BLOWOUT PREVENTER (BOP)

FAILURE MODE EFFECT CRITICALITY ANALYSIS (FMECA) – 2


FOR
THE BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT

2650788-DFMECA-2-D2 3 Final Report 6/27/2013


2650788-DFMECA-2-D2 2 Issued for to BSEE as Draft for 4/20/2013
comments
2650788-DFMECA-2-D2 1 Issued for to IPs as Draft for 4/10/2013
comments
Report No. Revision Purpose of Revision Date

June 2013

This work was performed by American Bureau of Shipping and ABSG Consulting Inc. for the
Bureau of Safety and Environmental Enforcement (BSEE) under the terms of BSEE contract number
M11PC00027.
THIS PAGE INTENTIONALLY LEFT BLANK

ii
LIST OF CONTRIBUTORS:

ABS Consulting
Randal Montgomery
Philip Howard, PMP
James J Rooney, PMP

iii
THIS PAGE INTENTIONALLY LEFT BLANK

iv
SUMMARY
As part of the Blowout Preventer (BOP) Maintenance and Inspection for Deepwater Operations study
(Bureau of Safety and Environmental Enforcement [BSEE] contract number M11PC00027),
American Bureau of Shipping (ABS) and ABSG Consulting Inc. (ABS Consulting) performed a
Failure Mode, Effect, and Criticality Analysis (FMECA) on specific BOP subsystems and
equipment. There were three FMECAs performed with three different teams of operators, drilling
contractors and original equipment manufacturers. This is the draft report of the FMECA conducted
with Team 2 and represents the study deliverable associated with Task 6.2.2.1 as outlined in the
contract.

This report presents the objective and scope of the FMECA study, FMECA methodology, FMECA
results/worksheets and discusses major findings of the two workshops (Functional-level and
Equipment-level) that were conducted on a selected BOP and associated equipment (Class VII BOP,
6 Rams,1 Annular) that met the study’s criteria (refer to Section 1.2 Analysis Scope for more detail).

The objectives of the FMECA analysis were to (1) establish the relationship between a specific
subsystem/equipment failure and a loss of system functionality, (2) identify the critical failures by
using risk-ranking methods, and (3) align the current maintenance, inspection, and testing (MIT)
practices and their associated frequencies with each functional failure and the associated subsystem
and equipment failures.

Section 2 of the report outlines the methodology used to conduct the FMECA. The FMECA was
conducted in two phases, functional-level and equipment-level. The functional-level (top-down)
FMECA was conducted to identify the functional failures that could degrade the BOP functions. The
equipment-level (bottom-up) FMECA was conducted to identify the impact of major equipment and
component failures on the BOP performance by evaluating equipment-level failure modes,
identifying specific equipment-level causes, identifying the safeguards to prevent or detect the failure
modes, and ranking the criticality of failure modes. In addition, the equipment-level FMECA was
used to align MIT activities with equipment-level failure modes and specific equipment failures.

In preparation for the FMECA, ABS Consulting engineers identified potential functional failures and
equipment-level failure modes to help guide the analysis team. Functional- and equipment-level
FMECA sessions were held with BOP subject matter experts from the original equipment
manufacturer (OEM), drilling contractor, and operator.    ABS Consulting and ABS engineers
facilitated and documented the analysis using ABS Consulting’s Enterprise LEADER software tool.

v
The team identified the eight BOP functions in American Petroleum Institute (API) Recommended
Practices (RP) 53, Third Edition, Section 7.1.3, and one additional function prior to the FMECA
analysis to meet the above objectives. During the FMECA session, it was determined that the “shear
the drill pipe and seal the wellbore” function needed to be broken down into three functions based on
differing operating conditions. The following 11 BOP functions were considered in the functional-
level FMECA:

1. Close and seal on the drill pipe and allow circulation on demand.
2. Close and seal on open hole and allow volumetric well control operations on demand.
3. Strip the drill string using the annular BOP(s).
4. Hang-off the drill pipe on a ram BOP and control the wellbore.
5. Controlled operation – Shear the drill pipe and seal the wellbore.
6. Emergency Operation – Auto-Shear – Shear the drill pipe and seal the wellbore.
7. Emergency Operation – Emergency Disconnect System (EDS) – Shear the drill pipe and seal
the wellbore.
8. Disconnect the lower marine-riser package (LMRP)/BOP.
9. Circulate the well after drill pipe disconnect.
10. Circulate across the BOP stack to remove trapped gas.
11. Connect BOP and LMRP at landing (not included API recommended practices [RP] 53).

During the functional-level FMECA, the analysis team evaluated these 11 BOP functions and their
52 associated functional failures. Each function and its associated functional failures were evaluated
in detail by identifying (1) the potential end effects resulting from the functional failure,
(2) equipment-level causes and failure modes potentially resulting in the functional failure, and
(3) safeguards used to prevent and/or detect the potential functional failure. Appendix A presents the
Functional-level FMECA worksheets, Appendix B presents the Equipment-level FMECA
worksheets.

For the equipment-level FMECA, the analysis team and industry participants (IP) identified and
evaluated the following 3 major BOP subsystems and 21 major equipment categories:

1. Surface Control System


1.1. Hydraulic Power Unit (HPU)
1.2. Power
1.3. Multiplex (MUX) System and Communication Cables
1.4. Hydraulic Supply
1.5. Control Panels
1.6. Accumulators – Surface
1.7. Fluid Reservoir Unit
1.8. Secondary & Emergency Control Systems

vi
2. Subsea Control System
2.1. Blue and Yellow Control Systems – Electrical Section
2.2. Blue and Yellow Control Systems – Hydraulics
2.3. Accumulators
2.4. Emergency Control Systems (ECS)
2.5. Hydraulic Supply, Rigid Conduit and Manifold
3. BOP Stack
3.1. Annulars
3.2. Blind Shear Ram
3.3. Casing Shear Ram
3.4. Pipe and Test Rams
3.5. Choke and Kill Lines and Valves
3.6. Connectors
3.7. Autoshear System
3.8. Remote operated vehicle (ROV) Intervention Interface

Note:
1- For the purpose of this study the “BOP System” is the first level of indenture in the BOP hierarchy (e.g. Surface
Control System, Subsea Control System, BOP Stack) and “Major BOP Component” is considered the second level of
indenture (e.g. MUX System, Annular).
2- The above naming convention was adopted during the FMECA sessions and are used throughout this FMECA report
and may differ slightly from industry subsystem or equipment naming convention; see Table1-1 for additional
information

Boundaries were established to further define the major equipment items by identifying all of the
components included with each major equipment item.
 
During the equipment-level FMECA meetings, the analysis team evaluated each major equipment
item by first identifying potential equipment-level failure modes and then postulating on specific
equipment failure causes resulting in each failure mode. The team then identified the potential effects
resulting from each failure mode. The effects were then identified and classified into various BOP
functional failures. Based on this classification the equipment-level failure modes and BOP were
linked with a corresponding BOP functional failure. Once these links were established, the analysis
team identified any safeguards that are currently in place to detect, prevent or mitigate the failure
mode. The analysis team then identified specific MIT practices currently employed to prevent or
detect the specific equipment failure causes.

In order to establish the potential risk of each equipment level failure mode, the analysis team used a
Risk Priority Number (RPN) scoring methodology. The identified failure mode effects were ranked
according to their severity, occurrence, and detection. The RPN for each effect (functional failure)
was determined and recorded. The severity rankings were based on the worst-case end effect of each
functional failure assuming that there is no redundancy. The occurrence rankings were based on the
frequency of the failure mode occurring, giving credit for any system redundancy in the system(s).

vii
Finally, the detection rankings were based on the probability of the failure mode being detected by
current protections (e.g. alarms) and/or current MIT practices. Appendix B contains the results of the
equipment-level FMECA.

Section 3 of this report contains the analysis results. The analysis team identified and evaluated
132 functional and 144 equipment failure modes. Even though each equipment item and its mode of
failure will affect the functionality of the BOP to a certain degree, the FMECA team identified the
following equipment items as the most critical items contributing to the BOP’s potential functional
failure:

 Choke & Kill Lines & Valves


 Blind Shear Ram
 Casing Shear Ram
 Pipe & Test Rams
 Autoshear Systems
 Connectors
 Control Panels
 Blue & Yellow Control Systems - Hydraulics
 Accumulator-Subsea

Table S-1 highlights the top 15% of the equipment failures that could potentially result in a severe
impact on functionality of the BOP.

Table S-1: Failure Modes with Highest RPN


Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
Lines & Valves Plugged 10 4 4 160 4
- BOP Stack
Blind Shear External
Ram - BOP Leak/ 9 5 3 135 1
Stack Rupture
Blind Shear
Mechanical
Ram - BOP 9 5 3 135 1
Failure
Stack
Blind Shear
Ram - BOP Wear 9 5 3 135 1
Stack
Casing Shear External
Ram - BOP Leak/ 9 5 3 135 1
Stack Rupture

viii
Table S-1: Failure Modes with Highest RPN (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Casing Shear
Mechanical
Ram - BOP 9 5 3 135 1
Failure
Stack
Casing Shear
Ram - BOP Wear 9 5 3 135 1
Stack
Choke & Kill External
Lines & Valves Leak/ 9 5 3 135 1
- BOP Stack Rupture
Choke & Kill
Mechanical
Lines & Valves 9 5 3 135 1
Failure
- BOP Stack
Pipe & Test External
Rams - BOP Leak/ 9 5 3 135 1
Stack Rupture
Pipe & Test
Mechanical
Rams - BOP 9 5 3 135 1
Failure
Stack
Autoshear Mechanical
System - BOP Failure 9 2 7 126 1
Stack
Blue & Yellow Corrosion/
Control Erosion
Systems -
9 2 7 126 1
Hydraulics -
Subsea Control
Systems
Blue & Yellow Mechanical
Control Failure
Systems -
9 2 7 126 1
Hydraulics -
Subsea Control
Systems
Connectors - Mechanical
9 2 7 126 1
BOP Stack Failure
Hydraulic Corrosion/
9 2 7 126 1
Supply: Rigid Erosion

ix
Table S-1: Failure Modes with Highest RPN (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Hydraulic Mechanical
Supply: Rigid Failure
Conduit and
9 2 7 126 1
Manifold -
Subsea Control
Systems
Accumulators - External
Subsea Control Leak/ 10 2 6 120 2
Systems Rupture
Accumulators -
Internal
Subsea Control 10 2 6 120 2
Leak
Systems
Accumulators - Loss of
Subsea Control Function 10 2 6 120 2
Systems (general)
Accumulators -
Mechanical
Subsea Control 10 2 6 120 2
Failure
Systems
Accumulators -
Subsea Control Wear 10 2 6 120 2
Systems
Autoshear
Mechanical
System - BOP 10 2 6 120 2
Failure
Stack
Blind Shear External
Ram - BOP Leak/ 10 2 6 120 4
Stack Rupture
Blind Shear
Ram - BOP Wear 10 2 6 120 4
Stack
Blind Shear
Mechanical
Ram - BOP 10 2 6 120 3
Failure
Stack
Blind Shear
Corrosion/
Ram - BOP 10 2 6 120 2
Erosion
Stack

x
Table S-1: Failure Modes with Highest RPN (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blind Shear
Internal
Ram - BOP 10 2 6 120 2
Leak
Stack
Blue & Yellow
Control
Systems - Corrosion/
10 2 6 120 2
Hydraulics - Erosion
Subsea Control
Systems
Blue & Yellow
Control
External
Systems -
Leak/ 10 2 6 120 2
Hydraulics -
Rupture
Subsea Control
Systems
Blue & Yellow
Control
Systems - Internal
10 2 6 120 2
Hydraulics - Leak
Subsea Control
Systems
Blue & Yellow
Control
Systems - Mechanical
10 2 6 120 2
Hydraulics - Failure
Subsea Control
Systems
Blue & Yellow
Control
Systems -
Plugged 10 2 6 120 2
Hydraulics -
Subsea Control
Systems

The Choke & Kill Lines & Valves - BOP Stack was the highest ranked piece of equipment that could
have an effect on the BOP’s functionality and operation. The team identified 6 functional failures
that contributed to the failure of the Choke & Kill Lines & Valves - BOP Stack. The result of these
failure modes could potentially reduce or eliminate the associated equipment functionality and
possibly a loss of BOP operation.

xi
As identified above, the Blind Shear Ram is ranked as the second ranked piece of equipment whose
failure could potentially have a severe effect on the BOP’s overall ability to function properly when
demanded. Even though the occurrence of such a failure is identified as being fairly low (i.e., less
than one event every 5 years to one event every 10 years), the high severity and high detection (i.e.,
hard to detect) increase the risk of such a failure. Therefore the Blind Shear Ram is considered to be
the most critical piece of equipment that could lead to the loss of the primary function of the BOP. In
this study, “loss of primary function of the BOP” is defined as controlling the well.

The high severity rating in this case is attributed to the fact that the failure of the Blind Shear Ram
will diminish or eliminate the last protection for controlling the well (i.e. loss of primary function of
the BOP). The high detection rating is due to the low chance of discovering such a failure during
normal BOP operation. For example, mechanical failures might not be detected during normal BOP
operation and could only be discovered during a major preventive or planned maintenance. As
indicated in the above table, the Blind Shear Ram failure modes resulted in 18 functional failures that
could potentially result in the loss of BOP operation

According to the findings of this study, it appears that the highest critical failures are associated with
the detectability of these failures. A piece of equipment might function properly during a function
test or pressure test, but a hidden or dormant failure could occur because of the frequency of the test
or after the tests are conducted. Additionally, some failure modes simply cannot be detected during
normal testing and these types of failures may not be fully discovered until there is a real demand or
the equipment is pulled from the well and inspected during major preventive maintenance.

When comparing these highly ranked failure modes with the lower ranked failure modes, it is evident
that the rigorous MIT activities increase the detectability of the failures, therefore resulting in lower
criticality or RPN.

During the FMECA study, the causes of each failure mode were identified. Depending on the
equipment and the failure mode, components or other failure causes such as SEM communication,
bolts, seals, packing elements, insufficient volume, clogged lines, loss of signal, regulators, SPM
valves, shuttle valves, and filters were considered (see Appendix B for more detail). The team
identified and aligned the MIT activities for each failure mode and its causes.

The occurrence and detection rankings of the failure modes are a good indication of these facts.
After aligning the MIT activities with the failure modes, it was evident that there are sufficient
indication and detection factors in place for mitigating the failures or reducing the criticality.

xii
TABLE OF CONTENTS
Section Page
SUMMARY .......................................................................................................................................... v 
LIST OF TABLES ............................................................................................................................. xv 
LIST OF FIGURES ........................................................................................................................... xv 
1.0  INTRODUCTION.................................................................................................................... 1 
1.1  Objectives ............................................................................................................................... 1 
1.2  Analysis Scope........................................................................................................................ 1 
1.3  FMECA Team Members and Meeting Schedule.................................................................... 6 
1.4  Report Organization................................................................................................................ 7 
2.0  ANALYSIS METHODOLOGY ............................................................................................. 9 
2.1  Analysis Approach.................................................................................................................. 9 
2.2  Analysis Procedures.............................................................................................................. 11 
2.2.1  Functional Level (Top-Down) FMECA ........................................................................ 11 
2.2.2  Equipment Level (Bottom-Up) FMECA ........................................................................ 14 
2.2.3  Evaluation and Ranking of Equipment Failure Modes (Criticality/Risk Ranking) ...... 16 
3.0  FMECA RESULTS ................................................................................................................ 21 
4.0  CONCLUSIONS .................................................................................................................... 57 
Appendix A – Functional-Level FMECA Tables .......................................................................... A-1 
Appendix B – Equipment-Level FMECA Tables.......................................................................... B-1 
Appendix C – All Data Sorted By RPN.......................................................................................... C-1 

xiii
THIS PAGE INTENTIONALLY LEFT BLANK

xiv
LIST OF TABLES
Table Description Page
S-1 Failure Modes with Highest RPN .......................................................................................... viii
1-1 Equipment-Level FMECA Major Component Boundaries ....................................................... 4
1-2 IP FMECA Team Members....................................................................................................... 6
1-3 ABS and ABS Consulting FMECA Team Members ................................................................ 6
2-1 Functions and Functional Failures........................................................................................... 13
2-2 General Equipment Failure Modes .......................................................................................... 15
2-3 Severity Ratings....................................................................................................................... 17
2-4 Occurrence Ratings ................................................................................................................. 19
2-5 Detection Ratings ........................................................................................................................... 20
3-1a Failure Modes with Highest RPN – Sorted by RPN ............................................................... 21
3-1b Failure Modes with Highest RPN – Sorted by Major Component/Subsystem ....................... 25
3-2 Failure Modes with Severity ≥ 10 ........................................................................................... 29
3-3 Failure Modes with Occurrence ≥ 5 ........................................................................................ 48
3-4 Failure Modes with Detection ≥ 6 ........................................................................................... 49
3-5 Failure Modes with S = 10, O ≥ 4, and D ≤ 5 ......................................................................... 53
3-6 Functional Failures with Highest Average RPN ..................................................................... 54
3-7 Functional Failures with Greatest Occurrences Due to Equipment Failures........................... 55

LIST OF FIGURES
Figure Description Page
2-1 General FMECA Approach ..................................................................................................... 10
2-2 Functional-level FMECA Procedure ....................................................................................... 12
2-3 FMECA Bottom-up Procedures .............................................................................................. 15

xv
THIS PAGE INTENTIONALLY LEFT BLANK

xvi
LIST OF ACRONYMS

ABS — American Bureau of Shipping


ABS Consulting — ABSG Consulting Inc.
API — American Petroleum Institute
BSEE — Bureau of Safety and Environmental Enforcement
BOP — Blowout Preventer
EDS — Emergency Disconnect System
FMECA — Failure Mode, Effect, and Criticality Analysis
HPU — Hydraulic Power Unit
IP — Industry Participant
MIT — Maintenance, Inspection, and Testing
MUX — Multiplex
LMRP — Lower Marine-Riser Package
OEM — Original Equipment Manufacturer
ROV — Remote Operated Vehicle
RP — Recommended Practices
RPN — Risk Priority Number

xvii
THIS PAGE INTENTIONALLY LEFT BLANK

xviii
1.0 INTRODUCTION
As part of the Blowout Preventer (BOP) Maintenance and Inspection for Deepwater Operations study
(Bureau of Safety and Environmental Enforcement [BSEE] contract number M11PC00027),
American Bureau of Shipping (ABS) and ABSG Consulting Inc. (ABS Consulting) performed a
Failure Mode, Effect and Criticality Analysis on specific BOP subsystems and equipment. This
report represents the first draft Failure Mode, Effect, and Criticality Analysis (FMECA) deliverable
of the study associated with Task 6.2.2.1 as outlined in the contract.

Three FMECAs were performed with three different analysis teams. Each analysis team included
personnel from a BOP original equipment manufacturer (OEM), drilling contractor, and an operator,
with the condition that these three industry participants (IPs) have a working relationship and operate
a drilling rig using the BOP equipment manufactured by the OEM participating in the FMECA
sessions.

This report presents the objective and scope of the FMECA study, FMECA methodology and
worksheets and the results of the functional- and equipment-level FMECAs that were conducted on a
Class VII BOP with six rams and one annular. This section details the FMECA objectives, scope, and
analysis team participants.

1.1 OBJECTIVES
The objectives of the FMECA were to (1) establish the relationship between a specific
subsystem/equipment failure and a loss of system functionality, (2) identify the critical failures by
using risk-ranking methods, and (3) align the current maintenance, inspection, and testing (MIT)
practices and their associated frequencies with each functional failure and the associated subsystem
and equipment failures.

1.2 ANALYSIS SCOPE


The scope of this effort was the analysis of a selected BOP and associated equipment from one of the
OEMs, drilling contractors and operators participating in the study that meets the following criteria:

 Operation Location – Gulf of Mexico (majority of the operation and maintenance to be from
the Gulf of Mexico)
 Operating Depth – 5,000 Feet and Deeper
 BOP Configurations:
o Class VI BOP, five ram configuration and single annular or a four ram and dual annular
o Class VII BOP, five ram configuration and dual annular or a six ram and single annular
o Class VIII BOP, six ram configuration and dual annular(ram configurations can consist
of a combination of blind/shear ram, non-sealing casing ram and pipe ram preventers)

1
Class VI BOP Class VII BOP Class VIII BOP

The analysis included the compilation of information from IPs, followed by the review and analysis
of the selected BOP and associated control systems used by the driller.

The analytical scope for the functional-level FMECA consisted for the evaluation of the eight BOP
functions specified in American Petroleum Institute (API) recommended practices (RP) 53 Standard,
Section 7.1.3, and the additional functions identified by the analysis team. During the FMECA
session, it was determined that the “shear the drill pipe and seal the wellbore” function needed to be
broken down into three functions based on differing operating condition/logic. A total of 11 major
BOP functions and 52 functional failures were identified and agreed upon. The following BOP
functions were evaluated in this study:

1. Close and seal on the drill pipe and allow circulation on demand.
2. Close and seal on open hole and allow volumetric well control operations on demand.
3. Strip the drill string using the annular BOP(s).
4. Hang-off the drill pipe on a ram BOP and control the wellbore.
5. Controlled operation – Shear the drill pipe and seal the wellbore.
6. Emergency operation – Auto-Shear – Shear the drill pipe and seal the wellbore.
7. Emergency operation – Emergency Disconnect System (EDS) – Shear the drill pipe and seal
the wellbore.
8. Disconnect the Lower Marine-Riser Package (LMRP)/BOP.
9. Circulate the well after drill pipe disconnect.
10. Circulate across the BOP stack to remove trapped gas.
11. Connect BOP and LMRP at Landing (not included in API RP 53 Standard).

2
For the equipment-level FMECA, the BOP was divided into 3 major BOP subsystems and 21 major
equipment items. The following represents the selected functions and BOP systems/equipment for
the FMECA assessment:

1. Surface Control System


1.1. Hydraulic Power Unit
1.2. Power
1.3. Multiplex System and Communication Cables
1.4. Hydraulic Supply
1.5. Control Panels
1.6. Accumulators – Surface
1.7. Fluid Reservoir Unit
1.8. Secondary and Emergency Control System
2. Subsea Control System
2.1. Blue and Yellow Control Systems – Electrical
2.2. Blue and Yellow Control Systems – Hydraulic
2.3. Accumulators – Subsea
2.4. Emergency Control Systems (ECS)
2.5. Hydraulic Supply: Rigid Conduit and Manifold
3. BOP Stack
3.1. Annulars
3.2. Blind Shear Ram
3.3. Shear Ram (Casing)
3.4. Pipe and Test Rams
3.5. Choke and Kill Lines and Valves
3.6. Connectors
3.7. Autoshear System
3.8. Remote operated vehicle (ROV) Intervention Interface

In addition, boundaries were established for each major equipment item to identify all of the specific
components to be included with each major equipment item. Table 1-1 lists the boundaries used in
this specific analysis.

3
Table 1-1: Equipment-Level FMECA Major Component Boundaries
Specific Components Included With Major
Major Component
Component Boundary
Surface Control System
Hydraulic Power Unit (HPU) HPU including three HPU pumps and associated piping
and regulators
Power Power including Blue & Yellow Power Distribution
Panels, Power Isolation J-box; Blue & Yellow UPSs,
Blue & Yellow Subsea Transformers, and blue and
yellow distribution panels, umbilical J-box; and
connections to associated cabinets and equipment (e.g.,
MUX, control panels)
Multiplex (MUX) System MUX System, including Central Control Unit with
Communication Cables process array, blue & yellow processor array, and
associated equipment and cabinets; MUX cable reels and
MUX cables (to connections with Blue & Yellow Pods)
Hydraulic Supply Hydraulic Supply including blue & yellow hotline reels,
hotline hoses (to connection at Blue & Yellow Pods) and
rigid conduit (to connection with subsea accumulator
system)
Control Panels Control Panels including driller’s panel with system
controller and tool pusher’s panel with system controller
Accumulators – Surface Accumulators - Surface including one 300 gallon, 5K
rack; one 180 gallon 5K accumulator rack and
associated ball valve; and connectors to HPU
Fluid Reservoir Unit Fluid Reservoir Unit, including 650 gallon. glycol, 550
gallon concentrate, and 1350 gallon mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps;
and associated piping, and mixing system
Secondary & Emergency Control Secondary & Emergency Control Units with process
Systems array, blue & yellow processor array, and associated
equipment and cabinets; MUX cable reels and MUX
cables, UPS
Subsea Control System
Blue & Yellow Control Systems – Blue & Yellow Control Systems including MUX
Electrical control, MUX POD power & communication, hydraulic
connections within the pod
Blue & Yellow Control Systems – Blue & Yellow Control Systems , E/H section
Hydraulics (hydraulics, power, communication, SEM interface,
pressure, temperature, and water sensors, transformer,
pod cabling, solenoid boards, solenoids)

4
Table 1-1: Equipment-Level FMECA Major Component Boundaries (cont’d)
Specific Components Included With Major
Major Component
Component Boundary
Accumulators – Subsea Accumulators - Subsea including associated hydraulic
piping and connections such as MUX pod and rigid
conduit connections, 16x 80gallon bottles
EDS Secondary & Emergency Control Systems - Subsea
including POD angle sensor, inclinometer, acoustic, and
deadman
Hydraulic Supply, Rigid Conduit, and Lower Valve Section including regulators and SPM
Manifold valves to the shuttle valve, Rigid conduit, crossover
BOP Stack
Annulars Blowout preventer that uses a shaped elastomeric sealing
element to seal the space between the tubular and the
wellbore or an open hole, including both lower and
upper annulars and hydraulic supply
Blind Shear Ram Ram BOP whose Ram Blocks incorporate a cutting
blade to shear the pipe and sealing elements to contain
well bore pressure upon shearing of the pipe, including
hydraulic supply
Shear Ram Ram BOP whose Ram Blocks incorporate a cutting
blade to cut casing and/or heavier grade tubulars within a
specific range. They do not seal the well bore.
Pipe & Test Rams Pipe Ram: A closing and sealing component in a ram
blowout preventer that seals around the outside diameter
of a tubular in the wellbore. Test Ram: A Variable Bore
Ram located in the lower most Ram Cavity with ram
block installed in inverted position to seal pressure from
the top and enable testing of the BOP Stack without
running a Test Tool.
Choke & Kill Lines & Valves Valves and pipes assembly enabling communication to
or from the well bore to the surface C&K manifold to
circulate well, control kicks or kill well. Choke & Kill
Lines & Valves on both LMRP & Stack.
Connectors Connectors at Wellhead and LMRP/BOP Stack and
Hydraulic Actuators
Autoshear System Autoshear trigger valve, SPM valve
ROV Intervention Interface Shuttle valve, piping

5
1.3 FMECA TEAM MEMBERS AND MEETING SCHEDULE
The analysis team for this study included personnel from three IPs, ABS, and ABS Consulting. The
IPs participating included one or more representatives from an OEM, drilling contractor, and
operator. These individuals provided knowledge of the design, engineering, operation, and
maintenance of the BOP being evaluated. Table 1-2 lists the functional positions for the IP personnel
who participated in this study.

Table 1-2: IP FMECA Team Members


IP Organization Position/Expertise
BOP OEM Engineering Manager, Drilling Products
Manager, Reliability Engineering/Drilling and Production
Electrical Engineering Manager, Drilling and Production
Sub Section Manager, Stacks, Mechanical Controls and
Risers
Drilling Contractor Director, Subsea Operation Manager
Operator Well Technology

In addition to the IP representatives, personnel from ABS and ABS Consulting participated in the
FMECA sessions. Specifically, ABS personnel provided knowledge of the overall BOP operations
and class society and regulatory requirements applicable to BOP design and operation.
ABS Consulting personnel facilitated and documented the FMECA study. Table 1-3 lists the ABS
and ABS Consulting personnel participating in this study.

Table 1-3: ABS and ABS Consulting FMECA Team Members


Name Organization Title Study Role
David Cherbonnier ABS Staff Consultant, Subsea Engineer
Corporate Offshore
Technology
Randy Montgomery ABS Consulting Senior Director, Integrity Project Technical
Management Lead
Farzin Nouri ABS Consulting Senior Risk and Reliability Workshop Facilitator
Engineer
Philip Howard ABS Consulting Lead Engineer Workshop Scribe

To prepare for the FMECA studies, ABS and ABS Consulting held a FMECA kickoff meeting with
the IPs on December 6 and 7, 2011. The purposes of the kickoff meeting were to discuss the FMECA
analysis approach and the analysis scope to help ensure that all participants have the same level of
understanding of the FMECA procedures.
The functional-level FMECA study was conducted by the analysis team during sessions held on
September 18 through 20, 2012. During this meeting, the analysis team members were provided an
introduction to FMECA methodology and procedures and then performed the functional-level
FMECA. The equipment-level FMECA was conducted during sessions held on October 1 through 5,
2012.

6
1.4 REPORT ORGANIZATION
Section 2 of this report provides an overview of the methodology used to analyze the BOP’s selected
functions and equipment to determine the critical failure modes and their effects. Section 3 discusses
the results of the effort. Appendix A contains the functional-level FMECA worksheets and
Appendix B contains the equipment-level FMECA worksheets.

7
THIS PAGE INTENTIONALLY LEFT BLANK

8
2.0 ANALYSIS METHODOLOGY
In order to evaluate BOP MIT practices, reduce the risk of failures and improve the reliability of
BOP performance, it is essential to identify the BOP’s critical failure modes and their effects.
Therefore, ABS and ABS Consulting selected and employed both functional- and equipment-level
FMECA methodologies to evaluate BOP functions and identify specific subsystem and equipment
failures of interest as outlined in Section 1.2, Analysis Scope.

This analysis methodology was chosen because it provided a means to establish a relationship among
(1) BOP functions, (2) BOP equipment failures, and (3) BOP MIT practices by

 Identifying the potential effects resulting from deviations to BOP functions (i.e., functional
failures) and equipment-level failure modes causing the BOP functional failures.
 Identifying the potential functional failures resulting from BOP equipment failure modes and
specific equipment failures causing the BOP equipment failure modes.
 Linking specific equipment failures to BOP functional failures.
 Identifying and aligning the MIT activities (Indication / Protection / Maintenance) currently
provided for preventing specific equipment failures resulting in BOP functional failures and
their potential end effects.
 Risk-ranking the equipment-level failure modes.

2.1 ANALYSIS APPROACH


FMECA is an inductive reasoning approach that (1) considers how the functional failures of each
system function or the failure modes of each component could result in system performance
problems and (2) helps evaluate safeguards that are in place (including engineered protections &
monitoring systems, human actions, and maintenance activities) to prevent, detect or mitigate such
problems. The main focus of a FMECA is to establish the cause-and-effect relationship between
potential equipment failures, functional failures, and the end effect of those failures, and to evaluate
the criticality of the postulated functional failure/failure mode.

Figure 2-1 represents the general FMECA steps used in evaluating the BOP system. Specifically, this
study employed both functional- and equipment-level FMECA approaches (see Step 3) with the
explicit purpose of transitioning the functional-level FMECA to a more detailed level to better ensure
the alignment of MIT activities with specific equipment failures and link the specific equipment
failures with their potential impact of BOP performance via functional failures. This FMECA
approach is very similar to the approach employed in many classical reliability-centered maintenance
approaches, which have the overall objective of determining the optimal maintenance strategy for
preserving system functionality via detection and prevention of equipment failures.

9
Figure 2-1. General FMECA Approach

10
2.2 ANALYSIS PROCEDURES
This section summarizes the procedures and specific tools used in performing the functional- and
equipment-level FMECAs. In addition, the risk priority number approach that was used to risk rank
the functional failure effects and equipment failure mode pairs has been provided. More explanation
on the ranking method is given in Section 2.2.3.

2.2.1 Functional Level (Top-Down) FMECA


The functional-level FMECA was performed by analyzing each function and its associated functional
failures. The functional-level FMECA process is illustrated in Figure 2-2. In executing this
procedure, the following operating modes were applied:

 Normal Drilling
 Kick Control
 Emergency Operation (e.g., disconnect)
 Riding the Storm

In addition, the following are consequences of interest for identifying end effects of interest during
the functional-level FMECA:

 Safety Effects
o Inability to Control or Correct a Well Kick (or other BOP function)
o Potential Release of Hydrocarbon to the Atmosphere Resulting in Potential Fire,
Explosion, and/or Exposure to Toxic Materials Causing Injury or Worse
 Environmental Effects
o Inability to Control or Correct a Well Kick (or other BOP function)
o Potential Release of Hydrocarbons to the environment resulting in a Minor, Significant,
Small (<1,000 bbls), Medium (1,000 to 10,000 bbl.), or Large (>10,000 bbl.)
Spill/Atmospheric Release
 Significant Downtime
o Failures Requiring Pulling of the LMRP or BOP Stack
o Downtime Exceeding 5 Days

In evaluating potential end effects, the team evaluated the severities based on worst-case end effects
assuming that available safeguards do not prevent or mitigate the end effects. Therefore, the end
effects represent the potential severity and conservatively overstate the expected consequences.

11
Figure 2-2. Functional-level FMECA Procedure

Specifically during the functional-level FMECA, the analysis team evaluated 11 BOP functions and
48 associated functional failures. Table 2-1 list the functions and functional failures evaluated.

During the functional-level FMECA workshop, the analysis team evaluated each of the
above-mentioned functions and functional failures in detail by identifying (1) the potential end
effects resulting from the functional failures, (2) the equipment-level causes and failure modes
resulting in each potential functional failure, and (3) the safeguards used to prevent or detect the
potential functional failure and its associated equipment-level causes. These evaluations were
recorded in tabular format using the Enterprise LEADER software. The equipment-level causes and
failure modes were then studied in detail during the equipment-level FMECA workshop.

12
Table 2-1: Functions and Functional Failures
No. Function Functional Failure Modes
1 Close and seal on the drill pipe and allow Failure to close on drill pipe through annular(s)
circulation on demand Failure to close on drill pipe through pipe rams
Failure to seal or partial seal on drill pipe
through annular(s)
Failure to seal or partial seal on drill pipe
through pipe rams
Unintentional closing / opening
Failure to open/close fail-safe valves to seal
Closes too slowly
Loss of containment
2 Close and seal on open hole and allow Failure to close on open hole through blind-
volumetric well control operations on shear rams or annular
demand Unintentional closing / opening
Failure to open/close fail-safe valves
Closes too slowly
Loss of containment
3 Strip the drill string using the annular Failure to close annulars
BOP(s) Failure to maintain stripping pressure
Failure to seal
4 Hang-off the drill pipe on a ram BOP Failure of hang-off ram to close
and control the wellbore Failure to maintain closing pressure
Failure to maintain locking
5 Controlled Operation-Shear the drill pipe Failure to close
and seal the wellbore Failure to shear the drill pipe
Failure to seal the wellbore
Unintentional closing / opening
Closes too slowly
Loss of containment
6 Emergency Operation-Auto shear- Shear Failure to arm
the drill pipe and seal the wellbore Failure to close
Failure to shear the drill pipe
Failure to seal the wellbore
Unintentional closing / opening
Closes too slowly
Loss of containment
7 Emergency Operation: EDS - Disconnect Failure to receive EDS signal
from the stack Failure to disconnect the LMRP
Unintentional disconnect from riser
8 Controlled Operation - Disconnect the Failure to disconnect the LMRP
LMRP from the Lower BOP stack Unintentional disconnect of the LMRP

13
Table 2-1: Functions and Functional Failures (cont’d)
No. Function Functional Failure Modes
9 Circulate the well after drill pipe Failure to circulate
disconnect Failure to circulate at desired flow rate
Failure to open/close fail-safe valves
Failure to seal wellbore after drill pipe
disconnect
Loss of containment
10 Circulate across the BOP stack to Failure to circulate
remove trapped gas Failure to circulate at desired flow rate
Failure to open/close fail-safe valves to seal
Loss of containment
11 Connect BOP and LMRP at landing Inadequate BOP connection
Inadequate LMRP connection

2.2.2 Equipment Level (Bottom-Up) FMECA


The equipment-level FMECA was performed by analyzing each major component with its associated
sub-components using equipment-level failure modes. Figure 2-3 outlines the equipment-level
FMECA process.

The analysis team evaluated the 20 major equipment items and their associated sub-components
listed in Table 1-1.

To evaluate each equipment item, a list of the general failure modes was developed during the
FMECA kick-off meeting and is provided in Table 2-2. During the equipment-level FMECA, the
analysis team modified these general equipment failure modes to describe the means in which each
major component can fail.

14
Figure 2-3. FMECA Bottom-up Procedures

Table 2-2: General Equipment Failure Modes


Mechanical Failures Electrical/Electronic Failure
External leak/rupture Loss of, or degraded power
Internal leak Fails with no output signal/no
communication
Plugged Fails with low or high output signal
Mechanical failure (e.g., fracture, galling, fatigue) Erratic output
Corrosion/erosion Fails to respond to input
Wear/mechanical damage Processing error (e.g., calculation error,
sequence error)
Loss of function (general) Short
Loss of hydraulic power Loss of function (general)

15
Once a major component’s failure modes were identified, the analysis team evaluated each
equipment-level failure mode by:

1. Postulating on specific equipment causes resulting in the failure mode and


2. Then identifying the potential effects resulting from each failure mode.

The equipment-level effects were identified as BOP functional failures and then electronically linked
in Enterprise LEADER to establish the relationship between specific equipment-level failure modes
and BOP functions. Once these links were established, the analysis team identified any safeguards
that are currently in place to prevent or detect or mitigate the failure mode before the end effects
associated with the BOP functional failure are realized. Next, the analysis team identified specific
MIT practices currently employed to prevent or detect the specific equipment causes. These
evaluations, along with criticality rankings described below, were recorded in tabular format using
the Enterprise LEADER software.

2.2.3 Evaluation and Ranking of Equipment Failure Modes (Criticality/Risk Ranking)


To provide a consistent means to evaluate the relative criticality of BOP subsystem/component
failures and to help judge the sufficiency of MIT activities performed to prevent and detect the
failures, a risk priority number ranking scheme based the following factors was employed:

 Frequency of Failure of the Major Equipment Failure Mode


 Level of Redundancy to Prevent Specific Failure from Resulting in Complete Loss of Safety
Critical Functions
 Ability to Detect and Prevent the Failure Mode via MIT Practices (Indication / Protection /
Maintenance column in Appendix B)
 Severity of End Effect for Each BOP Functional Failure

A Risk Priority Number (RPN) ranking for each functional failure associated with an equipment-
level failure mode was based on the product of the following three independent factors:

 Severity Rating – This rating assesses the severity of worst-case end effect for a given
functional failure. (Note: The functional failure end effects documented in the functional-
level FMECA were used to determine this rating assuming no redundancies are present.)
 Occurrence Rating – This rating assesses the likelihood of the failure mode resulting in the
functional failure and its stated end effect. This rating takes into consideration any safeguards
that are in place to detect, prevent or mitigate the failure mode from resulting in the
functional failure. These are the Protection (P) items in the Indication / Protection /
Maintenance column of Appendix B. The presence of redundant components and systems is
explicitly considered in this rating.

16
 Detection Rating – This rating assesses the likelihood of the current applicable inspection and
maintenance activities to detect the failure mode before it results in the functional failure.
These ratings are based on the Indication (I) and Maintenance (M) items from the Indication /
Protection / Maintenance column of Appendix B.

The severity, occurrence, and detection ratings are provided in Tables 2-3 through 2-5, respectively.
These ratings were then used to calculate a single RPN ranking for each functional failure effect and
equipment failure mode pair (i.e., RPN ranking for each functional failure associated with an
equipment-level failure mode) using the following equation:

RPN = Severity Rating X Occurrence Rating X Detection Rating

The individual RPN rankings provide a relative ranking of the risk associated with a given functional
failure effect-equipment failure mode pair. Thereby, providing a means to identify the most critical
equipment-level failure modes in overall BOP performance, as well as, identifying the more critical
failure modes associated with a specific BOP functional failure.

Table 2-3: Severity Ratings


Severity
Significance Personnel Environment Down Time
Rank
Does not affect BOP No impact No impact No downtime, repair can
1 functionality; no impact on be done while drilling
safety and environment. continues.
Does not affect BOP No impact No impact No downtime, repair can
functionality but needs to be be done at next
2
corrected; no impact on opportunity, drilling
safety and environment. continues.
Partial loss of BOP No impact No impact Downtime of less than a
3 function; no loss of well shift, stop drilling,
control. intervene and repair.
Partial loss of BOP No impact No impact Downtime between a
function; no loss of well shift and 24 hours, stop
4
control. drilling, intervene and
repair.
Partial loss of BOP primary No impact No impact Downtime between 1 and
function if not corrected 7 days - stop drilling,
5
immediately. intervene and repair
(surface only).

17
Table 2-3: Severity Ratings (cont’d)
Severity
Significance Personnel Environment Down Time
Rank
Partial loss of BOP primary Minor Minor Downtime between 8 and
function if not corrected Injury; no external 21 days - stop drilling,
immediately. recordable subsea leak intervene and repair
6
lost time (e.g., C&K (surface only).
connector
leak)
Loss of BOP primary Minor Significant Pulling LMRP only.
function. Injury; external
some lost subsea leak
7
time. (e.g., major
connector
leak)
Loss of BOP primary Serious <1000 BBL Pulling LMRP/BOP
function. Injury; stack.
8
significant
lost time.
Loss of BOP primary Single >1000BBL Shut down of operations;
function. Fatality; drilling stopped and
multiple major regulatory
9
serious implications; changes to
injuries. drilling schedule > 3
months.
Loss of BOP primary Multiple >10,000BBL Shut down of operations;
function. fatalities and severe drilling stopped and
and environmen- major regulatory
10
injuries. tal damage implications; total loss of
over a large asset.
area.

18
Table 2-4: Occurrence Ratings
Occurrence
Frequency/Rig Yr. Occurrence
Ratings
10 >50+ events/ rig yr. Once a week or more often
<50 events /rig yr. to 10 events /rig Less than once a week to once a month
9
yr.
8 <10 events /rig yr. to 4 events /rig yr. Less than once a month to once a quarter
7 <4 events /rig yr. to 2 events /yr. Less than once a quarter to twice a year
6 <2 events /rig yr. to 1 event/yr. Less than twice a year to once a year
<1 event /rig yr. to 1 events every 2 Less than once a year to once every 2
5
years years
<1 event every 2 years to 1 event Less than once every 2 years to once
4
every 5 years every 5 years
<1 event every 5 years to 1 event Less than once every 5 years to once
3
every 10 years every 10 years
<1 event every 10 years to 1 event Less than once every 10 years to 10%
2
every 100 years chance every 10 years of operation
<1 event every 100 years Less than 1% chance every 10 years of
1
operation

19
Table 2-5: Detection Ratings
Detection
Detection Likelihood of Detection
Rating
Almost Certain Very high probability of detection (>90% probability of
detection) by design controls (redundant or independent self-
1
diagnostic capability, independent alarms) will certainly
detect failures
Very High High probability of detection (50 to 90% of detection) by
design controls (single device self-diagnostic capability,
2
single alarms, visual monitoring, leak monitoring, loss of
fluid etc.) will certainly detect failures
High Probability of detection via weekly on-stream
3 tests/inspections will provide immediate detection of the
failure
Moderately high Probability of detection via monthly on-stream
4 tests/inspections will provide immediate detection of the
failure
Moderate Probability of detection via quarterly on-stream
5 tests/inspections will provide immediate detection of the
failure
Low Can only be detected during routine inspections/tests while
6
the BOP is pulled from the well
Very Low Can only be detected during major PMs while the BOP is
7-8
pulled from the well
Remote Can only be detected and/or corrected during major overhaul
9
or rebuilding-type activities
Absolute Uncertainty Currently no design controls or maintenance techniques in
10
place

20
3.0 FMECA RESULTS
This section summarizes the results of the FMECA analysis—specifically, the results of the
functional-level and equipment-level FMECAs which are provided in tabular format in
Appendices A and B, respectively. These appendices also include a description of the FMECA table
information.

In addition to the tabular results provided in the above-mentioned appendices, the following tables
provide a more detailed look at the most critical failure modes based on the RPN rankings. Each of
the following tables presents the results against a specific set of criteria described below. The
complete data from which these tables have been derived is provided in Appendices C and D, which
are essentially a reformatted presentation of Appendix B. In each of the following tables, the shaded
column indicates the sorting order.

Table 3-1 presents the top 15% of failure modes with the highest RPN score. RPN scores from the
FMECA range from 6–160, with the top 15% ranging from 120–160. Tables 3-1a and 3-1b present
the same data but are sorted differently; Table 3-1a is sorted by RPN and Table 3-1b is sorted by
Major Equipment/Subsystem. Table 3-1 represents what are considered to be the most critical failure
modes. It should be noted that each failure mode may be associated with multiple effects/functional
failures as shown in the last column of the tables. Table 3-1b suggests that failures of the - Choke &
Kill lines & valves, Surface Accumulators, Blind Shear Ram and Casing Shear Ram are the most
dominant equipment of concern.

Table 3-1a: Failure Modes with Highest RPN – Sorted by RPN


Major # of Effects
Severity Occurrence Detection RPN
Component/ Failure Mode (Functional
(S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
Lines &
Plugged 10 4 4 160 4
Valves - BOP
Stack
Blind Shear
External
Ram - BOP 9 5 3 135 1
Leak/Rupture
Stack
Blind Shear
Mechanical
Ram - BOP 9 5 3 135 1
Failure
Stack
Blind Shear
Ram - BOP Wear 9 5 3 135 1
Stack
Casing Shear
External
Ram - BOP 9 5 3 135 1
Leak/Rupture
Stack

21
Table 3-1a: Failure Modes with Highest RPN – Sorted by RPN (cont’d)
Major # of Effects
Severity Occurrence Detection RPN
Component/ Failure Mode (Functional
(S) (O) (D) (SxOxD)
Subsystem Failures)
Casing Shear
Mechanical
Ram - BOP 9 5 3 135 1
Failure
Stack
Casing Shear
Ram - BOP Wear 9 5 3 135 1
Stack
Choke & Kill
Lines & External
9 5 3 135 1
Valves - BOP Leak/Rupture
Stack
Choke & Kill
Lines & Mechanical
9 5 3 135 1
Valves - BOP Failure
Stack
Pipe & Test
External
Rams - BOP 9 5 3 135 1
Leak/Rupture
Stack
Pipe & Test
Mechanical
Rams - BOP 9 5 3 135 1
Failure
Stack
Autoshear Mechanical
System - Failure 9 2 7 126 1
BOP Stack
Blue & Corrosion/Erosion
Yellow
Control
Systems -
9 2 7 126 1
Hydraulics -
Subsea
Control
Systems
Blue & Mechanical
Yellow Failure
Control
Systems -
9 2 7 126 1
Hydraulics -
Subsea
Control
Systems
Connectors - Mechanical
9 2 7 126 1
BOP Stack Failure

22
Table 3-1a: Failure Modes with Highest RPN – Sorted by RPN (cont’d)
Major # of Effects
Severity Occurrence Detection RPN
Component/ Failure Mode (Functional
(S) (O) (D) (SxOxD)
Subsystem Failures)
Hydraulic Corrosion/Erosion
Supply: Rigid
Conduit and
Manifold - 9 2 7 126 1
Subsea
Control
Systems
Hydraulic Mechanical
Supply: Rigid Failure
Conduit and
Manifold - 9 2 7 126 1
Subsea
Control
Systems
Accumulators
- Subsea External
10 2 6 120 2
Control Leak/Rupture
Systems
Accumulators
- Subsea
Internal Leak 10 2 6 120 2
Control
Systems
Accumulators
- Subsea Loss of Function
10 2 6 120 2
Control (general)
Systems
Accumulators
- Subsea Mechanical
10 2 6 120 2
Control Failure
Systems
Accumulators
- Subsea
Wear 10 2 6 120 2
Control
Systems
Autoshear
Mechanical
System - 10 2 6 120 2
Failure
BOP Stack
Blind Shear
External
Ram - BOP 10 2 6 120 4
Leak/Rupture
Stack

23
Table 3-1a: Failure Modes with Highest RPN – Sorted by RPN (cont’d)
Major # of Effects
Severity Occurrence Detection RPN
Component/ Failure Mode (Functional
(S) (O) (D) (SxOxD)
Subsystem Failures)
Blind Shear
Ram - BOP Wear 10 2 6 120 4
Stack
Blind Shear
Mechanical
Ram - BOP 10 2 6 120 3
Failure
Stack
Blind Shear
Ram - BOP Corrosion/Erosion 10 2 6 120 2
Stack
Blind Shear
Ram - BOP Internal Leak 10 2 6 120 2
Stack
Blue &
Yellow
Control
Systems -
Corrosion/Erosion 10 2 6 120 2
Hydraulics -
Subsea
Control
Systems
Blue &
Yellow
Control
Systems - External
10 2 6 120 2
Hydraulics - Leak/Rupture
Subsea
Control
Systems
Blue &
Yellow
Control
Systems -
Internal Leak 10 2 6 120 2
Hydraulics -
Subsea
Control
Systems
Blue &
Yellow
Control
Systems - Mechanical
10 2 6 120 2
Hydraulics - Failure
Subsea
Control
Systems

24
Table 3-1a: Failure Modes with Highest RPN – Sorted by RPN (cont’d)
Major # of Effects
Severity Occurrence Detection RPN
Component/ Failure Mode (Functional
(S) (O) (D) (SxOxD)
Subsystem Failures)
Blue &
Yellow
Control
Systems -
Plugged 10 2 6 120 2
Hydraulics -
Subsea
Control
Systems

Table 3-1b: Failure Modes with Highest RPN – Sorted by Major Component/Subsystem
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Accumulators - External
Subsea Control Leak/ 10 2 6 120 2
Systems Rupture
Accumulators -
Internal
Subsea Control 10 2 6 120 2
Leak
Systems
Accumulators -
Mechani-
Subsea Control 10 2 6 120 2
cal Failure
Systems
Accumulators -
Subsea Control Wear 10 2 6 120 2
Systems
Accumulators - Loss of
Subsea Control function 10 2 6 120 2
Systems (general)
Autoshear System Mechani-
9 2 7 126 1
- BOP Stack cal Failure
Blind Shear Ram External
- BOP Stack Leak/ 9 5 3 135 1
Rupture
Blind Shear Ram Mechani-
9 5 3 135 1
- BOP Stack cal Failure
Blind Shear Ram
Wear 9 5 3 135 1
- BOP Stack
External
Blind Shear Ram
Leak/ 10 4 2 120 4
- BOP Stack
Rupture
Blind Shear Ram
Wear 10 4 2 120 4
- BOP Stack

25
Table 3-1b: Failure Modes with Highest RPN – Sorted by Major Component/Subsystem
(cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue & Yellow
Control Systems -
Mechani-
Hydraulics - 9 2 7 126 1
cal Failure
Subsea Control
Systems
Blue & Yellow
Control Systems -
Erosion/
Hydraulics - 9 2 7 126 1
Corrosion
Subsea Control
Systems
Blue & Yellow
Control Systems -
Hydraulics - Plugged 10 2 6 120 2
Subsea Control
Systems
Blue & Yellow
Control Systems -
Mechani-
Hydraulics - 10 2 6 120 2
cal Failure
Subsea Control
Systems
Blue & Yellow
Control Systems -
Corrosion/
Hydraulics - 10 2 6 120 2
Erosion
Subsea Control
Systems
Casing Shear External
Ram - BOP Stack Leak/ 9 5 3 135 1
Rupture
Casing Shear Mechani-
9 5 3 135 1
Ram - BOP Stack cal Failure
Casing Shear
Wear 9 5 3 135 1
Ram - BOP Stack
Choke & Kill
Erratic
Lines & Valves - 10 4 4 160 4
output
BOP Stack
Choke & Kill External
Lines & Valves - Leak/ 9 5 3 135 1
BOP Stack Rupture
Choke & Kill
Mechani-
Lines & Valves - 9 5 3 135 1
cal Failure
BOP Stack

26
Table 3-1b: Failure Modes with Highest RPN – Sorted by Major Component/Subsystem
(cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Connectors - Mechani-
9 2 7 126 1
BOP Stack cal Failure
Hydraulic
Supply: Rigid
Conduit and Mechani-
9 2 7 126 1
Manifold - cal Failure
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Erosion/
9 2 7 126 1
Manifold - Corrosion
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and External
10 2 6 120 2
Manifold - Leak
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Internal
10 2 6 120 2
Manifold - Leak
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Plugged 10 2 6 120 2
Manifold -
Subsea Control
Systems

27
Table 3-1b: Failure Modes with Highest RPN – Sorted by Major Component/Subsystem
(cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Hydraulic
Supply: Rigid
Conduit and Mechani-
10 2 6 120 2
Manifold - cal Failure
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Erosion/
10 2 6 120 2
Manifold - Corrosion
Subsea Control
Systems
Pipe & Test External
Rams - BOP Leak/ 9 5 3 135 1
Stack Rupture
Pipe & Test
Mechani-
Rams - BOP 9 5 3 135 1
cal Failure
Stack

Table 3-2 shows the equipment failure modes which could lead to the worst potential end effects.
These are the failure modes with a severity ranking greater than or equal to 10. Severity results from
this FMECA range from 2 – 10.

Table 3-2: Failure Modes with Severity ≥ 10


Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
Lines &
Plugged 10 4 4 160 4
Valves - BOP
Stack
HPU -
External
Surface
Leak / 10 4 4 160 1
Control
Rupture
Systems
Blind Shear
Corrosion/
Ram - BOP 10 2 6 120 2
Erosion
Stack

28
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue &
Yellow
Control
Systems - Corrosion/
10 2 6 120 2
Hydraulics - Erosion
Subsea
Control
Systems
Casing Shear
Corrosion/
Ram - BOP 10 2 6 120 2
Erosion
Stack
Hydraulic
Supply: Rigid
Conduit and
Corrosion/
Manifold - 10 2 6 120 2
Erosion
Subsea
Control
Systems
Blue &
Yellow
Control
External
Systems -
Leak/ 10 2 6 120 2
Hydraulics -
Rupture
Subsea
Control
Systems
Accumulators
External
- Subsea
Leak/ 10 2 6 120 2
Control
Rupture
Systems
Blind Shear External
Ram - BOP Leak/ 10 2 6 120 2
Stack Rupture
Blind Shear External
Ram - BOP Leak/ 10 4 3 120 2
Stack Rupture
Casing Shear External
Ram - BOP Leak/ 10 2 6 120 2
Stack Rupture
Choke & Kill
External
Lines &
Leak/ 10 4 3 120 2
Valves - BOP
Rupture
Stack

29
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
External
Lines &
Leak/ 10 4 3 120 1
Valves - BOP
Rupture
Stack
Hydraulic
Supply: Rigid
Conduit and External
Manifold - Leak/ 10 2 6 120 2
Subsea Rupture
Control
Systems
Accumulators
- Subsea Internal
10 2 6 120 2
Control Leak
Systems
Blind Shear
Internal
Ram - BOP 10 2 6 120 2
Leak
Stack
Blue &
Yellow
Control
Systems - Internal
10 2 6 120 2
Hydraulics - Leak
Subsea
Control
Systems
Casing Shear
Internal
Ram - BOP 10 2 6 120 2
Leak
Stack
Choke & Kill
Lines & Internal
10 4 3 120 1
Valves - BOP Leak
Stack
Hydraulic
Supply: Rigid
Conduit and
Manifold - Internal leak 10 2 6 120 1
Subsea
Control
Systems
Accumulators
Loss of
- Subsea
Function 10 2 6 120 2
Control
(general)
Systems

30
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Hydraulic
Supply - Loss of
Surface Function 10 2 6 120 2
Control (general)
Systems
Accumulators
- Subsea Mechanical
10 2 6 120 2
Control Failure
Systems
Autoshear
Mechanical
System - BOP 10 2 6 120 2
Failure
Stack
Blind Shear
Mechanical
Ram - BOP 10 2 6 120 3
Failure
Stack
Blue &
Yellow
Control
Systems - Mechanical
10 2 6 120 2
Hydraulics - Failure
Subsea
Control
Systems
Casing Shear
Mechanical
Ram - BOP 10 2 6 120 2
Failure
Stack
Casing Shear
Mechanical
Ram - BOP 10 4 3 120 2
Failure
Stack
Choke & Kill
Lines & Mechanical
10 4 3 120 2
Valves - BOP Failure
Stack
Hydraulic
Supply: Rigid
Conduit and
Mechanical
Manifold - 10 2 6 120 2
Failure
Subsea
Control
Systems

31
3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue &
Yellow
Control
Systems -
Plugged 10 2 6 120 2
Hydraulics -
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Manifold - Plugged 10 2 6 120 2
Subsea
Control
Systems
Accumulators
- Subsea
Wear 10 2 6 120 2
Control
Systems
Blind Shear
Ram - BOP Wear 10 2 6 120 2
Stack
Blind Shear
Ram - BOP Wear 10 4 3 120 1
Stack
Blue &
Yellow
Control
Systems - Mechanical
10 2 6 120 1
Hydraulics - Failure
Subsea
Control
Systems
Blue &
Yellow
Control
Systems - Mechanical
10 2 6 120 1
Hydraulics - Failure
Subsea
Control
Systems
Casing Shear
Mechanical
Ram - BOP 10 2 6 120 2
Failure
Stack

32
3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Casing Shear
Mechanical
Ram - BOP 10 4 3 120 2
Failure
Stack
Choke & Kill
Lines & Mechanical
10 4 3 120 2
Valves - BOP Failure
Stack
Hydraulic
Supply: Rigid
Conduit and
Mechanical
Manifold - 10 2 6 120 2
Failure
Subsea
Control
Systems
Casing Shear
Mechanical
Ram - BOP 10 4 3 120 2
Failure
Stack
Choke & Kill
Lines & Mechanical
10 4 3 120 2
Valves - BOP Failure
Stack
Hydraulic
Supply: Rigid
Conduit and
Mechanical
Manifold - 10 2 6 120 2
Failure
Subsea
Control
Systems
Blue &
Yellow
Control
Systems -
Plugged 10 2 6 120 2
Hydraulics -
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Manifold - Plugged 10 2 6 120 2
Subsea
Control
Systems

33
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Accumulators
- Subsea
Wear 10 2 6 120 2
Control
Systems
Blind Shear
Ram - BOP Wear 10 2 6 120 2
Stack
Casing Shear
Ram - BOP Wear 10 2 6 120 4
Stack
Choke & Kill
Lines &
Wear 10 4 3 120 2
Valves - BOP
Stack
Choke & Kill
External
Lines &
Leak/ 10 3 3 90 1
Valves - BOP
Rupture
Stack
Choke & Kill
Lines & Internal
10 3 3 90 1
Valves - BOP Leak
Stack
HPU -
Surface Internal
10 3 3 90 5
Control Leak
Systems
HPU -
Surface
Plugged 10 3 3 90 4
Control
Systems
Choke & Kill
Lines &
Wear 10 3 3 90 4
Valves - BOP
Stack
Choke & Kill
External
Lines &
Leak/ 10 4 2 80 1
Valves - BOP
Rupture
Stack
Choke & Kill
Lines & Internal
10 4 2 80 1
Valves - BOP Leak
Stack

34
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
HPU -
Surface Mechanical
10 4 2 80 4
Control Failure
Systems
Choke & Kill
Lines &
Wear 10 4 2 80 1
Valves - BOP
Stack
Choke & Kill
External
Lines &
Leak/ 10 4 2 80 1
Valves - BOP
Rupture
Stack
HPU -
External
Surface
Leak/ 10 3 2 60 6
Control
Rupture
Systems
HPU -
Loss of
Surface
function 10 3 2 60 6
Control
(general)
Systems
Blue &
Yellow
Control
Systems - Corrosion/
10 2 2 40 1
Hydraulics - Erosion
Subsea
Control
Systems
Blue &
Yellow
Control
External
Systems -
Leak / 10 2 2 40 2
Hydraulics -
Rupture
Subsea
Control
Systems
External
Annulars -
Leak/ 10 2 2 40 11
BOP Stack
Rupture
Blind Shear External
Ram - BOP Leak/ 10 2 2 40 3
Stack Rupture

35
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Casing Shear External
Ram - BOP Leak/ 10 2 2 40 1
Stack Rupture
Choke & Kill
External
Lines &
Leak/ 10 2 2 40 1
Valves - BOP
Rupture
Stack
Hydraulic
Supply - External
Surface Leak/ 10 4 1 40 1
Control Rupture
Systems
Annulars - Internal
10 2 2 40 1
BOP Stack Leak
Blind Shear
Internal
Ram - BOP 10 2 2 40 1
Leak
Stack
Blue &
Yellow
Control
Systems - Internal
10 2 2 40 1
Hydraulics - Leak
Subsea
Control
Systems
Connectors - Internal
10 2 2 40 1
BOP Stack Leak
Hydraulic
Supply - Loss of
Surface Function 10 2 2 40 1
Control (general)
Systems
Annulars - Mechanical
10 2 2 40 1
BOP Stack Failure
Blind Shear
Mechanical
Ram - BOP 10 2 2 40 3
Failure
Stack

36
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue &
Yellow
Control
Systems - Mechanical
10 2 2 40 1
Hydraulics - Failure
Subsea
Control
Systems
Casing Shear
Mechanical
Ram - BOP 10 2 2 40 1
Failure
Stack
Blue &
Yellow
Control
Systems -
Plugged 10 2 2 40 1
Hydraulics -
Subsea
Control
Systems
Blind Shear
Ram - BOP Wear 10 2 2 40 3
Stack
Casing Shear
Ram - BOP Wear 10 2 2 40 1
Stack
Choke & Kill
Lines &
Wear 10 2 2 40 1
Valves - BOP
Stack
Blue &
Yellow
Control
External
Systems -
Leak / 10 3 1 30 1
Hydraulics -
Rupture
Subsea
Control
Systems
Autoshear External
System - BOP Leak/ 10 3 1 30 1
Stack Rupture

37
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
External
Lines &
Leak/ 10 3 1 30 2
Valves - BOP
Rupture
Stack
HPU -
External
Surface
Leak/ 10 3 1 30 1
Control
Rupture
Systems
Hydraulic
Supply: Rigid
Conduit and External
Manifold - leak/ 10 3 1 30 2
Subsea Rupture
Control
Systems
Autoshear
Internal
System - BOP 10 3 1 30 1
Leak
Stack
Autoshear
Mechanical
System - BOP 10 3 1 30 1
Failure
Stack
Blue &
Yellow
Control
Systems - Corrosion/
10 2 1 20 2
Hydraulics - Erosion
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Corrosion/
Manifold - 10 1 2 20 1
Erosion
Subsea
Control
Systems
Blue &
Yellow
Control
Systems - Erratic
10 2 1 20 3
Electrical - output
Subsea
Control
Systems

38
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Control
Panels -
Erratic
Surface 10 2 1 20 3
output
Control
Systems
EDS - Subsea
Erratic
Control 10 2 1 20 2
output
Systems
MUX System
Erratic
- Surface
output 10 2 1 20 3
Control
(Network)
Systems
Blue &
Yellow
Control
External
Systems -
Leak / 10 2 1 20 2
Hydraulics -
Rupture
Subsea
Control
Systems
Accumulators
External
- Subsea
Leak/ 10 2 1 20 2
Control
Rupture
Systems
Choke & Kill
External
Lines &
Leak/ 10 2 1 20 1
Valves - BOP
Rupture
Stack
External
Connectors -
Leak/ 10 1 2 20 1
BOP Stack
Rupture
Fluid
Reservoir External
Unit - Surface Leak/ 10 1 2 20 1
Control Rupture
Systems
Hydraulic
Supply: Rigid
Conduit and
External
Manifold - 10 2 1 20 2
leak/rupture
Subsea
Control
Systems

39
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Fails to
Control respond
Panels - (with no
Surface output 10 2 1 20 6
Control signal/com-
Systems munication
or to input)
EDS - Subsea Fails to
Control respond to 10 2 1 20 2
Systems input
MUX System
Fails to
- Surface
respond to 10 2 1 20 3
Control
input
Systems
Blue &
Yellow
Control Fails to
Systems - respond to
10 2 1 20 3
Electrical - input -
Subsea Electrical
Control
Systems
Blue &
Yellow
Control Fails with no
Systems - output
10 2 1 20 3
Electrical - signal/com-
Subsea munication
Control
Systems
Fails with no
EDS - Subsea
output
Control 10 2 1 20 2
signal/com-
Systems
munication
MUX System Fails with no
- Surface output
10 2 1 20 3
Control signal/com-
Systems munication

40
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Secondary &
Fails with no
Emergency
output
Control
signal/com-
Systems - 10 2 1 20 3
munication
Surface
(Includes
Control
Short)
Systems
Accumulators
- Subsea Internal
10 2 1 20 3
Control Leak
Systems
Annulars - Internal
10 2 1 20 7
BOP Stack Leak
Blue &
Yellow
Control
Systems - Internal
10 2 1 20 3
Hydraulics - Leak
Subsea
Control
Systems
Choke & Kill
Lines & Internal
10 2 1 20 1
Valves - BOP Leak
Stack
Connectors - Internal
10 2 1 20 1
BOP Stack Leak
Hydraulic
Supply: Rigid
Conduit and
Manifold - Internal leak 10 2 1 20 2
Subsea
Control
Systems
ROV
Intervention Loss of
10 1 2 20 1
Interface - Function
BOP Stack

41
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Secondary &
Emergency
Control Loss of
Systems - function 10 2 1 20 3
Surface (general)
Control
Systems
Accumulators
Loss of
- Subsea
Function 10 2 1 20 3
Control
(general)
Systems
Blue &
Yellow
Control
Loss of
Systems -
function 10 2 1 20 3
Electrical -
(general)
Subsea
Control
Systems
Control
Panels - Loss of
Surface function 10 2 1 20 3
Control (general)
Systems
EDS - Subsea Loss of
Control function 10 2 1 20 2
Systems (general)
Fluid
Reservoir Loss of
Unit - Surface Function 10 1 2 20 1
Control (general)
Systems
Hydraulic
Supply - Loss of
Surface Function 10 1 2 20 1
Control (general)
Systems
MUX System
Loss of
- Surface
function 10 2 1 20 2
Control
(general)
Systems

42
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Loss of
Power -
Power (UPS
Surface
Shuts down 10 2 1 20 3
Control
with power
Systems
degradation)
Secondary &
Emergency
Control Loss of, or
Systems - Degraded 10 2 1 20 3
Surface Power
Control
Systems
Blue &
Yellow
Control
Loss of, or
Systems -
Degraded 10 2 1 20 3
Electrical -
Power
Subsea
Control
Systems
Control
Panels - Loss of, or
Surface Degraded 10 2 1 20 3
Control Power
Systems
EDS - Subsea Loss of, or
Control Degraded 10 2 1 20 2
Systems Power
Accumulators
- Subsea Mechanical
10 1 2 20 2
Control Failure
Systems
Blue &
Yellow
Control
Systems - Mechanical
10 2 1 20 3
Hydraulics - Failure
Subsea
Control
Systems

43
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Fluid
Reservoir
Mechanical
Unit - Surface 10 1 2 20 1
Failure
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Mechanical
Manifold - 10 2 1 20 2
Failure
Subsea
Control
Systems
Fluid
Reservoir
Mechanical
Unit - Surface 10 1 2 20 1
Failure
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Mechanical
Manifold - 10 2 1 20 1
Failure
Subsea
Control
Systems
Fluid
Reservoir
Unit - Surface Plugged 10 1 2 20 1
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Manifold - Plugged 10 2 1 20 2
Subsea
Control
Systems
EDS - Subsea
Processing
Control 10 2 1 20 1
error
Systems
Control
Panels -
Surface Short 10 2 1 20 3
Control
Systems

44
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
MUX System
- Surface
Short 10 2 1 20 3
Control
Systems
Accumulators
- Subsea
Wear 10 2 1 20 3
Control
Systems
Choke & Kill
Lines &
Wear 10 1 2 20 1
Valves - BOP
Stack
Power -
Surface Electrical
10 1 1 10 1
Control Short
Systems
Blue &
Yellow
Control
Systems - Erratic
10 1 1 10 1
Electrical - output
Subsea
Control
Systems
Control
Panels -
Erratic
Surface 10 1 1 10 1
output
Control
Systems
MUX System
Erratic
- Surface
output 10 1 1 10 2
Control
(Network)
Systems
MUX System
Fails to
- Surface
respond to 10 1 1 10 1
Control
input
Systems

45
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue &
Yellow
Control Fails to
Systems - respond to
10 1 1 10 1
Electrical - input -
Subsea Electrical
Control
Systems
Blue &
Yellow
Control Fails with no
Systems - output
10 1 1 10 1
Electrical - signal/com-
Subsea munication
Control
Systems
MUX System Fails with no
- Surface output
10 1 1 10 1
Control signal/com-
Systems munication
Secondary &
Fails with no
Emergency
output
Control
signal/com-
Systems - 10 1 1 10 1
munication
Surface
(Includes
Control
Short)
Systems
Secondary &
Emergency
Control Loss of
Systems - function 10 1 1 10 1
Surface (general)
Control
Systems
Blue &
Yellow
Control
Loss of
Systems -
function 10 1 1 10 1
Electrical -
(general)
Subsea
Control
Systems

46
Table 3-2: Failure Modes with Severity ≥ 10 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Control
Panels - Loss of
Surface function 10 1 1 10 1
Control (general)
Systems
Loss of
Power -
Power (UPS
Surface
Shuts down 10 1 1 10 1
Control
with power
Systems
degradation)
Secondary &
Emergency
Control Loss of, or
Systems - Degraded 10 1 1 10 1
Surface Power
Control
Systems
Blue &
Yellow
Control
Loss of, or
Systems -
Degraded 10 1 1 10 1
Electrical -
Power
Subsea
Control
Systems
Control
Panels - Loss of, or
Surface Degraded 10 1 1 10 1
Control Power
Systems
Control
Panels -
Surface Short 10 1 1 10 1
Control
Systems
MUX System
- Surface
Short 10 1 1 10 1
Control
Systems

Table 3-3 shows the equipment failure modes with an occurrence ranking greater than or equal to 5.
These are the most frequently occurring equipment failures. Occurrence results from this FMECA
range from 1–4. The Blind Shear Ram contributes to the most functional failures.

47
Table 3-3: Failure Modes with Occurrence ≥ 5
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
EDS - Subsea Ground
2 7 1 14 1
Control Systems Fault
Pipe & Test External
Rams - BOP Leak/ 9 5 3 135 1
Stack Rupture
Pipe & Test
Mechanical
Rams - BOP 9 5 3 135 1
Failure
Stack
Choke & Kill External
Lines & Valves - Leak/ 9 5 3 135 1
BOP Stack Rupture
Choke & Kill
Mechanical
Lines & Valves - 9 5 3 135 1
Failure
BOP Stack
Casing Shear External
Ram - BOP Leak/ 9 5 3 135 1
Stack Rupture
Casing Shear
Mechanical
Ram - BOP 9 5 3 135 1
Failure
Stack
Casing Shear
Ram - BOP Wear 9 5 3 135 1
Stack
External
Blind Shear Ram
Leak/ 9 5 3 135 1
- BOP Stack
Rupture
Blind Shear Ram Mechanical
9 5 3 135 1
- BOP Stack Failure
Blind Shear Ram
Wear 9 5 3 135 1
- BOP Stack
Casing Shear
Ram - BOP Wear 8 5 2 80 1
Stack
Casing Shear
Mechanical
Ram - BOP 8 5 2 80 1
Failure
Stack
External
Blind Shear Ram
Leak/ 8 5 2 80 1
- BOP Stack
Rupture
Blind Shear Ram Internal
8 5 2 80 1
- BOP Stack Leak
Blind Shear Ram Mechanical
8 5 2 80 1
- BOP Stack Failure

48
Table 3-3: Failure Modes with Occurrence ≥ 5 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blind Shear Ram
Wear 8 5 2 80 1
- BOP Stack
External
Connectors -
Leak/ 2 5 3 30 1
BOP Stack
Rupture
Loss of
Connectors -
Function 2 5 3 30 1
BOP Stack
(general)
Connectors - Mechanical
2 5 3 30 1
BOP Stack Failure

Table 3-4 shows the equipment failure modes with a detection ranking greater than or equal to 6,
which are the hardest to detect. This list helps identify the equipment-level failure modes for which
additional MIT activities may be needed. Detection results from this FMECA range from 1–10.
Hydraulic supply: Rigid Conduit and Manifold and Connectors have the worst detectability followed
by casing shear ram and surface hydraulic supply

Table 3-4: Failure Modes with Detection ≥ 6


Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Hydraulic
Supply: Rigid
Conduit and Corrosion/
9 2 7 126 1
Manifold - Erosion
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Mechanical
9 2 7 126 1
Manifold - Failure
Subsea Control
Systems
Connectors - Mechanical
9 2 7 126 1
BOP Stack Failure
Blue & Yellow
Control Systems
Corrosion/
- Hydraulics - 9 2 7 126 1
Erosion
Subsea Control
Systems

49
Table 3-4: Failure Modes with Detection ≥ 6 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blue & Yellow
Control Systems
Mechanical
- Hydraulics - 9 2 7 126 1
Failure
Subsea Control
Systems
Autoshear
Mechanical
System - BOP 9 2 7 126 1
Failure
Stack
Hydraulic
Supply: Rigid
Conduit and Corrosion/
10 2 6 120 2
Manifold - Erosion
Subsea Control
Systems
Hydraulic
Supply: Rigid
External
Conduit and
leak/ 10 2 6 120 2
Manifold -
Rupture
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Internal
10 2 6 120 2
Manifold - leak
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and Mechanical
10 2 6 120 2
Manifold - Failure
Subsea Control
Systems
Hydraulic
Supply: Rigid
Conduit and
Plugged 10 2 6 120 2
Manifold -
Subsea Control
Systems
Hydraulic
Loss of
Supply -
Function 10 2 6 120 2
Surface Control
(general)
Systems

50
Table 3-4: Failure Modes with Detection ≥ 6 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Casing Shear
Corrosion/
Ram - BOP 10 2 6 120 2
Erosion
Stack
Casing Shear External
Ram - BOP Leak/ 10 2 6 120 2
Stack Rupture
Casing Shear
Internal
Ram - BOP 10 2 6 120 2
Leak
Stack
Casing Shear
Mechanical
Ram - BOP 10 2 6 120 2
Failure
Stack
Casing Shear
Ram - BOP Wear 10 2 6 120 2
Stack
Blue & Yellow
Control Systems
Corrosion/
- Hydraulics - 10 2 6 120 2
Erosion
Subsea Control
Systems
Blue & Yellow
Control Systems External
- Hydraulics - Leak/ 10 2 6 120 2
Subsea Control Rupture
Systems
Blue & Yellow
Control Systems
Internal
- Hydraulics - 10 2 6 120 2
Leak
Subsea Control
Systems
Blue & Yellow
Control Systems
Mechanical
- Hydraulics - 10 2 6 120 2
Failure
Subsea Control
Systems
Blue & Yellow
Control Systems
- Hydraulics - Plugged 10 2 6 120 2
Subsea Control
Systems
Blind Shear
Corrosion/
Ram - BOP 10 2 6 120 2
Erosion
Stack

51
Table 3-4: Failure Modes with Detection ≥ 6 (cont’d)
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Blind Shear External
Ram - BOP Leak/ 10 2 6 120 2
Stack Rupture
Blind Shear
Internal
Ram - BOP 10 2 6 120 2
Leak
Stack
Blind Shear
Mechanical
Ram - BOP 10 2 6 120 2
Failure
Stack
Blind Shear
Ram - BOP Wear 10 2 6 120 2
Stack
Autoshear
Mechanical
System - BOP 10 2 6 120 2
Failure
Stack
Accumulators - External
Subsea Control Leak/Ruptu 10 2 6 120 2
Systems re
Accumulators -
Internal
Subsea Control 10 2 6 120 2
Leak
Systems
Accumulators - Loss of
Subsea Control Function 10 2 6 120 2
Systems (general)
Accumulators -
Mechanical
Subsea Control 10 2 6 120 2
Failure
Systems
Accumulators -
Subsea Control Wear 10 2 6 120 2
Systems
Connectors - Internal
9 1 6 54 2
BOP Stack Leak
Choke & Kill External
Lines & Valves Leak/ 9 1 6 54 2
- BOP Stack Rupture
Choke & Kill
Lines & Valves Wear 5 1 6 54 2
- BOP Stack

Table 3-5 shows the equipment failure modes with a severity ranking of 10, an occurrence ranking
greater than or equal to 4 and a detection ranking less than or equal to 5. These are the equipment
failures that occur most frequently and could result in the highest severity but are easy to detect.

52
Table 3-5: Failure Modes with S = 10, O ≥ 4, and D ≤ 5
Major # of Effects
Failure Severity Occurrence Detection RPN
Component/ (Functional
Mode (S) (O) (D) (SxOxD)
Subsystem Failures)
Choke & Kill
Lines & Valves Plugged 10 4 4 160 4
- BOP Stack
Choke & Kill
Mechanical
Lines & Valves 10 4 3 120 2
Failure
- BOP Stack
Choke & Kill
Lines & Valves Wear 10 4 3 120 2
- BOP Stack
Casing Shear
Ram - BOP Wear 10 4 3 120 1
Stack
Choke & Kill External
Lines & Valves Leak/ 10 4 3 120 1
- BOP Stack Rupture
Choke & Kill
Internal
Lines & Valves 10 4 3 120 2
Leak
- BOP Stack
Casing Shear External
Ram - BOP Leak/ 10 4 3 120 2
Stack Rupture
Casing Shear
Mechanical
Ram - BOP 10 4 3 120 2
Failure
Stack
Blind Shear
Ram - BOP Wear 10 4 3 120 2
Stack
Blind Shear
Mechanical
Ram - BOP 10 4 3 120 1
Failure
Stack
Blind Shear External
Ram - BOP Leak/ 10 4 3 120 2
Stack Rupture
HPU - Surface
Mechanical
Control 10 4 2 80 2
Failure
Systems

53
Equipment failure modes with a severity ranking of 10, an occurrence ranking greater than or equal
to 3 and detection ranking greater than 5 are also of interest. These are the equipment failures that
occur most frequently and could result in the highest severity and are the hardest to detect. No
failures in the FMECA meet this criterion.

The effect of each equipment level failure is linked to a functional failure. Table 3-6 lists the top 25%
of effects/functional failures with the highest average RPN for all of the equipment failures
associated with that functional failure. External Leak - Loss of containment - Close and seal on the
drill pipe and allow circulation on demand (linked to 1.1.8.1) has the six worst average RPN scores.

Table 3-6: Functional Failures with Highest Average RPN


# of Cumulative Average
Effect
Occurrences FF RPN FF RPN
External Leak - Loss of containment - Close and seal on
the drill pipe and allow circulation on demand (linked to 14 1606 115
1.1.8.1)
Actuates Too Slowly on Demand - Closes too slowly -
Emergency Operation - Auto-Shear - Shear the drill pipe 4 457 114
and seal the wellbore (linked to 1.6.6.1)
Failure of Shear Ram to Seal On Demand - Failure to
seal the wellbore - Emergency Operation - Auto-Shear - 114
38 4340
Shear the drill pipe and seal the wellbore (linked to
1.6.4.1)
Failure to Maintain Sealing Pressure on Shear Ram -
Failure to seal the wellbore - Emergency Operation -
38 4340 114
Auto-Shear - Shear the drill pipe and seal the wellbore
(linked to 1.6.4.2)
Failure to Actuate Under Fail-safe Conditions - Failure
to open / close fail-safe valves - Close and seal on the
8 900 113
drill pipe and allow circulation on demand (linked to
1.1.6.1)
External Leak - Loss of containment - Circulate the well
13 1368 105
after drill pipe disconnect (linked to 1.9.5.1)
External Leak - Loss of containment - Circulate across
the BOP stack to remove trapped gas - (linked to 13 1288 99
1.10.4.1)
Inability to Operate C&K Valves as Needed - Failure to
circulate - Circulate across the BOP stack to remove 3 240 80
trapped gas (linked to 1.10.1.3)
Failure to Engage Lock on Hang-off Ram - Failure to
maintain locking - Hang-off the drill pipe on a ram BOP 6 480 80
and control the wellbore (linked to 1.4.3.1)
Failure to Provide Control Signal to Pipe Ram or C&K
Valves When Demanded - Failure to close on drill pipe
18 1296 72
through pipe rams - Close and seal on the drill pipe and
allow circulation on demand (linked to 1.1.2.1)

54
Table 3-6: Functional Failures with Highest Average RPN (cont’d)
# of Cumulative Average
Effect
Occurrences FF RPN FF RPN
Actuates Too Slowly on Demand - Closes too slowly -
Close and seal on the drill pipe and allow circulation on 25 1609 64
demand (linked to 1.1.7.1)
Failure to Adequately Seal under Fail-safe Condition -
Failure to open / close fail-safe valves to seal - Circulate
4 240 60
across the BOP stack to remove trapped gas (linked to
1.10.3.2)
Failure to Adequately Seal under Fail-safe Conditions -
Failure to open / close fail-safe valves to seal - Circulate 4 240 60
the well after drill pipe disconnect (linked to 1.9.3.2)

Table 3-7 lists the top 25% of effects/functional failures that are most frequently linked to equipment
failures. Failing to supply hydraulic fluid and pressure to annulars is by far the most frequently
occurring functional failure.

Table 3-7: Functional Failures with Greatest Occurrences Due to Equipment Failures
# of Cumulative Average
Effect
Occurrences FF RPN FF RPN
Failure to Supply Hydraulic Fluid & Pressure to
Annulars - Failure to close annulars - Strip the drill string 42 2668 56
using the annular BOP(s) (linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Shear
Ram - Failure to close - Emergency Operation - Auto-
47 1854 39
Shear - Shear the drill pipe and seal the wellbore (linked
to 1.6.2.1)
Failure to Supply Hydraulic Fluid & Pressure to Annular
& C&K Valves When Demanded - Failure to close on
42 1626 39
drill pipe through annular(s) - Close and seal on the drill
pipe and allow circulation on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to
Annular/ Blind-Shear Ram or C&K Valves - Failure to
close on open hole through blind-shear rams or annular - 43 1028 24
Close and seal on open hole and allow volumetric well
control operations on demand (linked to 1.2.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-
off Ram - Failure of hang-off ram to close - Hang-off the
42 1493 36
drill pipe on a ram BOP and control the wellbore (linked
to 1.4.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Shear
Ram - Failure to close - Controlled operation - Shear the 42 1170 28
drill pipe and seal the wellbore (linked to 1.5.1.2)

55
Table 3-7: Functional Failures with Greatest Occurrences Due to Equipment Failures (cont’d)
# of Cumulative Average
Effect
Occurrences FF RPN FF RPN
Failure to Supply Hydraulic Fluid & Pressure to Pipe
Ram or C&K Valves When Demanded - Failure to close
on drill pipe through pipe rams - Close and seal on the 39 1980 51
drill pipe and allow circulation on demand (linked to
1.1.2.2)
Failure to Supply Hydraulic Fluid & Pressure to C&K
Valves - Failure to seal wellbore - Circulate the well 39 636 16
after drill pipe disconnect (linked to 1.9.4.2)
Failure to Supply Hydraulic Fluid & Pressure to C&K
Valves - Failure to circulate - Circulate the well after 39 636 16
drill pipe disconnect (linked to 1.9.1.2)
Failure of Shear Ram to Seal On Demand - Failure to
seal the wellbore - Emergency Operation - Auto-Shear -
38 4340 114
Shear the drill pipe and seal the wellbore (linked to
1.6.4.1)
Failure to Maintain Sealing Pressure on Shear Ram -
Failure to seal the wellbore - Emergency Operation -
38 4340 114
Auto-Shear - Shear the drill pipe and seal the wellbore
(linked to 1.6.4.2)
Failure to Shear Pipe - Failure to shear the drill pipe -
Controlled operation - Shear the drill pipe and seal the 37 420 11
wellbore (linked to 1.5.2.1)
Failure to Shear Pipe - Failure to shear the drill pipe -
Emergency Operation - Auto-Shear - Shear the drill pipe 36 900 25
and seal the wellbore (linked to 1.6.3.2)

56
4.0 CONCLUSIONS
The initial assessment showed that based on the criticality ranking, the following equipment and their
failure modes were identified as the top 25% of the critical items contributing to the BOP’s potential
functional failure:

 Choke & Kill Lines & Valves - BOP Stack


 Blind Shear Ram - BOP Stack
 Casing Shear Ram - BOP Stack
 Casing Shear Ram - BOP Stack
 Casing Shear Ram - BOP Stack
 Pipe & Test Rams - BOP Stack
 Pipe & Test Rams - BOP Stack
 Autoshear System - BOP Stack
 Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems
 Connectors - BOP Stack
 Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems
 Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems
 Accumulators - Subsea Control Systems

The top 10% of equipment by RPN, as discussed, are - Choke & Kill lines & valves, , Blind Shear
Ram and Casing Shear Ram.

The MIT data and the failure data provided by the drilling contractor and the OEM were reviewed
against the FMECA results. The findings are presented in Section 3 of this report.

This preliminary FMECA analysis and assessment report is submitted for review by the IPs. The
final report may bear the modifications suggested during the review process.

