WHEEUSUPPORT

LOCATION

NOTES:

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE NOTED.

C.G. TRANS MER,'PAD 2. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVESTRENGTH OF


c.G. TRANS RMER/PAD rc = 20.70MPaAT 28 DAYS PERIOD.

3. REINFORCINGSTEL BARS SHALL CONFORMTO THE LATEST


REQUIREMENTS OF PNS FOR OSB GRADE 275.

4. ALL ASPECTS OF CONSTRUCTIONAND DETAILING OF REINFORCEMENTS


SHALL BE IN ACCORDANCE WITHTHE LATEST EDITIONOF THE ACI CODE
5. INSTALLATION PROCEDURESSHALL BE REFERRED TO SUPPLIERS/
MANUFACTURER'SDRAWINGS.

6. ALL EMBEDDEDITEMSSHALL BE CONSIDEREDPRIOR TO CONCRETING


OF THE FOUNDATION.

5-20M"ø TOP BARS 4-16MMø TOP BARS


GRAVEL SURFACING GRAVEL SURFACING
6-20MMø TOP BA 4-16MMø TOP BARS
c. TRANSFORMER 1PAD C.c. SFORMER 1PAD

S-20MMø BOTTOMBARS 4-16MMø BOTTOMBARS


6-20MMø BOTTOMBARS 4-16MMø BOTTOMBARS
SECTIONA-A SECTION A -A

S-20MMø TOP BARS


GRAVEL SURFACING 4-16MMø TOP BARS GRAVEL SURFACING
6-20MMø TOP BARS 4-16MMø TOP BARS
c TRANSFORMER PAD C.G. NSFORMER 1PAD

VFGL

NATIONAL POWER CORPORATION


AGI-LANROA,m DILNAN. QUEZC* CITY
4-16M"ø BOTTOMBARS
6-20MM
ø BOTTOMBARS 4-16UMø BOTTOMBARS CC*TRACTCR
S-20MM
Ø BOTTOMBARS D.A. CONSUNJI INC.
SECTION B -

1500kVA TRANSFORMER FOUNDATION 112.5 kVA TRANSFORMER FOUNDATION PRO-ECT:

SCALE 1:30 SCALE 1:30


CIBTRACT XO LOG "SSP NO-OI-OII-ZCT
BOAC. MAR"OVQUE

1500 kVA & 112.5 WA TRANSFORMER


FOUNDATIONS

ASS FOR
DATE NATURE