EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Page 1 of 3
SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Passively Cooled Shelter Installation Inspection SAIC-K-4035 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The Battery Room shall not have any ventilation opening or fan that SAES-K-003
A8
would compromise the effectiveness of the hybrid cooling system. Para. 7.4.2
REMARKS:
REFERENCE DOCUMENTS:
1-SAES-K-003 -- Air Conditioning Systems For Communications Buildings, 31 May, 2004 Facilities & Data Centers 19 December 2010
2-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 05 July 2009 Design and Installation of Heating,
Ventilating and Air Conditioning Systems 5 December 2012
Page 2 of 3
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified