Asst. Mgr(Inst.)
Intoduction to Phulpur Unit
Ammonia-I : 1215 MTPD
Ammonia-II : 1740 MTPD
Urea-I : 2115 MTPD
Urea-II : 3030 MTPD
Power Plant-I : (125*3)TPH+12.5MW
Power Plant-II : 200 TPH + 18.0 MW
Block Diagram of AMMONIA Plant
PROCESS AIR
LNG FEED
PRIMARY SECONDARY HIGH
TEMPERATURE LT
REFORMER REFORMER GAURD
SHIFT CONVERTER
STEAM
CO₂
SYNYTHESIS LOW
GV TEMPERATURE
COMPRESSOR & METHANATOR
CONVERTER SECTION SHIFT CONVERTER
AMMONIA
CHILLERS SEPERATOR
FINAL AMMONIA PRODUCT
44
Block Diagram of UREA Plant
Ammonia
CO2
5
Measurement of Process parameters
PRESSURE
TEMPERATURE
FLOW
LEVEL
PV
Feedback
E(t)=SV-PV Error signal
SV=Set Value
PV=Process Value
MV=Manipulated Value
6
Pressure measurement
Most liquid and all gaseous materials in the process industries are
contained within closed vessels. For the safety of plant personnel and
protection of the vessel, pressure in the vessel is controlled. In addition,
pressure is controlled because it influences key process operations like
vapor-liquid equilibrium, chemical reaction rate, and fluid flow.
Junction
Box(JB)
Isolator NIU FCS
Press. Tx(PT)
(4-20 mA)
4-20 mA
I/P Junction
Converter Box(JB)
Isolator NIU FCS
0.2-1.0 Kg/Cm2
88
Temperature measurement
Temperature control is important for separation and
reaction processes, and temperature must be
maintained within limits to ensure safe and reliable
operation of process equipment
Junction
Box(JB)
Isolator NIU FCS
Thermocouple
( mVolts)
4-20 mA
I/P Junction
Converter Box(JB)
Isolator NIU FCS
0.2-1.0 Kg/Cm2
10
Flow Measurement
The instrument to conduct flow measurement is
called flow meter.
❖ Measure of a Product Gas, Liquid or Solid
❖ Two Forms: Volumetric and Mass
❖ Volumetric: Measure of a Volume or Space such
as gallons or liters
❖ Mass: Measure of the Weight of a material in lbs
or grams
11
11
Continued….
Junction
Box(JB)
Isolator NIU FCS
Flow Tx(FT)
(4-20 mA)
4-20 mA
I/P Junction
Converter Box(JB)
Isolator NIU FCS
0.2-1.0 Kg/Cm2
12
Flow Sensors
❖ Differential Pressure
Orifice
Flow Nozzle
Venturi
Pitot Tube
Annubar
Elbow
❖ Variable Area Rotameter
❖ Positive Displacement
Nutating Disc
Oval Gear
❖ Magnetic
❖ Turbine
❖ Ultrasonic
❖ Vortex
❖ Coriolis
13
Level Measurement
Level of liquid in a vessel should be maintained above the exit pipe
because if the vessel empties the exit flow will become zero, a situation
that would upset downstream processes and could damage pumping
equipment that requires liquid. Also, the level should not overflow an
open vessel nor should it exit through a vapor line of a closed vessel,
which could disturb a process designed for vapor.
Junction
Box(JB)
Isolator NIU FCS
Level Tx(LT)
(4-20 mA)
4-20 mA
I/P Junction
Converter Box(JB)
Isolator NIU FCS
0.2-1.0 Kg/Cm2
15
15
Distributed Control System(DCS)
Manufacturer : Yokogawa India Ltd.
Model : Centum vp
Major system components
◦ Information & command station (ICS)
◦ Field control station (FCS)
◦ Engineering work station (EWS)
◦ Communication gateway unit (AGC)
◦ Nodes with I/O cards
16
DCS : Power Plant
Honeywell Automation India Ltd. (HAIL)
Windows 2000 Server
Experion PKS (C-200/R201)
Single Redundant Network
FTE Communication
Operator Station:Flex & Console
MIS System : Report Generation
17
Block Diagram :
I/O
FTA MODULES C-200
18
SECURITY LEVEL:
Security Description
LVL1 View only mode
TYPE BIDRUM, WATER BIDRUM, WATER TWO STAGE, EXTN TWO STAGE,
TUBE,TANGENTIALLY TUBE,FRONT TYPE, CONDENSING, EXTN
PC FIRED, RLNG / OIL FIRED TURBINE TYPE,CONDEN
Pr -110KG/CM2 Pr -115KG/CM2 SING TURBINE
TEMP - 465 DEG C TEMP -515 DEG C
POWER DOUBLE ACTING RGS & HAGON RETAINED WITH RETAINED / I/P
CYLINDER I/P CONVERTER OF ABB
25
25
UPS SYSTEM
UPS: Uninterrupted Power Supply
BATTERY
Causes of UPS Failure:
O/P overload
Inverter overvoltage
Inverter Under voltage
I/P Breaker tripped
Fuse blown
Fan failure
Battery voltage low
Inverter failure
Rectifier failure
26
26
Continued…
27
Maintenance Procedures
Preventive maintenance
◦ Analyser sample flow adjustments
◦ Liquid analyser electrode cleaning
◦ Cleaning and painting of field instruments
Breakdown maintenance
28
Continued….
Scheduled maintenance
◦ Physical inspection
◦ Calibration
◦ Cleaning & Lubrication
◦ Repair / Part replacement
Annual maintenance
◦ Calibration of critical instruments
◦ Control valve trim inspection & repair
29