Ballast Water
Management Plan
Preliminary Approved
GL as being in compliance with the relevant requirements for
Ballast Water Management
kakr
Shanghai 2012-12-18 Ref.-No. 12-136584
Unless otherwise agreed, assignments are undertaken in accordance with DNR 2005 Legal relationship client-architect, engineer and consultant
Digitally signed by Germanischer Lloyd, Date: 2012-12-18 06:18:11 GMT
Germanischer Lloyd Ref.-No. 12-136584
NOTE: .
This manual is to be used in conjunction with the following manuals and plans:
Longitudinal Strength Loading Manual, document number 076-110
Intact Stability Loading Manual, document number 076-130
Tank Sounding Manual, document number 076-180
i
Rev. Date Approved Description
ii
Table of contents
Page
1. General particulars............................................................................................................................................. 1.1
1.1 Ship data ................................................................................................................................................ 1.1
1.2 Ballast water capacity ........................................................................................................................ 1.1
5. Procedures & operation of the ballast water management systems .................................................... 5.1
5.1 Operation and planning of ballast water management ........................................................... 5.1
5.2 Additional measures and designated areas ................................................................................. 5.2
5.3 Precautionary practices ..................................................................................................................... 5.2
5.4 Methods of ballast water exchange ............................................................................................... 5.2
5.5 Retention on board ............................................................................................................................. 5.3
5.6 Treatment methods ............................................................................................................................. 5.3
5.7 Sediment management ..................................................................................................................... 5.3
iii
1 GENERAL PARTICULARS
1.1 Ship data
Ships Name : VECTIS CASTLE
Ship Type : General Cargo / Multi Purpose Vessel
Call Sign :
Class Number : GL 116735
IMO Number : 9626168
Official Number :
Flag : United Kingdom
Port of Registry : Cowes
Flag State ID Number :
Builder : Jiangsu Yangzijiang Shipbuilding Co., Ltd.
Yard Number : YZJ2011-1000 Minimum draft at forward perpendicular: 3.40 m
Date of Keel laying / expected The bottom structure is checked against slamming
: ..-..-.. / ..-..-..
Delivery loads using this draft.
1.1
2 PURPOSE OF BALLAST WATER MANAGEMENT PLAN
2.1 Introduction
This Plan has been prepared to meet the requirements of MEPC Res.127(53)
“GUIDELINES BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT
PLANS (G4)”
and IMO Res.A.868(20)
“GUIDELINES FOR THE CONTROL AND MANAGEMENT OF SHIPS’ BALLAST WATER TO MINIMISE THE
TRANSFER OF HARMFUL AQUATIC ORGANISMS AND PATHOGENS”
Furthermore the Plan is intended to meet requirements as stipulated in the
“INTERNATIONAL CONVENTION FOR THE CONTROL AND MANAGEMENT OF SHIPS’ BALLAST WATER AND
SEDIMENTS”
The Plan provides standard operational guidance for the planning and management of ships’ ballast
water and sediments and describes safe procedures to be followed.
In regions where Ballast Water Management is already requested based on national legislation, this
Plan should be kept available for inspection on request by an authorized Authority.
2.3 Requirements
Several States have already established national standards on ballast water exchange procedures
and have specified the necessary documentation on basis of the IMO Res.A.868(20). These
procedures have been developed in order to guarantee the formal acceptance of the quarantine
officers.
It is to be observed that particular requirements may differ on basis of national legislation.
Germanischer
Furthermore it is to be noted that this Plan cannotLloyd Ref.-No.
replace 12-136584
the national forms, which
. may be required
by some Port States for the documentation of an accurate ballast log.
Common to all States that require Ballast Water Management is the need for ships to report in
advance to the national monitoring Authority, how much ballast water will be on board on arrival,
where it was taken on board and whether ballast exchange has been carried out.
2.1
2.4 Usage of the Ballast Water Management Plan
Each part of this Ballast Water Management Plan should be viewed as a tool, which, if correctly
applied, will help to minimise the risk of transferring unwanted organisms associated with ballast
water discharge and the safety aspects of ballast water exchange. Thus this plan gives a guidance
of how to exchange ballast water while at sea, continuing the plan shall enable a quarantine officer
to familiarise himself with the ships’ ballast practice.
For the demonstration of the correct exchange of ballast water during a voyage an accurate ballast
water log is to be maintained. A suitable model log is attached in the Annex 2 of this Plan. Even if a
ship is not trading in an area where ballast water information is required, it may later prove
worthwhile to have a history of what ballast water has been carried.
The Plan should be kept available for inspection on request by an authorized authority (Port State
control officer or by a quarantine officer).
2.2
3 OFFICER AND CREW
On this vessel the designated person for the control of the ballast water management procedures is
the Chief Officer.
The overall responsibility remains with the master.
3.1
• procedures for recording (Ballast Water Record Book), sampling and sounding to prove a proper
record as postulated in the regulations
• ballast pump capacity restrictions, if any
• ballast water exchange procedures
• precautions for entering tanks for sediment removal, further procedures for the safe handling and
packaging of sediment and storage thereof.
To facilitate the administration of ballast water exchange (and treatment procedures, if applicable),
the designated Ballast Water Management Officer is responsible for a continuous and correct record
keeping.
When carrying out ballast water operations the details are to be recorded in the Ballast Water
Record Booklet together with any exemptions, if applicable.
Where a Port State requires information on ship’s ballast operations, relevant documentation should
be made available to the Port State.
3.2
4 BALLAST WATER ARRANGEMENTS
4.1
4.2 Piping and pumping arrangement
Name Capacity Quantity Location
Bilge & Ballast Pump 300 m3/h 2 Engine room
For this vessel the ballast system consist of a double line system. Each tank has his own ballast line and
the valves must be operated in the engine room; according scheme:
See Annex 6 (Bilge & Ballast diagram)
The ballast system is provided with two shore connections on the poopdeck aft, for discharge of
ballast water to Port Reception Facilities.
4.2
5 PROCEDURES & OPERATION OF THE BALLAST WATER MANAGEMENT
SYSTEM
The designated Ballast Water Management Officer and the crew should be familiar with the
requirements of the Port Authorities with respect to ballast water and sediment management,
including information that will be needed to obtain entry clearance.
A ballast handling plan (Ballast Water Exchange Sequence) for a voyage with ballast water is to be
prepared in advance, whereby a step by step procedure for the exchange of ballast water is to be
worked out. The Ballast Water Exchange Sequence should be based on the specific loading
condition for which it is intended for.
This pre-planning is necessary in order to maintain safety in case compliance with ballast water
exchange or other ballast water treatment or control options is required.
All Safety Considerations (Chap. 6) and Limitations (Chap. 7) should be taken into account when
preparing the Ballast Water Exchange Sequence.
In general exchange of ballast water should be carried out in a deep sea condition. It is
recommended to perform ballast water exchange at least 200 nm from the nearest land and in
waters at least 200 m in depth, if this is not possible at least 50 nm from the nearest land and in waters
at least 200 m in depth or in areas designated by the Port State.
A ship shall not be required to deviate from its intended voyage, or delay the voyage, in order to
comply with the requirements mentioned above.
A ship shall not be required to comply with requirement exchange of ballast water, if the master
reasonably decides that such exchange would threaten the safety or stability of the ship, its crew, or
its passengers because of adverse weather, ship design or stress, equipment failure, or any other
extraordinary condition.
If ballast water exchange is not undertaken for any reasons then details of the reasons ballast water
exchange was not undertaken are to be recorded in the Ballast Water Record Book. Such a
statement will assist the master when responding to enquiries from a quarantine officer.
5.1
• If a tank couple will be operated simultaneously with both BW pumps running, the tank levels
have to be controlled continuously and if necessary one line has to be reduced. In any case it
has to be ensured that a single tanks is filled or discharged by only one pump to avoid
unacceptable high pressure.
For this vessel the sequential exchange method is applicable, together with the treatment method.
The other exchange methods are NOT applicable to this vessel.
Special attention should be paid to considerable heeling moments resulting from exchange of tanks
with different volumes or one-sided sequential ballast water exchange. This heel can be reduced by
simultaneous measures like ballast water exchange of an opposite tank or by counter-filling of
another empty tank. In general a heeling angle of 2.0 deg. shall not be exceeded. Thus, the
availability of a pair of empty spare tanks could be helpful to successfully conduct ballast water
exchange. This circumstance should be taking into account during the planning of the ballast water
distribution.
5.2
5.4.2 Flow through method (NOT applicable)
A process by which replacement ballast water is pumped into a ballast tank, allowing water to flow
through overflow or other arrangements. At least three times the tank volume needs to be pumped
through the tanks.
5.3
Removal of sediment from ballast tanks should preferably be undertaken under controlled conditions
in port, at a repair facility or in dry dock. The removed sediment should preferably be disposed of in a
sediment reception facility if available, reasonable and practicable.
When a tank is entered for sediment removal appropriate safety considerations are to be observed.
When sediment has accumulated, consideration should be given to flushing tank bottoms and other
surfaces when in suitable areas, i.e. outside 200 nm from the nearest land and in waters at least 200
m in depth, if this is not possible at least 50 nm from the nearest land and in waters at least 200 m in
depth.
5.4
6 SAFETY CONSIDERATIONS
When choosing the “sequential method” by emptying and then re-filling a tank the vessel’s loading
condition is changed which has a major influence on the stability behaviour, structural strength,
visibility and manoeuvrability.
It is strictly recommended that every intermediate step of the exchange procedure shall be pre-
calculated and monitored by means of the installed Loading Computer. A blank form for a Ballast
Water Exchange Sequence is included in the Annex 3.
• In all situations the stability limitations (GM/KG limit curve) and the allowable strength values
(Bending Moments and Shear Forces [and Torsional Moments, if applicable]) are to be observed
and complied with.
• In intermediate stages the effect of free surfaces for the respective tank is to be considered in the
stability calculation for the most onerous transitory stage.
• With respect to bottom slamming it is to be observed that during ballast operations the forward
draft is not less than the required minimum forward draft.
• It is important to avoid excessive under-pressure in a tank due to emptying, respectively excessive
overpressure when filling.
• Germanischer
In order to safeguard the manoeuvrability Lloyd
of the Ref.-No.
vessel 12-136584
a sufficient .
propeller and rudder
immersion is to be ensured (required draft at aft perpendicular). Respective operational
restrictions as stipulated by the shipyards or designer are to be observed.
• Attention should be paid to a sufficient visibility and line of sight from the bridge.
• Considerations regarding tank sloshing in partially filled tanks need to be taken into account (not
applicable to this ship).
• For the calculation of the needed time span it is to be observed that both steps of the procedure
(emptying and refilling) are considered.
6.1
• In case an unsymmetrical exchange of ballast tanks will be performed, heeling angles can occur.
Such heeling angles must not exceed 2.0 deg. Furthermore the hull structure is subject to torsional
moments which should be pre-calculated and monitored with the Loading Computer.
• In order to prevent damage of the tank structure caused by overpressure during the ballasting
process, the tanks are to be filled up to tank top only, i.e. overflow through the overflow pipes or
venting pipes is to be avoided as much as possible.
6.2
7 LIMITATIONS
7.2 Permissible still water Shear Forces, Bending Momens and Torsional Moments
For Permissible Stillwater Shear forces, Bending moments and Static torsional moments see the
Longitudinal Strength Loading Manual.
7.5 Visibility
In order to ensure a sufficient visibility from the bridge, the view of the sea surface from the conning
position shall not be obscured by more than two ship lengths, or 500 m whichever is less.
For this vessel the calculated line of sight for a loading condition shall not be more than lsreq ≈ 247.9
m.
7.1
8 SAMPLE CASES FOR BALLAST WATER EXCHANGE
For this vessel a number of sample loading conditions from the intact stability loading manual have
been checked for compliance with all relevant criteria and limitations and the estimated time span
has been calculated.
Beginning from fore to aft, in a step by step procedure, each loaded ballast water tank is first
investigated for the sequential method. In case a “non-compliance” with any criteria is found the
respective requirement is stated (see column “remark”).
For intermediate stages the maximum free surface moment for the respective tanks has been
considered.
For the sample loading conditions consumables with 100 % (departure) have been considered. As
ballast water exchange should be commenced in an open ocean condition an adjusted “half-
bunker” condition, i.e. 50% consumables, may be acceptable as well.
The ballast water exchange sequence for the sample loading conditions is stated in Annex 3.
8.1
9 BALLAST WATER REPORTING FORM AND HANDLING LOG
When taking on or discharging ballast water the dates, geographical locations, ship's tanks and/or
cargo holds, ballast water temperature and salinity as well as the amount of ballast water loaded or
discharged is to be recorded. A suitable format is shown in the Annex 1 and 2. The record should be
made available to the Port State Authority.
Where a Port State Authority requires that specific ballast water procedures to be undertaken, and
due to weather, sea conditions or operational impracticability such action cannot be taken, the
master should report this fact to the Port State Authority as soon as possible and, where appropriate,
prior to entering seas under its jurisdiction.
In Annex 1 and 2 the forms "Ballast water reporting form" as well as "Record of loading and
discharging ballast" and "Narrative pages for recording unusual events" are attached which may
serve as a general guidance.
9.1
10 PORT STATE CONTROL REQUIREMENTS
This Plan does not contain any specific national Port State requirements. As a general guideline the
IMO Res.A.868(20) and the attached forms can be used. However, it is to be noted that several
Authorities have distinct requirements e.g. standardised forms. It lies in the responsibility of the
designated Ballast Water Management Officer to obtain sufficient information of the requirements of
the Port Authorities of the next visiting port.
In general the use of the attached forms does not release from the use of official forms issued by
relevant Port Authorities.
10.1
ANNEX 1: BALLAST WATER REPORTING FORM
Annex 1 - 1
BALLAST WATER REPORTING FORM
(To be provided to the Port State Authority upon request)
1. SHIP INFORMATION 2. BALLAST WATER
Ship’s Name: Type: IMO Number: Specify Units: M 3, MT, LT, ST
Owner: Gross Tonnage: Call Sign: Total Ballast Water on Board:
Flag: Arrival Date: Agent:
Last Port and Country: Arrival Port: Total Ballast Water Capacity:
Next Port and Country:
3. BALLAST WATER TANKS Ballast Water Management Plan on board? YES NO Management Plan Implemented? YES NO
Total number of ballast tanks on board: ________________ No. of tanks in ballast: ________________ IF NONE IN BALLAST GO TO No. 5.
No. of tanks exchanged: ________________ No. of tanks not exchanged: ________________
4. BALLAST WATER HISTORY: RECORD ALL TANKS THAT WILL BE DEBALLASTED IN PORT STATE OF ARRIVAL; IF NONE GO TO No. 5.
Tanks/ BALLAST WATER SOURCE BALLAST WATER EXCHANGE BALLAST WATER DISCHARGE
Holds Circle one: Empty/Refill or Flow Through
(List multiple
DATE Port or Volume Temp DATE Endpoint Volume Sea DATE Port or Volume Salinity
sources per % Exch.
tank separately) DD-MM-YY Lat/Long (units) (units) DD-MM-YY Lat/Long. (units) Hgt. (m) DD-MM-YY Lat/Long (units) (units)
Ballast Water Tank Codes: Forepeak = FP, Aftpeak = AP; Double Bottom = DB; Wing = WT; Topside = TS; Cargo Hold = CH; Other = O
IF EXCHANGES WERE NOT CONDUCTED, STATE OTHER CONTROL ACTION(S) TAKEN:______________________________________________________________
IF NONE STATE REASON WHY NOT:__________________________________________________________________________________________________________
5: IMO BALLAST WATER GUIDELINES ON BOARD (RES. A.868(20))? YES NO
RESPONSIBLE OFFICER’S NAME AND TITLE (PRINTED) AND SIGNATURE: ________________________________________________________________________
Annex 1 - 2
GUIDELINES FOR COMPLETING THE BALLAST WATER REPORTING FORM
SECTION 1: SHIP INFORMATION Ballast Water Management Plan on board?: Do you have a Endpoint or Latitude/Longitude: Location of ballast water
Ship’s Name: Print the name of the ship. ballast water management plan, specific to your ship, onboard? exchange. If it occurred over an extended distance, list the end
Owner: The registered owners or operators of the ship. Circle Yes or No. point latitude and longitude.
Flag: Country of the port of registry. Management Plan Implemented?: Do you follow the above plan? Volume: Volume of ballast water exchanged, with units.
Circle Yes or No. Percentage exchanged: Percentage of ballast water exchanged.
Last Port and Country: Last port and country at which the ship
called before arrival in the current port - no abbreviations, please. No. of Tanks in Ballast: Number of segregated ballast water Calculate this by dividing the number of units of water exchanged
Next Port and Country: Next port and country at which the ship tanks and holds with ballast at the start of the voyage to the current by the original volume of ballast water in the tank. If necessary,
will call, upon departure from the current port - no abbreviations, port. If you have no ballast water on board, go to section 5. estimate this based on pump rate. (Note: For effective flow-through
please. No. of Tanks Exchanged: This refers only to tanks and holds with exchange this value should be at least 300%).
Type: List specific ship type, write out or use the following ballast at the start of the voyage to the current port. Sea Height (m): Record the sea height in metres at the time of the
abbreviations: No. of Tanks Not Exchanged: This refers only to tanks and holds ballast exchange (Note: this is the combined height of the wind
with ballast at the start of the voyage to the current port. seas and swell, measured from crest to trough. It does not refer to
bulk(bc); roro (rr); container (cs); tanker(ts); passenger (pa); the depth).
oil/bulk ore (ob); general cargo (gc). Write out any additional ship SECTION 4: BALLAST WATER HISTORY
types. BW Source: Please list all tanks and holds that you have BW Discharge:
GT: Gross tonnage. discharged or plan to discharge in this port. Carefully write out, or Date: Date of ballast water discharge. Use European format (DD-
use codes listed below the table. Follow each tank across the MM-YY).
Arrival Date: Arrival date at current port. Please use the
European date format (DD-MM-YY) page, listing all source(s), exchange events, and/or discharge Port or Latitude/Longitude: Location of ballast water discharge, no
events separately. If the ballast water history is identical (i.e. the abbreviations for ports.
IMO Number: Identification Number of the ship used by the
same source, exchange and discharge dates and locations), sets of Volume: Volume of ballast water discharged, with units.
International Maritime Organization.
tanks can be combined (example: wing tank 1 with wing tank 2, Salinity: Record salinity of ballast water at the time of discharge,
Call Sign: Official call sign. both water from Belgium, exchanged 02.11.97, mid ocean). with units, (i.e. specific gravity (sg) or parts per thousand (ppt)).
Agent: Agent used for this voyage. Please use an additional page if you need, being careful to include If exchanges were not conducted, state other control action(s)
Arrival Port: This is the current port. No abbreviations, please. the arrival date, ship’s name and IMO number at the top. taken: If exchanges were not made on all tanks and holds to be
SECTION 2: BALLAST WATER Date: Date of ballast water uptake. Use European format (DD- discharged, what other actions were taken? E.g. transfer of water
(Note: Segregated ballast water = clean, non-oily ballast) MM-YY). to a landbased holding facility, or other approved treatment.
Total ballast water on board: Total segregated ballast water Port or Latitude/Longitude: Location of ballast water uptake. If none, state reasons why not: List specific reasons why ballast
upon arrival at current port - with units. Volume: Volume of ballast water uptake, with units. exchange was not done. This applies to all tanks and holds being
Total ballast water capacity: Total volume of all ballastable tanks Temperature: Water temperature at time of ballast water uptake, discharged.
or holds - with units. in degrees centigrade (Celsius). Germanischer Lloyd
SECTION Ref.-No.
5: 12-136584 .
SECTION 3: BALLAST WATER TANKS BW Exchange: Indicate Exchange Method: Circle empty/refill or IMO Ballast Water Guidelines On Board?: Do you have IMO
Count all tanks and holds separately (e.g. port and starboard tanks flow through. Resolution A.868(20) on board your ship? Circle Yes or No.
should be counted separately) Date: Date of ballast water exchange. Use European format (DD- Responsible Officer’s name and title (Printed) and signature:
Total No. of Tanks on board: Count all tanks and holds that can MM-YY). e.g. the First Mate, Captain, or Chief Engineer must print his
carry segregated ballast water. name and title and sign the form
Annex 1 - 3
ANNEX 2: BALLAST WATER HANDLING LOG
Annex 2 - 1
BALLAST WATER HANDLING LOG
Record of ballast water management on board
Ship ........................................ Port of Registry ............…........... IMO number .........................
TANK DATE INITIAL FINAL GEOGRAPHIC PUMPS DURATION SALINITY SIGNATURE RANK
LOCATION CONTENT CONTENT LOCATION OF USED, or OF OF OFFICER IN
(tonnes) (tonnes) SHIP GRAVITATE OPERATION CHARGE
(Port or
Lat. & Long.)
Annex 2 - 2
BALLAST WATER HANDLING LOG
Narrative record of events related to ballast water management on board
Ship ........................................ Port of Registry .............. ........... IMO number .........................
Record here events which are relevant to ballast management, and which will be of interest to quarantine officers, such as sediment removal during drydock, or tank flushing
at sea. Each entry should be completed with the signature and rank of the officer making the entry.
Annex 2 - 3
ANNEX 3: BALLAST WATER EXCHANGE SEQUENCE
This annex contains an empty Ballast water exchange sequence form and examples of step by step
calculated loading conditions including the ballast water exchange sequence forms with checks
concerning safety considerations.
Remarks :
• For calculation of the time span for exchanging one tank, use only one ballast pump (300 m3/h),
see also Chapter 6: Safety considerations.
Page
Empty ballast water exchange sequence table 2
Example conditions on pages 3-3 to 3-510 NOT ACCEPTED for two reasons:
- They already have been not accepted in our letter 12-088907 dated 2012-08-07 for
sister ship 116644, hull no. YZJ2011-997.
- For ships having a treatment system installed such exchange sequences are not
required to be included in the BWM Plan.
Because it is not clear when during pumping the max. FSM occurs, the maximum value (see table on
page 7.1 of the Prel. Stability Booklet) must be considered in the initial condition with full tanks as
well as in the intermediate conditions with tanks empty.
Germanischer
Consequently in the initial condition Lloyd
the maximum FSMRef.-No. 12-136584
of all exchange .
operations must be
considered together with the FSM of partly filled tanks and consumable tanks acc. to IMO 749 chapter
3.3. In the single steps, where the tanks under consideration are empty, the max. FSM during this
particular operation must be included.
Annex 3 - 1
BALLAST WATER EXCHANGE SEQUENCE FORM (BLANK)
Loading Condition: date:
Tank
Tank Description Step no.
No.
start finish
1 Forepeak
2 Deeptank PS
3 Deeptank SB
4 DB PS
5 DB SB
6 WT PS
7 WT SB
8 WT PS
9 WT SB
10 DB PS
11 DB SB
12 WT PS
13 WT SB
14 DB PS
15 DB SB
16 WT PS
17 WT SB
18 DB PS
19 DB SB
20 WT PS
21 WT SB
22 DB PS
23 DB SB
24 WT PS
25 WT SB
26 DB PS
27 DB SB
28 WT PS
29 WT SB
30 AP PS
31 AP SB
Stabilty criteria
Strength criteria
torsional moment criterion
Draft at FPP > 3.40 m
Heeling angle < 2 deg.
Visibility
Min. time span [min]
Remarks
100 Full
0 Empty
D/F Germanischer
Exchange (DischargeLloyd
and/orRef.-No.
Fill) 12-136584 .
Annex 3 - 2
BALLAST WATER EXCHANGE SEQUENCE – EXAMPLE CONDITION 1
L oadin g C ondition : ballast 50% consum ables
T an k initial S tep no.
N o. Tank D escription start 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 end
1 Forepeak 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 D eeptank P S 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100
3 D eeptank S B 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100
4 DB PS 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100
5 DB SB 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 Not Accepted
100 100
Ref.-No. 12-136584
6 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100
GL
7 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100
8 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 Shanghai 2012-12-18 100
9 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100
10 D B P S 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 kakr 100
11 D B S B 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100
12 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100
13 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100
14 D B P S 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100
15 D B S B 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100
16 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100
17 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100
1 4A D B P S 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100
1 5A D B S B 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
1 6A WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100
1 7A WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100
18 D B P S 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
19 D B S B 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
20 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100
21 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 37 100
22 D B P S 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
23 D B S B 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
24 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100
25 WT SB 17(2) 17 25 0 26 6 26 7 18 15 17 15 17 15 15 15 15 15 15 15 15 17
26 D B P S 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
27 D B S B 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
28 WT PS 0 0 0 0
29 WT SB 0 0 0 0
30 AP P S 0 0 0 0
31 AP S B 0 0 0 0
Stabilty crite ria OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Strength criteria OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK (1) OK
torsio nal m om ent criterion OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
D raft at F PP > 3.40 m OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
H eeling angle < 2 d eg. OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Visib ility OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
M in. tim e span [m in] - 45 44 49 55 52 53 51 40 36 32 31 36 82 89 137 124 136 170 170 92 28
R em a rks total tim e (hours): 25.8
(1) bending m om ent exceeding lim it but rem ains below 105% 100 Full
(2) tank no 25 used for heeling angle corrections 0 E m pty
D /F E xchange (D ischarge and/or Fill)
35 filling degree (%)
visibility com plies if: m ean draft from base + ( trim at Lpp / 121.7) * 308.75 > -3.803
Annex 3 - 3
BALLAST WATER EXCHANGE SEQUENCE - EXAMPLE CONDITION: BALLAST DEPARTURE
GL
Minimum metacentric height G'M 0.150 1.611 meter
Shanghai 2012-12-18
Maximum GZ at 30 degrees or more 0.200 1.647 meter
Top of the GZ curve at least at 25.000 50.100 degrees
Area under the GZ curve up to 30 degrees 0.055 0.260 mrad
Area under the GZ curve up to 40 degrees
Area under the GZ curve between 30 and 40 degrees
kakr 0.090
0.030
0.494
0.234
mrad
mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 26.622 degrees
Maximum statical angle due to wind 16.000 3.244 degrees
Maximum statical angle 80% of angle of deck immersion 30.352 3.244 degrees
Maximum allowable VCG' according damage stability requirements 6.507 6.268 meter
VCG'
Actual 6.268 m
Maximum allowable 6.507 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.407 m
Maximum allowable 6.481 m
Loading condition complies with the stated criteria.
