Project No. Project Title Facilities INFORMATION Tag no. System / Sub System no. Frequency Voltage Manufacturer Rating Model Ref Drawing nos. Serial no. Location INSPECTION / TEST OK N/A P/L No. Documents required: a) GTG data sheets, GA drawings and the skid drawing 1 b) Packing list c) Interconnection drawings (site wiring) d) Relevant portion of the cable schedule Verify and ensure that all construction / installation activities have 2 been completed. Check all nameplate data against data sheets, approved drawing and 3 vendor documentation. Review equipment preservation records against vendor 4 recommendations. Check equipment for mechanical damages (dents/scratches, corrosion, 5 broken handles etc.) Verify space heaters, instruments, indication lamps, control switches, 6 protection relays and phase identification tags/ labels are installed as per approved drawings. All associated E & I cables (vendor & project) JB's marshalling boxes 7 identified, installed, glanded and terminated as shown on the approved vendor drawings / project specification. Verify CT's, surge capacitor, lighting arrestor and all associated wiring 8 installed as shown on the approved drawings. 9 All labeling and warning signs correct and visible. 10 Earthing installed to project design and specification. 11 Unit lighting / ventilation / correctly installed. 12 All associated instrumentation correctly installed. Confirm the air intake and the exhaust are clear of all obstructions and 13 intake/exhaust piping works comply with approved drawings. Check starting battery and give commissioning charge / keep under 14 float charging as necessary