STEAM TURBINE GENERATOR SERIOUS INSPECTION

TOSHIBA STEAM TURBIN – ALSTOM GENERATOR UNIT 1


PT. PLN (PERSERO0 WILAYAH KALIMANTAN TENGAH
KALIMANTAN SELATAN – PLTU ASAM ASAM
SOUTH KALIMANTAN

Prepared by
Wawan Kuswardhana
Site Coordinator.

Reviewed and Approved by


Andrianto Hapsoro
Field Service Manager

Project No. P-01739

DECEMBER 2016

Rotating Equipment Services


Purwakarta Service Center
PT. Sulzer Turbo Services Indonesia
Kawasan Industri Kota Bukit Indah
Blok AII, Kav. IC-ID,
Purwakarta 41181, Indonesia
Tel. 62 264 351 920
Fax. 62 264 351 143
www.sulzer.com

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 1 of 35
FIELD SERVICE REPORT
STEAM TURBINE GENERATOR MAJOR INSPECTION

Customer PT PLN (PERSERO) WKTKS- PLTU ASAM ASAM


Unit Location: ASAM ASAM – JURONG – SOUTH KALIMANTAN
Sulzer TSID Job No: P -01739
Equipment Type: STEAM TURBINE GENERATOR
Manufacturer: STEAM TURBINE- TOSHIBA, GENERATOR – ALSTOM, 65 MW
Model: TBA
Equipment Number: Unit 1
Speed: 3000 RPM

I. Introduction

PT. Sulzer Indonesia was awarded to performs major inspection/serious inspection both steam
turbine and generator 65 MW owned by PLN (Persero) WKTKS PLTU ASAM ASAM. The unit
service is a power generation unit located in Asam asam – Jurong – South Kalimantan.
Sulzer’s scope of the work included complete disassembly. inspection, cleaning include alumina
blasting existing rotor and existing diaphragm, NDE, minor repair, and assembly all of steam
control and stop valves, turbine rotor, bearings, diaphragms, casing, and turning gears. Due to
limited time, cleaning rotor and diaphragm using alumina blasting was cancel it and changed to
mechanical or manual cleaning.
Removal and assembly of turbine and generator instrument were performed by customer E/I
technician and also the verification and calibration were done by them.

Commissioning services were provided by Sulzer which included supporting adjustment of


actuator control valve, labor support for lube oil flushing, and assessment of temperatures,
pressures, and vibration levels during start-up .

Sulzer’s workforce mobilized onsite started on November 14th , 2016 for safety induction and site
establishment. Due to operational purpose the turbine was taken off turning gear and disassembly
of the turbine began on 23rd November. Mechanical assembly of the turbine and generator were
completed on December 18th 2016. All commissioning activities were completed on December
23th when the unit reached 58 MW and the remaining personnel were demobilized on December
24th . This report will discuss the process of overhaul and commissioning Steam turbine Toshiba
Unit #1 PLTU ASAM ASAM.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 2 of 35
STEAM TURBINE MACHINE DATA SHEET

Customer : PT. PLN (Persero) Wil. KalTeng & KalSel


Station : PLTU ASAM – ASAM
Unit : UNIT 1

Model / Type :
Rating : 65 MW

Control System : Service Type : Serious Inspection

Steam Pressure : bara Steam Temperature : Deg C

Speed : 3000 rpm

Stages : 16 stages.

District Office : Purwakarta – Indonesia


Job No. : P 01739
Site Coordinator : Wawan Kuswardhana

Job Start date : 23 November 2016 Completion Date : 20 December 2016

Job Type : Major Inspection Full Load

Work Scope : [Y] Turbine [Y] Generator [Y] Valves

Site Personnel
Name Position
Wawan Kuswardhana Site Coordinator
Widada Sr. Mechanic Turbine
Mohammad Anton Supervisor Generator

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 3 of 35
II. Technical Observation.
Dismantling

The last major overhaul was performed by other contractor in 2013 and on this major
overhaul the dismantling works was started with removed turbine enclosure, disconnect
electrical and instrument devices by customer technician , and continue with opened
turbine manhole. Then work was continue with removed turning gear, loosen bolt casing ,
lift up casing and continue to turn over upper half casing.
Rotor was lifting and put on stand after initial measurement has been taken.

Inspection works

On this overhaul, the inspection works are consist of 3 of type of inspections. They are
visual inspection, NDT inspection and dimensional inspection.

Reassembly and Mechanical Completion

Prior to reassembly turbine, cleaning works was mandatory, cleaning works were did on all
the part which was removed in this outage. Due limited time, cleaning with alumina blast on
rotor and diaphragm were changed to mechanical cleaning by power hand tools.
Reassembly was started after all the parts that repaired on shop received at site. Started
on diaphragm installation then continue to install rotor to check contact between bearing
and rotor journal, the result said that the bearing no #2 need to correction. After the
correction the contact was checked again prior the final rotor installation. Radial, axial and
thrust clearance were checked mean while the upper half casing was turn over after the
upper half diaphragm installed and drop check measurement were performed.
Control valve installation on upper half casing and applied adequate amount of birkosit as
joint sealing to the surfaces of the horizontal flanges of the casing were done prior upper
half casing installation. Bolting and tightening were next step to performed ,tightening
started from HP side using bolt heater than continue to LP Side.
After tightening casing bolt completed, then work was continue with alignment Turbine –
Generator including install coupling bolts after alignment finished. Reinstall and setting
gland seal, oil baffle, casing man hole, cover pedestal bearing both no#1 and no#2, turning
gear and oil pipe which connected to turning gear were performed after tightening coupling
bolts finished. Turbine enclosure was installed on December 23rd , 2016 after turbine
running in normal load.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 4 of 35
III. Report Content
3.1 Work Summary

TURBINE ROTOR

Turbine rotor was removed, cleaning was using mechanical hand power tools, visual inspect
and NDT check were carry out after sand blasting were completed. There were found rubs on
journal both generator and turbine side, major rubs on HP gland seal. There were found heavy
rubs on shroud stage 14 and also found cracks on thrust collar that recommend to repair
before put the rotor in service.