Annex 3 - 4
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.507 meter
Maximum GZ at 30 degrees or more 0.200 1.528 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.878 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.224 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.440 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.216 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.755 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.414
5.185
5.185
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.491 6.385 meter
VCG'
Actual 6.385 m
Maximum allowable 6.490 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.405 m
Maximum allowable 6.482 m
Loading condition complies with the stated criteria.
Annex 3 - 5
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.502 meter
Maximum GZ at 30 degrees or more 0.200 1.517 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.774 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.221 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.435 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.215 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.913 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.555
5.421
5.421
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.495 6.400 meter
VCG'
Actual 6.400 m
Maximum allowable 6.494 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.413 m
Maximum allowable 6.488 m
Loading condition complies with the stated criteria.
Annex 3 - 6
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.510 meter
Maximum GZ at 30 degrees or more 0.200 1.520 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.673 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.222 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.438 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.216 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.921 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.696
5.394
5.394
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.502 6.400 meter
VCG'
Actual 6.400 m
Maximum allowable 6.502 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.411 m
Maximum allowable 6.495 m
Loading condition complies with the stated criteria.
Annex 3 - 7
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.535 meter
Maximum GZ at 30 degrees or more 0.200 1.539 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.781 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.225 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.443 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.218 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.932 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.735
5.332
5.332
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.507 6.377 meter
VCG'
Actual 6.377 m
Maximum allowable 6.506 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.374 m
Maximum allowable 6.505 m
Loading condition complies with the stated criteria.
Annex 3 - 8
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.554 meter
Maximum GZ at 30 degrees or more 0.200 1.560 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.774 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.232 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.454 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.222 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.697 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.761
4.918
4.918
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.510 6.358 meter
VCG'
Actual 6.358 m
Maximum allowable 6.510 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.355 m
Maximum allowable 6.509 m
Loading condition complies with the stated criteria.
Annex 3 - 9
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.567 meter
Maximum GZ at 30 degrees or more 0.200 1.595 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.401 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.255 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.484 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.229 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 26.761 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.904
3.353
3.353
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.514 6.354 meter
VCG'
Actual 6.354 m
Maximum allowable 6.514 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.338 m
Maximum allowable 6.535 m
Loading condition complies with the stated criteria.
Annex 3 - 10
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.719 meter
Maximum GZ at 30 degrees or more 0.200 1.672 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 49.858 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.274 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.516 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.241 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.153 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
31.633
3.223
3.223
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.534 6.279 meter
VCG'
Actual 6.279 m
Maximum allowable 6.533 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.299 m
Maximum allowable 6.544 m
Loading condition complies with the stated criteria.
Annex 3 - 11
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.727 meter
Maximum GZ at 30 degrees or more 0.200 1.665 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 50.033 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.275 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.516 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.241 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.316 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
31.952
3.253
3.253
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.526 6.292 meter
VCG'
Actual 6.292 m
Maximum allowable 6.525 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.305 m
Maximum allowable 6.510 m
Loading condition complies with the stated criteria.
Annex 3 - 12
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.702 meter
Maximum GZ at 30 degrees or more 0.200 1.637 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 50.510 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.271 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.508 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.237 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 27.489 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
31.710
3.356
3.356
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.488 6.315 meter
VCG'
Actual 6.315 m
Maximum allowable 6.488 m
Loading condition complies with the stated criteria.
VCG'
Actual 6.315 m
Maximum allowable 6.459 m
Loading condition complies with the stated criteria.
Annex 3 - 13
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Intact Stability Code standard stability criteria Criterion Value
Minimum metacentric height G'M 0.150 1.669 meter
Maximum GZ at 30 degrees or more 0.200 1.609 meter
Ref.-No. 12-136584
Top of the GZ curve at least at 25.000 51.349 degrees
GL
Area under the GZ curve up to 30 degrees 0.055 0.240 mrad
Shanghai 2012-12-18
Area under the GZ curve up to 40 degrees 0.090 0.467 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.227 mrad
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 28.408 degrees
Maximum statical angle due to wind
kakr
Maximum statical angle 80% of angle of deck immersion
16.000
30.747
5.168
5.168
degrees
degrees
Maximum allowable VCG' according damage stability requirements 6.457 6.275 meter
VCG'
Actual 6.275 m
Maximum allowable 6.457 m
Loading condition complies with the stated criteria.
Annex 3 - 14
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 17.0 1.025 33.283 1.936 39.507 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 4.999 !
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 4.545 !
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3758.121 3.917 73.237 -0.329 15.967
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 15
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 16
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 17
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.907 m
T aftmark (usk) 5.240 m
T midmark (usk) 4.923 m
T foremark (usk)
Trim Not Accepted
4.612
-0.643
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.04 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.268 m
Maximum allowable 6.507 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 18
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 17.0 1.025 33.283 1.936 39.507 7.796 6.151
26 DB PS 0.0 1.025 0.000 -0.000 29.553 -2.309 221.772 !
27 DB SB 0.0 1.025 0.000 -0.000 29.260 2.261 242.157 !
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3643.470 4.019 74.623 -0.342 470.079
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 19
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 20
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 21
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.849 m
T aftmark (usk) 5.061 m
T midmark (usk) 4.863 m
T foremark (usk)
Trim Not Accepted
4.670
-0.400
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.01 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.407 m
Maximum allowable 6.481 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 22
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 0.0 1.025 0.000 -0.000 40.213 4.045 401.799 !
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 25.0 1.025 48.945 2.280 39.505 7.797 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3669.866 4.006 74.048 -0.440 408.221
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 23
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 24
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 25
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.861 m
T aftmark (usk) 5.134 m
T midmark (usk) 4.877 m
T foremark (usk)
Trim Not Accepted
4.624
-0.523
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.77 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.385 m
Maximum allowable 6.490 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 26
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 0.0 1.025 0.000 -0.000 40.395 -4.139 375.423 !
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 0.0 1.025 0.000 1.200 39.526 7.771 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3624.414 4.026 74.478 -0.277 381.846
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 27
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 28
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 29
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.837 m
T aftmark (usk) 5.079 m
T midmark (usk) 4.852 m
T foremark (usk)
Trim Not Accepted
4.630
-0.460
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.18 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.405 m
Maximum allowable 6.482 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 30
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 0.0 1.025 0.000 0.000 52.800 4.307 447.992 !
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 26.0 1.025 50.903 2.323 39.505 7.797 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3659.522 4.017 73.724 -0.454 454.415
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 31
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 32
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 33
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.854 m
T aftmark (usk) 5.175 m
T midmark (usk) 4.870 m
T foremark (usk)
Trim Not Accepted
4.571
-0.619
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.99 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.400 m
Maximum allowable 6.494 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 34
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 0.0 1.025 0.000 0.000 52.915 -4.389 421.570 !
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 6.0 1.025 11.747 1.462 39.519 7.789 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3623.859 4.029 74.070 -0.235 427.992
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 35
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 36
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 37
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.835 m
T aftmark (usk) 5.131 m
T midmark (usk) 4.851 m
T foremark (usk)
Trim Not Accepted
4.577
-0.568
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.92 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.413 m
Maximum allowable 6.488 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 38
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 0.0 1.025 0.000 0.000 66.800 4.307 447.962 !
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 26.0 1.025 50.903 2.323 39.505 7.797 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3659.522 4.017 73.279 -0.454 454.385
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 39
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 40
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 41
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.851 m
T aftmark (usk) 5.230 m
T midmark (usk) 4.868 m
T foremark (usk)
Trim Not Accepted
4.513
-0.734
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.98 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.400 m
Maximum allowable 6.502 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 42
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 0.0 1.025 0.000 0.000 66.915 -4.389 421.614 !
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 7.0 1.025 13.705 1.506 39.516 7.791 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3625.817 4.028 73.616 -0.231 428.037
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 43
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 44
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 45
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.834 m
T aftmark (usk) 5.188 m
T midmark (usk) 4.851 m
T foremark (usk)
Trim Not Accepted
4.521
-0.683
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.98 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.411 m
Maximum allowable 6.495 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 46
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 0.0 1.025 0.000 0.000 79.312 4.246 354.833 !
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 18.0 1.025 35.240 1.979 39.507 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3667.641 3.999 73.064 -0.455 361.256
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 47
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 48
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 49
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.855 m
T aftmark (usk) 5.259 m
T midmark (usk) 4.872 m
T foremark (usk)
Trim Not Accepted
4.494
-0.783
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.98 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.377 m
Maximum allowable 6.506 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 50
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 0.0 1.025 0.000 0.000 79.391 -4.349 328.523 !
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3665.260 3.998 73.122 -0.227 334.945
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 51
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 52
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 53
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.854 m
T aftmark (usk) 5.250 m
T midmark (usk) 4.871 m
T foremark (usk)
Trim Not Accepted
4.499
-0.769
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.96 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.374 m
Maximum allowable 6.505 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 54
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 0.0 1.025 0.000 0.000 90.027 3.504 271.001 !
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 17.0 1.025 33.283 1.936 39.507 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3677.950 3.988 72.865 -0.432 277.424
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 55
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 56
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 57
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.860 m
T aftmark (usk) 5.284 m
T midmark (usk) 4.877 m
T foremark (usk)
Trim Not Accepted
4.479
-0.824
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.59 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.358 m
Maximum allowable 6.510 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 58
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
0.0
1.025
1.025 kakr
175.892
0.000
5.834
-0.000
98.880
90.106
6.003
-3.600
0.000
250.008 !
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3677.528 3.986 72.915 -0.251 256.431
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 59
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 60
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 61
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.860 m
T aftmark (usk) 5.277 m
T midmark (usk) 4.877 m
T foremark (usk)
Trim Not Accepted
4.485
-0.811
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.50 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.355 m
Maximum allowable 6.509 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 62
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 0.0 1.025 0.000 0.000 99.729 -2.355 85.400 !
GL
05 DB SB 0.0 1.025 0.000 0.000 99.792 2.299 93.436 !
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.504
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 17.0 1.025 33.283 1.936 39.507 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3666.764 3.997 72.544 -0.339 185.258
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 63
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 64
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 65
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.852 m
T aftmark (usk) 5.322 m
T midmark (usk) 4.870 m
T foremark (usk)
Trim Not Accepted
4.426
-0.918
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.01 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.354 m
Maximum allowable 6.514 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 66
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3547.275 3.906 71.176 -0.352 97.287
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 67
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 68
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 69
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.777 m
T aftmark (usk) 5.477 m
T midmark (usk) 4.798 m
T foremark (usk)
Trim Not Accepted
4.132
-1.377
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.00 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.338 m
Maximum allowable 6.535 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 70
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 0.0 1.025 0.000 1.200 103.824 -4.711 19.408 !
07 WT SB 0.0 1.025 0.000 1.200 103.824 4.711 19.408 !
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3524.985 3.776 71.255 -0.360 45.239
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 71
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 72
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 73
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.765 m
T aftmark (usk) 5.466 m
T midmark (usk) 4.786 m
T foremark (usk)
Trim Not Accepted
4.120
-1.379
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.09 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.279 m
Maximum allowable 6.533 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 74
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 0.0 1.025 0.000 1.200 98.746 -5.345 38.273 !
09 WT SB
10 DB PS
0.0
100.0
1.025
1.025 kakr
0.000
76.678
1.200
0.632
98.746
90.386
5.345
-4.505
38.273 !
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3402.421 3.720 70.625 -0.373 82.969
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 75
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 76
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 77
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.692 m
T aftmark (usk) 5.525 m
T midmark (usk) 4.716 m
T foremark (usk)
Trim Not Accepted
3.922
-1.642
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.09 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.299 m
Maximum allowable 6.544 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 78
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 0.0 1.025 0.000 1.200 89.350 -7.516 5.495 !
13 WT SB 0.0 1.025 0.000 1.200 89.350 7.516 5.495 !
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3437.734 3.751 71.702 -0.369 17.413
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 79
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 80
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 81
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.718 m
T aftmark (usk) 5.406 m
T midmark (usk) 4.740 m
T foremark (usk)
Trim Not Accepted
4.086
-1.352
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.09 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.292 m
Maximum allowable 6.525 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 82
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 0.0 1.025 0.000 1.200 79.345 -7.763 5.647 !
17 WT SB 0.0 1.025 0.000 1.200 79.345 7.763 5.647 !
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3406.366 3.756 72.647 -0.372 17.716
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 83
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 84
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 85
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.706 m
T aftmark (usk) 5.296 m
T midmark (usk) 4.726 m
T foremark (usk)
Trim Not Accepted
4.167
-1.156
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.09 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.305 m
Maximum allowable 6.510 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 86
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 0.0 1.025 0.000 1.200 66.800 -7.774 7.124 !
17A WT SB 0.0 1.025 0.000 1.200 66.800 7.774 7.124 !
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 100.0 1.025 217.584 5.502 52.800 7.800 0.000
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3319.039 3.710 74.121 -0.382 20.671
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 87
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 88
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 89
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.664 m
T aftmark (usk) 5.123 m
T midmark (usk) 4.682 m
T foremark (usk)
Trim Not Accepted
4.249
-0.894
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.09 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.315 m
Maximum allowable 6.488 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 90
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 0.0 1.025 0.000 1.200 52.800 -7.774 7.197 !
21 WT SB 0.0 1.025 0.000 1.200 52.800 7.774 7.197 !
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 100.0 1.025 195.780 5.503 39.501 -7.799 0.000
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3319.039 3.710 75.956 -0.382 20.816
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 91
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 92
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 93
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.671 m
T aftmark (usk) 4.906 m
T midmark (usk) 4.686 m
T foremark (usk)
Trim Not Accepted
4.470
-0.447
m
m
Ref.-No. 12-136584
Statical angle of inclination 0.10 degrees PS
Flooding angle 60.00 degrees
VCG'
Actual 6.315 m
Maximum allowable 6.459 m
Loading condition complies with the stated criteria.
1.0
Righting lever 1/25
0.0
0.0 50.0
Annex 3 - 94
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
GL
05 DB SB 100.0 1.025 47.425 0.667 101.029 3.310 0.000
Shanghai 2012-12-18
06 WT PS 100.0 1.025 114.611 6.105 104.289 -5.442 0.000
07 WT SB 100.0 1.025 114.611 6.105 104.289 5.442 0.000
08 WT PS 100.0 1.025 175.892 5.834 98.880 -6.003 0.000
09 WT SB
10 DB PS
100.0
100.0
1.025
1.025 kakr
175.892
76.678
5.834
0.632
98.880
90.386
6.003
-4.505
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 100.0 1.025 173.920 5.505 79.396 -7.799 0.000
17 WT SB 100.0 1.025 173.920 5.505 79.396 7.799 0.000
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 100.0 1.025 217.584 5.502 66.800 -7.800 0.000
17A WT SB 100.0 1.025 217.584 5.502 66.800 7.800 0.000
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 100.0 1.025 217.584 5.502 52.800 -7.800 0.000
21 WT SB 37.0 1.025 80.506 2.794 52.800 7.799 7.197 !
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 0.0 1.025 0.000 1.200 39.526 -7.771 6.423 !
25 WT SB 15.0 1.025 29.367 1.850 39.508 7.796 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 0.000
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 0.000
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3421.350 3.700 76.025 -0.237 20.042
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 95
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
39 Fresh water SB 50.0 1.000 17.398 5.519 6.080 2.062 43.967 !
GL
SUBTOTAL - - 34.796 5.519 6.080 -0.000 87.933
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 96
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 97
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 4.729 m
T aftmark (usk) 4.892 m
T midmark (usk) 4.743 m
T foremark (usk)
Trim Not Accepted
4.597
-0.302
m
m
Ref.-No. 12-136584
Statical angle of inclination 1.95 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 6.275 m
Maximum allowable 6.457 m
Loading condition complies with the stated criteria.
1.0
0.0
Righting lever 1/25
0.0 50.0
Annex 3 - 98
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
kakr
=
=
4.849 m
-0.400 m
= 19085.72 Tonm
Maximum shearforce = 783.40 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 2
======================================================================
Draft mld. = 4.861 m
Trim = -0.523 m
Maximum moment = 19711.73 Tonm
Maximum shearforce = 772.36 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 3
======================================================================
Draft mld. = 4.837 m
Trim = -0.460 m
Maximum moment = 20066.36 Tonm
Maximum shearforce = 781.13 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 4
======================================================================
Draft mld. = 4.854 m
Trim = -0.619 m
Maximum moment = 19987.89 Tonm
Maximum shearforce = 766.43 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 99
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step 5
======================================================================
Draft mld. = 4.835 m
Trim = -0.568 m
Maximum moment = 20216.69 Tonm
Maximum shearforce = 773.75 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Not Accepted
Condition step 6
Ref.-No. 12-136584
Draft mld.
Trim
Maximum moment
GL Shanghai 2012-12-18
======================================================================
kakr
=
=
4.851 m
-0.734 m
= 19448.91 Tonm
Maximum shearforce = 757.87 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 7
======================================================================
Draft mld. = 4.834 m
Trim = -0.683 m
Maximum moment = 19696.91 Tonm
Maximum shearforce = 765.17 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 8
======================================================================
Draft mld. = 4.855 m
Trim = -0.783 m
Maximum moment = 19090.30 Tonm
Maximum shearforce = 753.35 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 9
======================================================================
Draft mld. = 4.854 m
Trim = -0.769 m
Maximum moment = 19119.65 Tonm
Maximum shearforce = 754.67 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 100
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step 10
======================================================================
Draft mld. = 4.860 m
Trim = -0.824 m
Maximum moment = 18825.29 Tonm
Maximum shearforce = 749.18 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Not Accepted
Condition step 11
Ref.-No. 12-136584
Draft mld.
Trim
Maximum moment
GL Shanghai 2012-12-18
======================================================================
kakr
=
=
4.860 m
-0.811 m
= 18863.56 Tonm
Maximum shearforce = 750.18 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 12
======================================================================
Draft mld. = 4.852 m
Trim = -0.918 m
Maximum moment = 18498.87 Tonm
Maximum shearforce = 743.17 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 13
======================================================================
Draft mld. = 4.777 m
Trim = -1.377 m
Maximum moment = 17384.77 Tonm
Maximum shearforce = 720.16 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 14
======================================================================
Draft mld. = 4.765 m
Trim = -1.379 m
Maximum moment = 17526.57 Tonm
Maximum shearforce = 722.51 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 101
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step 15
======================================================================
Draft mld. = 4.692 m
Trim = -1.642 m
Maximum moment = 17261.86 Tonm
Maximum shearforce = 715.14 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Not Accepted
Condition step 16
Ref.-No. 12-136584
Draft mld.
Trim
Maximum moment
GL Shanghai 2012-12-18
======================================================================
kakr
=
=
4.718 m
-1.352 m
= 18228.74 Tonm
Maximum shearforce = 734.20 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 17
======================================================================
Draft mld. = 4.706 m
Trim = -1.156 m
Maximum moment = 19335.69 Tonm
Maximum shearforce = 752.68 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 18
======================================================================
Draft mld. = 4.664 m
Trim = -0.894 m
Maximum moment = 21577.24 Tonm
Maximum shearforce = 780.89 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step 19
======================================================================
Draft mld. = 4.671 m
Trim = -0.447 m
Maximum moment = 23387.93 Tonm
Maximum shearforce = 810.66 Ton
The vessel DOES NOT comply with 1 or more criteria (sea condition)
======================================================================
Annex 3 - 102
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step 20
======================================================================
Draft mld. = 4.729 m
Trim = -0.302 m
Maximum moment = 21690.31 Tonm
Maximum shearforce = 810.63 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
The vessel DOES NOT comply with 1 or more criteria
kakr
Annex 3 - 103
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 104
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 105
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 106
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 107
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 108
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 109
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 110
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 111
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 112
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 113
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 114
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 115
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 116
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 117
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 118
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 119
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 120
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 121
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 122
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 123
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 124
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 125
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 126
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 127
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 128
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 129
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 130
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 131
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 132
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 133
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 134
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 135
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 136
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 137
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 138
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 139
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 140
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 141
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 142
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 143
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 144
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 145
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 146
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 147
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 148
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 149
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 150
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 151
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 152
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 153
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 154
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 155
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 156
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 157
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 158
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 159
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 160
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 161
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 162
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 163
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 164
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 165
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 166
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 167
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 168
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 169
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 170
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 171
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 172
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 173
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 174
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 175
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 176
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 177
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 178
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 179
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 180
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 181
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 182
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 183
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 184
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 185
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 186
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 187
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 188
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 189
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 190
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 191
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 192
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 193
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 194
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 195
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 196
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 197
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 198
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 199
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 200
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 201
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 202
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 203
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 204
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 205
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 206
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 207
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 208
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 209
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 210
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 211
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 212
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 213
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 214
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 215
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 216
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 217
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 218
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 219
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 220
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Loading condition DOES NOT comply with the stated criteria. (sea condition)
Annex 3 - 221
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 222
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 223
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 224
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 225
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 226
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Annex 3 - 227
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 228
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 229
L o a d in g C o n d itio n : co n ta in e r s 1 4 t/te u , 5 0 % co n su m a b le s
T ank in itia l S te p no.
No. T a n k D e s cr ip tio n s ta r t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 end
1 F o re pe a k 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 D /F 70
2 D e e p ta n k P S 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100
3 D e e p ta n k S B 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100
4 DB PS 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100
5 DB SB 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100
6 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100
7 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100
8 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100
9
10
WT SB
DB PS
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
D /F
100
100
100
100
100
100 Not Accepted
D /F
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
Ref.-No. 12-136584
11 DB SB 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100
12 WT PS 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100
GL Shanghai 2012-12-18
13 WT SB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100
14 DB PS 100 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100
15 DB SB 100 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100
kakr
16 WT PS 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75 75 75 75
17 WT SB 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75 75 75 75
14A D B P S 100 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
15A D B S B 100 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
16A W T P S 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75 75 75
17A W T S B 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75 75 75
18 DB PS 100 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
19 DB SB 100 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
20 WT PS 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75 75
21 WT SB 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 15 75 75 75
22 DB PS 100 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
23 DB SB 100 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
24 WT PS 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75 75
25 WT SB 3 1 (1 ) 31 55 7 60 0 60 3 51 12 32 32 30 32 32 32 32 32 32 32 32 32 32
26 DB PS 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
27 DB SB 100 D /F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
28 WT PS 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75
29 WT SB 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 D /F 75 75
30 AP PS 0 0 0 0
31 AP SB 0 0 0 0
S ta b ilty c r ite r ia OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
S tr e n g th c r ite r ia OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
to r s io n a l m o m e n t c r ite r io n OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
D r a ft a t F P P > 3 .4 0 m OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
H e e lin g a n g le < 2 d e g . OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
V is ib ility OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
M in . tim e s p a n [m in ] - 45 50 58 66 67 68 66 54 50 39 36 82 90 137 124 102 127 127 79 84 53
R e m a rk s to ta l tim e ( h o u r s ) : 2 6 .7
(1) ta n k n o 2 5 u s e d fo r h e e lin g a n g le co r r e ctio n s 100 F u ll
0 E m p ty
D /F E x ch a n g e ( D isc h a r g e a n d /o r F ill)
35 fillin g d e g r e e ( % )
Annex 3 - 230
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.721 meter
Top of the GZ curve at least at 25.000 49.029 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.084 mrad
Area under the GZ curve up to 40 degrees 0.090 0.174 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.090 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 49.029 27.530 degrees
Maximum statical angle due to wind 16.000 8.694 degrees
Maximum statical angle 80% of angle of deck immersion 19.799 8.694 degrees
Maximum allowable VCG' according damage stability requirements 7.317 7.189 meter
VCG'
Actual 7.189 m
Maximum allowable 7.316 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.285 m
Maximum allowable 7.300 m
Loading condition complies with the stated criteria.
Annex 3 - 231
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.660 meter
Top of the GZ curve at least at 25.000 49.397 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.068 mrad
Area under the GZ curve up to 40 degrees 0.090 0.149 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.081 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 49.397 29.354 degrees
Maximum statical angle due to wind 16.000 11.560 degrees
Maximum statical angle 80% of angle of deck immersion 19.845 11.560 degrees
Maximum allowable VCG' according damage stability requirements 7.311 7.266 meter
VCG'
Actual 7.266 m
Maximum allowable 7.311 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.288 m
Maximum allowable 7.300 m
Loading condition complies with the stated criteria.
Annex 3 - 232
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.655 meter
Top of the GZ curve at least at 25.000 49.135 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.068 mrad
Area under the GZ curve up to 40 degrees 0.090 0.148 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.080 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 49.135 29.390 degrees
Maximum statical angle due to wind 16.000 11.575 degrees
Maximum statical angle 80% of angle of deck immersion 19.972 11.575 degrees
Maximum allowable VCG' according damage stability requirements 7.315 7.275 meter
VCG'
Actual 7.275 m
Maximum allowable 7.315 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.304 m
Maximum allowable 7.302 m
Loading condition DOES NOT comply with the stated criteria.
Annex 3 - 233
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.656 meter
Top of the GZ curve at least at 25.000 48.854 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.068 mrad
Area under the GZ curve up to 40 degrees 0.090 0.149 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.080 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 48.854 29.361 degrees
Maximum statical angle due to wind 16.000 11.501 degrees
Maximum statical angle 80% of angle of deck immersion 20.105 11.501 degrees
Maximum allowable VCG' according damage stability requirements 7.320 7.275 meter
VCG'
Actual 7.275 m
Maximum allowable 7.319 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.301 m
Maximum allowable 7.307 m
Loading condition complies with the stated criteria.
Annex 3 - 234
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.668 meter
Top of the GZ curve at least at 25.000 48.725 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.070 mrad
Area under the GZ curve up to 40 degrees 0.090 0.152 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.082 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 48.725 29.183 degrees
Maximum statical angle due to wind 16.000 11.242 degrees
Maximum statical angle 80% of angle of deck immersion 20.142 11.242 degrees
Maximum allowable VCG' according damage stability requirements 7.322 7.257 meter
VCG'
Actual 7.257 m
Maximum allowable 7.321 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.274 m
Maximum allowable 7.313 m
Loading condition complies with the stated criteria.
Annex 3 - 235
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.645 meter
Top of the GZ curve at least at 25.000 49.378 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.069 mrad
Area under the GZ curve up to 40 degrees 0.090 0.149 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.080 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 29.310 degrees
Maximum statical angle due to wind 16.000 11.219 degrees
Maximum statical angle 80% of angle of deck immersion 20.408 11.219 degrees
Maximum allowable VCG' according damage stability requirements 7.323 7.312 meter
VCG'
Actual 7.312 m
Maximum allowable 7.323 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.250 m
Maximum allowable 7.323 m
Loading condition complies with the stated criteria.
