Introduction
• Welcome to K&M’s 3-Day Horizontal Drilling Course
• Schedule
– 8:00 – 16:30 Day 1-3
– Breaks every hour (roughly)
• Please turn cell phones OFF or to vibrate
• This is an informal setting – please ask questions.
• Have a great time!
Avoiding This…
40,000
What happened here? World record wells
• ≤25,000’ were being drilled relatively problem free
35,000
• 2 / 13Red
wells experienced
Denotes Train Wreck train wrecks before M11
Frequency = 8/20
• 5 / 6 wells experience train wrecks after M11
30,000
Horizontal Displacement, feet
15,000
10,000
5,000
0
F 18 F 19 F 20 F 21 M1 M2 M3 M5 M6 M7 M8 M9 M 10 M 11 M 12 M 13 M 14 M 16 M 17 M 18
Drilling Order © K&M Technology Group 2015 Page 9 of 15
9/18
x-value of “8”?
4 5 67
Pressure
Y Roughly “9”?
What if this was a leakoff test?
3
0 1 2 3 4 5 6 7 8 9 10
Volume
X
© K&M Technology Group 2015 Page 10 of 15
10/18
Key Messages
• This course is primarily about Prevention
• 1 oz of Prevention > 1 lb of Cure
– (28.3 g of Prevention > 0.45 kg of Cure for the Canuks)
• Correct Preventative action is not always intuitive
– Intuition is often wrong, especially in deviated wells
• This course is not intended to reinforce
conventional wisdom
– In order to improve, things have to change…
Most wells don’t require a “big rig” or “new” technology. Simply correcting
mistakes is a big improvement on most wells!
Key Messages
• Hole cleaning is often misunderstood
– We often don’t rotate fast enough
– We rarely circulate long enough
– Lots of misconceptions about sweeps, wiper trips, and mud