Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Guide to
Installing
Primavera P6
Professional
A Publication of
1 P6 Installation Guide
Table of Contents
Is this Guide right for me? 2
Introduction 3
Get Organized 9
Installing Java 10
P6 Setup 14
Conclusion 20
Intermediate
Intermediate users have been using Primavera P6 for some time and may have
completed a classroom course or formal training. They have experience
planning and updating projects in Primavera P6 and are comfortable with some
advanced features as well.
Advanced
Advanced users are competent and experienced with most aspects of
Primavera P6. They have likely completed some formal training on Primavera
P6 and have much experience using the tool on real-world projects. They are
also familiar with many advanced features of Primavera P6.
Introduction
That’s why the team at PlannerTuts, the trainers behind the leading Primavera
P6 Online Training, have put together “The Essential Primavera P6 Installation
Guide”.
1A. Go to http://edelivery.oracle.com
1B. Sign in to your Oracle Account (Create One, if you don’t have one already).
1D. Select your Product Pack and Platform. Next, Click Go.
1E. Select P6 Professional Project Management R8.3 Media Pack for Windows and Click
Continue.
Get Organized 2
Installing Java 3
3C. Once the installation is complete, we need make sure the computer knows where to
access it. This is done by changing the environmental variables. Right click ‘My Computer’
>> Click ‘Properties’ >> Click on ‘Advanced System Settings’.
3D. Click on ‘Environmental Variables’ >> Under System Variables, click New
P6 Setup 4
4B. Click on Standalone (This means you have local Database residing in your computer.)
4C. Enter the Password you will use for your databases.
4D) Check the Include Sample Date checkbox to have the installation include sample
projects, resources, codes etc. in your Primavera P6 database.
*We recommend you "Include Sample Data" if you want to have projects to use as you learn
P6.
5A. Open your Primevera P6 and enter the password you entered during setup (step 4c).
Your Setup is now complete. You will now see the program open and ready to use!
Conclusion
Now that you’ve successfully installed Primavera P6, you’re ready to dive in and get your first
project going.
However, as you may have already noticed, mastering Primavera P6 takes time and patience.
Not to worry, we’re here to help!
PlannerTuts Premium delivers expert and effective Primavera P6 training when you need it.
Our courses are designed to teach you step-by-step the skills you need to manage projects in
Primavera P6 and track your progress as you go.