Annex 3 - 236
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.698 meter
Top of the GZ curve at least at 25.000 47.843 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.079 mrad
Area under the GZ curve up to 40 degrees 0.090 0.166 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.087 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 47.843 28.399 degrees
Maximum statical angle due to wind 16.000 9.640 degrees
Maximum statical angle 80% of angle of deck immersion 20.076 9.640 degrees
Maximum allowable VCG' according damage stability requirements 7.335 7.248 meter
VCG'
Actual 7.248 m
Maximum allowable 7.335 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.212 m
Maximum allowable 7.334 m
Loading condition complies with the stated criteria.
Annex 3 - 237
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.727 meter
Top of the GZ curve at least at 25.000 49.819 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.082 mrad
Area under the GZ curve up to 40 degrees 0.090 0.173 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.091 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 28.325 degrees
Maximum statical angle due to wind 16.000 9.445 degrees
Maximum statical angle 80% of angle of deck immersion 20.074 9.445 degrees
Maximum allowable VCG' according damage stability requirements 7.341 7.233 meter
VCG'
Actual 7.233 m
Maximum allowable 7.340 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.227 m
Maximum allowable 7.331 m
Loading condition complies with the stated criteria.
Annex 3 - 238
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.704 meter
Top of the GZ curve at least at 25.000 49.786 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.078 mrad
Area under the GZ curve up to 40 degrees 0.090 0.165 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.087 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 28.559 degrees
Maximum statical angle due to wind 16.000 9.965 degrees
Maximum statical angle 80% of angle of deck immersion 20.603 9.965 degrees
Maximum allowable VCG' according damage stability requirements 7.320 7.246 meter
VCG'
Actual 7.246 m
Maximum allowable 7.320 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.261 m
Maximum allowable 7.308 m
Loading condition complies with the stated criteria.
Annex 3 - 239
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.691 meter
Top of the GZ curve at least at 25.000 49.783 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.073 mrad
Area under the GZ curve up to 40 degrees 0.090 0.159 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.085 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 28.960 degrees
Maximum statical angle due to wind 16.000 10.749 degrees
Maximum statical angle 80% of angle of deck immersion 20.408 10.749 degrees
Maximum allowable VCG' according damage stability requirements 7.293 7.261 meter
VCG'
Actual 7.261 m
Maximum allowable 7.292 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.243 m
Maximum allowable 7.289 m
Loading condition complies with the stated criteria.
Annex 3 - 240
SUMMARY STABILITY CALCULATIONS P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Maximum GZ at 30 degrees or more 0.200 0.694 meter
Top of the GZ curve at least at 25.000 49.870 degrees
GL Shanghai 2012-12-18
Area under the GZ curve up to 30 degrees 0.055 0.072 mrad
Area under the GZ curve up to 40 degrees 0.090 0.157 mrad
Area under the GZ curve between 30 and 40 degrees 0.030 0.085 mrad
kakr
Maximum angle of inclination acc. to IMO's A.562 weathercriterion 50.000 28.956 degrees
Maximum statical angle due to wind 16.000 10.976 degrees
Maximum statical angle 80% of angle of deck immersion 19.767 10.976 degrees
Maximum allowable VCG' according damage stability requirements 7.285 7.235 meter
VCG'
Actual 7.235 m
Maximum allowable 7.284 m
Loading condition complies with the stated criteria.
VCG'
Actual 7.223 m
Maximum allowable 7.331 m
Loading condition complies with the stated criteria.
Annex 3 - 241
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 31.0 1.025 60.692 2.538 39.504 7.798 6.171
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3781.838 3.501 73.062 -0.192 94.054
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 242
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 243
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 244
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.390 -0.040 0.664 0.627 0.001 0.037 0.002
GL
10.00 7.382 0.001 1.328 1.248 0.001 0.079 0.007
12.00
15.00
7.377
7.368
0.024
0.064
1.594
1.994
Shanghai 2012-12-18
1.495
1.861
0.001
0.001
0.098
0.132
0.010
0.016
20.00 7.349 0.146 2.665 kakr2.459 0.001 0.206 0.030
25.00 7.321 0.248 3.348 3.038 0.001 0.309 0.053
30.00 7.312 0.391 4.008 3.595 0.001 0.413 0.084
35.00 7.337 0.563 4.634 4.124 0.001 0.510 0.124
40.00 7.373 0.741 5.241 4.621 0.001 0.619 0.174
50.00 7.487 1.263 6.230 5.507 0.000 0.722 0.294
60.00 7.686 1.915 6.822 6.226 0.000 0.596 0.412
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.393 m
T aftmark (usk) 7.432 m
T midmark (usk) 7.405 m
T foremark (usk) 7.378 m
Trim -0.056 m
Statical angle of inclination 0.08 degrees PS
Flooding angle 49.04 degrees
VCG'
Actual 7.189 m
Maximum allowable 7.316 m
Loading condition complies with the stated criteria.
Annex 3 - 245
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
0.5
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 246
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 31.0 1.025 60.692 2.538 39.504 7.798 6.423 !
26 DB PS 0.0 1.025 0.000 -0.000 29.553 -2.309 221.772 !
27 DB SB 0.0 1.025 0.000 -0.000 29.260 2.261 242.157 !
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3667.186 3.590 74.433 -0.200 558.234
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 247
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 248
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 249
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.340 0.131 0.663 0.635 0.001 0.026 0.001
GL
10.00 7.332 0.177 1.326 1.265 0.001 0.059 0.005
12.00
15.00
7.327
7.317
0.202
0.246
1.591
1.991
1.515
1.886
Shanghai 2012-12-18
0.001
0.001
0.076
0.104
0.007
0.012
20.00 7.297 0.333 2.662 kakr2.492 0.001 0.169 0.024
25.00 7.268 0.441 3.344 3.079 0.001 0.264 0.042
30.00 7.254 0.596 4.009 3.643 0.001 0.366 0.070
35.00 7.276 0.788 4.638 4.179 0.001 0.458 0.106
40.00 7.308 0.991 5.245 4.683 0.001 0.561 0.150
50.00 7.397 1.590 6.236 5.581 0.001 0.655 0.259
60.00 7.555 2.381 6.828 6.309 0.001 0.519 0.365
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.343 m
T aftmark (usk) 7.298 m
T midmark (usk) 7.354 m
T foremark (usk) 7.409 m
Trim 0.114 m
Statical angle of inclination 0.21 degrees PS
Flooding angle 50.00 degrees
VCG'
Actual 7.285 m
Maximum allowable 7.300 m
Loading condition complies with the stated criteria.
Annex 3 - 250
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 251
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 0.0 1.025 0.000 -0.000 40.213 4.045 401.799 !
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 55.0 1.025 107.679 3.569 39.502 7.799 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3724.908 3.599 73.574 -0.231 496.104
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 252
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 253
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 254
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.364 0.011 0.663 0.633 0.011 0.019 0.001
GL
10.00 7.355 0.054 1.327 1.262 0.011 0.054 0.004
12.00
15.00
7.351
7.342
0.078
0.119
1.593
1.993
1.511
1.881
Shanghai 2012-12-18
0.011
0.011
0.071
0.101
0.006
0.010
20.00 7.322 0.203 2.664 kakr2.485 0.011 0.168 0.022
25.00 7.293 0.307 3.346 3.071 0.010 0.265 0.041
30.00 7.282 0.456 4.009 3.633 0.010 0.366 0.068
35.00 7.306 0.634 4.637 4.168 0.009 0.460 0.104
40.00 7.340 0.821 5.243 4.671 0.009 0.564 0.149
50.00 7.442 1.369 6.234 5.566 0.007 0.660 0.259
60.00 7.621 2.071 6.826 6.293 0.006 0.527 0.366
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.367 m
T aftmark (usk) 7.381 m
T midmark (usk) 7.379 m
T foremark (usk) 7.376 m
Trim -0.006 m
Statical angle of inclination 1.90 degrees PS
Flooding angle 49.41 degrees
VCG'
Actual 7.266 m
Maximum allowable 7.311 m
Loading condition complies with the stated criteria.
Annex 3 - 255
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 256
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 0.0 1.025 0.000 -0.000 40.395 -4.139 375.423 !
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 7.0 1.025 13.705 1.506 39.516 7.791 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3634.426 3.589 74.419 -0.165 469.729
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 257
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 258
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 259
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.322 0.092 0.662 0.635 0.009 0.018 0.000
GL
10.00 7.313 0.139 1.325 1.265 0.009 0.051 0.003
12.00
15.00
7.308
7.299
0.163
0.207
1.591
1.991
1.515
1.886
Shanghai 2012-12-18
0.009
0.009
0.067
0.096
0.005
0.010
20.00 7.279 0.295 2.662 kakr2.493 0.009 0.161 0.021
25.00 7.250 0.403 3.344 3.080 0.008 0.256 0.039
30.00 7.235 0.557 4.011 3.644 0.008 0.359 0.066
35.00 7.256 0.747 4.640 4.180 0.008 0.452 0.101
40.00 7.287 0.949 5.247 4.684 0.007 0.556 0.145
50.00 7.370 1.544 6.239 5.583 0.006 0.651 0.253
60.00 7.518 2.317 6.831 6.311 0.005 0.515 0.359
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.325 m
T aftmark (usk) 7.300 m
T midmark (usk) 7.336 m
T foremark (usk) 7.373 m
Trim 0.075 m
Statical angle of inclination 1.79 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.288 m
Maximum allowable 7.300 m
Loading condition complies with the stated criteria.
Annex 3 - 260
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 261
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 0.0 1.025 0.000 0.000 52.800 4.307 447.992 !
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 60.0 1.025 117.468 3.784 39.502 7.799 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3722.394 3.616 73.183 -0.227 542.298
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 262
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 263
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 264
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.358 -0.075 0.664 0.634 0.010 0.020 0.001
GL
10.00 7.350 -0.033 1.328 1.263 0.010 0.054 0.004
12.00
15.00
7.346
7.337
-0.010
0.030
1.594
1.994
Shanghai 2012-12-18
1.513
1.883
0.010
0.010
0.071
0.101
0.006
0.010
20.00 7.317 0.113 2.665 kakr2.488 0.009 0.167 0.022
25.00 7.289 0.217 3.347 3.075 0.009 0.264 0.041
30.00 7.278 0.360 4.011 3.638 0.009 0.364 0.068
35.00 7.302 0.533 4.638 4.173 0.008 0.457 0.104
40.00 7.336 0.711 5.245 4.677 0.008 0.560 0.148
50.00 7.439 1.225 6.235 5.573 0.006 0.655 0.257
60.00 7.618 1.879 6.826 6.301 0.005 0.521 0.364
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.361 m
T aftmark (usk) 7.419 m
T midmark (usk) 7.374 m
T foremark (usk) 7.330 m
Trim -0.091 m
Statical angle of inclination 1.72 degrees PS
Flooding angle 49.14 degrees
VCG'
Actual 7.275 m
Maximum allowable 7.315 m
Loading condition complies with the stated criteria.
Annex 3 - 265
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 266
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 0.0 1.025 0.000 0.000 52.915 -4.389 421.570 !
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 0.0 1.025 0.000 1.200 39.526 7.771 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3608.420 3.607 74.256 -0.179 515.876
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 267
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 268
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 269
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.306 0.030 0.662 0.637 0.006 0.020 0.001
GL
10.00 7.298 0.076 1.326 1.268 0.006 0.052 0.004
12.00
15.00
7.293
7.284
0.100
0.144
1.591
1.991
1.519
1.890
Shanghai 2012-12-18
0.006
0.006
0.067
0.095
0.006
0.010
20.00 7.263 0.231 2.663 kakr2.498 0.005 0.159 0.021
25.00 7.234 0.341 3.345 3.087 0.005 0.253 0.039
30.00 7.219 0.492 4.013 3.652 0.005 0.356 0.065
35.00 7.239 0.678 4.643 4.189 0.005 0.448 0.100
40.00 7.269 0.875 5.250 4.695 0.004 0.550 0.144
50.00 7.348 1.450 6.242 5.595 0.004 0.643 0.251
60.00 7.488 2.196 6.833 6.326 0.003 0.505 0.355
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.309 m
T aftmark (usk) 7.315 m
T midmark (usk) 7.321 m
T foremark (usk) 7.327 m
Trim 0.012 m
Statical angle of inclination 1.17 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.304 m
Maximum allowable 7.302 m
Loading condition DOES NOT comply with the stated criteria.
Annex 3 - 270
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 271
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 0.0 1.025 0.000 0.000 66.800 4.307 447.962 !
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 60.0 1.025 117.468 3.784 39.502 7.799 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3722.394 3.616 72.745 -0.227 542.268
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 272
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 273
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 274
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.354 -0.168 0.664 0.634 0.010 0.020 0.001
GL
10.00 7.346 -0.128 1.328 1.263 0.010 0.055 0.004
12.00
15.00
7.342
7.333
-0.105
-0.065
1.594
1.994
Shanghai 2012-12-18
1.513
1.883
0.010
0.010
0.072
0.102
0.006
0.010
20.00 7.313 0.016 2.666 kakr2.488 0.009 0.168 0.022
25.00 7.286 0.118 3.349 3.075 0.009 0.265 0.041
30.00 7.275 0.257 4.012 3.638 0.009 0.366 0.068
35.00 7.299 0.421 4.639 4.173 0.008 0.458 0.104
40.00 7.334 0.590 5.246 4.677 0.008 0.562 0.149
50.00 7.437 1.074 6.236 5.573 0.006 0.656 0.258
60.00 7.618 1.670 6.827 6.301 0.005 0.521 0.365
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.357 m
T aftmark (usk) 7.460 m
T midmark (usk) 7.370 m
T foremark (usk) 7.282 m
Trim -0.183 m
Statical angle of inclination 1.70 degrees PS
Flooding angle 48.86 degrees
VCG'
Actual 7.275 m
Maximum allowable 7.319 m
Loading condition complies with the stated criteria.
Annex 3 - 275
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 276
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 0.0 1.025 0.000 0.000 66.915 -4.389 421.614 !
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 3.0 1.025 5.873 1.332 39.523 7.782 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3614.293 3.604 73.763 -0.166 515.920
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 277
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 278
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 279
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.305 -0.066 0.663 0.636 0.009 0.017 0.000
GL
10.00 7.296 -0.022 1.326 1.268 0.009 0.049 0.003
12.00
15.00
7.292
7.283
0.002
0.045
1.592
1.992
Shanghai 2012-12-18
1.518
1.890
0.009
0.009
0.065
0.093
0.005
0.009
20.00 7.262 0.130 2.664 kakr2.497 0.009 0.158 0.020
25.00 7.234 0.237 3.346 3.086 0.008 0.252 0.038
30.00 7.219 0.384 4.014 3.651 0.008 0.355 0.064
35.00 7.240 0.563 4.644 4.188 0.008 0.448 0.099
40.00 7.271 0.749 5.251 4.693 0.007 0.550 0.143
50.00 7.351 1.288 6.243 5.593 0.006 0.644 0.250
60.00 7.494 1.977 6.834 6.323 0.005 0.506 0.354
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.308 m
T aftmark (usk) 7.361 m
T midmark (usk) 7.320 m
T foremark (usk) 7.280 m
Trim -0.083 m
Statical angle of inclination 1.83 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.301 m
Maximum allowable 7.307 m
Loading condition complies with the stated criteria.
Annex 3 - 280
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 281
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 0.0 1.025 0.000 0.000 79.312 4.246 354.833 !
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 51.0 1.025 99.848 3.398 39.502 7.799 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3728.555 3.585 72.553 -0.232 449.139
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 282
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 283
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 284
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.356 -0.203 0.664 0.633 0.012 0.020 0.001
GL
10.00 7.348 -0.163 1.328 1.260 0.011 0.057 0.004
12.00
15.00
7.343
7.335
-0.141
-0.102
1.595
1.995
Shanghai 2012-12-18
1.509
1.878
0.011
0.011
0.074
0.105
0.006
0.011
20.00 7.315 -0.021 2.667 kakr2.482 0.011 0.173 0.023
25.00 7.288 0.080 3.349 3.067 0.011 0.271 0.042
30.00 7.277 0.217 4.013 3.629 0.010 0.374 0.070
35.00 7.302 0.378 4.640 4.163 0.010 0.467 0.107
40.00 7.337 0.543 5.246 4.665 0.009 0.572 0.152
50.00 7.441 1.015 6.236 5.560 0.007 0.669 0.264
60.00 7.625 1.588 6.827 6.285 0.006 0.536 0.372
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.358 m
T aftmark (usk) 7.479 m
T midmark (usk) 7.372 m
T foremark (usk) 7.267 m
Trim -0.218 m
Statical angle of inclination 1.87 degrees PS
Flooding angle 48.74 degrees
VCG'
Actual 7.257 m
Maximum allowable 7.321 m
Loading condition complies with the stated criteria.
Annex 3 - 285
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 286
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.504
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 0.0 1.025 0.000 0.000 79.391 -4.349 328.523 !
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 12.0 1.025 23.494 1.721 39.510 7.795 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3655.694 3.576 73.248 -0.158 422.829
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 287
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 288
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 289
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.323 -0.130 0.663 0.634 0.011 0.018 0.000
GL
10.00 7.315 -0.088 1.327 1.263 0.011 0.053 0.004
12.00
15.00
7.310
7.301
-0.064
-0.023
1.593
1.993
Shanghai 2012-12-18
1.512
1.883
0.011
0.011
0.070
0.100
0.006
0.010
20.00 7.281 0.060 2.665 kakr2.488 0.010 0.167 0.022
25.00 7.253 0.165 3.347 3.074 0.010 0.263 0.040
30.00 7.239 0.307 4.014 3.637 0.010 0.367 0.068
35.00 7.262 0.479 4.642 4.172 0.009 0.461 0.104
40.00 7.294 0.656 5.249 4.675 0.008 0.565 0.149
50.00 7.384 1.166 6.241 5.572 0.007 0.662 0.259
60.00 7.542 1.805 6.831 6.299 0.005 0.527 0.366
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.325 m
T aftmark (usk) 7.410 m
T midmark (usk) 7.338 m
T foremark (usk) 7.268 m
Trim -0.146 m
Statical angle of inclination 1.93 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.274 m
Maximum allowable 7.313 m
Loading condition complies with the stated criteria.
Annex 3 - 290
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 291
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
0.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
0.000
0.667
6.105
6.105
5.834
5.834
-0.000
101.029
104.289
104.289
98.880
98.880
90.106
3.310
-5.442
5.442
-6.003
6.003
-3.600
0.000
0.000
0.000
0.000
0.000
250.008 !
11 DB SB 0.0 1.025 0.000 0.000 90.027 3.504 271.001 !
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3626.946 3.625 72.296 -0.198 615.315
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 292
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 293
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 294
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.298 -0.357 0.664 0.637 -0.000 0.027 0.001
GL
10.00 7.290 -0.318 1.329 1.270 -0.000 0.059 0.005
12.00
15.00
7.285
7.277
-0.296
-0.256
1.595
1.995
Shanghai 2012-12-18
1.520
1.892
-0.000
-0.000
0.075
0.103
0.007
0.012
20.00 7.258 -0.176 2.667 kakr2.501 -0.000 0.166 0.023
25.00 7.230 -0.075 3.350 3.090 -0.000 0.260 0.042
30.00 7.216 0.058 4.018 3.656 -0.000 0.363 0.069
35.00 7.239 0.213 4.647 4.194 -0.000 0.454 0.105
40.00 7.272 0.369 5.254 4.700 -0.000 0.554 0.149
50.00 7.357 0.800 6.246 5.601 -0.000 0.645 0.256
60.00 7.509 1.317 6.835 6.332 -0.000 0.503 0.360
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.300 m
T aftmark (usk) 7.498 m
T midmark (usk) 7.315 m
T foremark (usk) 7.135 m
Trim -0.371 m
Statical angle of inclination 0.01 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.312 m
Maximum allowable 7.323 m
Loading condition complies with the stated criteria.
Annex 3 - 295
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 296
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 0.0 1.025 0.000 0.000 99.729 -2.355 85.400 !
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL 0.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
0.000
114.611
114.611
kakr
175.892
175.892
76.678
0.000
6.105
6.105
5.834
5.834
0.632
99.792
104.289
104.289
98.880
98.880
90.386
2.299
-5.442
5.442
-6.003
6.003
-4.505
93.436 !
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3692.438 3.571 72.351 -0.194 273.141
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 297
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 298
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 299
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.334 -0.282 0.664 0.632 -0.000 0.032 0.001
GL
10.00 7.326 -0.242 1.329 1.259 -0.000 0.070 0.006
12.00
15.00
7.322
7.313
-0.220
-0.181
1.595
1.995
Shanghai 2012-12-18
1.507
1.876
-0.000
-0.000
0.087
0.119
0.009
0.014
20.00 7.294 -0.101 2.667 kakr2.480 -0.000 0.187 0.027
25.00 7.267 0.000 3.350 3.064 -0.000 0.286 0.048
30.00 7.255 0.134 4.015 3.625 -0.000 0.390 0.077
35.00 7.279 0.291 4.643 4.158 -0.000 0.484 0.115
40.00 7.313 0.451 5.249 4.660 -0.000 0.589 0.162
50.00 7.411 0.896 6.240 5.554 -0.000 0.686 0.276
60.00 7.584 1.438 6.830 6.279 -0.000 0.551 0.388
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.336 m
T aftmark (usk) 7.496 m
T midmark (usk) 7.351 m
T foremark (usk) 7.208 m
Trim -0.296 m
Statical angle of inclination 0.01 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.250 m
Maximum allowable 7.323 m
Loading condition complies with the stated criteria.
Annex 3 - 300
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 301
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 0.0 1.025 0.000 0.000 107.361 1.401 44.994 !
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 30.0 1.025 58.734 2.495 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3572.949 3.465 70.987 -0.202 185.170
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 302
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 303
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 304
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.255 -0.677 0.665 0.632 0.000 0.034 0.001
GL
10.00 7.248 -0.641 1.331 1.259 0.000 0.072 0.006
12.00
15.00
7.244
7.236
-0.620
-0.584
1.597
1.998
Shanghai 2012-12-18
1.507
1.876
0.000
0.000
0.090
0.122
0.009
0.014
20.00 7.217 -0.507 2.671 kakr2.479 0.000 0.192 0.028
25.00 7.191 -0.410 3.355 3.063 0.000 0.291 0.049
30.00 7.176 -0.291 4.026 3.624 0.000 0.402 0.079
35.00 7.199 -0.159 4.655 4.157 0.000 0.498 0.118
40.00 7.231 -0.032 5.262 4.659 0.000 0.603 0.166
50.00 7.310 0.292 6.255 5.552 0.000 0.702 0.283
60.00 7.448 0.639 6.841 6.277 0.000 0.564 0.398
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.258 m
T aftmark (usk) 7.614 m
T midmark (usk) 7.275 m
T foremark (usk) 6.942 m
Trim -0.689 m
Statical angle of inclination 0.02 degrees PS
Flooding angle 47.85 degrees
VCG'
Actual 7.248 m
Maximum allowable 7.335 m
Loading condition complies with the stated criteria.
Annex 3 - 305
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 306
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
0.0
0.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
0.000
0.000
kakr
175.892
175.892
76.678
0.667
1.200
1.200
5.834
5.834
0.632
101.029
103.824
103.824
98.880
98.880
90.386
3.310
-4.711
4.711
-6.003
6.003
-4.505
0.000
19.408 !
19.408 !
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3554.574 3.333 71.030 -0.200 133.122
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 307
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 308
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 309
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.246 -0.685 0.665 0.629 0.001 0.036 0.002
GL
10.00 7.239 -0.649 1.331 1.252 0.001 0.078 0.006
12.00
15.00
7.235
7.226
-0.628
-0.591
1.597
1.998
Shanghai 2012-12-18
1.499
1.867
0.001
0.001
0.097
0.131
0.009
0.015
20.00 7.208 -0.514 2.671 kakr2.467 0.000 0.204 0.030
25.00 7.181 -0.417 3.354 3.048 0.000 0.306 0.052
30.00 7.165 -0.297 4.027 3.606 0.000 0.420 0.084
35.00 7.188 -0.165 4.656 4.136 0.000 0.520 0.125
40.00 7.220 -0.038 5.263 4.636 0.000 0.627 0.175
50.00 7.295 0.286 6.256 5.525 0.000 0.731 0.296
60.00 7.427 0.641 6.843 6.246 0.000 0.597 0.416
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.248 m
T aftmark (usk) 7.609 m
T midmark (usk) 7.265 m
T foremark (usk) 6.928 m
Trim -0.697 m
Statical angle of inclination 0.09 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.212 m
Maximum allowable 7.334 m
Loading condition complies with the stated criteria.
Annex 3 - 310
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
0.5
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 311
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
0.0
0.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
0.000
0.000
76.678
0.667
6.105
6.105
1.200
1.200
0.632
101.029
104.289
104.289
98.746
98.746
90.386
3.310
-5.442
5.442
-5.345
5.345
-4.505
0.000
0.000
0.000
38.273 !
38.273 !
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3432.010 3.262 70.396 -0.207 170.852
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 312
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 313
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 314
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.173 -0.920 0.666 0.630 0.001 0.035 0.001
GL
10.00 7.166 -0.885 1.332 1.256 0.001 0.075 0.006
12.00
15.00
7.162
7.154
-0.865
-0.829
1.599
2.000
Shanghai 2012-12-18
1.504
1.872
0.001
0.001
0.094
0.127
0.009
0.015
20.00 7.136 -0.753 2.673 kakr2.474 0.000 0.199 0.029
25.00 7.110 -0.657 3.358 3.057 0.000 0.300 0.051
30.00 7.091 -0.543 4.035 3.617 0.000 0.418 0.082
35.00 7.111 -0.422 4.668 4.149 0.000 0.518 0.123
40.00 7.140 -0.312 5.274 4.650 0.000 0.625 0.173
50.00 7.193 -0.052 6.269 5.541 0.000 0.727 0.294
60.00 7.289 0.207 6.853 6.264 0.000 0.588 0.413
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.176 m
T aftmark (usk) 7.653 m
T midmark (usk) 7.194 m
T foremark (usk) 6.744 m
Trim -0.932 m
Statical angle of inclination 0.09 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.233 m
Maximum allowable 7.340 m
Loading condition complies with the stated criteria.