57
THIS PAGE INTENTIONALLY LEFT BLANK

58
Appendix A – Functional-Level FMECA Tables
THIS PAGE INTENTIONALLY LEFT BLANK

A-2
Appendix B – Equipment-Level FMECA Tables
THIS PAGE INTENTIONALLY LEFT BLANK

B-2
Appendix C – All Data Sorted By RPN
C-2
APPENDIX A
FUNCTIONAL-LEVEL FMECA WORKSHEETS

2650788-DFMECA-2-D2
1- Functional level FMECA

Enterprise A1
LEADER
1- Close and seal on the drill pipe and allow
circulation on demand

Enterprise A2
LEADER
1.1.1 Functional Failure: Failure to close on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Short - MUX System - Surface Control Systems Atypical current reading across solenoid coil Significant down time that impacts operation
Signal to Annular or C&K (linked to 2.1.3.7) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Valves When Demanded Loss of function (general) - MUX System - Flashing red screen on touch screen alerts to a resulting in spill with large impact
Surface Control Systems (linked to 2.1.3.8) communications failure Release of hydrocarbons to atmosphere
Fails with no output signal/communication - Blue Type (I, P or M): I potentially resulting in fire/explosion hazard with
& Yellow Control Systems - Electrical - Subsea No or low flow meter readings large impact
Control Systems (linked to 2.2.1.2) Type (I, P or M): I Down time, after well control issue is resolved,
Loss of Power (UPS Shuts down with power Pod mismatch & alarm to repair an individual C&K valve that cannot be
degradation) - Power - Surface Control Systems Type (I, P or M): I operated
(linked to 2.1.2.1) Visible effects, such as mud flow on rig floor, as
Electrical Short - Power - Surface Control an indication of failure to close annulars
Systems (linked to 2.1.2.5) Type (I, P or M): I
Erratic output (Network) - MUX System - Surface Redundant mechanical systems and components
Control Systems (linked to 2.1.3.4) Type (I, P or M): P
Fails to respond to input - MUX System - Surface Redundant touch screen, controllers, control
Control Systems (linked to 2.1.3.5) pods, cables, powers supplies, SEM exist
Fails to respond (with no output Type (I, P or M): P
signal/communication or to input) - Control Function test annular every 7 days
Panels - Surface Control Systems (linked to Type (I, P or M): M
2.1.5.2) Function tests between wells and upon latch-up
Erratic output - Control Panels - Surface Control Type (I, P or M): M
Systems (linked to 2.1.5.4)
Wiring harness fails
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)

Enterprise A3
LEADER
1.1.1 Functional Failure: Failure to close on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems HPU pumps running constantly Significant down time that impacts operation
Fluid & Pressure to Annular (linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
& C&K Valves When Internal Leak - Choke & Kill Lines & Valves - BOP There are manual indicators on valves that the resulting in spill with large impact
Demanded Stack (linked to 2.3.5.2) ROV can read Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I potentially resulting in fire/explosion hazard with
to 2.1.1.3) Accumulators with stored hydraulic pressure large impact
Mechanical Failure - HPU - Surface Control energy act as backup Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Type (I, P or M): P to repair an individual C&K valve that cannot be
Plugged - Fluid Reservoir Unit - Surface Control Design includes margin of safety (conduits work operated
Systems (linked to 2.1.7.3) at 5k psi, max @ 7.5k psi)
Type (I, P or M): P
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to Multiple annulars & rams
2.2.2.2) Type (I, P or M): P
Plugged - Choke & Kill Lines & Valves - BOP Redundant conduit lines exist, with the additional
Stack (linked to 2.3.5.3) ability to isolate the leaking line and cross-
connect via conduit manifold
Mechanical Failure - Blue & Yellow Control Type (I, P or M): P
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4) Redundant pods provide the same functions
Type (I, P or M): P
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3) Redundant pumping capability through three
100% capacity pumps
Loss of Function (general) - HPU - Surface Type (I, P or M): P
Control Systems (linked to 2.1.1.7)
There are redundant hydraulic pressure
Loss of Function (general) - Hydraulic Supply - regulators
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control Controlled function tests ("soak test") between
Systems - Hydraulics - Subsea Control Systems wells
(linked to 2.2.2.1) Type (I, P or M): M
Plugged - Annulars - BOP Stack - (linked to Filters are replaced frequently as a preventive
2.3.1.3) measure
Internal Leak - Connectors - BOP Stack (linked Type (I, P or M): M
to 2.3.6.2) ROV inspection every 3 days
External Leak/Rupture - Surface Control Systems Type (I, P or M): M
- Accumulators - Surface (linked to 2.1.6.1) The systems/components involved have
Internal Leak - Surface Control Systems - maintenance programs and undergo regular
Accumulators - Surface (linked to 2.1.6.2) inspection and maintenance
Mechanical Failure - Surface Control Systems - Type (I, P or M): M
Accumulators - Surface (linked to 2.1.6.4) Weekly BOP function test
Wear - Surface Control Systems - Accumulators - Type (I, P or M): M
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Enterprise A4
LEADER
1.1.1 Functional Failure: Failure to close on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Wear - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Choke & Kill Lines &

Enterprise A5
LEADER
1.1.1 Functional Failure: Failure to close on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Valves - BOP Stack (linked to 2.3.5.1)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

3 Failure to Close Annular on External Leak/Rupture - Annulars - BOP Stack Hydraulic fluid flow is monitored via flow meters Significant down time that impacts operation
Demand (linked to 2.3.1.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Wellbore flow indicates failure to close resulting in spill with large impact
Type (I, P or M): I Release of hydrocarbons to atmosphere
There are multiple annulars, with redundant pipe potentially resulting in fire/explosion hazard with
rams as backup, to ensure closure large impact
Type (I, P or M): P Down time, after well control issue is resolved,
Maintenance/overhaul of annulars is performed to repair an individual C&K valve that cannot be
at the completion of every well operated
Type (I, P or M): M

4 Inability to Operate (an Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of hydraulic pumps Significant down time that impacts operations
individual) C&K Valves as Stack (linked to 2.3.5.2) Type (I, P or M): I
Needed Wear - Choke & Kill Lines & Valves - BOP Stack Increasing system hydraulic pressure
(linked to 2.3.5.5) Type (I, P or M): I
External Leak/Rupture - Choke & Kill Lines & Flow meter reading is monitored (volume and
Valves - BOP Stack (linked to 2.3.5.1) time required to actuate are known. Too high a
volume indicates a leak. Too long a time
indicates galling or leak.)
Type (I, P or M): I
Pressure test of chambers is conducted at end of
well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack and control valves

Enterprise A6
LEADER
1.1.1 Functional Failure: Failure to close on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Type (I, P or M): M
Wellbore test are conducted between wells and
every 14 days while drilling
Type (I, P or M): M

Enterprise A7
LEADER
1.1.2 Functional Failure: Failure to close on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Wiring harness fails C&K valves are redundant and have fail-safe Significant down time that impacts operation
Signal to Pipe Ram or C&K Electrical Short - Power - Surface Control design Release of hydrocarbons to air or sea potentially
Valves When Demanded Systems (linked to 2.1.2.5) Type (I, P or M): P resulting in spill with large impact
Erratic output (Network) - MUX System - Surface ROV intervention will enable closure of one of Release of hydrocarbons to atmosphere
Control Systems (linked to 2.1.3.4) the pipe rams potentially resulting in fire/explosion hazard with
Type (I, P or M): P large impact
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5) There are multiple annulars, with redundant pipe Down time, after well control issue is resolved,
rams as backup, to ensure closure to repair an individual C&K valve that cannot be
Short - MUX System - Surface Control Systems Type (I, P or M): P
(linked to 2.1.3.7) operated
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Loss of Power (UPS Shuts down with power
degradation) - Power - Surface Control Systems
(linked to 2.1.2.1)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)

Enterprise A8
LEADER
1.1.2 Functional Failure: Failure to close on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems C&K valves are redundant and have fail-safe Significant down time that impacts operation
Fluid & Pressure to Pipe Ram (linked to 2.1.1.2) design Release of hydrocarbons to air or sea potentially
or C&K Valves When Plugged - HPU - Surface Control Systems (linked Type (I, P or M): P resulting in spill with large impact
Demanded to 2.1.1.3) ROV intervention will enable closure of one of Release of hydrocarbons to atmosphere
Mechanical Failure - HPU - Surface Control the pipe rams potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.4) Type (I, P or M): P large impact
Internal Leak - Choke & Kill Lines & Valves - BOP There are multiple annulars, with redundant pipe Down time, after well control issue is resolved,
Stack (linked to 2.3.5.2) rams as backup, to ensure closure to repair an individual C&K valve that cannot be
Type (I, P or M): P operated
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Plugged - Annulars - BOP Stack - (linked to
2.3.1.3)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal Leak - Accumulators - Subsea Control
Enterprise A9
LEADER
1.1.2 Functional Failure: Failure to close on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)

Enterprise A 10
LEADER
1.1.2 Functional Failure: Failure to close on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

3 Failure to Close Pipe Ram on Shaft seal leaks with higher wellbore pressure C&K valves are redundant and have fail-safe Significant down time that impacts operation
Demand than operating pressure to close side of piston design Release of hydrocarbons to air or sea potentially
Internal Leak - Connectors - BOP Stack (linked Type (I, P or M): P resulting in spill with large impact
to 2.3.6.2) ROV intervention will enable closure of one of Release of hydrocarbons to atmosphere
Wear - Choke & Kill Lines & Valves - BOP Stack the pipe rams potentially resulting in fire/explosion hazard with
(linked to 2.3.5.5) Type (I, P or M): P large impact
External Leak/Rupture - Choke & Kill Lines & There are multiple annulars, with redundant pipe Down time, after well control issue is resolved,
Valves - BOP Stack (linked to 2.3.5.1) rams as backup, to ensure closure to repair an individual C&K valve that cannot be
Type (I, P or M): P operated
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

4 Inability to Operate C&K Seal between head case and body fails Deadheading of hydraulic pumps Significant down time that impacts operations
Valves as Needed Internal Leak - Choke & Kill Lines & Valves - BOP Type (I, P or M): I
Stack (linked to 2.3.5.2) Flow meter reading is monitored (volume and
Wear - Choke & Kill Lines & Valves - BOP Stack time required to actuate are known. Too high a
(linked to 2.3.5.5) volume indicates a leak. Too long a time
indicates galling or leak.)
External Leak/Rupture - Choke & Kill Lines & Type (I, P or M): I
Valves - BOP Stack (linked to 2.3.5.1)
Increasing system hydraulic pressure
Type (I, P or M): I
Pressure test of chambers is conducted at end of
well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack and control valves
Type (I, P or M): M
Wellbore test are conducted between wells and
every 14 days while drilling
Type (I, P or M): M

5 Failure to Open Pipe Ram on Ram mechanism fails Hydraulic fluid flow meter reading(s) indicate Significant down time that impacts operations
Demand (as part of the well pipe ram position
control effort) Type (I, P or M): I
Increased drag on drill pipe indicates a closed or
partially closed ram
Type (I, P or M): I

Enterprise A 11
LEADER
1.1.2 Functional Failure: Failure to close on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Wellbore flow provides indication of pipe ram
position
Type (I, P or M): I
Annual inspection of ram foot
Type (I, P or M): M
Between well maintenance
Type (I, P or M): M
Weekly function test of pipe rams
Type (I, P or M): M

Enterprise A 12
LEADER
1.1.3 Functional Failure: Failure to seal or partial seal on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Annular to Seal on Inadequate hydraulic operating pressure Wellbore flow provides indication of problem Some down time that impacts operation
Demand Mechanical Failure - Annulars - BOP Stack (linked Type (I, P or M): I Release of hydrocarbons to air or sea potentially
to 2.3.1.4) There are multiple annulars, with redundant pipe resulting in spill with small to medium impact
Wear - Annulars - BOP Stack (linked to 2.3.1.5) rams as backup, to ensure closure Release of hydrocarbons to atmosphere
Type (I, P or M): P potentially resulting in fire/explosion hazard with
Pressure test every 14 days small to medium impact
Type (I, P or M): M Down time, after well control issue is resolved,
Rebuild annulars between each well with the to repair an individual C&K valve that cannot be
following replacement sequence: new to lower, operated
existing lower to upper, and existing upper
removed
Type (I, P or M): M

2 Failure to Maintain Adequate Internal Leak - HPU - Surface Control Systems Check valves in rigid conduit help maintain Significant down time that impacts operation
Sealing Pressure on Annular (linked to 2.1.1.2) hydraulic pressure Release of hydrocarbons to air or sea potentially
Internal Leak - Fluid Reservoir Unit - Surface Type (I, P or M): P resulting in spill with large impact
Control Systems (linked to 2.1.7.2) Redundant pod provides backup in case of Release of hydrocarbons to atmosphere
Loss of Function (general) - Hydraulic Supply - functional failures in the active one potentially resulting in fire/explosion hazard with
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): P large impact
Mechanical Failure - Blue & Yellow Control There are redundant banks of accumulators Down time, after well control issue is resolved,
Systems - Hydraulics - Subsea Control Systems (surface and subsea). Each bank provides to repair an individual C&K valve that cannot be
(linked to 2.2.2.4) stored hydraulic supply and energy. operated
Type (I, P or M): P
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1) Accumulators are tested weekly for proper
function
External Leak/Rupture - Hydraulic Supply - Type (I, P or M): M
Surface Control Systems (linked to 2.1.4.1)
Test connector/chamber check valves
Corrosion/Erosion - Hydraulic Supply: Rigid Type (I, P or M): M
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

3 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of hydraulic pumps Significant down time that impacts operations
Valves as needed Stack (linked to 2.3.5.2) Type (I, P or M): I
Wear - Choke & Kill Lines & Valves - BOP Stack Flow meter reading is monitored (volume and
time required to actuate are known. Too high a
Enterprise A 13
LEADER
1.1.3 Functional Failure: Failure to seal or partial seal on drill pipe through annular(s) - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


(linked to 2.3.5.5) volume indicates a leak. Too long a time
External Leak/Rupture - Choke & Kill Lines & indicates galling or leak.)
Valves - BOP Stack (linked to 2.3.5.1) Type (I, P or M): I
Increasing system hydraulic pressure
Type (I, P or M): I
Pressure test of chambers is conducted at end of
well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack and control valves
Type (I, P or M): M
Wellbore test are conducted between wells and
every 14 days while drilling
Type (I, P or M): M

Enterprise A 14
LEADER
1.1.4 Functional Failure: Failure to seal or partial seal on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Pipe Ram to Seal Pipe and ram size mismatch Wellbore flow indicates failure to close Some down time that impacts operation
on Demand Mechanical damage Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Trash in the well (swarf, concrete, etc.) Dimensional inspection of seal plate and wear resulting in spill with small to medium impact
plate is performed regularly (frequency varies Release of hydrocarbons to atmosphere
Internal Leak - HPU - Surface Control Systems from between well inspection to annual
(linked to 2.1.1.2) potentially resulting in fire/explosion hazard with
inspection) small to medium impact
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): P
to 2.1.1.3) Down time, after well control issue is resolved,
There are multiple annulars, with redundant pipe to repair an individual C&K valve that cannot be
Mechanical Failure - HPU - Surface Control rams as backup, to ensure closure operated
Systems (linked to 2.1.1.4) Type (I, P or M): P
Internal Leak - Blue & Yellow Control Systems - Maintenance/overhaul of annulars is performed
Hydraulics - Subsea Control Systems (linked to at the completion of every well
2.2.2.2) Type (I, P or M): M
Loss of Function (general) - HPU - Surface Wellbore test are conducted between wells and
Control Systems (linked to 2.1.1.7) every 14 days while drilling
Loss of Function (general) - Hydraulic Supply - Type (I, P or M): M
Surface Control Systems (linked to 2.1.4.7)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)

Enterprise A 15
LEADER
1.1.4 Functional Failure: Failure to seal or partial seal on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Internal Leak - Pipe & Test Rams - BOP Stack
(linked to 2.3.4.2)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
External Leak/Rupture - Pipe & Test Rams - BOP
Stack (linked to 2.3.4.1)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Wear - Pipe & Test Rams - BOP Stack (linked to
2.3.4.5)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Corrosion/Erosion - Pipe & Test Rams - BOP
Stack (linked to 2.3.4.6)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)

2 Failure to Maintain Adequate Seals on the chamber ring fail to allow the A multi position locking (MPL) mechanism offers Some down time that impacts operation
Sealing Pressure on Pipe transfer ring to move freely & doesn't allow the redundant and diverse means of backing-up Release of hydrocarbons to air or sea potentially
Ram springs to fully engage clutch ram/sealing function resulting in spill with small to medium impact
Wear on packers on ram blocks Type (I, P or M): P
Release of hydrocarbons to atmosphere
Motion compensator fails to prevent excessive Motion compensator for drill string helps to potentially resulting in fire/explosion hazard with
wear on ram blocks avoid excess wear on seals small to medium impact
Type (I, P or M): P
Internal Leak - HPU - Surface Control Systems Down time, after well control issue is resolved,
(linked to 2.1.1.2) Rams are periodically lock tested on surface to repair an individual C&K valve that cannot be
(without closing pressure) operated
Plugged - HPU - Surface Control Systems (linked
Enterprise A 16
LEADER
1.1.4 Functional Failure: Failure to seal or partial seal on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


to 2.1.1.3) Type (I, P or M): M
Mechanical Failure - HPU - Surface Control Wellbore test are conducted between wells and
Systems (linked to 2.1.1.4) every 14 days while drilling
Loss of Function (general) - HPU - Surface Type (I, P or M): M
Control Systems (linked to 2.1.1.7)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Fluid Reservoir Unit - Surface
Control Systems (linked to 2.1.7.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to

Enterprise A 17
LEADER
1.1.4 Functional Failure: Failure to seal or partial seal on drill pipe through pipe rams - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


2.2.2.3)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)

3 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of hydraulic pumps Significant down time that impacts operation
Valves as Needed Stack (linked to 2.3.5.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Wear - Choke & Kill Lines & Valves - BOP Stack Flow meter reading is monitored (volume and resulting in spill with large impact
(linked to 2.3.5.5) time required to actuate are known. Too high a Release of hydrocarbons to atmosphere
External Leak/Rupture - Choke & Kill Lines & volume indicates a leak. Too long a time potentially resulting in fire/explosion hazard with
Valves - BOP Stack (linked to 2.3.5.1) indicates galling or leak.) large impact
Type (I, P or M): I
Down time, after well control issue is resolved,
Increasing system hydraulic pressure to repair an individual C&K valve that cannot be
Type (I, P or M): I operated
Pressure test of chambers is conducted at end of
well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack and control valves
Type (I, P or M): M
Wellbore test are conducted between wells and
every 14 days while drilling
Type (I, P or M): M

Enterprise A 18
LEADER
1.1.5 Functional Failure: Unintentional closing / opening - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Unintentional Operation Fails with no output - Power - Surface Control The hydraulic system has built-in redundancy Significant down time that impacts operations
Systems (linked to 2.1.2.2) Type (I, P or M): P Potential to overpressure standpipe and/or
Loss of Function - Power - Surface Control There are multiple annulars, with redundant pipe manifold leading to hydrocarbon release, fire, or
Systems (linked to 2.1.2.6) rams as backup, to ensure closure explosion
Mechanical Failure - MUX System - Surface Type (I, P or M): P
Control Systems (linked to 2.1.3.9) Pressure test of chambers is conducted at end of
Corrosion/Erosion - Choke & Kill Lines & Valves - well
BOP Stack (linked to 2.3.5.6) Type (I, P or M): M
Erratic output (Erratic, Intermittent) - Power - Shell test using end of tail rod between wells, on
Surface Control Systems (linked to 2.1.2.3) surface
Type (I, P or M): M
Ground Faults - Power - Surface Control Systems
(linked to 2.1.2.7) Weekly function test of stack and control valves
Type (I, P or M): M
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7) Wellbore test are conducted between wells and
every 14 days while drilling
Ground Fault - Blue & Yellow Control Systems - Type (I, P or M): M
Electrical - Subsea Control Systems (linked to
2.2.1.6)
Internal Leak - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.2)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Electrical Short - Power - Surface Control
Systems (linked to 2.1.2.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Loss of Power (UPS Shuts down with power
degradation) - Power - Surface Control Systems
(linked to 2.1.2.1)
Loss of subsea transformer - Power - Surface
Control Systems (linked to 2.1.2.8)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
Enterprise A 19
LEADER
1.1.5 Functional Failure: Unintentional closing / opening - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Unintentional Opening No scenarios resulting in unintentional opening


during 'Close and seal on the drill pipe and allow
circulation on demand'

Enterprise A 20
LEADER
1.1.6 Functional Failure: Failure to open / close fail-safe valves - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Actuate Under Fail- Mechanical Failure - Connectors - BOP Stack Close manual valves at choke manifold on Significant down time that impacts operation
safe Conditions (linked to 2.3.6.4) surface Release of hydrocarbons to air or sea potentially
Corrosion/Erosion - Blue & Yellow Control Type (I, P or M): P resulting in spill with large impact
Systems - Hydraulics - Subsea Control Systems Redundant valves in series on stack Release of hydrocarbons to atmosphere
(linked to 2.2.2.6) Type (I, P or M): P potentially resulting in fire/explosion hazard with
Mechanical Failure - Autoshear System - BOP Valves close via hydraulic/or spring if hydraulic large impact
Stack (linked to 2.3.7.4) open pressure bleeds Down time, after well control issue is resolved,
Mechanical Failure - Blue & Yellow Control Type (I, P or M): P to repair an individual C&K valve that cannot be
Systems - Hydraulics - Subsea Control Systems Maintenance/overhaul of annulars is performed operated
(linked to 2.2.2.4) at the completion of every well. Between well
Mechanical Failure - Hydraulic Supply: Rigid maintenance - specifically tested for proper
Conduit and Manifold - Subsea Control Systems operation
(linked to 2.2.5.4) Type (I, P or M): M
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

2 Failure to Adequately Seal No scenarios resulting in failure to adequately


Under Fail-safe Conditions seal under fail-safe conditions during 'Close and
seal on the drill pipe and allow circulation on
demand'

Enterprise A 21
LEADER
1.1.7 Functional Failure: Closes too slowly - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Actuates Too Slowly on Air in hydraulic system Hydraulic fluid flow meter Increased influx of hydrocarbons into Riser
Demand Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I resulting in safety (fire/explosion) and/or
to 2.1.1.3) Wellbore flow environmental effects
Mechanical Failure - HPU - Surface Control Type (I, P or M): I Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Redundant annulars with redundant pipe rams to repair an individual C&K valve that cannot be
Type (I, P or M): P operated
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3) Redundant controls
Loss of Function (general) - HPU - Surface Type (I, P or M): P
Control Systems (linked to 2.1.1.7) Maintenance/overhaul at end of every well for
Loss of Function (general) - Hydraulic Supply - annulars
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): M
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)

Enterprise A 22
LEADER
1.1.7 Functional Failure: Closes too slowly - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)

Enterprise A 23
LEADER
1.1.8 Functional Failure: Loss of containment - Close and seal on the drill pipe and allow circulation on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak Mechanical Failure - Blind Shear Ram - BOP Connectors tested with casing test & blind shear Potential for the release of significant amount of
Stack (linked to 2.3.2.4) ram test hydrocarbon to the environment
External Leak/Rupture - Casing Shear Ram - BOP Type (I, P or M): M Drilling mud spill to the environment
Stack (linked to 2.3.3.1) Pressure test every 14 days Potential for Fire/Explosion, with severity
External Leak/Rupture - Blind Shear Ram - BOP Type (I, P or M): M depending on location. (For example, if failed at
Stack (linked to 2.3.2.1) ROV inspection every 3 days choke manifold connection, large fire could
Mechanical Failure - Pipe & Test Rams - BOP Type (I, P or M): M result.)
Stack (linked to 2.3.4.4) If loss of containment is at wellhead connector,
Loss of Function (general) - Hydraulic Supply - it could result in a medium release to the
Surface Control Systems (linked to 2.1.4.7) environment due to limited mitigation options
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
External Leak/Rupture - Pipe & Test Rams - BOP
Stack (linked to 2.3.4.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)

2 Rupture Not credible causes resulting in rupture during


'Close and seal on the drill pipe and allow
circulation on demand'

Enterprise A 24
LEADER
2- Close and seal on open hole and allow volumetric
well control operations, on demand

Enterprise A 25
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Wiring harness fails Atypical current across solenoid coil Significant down time that impacts operation
Signal to Annular / Blind- Loss of Power (UPS Shuts down with power Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Shear Ram or C&K Valves degradation) - Power - Surface Control Systems Communications failure via flashing red screen resulting in spill with large impact
When Demanded (linked to 2.1.2.1) on touch screen Release of hydrocarbons to atmosphere
Electrical Short - Power - Surface Control Type (I, P or M): I potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.2.5) Mud on rig floor large impact
Erratic output (Network) - MUX System - Surface Type (I, P or M): I Down time, after well control issue is resolved,
Control Systems (linked to 2.1.3.4) No flow in flow meters to repair an individual C&K valve that cannot be
Short - MUX System - Surface Control Systems Type (I, P or M): I operated
(linked to 2.1.3.7) Pod mismatch & alarm
Fails with no output signal/communication - MUX Type (I, P or M): I
System - Surface Control Systems (linked to Redundant mechanicals
2.1.3.2) Type (I, P or M): P
Fails to respond to input - MUX System - Surface Redundant touch screen, controllers, control
Control Systems (linked to 2.1.3.5) pods, cables, powers supplies, SEM
Loss of function (general) - MUX System - Type (I, P or M): P
Surface Control Systems (linked to 2.1.3.8) Function test (or obtain waiver) blind shear ram
Loss of, or Degraded Power - Control Panels - every 7 days (used to be every 30 days, recent
Surface Control Systems (linked to 2.1.5.1) BSEE regulation change in last 6 months)
Type (I, P or M): M
Fails to respond (with no output
signal/communication or to input) - Control Function tests between wells and upon latch-up
Panels - Surface Control Systems (linked to Type (I, P or M): M
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

Enterprise A 26
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems HPU pumps running constantly Significant down time that impacts operation
Fluid & Pressure to Annular / (linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Blind-Shear Ram or C&K Internal Leak - Blind Shear Ram - BOP Stack Manual indicators on valves that the ROV can resulting in spill with large impact
Valves (linked to 2.3.2.2) read Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I potentially resulting in fire/explosion hazard with
to 2.1.1.3) Design margin/safety factors (conduits work at large impact
Mechanical Failure - HPU - Surface Control 5k, max @ 7.5k) Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Type (I, P or M): P to repair an individual C&K valve that cannot be
Plugged - Annulars - BOP Stack - (linked to Multiple annulars & rams operated
2.3.1.3) Type (I, P or M): P
Internal Leak - Choke & Kill Lines & Valves - BOP Multiple annulars capable of closing hole.
Stack (linked to 2.3.5.2) Additional rams are not an option without a drill
string
Plugged - Choke & Kill Lines & Valves - BOP Type (I, P or M): P
Stack (linked to 2.3.5.3)
Multiple pumps (1 pump needed, 3 pumps
Loss of Function (general) - HPU - Surface present)
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
Internal Leak - Blue & Yellow Control Systems - Redundant conduit lines with ability to isolate
Hydraulics - Subsea Control Systems (linked to leaking line and cross-connect via conduit
2.2.2.2) manifold
External Leak/Rupture - Blind Shear Ram - BOP Type (I, P or M): P
Stack (linked to 2.3.2.1) Redundant functions between pods
Loss of Function (general) - Hydraulic Supply - Type (I, P or M): P
Surface Control Systems (linked to 2.1.4.7) Redundant regulators
Internal Leak - Connectors - BOP Stack (linked Type (I, P or M): P
to 2.3.6.2) Accumulators with stored energy
External Leak / Rupture - Blue & Yellow Control Type (I, P or M): P
Systems - Hydraulics - Subsea Control Systems Filter replacement frequency
(linked to 2.2.2.1) Type (I, P or M): M
External Leak/Rupture - Surface Control Systems Maintenance programs
- Accumulators - Surface (linked to 2.1.6.1) Type (I, P or M): M
Internal Leak - Surface Control Systems - ROV inspection every 3 days
Accumulators - Surface (linked to 2.1.6.2) Type (I, P or M): M
Mechanical Failure - Surface Control Systems - SOAK test between wells
Accumulators - Surface (linked to 2.1.6.4) Type (I, P or M): M
Wear - Surface Control Systems - Accumulators - Weekly BOP function test
Surface (linked to 2.1.6.5) Type (I, P or M): M
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Fluid Reservoir Unit -
Enterprise A 27
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Surface Control Systems (linked to 2.1.7.4)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

