(Mu=Mu,lim)=0.133fck*b*d2 d req= 166.84 mm O.K. Mu/bd2 0.31 Pt 0.073 % (Refer table-4, SP-16) Minimum % of Steel (Cl.26.5.2.1, IS:456) 0.12 % 0.12% , Minimum % of Steel 2 Ast 300 mm /m Dia of Main Bar 12 mm Area of one bar 113.04 mm2 No.of Bar 2.65 Spacing Req 376.80 mm spacing Provided 125 mm O.K. Ast Provided 904.32 mm2/m Pt Provided 0.40 % Check for Shear: (K) for M-25 1.10 (Refer Cl.-40.2.1.1, IS 456:2000) 2 Maximum shear stress, Tcmax 3.10 n/mm (Refer table-20, IS 456:2000) 2 Nominal Shear Stress, Tv 0.10 n/mm Percentage of Tensile Reinforcement Provided 0.12 % 2 Shear Strength of M-25 concrete for given % of steel, Tc 0.29 n/mm (Refer table-19, IS 456:2000)
O.K. Check for deflection:
fs=0.58*fy*Ast req/Ast Provided 96.2 (Refer IS 456:2000-Page-38)
Modification factor 2 Required Depth 96 mm Clear cover 20 mm Over all depth provided 250 mm Effective depth provided 224 mm O.K.
Distribution Reinforcement (0.12%):
Ast 300 mm2 Diameter of Bar used, F 12 mm Area of one bar 113.04 mm2 No.of Bar 3 Spacing Req 376.8 Spacing provided 125 c/c O.K. Anchorage length: Ld=(.87fyØ/4Tbd) 583 mm (Refer IS 456:2000-Cl-26.2.1)