Virtual Commissioning
Simulation to Virtual Commissioning
Agenda
• DSI Overview
• Systems Analysis using Plant Simulation
• Skillet System
• Baggage Handling System
• Emulation/Virtual Commissioning
Introduction
Welcome to DSI
A full service engineering provider
Private company founded in 1983
Celebrating over 35 years of service
Focused on long term client relationships
Over 85% repeat client business
Over 275 engineering & support personnel
Strategic office locations to serve the global market place
Windsor, Ontario
Saltillo, Mexico
Introduction
Welcome to DSI
Process
• Review PLC program and identify I/O required to run Plant Simulation model
• Develop detailed model, including required field devices (proxes, photoeyes, etc.)
per design layout and I/O listing
• Set up the OPC server communication which serves as the interface between the
PLC and the Plant Simulation model
• Test the Plant Simulation model
• Verify PLC logic, HMI’s, and MES (alarms, graphics, part data, etc.)
DATA DATA
SOP
Logic Validation
can reduce the time
(On-Site Testing)
required on-site by
Project Stages Utilizing Virtual Commissioning: completing logic
Panel validation off-site
Engineering Field Install Field
Build Debug
virtually
SOP
Logic Validation
(Off-Site Testing)
Virtual Commissioning Services
Benefits
• Start-up and schedule risk mitigation
• Reduces control system development and debug time prior to installation so
development time is easier to manage
• Provides system testing in a lab environment without skilled trades required
• For maintenance personnel, provides an off-line tool for training and testing
of fault responses
• Reduced commissioning costs due to reduced systems validation time on the
plant floor
• Allows testing of complex product blends and production scenarios for