Enterprise A 28
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

3 Failure to Close Annular / Internal Leak - Annulars - BOP Stack (linked to Hydraulic fluid flow meter Significant down time that impacts operation
Blind-Shear Ram on Demand 2.3.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Internal Leak - Blind Shear Ram - BOP Stack Wellbore flow resulting in spill with large impact
(linked to 2.3.2.2) Type (I, P or M): I Release of hydrocarbons to atmosphere
External Leak/Rupture - Blind Shear Ram - BOP Other pipe rams & annular potentially resulting in fire/explosion hazard with
Stack (linked to 2.3.2.1) Type (I, P or M): P large impact
Internal Leak - Connectors - BOP Stack (linked Redundant controls Down time, after well control issue is resolved,
to 2.3.6.2) Type (I, P or M): P to repair an individual C&K valve that cannot be
External Leak/Rupture - Annulars - BOP Stack Redundant annulars with redundant pipe rams operated
(linked to 2.3.1.1) Type (I, P or M): P
Wear - Blind Shear Ram - BOP Stack (linked to Redundancy with fail-safe valves
2.3.2.5) Type (I, P or M): P
Shaft seal leaks with higher wellbore pressure ROV intervention - will close 1 of the pipe rams
than operating pressure to close side of piston Type (I, P or M): P
Mechanical Failure - Blind Shear Ram - BOP The only redundancies in this case are 2
Stack (linked to 2.3.2.4) annulars and 1 blind shear ram. The other pipe
External Leak/Rupture - Choke & Kill Lines & rams are not usable without the drill string in
Valves - BOP Stack (linked to 2.3.5.1) place.
Type (I, P or M): P
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5) Maintenance/overhaul at end of every well for
annulars
Type (I, P or M): M

4 Failure of Annular / Blind- Incorrect annular seal (bag) based on drilling Wellbore flow Significant down time that impacts operation
Shear Ram to Seal on mud Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Demand Age/storage related failure of seal (UV & Heat) Dimensional inspection of seal plate and wear resulting in spill with large impact
Washout of seal plate (frequency varies from between well, to Release of hydrocarbons to atmosphere
annually) potentially resulting in fire/explosion hazard with
Internal Leak - HPU - Surface Control Systems Type (I, P or M): P
(linked to 2.1.1.2) large impact
Redundant annulars Down time, after well control issue is resolved,
Plugged - HPU - Surface Control Systems (linked

Enterprise A 29
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


to 2.1.1.3) Type (I, P or M): P to repair an individual C&K valve that cannot be
External Leak/Rupture - HPU - Surface Control Redundant Rams operated
Systems (linked to 2.1.1.1) Type (I, P or M): P
Mechanical Failure - HPU - Surface Control End of well maintenance
Systems (linked to 2.1.1.4) Type (I, P or M): M
Mechanical Failure - Annulars - BOP Stack - Fourteen day functional testing of blind shears
(linked to 2.3.1.4) Type (I, P or M): M
Loss of Function (general) - HPU - Surface Pressure test of annulars every 14 days
Control Systems (linked to 2.1.1.7) Type (I, P or M): M
Internal Leak - Blue & Yellow Control Systems - Rebuild annulars between each well with
Hydraulics - Subsea Control Systems (linked to replacement (New lower, lower to upper & upper
2.2.2.2) to junk)
Internal leak - Hydraulic Supply: Rigid Conduit Type (I, P or M): M
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems

Enterprise A 30
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


(linked to 2.2.5.4)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)
Wear - Annulars - BOP Stack (linked to 2.3.1.5)

5 Failure to Maintain Adequate Internal Leak - HPU - Surface Control Systems Wellbore flow Significant down time that impacts operation
Sealing Pressure on Annular (linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
/ Blind-Shear Ram Plugged - HPU - Surface Control Systems (linked Dimensional inspection of seal plate and wear resulting in spill with large impact
to 2.1.1.3) plate (frequency varies from between well, to Release of hydrocarbons to atmosphere
External Leak/Rupture - HPU - Surface Control annually) potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.1) Type (I, P or M): P large impact
Mechanical Failure - HPU - Surface Control Redundant annulars Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Type (I, P or M): P to repair an individual C&K valve that cannot be
External Leak/Rupture - Surface Control Systems Redundant Rams operated
- Accumulators - Surface (linked to 2.1.6.1) Type (I, P or M): P
End of well maintenance
Enterprise A 31
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal Leak - Surface Control Systems - Type (I, P or M): M
Accumulators - Surface (linked to 2.1.6.2) Fourteen day functional testing of blind shears
External Leak/Rupture - Blind Shear Ram - BOP Type (I, P or M): M
Stack (linked to 2.3.2.1) Pressure test of annulars every 14 days
External Leak / Rupture - Blue & Yellow Control Type (I, P or M): M
Systems - Hydraulics - Subsea Control Systems Rebuild annulars between each well with
(linked to 2.2.2.1) replacement (New lower, lower to upper & upper
Internal Leak - Blue & Yellow Control Systems - to junk)
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): M
2.2.2.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Annulars - BOP Stack -
(linked to 2.3.1.4)
Wear - Annulars - BOP Stack (linked to 2.3.1.5)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)

Enterprise A 32
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Incorrect annular seal (bag) based on drilling
mud
Age/storage related failure of seal (UV & Heat)
Washout of seal
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

Enterprise A 33
LEADER
1.2.1 Functional Failure: Failure to close on open hole through blind-shear rams or annular - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

6 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of pump Significant down time that impacts operation
Valves as Needed Stack (linked to 2.3.5.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
External Leak/Rupture - Choke & Kill Lines & Flow meter (volume to actuate is known, should resulting in spill with large impact
Valves - BOP Stack (linked to 2.3.5.1) go 0 to 0.7 to 0 in ~ 5 seconds) If too high = Release of hydrocarbons to atmosphere
Wear - Choke & Kill Lines & Valves - BOP Stack leak. If long time = galling or leak potentially resulting in fire/explosion hazard with
(linked to 2.3.5.5) Type (I, P or M): I large impact
Increasing pressure Down time, after well control issue is resolved,
Type (I, P or M): I to repair an individual C&K valve that cannot be
Pressure test chambers at end of well operated
Type (I, P or M): P
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack
Type (I, P or M): M
Wellbore test between wells and 14 while subsea
Type (I, P or M): M

Enterprise A 34
LEADER
1.2.2 Functional Failure: Unintentional closing / opening - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Unintentional Closing Fails with no output - Power - Surface Control Redundant BOPs Down time with potential impact on operation
Systems (linked to 2.1.2.2) Type (I, P or M): P Potential to overpressure standpipe and
Erratic output (Erratic, Intermittent) - Power - Redundancy in hydraulic system manifold, leading to gas migration and/or fire
Surface Control Systems (linked to 2.1.2.3) Type (I, P or M): P and/or explosion
Loss of Function - Power - Surface Control Standard pressure/functional testing
Systems (linked to 2.1.2.6) Type (I, P or M): M
Mechanical Failure - MUX System - Surface
Control Systems (linked to 2.1.3.9)
Ground Faults - Power - Surface Control Systems
(linked to 2.1.2.7)
Electrical Short - Power - Surface Control
Systems (linked to 2.1.2.5)
Loss of subsea transformer - Power - Surface
Control Systems (linked to 2.1.2.8)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Loss of Power (UPS Shuts down with power
degradation) - Power - Surface Control Systems
(linked to 2.1.2.1)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Ground Fault - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.6)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)

Enterprise A 35
LEADER
1.2.2 Functional Failure: Unintentional closing / opening - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Unintentional Opening No credible causes resulting in unintentional


opening during 'Close and seal on open hole and
allow volumetric well control operations on
demand'

Enterprise A 36
LEADER
1.2.3 Functional Failure: Failure to open/close fail-safe valves - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Actuate Under Fail- No credible causes resulting in a failure to


safe Conditions actuate under fail-safe conditions during 'Close
and seal on open hole and allow volumetric well
control operations on demand'

2 Failure to Adequately Seal No credible causes resulting in failure to


Under Fail-safe Conditions adequately seal under fail-safe conditions during
'Close and seal on open hole and allow
volumetric well control operations on demand'

Enterprise A 37
LEADER
1.2.4 Functional Failure: Closes too slowly - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Actuates Too Slowly on No credible causes resulting in Actuates Too


Demand Slowly on Demand during 'Close and seal on
open hole and allow volumetric well control
operations on demand'

Enterprise A 38
LEADER
1.2.5 Functional Failure: Loss of containment - Close and seal on open hole and allow volumetric well control operations on demand

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak No credible causes resulting in an external leak


during 'Close and seal on open hole and allow
volumetric well control operations on demand'

2 Rupture No credible causes resulting in a rupture during


'Close and seal on open hole and allow
volumetric well control operations on demand'

Enterprise A 39
LEADER
3- Strip the drill string using the annular BOP(s)

Enterprise A 40
LEADER
1.3.1 Functional Failure: Failure to close annulars - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Electrical Short - Power - Surface Control Wellbore flow Significant down time that impacts operation
Signal to Annulars When Systems (linked to 2.1.2.5) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Demanded Loss of Power (UPS Shuts down with power From drillers chair/console it is two switches that resulting in spill with large impact
degradation) - Power - Surface Control Systems are both covered Release of hydrocarbons to atmosphere
(linked to 2.1.2.1) Type (I, P or M): P potentially resulting in fire/explosion hazard with
Erratic output (Network) - MUX System - Surface Redundant annulars large impact
Control Systems (linked to 2.1.3.4) Type (I, P or M): P Down time, after well control issue is resolved,
Fails with no output signal/communication - MUX Redundant Rams to repair an individual C&K valve that cannot be
System - Surface Control Systems (linked to Type (I, P or M): P operated
2.1.3.2) Two hand operation, Password, confirmation
Loss of, or Degraded Power - Control Panels - Type (I, P or M): P
Surface Control Systems (linked to 2.1.5.1) Pressure test every 14 days
Fails to respond to input - Electrical - Blue & Type (I, P or M): M
Yellow Control Systems - Electrical - Subsea Rebuild annulars between each well with
Control Systems (linked to 2.2.1.4) replacement (New lower, lower to upper & upper
Loss of function (general) - Blue & Yellow to junk)
Control Systems - Electrical - Subsea Control Type (I, P or M): M
Systems (linked to 2.2.1.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Wiring harness fails
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

Enterprise A 41
LEADER
1.3.1 Functional Failure: Failure to close annulars - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems HPU pumps running constantly Significant down time that impacts operation
Fluid & Pressure to Annulars (linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Plugged - HPU - Surface Control Systems (linked Manual indicators on valves that the ROV can resulting in spill with large impact
to 2.1.1.3) read Release of hydrocarbons to atmosphere
External Leak/Rupture - HPU - Surface Control Type (I, P or M): I potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.1) Accumulators with stored energy large impact
Mechanical Failure - HPU - Surface Control Type (I, P or M): P Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Design margin/safety factors (conduits work at to repair an individual C&K valve that cannot be
Loss of Function (general) - HPU - Surface 5k, max @ 7.5k) operated
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
Plugged - Choke & Kill Lines & Valves - BOP Multiple annulars & rams
Stack (linked to 2.3.5.3) Type (I, P or M): P
Internal Leak - Choke & Kill Lines & Valves - BOP Multiple pumps (1 pump needed, 3 pumps
Stack (linked to 2.3.5.2) present)
Type (I, P or M): P
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2) Redundant conduit lines with ability to isolate
leaking line and cross-connect via conduit
External Leak / Rupture - Blue & Yellow Control manifold
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1)
Redundant functions between pods
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to
2.2.2.2) Redundant regulators
Type (I, P or M): P
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7) Filter replacement frequency
Type (I, P or M): M
Plugged - Annulars - BOP Stack - (linked to
2.3.1.3) Maintenance programs
Type (I, P or M): M
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4) ROV inspection every 3 days
Type (I, P or M): M
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to SOAK test between wells
2.2.5.2) Type (I, P or M): M
Internal Leak - Annulars - BOP Stack (linked to Weekly BOP function test
2.3.1.2) Type (I, P or M): M
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Enterprise A 42
LEADER
1.3.1 Functional Failure: Failure to close annulars - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Choke & Kill Lines & Valves -

Enterprise A 43
LEADER
1.3.1 Functional Failure: Failure to close annulars - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


BOP Stack (linked to 2.3.5.4)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

3 Failure to Close Annulars on External Leak/Rupture - Annulars - BOP Stack Hydraulic fluid flow meter Significant down time that impacts operation
Drill String on Demand (linked to 2.3.1.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Wellbore flow resulting in spill with large impact
Type (I, P or M): I Release of hydrocarbons to atmosphere
Redundant annulars with redundant pipe rams potentially resulting in fire/explosion hazard with
Type (I, P or M): P large impact
Redundant controls Down time, after well control issue is resolved,
Type (I, P or M): P to repair an individual C&K valve that cannot be
Maintenance/overhaul at end of every well for operated
annulars
Type (I, P or M): M

Enterprise A 44
LEADER
1.3.2 Functional Failure: Failure to maintain stripping pressure - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Maintain Hydraulic Internal Leak - HPU - Surface Control Systems Flow (returns through riser) of well Significant down time that impacts operation
Fluid & Pressure to Annulars (linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Loss of Function (general) - HPU - Surface Pressure readings on annular resulting in spill with large impact
Control Systems (linked to 2.1.1.7) Type (I, P or M): I Release of hydrocarbons to atmosphere
External Leak / Rupture - Blue & Yellow Control Accumulators potentially resulting in fire/explosion hazard with
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P large impact
(linked to 2.2.2.1) Check valves in rigid conduit Down time, after well control issue is resolved,
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P to repair an individual C&K valve that cannot be
Hydraulics - Subsea Control Systems (linked to Second annular operated
2.2.2.2) Type (I, P or M): P
Internal Leak - Fluid Reservoir Unit - Surface Redundant pods
Control Systems (linked to 2.1.7.2) Type (I, P or M): P
Internal leak - Hydraulic Supply: Rigid Conduit Test connector/chamber check valves
and Manifold - Subsea Control Systems (linked to Type (I, P or M): M
2.2.5.2)
Test performed every 14 days
Mechanical Failure - Hydraulic Supply: Rigid Type (I, P or M): M
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4) Weekly function test
Type (I, P or M): M
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

Enterprise A 45
LEADER
1.3.3 Functional Failure: Failure to seal - Strip the drill string using the annular BOP(s)

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Annulars to Seal on Incorrect annular seal (bag) based on drilling Wellbore flow Significant down time that impacts operation
Demand mud Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Inadequate operating pressure Ability to increase operating pressure resulting in spill with large impact
Mechanical Failure - Annulars - BOP Stack (linked Type (I, P or M): P Release of hydrocarbons to atmosphere
to 2.3.1.4) Redundant annulars potentially resulting in fire/explosion hazard with
Wear - Annulars - BOP Stack (linked to 2.3.1.5) Type (I, P or M): P large impact
External Leak/Rupture - Annulars - BOP Stack Redundant Rams Down time, after well control issue is resolved,
(linked to 2.3.1.1) Type (I, P or M): P to repair an individual C&K valve that cannot be
Pressure test every 14 days operated
Type (I, P or M): M
Rebuild annulars between each well with
replacement (New lower, lower to upper & upper
to junk)
Type (I, P or M): M

2 Failure to Maintain Sealing Incorrect annular seal (bag) based on drilling Wellbore flow Significant down time that impacts operation
Pressure on Annulars mud Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Mechanical Failure - Annulars - BOP Stack (linked Ability to increase operating pressure resulting in spill with large impact
to 2.3.1.4) Type (I, P or M): P Release of hydrocarbons to atmosphere
Inadequate operating pressure Redundant annulars potentially resulting in fire/explosion hazard with
Wear - Annulars - BOP Stack (linked to 2.3.1.5) Type (I, P or M): P large impact
External Leak/Rupture - Annulars - BOP Stack Rams are a back up and can be used to seal Down time, after well control issue is resolved,
(linked to 2.3.1.1) around drill pipe to repair an individual C&K valve that cannot be
Type (I, P or M): P operated
Redundant Rams
Type (I, P or M): P
Pressure test every 14 days
Type (I, P or M): M
Rebuild annulars between each well with
replacement (New lower, lower to upper & upper
to junk)
Type (I, P or M): M

Enterprise A 46
LEADER
4- Hang-off the drill pipe on a ram BOP and control
the wellbore

Enterprise A 47
LEADER
1.4.1 Functional Failure: Failure of hang-off ram to close - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Wiring harness fails Redundancy of annular and redundant pipe rams Potential down time that can impact operation
Signal to Hang-off Ram Loss of Power (UPS Shuts down with power Type (I, P or M): P No well control issues identified for this condition
When Demanded degradation) - Power - Surface Control Systems Redundancy with fail-safe valves due to other available options
(linked to 2.1.2.1) Type (I, P or M): P
Electrical Short - Power - Surface Control ROV intervention - will close 1 of the pipe rams
Systems (linked to 2.1.2.5) Type (I, P or M): P
Fails to respond to input - Electrical - Blue &
Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.4)
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)

Enterprise A 48
LEADER
1.4.1 Functional Failure: Failure of hang-off ram to close - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems Redundancy of annular and redundant pipe rams Potential down time that can impact operation
Fluid & Pressure to Hang-off (linked to 2.1.1.2) Type (I, P or M): P No well control issues identified for this condition
Ram Plugged - HPU - Surface Control Systems (linked Redundancy with fail-safe valves due to other available options
to 2.1.1.3) Type (I, P or M): P
External Leak/Rupture - HPU - Surface Control ROV intervention - will close 1 of the pipe rams
Systems (linked to 2.1.1.1) Type (I, P or M): P
Mechanical Failure - HPU - Surface Control
Systems (linked to 2.1.1.4)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
Internal Leak - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.2)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Plugged - Annulars - BOP Stack - (linked to
2.3.1.3)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Enterprise A 49
LEADER
1.4.1 Functional Failure: Failure of hang-off ram to close - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
Loss of Function - ROV Intervention Interface -

Enterprise A 50
LEADER
1.4.1 Functional Failure: Failure of hang-off ram to close - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


BOP Stack (linked to 2.3.8.3)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

3 Failure to Close Hang-off Shaft seal leaks with higher wellbore pressure Other pipe rams & annular Potential down time that can impact operation
Ram on Demand than operating pressure to close side of piston Type (I, P or M): P No well control issues identified for this condition
Internal Leak - Annulars - BOP Stack (linked to Redundancy of annular and redundant pipe rams due to other available options
2.3.1.2) Type (I, P or M): P
Internal Leak - Connectors - BOP Stack (linked Redundancy with fail-safe valves
to 2.3.6.2) Type (I, P or M): P
External Leak/Rupture - Annulars - BOP Stack ROV intervention - will close 1 of the pipe rams
(linked to 2.3.1.1) Type (I, P or M): P
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

Enterprise A 51
LEADER
1.4.2 Functional Failure: Failure to maintain closing pressure - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Maintain Closing Motion compensator fails to prevent excessive Motion compensator for drill string to avoid Potential down time/operational hit due to loss
Pressure on Hang-off Ram wear on ram blocks excess wear on seals of the drillpipe in the hole and having to pull the
Internal Leak - HPU - Surface Control Systems Type (I, P or M): P pipe
(linked to 2.1.1.2) MPL on rams
External Leak/Rupture - HPU - Surface Control Type (I, P or M): P
Systems (linked to 2.1.1.1) Multi position locking (MPL)
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): P
to 2.1.1.3) Redundant rams to hang-off
Mechanical Failure - HPU - Surface Control Type (I, P or M): P
Systems (linked to 2.1.1.4) Lock test on surface (without closing pressure)
Loss of Function (general) - HPU - Surface Type (I, P or M): M
Control Systems (linked to 2.1.1.7) Wellbore tests
Wear - Casing Shear Ram - BOP Stack (linked to Type (I, P or M): M
2.3.3.5)
Wear - Pipe & Test Rams - BOP Stack (linked to
2.3.4.5)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Enterprise A 52
LEADER
1.4.2 Functional Failure: Failure to maintain closing pressure - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)

Enterprise A 53
LEADER
1.4.3 Functional Failure: Failure to maintain locking - Hang-off the drill pipe on a ram BOP and control the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Engage Lock on Internal Leak - Blind Shear Ram - BOP Stack Pipe has dropped down the hole Potential down time/operational hit due to loss
Hang-off Ram (linked to 2.3.2.2) Type (I, P or M): I of the drillpipe in the hole and having to pull the
External Leak/Rupture - Blind Shear Ram - BOP Rams are periodically lock tested on surface pipe
Stack (linked to 2.3.2.1) (without closing pressure)
Wear - Casing Shear Ram - BOP Stack (linked to Type (I, P or M): M
2.3.3.5) Signature tests using low pressure (i.e., 50 psi)
Wear - Blind Shear Ram - BOP Stack (linked to to test ram drag between wells. Use hot-line to
2.3.2.5) ram to test pressure required to close ram.
Expectation is that pressure will stay low during
Mechanical Failure - Casing Shear Ram - BOP test, until rams are fully closed.
Stack (linked to 2.3.3.4) Type (I, P or M): M
Mechanical Failure - Blind Shear Ram - BOP Surface pressure tests on the ram
Stack (linked to 2.3.2.4) Type (I, P or M): M
Wellbore test are conducted between wells and
every 14 days while drilling
Type (I, P or M): M

Enterprise A 54
LEADER
5- Controlled operation - Shear the drill pipe and seal
the wellbore

Enterprise A 55
LEADER
1.5.1 Functional Failure: Failure to close - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Wiring harness fails E/H backup Significant down time that impacts operation
Signal to Shear Ram When Loss of Power (UPS Shuts down with power Type (I, P or M): P Release of hydrocarbons to air or sea potentially
Demanded degradation) - Power - Surface Control Systems Redundancy of annular and redundant pipe rams resulting in spill with large impact
(linked to 2.1.2.1) Type (I, P or M): P Release of hydrocarbons to atmosphere
Electrical Short - Power - Surface Control Redundancy with fail-safe valves potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.2.5) Type (I, P or M): P large impact
Fails to respond to input - Electrical - Blue & ROV intervention - will close 1 of the pipe rams Down time, after well control issue is resolved,
Yellow Control Systems - Electrical - Subsea Type (I, P or M): P to repair an individual C&K valve that cannot be
Control Systems (linked to 2.2.1.4) operated
Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

Enterprise A 56
LEADER
1.5.1 Functional Failure: Failure to close - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure to Supply Hydraulic Internal Leak - HPU - Surface Control Systems Redundancy of annular and redundant pipe rams Significant down time that impacts operation
Fluid & Pressure to Shear (linked to 2.1.1.2) Type (I, P or M): P Release of hydrocarbons to air or sea potentially
Ram Plugged - HPU - Surface Control Systems (linked Redundancy with fail-safe valves resulting in spill with large impact
to 2.1.1.3) Type (I, P or M): P Release of hydrocarbons to atmosphere
Mechanical Failure - HPU - Surface Control ROV intervention - will close 1 of the pipe rams potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.4) Type (I, P or M): P large impact
Loss of Function (general) - HPU - Surface Down time, after well control issue is resolved,
Control Systems (linked to 2.1.1.7) to repair an individual C&K valve that cannot be
Plugged - Choke & Kill Lines & Valves - BOP operated
Stack (linked to 2.3.5.3)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal Leak - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.2)
Plugged - Annulars - BOP Stack - (linked to
2.3.1.3)
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Surface Control Systems
Enterprise A 57
LEADER
1.5.1 Functional Failure: Failure to close - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External Leak/Rupture - Annulars - BOP Stack
(linked to 2.3.1.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

Enterprise A 58
LEADER
1.5.1 Functional Failure: Failure to close - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - HPU - Surface Control
Systems (linked to 2.1.1.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

Enterprise A 59
LEADER
1.5.2 Functional Failure: Failure to shear the drill pipe - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Shear Pipe Having incorrect space out/non-shearables Improper gallon count on hydraulics & flow Significant down time that impacts operation
across the rams meter Release of hydrocarbons to air or sea potentially
Internal Leak - HPU - Surface Control Systems Type (I, P or M): I resulting in spill with large impact
(linked to 2.1.1.2) No change in string weight (likely first indication) Release of hydrocarbons to atmosphere
External Leak/Rupture - HPU - Surface Control Type (I, P or M): I potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.1) Wellbore flow large impact
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I Down time, after well control issue is resolved,
to 2.1.1.3) All operators have been upgraded to 5k psi pipe to repair an individual C&K valve that cannot be
Mechanical Failure - HPU - Surface Control rams operated
Systems (linked to 2.1.1.4) Type (I, P or M): P
Loss of Function (general) - HPU - Surface Open shear, move pipe and re-attempt shear
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
Corrosion/Erosion - Casing Shear Ram - BOP Other shear rams (priority would be casing
Stack (linked to 2.3.3.6) shears & then blind shear rams)
Type (I, P or M): P
Corrosion/Erosion - Blind Shear Ram - BOP Stack
(linked to 2.3.2.6) Planning of contingencies before putting non-
shearables down the hole
Internal Leak - Casing Shear Ram - BOP Stack Type (I, P or M): P
(linked to 2.3.3.2)
Rotate the drill pipe and pull (twist off pipe)
External Leak / Rupture - Blue & Yellow Control Type (I, P or M): P
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1) Annual inspection of shear rams and shear-ram
blocks & blades. Replace blades after shearing,
Loss of Function (general) - Hydraulic Supply - or every 5 years for full NDT and certification.
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): M
Internal Leak - Blue & Yellow Control Systems - Shear tests performed for variety of pipe
Hydraulics - Subsea Control Systems (linked to used/provided. Sent specimen with higher
2.2.2.2) elongation % for testing. Rental pipe requires
External Leak/Rupture - Surface Control Systems certification of properties and shearability.
- Accumulators - Surface (linked to 2.1.6.1) Subsea shearing tests were performed as
Internal Leak - Blind Shear Ram - BOP Stack validation, post-Macondo
(linked to 2.3.2.2) Type (I, P or M): M
External Leak/Rupture - Blind Shear Ram - BOP Tests performed to validate shearability of off-
Stack (linked to 2.3.2.1) centered pipe
Type (I, P or M): M
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)

Enterprise A 60
LEADER
1.5.2 Functional Failure: Failure to shear the drill pipe - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)

Enterprise A 61
LEADER
1.5.2 Functional Failure: Failure to shear the drill pipe - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

Enterprise A 62
LEADER
1.5.3 Functional Failure: Failure to seal the wellbore - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Shear Ram to Seal Shear seat not in correct location Improper gallon count on hydraulics & flow Significant down time that impacts operation
On Demand Obstruction of sealing surface meter Release of hydrocarbons to air or sea potentially
Type (I, P or M): I resulting in spill with large impact
Trash in the well (swarf, concrete, etc.)
No change in string weight (likely first indication) Release of hydrocarbons to atmosphere
Internal Leak - HPU - Surface Control Systems Type (I, P or M): I
(linked to 2.1.1.2) potentially resulting in fire/explosion hazard with
Wellbore flow large impact
External Leak/Rupture - HPU - Surface Control Type (I, P or M): I
Systems (linked to 2.1.1.1) Down time, after well control issue is resolved,
All operators have been upgraded to 5k psi pipe to repair an individual C&K valve that cannot be
Plugged - HPU - Surface Control Systems (linked rams operated
to 2.1.1.3) Type (I, P or M): P
Mechanical Failure - HPU - Surface Control Dimensional inspection of seal plate and wear
Systems (linked to 2.1.1.4) plate (frequency varies from between well, to
Loss of Function (general) - HPU - Surface annually)
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
External Leak/Rupture - Surface Control Systems Open shear, move pipe and re-attempt shear
- Accumulators - Surface (linked to 2.1.6.1) Type (I, P or M): P
Corrosion/Erosion - Blind Shear Ram - BOP Stack Other shear rams (priority would be casing
(linked to 2.3.2.6) shears & then blind shear rams)
Corrosion/Erosion - Casing Shear Ram - BOP Type (I, P or M): P
Stack (linked to 2.3.3.6) Planning of contingencies before putting non-
External Leak / Rupture - Blue & Yellow Control shearables down the hole
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1) Redundant pipe rams and annulars
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Rotate the drill pipe and pull (twist off pipe)
2.2.2.2) Type (I, P or M): P
Loss of Function (general) - Hydraulic Supply - Annual inspection of shear rams and shear-ram
Surface Control Systems (linked to 2.1.4.7) blocks & blades. Replace blades after shearing,
Internal Leak - Blind Shear Ram - BOP Stack or every 5 years for full NDT and certification.
(linked to 2.3.2.2) Type (I, P or M): M
Having incorrect space out/non-shearables End of well maintenance
across the rams Type (I, P or M): M
Internal Leak - Casing Shear Ram - BOP Stack Fourteen day functional testing of blind shears
(linked to 2.3.3.2) Type (I, P or M): M
External Leak/Rupture - Hydraulic Supply - Shear tests performed for variety of pipe
Surface Control Systems (linked to 2.1.4.1) used/provided. Sent specimen with higher
elongation % for testing. Rental pipe requires
Plugged - Blue & Yellow Control Systems -
certification of properties and shearability.
Hydraulics - Subsea Control Systems (linked to
Subsea shearing tests were performed as
2.2.2.3)
validation, post-Macondo
Internal leak - Hydraulic Supply: Rigid Conduit Type (I, P or M): M
and Manifold - Subsea Control Systems (linked to
Tests performed to validate shearability of off-
2.2.5.2)
centered pipe
Type (I, P or M): M