CASING

The upper and lower casing were manually mechanical cleaned, visual inspected was
performed after cleaning activity had completed, found deep score and scale on upper and
lower casing split line last stage area. No found any indication on other area during NDT
Examination.
During casing reassembly, the horizontal joint bolts were stretched and tightened as per OEM
specification and clearance of the horizontal joint was checked to ensure the casing has close
tight. BIRKOSIT was applied as the joint sealant.

DIAPHRAGM

Stage #2, #3, #14 and 15 both upper and lower diaphragms were removed from the casing
and shipped to the Sulzer workshop for further repair, while the others still in the casing. Drop
check between casing and diaphragm was checked. Due to limited time, cleaning using sand
blasting was changed to mechanical cleaning by hand tools.
There were found minor rubs on seal all stage diaphragm. No found any indication during NDT
Examination.

MAIN STOP VALVE – MSV

The main stop valve was dismantled, all the parts were cleaned and check the NDT and found
no any indication only rubs on body pilot valves . Measurement was taken on stem valves and
found the run out within tolerance. During the reassembly contact check between the main disc
and seat valves were performed and found the contact check were 100 % contacted. Contact
check also was performed on pilot valves and the seat and found the contact check also were
100%. Prior to close the main stop valves, it was checked by inspection team to ensure the
valves were cleaned and no foreign material inside the valves.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 5 of 35
CONTROL VALVES

The control valves where location on upper half casing were dismantled before upper half
casing removed, dismantling part such as bushing, and stem were performed on Workshop at
Banjarmasin. All the control valve parts were replaced with new spare part. The contact check
were performed to ensure the valves have good contact.
Prior to assembly, it was checked by inspection team to ensure the valves were cleaned and
no foreign material inside the valves.

STEAM STRAINER

The steam strainer which located inside of main stop valve was dismantled, strainer was
cleaned by mechanical cleaning ( grind) and NDT check was performed to and no found any
crack or defect.

TURNING GEAR

The turning gear was dismantled, cleaned and took NDT on turning gear worm gear. It was
found no indication on turning gear worm gear, contact check and backlash were performed
also during reassembly turning gear.

COUPLING BOLTS

The coupling bolts were removed, cleaned and NDT check. There were found minor scratch
on all coupling bolts and the lock plate were damaged and need to replace with new one.
During installation elongation checked was performed to ensure the tightening bolt couplings
are within specification.

MAIN OIL TANK

On this Overhaul, the existing main lube oil was replaced with the new one. Main lube oil was
drained and then the Tank was cleaned and visual inspected. New oil was filled to the oil tank
after get clearance from inspector team.

LUBRICATION OIL FLUSHING

Oil flushing for unit #1 was started on December, 18th 2016, at afternoon . Flushing screens of
200 mesh were installed at main supply line bearing number #1, main supply line bearing #3
and main supply line bearing #4.. The screens were inspected every 1 – 4 hours or as
requested by customer. Oil Flushing was completed on December ,19 2016, around 14:00
WITA.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 6 of 35
3.2 Summary of Inspection Findings

Finding / remark Corrective measure


3.2.1 Turbine Bearings
Inspection
 Journal bearing #1 Babbitt surfaces
 Replaced the bearing with
received UT and PT NDE, found the
the new one.
linear indication out of tolerance and
recommend to replace.

 Journal bearing #2 Babbitt surfaces  Cleaned and polished.


received UT and PT NDE, no found
any indication
3.2.1.1

 All bearing journal were measured and  Within tolerance


compare with design criteria.

 Thrust bearing pads were received UT


 Repaired active and in
and PT NDE, found crack and porosity
active pads thrust bearing.
on both active and in active side.

Assembly
 All journal bearing clearances were  Adding shim 0.25 mm on
checked during assembly and found pedestal bearing no #2 and
acceptable. polished the bearings.
 Thrust bearing clearance was checked
by thrusting the rotor towards the
active and inactive pads. The
3.2.1.2
clearance was found acceptable.
 During the assembly, it was found the
contact check between journal rotor
and bearing was out of specification.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 7 of 35
Finding / remark Corrective measure
3.2.2 Turbine Rotor Unit 1

 The rotor steam path areas were


cleaned by mechanical power tools to
remove mineral deposits.
 Rotor journals were inspected and  Polished.
measured. Found minor rubs both on
journal rotor generator side and
Turbine Side. Both journal received a
MT NDE examination. No indications
were found.
 Thrust bearing collars were inspected  Recommend to repair due
and cracks were found. to limited time, customer
decided to leave as it is,
just polished on thrust
collar surface.
 Gland seal HP Side was inspected  Recommend to repair due
and found major erosion on HP Gland to limited time, customer
seal segment 1-4 while the others only decided to leave as it is.
minor erosion. Gland seal HP received
a MT NDE examination. No 
indications were found.
 Polished and removed high
 Gland seal LP Side was inspected and
3.2.2.1 metal if necessary.
found minor erosion only. Gland seal
HP received a MT NDE examination.
No indications were found.
 All stage blades received a MT NDE
examination and no indications were
founds
 All shrouds were inspected and found
 Recommend to repair or
major rubs on shroud stage no : 14.
replace with new spare
Depth of the rubs is 2 – 3.1 mm, while
thickness of the shrouds are +/- 5.2
mm.
 Turbine rotor were performed Low
Speed Balancing (LSB). Duration of

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 8 of 35
Finding / remark Corrective measure
LSB was 2 days.
 Balance weights were inspected and
found to be tight.

