REV 0
TABLE OF CONTENTS
1. Introduction ……………………………………………………………………… 01
2. Design Parameters…………………………………………………………….. 02
4. Structural Results………………………………………………………………… 05
5. Design Calculations………………………………………………………………. 06
1.0 INTRODUCTION
Chamber is consisting of four walls and walls are connected with 300 mm thick base.
Structural analysis of this chamber was done by SAP2000 software and those results were
input in the spreadsheet to design structural elements
1
2.0 Design Parameters
2.1 Cover
For wall - 50 mm
Base - 50 mm
2
3.0 Structural Analysis
3.1 3D model
3
3.3 Load Cases
Following load combinations were taken in to account in analyzing this structure using
SAP 2000.
a. COM 1 ( ULS ) - > 1.4 DEAD LOAD + 1.4 WATER LOAD + 1.4 SOIL LOAD+ 1.6 PIPE PRESSURE
b. COM 2 ( SLS ) - > 1.0 DEAD LOAD + 1.0 WATER LOAD + 1.0 SOIL LOAD+ 1. 0 PIPE PRESSURE
4
4.0. Structure Results
This section provides structure results,
5
4.3 Top slab Moment
6
5.1 Wall Reinforcement Calculation
As per BS 8110,
d = 300 - 50 - 12/2 = 244.0 mm
K' = 0.156 > K = 0.030 OK
z = 244.0 [0.5 + (0.25 - 0.030 /0.893)]^½
= 235.5 > 0.95d = 231.8 mm
7
5.3 Top Slab Calculation
As per BS 8110,
d = 300 - 50 - 16/2 = 242.0 mm .
K' = 0.156 > K = 0.064 OK .
z = 242.0 [0.5 + (0.25 - 0.064 /0.893)]^½
= 223.4 < 0.95d = 229.9 mm