Enterprise A 63
LEADER
1.5.3 Functional Failure: Failure to seal the wellbore - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)

Enterprise A 64
LEADER
1.5.3 Functional Failure: Failure to seal the wellbore - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

2 Failure to Maintain Sealing Internal Leak - HPU - Surface Control Systems Motion compensator for drill string to avoid Significant down time that impacts operation
Pressure on Shear Ram (linked to 2.1.1.2) excess wear on seals Release of hydrocarbons to air or sea potentially
External Leak/Rupture - HPU - Surface Control Type (I, P or M): P resulting in spill with large impact
Systems (linked to 2.1.1.1) MPL Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): P potentially resulting in fire/explosion hazard with
to 2.1.1.3) Multiposition locking (MPL) large impact
Mechanical Failure - HPU - Surface Control Type (I, P or M): P Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Lock test on surface (without closing pressure) to repair an individual C&K valve that cannot be
Loss of Function (general) - HPU - Surface Type (I, P or M): M operated
Control Systems (linked to 2.1.1.7) Wellbore tests
External Leak / Rupture - Blue & Yellow Control Type (I, P or M): M
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Motion compensator fails to prevent excessive
wear on ram blocks

Enterprise A 65
LEADER
1.5.3 Functional Failure: Failure to seal the wellbore - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)

Enterprise A 66
LEADER
1.5.4 Functional Failure: Unintentional closing / opening - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Unintentional Closing Internal Leak - Autoshear System - BOP Stack No known single failure (i.e., arm solenoid then Significant down time that impacts operation
(linked to 2.3.7.2) fire solenoid) Release of hydrocarbons to air or sea potentially
External Leak/Rupture - Autoshear System - BOP Type (I, P or M): P resulting in spill with large impact
Stack (linked to 2.3.7.1) Weekly BOP function test Release of hydrocarbons to atmosphere
Mechanical Failure - Autoshear System - BOP Type (I, P or M): M potentially resulting in fire/explosion hazard with
Stack (linked to 2.3.7.4) large impact
Down time, after well control issue is resolved,
to repair an individual C&K valve that cannot be
operated

2 Unintentional Opening External Leak/Rupture - HPU - Surface Control Flow meter, if closely monitoring Significant down time that impacts operation
Systems (linked to 2.1.1.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Internal Leak - HPU - Surface Control Systems Procedural steps to check control system status resulting in spill with large impact
(linked to 2.1.1.2) of ram/valve location prior to latch back Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): P potentially resulting in fire/explosion hazard with
to 2.1.1.3) large impact
Mechanical Failure - HPU - Surface Control
Systems (linked to 2.1.1.4)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)

Enterprise A 67
LEADER
1.5.4 Functional Failure: Unintentional closing / opening - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)

Enterprise A 68
LEADER
1.5.5 Functional Failure: Closes too slowly - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Actuates Too Slowly on Plugged - HPU - Surface Control Systems (linked Gallon count If drillpipe has not been sheared, and is still
Demand to 2.1.1.3) Type (I, P or M): I moving, joint could damage shear ram resulting
Plugged - Choke & Kill Lines & Valves - BOP Hydraulic flow meter in serious operational issues
Stack (linked to 2.3.5.3) Type (I, P or M): I Likelihood of additional influx of hydrocarbons
Plugged - Blue & Yellow Control Systems - String weight indicator into Riser resulting in severe
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): I safety/environmental effects
2.2.2.3) High pressure close option Down time, after well control issue is resolved,
Plugged - Hydraulic Supply: Rigid Conduit and Type (I, P or M): P to repair an individual C&K valve that cannot be
Manifold - Subsea Control Systems (linked to operated
Weekly function tests
2.2.5.3) Type (I, P or M): M

Enterprise A 69
LEADER
1.5.6 Functional Failure: Loss of containment - Controlled operation - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak External Leak/Rupture - HPU - Surface Control Hydraulic fluid flow meter Likelihood of additional influx of hydrocarbons
Systems (linked to 2.1.1.1) Type (I, P or M): I into Riser resulting in severe
External Leak / Rupture - Blue & Yellow Control Wellbore flow safety/environmental effects
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): I Down time, after well control issue is resolved,
(linked to 2.2.2.1) Redundant annulars with redundant pipe rams to repair an individual C&K valve that cannot be
External leak/rupture - Hydraulic Supply: Rigid Type (I, P or M): P operated
Conduit and Manifold - Subsea Control Systems Redundant controls
(linked to 2.2.5.1) Type (I, P or M): P
External Leak/Rupture - Choke & Kill Lines & ROV intervention
Valves - BOP Stack (linked to 2.3.5.1) Type (I, P or M): P
Maintenance/overhaul at end of every well for
annulars
Type (I, P or M): M

2 Rupture No credible causes resulting in rupture during Significant down time that impacts operation
'Controlled operation - Shear the drill pipe and Release of hydrocarbons to air or sea potentially
seal the wellbore' resulting in spill with large impact

Enterprise A 70
LEADER
6- Emergency Operation: Auto-Shear - Shear the drill
pipe and seal the wellbore

Enterprise A 71
LEADER
1.6.1 Functional Failure: Failure to Arm - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Loss of, or Degraded Power - Secondary & No electrical feedback (pod mismatch) that the Down time/operational impact as this action is
Signal Emergency Control Systems - Surface Control solenoid operated completed after landing BOP. If re-arming fails,
Systems (linked to 2.1.8.1) Type (I, P or M): I operations will stop and the cause(s)
Loss of Power (UPS Shuts down with power Redundant touch screen, controllers, control investigated
degradation) - Power - Surface Control Systems pods, cables, powers supplies, SEM exist
(linked to 2.1.2.1) Type (I, P or M): P
Electrical Short - Power - Surface Control ROV has the ability to arm the system subsea
Systems (linked to 2.1.2.5) Type (I, P or M): P
Fails to respond to input - Electrical - Blue & Autoshear is rebuilt every year
Yellow Control Systems - Electrical - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.1.4) Subsea testing occurs once the BOP is latched-
Loss of function (general) - Blue & Yellow up
Control Systems - Electrical - Subsea Control Type (I, P or M): M
Systems (linked to 2.2.1.7) Surface testing between every well
Wiring harness fails Type (I, P or M): M
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)

Enterprise A 72
LEADER
1.6.1 Functional Failure: Failure to Arm - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)

Enterprise A 73
LEADER
1.6.2 Functional Failure: Failure to close - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Supply Hydraulic External Leak/Rupture - HPU - Surface Control Redundancy of annular and redundant pipe rams Significant down time that impacts operation
Fluid & Pressure to Shear Systems (linked to 2.1.1.1) Type (I, P or M): P Release of hydrocarbons to air or sea potentially
Ram Internal Leak - HPU - Surface Control Systems Redundancy with fail-safe valves resulting in spill with large impact
(linked to 2.1.1.2) Type (I, P or M): P Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked ROV intervention - will close 1 of the pipe rams potentially resulting in fire/explosion hazard with
to 2.1.1.3) Type (I, P or M): P large impact
Mechanical Failure - HPU - Surface Control Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) to repair an individual C&K valve that cannot be
Loss of Function (general) - HPU - Surface operated
Control Systems (linked to 2.1.1.7)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Internal Leak - Blind Shear Ram - BOP Stack
(linked to 2.3.2.2)
Internal Leak - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.2)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Internal Leak - Casing Shear Ram - BOP Stack
(linked to 2.3.3.2)
External Leak/Rupture - Autoshear System - BOP
Stack (linked to 2.3.7.1)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)

Enterprise A 74
LEADER
1.6.2 Functional Failure: Failure to close - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

Mechanical Failure - Blue & Yellow Control


Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Internal Leak - Autoshear System - BOP Stack
(linked to 2.3.7.2)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)

Enterprise A 75
LEADER
1.6.2 Functional Failure: Failure to close - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

Plugged - Hydraulic Supply: Rigid Conduit and


Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)

2 Failure to initiate autoshear Internal Leak - HPU - Surface Control Systems If ROV is present, pressure decrease in Significant down time that impacts operation
sequence (linked to 2.1.1.2) accumulator will be evident Release of hydrocarbons to air or sea potentially
External Leak/Rupture - Surface Control Systems Type (I, P or M): I resulting in spill with large impact
- Accumulators - Surface (linked to 2.1.6.1) If testing, indicators exist on surface (MUX Release of hydrocarbons to atmosphere
Internal Leak - Surface Control Systems - alarms) potentially resulting in fire/explosion hazard with
Accumulators - Surface (linked to 2.1.6.2) Type (I, P or M): I large impact
Wear - Surface Control Systems - Accumulators - ROV can arm and close the rams subsea Down time, after well control issue is resolved,
Surface (linked to 2.1.6.5) Type (I, P or M): P to repair an individual C&K valve that cannot be
External Leak / Rupture - Blue & Yellow Control Testing of system between wells on surface operated
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): M
(linked to 2.2.2.1) Testing of system once latched-up
Loss of Function (general) - Surface Control Type (I, P or M): M
Systems - Accumulators - Surface (linked to
2.1.6.7)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
External Leak/Rupture - Autoshear System - BOP
Stack (linked to 2.3.7.1)
Enterprise A 76
LEADER
1.6.2 Functional Failure: Failure to close - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Internal Leak - Autoshear System - BOP Stack
(linked to 2.3.7.2)
Mechanical Failure - Autoshear System - BOP
Stack (linked to 2.3.7.4)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)

Enterprise A 77
LEADER
1.6.3 Functional Failure: Failure to shear the drill pipe - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Supply Hydraulic Non-shearable in the way Deadheading of pump Significant down time that impacts operation
Fluid & Pressure to Shear External Leak/Rupture - HPU - Surface Control Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Ram Systems (linked to 2.1.1.1) Flow meter (volume to actuate is known, should resulting in spill with large impact
Plugged - HPU - Surface Control Systems (linked go 0 to 0.7 to 0 in ~ 5 seconds) If too high = Release of hydrocarbons to atmosphere
to 2.1.1.3) leak. If long time = galling or leak potentially resulting in fire/explosion hazard with
Type (I, P or M): I large impact
Mechanical Failure - HPU - Surface Control
Systems (linked to 2.1.1.4) Increasing pressure Down time, after well control issue is resolved,
Type (I, P or M): I to repair an individual C&K valve that cannot be
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7) Pressure test chambers at end of well operated
Type (I, P or M): M
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems Shell test using end of tail rod between wells, on
(linked to 2.2.2.1) surface
Type (I, P or M): M
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7) Weekly function test of stack
Type (I, P or M): M
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3) Wellbore test between wells and 14 while subsea
Type (I, P or M): M
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Internal Leak - Autoshear System - BOP Stack
(linked to 2.3.7.2)

Enterprise A 78
LEADER
1.6.3 Functional Failure: Failure to shear the drill pipe - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
External Leak/Rupture - Autoshear System - BOP
Stack (linked to 2.3.7.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

2 Failure to Shear Pipe Having incorrect space out/non-shearables Improper gallon count on hydraulics & flow Significant down time that impacts operation
across the rams meter Release of hydrocarbons to air or sea potentially
External Leak/Rupture - HPU - Surface Control Type (I, P or M): I resulting in spill with large impact
Systems (linked to 2.1.1.1) No change in string weight (likely first indication) Release of hydrocarbons to atmosphere
Internal Leak - HPU - Surface Control Systems Type (I, P or M): I potentially resulting in fire/explosion hazard with
(linked to 2.1.1.2) Wellbore flow large impact
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I Down time, after well control issue is resolved,
to 2.1.1.3) All operators have been upgraded to 5k psi pipe to repair an individual C&K valve that cannot be
Mechanical Failure - HPU - Surface Control rams operated
Systems (linked to 2.1.1.4) Type (I, P or M): P
Loss of Function (general) - HPU - Surface Other shear rams (priority would be casing
Control Systems (linked to 2.1.1.7) shears & then blind shear rams)
Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems Open shear, move pipe and re-attempt shear
(linked to 2.2.2.1) Type (I, P or M): P
Corrosion/Erosion - Casing Shear Ram - BOP Planning of contingencies before putting non-
Stack (linked to 2.3.3.6) shearables down the hole
Type (I, P or M): P
Corrosion/Erosion - Blind Shear Ram - BOP Stack
(linked to 2.3.2.6) Annual inspection of shear rams and shear-ram
blocks & blades. Replace blades after shearing,
Loss of Function (general) - Hydraulic Supply - or every 5 years for full NDT and certification.
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): M
Internal Leak - Blue & Yellow Control Systems - Tests performed to validate shearability of off-
Hydraulics - Subsea Control Systems (linked to centered pipe
2.2.2.2) Type (I, P or M): M

Enterprise A 79
LEADER
1.6.3 Functional Failure: Failure to shear the drill pipe - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Shear tests performed for variety of pipe
Internal Leak - Blind Shear Ram - BOP Stack used/provided. Sent specimen with higher
(linked to 2.3.2.2) elongation % for testing. Rental pipe requires
certification of properties and shearability.
External Leak/Rupture - Hydraulic Supply - Subsea shearing tests were performed as
Surface Control Systems (linked to 2.1.4.1) validation, post-Macondo
Plugged - Blue & Yellow Control Systems - Type (I, P or M): M
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Internal Leak - Casing Shear Ram - BOP Stack
(linked to 2.3.3.2)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)

Enterprise A 80
LEADER
1.6.3 Functional Failure: Failure to shear the drill pipe - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)

Enterprise A 81
LEADER
1.6.4 Functional Failure: Failure to seal the wellbore - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Shear Ram to Seal External Leak/Rupture - HPU - Surface Control ROV confirmation if present Significant down time that impacts operation, if
On Demand Systems (linked to 2.1.1.1) Type (I, P or M): I still latched to rig
Internal Leak - HPU - Surface Control Systems Maintenance and testing program on BOP and Release of hydrocarbons to air or sea potentially
(linked to 2.1.1.2) autoshear functionality previously listed resulting in spill with large impact, if still latched
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): M to rig
to 2.1.1.3) Release of hydrocarbons to atmosphere
Mechanical Failure - HPU - Surface Control potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.4) large impact, if still latched to rig
Loss of Function (general) - HPU - Surface Down time, after well control issue is resolved,
Control Systems (linked to 2.1.1.7) to repair an individual C&K valve that cannot be
operated, if still latched to rig
Shear seat not in correct location
Release of hydrocarbons to air or sea potentially
Obstruction of sealing surface resulting in spill with large impact
Trash in the well (swarf, concrete, etc.) Significant down time that impacts operation, if
Having incorrect space out/non-shearables unlatched from the rig
across the rams
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Corrosion/Erosion - Blind Shear Ram - BOP Stack
(linked to 2.3.2.6)
Internal Leak - Blind Shear Ram - BOP Stack
(linked to 2.3.2.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Corrosion/Erosion - Casing Shear Ram - BOP
Stack (linked to 2.3.3.6)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)

Enterprise A 82
LEADER
1.6.4 Functional Failure: Failure to seal the wellbore - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal Leak - Casing Shear Ram - BOP Stack
(linked to 2.3.3.2)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Autoshear System - BOP
Stack (linked to 2.3.7.4)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)

Enterprise A 83
LEADER
1.6.4 Functional Failure: Failure to seal the wellbore - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)

2 Failure to Maintain Sealing External Leak/Rupture - HPU - Surface Control ROV confirmation if present Significant down time that impacts operation, if
Pressure on Shear Ram Systems (linked to 2.1.1.1) Type (I, P or M): I still latched to rig
Internal Leak - HPU - Surface Control Systems MPL Release of hydrocarbons to air or sea potentially
(linked to 2.1.1.2) Type (I, P or M): P resulting in spill with large impact, if still latched
Plugged - HPU - Surface Control Systems (linked Remaining accumulator pressure to rig
to 2.1.1.3) Type (I, P or M): P Release of hydrocarbons to atmosphere
Mechanical Failure - HPU - Surface Control Maintenance and testing program on BOP and potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.4) autoshear functionality previously listed large impact, if still latched to rig
Loss of Function (general) - HPU - Surface Type (I, P or M): M Down time, after well control issue is resolved,
Control Systems (linked to 2.1.1.7) to repair an individual C&K valve that cannot be
operated, if still latched to rig
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems Release of hydrocarbons to air or sea potentially
(linked to 2.2.2.1) resulting in spill with large impact
Corrosion/Erosion - Blind Shear Ram - BOP Stack Significant down time that impacts operation, if
(linked to 2.3.2.6) unlatched from the rig
Shear seat not in correct location
Obstruction of sealing surface
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Trash in the well (swarf, concrete, etc.)
Having incorrect space out/non-shearables
across the rams
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
Internal Leak - Blind Shear Ram - BOP Stack
(linked to 2.3.2.2)
Corrosion/Erosion - Casing Shear Ram - BOP
Stack (linked to 2.3.3.6)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)

Enterprise A 84
LEADER
1.6.4 Functional Failure: Failure to seal the wellbore - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Internal Leak - Casing Shear Ram - BOP Stack
(linked to 2.3.3.2)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)

Enterprise A 85
LEADER
1.6.4 Functional Failure: Failure to seal the wellbore - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Autoshear System - BOP
Stack (linked to 2.3.7.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)

Enterprise A 86
LEADER
1.6.5 Functional Failure: Unintentional closing / opening - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Unintentional Closing Autoshear system activates/shears when If latched, stack accumulator pressure alarm Significant down time that impacts operation, if
intentionally disarmed Type (I, P or M): I still latched to rig
Loss of Function (general) - Autoshear System - If latched, annulars MAY still be an option Release of hydrocarbons to air or sea potentially
BOP Stack (linked to 2.3.7.7) Type (I, P or M): P resulting in spill with large impact, if still latched
Corrosion/Erosion - Autoshear System - BOP Specific arm/disarm procedures from OEM to rig
Stack (linked to 2.3.7.6) Type (I, P or M): P Release of hydrocarbons to atmosphere
Autoshear is rebuilt every year potentially resulting in fire/explosion hazard with
Type (I, P or M): M large impact, if still latched to rig
Autoshear surface testing to ensure it will fire Down time, after well control issue is resolved,
when conditions are met & also to ensure it will to repair an individual C&K valve that cannot be
not fire unless all proper conditions are met prior operated, if still latched to rig
to firing Release of hydrocarbons to air or sea potentially
Type (I, P or M): M resulting in spill with large impact
Significant down time that impacts operation, if
unlatched from the rig

2 Unintentional Opening If not properly closed & blocked, system will Flow meter, if closely monitoring Significant down time that impacts operation
return to last known state (what the control Type (I, P or M): I Release of hydrocarbons to air or sea potentially
system thinks it was), which could be open, Procedural steps to check control system status resulting in spill with large impact
when reconnecting to BOP of ram/valve location prior to latch back Release of hydrocarbons to atmosphere
External Leak/Rupture - HPU - Surface Control Type (I, P or M): P potentially resulting in fire/explosion hazard with
Systems (linked to 2.1.1.1) large impact
Internal Leak - HPU - Surface Control Systems Down time, after well control issue is resolved,
(linked to 2.1.1.2) to repair an individual C&K valve that cannot be
Plugged - HPU - Surface Control Systems (linked operated
to 2.1.1.3)
Mechanical Failure - HPU - Surface Control
Systems (linked to 2.1.1.4)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Plugged - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.3)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Internal Leak - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.2)
Enterprise A 87
LEADER
1.6.5 Functional Failure: Unintentional closing / opening - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Corrosion/Erosion - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)

Enterprise A 88
LEADER
1.6.6 Functional Failure: Closes too slowly - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Actuates Too Slowly on Air in hydraulic system Autoshear maintenance and testing program If drillpipe has not been sheared, and is still
Demand Plugged - HPU - Surface Control Systems (linked Type (I, P or M): M moving, joint could damage shear ram resulting
to 2.1.1.3) in serious operational issues
Plugged - Choke & Kill Lines & Valves - BOP Likelihood of additional influx of hydrocarbons
Stack (linked to 2.3.5.3) into Riser resulting in severe
safety/environmental effects
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to Down time, after well control issue is resolved,
2.2.2.3) to repair an individual C&K valve that cannot be
operated
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)

Enterprise A 89
LEADER
1.6.7 Functional Failure: Loss of containment - Emergency Operation - Auto-Shear - Shear the drill pipe and seal the wellbore

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak External Leak/Rupture - HPU - Surface Control ROV Intervention Significant down time that impacts operation, if
Systems (linked to 2.1.1.1) Type (I, P or M): P still latched to rig
External Leak / Rupture - Blue & Yellow Control BOP maintenance and testing programs Release of hydrocarbons to air or sea potentially
Systems - Hydraulics - Subsea Control Systems previously stated resulting in spill with large impact, if still latched
(linked to 2.2.2.1) Type (I, P or M): M to rig
External leak/rupture - Hydraulic Supply: Rigid Release of hydrocarbons to atmosphere
Conduit and Manifold - Subsea Control Systems potentially resulting in fire/explosion hazard with
(linked to 2.2.5.1) large impact, if still latched to rig
External Leak/Rupture - Choke & Kill Lines & Down time, after well control issue is resolved,
Valves - BOP Stack (linked to 2.3.5.1) to repair an individual C&K valve that cannot be
operated, if still latched to rig
Release of hydrocarbons to air or sea potentially
resulting in spill with large impact
Significant down time that impacts operation, if
unlatched from the rig

2 Rupture Snagging the BOP when pulling away and LMRP & BOP High-angle release design Significant down time that impacts operation
damaging the wellhead Type (I, P or M): P Release of hydrocarbons to air or sea potentially
Riser recoil devices resulting in spill with large impact
Type (I, P or M): P

Enterprise A 90
LEADER
7- Emergency Operation: EDS - Disconnect from the
stack

Enterprise A 91
LEADER
1.7.1 Functional Failure: Failure to receive EDS signal - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to provide control Erratic output - Blue & Yellow Control Systems - Atypical current across solenoid coil Severe operational problems, including
signal, when demanded Electrical - Subsea Control Systems (linked to Type (I, P or M): I equipment damage
2.2.1.3) Communications failure via flashing red screen Environmental impact includes filling riser with
Loss of Power (UPS Shuts down with power on touch screen mud, if stack is pulled over and well head is
degradation) - Power - Surface Control Systems Type (I, P or M): I damaged
(linked to 2.1.2.1) Mud on rig floor Potential injuries on rig due to number of actions
Electrical Short - Power - Surface Control Type (I, P or M): I automatically occurring on the rig floor, moon
Systems (linked to 2.1.2.5) No LMRP separate signal pool, riser tensioners, as a result of EDS
Erratic output (Network) - MUX System - Surface Type (I, P or M): I actuation
Control Systems (linked to 2.1.3.4) No flow in flow meters
Fails to respond to input - MUX System - Surface Type (I, P or M): I
Control Systems (linked to 2.1.3.5) Pod mismatch & alarm
Fails to respond (with no output Type (I, P or M): I
signal/communication or to input) - Control Redundant mechanicals
Panels - Surface Control Systems (linked to Type (I, P or M): P
2.1.5.2)
Redundant touch screen, controllers, control
Loss of, or Degraded Power - Secondary & pods, cables, powers supplies, SEM
Emergency Control Systems - Surface Control Type (I, P or M): P
Systems (linked to 2.1.8.1)
Between well surface (4 dry fires from different
Processing error - EDS - Subsea Control Systems stations, SEMs, Pods. Live fire from driller's pod)
(linked to 2.2.4.5) Type (I, P or M): M
Processing error - Blue & Yellow Control Systems Function test annular every 7 days
- Electrical - Subsea Control Systems (linked to Type (I, P or M): M
2.2.1.5)
Function tests between wells and upon latch-up
Erratic output - Control Panels - Surface Control Type (I, P or M): M
Systems (linked to 2.1.5.4)
Live subsea on commissioning and every 5 years
Fails to respond to input - Electrical - Blue & (per pending API S53)
Yellow Control Systems - Electrical - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.1.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Erratic output - EDS - Subsea Control Systems
(linked to 2.2.4.3)
Wiring harness fails
Fails with no output signal/communication - MUX
System - Surface Control Systems (linked to
2.1.3.2)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)

Enterprise A 92
LEADER
1.7.1 Functional Failure: Failure to receive EDS signal - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of function (general) - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.7)
Fails with no output signal/communication -
Subsea Control Systems - EDS (linked to 2.2.4.2)
Ground Fault - EDS - Subsea Control Systems
(linked to 2.2.4.6)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of, or Degraded Power - EDS - Subsea
Control Systems (linked to 2.2.4.1)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - EDS - Subsea Control
Systems (linked to 2.2.4.4)
Loss of function (general) - EDS - Subsea Control
Systems (linked to 2.2.4.7)
Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

Enterprise A 93
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Disconnect Wiring harness fails Communications failure via flashing red screen Severe operational problems, including
Signal (automatically) Loss of, or Degraded Power - Secondary & on touch screen equipment damage
Emergency Control Systems - Surface Control Type (I, P or M): I Environmental impact includes filling riser with
Systems (linked to 2.1.8.1) Pod mismatch and alarm mud, if stack is pulled over and well head is
Erratic output - EDS - Subsea Control Systems Type (I, P or M): I damaged
(linked to 2.2.4.3) E/H Backup Potential injuries on rig due to number of actions
Loss of Power (UPS Shuts down with power Type (I, P or M): P automatically occurring on the rig floor, moon
degradation) - Power - Surface Control Systems Plugs in well pool, riser tensioners, as a result of EDS
(linked to 2.1.2.1) Type (I, P or M): P actuation
Electrical Short - Power - Surface Control Redundant mechanicals
Systems (linked to 2.1.2.5) Type (I, P or M): P
Fails to respond to input - Electrical - Blue & Redundant touch screen, controllers, control
Yellow Control Systems - Electrical - Subsea pods, cables, powers supplies, SEM
Control Systems (linked to 2.2.1.4) Type (I, P or M): P
Loss of function (general) - Blue & Yellow ROV Intervention
Control Systems - Electrical - Subsea Control Type (I, P or M): P
Systems (linked to 2.2.1.7) Pulling BOP
Fails with no output signal/communication - MUX Type (I, P or M): M
System - Surface Control Systems (linked to
2.1.3.2)
Erratic output (Network) - MUX System - Surface
Control Systems (linked to 2.1.3.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of, or Degraded Power - EDS - Subsea
Control Systems (linked to 2.2.4.1)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - EDS - Subsea Control
Systems (linked to 2.2.4.4)

Enterprise A 94
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Loss of function (general) - EDS - Subsea Control
Systems (linked to 2.2.4.7)
Fails with no output signal/communication -
Subsea Control Systems - EDS (linked to 2.2.4.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure LMRP / BOP to Wear - Connectors - BOP Stack (linked to No LMRP separation indication from LMRP Severe operational problems, including
Connect or Disengage 2.3.6.5) Type (I, P or M): I equipment damage
Mechanical Failure - Connectors - BOP Stack Surge/retry unlatch option is only possible by Environmental impact includes filling riser with
(linked to 2.3.6.4) swapping pods/SEMs mud, if stack is pulled over and well head is
Loss of Function (general) - Connectors - BOP Type (I, P or M): I damaged
Stack (linked to 2.3.6.7) Weight on hook Potential injuries on rig due to number of actions
Corrosion/Erosion - Connectors - BOP Stack Type (I, P or M): I automatically occurring on the rig floor, moon
(linked to 2.3.6.6) Surge with greater pressure pool, riser tensioners, as a result of EDS
Type (I, P or M): P actuation
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2) Between well maintenance (clean, grease,
External Leak/Rupture - Connectors - BOP Stack inspect, pressure, & minimum unlock pressure
(linked to 2.3.6.1) test)
Type (I, P or M): M
Five year inspection of connectors
Type (I, P or M): M
Wellbore test every 14 days
Type (I, P or M): M