3.2.3 Diaphragms
 Diaphragms stage #2, #3, #14, #15
were removed and shipping to the
workshop for repaired the seal fin, the
summary inspection report can be
seen on attachment.  All stage diaphragms
 The remaining diaphragms were replaced with spare.
cleaned by mechanical power hand
tools.
 Except diaphragms #2, #3, #14, #15,
3.2.3.1 all areas accessible received a MT
NDE examination. No indications were
found.
 Found the medium erosion on split
line diaphragms stage #16 both upper
and bottom halves.
 Found the light to medium scratches
and nick on vanes all diaphragms.

3.2.4 Main Stop Valves ( MSV)


Inspection
 Main Stop Valves were dismantled
 Recommended to repair,
and disassembled. All parts were
due to limited time,
cleaned by mechanical power tolls
customer decided to leave
and inspected.
as it is.
3.2.4.1  MSV Parts such as : seat, valve disk,
stem valve and pilot valves were
received a PT NDE examination and
no indications were found.
 Found the medium erosion on body
pilot valves.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 9 of 35
Finding / remark Corrective measure
 Blue contact checks were made on
the valve seats and valve disc and
verified almost 100 percent contact.
 Stem valves were measured and
found the run out still within tolerance.

Assembly
 All bolting was torqued to OEM
3.2.4.2 specifications.
 All gaskets were replaced.

3.2.5 Control Valve


Inspection
 Control valves were dismantled and
 All existing parts were
continue to disassembled parts in
replaced with new spare
other workshop at Banjarmasin.
parts.
3.2.6.1  Blue contact checks were made on
the valve seats and valve disc and
verified almost 100 percent contact.
.

Assembly
 All bolting was torqued to OEM
specifications
 All gaskets were replaced.
3.2.6.2
 Setting the control valves actuator
were performed after got pressurize oil
hydraulic/ commissioning time.

3.2.7 Turning Gear


Inspection
 Backlash of all gears was checked
3.2.7.1 and found satisfactory.
 Blue contact patterns between all 
gears was checked and found

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 10 of 35
satisfactory.
 Latching mechanism was inspected
and found in good condition and
operable.
 NDT inspection was came with result
no found any indication.

Assembly
 Overall alignment of the turning gear
assembly to the turbine shaft was
3.2.7.2 checked and found satisfactory.
 All bolting was torqued to OEM
specifications.

3.2.8 Bolt Couplings


 Bolt couplings were removed, cleaned  Polished.
and took NDT. No indication was
3.2.8.1
found only minor scratches on all the
bolts.
3.2.9 Gland Seal
 Gland seal upper lower both turbine
HP and LP side were removed.
 Gland Seal Both HP and LP were ship  Replaced the packing seal LP
3.2.9.1 to Workshop for replace/repair with new seal.
packing seal which erosion.  Replaced the packing seal HP
with new seal which supplied
by other contractor.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 11 of 35
IV. Commissioning and Start up

The commissioning and setting of the set points for the instruments of turbine was
performed by Client, and during commissioning and startup Sulzer provided the following
support to PLN ( Persero) PLTU Asam Asam :

o Manpower support during lube oil flushing.


o Verifying and adjusting main control valve actuator
o Monitoring and assessing lube oil pressure and temperatures.
o Monitoring and assessing bearing metal temperatures.

Turning gear on was started on December 18th , 2016, soon after adjusting control valves were
completed. Full Speed No Load 3000 RPM for the unit was achieved on December 20th, 2016
afternoon. Some protection testing such as emergency trip test oil, overspeed trip test oil, lube
oil low trip test oil and condense vacuum low test oil were performed by customer. The unit
synchronized on October 20th, 2016 at 17:30 PM, during load increasing, found the vibration at
bearing #3 was high and reached until +/- 70 - 90 µm, due of that it was decided to slowly
increased the generator load with the vibration level maintenance below 100 µm.
During generator increasing, it was found the flexible hose which oil supply bearing #4 was
leaked. Decided to shutdown the unit for repair program.
After repaired the flexible hose , the unit was started again and lowly reached 58 MW on
December 23th, 2016, generator load can not increased to maximum load 65 MW due to
vibration level at bearing #3 will be going higher more than 100 µm. Except high vibration at
bearing #3, others turbine parameters are within specification.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 12 of 35
V. Conclusion & Recommendation

Reviewing along the outage process, inspection and operation data after Inspection, it comes to
the conclusion and recommendation as follows :

Conclusion

 The works previously scheduled for 23 (twenty third) Calendar day which was started on
November 26th , 2016 and shall be finished on December 20th , 2016. Unit was running with
maintenance load on 58 MW December 23rd , 2016 .

 The unit was keep loaded on 58 MW with parameter vibrations as following :


 Bearing 1
 H = 25.1 micron
 V = 25.1 micron
 Bearing 2
 H = 51.8 micron
 V = 36.1 micron
 Bearing 3
 H = 97.3 micron
 V = 37.6 micron
 Bearing 4
 H = 36.0 micron
 V = 26.7 micron

Recommendation

The following recommendations are necessary for the next future.

 Rotor
o Repair the thrust collar due to found crack
o Replace shroud and blade stage #14 with new spare.
o Repair step seal which erosion on HP side ( Segment 1-4).

