Sei sulla pagina 1di 8

Horizontal and High Angle Drilling

© K&M Technology Group 2015 Page 1 of 15


1/18

Introduction
• Welcome to K&M’s 3-Day Horizontal Drilling Course
• Schedule
– 8:00 – 16:30 Day 1-3
– Breaks every hour (roughly)
• Please turn cell phones OFF or to vibrate
• This is an informal setting – please ask questions.
• Have a great time!

© K&M Technology Group 2015 Page 2 of 15


2/18

Course Objectives, Description, & Schedule 1


Course Objectives
• Improve understanding of high angle drilling
• Gain confidence in an engineering approach to drilling
• Be able to explain why certain practices worked (or
didn’t work) on previous wells
• Be able to anticipate when (and why) different
techniques may be required on future wells
• Experience fewer problems on future wells!

© K&M Technology Group 2015 Page 3 of 15


3/18

Avoiding This…

© K&M Technology Group 2015 Page 4 of 15


4/18

Course Objectives, Description, & Schedule 2


© K&M Technology Group 2015 Page 5 of 15
5/18

© K&M Technology Group 2015 Page 6 of 15


6/18

Course Objectives, Description, & Schedule 3


Disaster Prevention
What causes most of the train wrecks?
• Mud?
• Iron?
• Lack of data?
• Or is it… People?

© K&M Technology Group 2015 Page 7 of 15


7/18

© K&M Technology Group 2015 Page 8 of 15


8/18

Course Objectives, Description, & Schedule 4


The People Problem…
Wytch Farm Dry Hole Train Wrecks

40,000
What happened here? World record wells
• ≤25,000’ were being drilled relatively problem free
35,000
• 2 / 13Red
wells experienced
Denotes Train Wreck train wrecks before M11
Frequency = 8/20
• 5 / 6 wells experience train wrecks after M11
30,000
Horizontal Displacement, feet

25,000 “Changing of the Guard”


New technical and operations staff.

Sidetracked to alternate BHL


20,000 Lessons learned were not transferred.

15,000

10,000

5,000

0
F 18 F 19 F 20 F 21 M1 M2 M3 M5 M6 M7 M8 M9 M 10 M 11 M 12 M 13 M 14 M 16 M 17 M 18
Drilling Order © K&M Technology Group 2015 Page 9 of 15
9/18

The Mind of a Driller


• Drillers tend to be skeptical
• Drillers tend to be resistant to change
• Drillers rely heavily on previous experiences
• Drillers struggle with the idea of non-linear behavior
10

Example: Here is some data…


9

Can you guess the y-value for an


8

x-value of “8”?
4 5 67
Pressure

Y Roughly “9”?
What if this was a leakoff test?
3

Was our initial experience relevant?


2
1
0

0 1 2 3 4 5 6 7 8 9 10
Volume
X
© K&M Technology Group 2015 Page 10 of 15
10/18

Course Objectives, Description, & Schedule 5


What’s Different about ERD
• “What’s Different” About ERD?
– Compared to vertical wells
– Compared to Low Angle Directional Wells

• When do things change?


– When does previous experience help?
– When does previous experience become a liability?

© K&M Technology Group 2015 Page 11 of 15


11/18

Key Messages
• This course is primarily about Prevention
• 1 oz of Prevention > 1 lb of Cure
– (28.3 g of Prevention > 0.45 kg of Cure for the Canuks)
• Correct Preventative action is not always intuitive
– Intuition is often wrong, especially in deviated wells
• This course is not intended to reinforce
conventional wisdom
– In order to improve, things have to change…

© K&M Technology Group 2015 Page 12 of 15


12/18

Course Objectives, Description, & Schedule 6


Key Messages
• Most Problems are Self-Inflicted
– Planning mistakes
– Practices mistakes
– Decision-making mistakes

Most wells don’t require a “big rig” or “new” technology. Simply correcting
mistakes is a big improvement on most wells!

© K&M Technology Group 2015 Page 13 of 15


13/18

Key Messages
• Hole cleaning is often misunderstood
– We often don’t rotate fast enough
– We rarely circulate long enough
– Lots of misconceptions about sweeps, wiper trips, and mud

• Tripping practices are paramount


– …but we need to understand the fundamentals of hole cleaning first
– How we trip in a high-angle well is totally different than a vertical well
– Bad tripping practices are the kiss of death!
• Packoffs
• Wellbore instability (self-inflicted)
• Stuck pipe
• Lost BHA’s. loss of the hole, loss of the well

© K&M Technology Group 2015 Page 14 of 15


14/18

Course Objectives, Description, & Schedule 7


Key Messages
• Annular Pressure is a Big Deal
– ECD, Surge, and Swab fluctuations are large in these wells
• Well design can dramatically minimizes (or maximize) these effects
– How to interpret what is going on requires more than just a PWD tool
• Conventional wisdom regarding PWD interpretation is wrong
– Certain operational practices can minimize pressure cycles on the hole

• “Listening to the Hole” requires some effort


– A little science clarifies what is happening below the rotary table
– When this is done properly, better decisions can be made in real-time

© K&M Technology Group 2015 Page 15 of 15


15/18

Course Objectives, Description, & Schedule 8

Potrebbero piacerti anche