Annex 3 - 315
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
0.5
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 316
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 0.0 1.025 0.000 1.200 89.350 -7.516 5.495 !
13 WT SB 0.0 1.025 0.000 1.200 89.350 7.516 5.495 !
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.362
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.362
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3467.323 3.298 71.467 -0.205 105.296
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 317
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 318
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 319
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.203 -0.678 0.665 0.630 0.001 0.035 0.001
GL
10.00 7.195 -0.640 1.330 1.255 0.001 0.075 0.006
12.00
15.00
7.191
7.183
-0.619
-0.580
1.597
1.997
Shanghai 2012-12-18
1.503
1.870
0.001
0.001
0.093
0.126
0.009
0.015
20.00 7.164 -0.501 2.670 kakr2.472 0.000 0.198 0.029
25.00 7.137 -0.401 3.354 3.054 0.000 0.299 0.050
30.00 7.118 -0.279 4.030 3.613 0.000 0.416 0.081
35.00 7.138 -0.138 4.662 4.145 0.000 0.516 0.122
40.00 7.167 -0.006 5.269 4.645 0.000 0.623 0.172
50.00 7.224 0.338 6.263 5.536 0.000 0.727 0.293
60.00 7.328 0.721 6.849 6.259 0.000 0.590 0.412
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.205 m
T aftmark (usk) 7.562 m
T midmark (usk) 7.222 m
T foremark (usk) 6.888 m
Trim -0.691 m
Statical angle of inclination 0.09 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.227 m
Maximum allowable 7.331 m
Loading condition complies with the stated criteria.
Annex 3 - 320
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
0.5
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 321
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 0.0 1.025 0.000 1.200 79.345 -7.763 5.647 !
17 WT SB 0.0 1.025 0.000 1.200 79.345 7.763 5.647 !
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.798
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.798
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3522.916 3.432 72.574 -0.202 94.875
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 322
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 323
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 324
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.243 -0.403 0.664 0.632 0.001 0.032 0.001
GL
10.00 7.236 -0.362 1.328 1.258 0.001 0.069 0.006
12.00
15.00
7.231
7.222
-0.339
-0.299
1.594
1.995
Shanghai 2012-12-18
1.507
1.876
0.001
0.001
0.087
0.119
0.008
0.014
20.00 7.203 -0.217 2.667 kakr2.478 0.000 0.188 0.027
25.00 7.175 -0.113 3.350 3.062 0.000 0.287 0.048
30.00 7.158 0.021 4.023 3.623 0.000 0.399 0.078
35.00 7.178 0.179 4.654 4.156 0.000 0.497 0.117
40.00 7.207 0.337 5.261 4.658 0.000 0.603 0.165
50.00 7.273 0.771 6.255 5.551 0.000 0.704 0.282
60.00 7.391 1.292 6.843 6.276 0.000 0.567 0.396
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.246 m
T aftmark (usk) 7.467 m
T midmark (usk) 7.261 m
T foremark (usk) 7.059 m
Trim -0.418 m
Statical angle of inclination 0.10 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.246 m
Maximum allowable 7.320 m
Loading condition complies with the stated criteria.
Annex 3 - 325
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 326
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.433
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.433
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 0.0 1.025 0.000 1.200 66.800 -7.774 7.124 !
17A WT SB 0.0 1.025 0.000 1.200 66.800 7.774 7.124 !
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.883
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.883
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3457.420 3.414 73.634 -0.206 95.100
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 327
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 328
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 329
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.217 -0.258 0.663 0.633 0.001 0.030 0.001
GL
10.00 7.209 -0.214 1.327 1.261 0.001 0.065 0.005
12.00
15.00
7.204
7.195
-0.189
-0.147
1.593
1.993
Shanghai 2012-12-18
1.510
1.879
0.001
0.001
0.083
0.113
0.008
0.013
20.00 7.175 -0.060 2.665 kakr2.484 0.000 0.181 0.026
25.00 7.147 0.047 3.348 3.069 0.000 0.278 0.045
30.00 7.127 0.190 4.022 3.631 0.000 0.391 0.075
35.00 7.144 0.363 4.656 4.165 0.000 0.491 0.113
40.00 7.171 0.541 5.263 4.668 0.000 0.595 0.161
50.00 7.222 1.040 6.258 5.563 0.000 0.695 0.276
60.00 7.316 1.663 6.846 6.289 0.000 0.557 0.389
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.220 m
T aftmark (usk) 7.370 m
T midmark (usk) 7.234 m
T foremark (usk) 7.101 m
Trim -0.275 m
Statical angle of inclination 0.11 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.261 m
Maximum allowable 7.308 m
Loading condition complies with the stated criteria.
Annex 3 - 330
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 331
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.433
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.433
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.793
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.793
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 0.0 1.025 0.000 1.200 52.800 -7.774 7.197 !
21 WT SB 0.0 1.025 0.000 1.200 52.800 7.774 7.197 !
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3457.420 3.414 74.956 -0.206 95.064
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 332
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 333
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 334
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.229 0.005 0.662 0.633 0.001 0.029 0.001
GL
10.00 7.220 0.053 1.325 1.261 0.001 0.063 0.005
12.00
15.00
7.215
7.206
0.079
0.125
1.590
1.990
1.510
1.879
Shanghai 2012-12-18
0.001
0.001
0.080
0.110
0.008
0.013
20.00 7.185 0.216 2.661 kakr2.484 0.000 0.177 0.025
25.00 7.156 0.328 3.344 3.069 0.000 0.275 0.044
30.00 7.135 0.482 4.018 3.631 0.000 0.387 0.073
35.00 7.152 0.674 4.652 4.165 0.000 0.486 0.111
40.00 7.177 0.879 5.259 4.667 0.000 0.591 0.159
50.00 7.226 1.472 6.254 5.563 0.000 0.691 0.273
60.00 7.315 2.246 6.844 6.289 0.000 0.555 0.386
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.232 m
T aftmark (usk) 7.251 m
T midmark (usk) 7.244 m
T foremark (usk) 7.238 m
Trim -0.014 m
Statical angle of inclination 0.12 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.261 m
Maximum allowable 7.292 m
Loading condition complies with the stated criteria.
Annex 3 - 335
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 336
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.433
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.433
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.793
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.793
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.879
21 WT SB 15.0 1.025 32.638 1.849 52.800 7.797 7.197 !
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 0.0 1.025 0.000 1.200 39.526 -7.771 6.423 !
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.667
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.294
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3506.411 3.404 75.203 -0.167 95.130
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 337
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 338
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 339
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.258 0.111 0.662 0.631 0.011 0.020 0.001
GL
10.00 7.250 0.159 1.324 1.258 0.011 0.056 0.004
12.00
15.00
7.245
7.235
0.186
0.231
1.590
1.990
1.506
1.875
Shanghai 2012-12-18
0.010
0.010
0.073
0.104
0.006
0.011
20.00 7.214 0.323 2.661 kakr2.477 0.010 0.173 0.023
25.00 7.185 0.436 3.343 3.061 0.010 0.272 0.042
30.00 7.165 0.594 4.015 3.622 0.009 0.384 0.070
35.00 7.183 0.790 4.647 4.155 0.009 0.484 0.108
40.00 7.209 1.002 5.254 4.656 0.008 0.590 0.155
50.00 7.266 1.625 6.249 5.549 0.007 0.693 0.270
60.00 7.371 2.446 6.839 6.273 0.005 0.561 0.383
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.262 m
T aftmark (usk) 7.228 m
T midmark (usk) 7.273 m
T foremark (usk) 7.317 m
Trim 0.092 m
Statical angle of inclination 1.83 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.243 m
Maximum allowable 7.289 m
Loading condition complies with the stated criteria.
Annex 3 - 340
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 341
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.433
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.433
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.793
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.793
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.879
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.879
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 0.0 1.025 0.000 1.200 28.714 -7.638 4.933 !
29 WT SB 0.0 1.025 0.000 1.200 28.227 7.659 4.577 !
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3569.127 3.443 75.746 -0.176 94.979
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 342
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 343
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 344
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.298 0.295 0.661 0.631 0.007 0.023 0.001
GL
10.00 7.289 0.345 1.323 1.256 0.007 0.060 0.004
12.00
15.00
7.284
7.274
0.371
0.418
1.589
1.988
1.504
1.873
Shanghai 2012-12-18
0.007
0.007
0.078
0.109
0.007
0.012
20.00 7.253 0.510 2.659 kakr2.475 0.007 0.178 0.024
25.00 7.223 0.625 3.341 3.058 0.007 0.277 0.044
30.00 7.206 0.789 4.010 3.618 0.006 0.386 0.072
35.00 7.224 0.996 4.640 4.150 0.006 0.484 0.110
40.00 7.252 1.222 5.248 4.651 0.006 0.592 0.157
50.00 7.320 1.900 6.241 5.543 0.005 0.694 0.273
60.00 7.443 2.811 6.833 6.266 0.004 0.564 0.386
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.301 m
T aftmark (usk) 7.176 m
T midmark (usk) 7.311 m
T foremark (usk) 7.445 m
Trim 0.275 m
Statical angle of inclination 1.24 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.235 m
Maximum allowable 7.284 m
Loading condition complies with the stated criteria.
Annex 3 - 345
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
0.5
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 346
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
03 Deeptank SB 100.0 1.025 98.475 4.110 109.265 2.443 0.000
04 DB PS 100.0 1.025 43.932 0.673 101.107 -3.408 0.000
05 DB SB
06 WT PS
07 WT SB
08 WT PS
09 WT SB
10 DB PS
GL100.0
100.0
100.0
100.0
100.0
100.0
1.025
1.025
1.025
1.025
1.025
1.025
Shanghai 2012-12-18
47.425
114.611
114.611
kakr
175.892
175.892
76.678
0.667
6.105
6.105
5.834
5.834
0.632
101.029
104.289
104.289
98.880
98.880
90.386
3.310
-5.442
5.442
-6.003
6.003
-4.505
0.000
0.000
0.000
0.000
0.000
0.000
11 DB SB 100.0 1.025 80.171 0.630 90.319 4.398 0.000
12 WT PS 100.0 1.025 158.236 5.729 90.329 -7.737 0.000
13 WT SB 100.0 1.025 158.236 5.729 90.329 7.737 0.000
14 DB PS 100.0 1.025 88.945 0.618 79.444 -4.921 0.000
15 DB SB 100.0 1.025 92.438 0.617 79.377 4.813 0.000
16 WT PS 75.0 1.025 130.440 4.431 79.395 -7.798 5.433
17 WT SB 75.0 1.025 130.440 4.431 79.395 7.798 5.433
14A DB PS 100.0 1.025 112.726 0.617 66.898 -4.918 0.000
15A DB SB 100.0 1.025 116.220 0.616 66.800 4.832 0.000
16A WT PS 75.0 1.025 163.188 4.428 66.800 -7.799 6.793
17A WT SB 75.0 1.025 163.188 4.428 66.800 7.799 6.793
18 DB PS 100.0 1.025 112.726 0.617 52.898 -4.918 0.000
19 DB SB 100.0 1.025 116.220 0.616 52.800 4.832 0.000
20 WT PS 75.0 1.025 163.188 4.428 52.800 -7.799 6.879
21 WT SB 75.0 1.025 163.188 4.428 52.800 7.799 6.879
22 DB PS 100.0 1.025 100.424 0.619 39.639 -4.911 0.000
23 DB SB 100.0 1.025 103.917 0.619 39.529 4.815 0.000
24 WT PS 75.0 1.025 146.835 4.429 39.502 -7.799 6.039
25 WT SB 32.0 1.025 62.650 2.581 39.504 7.798 6.423 !
26 DB PS 100.0 1.025 55.579 0.665 29.234 -4.429 0.000
27 DB SB 100.0 1.025 59.072 0.661 29.158 4.289 0.000
28 WT PS 75.0 1.025 112.944 4.482 28.334 -7.788 4.682
29 WT SB 75.0 1.025 101.725 4.463 27.902 7.821 4.241
30 AP PS 0.0 1.025 0.000 4.597 8.200 -2.847 0.000
31 AP SB 0.0 1.025 0.000 4.597 8.200 2.847 0.000
SUBTOTAL - - 3648.669 3.478 71.419 -0.195 116.146
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 347
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
80.0
90.0
90.0
-
0.900
0.900
0.900
Shanghai 2012-12-18
34.796
kakr
3.572
0.789
0.789
5.519 6.080
1.660
8.480
8.480
-0.000
14.850
8.100
8.100
0.000
-6.555
-5.865
87.933
0.646
0.016
0.016
!
!
!
63 LO STORE 1 90.0 0.900 5.915 8.150 9.000 3.795 0.784 !
64 LO STORE 2 90.0 0.900 5.915 8.150 9.000 5.865 0.785 !
65 Winch Oil 90.0 0.900 0.667 11.475 105.650 4.540 0.026 !
SUBTOTAL - - 17.647 6.991 13.756 2.855 2.273
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 348
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
St.1:4B on deck #18-28 - - 71.600 14.745 13.965 0.000 0.000
SUBTOTAL - - 207.500 11.287 18.049 0.000 0.000
kakr
10.000
12.000
12.000 2012-12-18
Shanghai 12.000
11.000
11.167
0.000
4.200
5.500
0.000
0.000
0.000
0.000
0.000
For FSM's marked with ! one of the following methods has been chosen :
1. FSM is set to zero, 2. FSM is set to the maximum, 3. FSM is set to zero if filling percentage > 98%
Annex 3 - 349
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
5.00 7.301 -0.518 0.665 0.630 0.001 0.035 0.001
GL
10.00 7.294 -0.482 1.330 1.254 0.001 0.075 0.006
12.00
15.00
7.289
7.281
-0.461
-0.423
1.596
1.997
Shanghai 2012-12-18
1.502
1.870
0.001
0.001
0.094
0.127
0.009
0.015
20.00 7.262 -0.346 2.669 kakr2.471 0.000 0.198 0.029
25.00 7.236 -0.248 3.353 3.053 0.000 0.299 0.050
30.00 7.222 -0.124 4.020 3.612 0.000 0.408 0.081
35.00 7.247 0.016 4.648 4.143 0.000 0.505 0.121
40.00 7.281 0.154 5.255 4.643 0.000 0.612 0.170
50.00 7.373 0.521 6.246 5.533 0.000 0.713 0.288
60.00 7.535 0.940 6.835 6.256 0.000 0.579 0.405
Summary
Hydrostatics Criterion Value
Draft mld. 8.000 7.303 m
T aftmark (usk) 7.581 m
T midmark (usk) 7.319 m
T foremark (usk) 7.062 m
Trim -0.531 m
Statical angle of inclination 0.09 degrees SB
Flooding angle 60.00 degrees
VCG'
Actual 7.223 m
Maximum allowable 7.331 m
Loading condition complies with the stated criteria.
Annex 3 - 350
TRIM AND STABILITY CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
0.5
GL Shanghai 2012-12-18
kakr
Righting lever 1/10
0.0
Annex 3 - 351
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
======================================================================
Ref.-No. 12-136584
GL
Condition step_1
Draft mld.
Shanghai 2012-12-18
======================================================================
= 7.343 m
Trim kakr = 0.114 m
Maximum moment = 9419.24 Tonm
Maximum shearforce = 369.89 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_2
======================================================================
Draft mld. = 7.367 m
Trim = -0.006 m
Maximum moment = 9660.85 Tonm
Maximum shearforce = -368.57 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_3
======================================================================
Draft mld. = 7.325 m
Trim = 0.075 m
Maximum moment = 10220.08 Tonm
Maximum shearforce = -371.80 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_4
======================================================================
Draft mld. = 7.361 m
Trim = -0.091 m
Maximum moment = 10379.94 Tonm
Maximum shearforce = -378.15 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 352
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step_5
======================================================================
Draft mld. = 7.309 m
Trim = 0.012 m
Maximum moment = 11048.54 Tonm
Maximum shearforce = -381.95 Ton
The vessel does comply with the criteria (sea condition)
Not Accepted
======================================================================
Ref.-No. 12-136584
GL
Condition step_6
Draft mld.
Shanghai 2012-12-18
======================================================================
= 7.357 m
Trim kakr = -0.183 m
Maximum moment = 10345.01 Tonm
Maximum shearforce = -388.14 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_7
======================================================================
Draft mld. = 7.308 m
Trim = -0.083 m
Maximum moment = 10772.48 Tonm
Maximum shearforce = -391.46 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_8
======================================================================
Draft mld. = 7.358 m
Trim = -0.218 m
Maximum moment = 9498.97 Tonm
Maximum shearforce = -391.06 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_9
======================================================================
Draft mld. = 7.325 m
Trim = -0.146 m
Maximum moment = 9802.42 Tonm
Maximum shearforce = -392.85 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 353
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step_10
======================================================================
Draft mld. = 7.300 m
Trim = -0.371 m
Maximum moment = 8862.92 Tonm
Maximum shearforce = -421.01 Ton
The vessel does comply with the criteria (sea condition)
Not Accepted
======================================================================
Ref.-No. 12-136584
GL
Condition step_11
Draft mld.
Shanghai 2012-12-18
======================================================================
= 7.336 m
Trim kakr = -0.296 m
Maximum moment = 8512.56 Tonm
Maximum shearforce = 331.55 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_12
======================================================================
Draft mld. = 7.258 m
Trim = -0.689 m
Maximum moment = 6672.19 Tonm
Maximum shearforce = 309.35 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_13
======================================================================
Draft mld. = 7.248 m
Trim = -0.697 m
Maximum moment = 6925.40 Tonm
Maximum shearforce = 310.59 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_14
======================================================================
Draft mld. = 7.176 m
Trim = -0.932 m
Maximum moment = 6606.57 Tonm
Maximum shearforce = 303.07 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 354
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step_15
======================================================================
Draft mld. = 7.205 m
Trim = -0.691 m
Maximum moment = 8470.18 Tonm
Maximum shearforce = -476.35 Ton
The vessel does comply with the criteria (sea condition)
Not Accepted
======================================================================
Ref.-No. 12-136584
GL
Condition step_16
Draft mld.
Shanghai 2012-12-18
======================================================================
= 7.246 m
Trim kakr = -0.418 m
Maximum moment = 10479.31 Tonm
Maximum shearforce = -439.64 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_17
======================================================================
Draft mld. = 7.220 m
Trim = -0.275 m
Maximum moment = 12907.95 Tonm
Maximum shearforce = -432.79 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_18
======================================================================
Draft mld. = 7.232 m
Trim = -0.014 m
Maximum moment = 13245.91 Tonm
Maximum shearforce = -404.63 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Condition step_19
======================================================================
Draft mld. = 7.262 m
Trim = 0.092 m
Maximum moment = 11780.29 Tonm
Maximum shearforce = -386.85 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 355
SUMMARY LONGITUDINAL STRENGTH P10046 GROOT SUPER GREEN 10.000 _4
Condition step_20
======================================================================
Draft mld. = 7.301 m
Trim = 0.275 m
Maximum moment = 9374.97 Tonm
Maximum shearforce = 393.55 Ton
The vessel does comply with the criteria (sea condition)
Not Accepted
======================================================================
Ref.-No. 12-136584
GL
Condition step_21
Draft mld.