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 13 of 35
 Diaphragms.
o Replace spill strips diaphragm stage #2
o Replace spill strips diaphragm stage #3
o Replace outer seal diaphragm stage #13 due to out of spesification.
o Replace outer seal diaphragm stage #14
o Weld repair split line and packing seal end area diaphragm stage #14 were having
erosion.
o Replace outer seal diaphragm stage #15
o Weld repair split line and packing seal end area diaphragm stage #15 were having
erosion.
o Provide spare interstage seal due to found some of seal already out of tolerance.
 Provide spare of pilot valves Main Stop Valves due to found erosion on body pilot valves.
 A sufficient amount of Belzona should be ordered for use during future outages as a sealant on
casing erosion areas.

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 14 of 35
Fig 1.After removed enclosure

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 15 of 35
Fig 2. Turbine Name Plate

Fig 3. Un bolt turbine casing using bolt heater

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 16 of 35
Fig 4. Prepare for upper casing removal

Fig 5. After casing removal

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 17 of 35
Fig 6. Prepare for remove bearing #1

Fig 7. As found rotor journal bearing #1

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 18 of 35
Fig 8. As found rotor journal bearing #2

Fig 9. Rigging for remove rotor

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 19 of 35
Fig 10. PT NDE examination on thrust collar

Fig 11. Major rubs on shroud stage #14

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 20 of 35
Fig 12. Unloading rotor turbine on balancing equipment

Fig 13. Turbine balancing

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 21 of 35
Fig 14. Pilot valve MSV condition ( erosion on body )

Fig 15. Pilot valve contact check almost 100% contact

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 22 of 35
Fig 16. Contact check Main Stop Valve, 100% contacted

Fig 17. Result of drop check between casing and diaphragm

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 23 of 35
Fig 18. Contact Check on turning gear

Fig 19. Erosion on split line casing last stage

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 24 of 35
Fig 21. Rotor installation for check in clearance

Fig 21. Clearance check

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 25 of 35
Fig 22. Final installation after clearance check

Fig 23. Process Turn over casing

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 26 of 35
Fig 24. Reassembly control valve

Fig 25. Birkosit as joint sealant casing and governor control valve

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 27 of 35
Fig 26. Governor control valve Installation

Fig 27. Birkosit as joint sealant casing and governor control valve

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 28 of 35
Fig 28. Upper half casing installation

Fig 29. Upper bearing housing#1 installation

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 29 of 35
Fig 30. Cement hot insulation

Fig 31. Upper casing MOP installation

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 30 of 35
Fig 32. Cover front pedestal installation

Fig 33. Check tightening bolt with torque wrench

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 31 of 35
Fig 34. Final hot turbine insulation

Fig 33. Supporting during setting actuator governor control valve

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 32 of 35
Fig 34. Condition 1000 rpm

Fig 35. Condition steam turbine on load 13 MW

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 33 of 35
Fig 36. Condition steam turbine on load 18 MW

Fig 37. Condition steam turbine on load 51MW

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 34 of 35
Fig 38. Condition steam turbine on load 51MW

FSD-01FR-01 Rev. 03 This material is the exclusive property of PT. Sulzer Indonesia.
Page 35 of 35
INITIAL
INSPECTION REPORT

This material is the exclusive property of PT. Sulzer Indonesia.


MFG/MODEL : Toshiba / SCSF
SERIAL N0. : TBA
EQUIP. N0. : Unit #1
Clearance Gland Seal CUSTOMER : PT, PLN Persero WKSKT
LOCATION : PLTU ASAM ASAM
JOB# : P - 1739

INSPECTED BY : Agung W DATE: Nov 25, 2016


STATUS : INITIAL FINAL UNIT : MM INCHI

Actual
Position Seal Design Left Right
A B A B
1 0.50 1.7 2.1 2 1.7
2 0.50 1.6 1.6 1.7 1.7
3 0.64 2.5 3 2.5 2.9
HP
4 0.50 2.35 2.5 2.7 2.5
5 0.50 2.1 2.2 2.35 2.4
6 0.50 2.7 2.9 2.15 2.2
1 0.64 1.5 1.8 1.7 1.9
LP 2 0.64 1.7 1.7 1.8 1.8
3 0.64 1.4 1.4 1.65 1.75

FSD-01FR-03 Rev.00 This material is the exclusive property of PT. Sulzer Indonesia.
PAGE 1 OF 1
FINAL
INSPECTION REPORT

This material is the exclusive property of PT. Sulzer Indonesia.


PT Sulzer Indonesia

MFG/MODEL : ALSTOM
RATING : 85312 KVA
SERIAL No. : T227 250
ALIGNMENT UNIT NO. : 1
(As Left) CUSTOMER : PLN – PLTU ASAM ASAM
LOCATION : South Kalimantan
JOB NO# : P – 1739

1. Result
0.000 0.000

+0.230
R +0.260 0.011
A 0.007

Average

+0.480 0.022

REMARKS :

The result is still in within tolerance.

Inspected by: Checked by: Approved by :

Sukoco Mohamad Anton


Date: 17th December 2016 Date: 17th December 2016 Date:
PRODUCTION Form
PROJECT NO. : P-01739
STEAM TURBINE ROTOR CUSTOMER : PLN (PERSERO) WKSKT
BALANCE REPORT MFR/MODEL : TOSHIBA / SCSF
S/N & EQUIPMENT NO. : TBA / UNIT #1
(TWO PLANES) REPORT NO. : BLC-TURBINE-01

INSPECTED BY:YD. DATE :December 10, 2016


 BALANCE PROCEDURE:
FULL ASSEMBLY BAL. CHECK BAL. INDIVIDUAL BAL. PROGRESSIVE BAL.
 TYPE OF ROTOR:
STEAM TURBINE. COMPRESSOR PUMP. OTHER : GENERATOR
 WHEEL/DISK NUMBER: SHAFT ONLY
 TYPE MACHINE USED: H 20 BU H 40 BU H6B IRD
 CORR. METHOD: ADDITIONAL REMOVAL PERMANENT TEMPORARY OTHERS
 BALANCE SPEED: 250 RPM
INITIAL BALANCE MACHINE READING:
77 GRAMS, AT RADIUS 340 MM, AT 83 DEGREES, ON TE SIDE.
105 GRAMS, AT RADIUS 890 MM, AT 64 DEGREES, ON CE SIDE.

FINAL BALANCE MACHINE READING:


7 GRAMS, AT RADIUS 340 MM, AT 91 DEGREES, ON TE SIDE.
9 GRAMS, AT RADIUS 890 MM, AT 86 DEGREES, ON CE SIDE.

ALLOWABLE RESIDUAL UNBALANCE TOLERANCE (ACC. TO ANSI/API STANDARD):


40.1 GRAMS, AT RADIUS 340 MM, ON TE SIDE.
15.33 GRAMS, AT RADIUS 890 MM, ON CE SIDE.

 BALANCE MACHINE SETUP:


a: 1200. mm b: 2290 . mm c: 710 mm

r1: 340 mm r2: 890 mm

=ZERO MACHINE BLC,(FROM KEY PHASER 20 DEG,CCW AS VIEWED


 “ZERO” DEGREE POINT IS:
FROM CE
(BALANCING ROTATION = OPERATION ROTATION)

 KEY WEIGHTS USE (IN GRAMS): N\A

 OTHER REMARKS:
COMMENTS:

ACCEPTABLE
APPROVED BY: MO.

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-30 Rev.04 Page 1 of 1
PRODUCTION Form
PROJECT NO. : P-01739

STEAM TURBINE ROTOR CUSTOMER


MFR/MODEL
:
:
PLN (PERSERO) WKSKT
TOSHIBA / SCSF
RESIDUAL UNBALANCE INSPECTION REPORT S/N & EQUIPMENT NO. : TBA / UNIT #1
REPORT NO. : BLC-TURBINE-02

INSPECTED BY: YD DATE: DECEMBER 10, 2016

STATUS: INITIAL FINAL PLANE: 1 CE TE SINGLE

 ROTOR/PART DESCRIPTION: TURBINE


 MAXIMUM CONTINUOUS SPEED ( N ): 3000 RPM.
 JOURNAL STATIC WEIGHT LOAD ( W ): 6 441 KG
 UNBALANCE RADIUS: 340 mm. TRIAL WEIGHT: 280 Gr
 ALLOWABLE RESIDUAL UNBALANCE TOLERANCE: 13634 gr-mm.

No. AMP PHASE


1 284 Gr. 356 Degree
2 283 Gr. 62 Degree
3 286 Gr. 111 Degree 100 200 300 400 500

4 282 Gr. 173 Degree


5 274 Gr. 233 Degree
6 280 Gr. 293 Degree
 TRIAL UNBALANCE : 340x280 = 95200 GR-mm.
286 -274
 Y= =6
2
286 + 274
 X=  = 280
2
 RESIDUAL UNBALANCE :
95 200 X  6
= 680 GR-mm. (PASS)
280

APPROVED BY: WK.


This material is the exclusive property of PT. Sulzer Indonesia
PRO-01FR-23 Rev.02 Page 1 of 2
PRODUCTION Form
PROJECT NO. : P-01739

STEAM TURBINE ROTOR CUSTOMER


MFR/MODEL
:
:
PLN (PERSERO) WKSKT
TOSHIBA / SCSF
RESIDUAL UNBALANCE INSPECTION REPORT S/N & EQUIPMENT NO. : TBA / UNIT #1
REPORT NO. : BLC-TURBINE-02

INSPECTED BY: YD DATE: DECEMBER 10, 2016

STATUS: INITIAL FINAL PLANE: CE TE SINGLE

 ROTOR/PART DESCRIPTION: TURBINE


 MAXIMUM CONTINUOUS SPEED ( N ): 3000 RPM.
 JOURNAL STATIC WEIGHT LOAD ( W ): 6 441 Kg.
 UNBALANCE RADIUS: 890 mm. KNOWN WEIGHT : 288 Gr
 ALLOWABLE RESIDUAL UNBALANCE TOLERANCE: 13644 gr-mm.

No. AMP PHASE


1 287 Gr. 1 Degree
2 295 Gr. 62 Degree
3 296 Gr. 131 Degree
100 200 300 400 500
4 287 Gr. 186 Degree
5 281 Gr. 249 Degree
6 280 Gr. 302 Degree
 TRIAL UNBALANCE : 890x288 = 256320 Gr-mm.
296 – 280
 Y= =8
2
296 + 280
 X=  = 288
2
 RESIDUAL UNBALANCE :
256320x 8
= 7120 gr-mm. (PASS)
288

APPROVED BY: WK.


This material is the exclusive property of PT. Sulzer Indonesia
PRO-01FR-23 Rev.02 Page 2 of 2
NDT REPORT

This material is the exclusive property of PT. Sulzer Indonesia.


PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

1 UNIT = ROTOR AS RECEIVED REPAIR


MAIN OIL PUMP FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

NO DESCRIPTION PARTS INSPECTIONS RESULTS

1 ROTOR CRACK INDICATION ON TRUS COLLAR

HEAVY RUBING ON DISK #13

2 MAIN OIL PUMP NO INDICATION

SEE PHOTOGRAPH ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 1 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

MOP AREA

Fig.1 MT inspection on Rotor

Fig.2 No indication on gear tooth CE area Fig.3 No indication on bolt hole CE area

Fig.4 No indication on trust collar CE area Fig.5 No indication on trust collar CE area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 2 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.7 No indication on journal shaft CE


Fig.8 No indication on seal CE area
area

Fig.9 No indication on blades area Fig.10 No indication on blades area

Fig.11 No indication on shroud and tenon Fig.12 No indication on shroud and tenon
area area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 3 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.14 No indication on shroud and tenon


Fig.13 No indication on blades area
area

Fig.15 Heavy rubing on disk #13 Fig.16 Heavy rubing on disk #13

Fig.17 No indication on blade triling adge Fig.18 No indication on blade triling adge
area area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 4 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.19 No indication on blade triling adge Fig.20 No indication on blade triling adge
area area

Fig.21 Found rubs on seal TE aera Fig.22 Typical no indication on seal TE area

Fig.23 Typical no indication on seal TE


Fig.24 No indication on journal shaft TE area
area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 5 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/001-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.25 Crack indication on trust bearing TE Fig.26 Crack indication on trust bearing TE
area area

Fig.27 No indication on Main Oil Pump part Fig.28 No indication on Main Oil Pump part

Fig.29 No indication on Main Oil Pump part Fig.30 No indication on Main Oil Pump part

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 6 of 6
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PUR REPORT NO. : TBA


MT LEVEL : II DATE : Dec 2, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

1 UNIT = Rotor thrust Collar AS RECEIVED REPAIR


FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
ALL VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:

AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

FOUND CRACK INDICATION , SEE DETAIL ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED IN ACCORDANCE WITH
APPLICABLE SULZER TSID STANDARD

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 1 of 2
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PUR REPORT NO. : TBA


MT LEVEL : II DATE : Dec 2, 2016

Fig. 1 Found crack indication thrust collar Fig. 2 Found crack indication thrust collar

Fig. 3 Found crack indication thrust collar Fig. 4 Found crack indication thrust collar

Fig. 5 Found crack indication thrust collar Fig. 6 Found crack indication thrust collar

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 2 of 2
PRODUCTION Form
PROJECT NO. : P-01739

DEMAGNETIZATION CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.004/XII-DMG/16


MT LEVEL : II DATE : DECEMBER 15, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

AS RECEIVED

1 UNIT = STEAM TURBINE ROTOR REPAIR

FINAL

TEST AREA :
PROCEDURE NO. : PRO-01WI-41
ALL VISIBLE SURFACE

DEMAGNETIZER: AMPERE RESIDUAL MAGNETISM READING WITH

1000 – 1500 AMP


MOBILE UNIT / CABLE WRAP GAUSS METER AT SURFACE:

MAGNAFLUX AC 0,5 COUPLING END / DE

YOKE 6 - 0,5 CENTER

0,5 THRUST END/ NDE

INSPECTION RESULT :

DEMAGNETIZATION BELOW 2 GAUSS

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
OPERATOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-102 Rev.03 Page 1 of 3
PRODUCTION Form
PROJECT NO. : P-01739

DEMAGNETIZATION CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.004/XII-DMG/16


MT LEVEL : II DATE : DECEMBER 15, 2016

Fig. 1 Demag bellow 2 gauss on shaft TE side Fig. 2 Demag bellow 2 gauss on shaft TE side

Fig. 3 Demag bellow 2 gauss on trust collar TE


Fig. 4 Demag bellow 2 gauss on shaft TE side
side

Fig. 5 Demag bellow 2 gauss on seal area TE


Fig. 6 Demag bellow 2 gauss on disk area
side

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-102 Rev.03 Page 2 of 3
PRODUCTION Form
PROJECT NO. : P-01739

DEMAGNETIZATION CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.004/XII-DMG/16


MT LEVEL : II DATE : DECEMBER 15, 2016

Fig. 7 Demag bellow 2 gauss on disk area Fig. 8 Demag bellow 2 gauss on disk area

Fig. 9 Demag bellow 2 gauss on disk area Fig. 4 Demag bellow 2 gauss on seal area CE side

Fig. 5 Demag bellow 2 gauss on shaft CE side Fig. 6 Demag bellow 2 gauss on gear area CE side

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-102 Rev.03 Page 3 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

AS RECEIVED
1 SET = PAD BEARING ACTIVE REPAIR
1 SET = PAD BEARING INACTIVE FINAL

PROCEDURE NO. : PRO-01WI-42


GENERAL PENETRANT DESCRIPTION:
ARDROX 970P25E ( FLUORESCENT )
ARDROX 985 P14 ( FLUORESCENT )
ARDROX-907 PB ( RED DYE )
MAGNAFLUX SKL – SP1 ( RED DYE )
TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY: --
BABBIT SURFACE
PENETRANT TYPE DWELL TIME: REMOVALL METHOD: DRYING:
MANUAL DRYER
FLUORESCENT 15 MINUTES SOLVENT WIPE ( TYPE C )
AMBIENT TEMPERATURE OTHER
RED DYE 30 MINUTES EMULSIFIER ( TYPE D / HIDRO PHYLIC )

60 MINUTES WATER WASHABLE ( TYPE A ) DEVELOPER APPLICATION:

OR MORE AQUEOUS NON AQUEOUS OTHER:

INSPECTION RESULT :

POROSITY, HEAVY RUBING AND LINIER INDICATION ON ABOVE INSPECTED PART, SEE THE
ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 1 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