Enterprise A 95
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

3 Failure of Hydraulic Fluid to External Leak/Rupture - HPU - Surface Control Manual indicators on valves that the ROV can Severe operational problems, including
disconnect Systems (linked to 2.1.1.1) read equipment damage
Internal Leak - HPU - Surface Control Systems Type (I, P or M): I Environmental impact includes filling riser with
(linked to 2.1.1.2) HPU pumps running constantly mud, if stack is pulled over and well head is
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I damaged
to 2.1.1.3) Multiple pumps (1 pump needed, 3 pumps Potential injuries on rig due to number of actions
Mechanical Failure - HPU - Surface Control present) automatically occurring on the rig floor, moon
Systems (linked to 2.1.1.4) Type (I, P or M): P pool, riser tensioners, as a result of EDS
Accumulators with stored energy actuation
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control Design margin/safety factors (conduits work at
Systems - Hydraulics - Subsea Control Systems 5k, max @ 7.5k)
(linked to 2.2.2.1) Type (I, P or M): P
Internal Leak - Blue & Yellow Control Systems - Multiple annulars & rams
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): P
2.2.2.2) Redundant conduit lines with ability to isolate
Internal Leak - Choke & Kill Lines & Valves - BOP leaking line and cross-connect via conduit
Stack (linked to 2.3.5.2) manifold
Type (I, P or M): P
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3) Redundant functions between pods
Type (I, P or M): P
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4) Redundant regulators
Type (I, P or M): P
Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to Filter replacement frequency
2.2.2.3) Type (I, P or M): M
Internal Leak - Blind Shear Ram - BOP Stack Maintenance programs
(linked to 2.3.2.2) Type (I, P or M): M
Internal Leak - Casing Shear Ram - BOP Stack ROV inspection every 3 days
(linked to 2.3.3.2) Type (I, P or M): M
External Leak/Rupture - Hydraulic Supply - SOAK test between wells
Surface Control Systems (linked to 2.1.4.1) Type (I, P or M): M
Loss of Function (general) - Hydraulic Supply - Weekly BOP function test
Surface Control Systems (linked to 2.1.4.7) Type (I, P or M): M
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.4)
Internal leak - Hydraulic Supply: Rigid Conduit
and Manifold - Subsea Control Systems (linked to
2.2.5.2)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)

Enterprise A 96
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

Corrosion/Erosion - Blue & Yellow Control


Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.6)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)

Enterprise A 97
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

External leak/rupture - Hydraulic Supply: Rigid


Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)

4 Moves too slowly to External Leak/Rupture - HPU - Surface Control HPU pumps running constantly Severe operational problems, including
disconnect Systems (linked to 2.1.1.1) Type (I, P or M): I equipment damage
Plugged - HPU - Surface Control Systems (linked Manual indicators on valves that the ROV can Environmental impact includes filling riser with
to 2.1.1.3) read mud, if stack is pulled over and well head is
Mechanical Failure - HPU - Surface Control Type (I, P or M): I damaged
Systems (linked to 2.1.1.4) Accumulators with stored energy Potential injuries on rig due to number of actions
Loss of Function (general) - HPU - Surface Type (I, P or M): P automatically occurring on the rig floor, moon
Control Systems (linked to 2.1.1.7) Design margin/safety factors (conduits work at pool, riser tensioners, as a result of EDS
5k, max @ 7.5k) actuation
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1) Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control E/H backup
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1) Pod/SEM redundancy
Internal Leak - Surface Control Systems - Type (I, P or M): P
Accumulators - Surface (linked to 2.1.6.2) Multiple annulars & rams
Mechanical Failure - Surface Control Systems - Type (I, P or M): P
Accumulators - Surface (linked to 2.1.6.4) Multiple pumps (1 pump needed, 3 pumps
Wear - Surface Control Systems - Accumulators - present)
Surface (linked to 2.1.6.5) Type (I, P or M): P

Enterprise A 98
LEADER
1.7.2 Functional Failure: Failure to disconnect the LMRP - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of Function (general) - Surface Control Possibility to use stack accumulator (ruin 5k stab
Systems - Accumulators - Surface (linked to though)
2.1.6.7) Type (I, P or M): P
Plugged - Choke & Kill Lines & Valves - BOP Redundant conduit lines with ability to isolate
Stack (linked to 2.3.5.3) leaking line and cross-connect via conduit
Plugged - Blue & Yellow Control Systems - manifold
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): P
2.2.2.3) Redundant functions between pods
External Leak/Rupture - Hydraulic Supply - Type (I, P or M): P
Surface Control Systems (linked to 2.1.4.1) Redundant regulators
Loss of Function (general) - Hydraulic Supply - Type (I, P or M): P
Surface Control Systems (linked to 2.1.4.7) ROV intervention
External Leak/Rupture - Accumulators - Subsea Type (I, P or M): P
Control Systems (linked to 2.2.3.1) Filter replacement frequency
Internal Leak - Accumulators - Subsea Control Type (I, P or M): M
Systems (linked to 2.2.3.2) Maintenance programs
Mechanical Failure - Accumulators - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.3.4) ROV inspection every 3 days
Plugged - Fluid Reservoir Unit - Surface Control Type (I, P or M): M
Systems (linked to 2.1.7.3) SOAK test between wells
Wear - Accumulators - Subsea Control Systems Type (I, P or M): M
(linked to 2.2.3.5) Weekly BOP function test
Loss of Function (general) - Accumulators - Type (I, P or M): M
Subsea Control Systems (linked to 2.2.3.7)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

Enterprise A 99
LEADER
1.7.3 Functional Failure: Unintentional disconnect of the riser - Emergency Operation: EDS - Disconnect from the stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Spurious Automatic EDS No credible causes resulting in spurious Visual indicators of it happening (mud volumes, Severe operational problems, including
Signal automatic disconnect signal during 'Emergency tensioners...) equipment damage
Operation: EDS - Disconnect from the stack' Type (I, P or M): I Environmental impact includes filling riser with
Weight indicator changes mud, if stack is pulled over and well head is
Type (I, P or M): I damaged
Implementation of latest Engineering Bulletin
Type (I, P or M): P

2 Unintentional Manual No credible causes resulting in Unintentional From drillers chair/console it is two switches that
Disconnect Signal Manual Disconnect Signal during 'Emergency are both covered
Operation: EDS - Disconnect from the stack' Type (I, P or M): P
Two hand operation, Password, confirmation
Type (I, P or M): P

Enterprise A 100
LEADER
8- Controlled Operation - Disconnect the LMRP from
the Lower BOP stack

Enterprise A 101
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Disconnect Wiring harness fails Atypical current across solenoid coil Significant down time that impacts operation
Signal (automatically or Loss of, or Degraded Power - Secondary & Type (I, P or M): I
manually) Emergency Control Systems - Surface Control Communications failure via flashing red screen
Systems (linked to 2.1.8.1) on touch screen
Loss of Power (UPS Shuts down with power Type (I, P or M): I
degradation) - Power - Surface Control Systems No flow in flow meters
(linked to 2.1.2.1) Type (I, P or M): I
Electrical Short - Power - Surface Control Pod mismatch & alarm
Systems (linked to 2.1.2.5) Type (I, P or M): I
Fails to respond to input - Electrical - Blue & E/H Backup
Yellow Control Systems - Electrical - Subsea Type (I, P or M): P
Control Systems (linked to 2.2.1.4) Plugs in well
Loss of function (general) - Blue & Yellow Type (I, P or M): P
Control Systems - Electrical - Subsea Control Redundant mechanicals
Systems (linked to 2.2.1.7) Type (I, P or M): P
Fails with no output signal/communication - MUX Redundant touch screen, controllers, control
System - Surface Control Systems (linked to pods, cables, powers supplies, SEM
2.1.3.2) Type (I, P or M): P
Erratic output (Network) - MUX System - Surface ROV Intervention
Control Systems (linked to 2.1.3.4) Type (I, P or M): P
Short - MUX System - Surface Control Systems Function tests between wells and upon latch-up
(linked to 2.1.3.7) Type (I, P or M): M
Loss of, or Degraded Power - Control Panels - Pulling BOP
Surface Control Systems (linked to 2.1.5.1) Type (I, P or M): M
Erratic output - EDS - Subsea Control Systems
(linked to 2.2.4.3)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Loss of, or Degraded Power - EDS - Subsea
Control Systems (linked to 2.2.4.1)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - EDS - Subsea Control
Systems (linked to 2.2.4.4)

Enterprise A 102
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Loss of function (general) - EDS - Subsea Control
Systems (linked to 2.2.4.7)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Fails with no output signal/communication -
Subsea Control Systems - EDS (linked to 2.2.4.2)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure of LMRP / BOP Wear - Connectors - BOP Stack (linked to No LMRP separation indication from LMRP Significant down time that impacts operation
Connector to Disengage 2.3.6.5) Type (I, P or M): I Potential Safety issue whose impact depends on
Mechanical Failure - Connectors - BOP Stack ROV observation the cause for the disconnect, for example due to
(linked to 2.3.6.4) Type (I, P or M): I impending weather hazard
Corrosion/Erosion - Connectors - BOP Stack Weight on hook
(linked to 2.3.6.6) Type (I, P or M): I
Internal Leak - Connectors - BOP Stack (linked Pull BOP with LMRP
to 2.3.6.2) Type (I, P or M): P
External Leak/Rupture - Connectors - BOP Stack Surge with greater pressure
(linked to 2.3.6.1) Type (I, P or M): P
Between well maintenance (clean, grease,
inspect, pressure, & minimum unlock pressure
test)
Type (I, P or M): M
Five year inspection of latch mechanism
Type (I, P or M): M
Wellbore test every 14 days
Type (I, P or M): M

Enterprise A 103
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

3 Failure of Hydraulic Fluid to External Leak/Rupture - HPU - Surface Control HPU pumps running constantly Significant down time that impacts operation
Disconnect Systems (linked to 2.1.1.1) Type (I, P or M): I Potential Safety issue whose impact depends on
Internal Leak - HPU - Surface Control Systems Manual indicators on valves that the ROV can the cause for the disconnect, for example due to
(linked to 2.1.1.2) read impending weather hazard
Plugged - HPU - Surface Control Systems (linked Type (I, P or M): I
to 2.1.1.3) Accumulators with stored energy
Mechanical Failure - HPU - Surface Control Type (I, P or M): P
Systems (linked to 2.1.1.4) Design margin/safety factors (conduits work at
Loss of Function (general) - HPU - Surface 5k, max @ 7.5k)
Control Systems (linked to 2.1.1.7) Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control E/H backup
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1) Multiple annulars & rams
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Multiple pumps (1 pump needed, 3 pumps
2.2.2.2) present)
Internal Leak - Choke & Kill Lines & Valves - BOP Type (I, P or M): P
Stack (linked to 2.3.5.2) Pull entire stack
Plugged - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Possibility to use stack accumulator (ruin 5k stab
2.2.2.3) though)
Internal Leak - Blind Shear Ram - BOP Stack Type (I, P or M): P
(linked to 2.3.2.2) Redundant conduit lines with ability to isolate
External Leak/Rupture - Hydraulic Supply - leaking line and cross-connect via conduit
Surface Control Systems (linked to 2.1.4.1) manifold
Type (I, P or M): P
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4) Redundant functions between pods
Type (I, P or M): P
Mechanical Failure - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems Redundant regulators
(linked to 2.2.2.4) Type (I, P or M): P
Internal Leak - Casing Shear Ram - BOP Stack ROV intervention
(linked to 2.3.3.2) Type (I, P or M): P
Plugged - Choke & Kill Lines & Valves - BOP Filter replacement frequency
Stack (linked to 2.3.5.3) Type (I, P or M): M
Internal leak - Hydraulic Supply: Rigid Conduit Maintenance programs
and Manifold - Subsea Control Systems (linked to Type (I, P or M): M
2.2.5.2) ROV inspection every 3 days
Corrosion/Erosion - Blue & Yellow Control Type (I, P or M): M
Systems - Hydraulics - Subsea Control Systems SOAK test between wells
(linked to 2.2.2.6) Type (I, P or M): M
External Leak/Rupture - Casing Shear Ram - BOP Weekly BOP function test
Stack (linked to 2.3.3.1) Type (I, P or M): M

Enterprise A 104
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Autoshear System - BOP
Stack (linked to 2.3.7.1)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Enterprise A 105
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)

4 Moves too slowly to External Leak/Rupture - HPU - Surface Control E/H Backup No effects of interest as long as the connector
disconnect Systems (linked to 2.1.1.1) Type (I, P or M): I unlocks and disconnects
Plugged - HPU - Surface Control Systems (linked ROV Intervention
to 2.1.1.3) Type (I, P or M): I
Mechanical Failure - HPU - Surface Control
Systems (linked to 2.1.1.4)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Loss of Function (general) - HPU - Surface
Control Systems (linked to 2.1.1.7)
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems
(linked to 2.2.2.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)

Enterprise A 106
LEADER
1.8.1 Functional Failure: Failure to disconnect the LMRP - Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Plugged - Blue & Yellow Control Systems -
Hydraulics - Subsea Control Systems (linked to
2.2.2.3)
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
External Leak/Rupture - Accumulators - Subsea
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External Leak/Rupture - Autoshear System - BOP
Stack (linked to 2.3.7.1)
Internal Leak - Autoshear System - BOP Stack
(linked to 2.3.7.2)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

Enterprise A 107
LEADER
1.8.2 Functional Failure: Unintentional disconnect of the LMRP Controlled Operation - Disconnect the LMRP from the Lower BOP stack

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Spurious Automatic No credible causes resulting in spurious Implementation of latest Engineering Bulletin Significant down time that impacts operation
Disconnect Signal automatic disconnect signal during 'Disconnect Type (I, P or M): P Environmental impact in the form of mud release
the LMRP from the Lower BOP stack'

2 Unintentional Manual No credible causes resulting in Unintentional From drillers chair/console it is two switches that
Disconnect Signal Manual Disconnect Signal during 'Disconnect the are both covered
LMRP from the Lower BOP Stack' Type (I, P or M): P
Two hand operation, Password, confirmation
Type (I, P or M): P

Enterprise A 108
LEADER
9- Circulate the well after drill pipe disconnect

Enterprise A 109
LEADER
1.9.1 Functional Failure: Failure to circulate - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Wiring harness fails Communications failure via flashing red screen Significant down time that impacts operation
Signal to C&K Valves when Loss of Power (UPS Shuts down with power on touch screen
Demanded degradation) - Power - Surface Control Systems Type (I, P or M): I
(linked to 2.1.2.1) Atypical current across solenoid coil
Electrical Short - Power - Surface Control Type (I, P or M): I
Systems (linked to 2.1.2.5) No flow in flow meters
Fails to respond to input - Electrical - Blue & Type (I, P or M): I
Yellow Control Systems - Electrical - Subsea Pod mismatch & alarm
Control Systems (linked to 2.2.1.4) Type (I, P or M): I
Loss of function (general) - Blue & Yellow Multiple (4) inlets below the blind shear rams for
Control Systems - Electrical - Subsea Control circulation if one is lost
Systems (linked to 2.2.1.7) Type (I, P or M): P
Fails with no output signal/communication - MUX Redundant mechanicals
System - Surface Control Systems (linked to Type (I, P or M): P
2.1.3.2) Redundant touch screen, controllers, control
Erratic output (Network) - MUX System - Surface pods, cables, powers supplies, SEM
Control Systems (linked to 2.1.3.4) Type (I, P or M): P
Loss of, or Degraded Power - Secondary & Function tests between wells and upon latch-up
Emergency Control Systems - Surface Control Type (I, P or M): M
Systems (linked to 2.1.8.1)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Secondary &

Enterprise A 110
LEADER
1.9.1 Functional Failure: Failure to circulate - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Erratic output - Blue & Yellow Control Systems -
Electrical - Subsea Control Systems (linked to
2.2.1.3)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure to Supply Hydraulic External Leak/Rupture - HPU - Surface Control HPU pumps running constantly Significant down time that impacts operation
Fluid & Pressure to C&K Systems (linked to 2.1.1.1) Type (I, P or M): I
Valves Internal Leak - HPU - Surface Control Systems Deadhead pumps / rupture disc rupture on pump
(linked to 2.1.1.2) Type (I, P or M): I
Plugged - HPU - Surface Control Systems (linked Manual indicators on valves that the ROV can
to 2.1.1.3) read
Mechanical Failure - HPU - Surface Control Type (I, P or M): I
Systems (linked to 2.1.1.4) Redundant conduit lines with ability to isolate
Loss of Function (general) - HPU - Surface leaking line and cross-connect via conduit
Control Systems (linked to 2.1.1.7) manifold
Type (I, P or M): P
External Leak / Rupture - Blue & Yellow Control
Systems - Hydraulics - Subsea Control Systems Multiple annulars & rams
(linked to 2.2.2.1) Type (I, P or M): P
Internal Leak - Blue & Yellow Control Systems - Redundant functions between pods
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): P
2.2.2.2) Multiple pumps (1 pump needed, 3 pumps
Internal Leak - Choke & Kill Lines & Valves - BOP present)
Stack (linked to 2.3.5.2) Type (I, P or M): P
Plugged - Blue & Yellow Control Systems - Accumulators with stored energy
Hydraulics - Subsea Control Systems (linked to Type (I, P or M): P
2.2.2.3) Design margin/safety factors (conduits work at
Mechanical Failure - Fluid Reservoir Unit - 5k, max @ 7.5k)
Surface Control Systems (linked to 2.1.7.4) Type (I, P or M): P
Mechanical Failure - Blue & Yellow Control Redundant regulators
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.4) ROV inspection every 3 days
Internal leak - Hydraulic Supply: Rigid Conduit Type (I, P or M): M
and Manifold - Subsea Control Systems (linked to Filter replacement frequency
2.2.5.2) Type (I, P or M): M
Corrosion/Erosion - Blue & Yellow Control Maintenance programs

Enterprise A 111
LEADER
1.9.1 Functional Failure: Failure to circulate - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Systems - Hydraulics - Subsea Control Systems Type (I, P or M): M
(linked to 2.2.2.6) Weekly BOP function test
External Leak/Rupture - Hydraulic Supply - Type (I, P or M): M
Surface Control Systems (linked to 2.1.4.1) SOAK test between wells
External Leak/Rupture - Accumulators - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.3.1)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Internal Leak - Accumulators - Subsea Control
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)

Enterprise A 112
LEADER
1.9.1 Functional Failure: Failure to circulate - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

3 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of pump Significant down time that impacts operation
Valves as Needed Stack (linked to 2.3.5.2) Type (I, P or M): I
External Leak/Rupture - Choke & Kill Lines & Flow meter (volume to actuate is known, should
Valves - BOP Stack (linked to 2.3.5.1) go 0 to 0.7 to 0 in ~ 5 seconds) If too high =
Wear - Choke & Kill Lines & Valves - BOP Stack leak. If long time = galling or leak
(linked to 2.3.5.5) Type (I, P or M): I
Increasing pressure
Type (I, P or M): I
Same pressure readings from BOP bore
indicators same as from C&K lines once open
Type (I, P or M): I
Pressure test chambers at end of well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack
Type (I, P or M): M
Wellbore test between wells and 14 while subsea
Type (I, P or M): M

Enterprise A 113
LEADER
1.9.2 Functional Failure: Failure to circulate the well at the desired flow rate - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Degraded Flow Pressure Fail-safe valves fail to open completely Higher circulating pressure/ lower flow rates Significant down time that impacts operation
Large diameter tools in the well that cause Type (I, P or M): I
increase in differential pressure and forced to Circulate through the C&K valves daily
pump at slower rate Type (I, P or M): M
Flush C&K valves 2x daily
Type (I, P or M): M

2 Restricted Flow Path No credible causes resulting in restricted flow


path during 'circulate the well after drill pipe
disconnect'

Enterprise A 114
LEADER
1.9.3 Functional Failure: Failure to open / close fail-safe valves to seal - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Actuate under Fail- Broken springs = it will not close without Continued flow/return to the surface Significant down time that impacts operation
safe Conditions hydraulic assistance Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Mechanical interference (debris, galling) Redundant/2 valves resulting in spill with large impact
Wellbore pressure above the closing pressure Type (I, P or M): P Release of hydrocarbons to atmosphere
Maintenance & testing between each well potentially resulting in fire/explosion hazard with
Type (I, P or M): M large impact

2 Failure to Adequately Seal Internal Leak - Annulars - BOP Stack (linked to Continued flow/return to the surface Significant down time that impacts operation
under Fail-safe Conditions 2.3.1.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Internal Leak - Choke & Kill Lines & Valves - BOP Redundant/2 valves resulting in spill with large impact
Stack (linked to 2.3.5.2) Type (I, P or M): P Release of hydrocarbons to atmosphere
External Leak/Rupture - Annulars - BOP Stack Maintenance & testing between each well potentially resulting in fire/explosion hazard with
(linked to 2.3.1.1) Type (I, P or M): M large impact
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

Enterprise A 115
LEADER
1.9.4 Functional Failure: Failure to seal wellbore - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Loss of Power (UPS Shuts down with power Atypical current across solenoid coil Significant down time that impacts operation
Signal to C&K Valves when degradation) - Power - Surface Control Systems Type (I, P or M): I
Demanded (linked to 2.1.2.1) Communications failure via flashing red screen
Electrical Short - Power - Surface Control on touch screen
Systems (linked to 2.1.2.5) Type (I, P or M): I
Erratic output - Blue & Yellow Control Systems - No flow in flow meters
Electrical - Subsea Control Systems (linked to Type (I, P or M): I
2.2.1.3) Pod mismatch & alarm
Fails to respond to input - Electrical - Blue & Type (I, P or M): I
Yellow Control Systems - Electrical - Subsea Multiple (4) inlets below the blind shear rams for
Control Systems (linked to 2.2.1.4) circulation if one is lost
Loss of function (general) - Blue & Yellow Type (I, P or M): P
Control Systems - Electrical - Subsea Control Redundant mechanicals
Systems (linked to 2.2.1.7) Type (I, P or M): P
Wiring harness fails Redundant touch screen, controllers, control
Fails with no output signal/communication - MUX pods, cables, powers supplies, SEM
System - Surface Control Systems (linked to Type (I, P or M): P
2.1.3.2) Function tests between wells and upon latch-up
Erratic output (Network) - MUX System - Surface Type (I, P or M): M
Control Systems (linked to 2.1.3.4)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Loss of, or Degraded Power - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.1)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)

Enterprise A 116
LEADER
1.9.4 Functional Failure: Failure to seal wellbore - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure to Supply Hydraulic External Leak/Rupture - HPU - Surface Control Deadhead pumps / rupture disc rupture on pump Significant down time that impacts operation
Fluid & Pressure to C&K Systems (linked to 2.1.1.1) Type (I, P or M): I
Valves Internal Leak - HPU - Surface Control Systems HPU pumps running constantly
(linked to 2.1.1.2) Type (I, P or M): I
Plugged - HPU - Surface Control Systems (linked Manual indicators on valves that the ROV can
to 2.1.1.3) read
Mechanical Failure - HPU - Surface Control Type (I, P or M): I
Systems (linked to 2.1.1.4) Accumulators with stored energy
Loss of Function (general) - HPU - Surface Type (I, P or M): P
Control Systems (linked to 2.1.1.7) Design margin/safety factors (conduits work at
External Leak / Rupture - Blue & Yellow Control 5k, max @ 7.5k)
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1) Multiple annulars & rams
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Multiple pumps (1 pump needed, 3 pumps
2.2.2.2) present)
Plugged - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Redundant conduit lines with ability to isolate
2.2.2.3) leaking line and cross-connect via conduit
Internal Leak - Choke & Kill Lines & Valves - BOP manifold
Stack (linked to 2.3.5.2) Type (I, P or M): P
Mechanical Failure - Blue & Yellow Control Redundant functions between pods
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.4) Redundant regulators
Corrosion/Erosion - Blue & Yellow Control Type (I, P or M): P
Systems - Hydraulics - Subsea Control Systems Filter replacement frequency
(linked to 2.2.2.6) Type (I, P or M): M
Internal leak - Hydraulic Supply: Rigid Conduit ROV inspection every 3 days
and Manifold - Subsea Control Systems (linked to Type (I, P or M): M
2.2.5.2) Maintenance programs

Enterprise A 117
LEADER
1.9.4 Functional Failure: Failure to seal wellbore - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


External Leak/Rupture - Hydraulic Supply - Type (I, P or M): M
Surface Control Systems (linked to 2.1.4.1) Weekly BOP function test
External Leak/Rupture - Accumulators - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.3.1) SOAK test between wells
Internal Leak - Accumulators - Subsea Control Type (I, P or M): M
Systems (linked to 2.2.3.2)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)

Enterprise A 118
LEADER
1.9.4 Functional Failure: Failure to seal wellbore - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)

3 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of pump Significant down time that impacts operation
Valves as Needed Stack (linked to 2.3.5.2) Type (I, P or M): I
External Leak/Rupture - Choke & Kill Lines & Flow meter (volume to actuate is known, should
Valves - BOP Stack (linked to 2.3.5.1) go 0 to 0.7 to 0 in ~ 5 seconds) If too high =
Wear - Choke & Kill Lines & Valves - BOP Stack leak. If long time = galling or leak
(linked to 2.3.5.5) Type (I, P or M): I
Increasing pressure
Type (I, P or M): I
Same pressure readings from BOP bore
indicators same as from C&K lines once open
Type (I, P or M): I
Pressure test chambers at end of well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack
Type (I, P or M): M
Wellbore test between wells and 14 while subsea
Type (I, P or M): M

Enterprise A 119
LEADER
1.9.5 Functional Failure: Loss of containment - Circulate the well after drill pipe disconnect

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak C&K connector spool fails (washout in bends) Potential isolation of leak depending on location Environmental impact in the form of drilling mud
Vibration on surface (rig floor) choke manifold - Type (I, P or M): P spilled into the ocean
bolts backed out Connectors tested with casing test & blind shear Release of hydrocarbons to air or sea, potentially
External Leak/Rupture - Casing Shear Ram - BOP ram test resulting in spill with large impact
Stack (linked to 2.3.3.1) Type (I, P or M): M Release of hydrocarbons to atmosphere
External Leak/Rupture - Hydraulic Supply - Pressure test every 14 days potentially resulting in fire or explosion (large
Surface Control Systems (linked to 2.1.4.1) Type (I, P or M): M fire if the failure is at the choke manifold
ROV inspection every 3 days connection)
Mechanical Failure - Blind Shear Ram - BOP
Stack (linked to 2.3.2.4) Type (I, P or M): M
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Hydraulic Supply: Rigid Conduit and
Manifold - Subsea Control Systems (linked to
2.2.5.3)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

2 Rupture No credible causes resulting in rupture during


'Circulate the well after drill pipe disconnect'

Enterprise A 120
LEADER
10- Circulate across the BOP stack to remove
trapped gas

Enterprise A 121
LEADER
1.10.1 Functional Failure: Failure to circulate - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Provide Control Loss of Power (UPS Shuts down with power Atypical current across solenoid coil Significant down time that impacts operation
Signal to C&K Valves when degradation) - Power - Surface Control Systems Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Demanded (linked to 2.1.2.1) Communications failure via flashing red screen resulting in spill with large impact
Electrical Short - Power - Surface Control on touch screen Release of hydrocarbons to atmosphere
Systems (linked to 2.1.2.5) Type (I, P or M): I potentially resulting in fire/explosion hazard with
Wiring harness fails No flow in flow meters large impact
Erratic output - Blue & Yellow Control Systems - Type (I, P or M): I Down time, after well control issue is resolved,
Electrical - Subsea Control Systems (linked to Pod mismatch & alarm to repair an individual C&K valve that cannot be
2.2.1.3) Type (I, P or M): I operated
Fails to respond to input - Electrical - Blue & Multiple (4) inlets below the blind shear rams for
Yellow Control Systems - Electrical - Subsea circulation if one is lost
Control Systems (linked to 2.2.1.4) Type (I, P or M): P
Loss of function (general) - Blue & Yellow Redundant mechanicals
Control Systems - Electrical - Subsea Control Type (I, P or M): P
Systems (linked to 2.2.1.7) Redundant touch screen, controllers, control
Fails with no output signal/communication - MUX pods, cables, powers supplies, SEM
System - Surface Control Systems (linked to Type (I, P or M): P
2.1.3.2) Function tests between wells and upon latch-up
Erratic output (Network) - MUX System - Surface Type (I, P or M): M
Control Systems (linked to 2.1.3.4)
Loss of, or Degraded Power - Control Panels -
Surface Control Systems (linked to 2.1.5.1)
Loss of, or Degraded Power - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.1)
Fails to respond to input - MUX System - Surface
Control Systems (linked to 2.1.3.5)
Short - MUX System - Surface Control Systems
(linked to 2.1.3.7)
Loss of function (general) - MUX System -
Surface Control Systems (linked to 2.1.3.8)
Fails to respond (with no output
signal/communication or to input) - Control
Panels - Surface Control Systems (linked to
2.1.5.2)
Erratic output - Control Panels - Surface Control
Systems (linked to 2.1.5.4)
Fails with no output signal/communication
(Includes Short) - Secondary & Emergency
Control Systems - Surface Control Systems
(linked to 2.1.8.2)
Fails to respond to input - Control Panels -
Surface Control Systems (linked to 2.1.5.5)