Shanghai 2012-12-18
======================================================================
= 7.303 m
Trim kakr = -0.531 m
Maximum moment = 7045.00 Tonm
Maximum shearforce = 315.31 Ton
The vessel does comply with the criteria (sea condition)
======================================================================
Annex 3 - 356
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 357
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 60.692 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 358
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 359
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 59.208 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
14.307
26.230
Loading
ton/m
kakr
30.668
42.112
2012-12-18
ShanghaiShearforce
ton
59.01
202.30
Moment
tonm
65.31
544.88
8.000 59.939 50.190 9.749 323.10 1629.76
12.000 63.423 74.895 -11.472 329.66 2972.45
16.000 73.757 84.137 -10.379 283.03 4191.99
20.000 108.799 112.403 -3.604 213.75 5162.15
24.000 118.802 122.732 -3.930 185.84 5987.96
28.000 123.850 128.151 -4.301 168.05 6697.12
32.000 128.948 130.376 -1.428 118.95 7261.46
36.000 132.684 131.127 1.557 123.01 7742.63
40.000 131.694 131.289 0.404 123.16 8228.70
44.000 124.787 131.269 -6.483 72.02 8654.30
48.000 130.962 131.237 -0.274 59.82 8906.60
52.000 131.055 131.204 -0.149 54.03 9129.50
56.000 126.526 131.171 -4.645 14.75 9319.16
60.000 125.945 131.138 -5.193 -3.70 9341.95
64.000 126.038 131.105 -5.067 -28.83 9275.77
68.000 63.734 131.073 -67.339 -63.31 9118.73
72.000 121.602 131.040 -9.438 -119.79 8719.13
76.000 121.058 131.007 -9.949 -162.85 8157.06
80.000 120.975 130.952 -9.977 -202.72 7426.34
84.000 128.346 130.464 -2.118 -299.52 6375.75
88.000 136.183 128.921 7.262 -271.70 5221.41
92.000 114.304 125.105 -10.802 -272.85 4156.59
96.000 90.349 117.933 -27.585 -362.80 2934.61
100.000 136.756 107.143 29.613 -239.21 1721.11
104.000 112.474 92.349 20.126 -140.01 973.31
108.000 85.229 74.360 10.869 -82.82 546.61
112.000 53.249 53.650 -0.400 -28.66 340.56
116.000 44.962 31.632 13.331 -52.22 126.25
120.000 16.650 9.014 7.636 -10.54 8.19
Annex 3 - 360
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 118.683 6.80 1745 7403.759 - 33.20 22300
GL
45.800 60.496 3.45 1755 8773.883 - 39.34 22300
51.400
57.000
54.122
10.126
3.08
0.58
1755
1755
Shanghai 2012-12-18
9096.961
9331.769
-
-
40.79
41.85
22300
22300
62.600 -21.706 1.24 1755 kakr9310.966 - 41.75 22300
68.200 -76.777 4.37 1755 9105.110 - 40.83 22300
73.800 -136.724 7.79 1755 8488.464 - 38.06 22300
85.000 -301.046 17.15 1755 6075.256 - 37.92 16020
96.200 -366.522 20.41 1796 2861.691 - 24.39 11735
107.400 -89.253 4.89 1827 598.171 - 9.02 6633
Annex 3 - 361
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 362
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 363
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 364
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 60.692 33.200 39.504 45.800
26 DB PS 0.000 23.400 29.553 33.200
27 DB SB 0.000 23.400 29.260 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 365
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 366
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.578 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
12.396
24.053
Loading
ton/m
kakr
32.579
44.288
2012-12-18
ShanghaiShearforce
ton
62.75
214.36
Moment
tonm
69.19
579.93
8.000 59.939 48.004 11.935 343.93 1730.50
12.000 63.423 72.796 -9.374 359.07 3173.72
16.000 73.757 82.138 -8.380 320.63 4527.36
20.000 108.799 110.504 -1.705 259.15 5663.61
24.000 112.730 120.932 -8.201 235.22 6684.87
28.000 112.543 126.451 -13.907 189.68 7543.10
32.000 112.407 128.775 -16.368 91.48 8102.80
36.000 132.684 129.626 3.058 80.96 8416.19
40.000 131.694 129.887 1.806 86.92 8745.77
44.000 124.787 129.967 -5.180 41.18 9037.32
48.000 130.962 130.034 0.929 34.00 9176.39
52.000 131.055 130.101 0.955 32.82 9305.33
56.000 126.526 130.167 -3.641 -2.25 9418.66
60.000 125.945 130.234 -4.289 -16.88 9381.19
64.000 126.038 130.301 -4.263 -38.59 9269.21
68.000 63.734 130.367 -66.633 -70.06 9079.27
72.000 121.602 130.434 -8.832 -123.92 8658.02
76.000 121.058 130.501 -9.443 -164.76 8084.01
80.000 120.975 130.545 -9.570 -202.80 7349.45
84.000 128.346 130.157 -1.810 -298.18 6301.52
88.000 136.183 128.713 7.470 -269.32 5154.76
92.000 114.304 124.998 -10.694 -269.85 4100.83
96.000 90.349 117.925 -27.576 -359.56 2891.47
100.000 136.756 107.227 29.529 -236.14 1690.73
104.000 112.474 92.504 19.970 -137.42 954.38
108.000 85.229 74.553 10.676 -80.94 536.68
112.000 53.249 53.838 -0.588 -27.56 336.62
116.000 44.962 31.771 13.191 -51.79 125.34
120.000 16.650 9.062 7.588 -10.49 8.15
Annex 3 - 367
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 72.335 4.15 1745 8201.059 - 36.78 22300
GL
45.800 31.966 1.82 1755 9103.465 - 40.82 22300
51.400
57.000
32.242
-5.883
1.84
0.34
1755
1755
Shanghai 2012-12-18
9285.712
9414.759
-
-
41.64
42.22
22300
22300
62.600 -32.624 1.86 1755 kakr9318.892 - 41.79 22300
68.200 -83.385 4.75 1755 9064.301 - 40.65 22300
73.800 -139.802 7.97 1755 8420.880 - 37.76 22300
85.000 -299.406 17.06 1755 6002.521 - 37.47 16020
96.200 -363.286 20.23 1796 2819.197 - 24.02 11735
107.400 -87.259 4.78 1827 587.076 - 8.85 6633
Annex 3 - 368
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 369
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 370
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 371
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 0.000 33.200 40.213 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 107.679 33.200 39.502 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 372
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 373
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.690 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
13.566
25.388
Loading
ton/m
kakr
31.408
42.953
2012-12-18
ShanghaiShearforce
ton
60.50
207.00
Moment
tonm
66.86
558.60
8.000 59.939 49.338 10.601 331.21 1669.01
12.000 63.423 74.068 -10.645 341.13 3050.82
16.000 73.757 83.340 -9.582 297.74 4322.71
20.000 108.799 111.636 -2.837 231.59 5357.97
24.000 118.802 121.993 -3.191 206.69 6261.16
28.000 123.850 127.443 -3.593 191.79 7059.51
32.000 128.948 129.697 -0.749 145.47 7724.39
36.000 128.229 130.478 -2.249 139.78 8299.62
40.000 127.166 130.669 -3.503 124.51 8822.04
44.000 120.187 130.679 -10.492 57.53 9221.45
48.000 130.962 130.676 0.287 39.33 9394.70
52.000 131.055 130.672 0.383 35.72 9540.03
56.000 126.526 130.669 -4.143 -1.49 9660.61
60.000 125.945 130.666 -4.721 -17.99 9622.36
64.000 126.038 130.662 -4.624 -41.29 9502.70
68.000 63.734 130.659 -66.925 -74.06 9299.28
72.000 121.602 130.656 -9.054 -128.95 8859.89
76.000 121.058 130.653 -9.595 -170.53 8264.19
80.000 120.975 130.627 -9.652 -209.04 7505.51
84.000 128.346 130.169 -1.822 -304.60 6432.15
88.000 136.183 128.655 7.528 -275.66 5259.77
92.000 114.304 124.870 -10.566 -275.81 4181.16
96.000 90.349 117.731 -27.382 -364.88 2949.16
100.000 136.756 106.979 29.777 -240.57 1728.86
104.000 112.474 92.228 20.246 -140.79 976.87
108.000 85.229 74.282 10.947 -83.20 547.90
112.000 53.249 53.607 -0.358 -28.81 340.86
116.000 44.962 31.615 13.347 -52.26 126.25
120.000 16.650 9.011 7.638 -10.54 8.18
Annex 3 - 374
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 146.013 8.37 1745 7898.983 - 35.42 22300
GL
45.800 38.753 2.21 1755 9308.449 - 41.74 22300
51.400
57.000
35.495
-5.617
2.02
0.32
1755
1755
Shanghai 2012-12-18
9518.569
9657.229
-
-
42.68
43.31
22300
22300
62.600 -34.795 1.98 1755 kakr9555.788 - 42.85 22300
68.200 -87.445 4.98 1755 9283.511 - 41.63 22300
73.800 -145.202 8.27 1755 8613.362 - 38.62 22300
85.000 -305.838 17.43 1755 6126.723 - 38.24 16020
96.200 -368.565 20.52 1796 2875.825 - 24.51 11735
107.400 -89.690 4.91 1827 599.713 - 9.04 6633
Annex 3 - 375
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 376
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 377
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 378
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 0.000 33.200 40.395 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 13.705 33.200 39.516 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 379
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 380
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.250 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
12.413
24.053
Loading
ton/m
kakr
32.561
44.289
2012-12-18
ShanghaiShearforce
ton
62.71
214.28
Moment
tonm
69.14
579.61
8.000 59.939 47.981 11.958 343.90 1729.93
12.000 63.423 72.750 -9.327 359.19 3173.27
16.000 73.757 82.069 -8.311 320.98 4527.78
20.000 108.799 110.412 -1.613 259.82 5666.00
24.000 118.802 120.817 -2.015 239.72 6691.73
28.000 123.850 126.313 -2.463 229.43 7631.44
32.000 128.948 128.614 0.334 187.53 8455.77
36.000 121.279 129.442 -8.164 166.88 9180.98
40.000 119.952 129.681 -9.729 127.32 9763.62
44.000 112.709 129.738 -17.029 34.82 10123.59
48.000 130.962 129.782 1.181 6.72 10171.38
52.000 131.055 129.826 1.230 6.59 10193.28
56.000 126.526 129.870 -3.343 -27.32 10203.97
60.000 125.945 129.913 -3.968 -40.72 10068.62
64.000 126.038 129.957 -3.919 -61.11 9863.90
68.000 63.734 130.001 -66.267 -91.15 9586.71
72.000 121.602 130.045 -8.443 -143.50 9084.07
76.000 121.058 130.089 -9.031 -182.74 8434.89
80.000 120.975 130.111 -9.135 -219.09 7631.76
84.000 128.346 129.699 -1.353 -312.67 6522.21
88.000 136.183 128.233 7.950 -281.94 5321.16
92.000 114.304 124.496 -10.192 -280.51 4220.62
96.000 90.349 117.410 -27.062 -368.18 2972.67
100.000 136.756 106.720 30.036 -242.71 1741.55
104.000 112.474 92.037 20.437 -142.03 982.86
108.000 85.229 74.159 11.071 -83.82 550.25
112.000 53.249 53.540 -0.290 -29.05 341.55
116.000 44.962 31.588 13.374 -52.31 126.38
120.000 16.650 9.007 7.642 -10.54 8.19
Annex 3 - 381
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 189.367 10.85 1745 8681.595 - 38.93 22300
GL
45.800 4.150 0.24 1755 10159.067 - 45.56 22300
51.400
57.000
5.858
-30.658
0.33
1.75
1755
1755
Shanghai 2012-12-18
10189.447
10175.139
-
-
45.69
45.63
22300
22300
62.600 -55.610 3.17 1755 kakr9945.435 - 44.60 22300
68.200 -104.403 5.95 1755 9567.527 - 42.90 22300
73.800 -158.673 9.04 1755 8812.311 - 39.52 22300
85.000 -313.444 17.86 1755 6208.943 - 38.76 16020
96.200 -371.804 20.70 1796 2898.686 - 24.70 11735
107.400 -90.381 4.95 1827 602.450 - 9.08 6633
Annex 3 - 382
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 383
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 384
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 385
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 0.000 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 117.468 33.200 39.502 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 386
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 387
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 56.725 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
14.107
25.976
Loading
ton/m
kakr
30.868
42.365
2012-12-18
ShanghaiShearforce
ton
59.41
203.61
Moment
tonm
65.73
548.66
8.000 59.939 49.904 10.035 325.50 1640.92
12.000 63.423 74.587 -11.164 333.25 2995.55
16.000 73.757 83.808 -10.051 287.88 4231.96
20.000 108.799 112.054 -3.255 219.96 5224.24
24.000 118.802 122.362 -3.560 193.49 6077.76
28.000 123.850 127.761 -3.911 177.22 6820.55
32.000 128.948 129.964 -1.016 129.72 7424.77
36.000 137.190 130.695 6.495 148.09 7970.06
40.000 136.200 130.837 5.363 168.03 8596.03
44.000 129.293 130.796 -1.503 136.77 9240.89
48.000 122.661 130.742 -8.081 116.35 9761.06
52.000 122.754 130.689 -7.935 79.37 10147.71
56.000 118.225 130.635 -12.410 8.99 10376.50
60.000 125.945 130.582 -4.637 -38.82 10314.41
64.000 126.038 130.528 -4.490 -61.68 10112.28
68.000 63.734 130.475 -66.741 -93.82 9828.52
72.000 121.602 130.421 -8.820 -147.86 9311.76
76.000 121.058 130.368 -9.310 -188.41 8642.43
80.000 120.975 130.292 -9.317 -225.68 7814.68
84.000 128.346 129.783 -1.437 -319.80 6677.61
88.000 136.183 128.220 7.964 -289.21 5447.69
92.000 114.304 124.386 -10.082 -287.53 4318.50
96.000 90.349 117.207 -26.858 -374.57 3043.66
100.000 136.756 106.439 30.317 -248.12 1788.87
104.000 112.474 91.709 20.765 -146.21 1010.99
108.000 85.229 73.827 11.402 -86.66 564.37
112.000 53.249 53.251 -0.002 -30.63 346.91
116.000 44.962 31.390 13.572 -52.91 127.51
120.000 16.650 8.943 7.707 -10.60 8.22
Annex 3 - 388
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 129.954 7.45 1745 7580.297 - 33.99 22300
GL
45.800 134.215 7.65 1755 9485.072 - 42.53 22300
51.400
57.000
84.138
-3.398
4.79
0.19
1755
1755
Shanghai 2012-12-18
10098.569
10379.518
-
-
45.29
46.54
22300
22300
62.600 -55.364 3.15 1755 kakr
10194.025 - 45.71 22300
68.200 -107.163 6.11 1755 9808.809 - 43.99 22300
73.800 -163.676 9.33 1755 9031.581 - 40.50 22300
85.000 -320.642 18.27 1755 6357.190 - 39.68 16020
96.200 -378.151 21.06 1796 2968.398 - 25.30 11735
107.400 -93.421 5.11 1827 618.333 - 9.32 6633
Annex 3 - 389
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 390
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 391
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 392
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 0.000 45.800 52.915 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 0.000 33.200 39.526 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 393
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 394
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.276 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
12.625
24.274
Loading
ton/m
kakr
32.349
44.067
2012-12-18
ShanghaiShearforce
ton
62.31
212.99
Moment
tonm
68.73
575.84
8.000 59.939 48.178 11.761 341.77 1719.28
12.000 63.423 72.912 -9.489 356.33 3152.61
16.000 73.757 82.194 -8.437 317.54 4494.50
20.000 108.799 110.501 -1.702 255.95 5618.10
24.000 118.802 120.869 -2.067 235.57 6627.78
28.000 123.850 126.329 -2.479 225.15 7550.61
32.000 128.948 128.593 0.354 183.26 8357.79
36.000 127.872 129.385 -1.513 180.90 9091.44
40.000 126.876 129.587 -2.711 168.68 9784.35
44.000 119.964 129.608 -9.644 104.98 10366.93
48.000 123.142 129.615 -6.473 73.58 10718.57
52.000 123.042 129.622 -6.580 42.53 10946.27
56.000 118.320 129.629 -11.309 -22.94 11037.79
60.000 125.945 129.637 -3.692 -66.84 10856.04
64.000 126.038 129.644 -3.606 -86.04 10549.18
68.000 63.734 129.651 -65.917 -114.76 10174.86
72.000 121.602 129.659 -8.057 -165.64 9580.69
76.000 121.058 129.666 -8.608 -203.26 8846.17
80.000 120.975 129.651 -8.676 -237.84 7964.45
84.000 128.346 129.203 -0.857 -329.52 6783.68
88.000 136.183 127.700 8.483 -296.73 5519.33
92.000 114.304 123.929 -9.625 -293.09 4364.02
96.000 90.349 116.818 -26.469 -378.45 3070.36
100.000 136.756 106.128 30.628 -250.59 1802.96
104.000 112.474 91.484 20.990 -147.61 1017.42
108.000 85.229 73.685 11.544 -87.33 566.74
112.000 53.249 53.177 0.072 -30.88 347.53
116.000 44.962 31.364 13.598 -52.96 127.60
120.000 16.650 8.940 7.710 -10.60 8.22
Annex 3 - 395
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 185.125 10.61 1745 8578.515 - 38.47 22300
GL
45.800 87.753 5.00 1755 10540.719 - 47.27 22300
51.400
57.000
46.467
-34.264
2.65
1.95
1755
1755
Shanghai 2012-12-18
10919.489
11009.389
-
-
48.97
49.37
22300
22300
62.600 -80.977 4.61 1755 kakr
10665.922 - 47.83 22300
68.200 -127.944 7.29 1755 10150.965 - 45.52 22300
73.800 -180.101 10.26 1755 9269.726 - 41.57 22300
85.000 -329.788 18.79 1755 6453.817 - 40.29 16020
96.200 -381.948 21.27 1796 2994.329 - 25.52 11735
107.400 -94.182 5.16 1827 621.138 - 9.36 6633
Annex 3 - 396
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 397
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 398
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 399
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 0.000 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 117.468 33.200 39.502 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 400
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 401
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 63.967 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
14.717
26.636
Loading
ton/m
kakr
30.258
41.706
2012-12-18
ShanghaiShearforce
ton
58.15
199.78
Moment
tonm
64.37
537.18
8.000 59.939 50.539 9.400 319.06 1608.87
12.000 63.423 75.171 -11.748 324.37 2932.80
16.000 73.757 84.338 -10.580 276.78 4129.18
20.000 108.799 112.529 -3.730 206.85 5072.95
24.000 118.802 122.783 -3.981 178.58 5870.36
28.000 123.850 128.127 -4.277 160.74 6550.31
32.000 128.948 130.277 -1.329 111.89 7085.82
36.000 137.190 130.953 6.237 129.11 7557.40
40.000 136.200 131.041 5.159 148.13 8105.53
44.000 129.293 130.946 -1.653 116.15 8669.28
48.000 130.962 130.838 0.124 113.52 9126.05
52.000 131.055 130.730 0.325 109.47 9567.14
56.000 126.526 130.622 -4.096 72.23 9982.55
60.000 117.644 130.515 -12.871 54.47 10239.68
64.000 117.737 130.407 -12.670 -1.22 10344.98
68.000 55.433 130.299 -74.867 -65.97 10237.72
72.000 113.300 130.192 -16.891 -152.41 9767.49
76.000 121.058 130.084 -9.026 -206.87 9035.65
80.000 120.975 129.954 -8.978 -242.90 8136.46
84.000 128.346 129.391 -1.044 -335.56 6933.36
88.000 136.183 127.773 8.410 -303.29 5643.69
92.000 114.304 123.887 -9.583 -299.71 4461.89
96.000 90.349 116.664 -26.316 -384.67 3142.42
100.000 136.756 105.877 30.879 -255.99 1851.65
104.000 112.474 91.168 21.306 -151.87 1046.72
108.000 85.229 73.352 11.877 -90.27 581.63
112.000 53.249 52.879 0.370 -32.54 353.25
116.000 44.962 31.155 13.807 -53.60 128.84
120.000 16.650 8.870 7.779 -10.67 8.26
Annex 3 - 402
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 111.752 6.40 1745 7219.722 - 32.38 22300
GL
45.800 113.357 6.46 1755 8876.135 - 39.80 22300
51.400
57.000
109.278
68.165
6.23
3.88
1755
1755
Shanghai 2012-12-18
9501.413
10052.923
-
-
42.61
45.08
22300
22300
62.600 16.560 0.94 1755 kakr
10334.069 - 46.34 22300
68.200 -80.942 4.61 1755 10223.454 - 45.85 22300
73.800 -182.731 10.41 1755 9466.087 - 42.45 22300
85.000 -336.000 19.15 1755 6597.379 - 41.18 16020
96.200 -388.140 21.61 1796 3065.150 - 26.12 11735
107.400 -97.325 5.33 1827 637.845 - 9.62 6633
Annex 3 - 403
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 404
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 405
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 406
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 0.000 59.800 66.915 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 5.873 33.200 39.523 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 407
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 408
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 61.898 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
13.276
25.001
Loading
ton/m
kakr
31.698
43.341
2012-12-18
ShanghaiShearforce
ton
61.04
208.92
Moment
tonm
67.43
563.99
8.000 59.939 48.886 11.053 334.81 1685.37
12.000 63.423 73.569 -10.146 346.64 3085.36
16.000 73.757 82.795 -9.037 305.34 4383.40
20.000 108.799 111.046 -2.246 241.46 5453.54
24.000 118.802 121.358 -2.556 219.01 6401.05
28.000 123.850 126.762 -2.912 206.75 7253.89
32.000 128.948 128.970 -0.022 163.24 7984.15
36.000 128.335 129.706 -1.371 160.78 8636.67
40.000 127.343 129.852 -2.509 149.25 9250.40
44.000 120.433 129.816 -9.383 86.47 9757.02
48.000 130.962 129.768 1.195 72.29 10054.50
52.000 131.055 129.719 1.336 72.40 10339.03
56.000 126.526 129.670 -3.144 39.09 10614.07
60.000 118.220 129.622 -11.401 25.13 10746.07
64.000 118.121 129.573 -11.452 -25.18 10745.09
68.000 55.624 129.524 -73.900 -85.56 10551.04
72.000 113.300 129.476 -16.176 -168.64 10009.48
76.000 121.058 129.427 -8.369 -220.43 9218.05
80.000 120.975 129.356 -8.381 -253.95 8269.69
84.000 128.346 128.852 -0.506 -344.33 7026.99
88.000 136.183 127.293 8.890 -310.03 5706.34
92.000 114.304 123.468 -9.164 -304.66 4501.23
96.000 90.349 116.311 -25.962 -388.07 3165.13
100.000 136.756 105.599 31.158 -258.12 1863.39
104.000 112.474 90.970 21.504 -153.05 1051.92
108.000 85.229 73.230 11.999 -90.81 583.48
112.000 53.249 52.819 0.430 -32.72 353.71
116.000 44.962 31.136 13.826 -53.63 128.92
120.000 16.650 8.870 7.780 -10.67 8.27
Annex 3 - 409
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 164.661 9.44 1745 8180.587 - 36.68 22300
GL
45.800 69.738 3.97 1755 9897.929 - 44.39 22300
51.400
57.000
71.603
35.971
4.08
2.05
1755
1755
Shanghai 2012-12-18
10295.735
10651.764
-
-
46.17
47.77
22300
22300
62.600 -9.164 0.52 1755 kakr
10768.949 - 48.29 22300
68.200 -100.336 5.72 1755 10532.865 - 47.23 22300
73.800 -197.769 11.27 1755 9679.953 - 43.41 22300
85.000 -344.244 19.62 1755 6682.492 - 41.71 16020
96.200 -391.464 21.80 1796 3087.190 - 26.31 11735
107.400 -97.940 5.36 1827 640.044 - 9.65 6633
Annex 3 - 410
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 411
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 412
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 413
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
0.000
Shanghai 2012-12-18
73.800
73.800
79.444
79.312
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 99.848 33.200 39.502 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 414
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 415
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 65.002 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
14.992
26.935
Loading
ton/m
kakr
29.983
41.407
2012-12-18
ShanghaiShearforce
ton
57.59
198.04
Moment
tonm
63.72
531.89
8.000 59.939 50.831 9.108 316.14 1594.19
12.000 63.423 75.443 -12.021 320.32 2904.10
16.000 73.757 84.590 -10.833 271.68 4082.07
20.000 108.799 112.761 -3.962 200.78 5003.41
24.000 118.802 122.994 -4.192 171.62 5774.68
28.000 123.850 128.319 -4.469 152.97 6425.09
32.000 128.948 130.448 -1.500 103.39 6928.00
36.000 135.791 131.104 4.687 116.05 7358.76
40.000 134.801 131.171 3.630 128.91 7842.27
44.000 127.894 131.056 -3.162 90.86 8316.94
48.000 130.962 130.928 0.034 85.30 8663.87
52.000 131.055 130.800 0.255 80.93 8991.41
56.000 126.526 130.672 -4.146 43.46 9292.15
60.000 125.945 130.544 -4.599 27.19 9434.00
64.000 126.038 130.416 -4.378 4.63 9496.39
68.000 63.734 130.288 -66.554 -26.91 9478.95
72.000 121.602 130.160 -8.559 -80.06 9231.48
76.000 112.742 130.032 -17.291 -137.76 8815.40
80.000 112.733 129.882 -17.149 -206.66 8126.82
84.000 120.178 129.299 -9.121 -331.81 7003.57
88.000 136.183 127.661 8.522 -307.29 5701.13
92.000 114.304 123.755 -9.451 -303.23 4504.26
96.000 90.349 116.515 -26.166 -387.62 3171.83
100.000 136.756 105.718 31.038 -258.33 1870.48
104.000 112.474 91.011 21.463 -153.56 1057.50
108.000 85.229 73.211 12.018 -91.37 586.86
112.000 53.249 52.767 0.482 -33.13 355.17
116.000 44.962 31.083 13.879 -53.81 129.24
120.000 16.650 8.848 7.802 -10.69 8.27
Annex 3 - 416
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 103.054 5.91 1745 7051.571 - 31.62 22300
GL
45.800 85.356 4.86 1755 8475.815 - 38.01 22300
51.400
57.000
80.788
39.343
4.60
2.24
1755
1755
Shanghai 2012-12-18
8942.797
9333.716
-
-
40.10
41.86
22300
22300
62.600 10.810 0.62 1755 kakr9485.409 - 42.54 22300
68.200 -40.218 2.29 1755 9472.615 - 42.48 22300
73.800 -95.374 5.43 1755 9073.774 - 40.69 22300
85.000 -340.315 19.39 1755 6667.303 - 41.62 16020
96.200 -391.061 21.77 1796 3093.973 - 26.37 11735
107.400 -98.504 5.39 1827 643.755 - 9.71 6633
Annex 3 - 417
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 418
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 419
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 420
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
0.000
92.438
Shanghai 2012-12-18
73.800
73.800
79.391
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 23.494 33.200 39.510 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 421
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 422
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 61.636 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
13.984
25.802
Loading
ton/m
kakr
30.990
42.540
2012-12-18
ShanghaiShearforce
ton
59.64
204.44
Moment
tonm
65.93
550.84
8.000 59.939 49.689 10.250 327.11 1647.86
12.000 63.423 74.339 -10.916 335.78 3010.69
16.000 73.757 83.528 -9.770 291.48 4259.26
20.000 108.799 111.741 -2.942 224.74 5268.20
24.000 118.802 122.016 -3.214 199.58 6143.38
28.000 123.850 127.383 -3.533 184.76 6913.34
32.000 128.948 129.555 -0.607 138.84 7550.79
36.000 129.732 130.253 -0.521 138.02 8106.62
40.000 128.741 130.362 -1.621 129.97 8636.23
44.000 121.834 130.289 -8.455 70.83 9072.96
48.000 130.962 130.204 0.759 57.34 9312.00
52.000 131.055 130.118 0.938 55.79 9533.39
56.000 126.526 130.032 -3.506 20.96 9738.90
60.000 125.945 129.946 -4.001 7.17 9795.77
64.000 126.038 129.860 -3.822 -13.08 9782.75
68.000 63.734 129.774 -66.040 -42.48 9698.80
72.000 121.602 129.689 -8.087 -93.66 9393.04
76.000 113.231 129.603 -16.372 -148.35 8927.60
80.000 113.014 129.495 -16.481 -214.08 8203.31
84.000 120.250 128.954 -8.704 -337.06 7055.06
88.000 136.183 127.358 8.825 -311.20 5734.42
92.000 114.304 123.495 -9.191 -306.01 4524.22
96.000 90.349 116.301 -25.953 -389.46 3182.61
100.000 136.756 105.556 31.201 -259.41 1875.49
104.000 112.474 90.902 21.573 -154.10 1059.34
108.000 85.229 73.150 12.079 -91.57 587.28
112.000 53.249 52.743 0.506 -33.16 355.16
116.000 44.962 31.081 13.881 -53.80 129.20
120.000 16.650 8.851 7.799 -10.69 8.27
Annex 3 - 423
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 139.567 8.00 1745 7717.537 - 34.61 22300
GL
45.800 55.777 3.18 1755 9187.223 - 41.20 22300
51.400
57.000
55.232
17.481
3.15
1.00
1755
1755
Shanghai 2012-12-18
9499.984
9758.288
-
-
42.60
43.76
22300
22300
62.600 -7.691 0.44 1755 kakr9797.120 - 43.93 22300
68.200 -55.687 3.17 1755 9689.365 - 43.45 22300
73.800 -108.143 6.16 1755 9211.614 - 41.31 22300
85.000 -345.181 19.67 1755 6713.735 - 41.91 16020
96.200 -392.854 21.87 1796 3104.391 - 26.45 11735
107.400 -98.745 5.40 1827 644.309 - 9.71 6633
Annex 3 - 424
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 425
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 426
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 427
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 428
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 429
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 61.710 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
15.270
27.169
Loading
ton/m
kakr
29.704
41.172
2012-12-18
ShanghaiShearforce
ton
56.98
196.38
Moment
tonm
63.04
526.62
8.000 59.939 50.985 8.954 313.70 1580.61
12.000 63.423 75.508 -12.085 317.44 2879.76