PAD BEARING ACTIVE

Fig. 1 Penetrant inspection on pad bearing Fig . 2 Found porosity indication on pad bearing
active active

Fig. 3 Porosity indication on pad bearing Fig. 4 Porosity indication on pad bearing
active active

Fig. 5 Porosity indication on pad bearing Fig. 6 Porosity indication on pad bearing
active active

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 2 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

PAD BEARING INACTIVE

Fig. 1 Penetrant inspection on pad bearing Fig . 2 Found linier and heavy rubs indication on pad
inactive bearing inactive

Fig. 3 Linier and heavy rubs on pad bearing Fig. 4 Linier and heavy rubs on pad bearing
inactive inactive

Fig. 5 Linier and heavy rubs on pad bearing


inactive

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 3 of 3
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/002-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

1 UNIT = CASING UPPER AND LOWER AS RECEIVED REPAIR


FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

NO DESCRIPTION PARTS INSPECTIONS RESULTS

1 CASING NO INDICATION

SEE PHOTOGRAPH ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT Sulzer Turbo Services Indonesia


PRO-01FR-08 Rev.03 Page 1 of 3
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/002-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.1 MT inspection on casing upper and lower

Fig.2 No indication on pit area on casing Fig.3 No indication on pit area on casing
upper and lower upper and lower

Fig.4 No indication on inspected area Fig.5 No indication on inspected area

This material is the exclusive property of PT Sulzer Turbo Services Indonesia


PRO-01FR-08 Rev.03 Page 2 of 3
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/002-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.7 No indication on inspected area Fig.8 No indication on inspected area

Fig.9 No indication on pit area on casing Fig.10 No indication on pit area on casing
upper and lower upper and lower

Fig.12 MT inspection on errosion lower,


Fig.11 Errosion indication on casing lower
found no crack inication

This material is the exclusive property of PT Sulzer Turbo Services Indonesia


PRO-01FR-08 Rev.03 Page 3 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

AS RECEIVED
1 SET = BEARING #1 REPAIR
1 SET = BEARING #2 FINAL

PROCEDURE NO. : PRO-01WI-42


GENERAL PENETRANT DESCRIPTION:
ARDROX 970P25E ( FLUORESCENT )
ARDROX 985 P14 ( FLUORESCENT )
ARDROX-907 PB ( RED DYE )
MAGNAFLUX SKL – SP1 ( RED DYE )
TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY: --
BABBIT SURFACE
PENETRANT TYPE DWELL TIME: REMOVALL METHOD: DRYING:
MANUAL DRYER
FLUORESCENT 15 MINUTES SOLVENT WIPE ( TYPE C )
AMBIENT TEMPERATURE OTHER
RED DYE 30 MINUTES EMULSIFIER ( TYPE D / HIDRO PHYLIC )

60 MINUTES WATER WASHABLE ( TYPE A ) DEVELOPER APPLICATION:

OR MORE AQUEOUS NON AQUEOUS OTHER:

INSPECTION RESULT :

FOUND LINIER AND CRACK INDICATION ON BEARING #1, SEE THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 1 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

BEARING #1

Fig. 1 Penetrant inspection on bearing #1


Fig . 2 Penetrant inspection on bearing #1 upper
lower

Fig. 3 Linier indication on bearing #1 upper Fig. 4 Crack indication on bearing #1 lower

Fig. 6 Typicak no indication on bearing #1


Fig. 5 Crack indication on bearing #1 lower
upper and lower

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 2 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

BEARING #2

Fig. 1 Penetrant inspection on bearing #2


Fig . 2 Penetrant inspection on bearing #2 upper
lower

Fig. 3 No indication on bearing #2 upper and Fig. 4 No indication on bearing #2 upper and
lower lower

Fig. 5 No indication on bearing #2 upper and Fig. 6 No indication on bearing #2 upper and
lower lower

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 3 of 3
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/003-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

12 EA = COUPLING BOLT AS RECEIVED REPAIR


CASING BOLT FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

NO DESCRIPTION PARTS INSPECTIONS RESULTS

1 COUPLING BOLT NO INDICATION

2 CASING BOLT NO INDICATION

SEE PHOTOGRAPH ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 1 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/003-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

COUPLING BOLT

Fig.1 MT inspection on coupling bolt Fig.2 No crack indication on coupling bolt

Fig.3 No crack indication on coupling bolt Fig.4 No crack indication on coupling bolt

Fig.5 No crack indication on coupling bolt Fig.6 No crack indication on coupling bolt

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 2 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/003-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.7 No crack indication on coupling bolt Fig.8 No crack indication on coupling bolt

Fig.9 No crack indication on coupling bolt Fig.10 No crack indication on coupling bolt

Fig.11 No crack indication on coupling bolt Fig.12 No crack indication on coupling bolt

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 3 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/003-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

CASING BOLT

Fig.13 MT inspection on casing bolt Fig.14 No crack indication on bolt casing

Fig.15 No crack indication on bolt casing Fig.16 No crack indication on bolt casing

Fig.17 No crack indication on bolt casing Fig.18 No crack indication on bolt casing

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 4 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/003-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.19 MT inspection on bolt casing Fig.20 No crack indication on bolt casing

Fig.21 No crack indication on bolt casing Fig.22 No crack indication on bolt casing

Fig.23 No crack indication on bolt casing Fig.24 No crack indication on bolt casing

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 5 of 5
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

