Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ASIGNATURA: TOPOGRAFÍA
TARMA - PERU
2019
2
ÍNDICE
INTRODUCCION ............................................................................................................................................................. 3
DE CAMPO: ...................................................................................................................................................................... 7
PERFIL LONGITUDINAL........................................................................................................................................... 21
CONCLUSIONES ........................................................................................................................................................... 26
RECOMENDACIONES ................................................................................................................................................. 27
PANEL DE FOTOS......................................................................................................................................................... 28
Topografía Grupo N° 1
3
INTRODUCCION
Topografía Grupo N° 1
4
OBJETIVOS
OBJETIVOS GENERALES
OBJETIVOS ESPECIFICOS
Determinar mediante el perfil longitudinal la rasante que pasa por dos puntos
obligados, correspondientes a la estación inicial 0+000 y la estación final
0+020.
Topografía Grupo N° 1
5
MARCO TEORICO
IMPORTANCIA DE LA PRACTRICA
Esta práctica de campo sirve como referencia para el conocimiento de las diversas
aplicaciones de los procesos altimétricos; uno de ellos y de gran importancia para la
ingeniería civil; la “Nivelación”, término genérico que se aplica a cualquiera de los diversos
procedimientos a través de los cuales se determinan elevaciones o diferencias de nivel entre
puntos, cuyos resultados se utilizan en proyectos de carreteras, vías férreas, canales, obras
de drenaje y sistemas de suministro de agua cuyas pendientes se adapten en forma óptima a
la topografía existente; en el trazo de construcciones de acuerdo con elevaciones planeadas,
en el cálculo de volúmenes de terracerías y otros materiales, etc.
Además de lo citado anteriormente, la aplicación de esta práctica de campo sirve para los
trabajos de terracería presente en los proyectos de construcción.
Topografía Grupo N° 1
6
Topografía Grupo N° 1
7
El docente de practica identifico los puntos en el cual debíamos realizar la nivelación ya sea
“S.T y P.L.
NIVELACIÓN COMPUESTA
Una vez colocado el BM (BENCH MARK) se llegó a identificar cada
punto, obteniendo longitudes previamente detallado en la libreta
topográfica.
Se realizo la medición de puntos longitudinales y previamente los
puntos transversales siendo perpendiculares a la longitudinal.
Al cabo del término de la medición, se realizó el visamiento de los puntos
siguiendo un orden en el cual se detalla en lo siguiente:
El integrante VELARDE BONELLI, JOSE realizo las anotaciones en la
Topografía Grupo N° 1
8
Topografía Grupo N° 1
9
Topografía Grupo N° 1
10
RECONOCIMIENTO Y EJECUCION
Topografía Grupo N° 1
11
TABLA DE DATOS
Rumbo S116˚00'00"O
BM 3060
TABLA N° 1
DATOS OBTENIDOS EN EL CAMPO
Topografía Grupo N° 1
12
COMPENSACIÓN DE LIBRETA
2 TOPOGRÁFICA
TABLA N°2
COMPENSACION DE LIBRETA
𝐸𝑚𝑎𝑥 =error maximo.
TOPOGRAFICA
𝑑(𝑘) = distancia en kilometros.
CALCULAR EL ERROR TOLERABLE ±0.02 =tolerancia en un
MÁXIMO kilómetro.
𝐸𝑚𝑎𝑥 = ±0.02√𝑑(𝑘)
TABLA N°3
ERROR MAXIMO
COMPROBANDO ERROR DE
3 CIERRE
Topografía Grupo N° 1
13
ai Ec dt Ci
0.004 145.41 2.7508E-05
5 COMPENSACIÓN DE COTAS
A 3060.000 3060.000
1 3059.764 5.00 0.000 3059.764
2 3059.643 10.00 0.000 3059.643