16.000 73.757 84.564 -10.807 268.72 4045.94
20.000 108.799 112.645 -3.846 198.10 4955.90
24.000 118.802 122.788 -3.986 169.59 5717.64
28.000 123.850 128.022 -4.172 151.95 6361.83
32.000 128.948 130.061 -1.113 103.74 6863.27
36.000 132.839 130.627 2.212 109.86 7287.17
40.000 131.849 130.603 1.245 113.01 7726.37
44.000 124.942 130.398 -5.456 65.60 8118.56
48.000 130.962 130.180 0.783 57.54 8353.48
52.000 131.055 129.961 1.094 56.34 8576.19
56.000 126.526 129.743 -3.217 22.41 8785.53
60.000 125.945 129.525 -3.580 10.04 8850.84
64.000 126.038 129.306 -3.268 -8.26 8853.01
68.000 63.734 129.088 -65.354 -35.18 8793.12
72.000 121.602 128.870 -7.268 -83.35 8522.40
76.000 121.058 128.651 -7.593 -117.36 8123.94
80.000 120.975 128.411 -7.435 -147.44 7594.53
84.000 128.346 127.737 0.609 -233.70 6785.91
88.000 121.315 126.009 -4.693 -240.69 5847.25
92.000 100.764 122.019 -21.255 -286.67 4814.85
96.000 78.137 114.725 -36.587 -415.49 3457.92
100.000 136.756 103.948 32.808 -281.48 2049.94
104.000 112.474 89.374 23.101 -169.87 1158.22
108.000 85.229 71.821 13.408 -101.58 634.86
112.000 53.249 51.712 1.538 -38.43 372.58
116.000 44.962 30.434 14.528 -55.68 132.85
120.000 16.650 8.654 7.996 -10.86 8.38
Annex 3 - 430
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 103.883 5.95 1745 6987.540 - 31.33 22300
GL
45.800 56.000 3.19 1755 8228.279 - 36.90 22300
51.400
57.000
55.700
19.233
3.17
1.10
1755
1755
Shanghai 2012-12-18
8542.481
8806.507
-
-
38.31
39.49
22300
22300
62.600 -3.615 0.21 1755 kakr8861.162 - 39.74 22300
68.200 -48.249 2.75 1755 8785.150 - 39.40 22300
73.800 -96.303 5.49 1755 8360.882 - 37.49 22300
85.000 -232.475 13.25 1755 6552.613 - 40.90 16020
96.200 -421.009 23.44 1796 3374.312 - 28.75 11735
107.400 -109.564 6.00 1827 698.139 - 10.53 6633
Annex 3 - 431
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 432
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 433
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 0.000 96.200 99.729 106.787
05 DB SB 0.000 96.200 99.792 106.975
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 434
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 435
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 436
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 57.759 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
15.248
27.186
Loading
ton/m
kakr
29.726
41.155
2012-12-18
ShanghaiShearforce
ton
57.04
196.46
Moment
tonm
63.16
527.15
8.000 59.939 51.047 8.892 313.62 1581.28
12.000 63.423 75.615 -12.192 317.02 2879.56
16.000 73.757 84.716 -10.958 267.79 4043.18
20.000 108.799 112.841 -4.042 196.48 4948.14
24.000 118.802 123.028 -4.226 167.10 5701.77
28.000 123.850 128.307 -4.457 148.40 6333.99
32.000 128.948 130.390 -1.442 98.97 6818.91
36.000 132.839 131.000 1.839 103.69 7221.03
40.000 131.849 131.021 0.827 105.25 7632.47
44.000 124.942 130.860 -5.918 56.08 7990.21
48.000 130.962 130.687 0.276 46.08 8183.29
52.000 131.055 130.513 0.543 42.77 8356.04
56.000 126.526 130.339 -3.812 6.54 8506.60
60.000 125.945 130.165 -4.220 -8.30 8503.60
64.000 126.038 129.991 -3.953 -29.25 8427.21
68.000 63.734 129.817 -66.083 -59.00 8277.81
72.000 121.602 129.643 -8.041 -110.17 7905.92
76.000 121.058 129.469 -8.411 -147.37 7393.91
80.000 120.975 129.273 -8.298 -180.80 6737.86
84.000 128.346 128.644 -0.298 -270.60 5788.80
88.000 136.183 126.960 9.223 -235.22 4765.12
92.000 114.304 123.011 -8.707 -228.26 3862.30
96.000 90.348 115.741 -25.392 -309.61 2835.81
100.000 127.569 104.946 22.623 -216.25 1775.92
104.000 105.577 90.291 15.286 -140.66 1069.91
108.000 85.229 72.596 12.633 -95.92 608.25
112.000 53.249 52.297 0.952 -35.50 362.93
116.000 44.962 30.792 14.170 -54.65 130.83
120.000 16.650 8.761 7.889 -10.77 8.31
Annex 3 - 437
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 98.707 5.66 1745 6937.233 - 31.11 22300
GL
45.800 45.630 2.60 1755 8082.058 - 36.24 22300
51.400
57.000
42.454
2.763
2.42
0.16
1755
1755
Shanghai 2012-12-18
8330.368
8511.421
-
-
37.36
38.17
22300
22300
62.600 -23.658 1.35 1755 kakr8464.070 - 37.96 22300
68.200 -72.212 4.11 1755 8265.070 - 37.06 22300
73.800 -124.535 7.10 1755 7694.877 - 34.51 22300
85.000 -270.292 15.40 1755 5518.148 - 34.45 16020
96.200 -312.896 17.42 1796 2773.568 - 23.64 11735
107.400 -103.431 5.66 1827 667.991 - 10.07 6633
Annex 3 - 438
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 439
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 440
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 0.000 107.400 107.361 107.282
03 Deeptank SB 0.000 107.400 107.361 107.282
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 441
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 58.734 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 442
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 443
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.250 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
17.026
28.987
Loading
ton/m
kakr
27.948
39.355
2012-12-18
ShanghaiShearforce
ton
53.25
185.41
Moment
tonm
58.91
493.09
8.000 59.939 52.687 7.252 295.65 1488.84
12.000 63.423 77.028 -13.606 292.94 2702.59
16.000 73.757 85.898 -12.141 238.52 3759.05
20.000 108.799 113.793 -4.994 162.94 4537.94
24.000 118.802 123.749 -4.947 130.21 5150.28
28.000 123.850 128.796 -4.946 109.09 5629.68
32.000 128.948 130.649 -1.701 58.16 5953.94
36.000 132.528 131.028 1.500 61.44 6190.06
40.000 131.538 130.818 0.720 62.10 6430.30
44.000 124.631 130.426 -5.795 12.97 6615.11
48.000 130.962 130.021 0.941 4.61 6638.01
52.000 131.055 129.616 1.439 4.42 6650.71
56.000 126.526 129.211 -2.685 -27.76 6655.58
60.000 125.945 128.806 -2.862 -37.63 6524.91
64.000 126.038 128.402 -2.364 -52.69 6342.59
68.000 63.734 127.997 -64.263 -75.62 6112.70
72.000 121.602 127.592 -5.990 -119.05 5689.42
76.000 121.058 127.187 -6.129 -147.58 5158.86
80.000 120.975 126.760 -5.784 -171.42 4520.76
84.000 128.346 125.900 2.447 -250.71 3629.87
88.000 136.183 123.985 12.198 -203.89 2708.28
92.000 114.304 119.818 -5.514 -184.59 1955.12
96.000 90.348 112.387 -22.039 -252.81 1129.31
100.000 136.756 101.577 35.179 -106.91 400.38
104.000 112.474 87.128 25.346 14.00 225.70
108.000 28.008 69.872 -41.864 56.43 444.78
112.000 53.249 50.205 3.044 -46.10 397.93
116.000 44.962 29.491 15.471 -58.42 138.13
120.000 16.650 8.366 8.284 -11.13 8.54
Annex 3 - 444
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 57.631 3.30 1745 6023.097 - 27.01 22300
GL
45.800 2.834 0.16 1755 6629.577 - 29.73 22300
51.400
57.000
3.577
-30.385
0.20
1.73
1755
1755
Shanghai 2012-12-18
6648.226
6626.643
-
-
29.81
29.72
22300
22300
62.600 -49.265 2.81 1755 kakr6413.820 - 28.76 22300
68.200 -88.467 5.04 1755 6096.654 - 27.34 22300
73.800 -129.628 7.39 1755 5465.742 - 24.51 22300
85.000 -247.627 14.11 1755 3380.486 - 21.10 16020
96.200 -255.427 14.22 1796 1078.485 - 9.19 11735
107.400 81.556 4.65 1755 403.319 - 6.08 6633
Annex 3 - 445
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 446
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 447
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 0.000 101.800 103.824 107.400
07 WT SB 0.000 101.800 103.824 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 448
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 449
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 450
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.276 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
16.943
28.889
Loading
ton/m
kakr
28.031
39.453
2012-12-18
ShanghaiShearforce
ton
53.42
185.95
Moment
tonm
59.16
494.86
8.000 59.939 52.580 7.359 296.60 1493.68
12.000 63.423 76.917 -13.494 294.33 2712.20
16.000 73.757 85.782 -12.024 240.36 3775.23
20.000 108.799 113.671 -4.872 165.25 4562.54
24.000 118.802 123.623 -4.821 133.02 5185.23
28.000 123.850 128.665 -4.815 112.42 5677.01
32.000 128.948 130.513 -1.565 62.02 6015.75
36.000 132.839 130.887 1.952 66.72 6269.73
40.000 131.849 130.673 1.176 69.21 6534.82
44.000 124.942 130.276 -5.334 21.91 6751.81
48.000 130.962 129.866 1.096 14.72 6813.49
52.000 131.055 129.456 1.599 15.16 6867.97
56.000 126.526 129.046 -2.520 -16.37 6917.16
60.000 125.945 128.637 -2.692 -25.57 6833.47
64.000 126.038 128.227 -2.189 -39.94 6700.84
68.000 63.734 127.817 -64.083 -62.15 6523.43
72.000 121.602 127.407 -5.806 -104.86 6155.52
76.000 121.058 126.998 -5.940 -132.64 5683.26
80.000 120.975 126.566 -5.590 -155.72 5106.50
84.000 128.346 125.701 2.646 -234.22 4280.05
88.000 136.183 123.781 12.402 -186.59 3426.09
92.000 114.304 119.610 -5.306 -166.47 2743.80
96.000 90.348 112.179 -21.831 -233.85 1992.20
100.000 136.756 101.377 35.379 -87.13 1340.78
104.000 68.619 86.947 -18.328 -73.70 1123.19
108.000 85.229 69.722 15.507 -117.28 709.19
112.000 53.249 50.093 3.156 -46.65 399.70
116.000 44.962 29.424 15.538 -58.61 138.49
120.000 16.650 8.346 8.304 -11.14 8.54
Annex 3 - 451
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 61.658 3.53 1745 6089.663 - 27.31 22300
GL
45.800 12.605 0.72 1755 6783.141 - 30.42 22300
51.400
57.000
14.223
-18.826
0.81
1.07
1755
1755
Shanghai 2012-12-18
6859.049
6899.722
-
-
30.76
30.94
22300
22300
62.600 -36.755 2.09 1755 kakr6754.366 - 30.29 22300
68.200 -74.968 4.27 1755 6510.090 - 29.19 22300
73.800 -115.102 6.56 1755 5957.707 - 26.72 22300
85.000 -230.933 13.16 1755 4047.270 - 25.26 16020
96.200 -236.426 13.16 1796 1945.170 - 16.58 11735
107.400 -126.545 6.93 1827 782.269 - 11.79 6633
Annex 3 - 452
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 453
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 454
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 0.000 96.200 98.746 101.800
Annex 3 - 455
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 456
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 457
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.483 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
17.630
29.526
Loading
ton/m
kakr
27.345
38.815
2012-12-18
ShanghaiShearforce
ton
51.91
181.76
Moment
tonm
57.50
481.77
8.000 59.939 53.102 6.837 290.08 1459.04
12.000 63.423 77.302 -13.879 285.99 2647.69
16.000 73.757 86.029 -12.272 230.76 3674.68
20.000 108.799 113.781 -4.982 154.94 4422.00
24.000 118.802 123.594 -4.792 122.55 5002.96
28.000 123.850 128.499 -4.649 102.34 5453.45
32.000 128.948 130.208 -1.260 52.88 5753.58
36.000 132.839 130.445 2.394 59.07 5973.81
40.000 131.849 130.092 1.757 63.60 6212.24
44.000 124.942 129.557 -4.615 18.90 6411.84
48.000 130.962 129.010 1.953 14.86 6467.63
52.000 131.055 128.462 2.593 19.00 6529.92
56.000 126.526 127.914 -1.388 -8.28 6602.83
60.000 125.945 127.367 -1.422 -12.67 6560.97
64.000 126.038 126.819 -0.781 -21.69 6490.48
68.000 63.734 126.271 -62.537 -37.99 6397.75
72.000 121.602 125.724 -4.122 -74.24 6139.23
76.000 121.058 125.176 -4.118 -95.01 5803.31
80.000 120.975 124.606 -3.631 -110.53 5392.03
84.000 128.346 123.603 4.743 -180.91 4762.42
88.000 136.183 121.546 14.637 -124.62 4138.85
92.000 114.304 117.247 -2.943 -95.30 3722.70
96.000 90.348 109.734 -19.385 -153.04 3274.98
100.000 76.823 98.953 -22.130 -245.10 2480.82
104.000 112.474 84.696 27.778 -217.24 1452.80
108.000 85.229 67.801 17.428 -131.46 775.83
112.000 53.249 48.631 4.618 -54.02 423.89
116.000 44.962 28.521 16.441 -61.22 143.48
120.000 16.650 8.072 8.577 -11.39 8.69
Annex 3 - 458
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 52.904 3.03 1745 5816.754 - 26.08 22300
GL
45.800 10.946 0.62 1755 6438.971 - 28.87 22300
51.400
57.000
17.474
-9.583
1.00
0.55
1755
1755
Shanghai 2012-12-18
6518.871
6594.060
-
-
29.23
29.57
22300
22300
62.600 -20.439 1.16 1755 kakr6519.801 - 29.24 22300
68.200 -50.499 2.88 1755 6389.258 - 28.65 22300
73.800 -81.397 4.64 1755 5999.298 - 26.90 22300
85.000 -175.513 10.00 1755 4584.001 - 28.61 16020
96.200 -155.126 8.64 1796 3244.156 - 27.65 11735
107.400 -141.892 7.77 1827 857.767 - 12.93 6633
Annex 3 - 459
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 460
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 461
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 462
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 0.000 85.000 89.350 96.200
GL
13 WT SB 0.000 85.000 89.350 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 463
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 464
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 67.899 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
16.239
28.096
Loading
ton/m
kakr
28.735
40.245
2012-12-18
ShanghaiShearforce
ton
54.89
190.45
Moment
tonm
60.77
508.28
8.000 59.939 51.762 8.177 304.33 1531.51
12.000 63.423 76.100 -12.677 305.33 2787.50
16.000 73.757 84.968 -11.211 254.62 3901.06
20.000 108.799 112.862 -4.063 182.77 4751.93
24.000 118.802 122.816 -4.014 153.77 5451.14
28.000 123.850 127.863 -4.013 136.39 6032.32
32.000 128.948 129.714 -0.766 89.19 6473.31
36.000 132.839 130.092 2.747 97.08 6842.32
40.000 131.849 129.881 1.968 102.74 7235.17
44.000 124.942 129.488 -4.546 58.59 7592.58
48.000 130.962 129.082 1.881 54.55 7807.29
52.000 131.055 128.675 2.380 58.12 8027.35
56.000 126.526 128.269 -1.743 29.71 8254.62
60.000 125.945 127.863 -1.918 23.61 8361.44
64.000 126.038 127.457 -1.419 12.33 8431.69
68.000 63.734 127.051 -63.317 -6.81 8469.49
72.000 121.602 126.645 -5.043 -46.46 8329.04
76.000 121.058 126.239 -5.181 -71.20 8096.45
80.000 120.975 125.810 -4.835 -91.25 7771.50
84.000 128.346 124.949 3.397 -166.73 7208.95
88.000 106.023 123.033 -17.010 -209.87 6488.52
92.000 87.072 118.869 -31.796 -301.56 5485.65
96.000 66.046 111.457 -45.411 -469.08 3989.43
100.000 136.756 100.702 36.055 -324.39 2383.94
104.000 112.474 86.354 26.120 -200.17 1346.08
108.000 85.229 69.242 15.987 -120.63 724.58
112.000 53.249 49.746 3.503 -48.33 405.20
116.000 44.962 29.220 15.742 -59.19 139.63
120.000 16.650 8.287 8.363 -11.20 8.59
Annex 3 - 465
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 89.782 5.15 1745 6580.392 - 29.51 22300
GL
45.800 50.710 2.89 1755 7691.218 - 34.49 22300
51.400
57.000
56.718
28.030
3.23
1.60
1755
1755
Shanghai 2012-12-18
7992.797
8283.642
-
-
35.84
37.15
22300
22300
62.600 14.434 0.82 1755 kakr8412.802 - 37.73 22300
68.200 -19.475 1.11 1755 8467.226 - 37.97 22300
73.800 -55.332 3.15 1755 8237.568 - 36.94 22300
85.000 -162.696 9.27 1755 7044.017 - 43.97 16020
96.200 -476.355 26.52 1796 3894.963 - 33.19 11735
107.400 -130.181 7.13 1827 799.765 - 12.06 6633
Annex 3 - 466
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 467
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 468
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 469
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
0.000 79.345 85.000
17 WT SB 0.000 73.800 79.345 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 470
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 471
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 68.313 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
14.812
26.614
Loading
ton/m
kakr
30.162
41.727
2012-12-18
ShanghaiShearforce
ton
57.90
199.36
Moment
tonm
64.03
535.25
8.000 59.939 50.379 9.560 319.00 1605.72
12.000 63.423 74.873 -11.450 325.23 2930.99
16.000 73.757 83.902 -10.144 279.11 4133.47
20.000 108.799 111.955 -3.156 211.19 5090.32
24.000 118.802 122.071 -3.269 185.50 5910.00
28.000 123.850 127.278 -3.428 170.78 6623.59
32.000 128.948 129.289 -0.341 125.60 7206.35
36.000 132.839 129.828 3.011 134.87 7723.92
40.000 131.849 129.777 2.072 141.26 8269.57
44.000 124.942 129.544 -4.602 97.21 8781.44
48.000 130.962 129.299 1.664 92.62 9149.70
52.000 131.055 129.053 2.002 95.01 9519.83
56.000 126.526 128.807 -2.281 64.76 9891.14
60.000 125.945 128.562 -2.617 56.19 10133.38
64.000 126.038 128.316 -2.278 41.79 10327.88
68.000 63.734 128.070 -64.336 18.89 10476.17
72.000 121.602 127.825 -6.223 -25.16 10429.90
76.000 97.729 127.579 -29.850 -106.28 10216.06
80.000 97.689 127.311 -29.623 -225.25 9553.12
84.000 105.102 126.610 -21.509 -400.12 8255.92
88.000 136.183 124.855 11.329 -379.70 6649.23
92.000 114.304 120.843 -6.539 -364.19 5185.44
96.000 90.348 113.546 -23.197 -436.79 3632.64
100.000 136.756 102.813 33.943 -295.70 2158.24
104.000 112.474 88.349 24.126 -179.74 1218.45
108.000 85.229 70.970 14.259 -107.68 663.33
112.000 53.249 51.079 2.170 -41.55 382.85
116.000 44.962 30.053 14.909 -56.77 134.99
120.000 16.650 8.541 8.108 -10.97 8.46
Annex 3 - 472
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 126.674 7.26 1745 7357.404 - 32.99 22300
GL
45.800 89.162 5.08 1755 8949.440 - 40.13 22300
51.400
57.000
93.818
62.522
5.35
3.56
1755
1755
Shanghai 2012-12-18
9463.092
9954.922
-
-
42.44
44.64
22300
22300
62.600 45.058 2.57 1755 kakr
10266.933 - 46.04 22300
68.200 6.023 0.34 1755 10479.028 - 46.99 22300
73.800 -36.219 2.06 1755 10374.816 - 46.52 22300
85.000 -421.005 23.99 1755 7845.135 - 48.97 16020
96.200 -439.637 24.48 1796 3544.995 - 30.21 11735
107.400 -116.187 6.36 1827 730.436 - 11.01 6633
Annex 3 - 473
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 474
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 475
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 476
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 0.000 59.800 66.800 73.800
17A WT SB 0.000 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 477
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 478
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 64.588 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
13.398
25.039
Loading
ton/m
kakr
31.576
43.302
2012-12-18
ShanghaiShearforce
ton
60.76
208.29
Moment
tonm
67.13
561.78
8.000 59.939 48.814 11.125 334.25 1680.68
12.000 63.423 73.383 -9.961 346.60 3079.33
16.000 73.757 82.496 -8.739 306.26 4379.02
20.000 108.799 110.634 -1.835 243.81 5455.57
24.000 118.802 120.833 -2.031 223.23 6416.08
28.000 123.850 126.124 -2.274 213.29 7290.31
32.000 128.948 128.220 0.728 172.55 8052.17
36.000 132.839 128.842 3.997 185.93 8765.93
40.000 131.849 128.876 2.973 196.10 9523.54
44.000 124.942 128.727 -3.785 155.49 10261.80
48.000 130.962 128.565 2.397 154.00 10869.51
52.000 131.055 128.404 2.651 159.15 11490.85
56.000 126.526 128.242 -1.716 131.33 12123.73
60.000 102.632 128.080 -25.448 120.19 12636.07
64.000 102.725 127.919 -25.193 14.30 12903.81
68.000 40.421 127.757 -87.336 -100.43 12758.52
72.000 98.289 127.596 -29.306 -236.65 12050.84
76.000 121.058 127.434 -6.376 -307.63 10919.26
80.000 120.975 127.250 -6.275 -332.96 9638.36
84.000 128.346 126.633 1.713 -414.69 8096.81
88.000 136.183 124.962 11.222 -371.28 6512.83
92.000 114.304 121.033 -6.729 -356.37 5081.66
96.000 90.348 113.814 -23.465 -429.89 3558.44
100.000 136.756 103.143 33.613 -290.00 2109.36
104.000 112.474 88.708 23.767 -175.44 1189.65
108.000 85.229 71.317 13.912 -104.81 648.93
112.000 53.249 51.372 1.877 -39.97 377.35
116.000 44.962 30.250 14.713 -56.18 133.76
120.000 16.650 8.605 8.045 -10.91 8.40
Annex 3 - 479
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 174.898 10.02 1745 8260.336 - 37.04 22300
GL
45.800 148.875 8.48 1755 10536.014 - 47.25 22300
51.400
57.000
157.567
129.647
8.98
7.39
1755
1755
Shanghai 2012-12-18
11395.729
12254.379
-
-
51.10
54.95
22300
22300
62.600 49.627 2.83 1755 kakr
12858.893 - 57.66 22300
68.200 -117.898 6.72 1755 12737.176 - 57.12 22300
73.800 -289.289 16.48 1755 11577.760 - 51.92 22300
85.000 -412.369 23.50 1755 7683.079 - 47.96 16020
96.200 -432.794 24.10 1796 3472.170 - 29.59 11735
107.400 -113.100 6.19 1827 714.240 - 10.77 6633
Annex 3 - 480
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 481
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 482
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 483
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 0.000 45.800 52.800 59.800
21 WT SB 0.000 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 484
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 485
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.250 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
11.742
23.186
Loading
ton/m
kakr
33.232
45.156
2012-12-18
ShanghaiShearforce
ton
63.88
218.58
Moment
tonm
70.27
591.40
8.000 59.939 47.014 12.925 351.89 1766.13
12.000 63.423 71.724 -8.301 371.16 3249.30
16.000 73.757 80.991 -7.233 337.16 4660.04
20.000 108.799 109.282 -0.483 280.42 5871.75
24.000 118.802 119.635 -0.833 264.94 6989.03
28.000 123.850 125.080 -1.230 259.48 8039.21
32.000 128.948 127.329 1.619 222.62 8993.73
36.000 132.839 128.105 4.734 239.25 9914.41
40.000 131.849 128.292 3.557 252.06 10890.74
44.000 124.942 128.297 -3.355 213.48 11857.04
48.000 107.650 128.289 -20.639 162.11 12643.23
52.000 107.743 128.281 -20.539 74.81 13112.26
56.000 103.214 128.273 -25.060 -46.08 13221.73
60.000 125.945 128.265 -2.320 -141.58 12838.34
64.000 126.038 128.257 -2.219 -155.27 12243.52
68.000 63.734 128.249 -64.515 -178.41 11603.43
72.000 121.602 128.241 -6.640 -223.65 10765.92
76.000 121.058 128.234 -7.176 -255.57 9810.72
80.000 120.975 128.203 -7.228 -284.39 8731.25
84.000 128.346 127.740 0.606 -370.25 7375.89
88.000 136.183 126.222 9.961 -331.58 5960.37
92.000 114.304 122.441 -8.138 -322.01 4677.51
96.000 90.348 115.344 -24.996 -401.42 3280.10
100.000 136.756 104.725 32.031 -267.79 1932.43
104.000 112.474 90.231 22.243 -159.47 1088.98
108.000 85.229 72.657 12.573 -94.61 600.32
112.000 53.249 52.421 0.828 -34.58 359.50
116.000 44.962 30.913 14.049 -54.24 130.03
120.000 16.650 8.809 7.841 -10.72 8.29
Annex 3 - 486
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 226.005 12.95 1745 9262.586 - 41.54 22300
GL
45.800 207.575 11.83 1755 12236.273 - 54.87 22300
51.400
57.000
87.133
-71.125
4.96
4.05
1755
1755
Shanghai 2012-12-18
13063.625
13163.396
-
-
58.58
59.03
22300
22300
62.600 -152.138 8.67 1755 kakr
12458.536 - 55.87 22300
68.200 -191.311 10.90 1755 11566.826 - 51.87 22300
73.800 -235.554 13.42 1755 10352.822 - 46.43 22300
85.000 -369.053 21.03 1755 7006.028 - 43.73 16020
96.200 -404.631 22.53 1796 3199.495 - 27.26 11735
107.400 -102.090 5.59 1827 659.264 - 9.94 6633
Annex 3 - 487
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 488
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 489
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 490
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 32.638 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 0.000 33.200 39.526 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 491
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 492
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 54.241 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
11.427
22.855
Loading
ton/m
kakr
33.547
45.487
2012-12-18
ShanghaiShearforce
ton
64.42
220.45
Moment
tonm
70.80
596.79
8.000 59.939 46.725 13.214 355.01 1781.60
12.000 63.423 71.494 -8.071 375.33 3279.46
16.000 73.757 80.823 -7.065 342.12 4708.58
20.000 108.799 109.176 -0.377 285.93 5941.35
24.000 118.802 119.590 -0.789 270.75 7081.40
28.000 123.850 125.097 -1.247 265.35 8155.05
32.000 128.948 127.408 1.540 228.30 9132.77
36.000 121.190 128.246 -7.056 211.88 10029.73
40.000 120.195 128.495 -8.300 177.39 10802.08
44.000 113.282 128.562 -15.280 91.25 11374.64
48.000 121.637 128.616 -6.978 48.48 11638.51
52.000 121.730 128.670 -6.939 15.70 11762.16
56.000 117.201 128.724 -11.522 -50.92 11743.88
60.000 125.945 128.777 -2.833 -95.19 11448.95
64.000 126.038 128.831 -2.793 -111.05 11035.44
68.000 63.734 128.885 -65.151 -136.61 10567.48
72.000 121.602 128.939 -7.337 -184.52 9891.93
76.000 121.058 128.993 -7.935 -219.35 9087.54
80.000 120.975 129.025 -8.049 -251.34 8146.72
84.000 128.346 128.623 -0.277 -340.60 6916.86
88.000 136.183 127.167 9.016 -305.59 5612.71
92.000 114.304 123.444 -9.141 -299.91 4426.12
96.000 90.348 116.388 -26.040 -383.43 3108.93
100.000 136.756 105.766 30.990 -253.99 1824.86
104.000 112.474 91.201 21.273 -149.72 1028.44
108.000 85.229 73.486 11.743 -88.47 571.39
112.000 53.249 53.055 0.195 -31.38 348.98
116.000 44.962 31.305 13.657 -53.11 127.84
120.000 16.650 8.927 7.723 -10.62 8.22
Annex 3 - 493
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 231.575 13.27 1745 9408.385 - 42.19 22300
GL
45.800 63.852 3.64 1755 11514.593 - 51.63 22300
51.400
57.000
19.861
-62.433
1.13
3.56
1755
1755
Shanghai 2012-12-18
11751.413
11687.411
-
-
52.70
52.41
22300
22300
62.600 -107.131 6.10 1755 kakr
11187.992 - 50.17 22300
68.200 -149.639 8.53 1755 10539.232 - 47.26 22300
73.800 -197.702 11.27 1755 9548.143 - 42.82 22300
85.000 -340.296 19.39 1755 6576.206 - 41.05 16020
96.200 -386.849 21.54 1796 3031.914 - 25.84 11735
107.400 -95.448 5.22 1827 626.502 - 9.45 6633
Annex 3 - 494
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 495
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 496
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 135.127 114.600 116.946 121.636
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 497
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 0.000 23.400 28.714 33.200
29 WT SB 0.000 23.400 28.227 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 498
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 499
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.483 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
10.734
22.085
Loading
ton/m
kakr
34.240
46.256
2012-12-18
ShanghaiShearforce
ton
65.53
224.57
Moment
tonm
71.75
608.01
8.000 59.939 46.016 13.923 362.10 1815.25
12.000 63.423 70.886 -7.463 385.06 3346.83
16.000 73.757 80.322 -6.565 354.07 4819.38
20.000 108.799 108.784 0.015 299.66 6103.59
24.000 94.887 119.306 -24.419 271.40 7296.95
28.000 101.805 124.921 -23.116 175.00 8188.79
32.000 108.773 127.340 -18.567 53.99 8634.77
36.000 132.839 128.286 4.553 46.37 8799.24
40.000 131.849 128.643 3.206 58.11 9002.10
44.000 124.942 128.817 -3.875 17.79 9189.33
48.000 130.962 128.979 1.983 15.29 9244.58
52.000 131.055 129.141 1.914 18.13 9306.81
56.000 126.526 129.303 -2.777 -13.28 9368.81
60.000 125.945 129.465 -3.520 -24.65 9293.81
64.000 126.038 129.627 -3.589 -43.48 9156.63
68.000 63.734 129.789 -66.055 -72.44 8952.26
72.000 121.602 129.950 -8.349 -124.17 8525.85
76.000 121.058 130.112 -9.054 -163.27 7954.41
80.000 120.975 130.252 -9.276 -199.95 7228.64
84.000 128.346 129.958 -1.612 -294.34 6194.21
88.000 136.183 128.610 7.573 -264.88 5064.11
92.000 114.304 124.990 -10.686 -265.19 4028.51
96.000 90.348 118.010 -27.661 -355.05 2837.61
100.000 136.756 107.395 29.362 -232.14 1653.98
104.000 112.474 92.730 19.744 -134.22 932.08
108.000 85.229 74.799 10.430 -78.70 525.27