AS RECEIVED
REPAIR
2 AREA = ROTOR FINAL

PROCEDURE NO. : PRO-01WI-42


GENERAL PENETRANT DESCRIPTION:
ARDROX 970P25E ( FLUORESCENT )
ARDROX 985 P14 ( FLUORESCENT )
ARDROX-907 PB ( RED DYE )
MAGNAFLUX SKL – SP1 ( RED DYE )
TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY: --
JOURNAL BEARING AND TRUST COLLAR AREA
PENETRANT TYPE DWELL TIME: REMOVALL METHOD: DRYING:
MANUAL DRYER
FLUORESCENT 15 MINUTES SOLVENT WIPE ( TYPE C )
AMBIENT TEMPERATURE OTHER
RED DYE 30 MINUTES EMULSIFIER ( TYPE D / HIDRO PHYLIC )

60 MINUTES WATER WASHABLE ( TYPE A ) DEVELOPER APPLICATION:

OR MORE AQUEOUS NON AQUEOUS OTHER:

INSPECTION RESULT :

FOUND CRACK INDICATION ON TRUST COLLAR CE SIDE ON ABOVE INSPECTED PART, SEE THE
ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 1 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

Fig. 1 Penetrant inspection on journal bearing and trust collar

Fig. 3 Found crack indication on trust collar TE


Fig. 4 Crack indication on trust collar TE side
side

Fig. 5 No indication on journal bearing TE


Fig. 5 Crack indication on trust collar TE side
side

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 2 of 3
PRODUCTION Form
PROJECT NO. : P-01739

PENETRANT TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04 /001P / XI-‘16


PT LEVEL : II DATE : DECEMBER 05, 2016

Fig. 1 Penetrant inspection on journal bearing


Fig . 2 No indication on trust collar CE side
CE side

Fig. 3 No indication on journal bearing CE side Fig. 4 No indication on trust collar CE side

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-06 Rev.03 Page 3 of 3
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/004-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

= DIAPHRAGM AS RECEIVED REPAIR


FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

NO DESCRIPTION PARTS INSPECTIONS RESULTS

1 DIAPHRAGM ACCEPTED

SEE PHOTOGRAPH ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 1 of 4
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/004-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.1 MT inspection on diaphragm Fig.2 No crack indication on inspected area

Fig.3 Crack indication on blades Fig.4 Crack indication on blades

Fig.5 Crack indication on weld area Fig.6 Crack indication on inspcted area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 2 of 4
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/004-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.7 No crack indication on shroud and


Fig.8 No crack indication on blades area
tenon area

Fig.10 No crack indication on shroud and


Fig.9 No crack indication on blades area
tenon area

Fig.11 No crack indication on blades triling Fig.12 No crack indication on blades triling
edge area edge area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 3 of 4
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/004-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.13 No crack indication on split line area Fig.14 No crack indication on seal area

Fig.15 Visualy no crack indication on seal Fig.16 Visualy no crack indication on seal
area area

Fig.17 Visualy no crack indication on seal Fig.18 Visualy no crack indication on seal
area area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 4 of 4
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/005-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:

1 UNIT = MAIN STOP VALVE AS RECEIVED REPAIR


FINAL

RESIDUAL FIELD CHECK GAUSS


DEMAGNETIZATION

PROCEDURE NO. : PRO-01WI-41

TEST AREA :
WITNESS ON TEST/DEFECTIVE AREAS BY:
VISIBLE SURFACE
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:
HEAD SHOT/CLAMP KEROSENE COUPLING END
COIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTER
CONDUCTOR HRUST END
MAGNAGLO 14AM
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS

YOKE
AC DC DRY POWDER (VISIBLE) OTHERS PARTS WITH DISCONTINUITIES MARKED

PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION

INSPECTIONS RESULTS:

NO DESCRIPTION PARTS INSPECTIONS RESULTS

1 MAIN STOP VALVE NO INDICATION

SEE PHOTOGRAPH ON THE ATTACHMENT:

I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTED


IN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD

PAS
INSPECTOR SIGNATURE

ENGINEERING/NDT LEVEL III/QC COMMENTS:

APPROVED BY : ES

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 1 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/005-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.1 MT inspection on Main Stop Valve

Fig.2 MT inspection on part of Main Stop


Fig.3 No indication on inspcted area
Valve

Fig.4 No indication on inspcted area Fig.5 No indication on inspcted area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 2 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/005-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.7 MT inspection on part of Main Stop


Fig.8 No indication on inspcted area
Valve

Fig.9 No indication on inspcted area Fig.10 No indication on inspcted area

Fig.11 MT inspection on part of Main Stop


Fig.12 No indication on inspcted area
Valve

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 3 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/005-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.13 MT inspection on part of Main Stop


Fig.14 No indication on inspcted area
Valve

Fig.15 No indication on inspcted area Fig.16 No indication on inspcted area

Fig.17 MT inspection on part of Main Stop


Fig.18 No indication on inspcted area
Valve

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 4 of 5
PRODUCTION Form
PROJECT NO. : P-01739

MAGNETIC PARTICLE TESTING CUSTOMER : PLN (PERSERO) WKSKT

REPORT MFR./MODEL : TOSHIBA / SCSF

S/N./EQUIPMENT NO. : TBA / UNIT #1

INSPECTED BY : PAS REPORT NO. : NDT.04/005-M/ XI”16


MT LEVEL : II DATE : DECEMBER 05, 2016

Fig.19 MT inspection on part of Main Stop


Fig.20 No indication on inspcted area
Valve

Fig.22 MT inspection on part of Main Stop


Fig.21 No indication on inspcted area
Valve

Fig.23 No indication on inspcted area Fig.24 No indication on inspcted area

This material is the exclusive property of PT. Sulzer Indonesia


PRO-01FR-08 Rev.03 Page 5 of 5