Enter
Enter the
the dollar
dollar amount
amount for
for each
each unit
unit of
of input.
input. IfIf the
the input
input isis already
already in
in dollars
dollars simply
simply e
item.
item.
Data
$ per unit
Period 1 Period 2 (optional)
Output 125000 125000
Days 35 4 1175.6891195
Train 1 0 15250
Boat 0 1 23500
Multifactor 56399.119182 28202.756478
A) The bote, even tho it’s more expensive at the end it ends up being cheaper because of the days it takes to arrive
B) Interest 0.94%
ts for
nts for each
each of
of the
the inputs
inputs for
for each
each period.
period.
ut isis already
put already in
in dollars
dollars simply
simply enter
enter aa 11 for
for that
that
Results
Per Unit
Sales Price $ 137.50
Raw Material $ 42.00
Proposed Solution
a
R6
P6
C6
Reliability of the system
First Step make Block 7 joining block 1 and 2
Rule 2 Rework
R7
P7
C7
Rz
Pz
Cz
1 3 5
2 4
4 5
2% 17%
$ 12.00 $ 4.00
Profit/Loss $ 94,452.50
Inital Process
Income $ 171,875 Proposed solution
Material cost $ 52,500.00
Material cost $ 52,500.00 Labor cost $ 26,108.81
Labor cost $ 24,922.50 Total Cost $ 78,608.81
Total Cost $ 77,422.50
Profit/Loss $ 93,266.19
0.1666
99.59%
0.41%
$ 4.86
oposed Solution
99.53%
0.47%
$ 20.89
(Q) Units per Day X (#)
(Q) Units per Day Y (#)
Standard time X (hour)
Standard time Y (hour)
Available time (hours/day)
Efficency
Utilization
189.2 300
8.75 53.57
20.81
30 54 This result is when we don´t count the existing Machine of each one
6.40 5.60
A) FROM/TO
A B C D E F
A 5000+10000+2000 3000
B 10000 3000 2000
C 3000 2000 5000+10000
D 5000+10000
E 3000 2000
F 3000
B) Real chart
A B C D E F
A A O
B E O U
C O U A
D A
E O U
F U
C)
A B C D E F
A E E U A X
B E O I U E
C E O O I I
D U I O A O
E A U I A X
F X E I O X
TCR
Product Route Volume
1 A-C-D-F 5000
2 B-A-C-D-F 10000
3 E-B-C-A-F 3000
4 F-A-C-B-E-F 2000
Flow(volume) Rating
>10000 (A)
<= 10000 y > 6000 ( E)
<= 6000 y > 3000 (I)
<= 3000 y > 2000 (O)
<= 2000 y > 500 (U)
<= 500 (X)