112.000 53.249 54.063 -0.814 -26.28 332.20
116.000 44.962 31.932 13.031 -51.30 124.37
120.000 16.650 9.116 7.534 -10.44 8.12
Annex 3 - 500
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 33.459 1.92 1745 8686.959 - 38.95 22300
GL
45.800 10.879 0.62 1755 9215.424 - 41.32 22300
51.400
57.000
16.980
-16.066
0.97
0.92
1755
1755
Shanghai 2012-12-18
9296.188
9354.285
-
-
41.69
41.95
22300
22300
62.600 -38.474 2.19 1755 kakr9213.825 - 41.32 22300
68.200 -85.648 4.88 1755 8936.823 - 40.08 22300
73.800 -139.224 7.93 1755 8288.996 - 37.17 22300
85.000 -295.381 16.83 1755 5899.138 - 36.82 16020
96.200 -358.795 19.98 1796 2766.236 - 23.57 11735
107.400 -84.874 4.65 1827 574.282 - 8.66 6633
Annex 3 - 501
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 502
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 503
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
40 HFO bunker 1 35.558 17.100 20.154 22.700
GL
41 HFO bunker 2 16.116 19.900 21.376 22.700
42 HFO bunker 3
43 HFO bunker 4
16.116
35.558
Shanghai 2012-12-18
19.900
17.100
21.376
20.154
22.700
22.700
44 HFO Day 1 kakr 13.200
6.832 14.250 15.300
45 HFO Day 2 6.832 13.200 14.250 15.300
46 HFO Settling 1 9.652 13.200 14.868 16.050
47 HFO Settling 2 9.712 13.200 14.867 16.050
48 HFO Overflow 1.938 13.200 14.382 15.000
98 MDO bunker 5 39.926 17.100 20.429 23.400
99 MDO bunker 6 39.926 17.100 20.429 23.400
50 MDO Bunker PS 11.802 10.200 11.162 12.000
52 MDO Day 1 3.120 0.000 1.200 2.400
53 MDO Day 2 3.120 0.000 1.200 2.400
54 MDO Emergency generator 1.733 2.400 2.700 3.000
100 MDO Overflow 1.742 13.200 14.382 15.000
38 Fresh water PS 17.398 2.642 6.080 7.800
39 Fresh water SB 17.398 2.642 6.080 7.800
60 LO Sump 3.572 12.600 14.850 17.100
61 LO GB 0.789 7.800 8.100 8.400
62 LO AE 0.789 7.800 8.100 8.400
63 LO STORE 1 5.915 8.400 9.000 9.600
64 LO STORE 2 5.915 8.400 9.000 9.600
65 Winch Oil 0.667 105.300 105.650 106.000
70 Sludge 2.056 8.400 9.563 10.200
71 Sewage 4.729 9.187 11.062 12.000
72 Dirty Oil 0.384 14.400 15.941 17.100
73 Bilge water coll. Hold 4.386 80.800 81.500 82.200
74 CW Drain 0.000 10.800 11.109 11.400
75 TO Drain 0.000 8.149 9.116 9.600
76 Bilge water coll. ER 0.457 9.600 10.235 10.800
77 TO Store 3.155 1.200 1.800 2.400
78 leak oil 0.384 14.400 15.941 17.100
79 watermist tank 2.775 -1.800 -1.500 -1.200
01 Forepeak 0.000 114.600 115.624 117.672
02 Deeptank PS 108.455 107.400 109.149 111.000
03 Deeptank SB 98.475 107.400 109.265 111.000
04 DB PS 43.932 96.200 101.107 107.400
05 DB SB 47.425 96.200 101.029 107.400
06 WT PS 114.611 101.800 104.289 107.400
07 WT SB 114.611 101.800 104.289 107.400
08 WT PS 175.892 96.200 98.880 101.800
Annex 3 - 504
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
12 WT PS 158.236 85.000 90.329 96.200
GL
13 WT SB 158.236 85.000 90.329 96.200
14 DB PS
15 DB SB
88.945
92.438
Shanghai 2012-12-18
73.800
73.800
79.444
79.377
85.000
85.000
16 WT PS kakr 73.800
130.440 79.395 85.000
17 WT SB 130.440 73.800 79.395 85.000
14A DB PS 112.726 59.800 66.898 73.800
15A DB SB 116.220 59.800 66.800 73.800
16A WT PS 163.188 59.800 66.800 73.800
17A WT SB 163.188 59.800 66.800 73.800
18 DB PS 112.726 45.800 52.898 59.800
19 DB SB 116.220 45.800 52.800 59.800
20 WT PS 163.188 45.800 52.800 59.800
21 WT SB 163.188 45.800 52.800 59.800
22 DB PS 100.424 33.200 39.639 45.800
23 DB SB 103.917 33.200 39.529 45.800
24 WT PS 146.835 33.200 39.502 45.800
25 WT SB 62.650 33.200 39.504 45.800
26 DB PS 55.579 23.400 29.234 33.200
27 DB SB 59.072 23.400 29.158 33.200
28 WT PS 112.944 23.400 28.334 33.200
29 WT SB 101.725 23.400 27.902 33.200
30 AP PS 0.000 7.801 8.200 8.400
31 AP SB 0.000 7.801 8.200 8.400
St.1:5A+B+D in hold #28-37 135.900 17.143 20.201 23.258
St.1:4B on deck #18-28 71.600 11.440 13.965 16.490
Bay : 1, 20 feet, hold 168.000 101.195 104.224 107.253
Bay : 1, 20 feet, hatch 70.000 101.195 104.224 107.253
Bay : 3, 20 feet, hold 168.000 95.062 98.091 101.120
Bay : 3, 20 feet, hatch 70.000 95.062 98.091 101.120
Bay : 5, 20 feet, hold 280.000 88.454 91.483 94.512
Bay : 5, 20 feet, hatch 70.000 88.454 91.483 94.512
Bay : 7, 20 feet, hold 280.000 82.320 85.349 88.378
Bay : 7, 20 feet, hatch 70.000 82.320 85.349 88.378
Bay : 9, 20 feet, hold 280.000 74.452 77.481 80.510
Bay : 9, 20 feet, hatch 70.000 74.452 77.481 80.510
Bay : 11, 20 feet, hold 280.000 68.320 71.349 74.378
Bay : 11, 20 feet, hatch 70.000 68.320 71.349 74.378
Bay : 13, 20 feet, hold 280.000 61.710 64.739 67.768
Bay : 13, 20 feet, hatch 98.000 61.710 64.739 67.768
Bay : 15, 20 feet, hold 280.000 55.578 58.607 61.636
Bay : 15, 20 feet, hatch 98.000 55.578 58.607 61.636
Annex 3 - 505
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Bay : 19, 20 feet, hatch 126.000 42.836 45.865 48.894
GL
Bay : 21, 20 feet, hold 280.000 36.226 39.255 42.284
Bay
Bay
:
:
21,
23,
20
20
feet,
feet,
hatch
hold
126.000
280.000
Shanghai 2012-12-18
36.226
30.094
39.255
33.123
42.284
36.152
Bay : 23, 20 feet, hatch kakr 30.094
126.000 33.123 36.152
Bay : 25, 20 feet, hold 280.000 23.486 26.515 29.544
Bay : 25, 20 feet, hatch 126.000 23.486 26.515 29.544
Bay : 27, 20 feet, hatch 126.000 17.354 20.383 23.412
Annex 3 - 506
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
Location where maximum moment occurs 55.250 m
Location
m
0.000
4.000
Weight
ton/m
44.974
68.341
GL Buoyancy
ton/m
16.516
28.501
Loading
ton/m
kakr
28.458
39.841
2012-12-18
ShanghaiShearforce
ton
54.36
188.54
Moment
tonm
60.13
502.82
8.000 59.939 52.276 7.663 300.59 1514.77
12.000 63.423 76.709 -13.286 299.34 2751.28
16.000 73.757 85.672 -11.914 246.00 3835.61
20.000 108.799 113.659 -4.860 171.14 4646.00
24.000 118.802 123.708 -4.906 138.77 5291.97
28.000 123.850 128.848 -4.998 117.63 5805.66
32.000 128.948 130.793 -1.845 66.30 6163.40
36.000 132.839 131.265 1.574 69.69 6431.89
40.000 131.849 131.148 0.701 70.47 6705.46
44.000 124.942 130.849 -5.907 21.07 6923.31
48.000 130.962 130.536 0.426 11.40 6976.69
52.000 131.055 130.224 0.831 8.96 7012.14
56.000 126.526 129.912 -3.386 -25.84 7030.02
60.000 125.945 129.600 -3.655 -38.70 6901.17
64.000 126.038 129.288 -3.250 -57.11 6707.96
68.000 63.734 128.976 -65.242 -83.77 6452.99
72.000 121.602 128.663 -7.062 -131.30 5988.99
76.000 121.058 128.351 -7.293 -164.30 5400.56
80.000 120.975 128.017 -7.041 -192.99 4685.96
84.000 128.346 127.249 1.097 -277.49 3698.46
88.000 136.183 125.427 10.756 -236.25 2658.66
92.000 114.304 121.347 -7.043 -222.90 1764.22
96.000 90.348 113.974 -23.626 -297.37 772.71
100.000 136.756 103.156 33.600 -157.82 -147.23
104.000 112.474 88.597 23.877 -43.05 -538.04
108.000 85.229 71.128 14.101 28.20 -548.15
112.000 53.249 51.162 2.087 93.86 -286.18
116.000 14.197 30.083 -15.886 30.03 -28.23
120.000 7.717 8.544 -0.828 -3.65 4.46
Annex 3 - 507
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Ref.-No. 12-136584
33.200 65.587 3.76 1745 6242.210 - 27.99 22300
GL
45.800 10.697 0.61 1755 6952.138 - 31.18 22300
51.400
57.000
8.478
-29.173
0.48
1.66
1755
1755
Shanghai 2012-12-18
7006.826
7002.651
-
-
31.42
31.40
22300
22300
62.600 -52.470 2.99 1755 kakr6784.536 - 30.42 22300
68.200 -96.816 5.52 1755 6435.305 - 28.86 22300
73.800 -143.847 8.20 1755 5741.487 - 25.75 22300
85.000 -275.767 15.71 1755 3421.602 - 21.36 16020
96.200 -300.300 16.72 1796 712.943 - 6.08 11735
107.400 19.795 1.13 1755 - 562.601 5.01 11224
Annex 3 - 508
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
100.0
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 509
LONGITUDINAL STRENGTH CALCULATION
P10046 GROOT SUPER GREEN 10.000 _4
Not Accepted
Ref.-No. 12-136584
GL Shanghai 2012-12-18
kakr
0.0
Annex 3 - 510
ANNEX 4: IMO RESOLUTIONS
• IMO Resolution A.868(20) – Guidelines for the control of ship’s ballast water to minimize the
transfer of harmful aquatic organisms and pathogens
• IMO Resolution MEPC.124(53) – Guidelines for ballast water exchange (G6)
E
IMO
A 20/Res.868
1 December 1997
Original: ENGLISH
ASSEMBLY
20th session
Agenda item 11
RESOLUTION A.868(20)
adopted on 27 November 1997
THE ASSEMBLY,
RECALLING Article 15(j) of the Convention on the International Maritime Organization concerning
the functions of the Assembly in relation to regulations and guidelines concerning prevention and control of
marine pollution from ships,
RECALLING ALSO resolution A.774(18) by which it recognized that the uncontrolled discharge of
ballast water and sediment from ships has led to the transfer of harmful aquatic organisms and pathogens,
causing injury to public health and damage to property and the environment, and accordingly adopted
Guidelines for Preventing the Introduction of Unwanted Aquatic Organisms and Pathogens from Ships' Ballast
Water and Sediment Discharges, and further that the Marine Environment Protection Committee (MEPC) and
the Maritime Safety Committee (MSC) shall keep the ballast water issue and the application of the Guidelines
under review with a view to further developing the Guidelines as a basis for a new Annex to MARPOL 73/78,
RECALLING FURTHER that the 1992 United Nations Conference on Environment and
Development (UNCED), in its Agenda 21 requests IMO to consider the adoption of appropriate rules on
ballast water discharge to prevent the spread of non-indigenous organisms, and further proclaims in its
Declaration on Environment and Development that States shall widely apply the precautionary approach
according to their capabilities,
BEARING IN MIND that MEPC/Circ.288 recognized that the existing Guidelines do not provide a
complete solution towards the total prevention of the introduction of harmful aquatic organisms and pathogens,
but urged that focus should be directed on measures aimed at minimizing the risks, emphasizing further that in
applying the existing Guidelines, the ship's safety was of paramount importance,
I:\ASSEMBLY\20\RES\868
NOTING FURTHER the status of work carried out by MEPC as requested by resolution A.774(18)
concerning the development of legally binding provisions on ballast water management together with guidelines
for their effective implementation, as well as the Guidance on Safety Aspects of Ballast Water Exchange at
Sea prepared by the Sub-Committee on Ship Design and Equipment, and distributed as MEPC/Circ.329 and
MSC/Circ.806, both of 30 June 1997,
RECOGNIZING that several States have taken unilateral action by adopting legally binding provisions
for local, regional or national application with a view to minimizing the risks of introducing harmful aquatic
organisms and pathogens through ships entering their ports, and also that this issue, being of worldwide
concern, demands action based on globally applicable regulation together with guidelines for their effective
implementation and uniform interpretation,
HAVING CONSIDERED the recommendation of the MEPC at its fortieth session on this issue,
1. ADOPTS the Guidelines for the Control and Management of Ships' Ballast Water to Minimize the
Transfer of Harmful Aquatic Organisms and Pathogens set out in the Annex to the present resolution;
2. REQUESTS Governments to take urgent action in applying these Guidelines, including the
dissemination thereof to the shipping industry, to use them as a basis for any measures they adopt with a view
to minimizing the risks of introducing harmful aquatic organisms and pathogens, and to report to the MEPC on
any experience gained in their implementation;
3. REQUESTS ALSO the MEPC to work towards completion of legally binding provisions on ballast
water management in the form of a new Annex to MARPOL 73/78, together with guidelines for their uniform
and effective implementation with a view to their consideration and adoption in the year 2000;
4. REQUESTS FURTHER the MSC to include in its workplan the evaluation of information received
from interested parties, particularly that relevant to 12.2 of the Guidelines adopted herewith, with a view to
determining the hazards and potential consequences for various existing ship types and operations. The MSC
is also requested to consider any other relevant issues concerning ballast water management as well as design
objectives for new ships, with a view to minimizing to the extent possible risks of introducing harmful aquatic
organisms and pathogens with ships' ballast water and sediments;
I:\ASSEMBLY\20\RES\868
-3- A 20/Res.868
ANNEX
Contents
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - DEFINITIONS
CHAPTER 3 - APPLICATION
I:\ASSEMBLY\20\RES\868
A 20/Res.868 -4-
I:\ASSEMBLY\20\RES\868
-5- A 20/Res.868
1 Introduction
1.1 Studies carried out in several countries have shown that many species of bacteria, plants, and animals
can survive in a viable form in the ballast water and sediment carried in ships, even after journeys of several
months' duration. Subsequent discharge of ballast water or sediment into the waters of port States may result
in the establishment of harmful aquatic organisms and pathogens which may pose threats to indigenous human,
animal and plant life, and the marine environment. Although other media have been identified as being
responsible for transferring organisms between geographically separated water bodies, ballast water discharge
from ships appears to have been among the most prominent.
1.2 The potential for ballast water discharge to cause harm has been recognised not only by the
International Maritime Organization but also by the World Health Organization, which is concerned about the
role of ballast water as a medium for the spreading of epidemic disease bacteria.
1.3 These Guidelines are not to be regarded as a certain solution to the problem. Rather, each part of
them should be viewed as a tool which, if correctly applied, will help to minimize the risks associated with
ballast water discharge. As scientific and technological advances are made, the Guidelines will be refined to
enable the risk to be more adequately addressed. In the interim, port States, flag States and other parties that
can assist in mitigating this problem should exercise due care and diligence in an effort to conform to the
maximum extent possible with the Guidelines.
1.4 The selection of appropriate methods of risk minimization will depend upon several factors, including
the type or types of organisms being targeted, the level of risk involved, its environmental acceptability, the
economic and ecological costs involved and the safety of ships.
2 Definitions
Administration means the Government of the State under whose authority the ship is operating.
Convention means MARPOL 73/78 (International Convention for the Prevention of Pollution from
Ships, 1973, and the Protocol of 1978 related thereto).
Member States means States that are Members of the International Maritime Organization.
Port State authority means any official or organisation authorized by the Government of a port State
to administer guidelines or enforce standards and regulations relevant to the implementation of national
and international shipping control measures.
Treatment means a process or mechanical, physical, chemical or biological method to kill, remove or
render infertile, harmful or potentially harmful organisms within ballast water.
3 Application
Germanischer Lloyd Ref.-No. 12-136584 .
The Guidelines are directed to Member States and can apply to all ships; however, a port State
authority shall determine the extent to which they do apply.
I:\ASSEMBLY\20\RES\868
A 20/Res.868 -6-
4.1 The objectives of these Guidelines, developed under technical and scientific guidance, are intended to
assist Governments and appropriate authorities, ship masters, operators and owners, and port authorities, as
well as other interested parties, in minimizing the risk of introducing harmful aquatic organisms and pathogens
from ships' ballast water and associated sediments while protecting ships' safety.
4.2 The Guidelines allow port States to exempt ships within the area under their jurisdiction from part or
all of the relevant provisions. Notwithstanding, any administration wishing to apply restrictions to ballast water
operations should still follow these Guidelines, when developing legislation or procedures.
4.3 In order that the Guidelines may be implemented in a standard and uniform manner, all Member State
Governments, ship operators, other appropriate authorities and interested parties are requested to apply these
Guidelines.
5 Dissemination of information
5.1 Administrations are encouraged to maintain and exchange information relevant to these Guidelines
through the Organization. Accordingly, administrations are encouraged to provide the Organization with the
following:
.1 Information on severe outbreaks or infestations of harmful aquatic organisms which may pose
a risk;
.4 Education materials (such as audio and video tapes) and printed materials; and
.5 Location and terms of use of alternative exchange zones, contingency strategies, availability
of shore reception facilities, fees, etc.
5.2 Member States, applying ballast water and sediment discharge procedures, should notify the
Organization of specific requirements and provide to the Organization, for the information of other Member
States and non-governmental organizations, copies of any regulations, standards, exemptions or guidelines being
applied. Verification and detailed information concerning port State requirements should be obtained by the
ship prior to arrival.
5.3 Port State authorities should provide the widest possible distribution of information on ballast water and
sediment management and treatment requirements that are being applied to shipping. Failure to do so may lead
to unnecessary delays for ships seeking entry to port States.
5.4 Shipping organizations and ships' managers should be familiar with the requirements of port State
authorities with respect to ballast water and sediment management and treatment procedures, including
information that will be needed to obtain entry clearance.
Germanischer Lloyd Ref.-No. 12-136584 .
5.5 Member States are invited to provide the Organization with details of any research and development
studies that they carry out with respect to the impact and control of harmful aquatic organisms and pathogens
in ships' ballast water and sediment.
I:\ASSEMBLY\20\RES\868
-7- A 20/Res.868
5.6 Member States should provide to the Organization details of records describing reasons why existing
requirements could not be complied with, e.g. force majeure, heavy weather, failure of equipment, or lack of
information concerning port State requirements.
6.1 Training for ships' masters and crews as appropriate should include instructions on the application of
ballast water and sediment management and treatment procedures, based upon the information contained in
these Guidelines. Instruction should also be provided on the maintenance of appropriate records and logs.
Governments should ensure that their marine training organizations include this in the contents of their syllabus.
6.2 The application of processes and procedures concerning ballast water management are currently at
the core of the solution to minimize the introduction of harmful aquatic organisms and pathogens.
6.3 Governments are encouraged to include knowledge of duties regarding the control of pollution of the
sea by harmful aquatic organisms and pathogens in their training requirements for certificates.
7.1.1 Every ship that carries ballast water should be provided with a ballast water management plan to assist
in the minimization of transfer of harmful aquatic organisms and pathogens. The intent of the plan should be to
provide safe and effective procedures for ballast water management.
7.1.2 The ballast water management plan should be specific to each ship.
7.1.3 The ballast water management plan should be included in the ship's operational documentation. Such a
plan should address, inter alia:
7.2.1 Reception and treatment facilities should be made available for the environmentally safe disposal of
ballast tank sediments.
7.2.2 Discharge of ship's ballast water into port reception and/or treatment facilities may provide an
acceptable means of control. Port State authorities wishing to utilize this strategy should ensure that the
facilities are adequate.
I:\ASSEMBLY\20\RES\868
A 20/Res.868 -8-
8.1.1 Where a port State authority requires that specific ballast water procedures and/or treatment option(s)
be undertaken, and due to weather, sea conditions or operational impracticability such action cannot be taken,
the master should report this fact to the port State authority as soon as possible and, where appropriate, prior to
entering seas under its jurisdiction.
8.1.2 To facilitate the administration of ballast water management and treatment procedures on board each
ship, a responsible officer should be appointed to maintain appropriate records and to ensure that ballast water
management and/or treatment procedures are followed and recorded.
8.1.3 When taking on or discharging ballast water, as a minimum, the dates, geographical locations, ship's
tank(s) and cargo holds, ballast water temperature and salinity as well as the amount of ballast water loaded or
discharged should be recorded. A suitable format is shown in appendix 1. The record should be made
available to the port State authority.
8.1.4 The location and suitable access points for sampling ballast or sediment should be described in the
ship's ballast water management plan. This will allow crew members to provide maximum assistance when
officers of the port State authority require a sample of the ballast water or sediment.
8.2.1 Consistent with 5.2 above, port States should provide ships with the following information:
- the availability, location, capacities of and applicable fees relevant to reception facilities that
are being provided for the environmentally safe disposal of ballast water and associated
sediment.
8.2.2 To assist ships in applying the precautionary practices described in 9.1.1 below, port States should
inform local agents and/or the ship of areas and situations where the uptake of ballast water should be
minimized, such as:
- areas with outbreaks, infestations or known populations of harmful organisms and pathogens;
- areas with current phytoplankton blooms (algal blooms, such as red tides);
I:\ASSEMBLY\20\RES\868
-9- A 20/Res.868
When loading ballast, every effort should be made to avoid the uptake of potentially harmful aquatic
organisms, pathogens and sediment that may contain such organisms. The uptake of ballast water should be
minimized or, where practicable, avoided in areas and situations such as:
- areas identified by the port State in connection with advice relating to 8.2.2 above;
Where practicable, routine cleaning of the ballast tank to remove sediments should be carried out in
mid-ocean or under controlled arrangements in port or dry dock, in accordance with the provisions of the ship's
ballast water management plan.
If it is necessary to take on and discharge ballast water in the same port to facilitate safe cargo
operations, care should be taken to avoid unnecessary discharge of ballast water that has been taken up in
another port.
Near-coastal (including port and estuarine) organisms released in mid-ocean, and oceanic organisms
released in coastal waters, do not generally survive.
When exchanging ballast at sea, guidance on safety aspects of ballast water exchange as set out in
appendix 2 should be taken into account. Furthermore, the following practices are recommended:
- where practicable, ships should conduct ballast exchange in deep water, in open ocean and as
far as possible from shore. Where this is not possible, requirements developed within regional
agreements may be in operation, particularly in areas within 200 nautical miles from shore.
Consistent with 9.1.2 above, all of the ballast water should be discharged until suction is lost,
and stripping pumps or eductors should be used if possible;
I:\ASSEMBLY\20\RES\868
A 20/Res.868 - 10 -
- where neither form of open ocean exchange is practicable, ballast exchange may be accepted
by the port State in designated areas; and
In cases where ballast exchange or other treatment options are not possible, ballast water may be
retained in tanks or holds. Should this not be possible, the ship should only discharge the minimum essential
amount of ballast water in accordance with port States' contingency strategies.
If reception facilities for ballast water and/or sediments are provided by a port State, they should,
where appropriate, be utilized.
9.2.4.1 If suitable new and emergent treatments and technologies prove viable, these may substitute for, or be
used in conjunction with, current options. Such treatments could include thermal methods, filtration, disinfection
including ultraviolet light, and other such means acceptable to the port State.
9.2.4.2 Results concerning the application and effectiveness of new ballast water management technologies
and associated control equipment should be notified to the Organization with a view to evaluation and
incorporation, as appropriate, into these Guidelines.
The following is provided for the guidance of port State authorities in the implementation of their ballast
water management programme, and to assess risks in relation to the ballast water containing harmful aquatic
organisms and pathogens.
Significantly different conditions may exist between port(s) of origin and the port in which ballast water
is discharged. Examples include freshwater ballast being released into highly saline ports. There may be
organisms capable of surviving such extreme transfers; however, there is a lower probability of species
establishment under such transport events.
The length of time during which ballast water is within an enclosed ballast tank may also be a factor in
determining the number of surviving organisms, because of the absence of light, decreasing nutrients and
oxygen, changes of salinity and other factors. However, the maximum length of survival of organisms in
ballast water varies, and in many cases is not known. Water of an age of 100 days should be considered the
minimum for applying this consideration.Germanischer
Ballast waterLloyd
and sediments 12-136584
Ref.-No. may contain dinoflagellate
. cysts and
other organisms capable of surviving for a much longer length of time.
