837.8/1172.9/1675.5
(50%/70%/100%)
Temp rise oil- 40 C (Over Ambient of 50 ) Insulation Level:
Temp rise winding- 45 (Over Ambient of 50 ) HV- L1 950AC 395-L1 170 AC 70
Purchase order Ref- PE-SPEC-719(R)/581257 IV- L1550AC 275
Dated 03.12.02 LV-L1 75AC 2×6.9
Maker Sl No- 6006080 Diagram DRG No- 34631900019
Elect Spec No- 601098 OGA DRG No- 3463000066
Phase 3Ǿ Core and winding (Kg)- 59700
Frequency 50 Hz Weight of oil (Kg)- 38280
Connection Symbol- YNa0d1 Total weight (Kg)-140365
Impedance Volt at 150MVA Base Oil quantity (L)- 44000
HV Position (1/IV)12.6% to 16.24% Transport Weight (Kg)-79000
HV Position (9b/IV) 14.1% to 15.5% Undertaking weight (Kg) – 59700
HV Position (17/IV) 13% to 16.77%
CURRENT TRANSFORMER (CT):
  Instrume
MAKE – ELECTRIC POWER EQUIPMENT CO.
MSR INDUSTRIES ESTATE, BANGALORE – 560054
nt
TYPE – OHCDB-R transfor
HSV – 36KV mer
SERIAL NO. – 33193
FREQ – 50 HZ.
RATED VOLTAGE – 33KV
SHORT TIME THERMAL CURRENT – 15.15KA FOR 3 SECS Current Potential
25.24KA FOR 1 SECS transfor transfor
INSULATION – 70/170KV
mer mer
QTY OF OIL/WT. – 20 LTR./ 24 KG APRX.
DYNAMIC CURRENT – 65.6 KAP POTENTIAL TRANSFORMER (PT):
YEAR – 1999
MAKE – MODERN ELECTRONIC
TOTAL WT. – 150 KGS (APRX) TYPE – OPT
MAX. TEMP. RISE - WINDING - 45C RATIO – 33KV3 / 1103V /1103V.
INSULATION – ‘A’ HSV – 36KV,
OVER AMBIENT (45C) OIL - 40C PHASE – 1,
CONTINUOUS THERMAL CURRENT – 780 A FREQ- 50 HZ
INSULATION CLASS – A
 
CORE - I II
BURDEN - 100 100
CLASS - 0.2 3P
V.F - 1.2 CONT. & 1.9 FOR 30 S
CONN – PH – E
BIL – 70/170KV
TEMP. RISE OVER WDG OIL
45C 35C
OIL QTY. – 20 LTR.
TOTAL WT. – 90KG
ISS – 3156,
SL. NO.- ME/PT/411/08
P.O NO. – CE(T)/P – 4/ST – BB/2087
Circuit Breakers:
MAIN FUNCTION OF CIRCUIT BREAKER IS TO SWITCH OFF AND SWITCH ON
THE NORMAL CURRENT AND TOP TRIP THE CIRCUIT AT THE OCCURANCE OF
ANY FAULT.

CIRCUIT BREAKERS USED IN THIS SUBSTATION:


 MINIMUM OIL CIRCUIT BREAKER
 SF6 CIRCUIT BREAKER
SF CIRCUIT BREAKER (220KV SYSTEM) DETAILS :
Type - 3AP1F1
Year of Manufacturing/No - 2006/IND/01/2276
Rated Voltage
245 kV
Rated lightning impulse withstand voltage
1050 kVP
Rated Power Freq. withstand voltage
460 kV
Rated Frequency
50 Hz
Rated Normal Current
3150 A
Rated S. Circuit breaking current
40kA
Rated S. Circuit Duration 3
S
Rated out of phase breaking current
Isolators:
ISOLATORS GIVE PHYSICAL SEPARATION BETWEEN LIVE
PART AND DEAD PART. PHYSICAL SEPARATION CAN BE
SEEN BY NAKED EYE FROM A DISTANCE.

Surge/Ligthning Arrestors (LA):


SINGLE POLE UNITS CONNECTED BETWEEN BUSBAR AND
GROUND. HIGH VOLTAGE SURGES CAUSED BY LIGHTNING
OR SWITCHING ARE DISCHARGED EFFECTIVELY TO
EARTH.
Bus bars: BUSBARS ARE CONDUCTORS OF ADEQUATE
CROSS-SECTION, SUPPORTED ON INSULATORS
PROTECTION & CONTROL:
Objectives of Protection:

I) TO DISCONNECT THE FAULTY CIRCUIT WITH MINIMUM


DAMAGE DUE TO FAULT.
II) TO LEAVE THE REST OF THE POWER SYSTEM IN A HEALTHY
STATE.
III) COST OF REPAIR OF DAMAGE TO BE KEPT MINIMUM.
IV) TO RESTRICT POSSIBILITY OF SPREADING AND INVOLVING
OTHER EQUIPMENT.
V) TO REDUCE TIME THE EQUIPMENT OUT OF SERVICE.
VI) TO MINIMIZE COST OF REVENUE LOSS.

Characteristic of Protection:

I) VERY FAST
II) SELECTIVE
III) SENSITIVE
III) STABLE UNDER EXTERNAL FAULT
REFERENCES

• article.wn.com (Generation)
• nirmancare.com (Hydro Power Plant)
• old.optcl.co.in (Power Grid)
• kalkitech.com (block of CLD)
• Company Manual (HR Department)
• Sub Station Manual

Potrebbero piacerti anche