B 3059.649 10.20 0.000 3059.649
3 3059.518 15.00 0.000 3059.518 TABLA N°5
COMPENSACION
4 3059.145 20.00 0.001 3059.144
C 3059.136 21.27 0.001 3059.135
5 3059.019 25.00 0.001 3059.018
6 3058.884 30.00 0.001 3058.883
COMPENSADO
D 3058.884 31.10 0.001 3058.883
7 3058.848 35.00 0.001 3058.847
E 3058.773 40.00 0.001 3058.772
8 3058.784 45.00 0.001 3058.783
9 3058.673 50.00 0.001 3058.672
10 3058.551 55.00 0.002 3058.549
11 3058.551 60.00 0.002 3058.549
F 3058.200 64.00 0.002 3058.198
12 3058.207 65.00 0.002 3058.205
13 3057.973 70.00 0.002 3057.971
G 3057.968 70.41 0.002 3057.966
A 3060.004 145.41 0.004 3060.000
TABLA N°6
COMPENSACION DE COTAS
Topografía Grupo N° 1
14
6 SECCIÓN TRANSVERSAL
NIVELACIÓN DE SECCIÓN TRANSVERSAL
DISTANCIA DISTANCIA
PUNTO DERECHA IZQUIERDA NIVELACIÓN COTA
(m) (m)
A 0.947 3060.000
1 5 0.687 3060.260
2 10 0.687 3060.260
3 -5 0.939 3060.008
4 -10 0.960 3059.987
5 1.830 3059.764
6 5 0.941 3060.006
7 10 0.941 3060.006
8 -5 1.173 3059.774
9 -10 1.159 3059.788
10 1.304 3059.649
11 5 1.399 3059.548
12 10 1.482 3059.465
13 -5 1.291 3059.656
14 -10 1.281 3059.666
15 1.429 3059.518
16 5 1.635 3059.312
17 10 1.634 3059.313
18 -5 1.479 3059.468
19 -10 1.438 3059.509
20 1.802 3059.144
TABLA N°7
SECCION TRANSVERSAL
Topografía Grupo N° 1
15
20 1.802 3059.144
21 5 1.749 3059.198
22 10 1.822 3059.125
23 -5 1.598 3059.349
24 -10 1.567 3059.380
25 1.928 3059.018
26 5 1.972 3058.975
27 10 2.081 3058.866
28 -5 1.728 3059.219
29 -10 1.558 3059.389
30 2.063 3058.883
31 5 2.081 3058.866
32 10 2.172 3058.775
33 -5 1.885 3059.062
34 -10 1.597 3059.350
35 1.587 3058.847
36 5 1.727 3058.708
37 10 1.815 3058.620
38 -5 1.317 3059.118
39 -10 1.380 3059.055
40 1.651 3058.772
41 5 1.732 3058.703
42 10 1.945 3058.490
43 -5 1.492 3058.943
44 -10 1.395 3059.040
45 1.762 3058.783
46 5 1.893 3058.542
47 10 1.952 3058.483
48 -5 1.605 3058.830
49 -10 1.553 3058.882
50 1.883 3058.672
TABLA N°8
CONTINUACION DE SECCION TRANSVERSAL
Topografía Grupo N° 1
16
50 1.883 3058.672
51 5 2.020 3058.415
52 10 2.279 3058.156
53 -5 1.756 3058.679
54 -10 1.596 3058.839
55 1.884 3058.551
56 5 2.243 3058.549
57 10 2.375 3058.060
58 -5 1.826 3058.609
59 -10 1.676 3058.759
60 2.228 3058.549
61 5 2.462 3057.973
62 10 2.480 3057.955
63 -5 2.011 3058.424
64 -10 1.776 3058.659
65 2.462 3058.205
66 5 2.535 3057.900
67 10 2.510 3057.925
68 -5 2.379 3058.056
69 -10 2.299 3058.136
70 2.467 3057.971
71 5 2.587 3057.848
72 10 2.379 3058.056
73 -5 2.300 3058.135
TABLA N°9
CONTINUACION DE SECCION TRANSVERSAL
Topografía Grupo N° 1
17
DISTANCIA DISTANCIA
PUNTO DERECHA IZQUIERDA NIVELACIÓN COTA
(m) (m)
A 0.947 3060.000
1 5 0.687 3060.260
2 10 0.687 3060.260
3 -5 0.939 3060.008
4 -10 0.96 3059.987
TABLA N°10
SECCION TRANSVERSAL K0-00
DISTANCIA DISTANCIA
PUNTO DERECHA IZQUIERDA NIVELACIÓN COTA
(m) (m)
20 1.802 3059.144
21 5 1.749 3059.198
22 10 1.822 3059.125
23 -5 1.598 3059.349
24 -10 1.567 3059.380
TABLA N°11
SECCION TRANSVERSAL K0-20
Topografía Grupo N° 1
18
DISTANCIA DISTANCIA
PUNTO DERECHA IZQUIERDA NIVELACIÓN COTA
(m) (m)
40 1.651 3058.772
41 5 1.732 3058.703
42 10 1.945 3058.490
43 -5 1.492 3058.943
44 -10 1.395 3059.040
TABLA N°12
SECCION TRANSVERSAL K0-40
DISTANCIA DISTANCIA
PUNTO DERECHA IZQUIERDA NIVELACIÓN COTA
(m) (m)
60 2.228 3058.549
61 5 2.462 3057.973
62 10 2.48 3057.955
63 -5 2.011 3058.424
64 -10 1.776 3058.659
TABLA N°13
SECCION TRANSVERSAL K0-60
Topografía Grupo N° 1
19
TABLA N°14
CALCULOS PERFIL LONGITUDINAL
Topografía Grupo N° 1
20
PERFIL LONGITUDINAL
22
CONCLUSIONES
Interpretación de resultados
Topografía Grupo N° 1
27
Recomendaciones
Topografía Grupo N° 1
28
PANEL DE FOTOS
NIVELACION TOPOGRAFICA
PROCEDIMIENTO:
Topografía Grupo N° 1
29