I:\ASSEMBLY\20\RES\868
- 11 - A 20/Res.868
10.3.1 Under certain circumstances it may be possible to determine if one or more target species are present
in the water of a specific port and have been ballasted in a ship. In these circumstances, the receiving port
State authority may invoke management measures accordingly. Even if such target species are not present,
however, it should be noted that the ship may still be carrying many untargetted species which, if released in
new waters, could be potentially harmful.
10.3.2 Port States are encouraged to carry out biological baseline surveys in their ports and to disseminate the
results of their investigations.
11.1 Consistent with the precautionary approach to environmental protection, these Guidelines can apply to
all ships unless specifically exempted by a port State authority within its jurisdiction. In accordance with 5.2
above, port State authorities should inform the Organization on how the Guidelines are being applied.
11.2 Member States have the right to manage ballast water by national legislation. However, any ballast
discharge restrictions should be notified to the Organization.
11.3 In all cases, a port State authority should consider the overall effect of ballast water and sediment
discharge procedures on the safety of ships and those on board. Guidelines will be ineffective if compliance is
dependent upon the acceptance of operational measures that put a ship or its crew at risk. Port States should
not require any action of the master which imperils the lives of seafarers or the safety of the ship.
11.4 It is essential that ballast water and sediment management procedures be effective as well as
environmentally safe, practicable, designed to minimize costs and delays to the ship, and based upon these
Guidelines whenever possible.
11.5 Any instructions or requirements of a ship should be provided in a timely manner and be clear and
concise.
11.6 Port States should on request provide a visiting ship with any requested information relative to ballast
water management and its potential effects with respect to harmful aquatic organisms and pathogens.
11.7 Any enforcement or monitoring activities should be undertaken in a fair, uniform and nationally
consistent manner at all ports within the port State. Where there are compelling reasons whereby nationally
consistent procedures cannot be followed, then deviations should be reported to the Organization.
11.8 Compliance monitoring should be undertaken by port State authorities by, for example, taking and
analysing ballast water and sediment samples to test for the continued survival of harmful aquatic organisms
and pathogens.
11.9 Where ballast water or sediment sampling for compliance or effectiveness monitoring is being
undertaken, port State authorities should minimize delays to ships when taking such samples.
Germanischer Lloyd Ref.-No. 12-136584 .
11.10 When sampling for research or compliance monitoring, the port State authority should give as much
notice as possible to the ship that sampling will occur, to assist in planning staffing and operational resources.
11.11 The master has a general obligation to provide reasonable assistance for the above monitoring which
may include provision of officers or crew, provision of the ship's plans, records pertaining to ballast
arrangements and details concerning the location of sampling points.
I:\ASSEMBLY\20\RES\868
A 20/Res.868 - 12 -
11.12 Sampling methods for research and monitoring is the responsibility of the individual port State. The
Organization welcomes information on new or innovative methods of sampling and/or analysis, and any
relevant information should be provided to it.
11.13 Port State authorities should indicate to the master or responsible officer the purpose for which a
sample is taken (i.e., monitoring, research or enforcement). Results of analyses of samples should be made
available to ship's operators on request.
11.14 Port State authorities may sample or require samples to analyse ballast water and sediment, before
permitting a ship to proceed to discharge its ballast water in environmentally sensitive locations. In the event
that harmful aquatic organisms or pathogens are found to be present in the samples, a port State's contingency
strategy may be applied.
I:\ASSEMBLY\20\RES\868
- 13 - A 20/Res.868
Operational measures such as ballast water exchange may be appropriate in the short term; however,
there is a clear need for further research. These Guidelines should be revised and adjusted in the light of
results concerning new ballast water management options.
Recognizing the need to evaluate the hazards and potential consequences for various types of ships
and operations, interested parties should carry out detailed studies and provide information relevant to:
- experience gained from carrying out ballast water exchange at sea, including any
samples/model procedures;
- an evaluation of the safety margins between the actual metacentric height and stresses versus
the allowable seagoing limits specified in the approved trim and stability booklet and loading
manual, rele vant to different types of ships and loading conditions;
- any hazards which may arise due to human element issues relative to the responsible
execution of ballast water exchange at sea in a manner which may not be fully prudent;
- operational procedures carried out prior to initiating the ballast water exchange at sea and
check points during the exchange;
- the extent of training and management necessary to ensure that the process of ballast water
exchange at sea is effectively monitored and controlled on board;
- plan of action to incorporate any unique procedures should an emergency occur which may
affect the exchange of ballast water at sea; and
- the decision-making process, taking into account relevant safety matters, including ship's
position, weather conditions, machinery performance, ballast system inspection and
maintenance, crew safety and availability.
Builders, owners and classification societies should take these Guidelines into consideration when
designing new ships or modifying existing ships.
I:\ASSEMBLY\20\RES\868
A 20/Res.868 - 14 -
APPENDIX 1
I:\ASSEMBLY\20\RES\868
- 15 - A 20/Res.868
APPENDIX 2
1 Introduction
1.1 This document is intended to provide guidance on the safety aspects of ballast water exchange at sea.
The different types of ships which may be required to undertake ballast water exchange at sea make it
presently impractical to provide specific guidelines for each ship type. Shipowners are cautioned that they
should consider the many variables that apply to their ships. Some of these variables include type and size of
ship, ballast tank configurations and associated pumping systems, trading routes and associated weather
conditions, port State requirements and manning.
1.2 Ballast water exchange at sea procedures contained in relevant management plans should
be individually assessed for their effectiveness from the environmental protection point of view as
well as from the point of view of their acceptability in terms of structural strength and stability.
1.3 In the absence of a more scientifically based means of control, exchange of ballast water in deep
ocean areas or open seas currently offers a means of limiting the probability that fresh water or coastal aquatic
species will be transferred in ballast water. Two methods of carrying out ballast water exchange at sea have
been identified:
.1 the sequential method, in which ballast tanks are pumped out and refilled with clean water;
and/or
.2 the flow-through method, in which ballast tanks are simultaneously filled and discharged by
pumping in clean water.
2 Safety precautions
2.1 Ships engaged in ballast water exchange at sea should be provided with procedures which account for
the following, as applicable:
.2 free surface effects on stability and sloshing loads in tanks that may be slack at any one time;
.6 Germanischer
permissible seagoing strength Lloydforces
limits of shear Ref.-No. 12-136584
and bending moments. in accordance with
an approved loading manual;
I:\ASSEMBLY\20\RES\868
A 20/Res.868 - 16 -
.11 contingency procedures for situations which may affect the ballast water exchange at sea,
including deteriorating weather conditions, pump failure, loss of power, etc.;
.12 time to complete the ballast water exchange or an appropriate sequence thereof, taking into
account that the ballast water may represent 50 % of the total cargo capacity for some ships;
and
2.2 If the flow through method is used, caution should be exercised, since:
.1 air pipes are not designed for continuous ballast water overflow;
.2 current research indicates that pumping of at least three full volumes of the tank capacity
could be needed to be effective when filling clean water from the bottom and overflowing
from the top; and
.3 certain watertight and weathertight closures (e.g. manholes) which may be opened during
ballast exchange, should be re-secured.
2.3 Ballast water exchange at sea should be avoided in freezing weather conditions. However, when it is
deemed absolutely necessary, particular attention should be paid to the hazards associated with the freezing of
overboard discharge arrangements, air pipes, ballast system valves together with their means of control, and
the accretion of ice on deck.
2.4 Some ships may need the fitting of a loading instrument to perform calculations of shear forces and
bending moments induced by ballast water exchange at sea and to compare with the permissible strength
limits.
2.5 An evaluation should be made of the safety margins for stability and strength contained in allowable
seagoing conditions specified in the approved trim and stability booklet and the loading manual, relevant to
individual types of ships and loading conditions. In this regard particular account should be taken of the
following requirements:
.1 stability to be maintained at all times to values not less than those recommended by the
Organization (or required by the Administration);
.2 longitudinal stress values not to exceed those permitted by the ship's classification society with
regard to prevailing sea conditions; and
.3 Germanischer
exchange of ballast in tanks Lloydsignificant
or holds where 12-136584
Ref.-No. structural loads may
. be generated by
sloshing action in the partially filled tank or hold to be carried out in favourable sea and swell
conditions so that the risk of structural damage is minimized.
2.6 The ballast water management plan should include a list of circumstances in which ballast water
exchange should not be undertaken. These circumstances may result from critical situations of an exceptional
I:\ASSEMBLY\20\RES\868
- 17 - A 20/Res.868
nature, force majeure due to stress of weather, or any other circumstances in which human life or safety of
the ship is threatened.
3.1 The ballast water management plan should include the nomination of key shipboard control personnel
undertaking ballast water exchange at sea.
3.2 Ships' officers and ratings engaged in ballast water exchange at sea should be trained in and
familiarized with the following:
.1 the ship's pumping plan, which should show ballast pumping arrangements, with positions of
associated air and sounding pipes, positions of all compartment and tank suctions and pipelines
connecting them to ship's ballast pumps and, in the case of use of the flow through method of
ballast water exchange, the openings used for release of water from the top of the tank
together with overboard discharge arrangements;
.2 the method of ensuring that sounding pipes are clear, and that air pipes and their non-return
devices are in good order;
.3 the different times required to undertake the various ballast water exchange operations;
.4 the methods in use for ballast water exchange at sea if applicable with particular reference to
required safety precautions; and
.5 the method of on-board ballast water record keeping, reporting and recording of routine
soundings.
________
I:\ASSEMBLY\20\RES\868
MEPC 53/24/Add.1
ANNEX 2
RESOLUTION MEPC.124(53)
RECALLING ALSO that the International Conference on Ballast Water Management for
Ships held in February 2004 adopted the International Convention for the Control and
Management of Ships’ Ballast Water and Sediments, 2004 (the Ballast Water Management
Convention) together with four Conference resolutions,
NOTING that Regulation A-2 of the Ballast Water Management Convention requires that
discharge of ballast water shall only be conducted through Ballast Water Management in
accordance with the provisions of the Annex to the Convention,
NOTING FURTHER that Regulation B-4 of the Annex to the Ballast Water Management
Convention addresses the conditions under which ballast water exchange should be conducted,
taking into account Guidelines developed by the Organization,
HAVING CONSIDERED the draft Guidelines for ballast water exchange developed by
the Ballast Water Working Group and the recommendation made by the Sub-Committee on Bulk
Liquids and Gases at its ninth session,
1. ADOPTS the Guidelines for ballast water exchange, as set out in the Annex to this
resolution;
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 2
ANNEX
1 INTRODUCTION
1.1 The purpose of these Guidelines is to provide shipowners and operators with general
guidance on the development of ship specific procedures for conducting ballast water exchange.
Whenever possible ship owner and operators should enlist the assistance of classification
societies or qualified marine surveyors in tailoring ballast exchange practices for various
conditions of weather, cargo and stability. The application of processes and procedures
concerning ballast water management are at the core of the solution to prevent, minimize and
ultimately eliminate the introduction of harmful aquatic organisms and pathogens. Ballast water
exchange offers a means, when used in conjunction with good ballast water management
practices, to assist in achieving this solution.
1.2 Ballast water exchange introduces a number of safety issues, which affect both the ship
and its crew. These Guidelines are intended to provide guidance on the safety and operational
aspects of ballast water exchange at sea.
1.3 Given that there are different types of ships, which may be required to undertake ballast
water exchange at sea, it is impractical to provide specific guidelines for each ship type.
Shipowners are cautioned that they should consider the many variables that apply to their ships.
Some of these variables include type and size of ship, ballast tank configurations and associated
pumping systems, trading routes and associated weather conditions, port State requirements and
manning.
Application
1.4 The Guidelines apply to all those involved with ballast water exchange including,
shipowners and operators, designers, classification societies and shipbuilders. Operational
procedures and guidance reflecting the issues rose in these Guidelines should be reflected in the
ships ballast water management plan.
2 DEFINITIONS
2.1 For the purposes of these Guidelines, the definitions in the International Convention for
the Control and Management of Ships’ Ballast Water and Sediments (the Convention) apply and:
.1 “Ballast Water Tank” – means any tank, hold, or space used for the carriage of
ballast water.
3 RESPONSIBILITIES
Germanischer Lloyd Ref.-No. 12-136584 .
3.1 Shipowners and operators should ensure, prior to undertaking ballast water exchange, that
all the safety aspects associated with the ballast water exchange method or methods used onboard
have been considered and that suitably trained personnel are onboard. A review of the safety
aspects, the suitability of the exchange methods being used and the aspects of crew training
should be undertaken at regular intervals.
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 3
3.2 The Ballast Water Management Plan is to include the duties of key shipboard control
personnel undertaking ballast water exchange at sea. Such personnel should be fully conversant
with the safety aspects of ballast water exchange and in particular the method of exchange used
on board their ship and the particular safety aspects associated with the method used.
3.3 In accordance with Regulation B-4.4 of the Convention if the master reasonably decides
that to perform ballast water exchange would threaten the safety or stability of the ship, its crew
or its passengers, because of adverse weather, the ship’s design, stress, equipment failure, or any
other extraordinary condition a ship shall not be required to comply with Regulations B-4.1
and B-4.2.
.1 When a ship does not undertake ballast water exchange for the reasons stated in
paragraph above, the reasons shall be entered in the Ballast Water Record Book.
.2 The port or coastal State concerned may require that the discharge of ballast water
must be in accordance with procedures determined by them taking into account
the Guidelines for additional measures including emergency situations (G13).
4.1 Exchange of ballast water in deep ocean areas or open seas offers a means of limiting the
probability that harmful aquatic organisms and pathogens be transferred in ships ballast water.
.1 ships performing ballast water exchange in accordance with this regulation shall
do so with an efficiency of at least 95 per cent volumetric exchange of ballast
water; and
4.3 There are three methods of Ballast Water exchange which have been evaluated and
accepted by the Organization. The three methods are the sequential method, the flow-through
method and the dilution method. The flow-through method and the dilution method are
considered as “pump through” methods.
Sequential method – a process by which a ballast tank intended for the carriage of
ballast water is first emptiedGermanischer
and then refilled with
Lloyd 12-136584 .
replacement ballast water
Ref.-No. to achieve at
least a 95 per cent volumetric exchange.
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 4
Dilution method – a process by which replacement ballast water is filled through the top
of the ballast tank intended for the carriage of ballast water with simultaneous discharge
from the bottom at the same flow rate and maintaining a constant level in the tank through
out the ballast exchange operation.
5.1 Three methods of carrying out ballast water exchange at sea have been identified as
acceptable by the Organization. Each has particular safety aspects associated with it that should
be considered when selecting the method(s) to be used on a particular ship.
5.2 When identifying the ballast water exchange method(s) for the first time for a particular
ship, an evaluation should be made which should include:
.1 the safety margins for stability and strength contained in allowable seagoing
conditions, as specified in the approved trim and stability booklet and the loading
manual relevant to individual types of ships. Account should also be taken of the
loading conditions and the envisaged ballast water exchange method or methods
to be used;
.2 the ballast pumping and piping system taking account of the number of ballast
pumps and their capacities, size and arrangements of ballast water tanks; and
.3 the availability and capacity of tank vents and overflow arrangements, for the flow
through method, the availability and capacity of tank overflow points, prevention
of under and over pressurization of the ballast tanks.
.1 stability which is to be maintained at all times and not less than those values
recommended by the Organization or required by the Administration;
.2 longitudinal stress, and where applicable torsional stress values, not to exceed
permitted values with regard to prevailing sea conditions;
.6 forward and aft draughts and trim, with particular reference to bridge visibility,
slamming, propeller immersion and minimum forward draft; and
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 5
5.4 Having undertaken an evaluation for a particular ship and the exchange method or
methods to be used, the ship should be provided with procedures, advice and information
appropriate to the exchange method(s) identified and ship type in the Ballast Water
Management Plan. The procedures, advice, and information in the Ballast Water Management
Plan, may include but is not limited to the following:
.2 free surface effects on stability and sloshing loads in tanks that may be slack at
any one time;
.5 torsional forces;
.6 forward and aft draughts and trim, with particular reference to bridge visibility,
propeller immersion and minimum forward draft;
.14 contingency procedures for situations which may affect ballast water exchange at
sea, including deteriorating weather conditions, pump failure and loss of power;
.16 continual monitoring of the ballast water operation; monitoring should include
pumps, levels in tanks, line and pump pressures, stability and stresses;
.17 a list of circumstances in which ballast water exchange should not be undertaken.
These circumstances may result from critical situations of an exceptional nature or
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 6
.18 ballast water exchange at sea should be avoided in freezing weather conditions.
However, when it is deemed absolutely necessary, particular attention should be
paid to the hazards associated with the freezing of overboard discharge
arrangements, air pipes, ballast system valves together with their means of control,
and the build up of ice on deck; and
.19 personnel safety, including precautions which may be required when personnel
are required to work on deck at night, in heavy weather, when ballast water
overflows the deck, and in freezing conditions. These concerns may be related to
the risks to the personnel of falling and injury, due to the slippery wet surface of
the deck plate, when water is overflowing on deck, and to the direct contact with
the ballast water, in terms of occupational health and safety.
5.5 During ballast water exchange sequences there may be times when, for a transitory
period, one or more of the following criteria cannot be fully met or are found to be difficult to
maintain:
5.6 As the choice of acceptable ballast water exchange sequences is limited for most ships, it
is not always practicable to dismiss from consideration those sequences where transitory non-
compliance may occur. The practical alternative would be to accept such sequences provided an
appropriate note is placed in the Ballast Water Management Plan to alert the ship’s master. The
note would advise the master of the nature of the transitory non-compliance, that additional
planning may be required and that adequate precautions need to be taken when using such
sequences.
5.7 In planning a ballast water exchange operation that includes sequences which involve
periods when the criteria for propeller immersion, minimum draft and / or trim and bridge
visibility cannot be met, the Master should assess:
.1 the duration(s) and time(s) during the operation that any of the criteria will not be
met;
.2 the effect(s) on the navigational and manoeuvring capabilities of the ship; and
5.8 A decision to proceed with the operation should only be taken when it is anticipated that:
I:\MEPC\53\24-ADD-1.DOC
MEPC 53/24/Add.1
ANNEX 2
Page 7
.4 the manoeuvrability of the vessel will not be unduly impaired by the draft and trim
and or propeller immersion during the transitory period; and
.5 the general weather and sea state conditions will be suitable and unlikely to
deteriorate.
5.9 On oil tankers, segregated ballast and clean ballast may be discharged below the water
line at sea by pumps if the ballast water exchange is performed under the provisions of
Regulation D-1.1 of the International Convention for the Control and Management of Ships’
Ballast Water and Sediments, provided that the surface of the ballast water has been examined
either visually or by other means immediately before the discharge to ensure that no
contamination with oil has taken place.
6.1 Appropriate training for ships’ masters and crews should include instructions on the
safety issues associated with ballast water exchange based upon the information contained in
these Guidelines. Instruction should be provided on the ships’ Ballast Water Management Plan
including the completion of required records.
6.2 Ships’ officers and crew engaged in ballast water exchange at sea should be trained in and
be familiar with the following as appropriate:
.1 the ship’s ballast pumping and piping arrangements, positions of associated air
and sounding pipes, positions of all compartment and tank suctions and pipelines
connecting them to ship's ballast pumps and, in the case of use of the flow through
method of ballast water exchange, the openings used for release of water from the
top of the tank together with overboard discharge arrangements;
.2 the method of ensuring that sounding pipes are clear, and that air pipes and their
non-return devices are in good order;
.3 the different times required to undertake the various ballast water exchange
operations including the time to complete individual tanks;
.4 the method(s) in use for ballast water exchange at sea if applicable with particular
reference to required safety precautions; and
7.1 These Guidelines may be revised and updated in the light of possible technical evolutions
with the ballast water exchange methods and of new ballast water management options.
***
I:\MEPC\53\24-ADD-1.DOC
ANNEX 5: TANK ARRANGEMENT
CLASS : GL
REV. : -
DATE : 2012.05.31
BUSAN OFFICE
[600-755] 3F, Hanjin Shipping bldg, 79-9, Jungang-Dong 4Ga, Jung-gu, Busan, KOREA
Tel. +82-51-603-3500(Rep) Fax. +82-51-603-3535
Project Name. : CARISBROOKE999/1000
PLAN HISTOY
REV. DATE DESCRIPTION REMARK
A 12.05.21 DELETED PIPE LINE AND VALVE WITH THE YARD COMMENT
DRAWING LIST
GENERAL
1. Power Distributor Equipment (PDE 24)
Power Meta of PDE consists of RCM (Rectifier Control Module) and provides 220V/440V power to
ECS components and it monitors the state of power supply in real-time. HMI (Human Machine
Interface) receives signal from RCM and it controls electric both current and voltage and it also can
be controlled by PRU (Power Rectifier Unit).
2. Control PC (CPC)
CPC is operated by HMI (Human Machine Interface) software and it is designed to control master
both automatically and manually. CPC is usually installed at Cargo Control Room and on the front
of PDE. However, CPC installed at PDE can only be used when Master CPC is out of order.
ANU is the equipment for neutralizing TRO density, which remains at ballast water during discharge.
ANU automatically control neutralizing agent volume and discharge the agent into pipe line. ANU
receives power and communication line by PDE.
Project No. : NCNFN00601-0174
GENERAL
7. TRO Sensor Unit (TSU)
TSU based on checked TRO (Total Residual Oxidant) figure controls adequate amount of electricity
during ballasting and adjust injection amount of neutral agent during deballasting.
TSU is automatically operated with HMI. Manual operation of TSU is possible even though.
TSU is under disorder by receiving approval of power and communication line from PDE.
GENERAL
1. Specification
Division Specification
Hull no. YZJ2011-999/1000
Type 10,000 DWT General Cargo
Rule and Regulation IMO Ballast Water Management
Ship builder Yangzijiang S/Y
Class GL
GENERAL
3. Dimension of ECS
Dimension
Unit Total
(Unit : mm) Q'ty
ITEM Weight Weight
(Sets)
W D H (kg) (kg)
Flow Meter Unit (DIN 250A PN10) 450 396 611 55 2 110
TOTAL 1,476
Scope of supply
1. Scope of supply
Q'ty Maker Shipyard
Item Component
(Sets) supply supply
J Spare parts 1 O
L ECS manual 1 O
N Transformer (380V-440V) 1 O
Scope of supply
2. Install Cable
Wiring Item Function Spec Scope Note
equipments)
3) Do not subject the items to electric shock during transportation. PDE is electrical equipment
and if shocked, abnormality to PDE can be taken place.
4) All cables are yard's supply however, cable wiring for internal skid module is maker' working
scope
Germanischer Lloyd Ref.-No. 12-136584 .
Germanischer Lloyd Ref.-No. 12-136584 .
Germanischer Lloyd Ref.-No. 12-136584 .
Project No. : NCNFN00601-0174
□ Control PC(CPC)
1. General Specification
Dimension : 383mm x 507mm x 120mm (WxDxH)
Weight : 21kg
Operating System : Window XP
Input Voltage : AC220V
Component : Load display(Touch screen), RJ-45 port, Terminal block
Cable Entrance : Bottom
Install Type Wall Mounting
2. Install Cable
Wiring Item Function Spec Scope Note
2. Install Cable
Wiring Item Function Spec Scope Note
Communication
Signal MPYCS-2(4~20mA) Yard To PDE 24
Cable
1. General Specification
Dimension : 94mm x 121mm x 186mm (WxDxH)
Weight : 3kg
Cable : 2X Pg 13.5
Materials Housing: PBT , Sensor: PP-GF-30
Power Consumption : 5W
Power Supply : 24 VDC
Output Signal : 4~20mA
Measured Value Display : LC Display, One line
2. Install Cable
Wiring Item Function Spec Scope Note
Communication
Main Control MPYCS-2 (4~20mA) Yard To PDE 24
Cable
1. General Specification
Division Specification
Dimension 1840mm x 663mm x 800mm (WxDxH)
Weight 680kg
Treatment Capacity Rate 300
600 ㎥/h
Input / Output Connection JIS 10K 250A Flange type / Drain port 5K 15A
Input power AC 440V 3P
PRU Cooling water
Tube Fitting(Bite type), Ø12 O.D
Inlet / Outlet
Inlet pressure : MIN 1.5bar / MAX 5bar
Flow rate volume : Under 0.47 ㎥/h (per PRU 1ea)
PRU Cooling water Condition
Inlet Flow temperature : Max. 40℃
Pressure Drop : 0.5 Bar (per PRU 1ea)
Component EM(4ea), PRU(4ea), ECU(1ea)
2. Install Cable
Communication
Main Control MPYCS-7 Yard To PDE 24
Cable
Weight : 220kg
Main component : Tank, PLC Control Chassis, Pump, Agitator, Level sensor,
Solenoid valve, SMPS, Tower lamp, Display panel
Water input : Fresh water, 0.5~3bar
2. Install Cable
Wiring Item Function Spec Scope Note
Communication
Main Control TTYCS-1(RS-485) Maker From PDE 24
Cable
2. Install Cable
Wiring Item Function Spec Scope Note
1. General Specification
Dimension : 106mm x 157mm x 290mm (WxDxH)
Weight : 2kg
Electrical Connection G(PF) 1/2", Cable Gland
Excitation : 11~28VDC
Output : 4~20mA(2Wire)
Power Supply : 24 VDC
Process Connection : R(PT) 1/2"
Display : ±1999(3 1/2) Digit LCD
2. Install Cable
Wiring Item Function Spec Scope Note
Communication Main Power &
MPYCS-2 (4~20mA&DC24V) Yard From PDE 24
Cable Control
PDE/PCU Relay
YM2LD EA 4
DC24V
PDE/PCU Relay
YM2-L EA 2
AC220V
1 Spare Parts
FR14AM50V50
PRU Fuse Germanischer
(50A/500V) Lloyd Ref.-No. 12-136584
EA 3 .
P12PSDG
PRU LAMP EA 1
(Green)
page 1/2
Standard Spare Part List
No PART ITEM SPEC. Picture Unit EPU V0.1 Remark
P12PSDR
PRU LAMP EA 2
(Red)
consumerble
2 Sodium Thiosulfate 25Kg. EA 12
part Germanischer Lloyd Ref.-No. 12-136584 .
Purified water 1L EA 6
page 2/2
Germanischer Lloyd Ref.-No. 12-136584 .