Enterprise A 122
LEADER
1.10.1 Functional Failure: Failure to circulate - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Loss of function (general) - Secondary &
Emergency Control Systems - Surface Control
Systems (linked to 2.1.8.3)
Short - Control Panels - Surface Control Systems
(linked to 2.1.5.7)
Loss of function (general) - Control Panels -
Surface Control Systems (linked to 2.1.5.8)
Loss of, or Degraded Power - Blue & Yellow
Control Systems - Electrical - Subsea Control
Systems (linked to 2.2.1.1)
Fails with no output signal/communication - Blue
& Yellow Control Systems - Electrical - Subsea
Control Systems (linked to 2.2.1.2)

2 Failure to Supply Hydraulic External Leak/Rupture - HPU - Surface Control Deadhead pumps / rupture disc rupture on pump Significant down time that impacts operation
Fluid & Pressure to C&K Systems (linked to 2.1.1.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Valves Internal Leak - HPU - Surface Control Systems HPU pumps running constantly resulting in spill with large impact
(linked to 2.1.1.2) Type (I, P or M): I Release of hydrocarbons to atmosphere
Plugged - HPU - Surface Control Systems (linked Manual indicators on valves that the ROV can potentially resulting in fire/explosion hazard with
to 2.1.1.3) read large impact
Mechanical Failure - HPU - Surface Control Type (I, P or M): I Down time, after well control issue is resolved,
Systems (linked to 2.1.1.4) Accumulators with stored energy to repair an individual C&K valve that cannot be
Loss of Function (general) - HPU - Surface Type (I, P or M): P operated
Control Systems (linked to 2.1.1.7) Design margin/safety factors (conduits work at
External Leak / Rupture - Blue & Yellow Control 5k, max @ 7.5k)
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.1) Multiple annulars & rams
Internal Leak - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Multiple pumps (1 pump needed, 3 pumps
2.2.2.2) present)
Plugged - Blue & Yellow Control Systems - Type (I, P or M): P
Hydraulics - Subsea Control Systems (linked to Redundant conduit lines with ability to isolate
2.2.2.3) leaking line and cross-connect via conduit
Mechanical Failure - Blue & Yellow Control manifold
Systems - Hydraulics - Subsea Control Systems Type (I, P or M): P
(linked to 2.2.2.4) Redundant functions between pods
Corrosion/Erosion - Blue & Yellow Control Type (I, P or M): P
Systems - Hydraulics - Subsea Control Systems Redundant regulators
(linked to 2.2.2.6) Type (I, P or M): P
Internal leak - Hydraulic Supply: Rigid Conduit Filter replacement frequency
and Manifold - Subsea Control Systems (linked to Type (I, P or M): M
2.2.5.2) Maintenance programs
External Leak/Rupture - Accumulators - Subsea Type (I, P or M): M
Control Systems (linked to 2.2.3.1) ROV inspection every 3 days

Enterprise A 123
LEADER
1.10.1 Functional Failure: Failure to circulate - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Internal Leak - Choke & Kill Lines & Valves - BOP Type (I, P or M): M
Stack (linked to 2.3.5.2) SOAK test between wells
External Leak/Rupture - Hydraulic Supply - Type (I, P or M): M
Surface Control Systems (linked to 2.1.4.1) Weekly BOP function test
Internal Leak - Accumulators - Subsea Control Type (I, P or M): M
Systems (linked to 2.2.3.2)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Mechanical Failure - Accumulators - Subsea
Control Systems (linked to 2.2.3.4)
Wear - Accumulators - Subsea Control Systems
(linked to 2.2.3.5)
Mechanical Failure - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.4)
Mechanical Failure - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.4)
Loss of Function (general) - Accumulators -
Subsea Control Systems (linked to 2.2.3.7)
External leak/rupture - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.1)
Plugged - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.3)
External Leak/Rupture - Surface Control Systems
- Accumulators - Surface (linked to 2.1.6.1)
Internal Leak - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.2)
Mechanical Failure - Surface Control Systems -
Accumulators - Surface (linked to 2.1.6.4)
Wear - Surface Control Systems - Accumulators -
Surface (linked to 2.1.6.5)
Loss of Function (general) - Surface Control
Systems - Accumulators - Surface (linked to
2.1.6.7)
External Leak/Rupture - Fluid Reservoir Unit -
Surface Control Systems (linked to 2.1.7.1)
Plugged - Fluid Reservoir Unit - Surface Control
Systems (linked to 2.1.7.3)
Loss of Function (general) - Fluid Reservoir Unit
- Surface Control Systems (linked to 2.1.7.7)

Enterprise A 124
LEADER
1.10.1 Functional Failure: Failure to circulate - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

Plugged - Hydraulic Supply: Rigid Conduit and


Manifold - Subsea Control Systems (linked to
2.2.5.3)
Corrosion/Erosion - Hydraulic Supply: Rigid
Conduit and Manifold - Subsea Control Systems
(linked to 2.2.5.6)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Loss of Function - ROV Intervention Interface -
BOP Stack (linked to 2.3.8.3)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1)
Internal Leak - Connectors - BOP Stack (linked
to 2.3.6.2)

3 Inability to Operate C&K Internal Leak - Choke & Kill Lines & Valves - BOP Deadheading of pump Significant down time that impacts operation
Valves as Needed Stack (linked to 2.3.5.2) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
External Leak/Rupture - Choke & Kill Lines & Flow meter (volume to actuate is known, should resulting in spill with large impact
Valves - BOP Stack (linked to 2.3.5.1) go 0 to 0.7 to 0 in ~ 5 seconds) If too high = Release of hydrocarbons to atmosphere
Wear - Choke & Kill Lines & Valves - BOP Stack leak. If long time = galling or leak potentially resulting in fire/explosion hazard with
(linked to 2.3.5.5) Type (I, P or M): I large impact
Increasing pressure Down time, after well control issue is resolved,
Type (I, P or M): I to repair an individual C&K valve that cannot be
Same pressure readings from BOP bore operated
indicators same as from C&K lines once open
Type (I, P or M): I
Pressure test chambers at end of well
Type (I, P or M): M
Shell test using end of tail rod between wells, on
surface
Type (I, P or M): M
Weekly function test of stack
Type (I, P or M): M
Wellbore test between wells and 14 while subsea
Type (I, P or M): M

Enterprise A 125
LEADER
1.10.2 Functional Failure: Failure to circulate at desired flow rate - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Degraded Flow Pressure Fail-safe valves fail to open completely Higher circulating pressure/ lower flow rates Significant down time that impacts operation
Large diameter tools in the well that cause Type (I, P or M): I
increase in differential pressure and forced to Circulate through the C&K valves daily
pump at slower rate Type (I, P or M): M
Flush C&K valves 2x daily
Type (I, P or M): M

2 Restricted Flow Path No credible cause resulting in restricted flow


path during 'Circulate across the BOP stack to
remove trapped gas'

Enterprise A 126
LEADER
1.10.3 Functional Failure: Failure to open / close fail-safe valves to seal - Circulate across the BOP stack to remove trapped gas

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure to Actuate under Fail- Broken springs = it will not close without Continued flow/return to the surface Significant down time that impacts operation
safe Conditions hydraulic assistance Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Mechanical interference (debris, galling) Redundant/2 valves resulting in spill with large impact
Wellbore pressure above the closing pressure Type (I, P or M): P Release of hydrocarbons to atmosphere
Maintenance & testing between each well potentially resulting in fire/explosion hazard with
Type (I, P or M): M large impact

2 Failure to Adequately Seal External Leak/Rupture - Annulars - BOP Stack Continued flow/return to the surface Significant down time that impacts operation
under Fail-safe Condition (linked to 2.3.1.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Internal Leak - Choke & Kill Lines & Valves - BOP Redundant/2 valves resulting in spill with large impact
Stack (linked to 2.3.5.2) Type (I, P or M): P Release of hydrocarbons to atmosphere
Wear - Choke & Kill Lines & Valves - BOP Stack Maintenance & testing between each well potentially resulting in fire/explosion hazard with
(linked to 2.3.5.5) Type (I, P or M): M large impact
Internal Leak - Annulars - BOP Stack (linked to
2.3.1.2)

Enterprise A 127
LEADER
1.10.4 Functional Failure: Loss of containment - Circulate across the BOP stack to remove trapped gas -

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 External Leak C&K connector spool fails (washout in bends) Potential isolation of leak depending on location Environmental impact in the form of drilling mud
Vibration on surface (rig floor) choke manifold - Type (I, P or M): P spilled into the ocean
bolts backed out Connectors tested with casing test & blind shear Release of hydrocarbons to air or sea, potentially
External Leak/Rupture - Pipe & Test Rams - BOP ram test resulting in spill with large impact
Stack (linked to 2.3.4.1) Type (I, P or M): M Release of hydrocarbons to atmosphere
External Leak/Rupture - Annulars - BOP Stack Pressure test every 14 days potentially resulting in fire or explosion (large
(linked to 2.3.1.1) Type (I, P or M): M fire if the failure is at the choke manifold
ROV inspection every 3 days connection)
External Leak/Rupture - Casing Shear Ram - BOP
Stack (linked to 2.3.3.1) Type (I, P or M): M
External Leak/Rupture - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.1)
Loss of Function (general) - Hydraulic Supply -
Surface Control Systems (linked to 2.1.4.7)
Mechanical Failure - Casing Shear Ram - BOP
Stack (linked to 2.3.3.4)
Internal Leak - Choke & Kill Lines & Valves - BOP
Stack (linked to 2.3.5.2)
External Leak/Rupture - Blind Shear Ram - BOP
Stack (linked to 2.3.2.1)
Wear - Blind Shear Ram - BOP Stack (linked to
2.3.2.5)
Mechanical Failure - Choke & Kill Lines & Valves -
BOP Stack (linked to 2.3.5.4)
Wear - Casing Shear Ram - BOP Stack (linked to
2.3.3.5)
External Leak/Rupture - Choke & Kill Lines &
Valves - BOP Stack (linked to 2.3.5.1)
Wear - Choke & Kill Lines & Valves - BOP Stack
(linked to 2.3.5.5)

2 Rupture No credible causes resulting in rupture during


'Circulate across the BOP stack to remove
trapped gas'

Enterprise A 128
LEADER
11- Connect BOP and LMRP at Landing

Enterprise A 129
LEADER
1.11.1 Functional Failure: Inadequate BOP Connection - Connect BOP and LMRP at Landing

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of Wellhead Poor wellhead surface (not cleaned) Flow meter There is only potential operational impact/delay,
Connector to Properly Lock Damaged seal areas or gaskets Type (I, P or M): I as the well is secure prior to landing BOP under
and Seal Overpull (pull on BOP/wellhead to ensure this scenario.
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1) connection)
Type (I, P or M): I
Loss of Function (general) - Connectors - BOP
Stack (linked to 2.3.6.7) Place resilient (metal gasket with elastomeric
component) seal on wellhead and/or BOP
Mechanical Failure - Connectors - BOP Stack Type (I, P or M): P
(linked to 2.3.6.4)
Clean wellhead mating surface with ROV prior to
landing
Type (I, P or M): M
New metal gasket for each landing
Type (I, P or M): M
ROV
Type (I, P or M): M
Test the BOP using a test plug in the wellhead to
the maximum pressure the BOP will be tested
Type (I, P or M): M

2 Failure of Connector Integrity Differential pressure between wellbore and sea Lock indicator If the well has been secured prior to landing
External Leak/Rupture - Connectors - BOP Stack Type (I, P or M): I BOP, there is only potential operational
(linked to 2.3.6.1) Loss of mud volume in trip tank impact/delay.
Poor wellhead surface (not cleaned) Type (I, P or M): I If the well has not been secured previously,
POCV there is potential for spill to the environment.
Damaged seal areas or gaskets
Type (I, P or M): I
Mechanical Failure - Connectors - BOP Stack
(linked to 2.3.6.4) Between well clean, grease, inspect
Type (I, P or M): M
Loss of Function (general) - Connectors - BOP
Stack (linked to 2.3.6.7) Chamber test (i.e. wellbore test)
Type (I, P or M): M
Five year inspection of latch
Type (I, P or M): M
Minimum unlock pressure on surface
Type (I, P or M): M
New gaskets
Type (I, P or M): M
Pressure test every 14 days (if no test ram,
connector is tested)
Type (I, P or M): M
Required ROV inspection every 3 day, however
ROV is subsea more often
Type (I, P or M): M
Tested on surface and subsea
Type (I, P or M): M

Enterprise A 130
LEADER
1.11.2 Functional Failure: Inadequate LMRP Connection - Connect BOP and LMRP at Landing

Item Failure Mode Causes Indications/Protections/Maintenance End Effects

1 Failure of LMRP Connector to Open C&K lines can pull seals off Flow meter There is only potential operational impact/delay,
Properly Lock and Seal Incorrect alignment Type (I, P or M): I as the well is secure prior to landing BOP under
(auxiliary connections) Key slots this scenario.
External Leak/Rupture - Connectors - BOP Stack
(linked to 2.3.6.1) Type (I, P or M): I NOTE: Other connections being made between
Overpull LMRP and BOP include main connection, C&K
Poor wellhead surface (not cleaned) lines, 5k stab, pob wedges to lower stack.
Type (I, P or M): I
Damaged seal areas or gaskets
Pressure tests
Mechanical Failure - Connectors - BOP Stack Type (I, P or M): M
(linked to 2.3.6.4)
ROV inspection of connection & frame
Loss of Function (general) - Connectors - BOP Type (I, P or M): M
Stack (linked to 2.3.6.7)

2 Failure of Connector Integrity External Leak/Rupture - Connectors - BOP Stack Flow meter Significant down time that impacts operation
(linked to 2.3.6.1) Type (I, P or M): I Release of hydrocarbons to air or sea potentially
Open C&K lines can pull seals off Key slots resulting in spill with large impact
Incorrect alignment Type (I, P or M): I
Poor wellhead surface (not cleaned) Lock indicator
Type (I, P or M): I
Damaged seal areas or gaskets
Loss of mud volume in trip tank
Mechanical Failure - Connectors - BOP Stack Type (I, P or M): I
(linked to 2.3.6.4)
Overpull
Loss of Function (general) - Connectors - BOP Type (I, P or M): I
Stack (linked to 2.3.6.7)
POCV
Type (I, P or M): I
Required ROV inspection every 3 day, however
ROV is subsea more often
Type (I, P or M): I
Between well clean, grease, inspect
Type (I, P or M): M
Chamber test
Type (I, P or M): M
Five year inspection of latch
Type (I, P or M): M
Minimum unlock pressure on surface
Type (I, P or M): M
New gaskets
Type (I, P or M): M
Pressure test every 14 days (if no test ram,
connector is tested)
Type (I, P or M): M
ROV inspection of connection & frame
Type (I, P or M): M

Enterprise A 131
LEADER
1.11.2 Functional Failure: Inadequate LMRP Connection - Connect BOP and LMRP at Landing

Item Failure Mode Causes Indications/Protections/Maintenance End Effects


Tested on surface and subsea
Type (I, P or M): M

Enterprise A 132
LEADER
APPENDIX B
EQUIPMENT-LEVEL FMECA WORKSHEETS

2650788-DFMECA-2-D2
2- Equipment level FMECA

Enterprise B-3
LEADER
1- Surface Control Systems

Enterprise B-4
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Pump leaks Frequent cycling of pumps on/off Additional wear on pumps due to 1 1 1
Leak/ Valve leaks Type (I, P or M): I more frequent pump cycling
Rupture Low pressure alarms (system would not be run to this
Connections/flanges leak point, pump isolated and removed
Type (I, P or M): I
Piping fails from service/problem corrected)
Visual indication by presence of [Local Effects]
Valve fails (ball, check, needle, fluid on rig
relief) Type (I, P or M): I
Seal/joint leaks Isolate problematic pump and
continue operations with
remaining pumps
Type (I, P or M): P
Located in climate controlled HPU
room out of weather
Type (I, P or M): P
Daily inspection/walk through of
HPU room/system
Type (I, P or M): M
Pumps on OEM-based
maintenance schedule
Type (I, P or M): M
Strainers checked on regular basis
(weekly)
Type (I, P or M): M
Surface draw down, before BOP
deployment, after latch-up, every
6 months subsea
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M

Continuous pumps running [Local 1 1 1


Effects]

Increased time to return to system 1 1 1


pressure [Local Effects]

Truncate pipe on surface, 1 1 1


preventing fluid supply to
accumulators [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
Enterprise B-5
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
When Demanded - Failure to close
and seal on the drill pipe and
allow circulation on demand due
to failure to close on drill pipe
through annular(s) (1.1) (linked to
1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 3 2 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
Enterprise B-6
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 3 2 54


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 3 2 54


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 3 2 48


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Shear Pipe - Failure to 6 3 2 36


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Enterprise B-7
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Shear Ram to Seal On 6 3 2 36


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 3 2 36


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 3 2 36
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

External Leak - Loss of 10 3 1 30


containment - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.6.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 3 2 54


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Enterprise B-8
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Shear Ram to Seal On 10 3 2 60


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 3 2 60


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 3 2 60
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

External Leak - Loss of 10 3 2 60


containment - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.7.1)

Failure of Hydraulic Fluid to 9 3 2 54


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 3 2 42


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
Enterprise B-9
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 3 2 36


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 3 2 36


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 3 2 60


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Failure to Supply Hydraulic Fluid & 10 3 2 60


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

2 Internal Pump degrades (internal leak) - Potentially notice on drawdown Increased time to return to system 1 1 1
Leak Wear of metal to metal seals test pressure [Local Effects]
Check valve leaks Type (I, P or M): I
Relief valve leaks Pressure fluctuation
Type (I, P or M): I
SPM valve vents
Time to return to system pressure
Pilot valve leaks (surface SPM Type (I, P or M): I
valve control)
Redundancy in system that minor
Regulator leaks leakage would have minimal effect
Closed isolation valves (ball on system
valves) Type (I, P or M): P
Regulator fails
Valve fails (ball, check, needle,
relief)
Trigger valve (SPM valve) does
not open

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annular & C&K Valves
When Demanded - Failure to close
Enterprise B-10
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 3 3 81


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 3 81


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 3 3 81


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Supply Hydraulic Fluid & 9 3 3 81


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 3 3 81


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Enterprise B-11
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 3 3 81


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 3 3 81


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 3 3 81


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 3 3 72


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 3 3 54


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 3 3 54


shear the drill pipe - Controlled
operation - Shear the drill pipe

Enterprise B-12
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 3 3 54


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 3 3 54


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 3 3 54
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 3 3 81


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 3 3 90


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 3 3 81


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 3 3 90


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Enterprise B-13
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Sealing 10 3 3 90


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 3 3 90
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 3 3 90


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 3 3 63


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 3 3 54


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 3 3 54


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 3 3 90


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged Contamination/filtering Differential pressure monitors on Cavitation in pump [Local Effects] 1 1 1


Filter media plugs filter housing (Alarmed)
Type (I, P or M): I
Strainer basket plugs

Enterprise B-14
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Organic fouling Fluid properties to prevent organic
Restriction in system (filter, hose, growth
ID of fitting) Type (I, P or M): P
Mix system filtration
Type (I, P or M): P
Mix system recirculation to
prevent precipitation
Type (I, P or M): P
Redundant flow paths
Type (I, P or M): P
Relief valves in system
Type (I, P or M): P
HPU fluid sampling (daily)/analysis
(monthly)
Type (I, P or M): M
Filters are replaced between wells
Type (I, P or M): M
Regular cleaning of strainers,
remove & rinse (weekly)
Type (I, P or M): M

Increased HP-side pressure [Local 1 1 1


Effects]

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 3 81


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)
Enterprise B-15
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Adequate 9 3 3 81


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 3 81


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 3 3 81


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 3 3 81


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 3 3 81


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Enterprise B-16
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 3 3 72


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 3 3 72


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 3 3 54


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 3 3 54


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 3 3 54


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 3 3 54
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Enterprise B-17
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Actuates Too Slowly on Demand - 8 3 3 72


Closes too slowly - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.5.1)

Failure to Supply Hydraulic Fluid & 9 3 3 81


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 3 81


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 3 3 81


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 3 3 90


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 3 3 90


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 3 3 90
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Actuates Too Slowly on Demand - 9 3 3 81


Closes too slowly - Emergency
Enterprise B-18
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.6.1)

Failure of Hydraulic Fluid to 9 3 3 81


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 3 81


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 3 3 63


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 3 81


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 3 3 54


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 3 3 54


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 3 3 90


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-19
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

4 Mechanical Valve fails Alarms SPM valve failure can lead to loss 1 1 1
Failure Rods fail Type (I, P or M): I of hydraulic supply to stack [Local
Audible indication Effects]
Belt fails
Type (I, P or M): I
Motor fails
External Leak
Pipe works fails Type (I, P or M): I
Pump fails Insufficient pressure
Pump fails due to wear Type (I, P or M): I
Pump running continuously
Type (I, P or M): I
Second/Third HPU pumps trip
when not expected
Type (I, P or M): I
Redundant flow paths
Type (I, P or M): P

System pressure not achieved 1 1 1


(increase time to achieve system
pressure) [Local Effects]

Failure to Supply Hydraulic Fluid & 8 4 2 64


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 4 2 64


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 4 2 72


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 4 2 72


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on

Enterprise B-20
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 4 2 72


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 4 2 72


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 4 2 72


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 4 2 72


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 4 2 64


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Enterprise B-21
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 4 2 64


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 4 2 64


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 4 2 48


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 4 2 48


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 4 2 48


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 4 2 48


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 4 2 48
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 4 2 72


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
Enterprise B-22
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 4 2 72


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 4 2 72


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 4 2 80


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 4 2 80


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 4 2 80
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 4 2 72


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 4 2 72


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Enterprise B-23
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 7 4 2 56


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 4 2 72


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 4 2 48


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 4 2 48


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 4 2 80


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear No credible causes resulting in


wear of the HPU - Surface Control
Systems

6 Corrosion/Er No credible causes resulting in Fluid sampling/testing


osion corrosion/erosion of the HPU - Type (I, P or M): M
Surface Control Systems Pipe wall thickness testing
Type (I, P or M): M
Stainless steel piping
Type (I, P or M): P

7 Loss of Pump fails due to wear Alarms Additional wear on pumps due to 1 1 1
Function Regulator fails Type (I, P or M): I more frequent pump cycling
(general) Audible indication (system would not be run to this
Pump leaks point, pump isolated and removed
Type (I, P or M): I
Valve leaks from service/problem corrected)
Differential pressure monitors on [Local Effects]
Connections/flanges leak filter housing (Alarmed)
Enterprise B-24
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Piping fails Type (I, P or M): I
Relief valve leaks External Leak
SPM valve vents Type (I, P or M): I
Pilot valve leaks (surface SPM Frequent cycling of pumps on/off
valve control) Type (I, P or M): I
Check valve leaks Insufficient pressure
Type (I, P or M): I
Pump leaks (internal) - wear of
metal to metal seals Low pressure alarms
Type (I, P or M): I
Regulator leaks
Potentially notice on drawdown
Closed isolation valves (ball test
valves) Type (I, P or M): I
Filter media plugs Pressure fluctuation
Strainer baskets plug Type (I, P or M): I
Organic fouling Pump running continuously
Valve fails Type (I, P or M): I
Rods break Second/Third HPU pumps trip
when not expected
Belt fails
Type (I, P or M): I
Motor fails
Time to return to system pressure
Valve fails (ball, check, needle, Type (I, P or M): I
relief)
Visual indication by presence of
Trigger valve (SPM valve) does fluid on rig
not open Type (I, P or M): I
Seal/joint leaks Fluid properties to prevent organic
growth
Type (I, P or M): P
Isolate problematic pump and
continue operations with
remaining pumps
Type (I, P or M): P
Located in climate controlled HPU
room out of weather
Type (I, P or M): P
Mix system filtration
Type (I, P or M): P
Mix system recirculation to
prevent precipitation
Type (I, P or M): P
Redundancy in system that minor
leakage would have minimal effect
on system
Enterprise B-25
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): P
Redundant flow paths
Type (I, P or M): P
Relief valves in system
Type (I, P or M): P
Daily inspection/walk through of
HPU room/system
Type (I, P or M): M
Filters are replaced between wells
Type (I, P or M): M
HPU fluid sampling (daily)/analysis
(monthly)
Type (I, P or M): M
Pumps on OEM-based
maintenance schedule
Type (I, P or M): M
Regular cleaning of strainers,
remove & rinse (weekly)
Type (I, P or M): M
Strainers checked on regular basis
(weekly)
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M
Surface drawdown, before BOP
deployment, after latch-up, every
6 months subsea
Type (I, P or M): M

Cavitation in pump [Local Effects] 1 1 1

Continuous pumps running [Local 1 1 1


Effects]

Increased HP-side pressure [Local 1 1 1


Effects]

Increased time to return to system 1 1 1


pressure [Local Effects]

Enterprise B-26
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

SPM valve failure can lead to loss 1 1 1


of hydraulic supply to stack [Local
Effects]

System pressure not achieved 1 1 1


(increase time to achieve system
pressure) [Local Effects]

Truncate pipe on surface, 1 1 1


preventing fluid supply to
accumulators [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 3 2 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Enterprise B-27
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 3 2 54


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 8 3 2 48


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 3 2 48


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Enterprise B-28
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 3 2 36


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 3 2 36


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 3 2 36


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 3 2 36


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 3 2 36
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Enterprise B-29
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Shear Pipe - Failure to 9 3 2 54


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 3 2 60


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 3 2 60


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 3 2 60
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 3 2 54


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 3 2 42


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
Enterprise B-30
LEADER
2.1.1 Equipment: HPU - Surface Control Systems HPU, including three HPU pumps and associated piping and regulators

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 3 2 36


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 3 2 36


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 3 2 60


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Failure to Maintain Adequate 10 3 2 60


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Enterprise B-31
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of Distribution panel fails Substantial alarms/notifications A UPS is a tertiary redundancy 1 1 1


Power (UPS Transformer (in UPS and in Type (I, P or M): I with a second UPS and rig power.
Shuts down subsea power control system) fails E/H Backup [Local Effects]
with power Type (I, P or M): P
degradation) UPS fails
Power cable fails Second UPS
Type (I, P or M): P
Breaker fails
Batteries are replaced on a regular
UPS Battery fails (only a problem basis (3 years, design life = 8
if power is also lost) years, recommend replace every 4
Electronics fail to 6 years)
Loss of Power Type (I, P or M): M
Daily, the UPS runs a battery test.
Type (I, P or M): M
Rig does test between well to
ensure UPSs will continue to run
and support panels for 2 hour
period
Type (I, P or M): M

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Inverter feeds battery and load. 1 1 1


Loss of Inverter switches system
to battery power. Auto switch to
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). [Local Effects]

Loss of redundancy. [Local 1 1 1


Effects]

Per API 16D, as long as 1 UPS is 1 1 1


fully functional, full redundancy
exists. [Local Effects]

UPSs are collocated in the same 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Enterprise B-32
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Enterprise B-33
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Enterprise B-34
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

2 Fails with no Cable fails Alarms in all panels If no redundant power source 1 1 1
output PDP Source select switch (One for Type (I, P or M): I exists, no alarms will be indicated
each Blue & Yellow Pod) fails Loss of Pod power for that side (no power). [Local Effects]
Breaker fails Type (I, P or M): I
Electronics fail Redundant UPS and other power
supplies
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Inverter feeds battery and load. 1 1 1


Loss of intverter switches system
to battery power. Autoswitch to
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). UPS automatically switch
to reserve line. [Local Effects]

Loss of redundancy [Local Effects] 1 1 1

Enterprise B-35
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Per API 16D, as long as 1 UPS is 1 1 1


fully functional, full redundancy
exists. [Local Effects]

UPS is a tertiary redundancy with 1 1 1


a second UPS and rig power.
[Local Effects]

UPSs are collocated in the same 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

3 Erratic Loose connections Quarterly electrical system Arcing/Sparking [Local Effects] 1 1 1


output Electronics fail maintenance (visually inspect,
(Erratic, tighten connections,
Intermittent) rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Panels that go on and off [Local 1 1 1


Effects]

Unintentional Operation - 3 2 1 6
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Enterprise B-36
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Closing - 3 2 1 6
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

4 Fails to No credible causes resulting in


Respond to fails to respond of the Power -
Input Surface Control Systems

5 Electrical Cabling fails Coordinated overcurrent A UPS is a tertiary redundancy 1 1 1


Short Mechanical component (i.e., protection system with a second UPS and rig power.
selector switch) fails in a panel Type (I, P or M): P [Local Effects]
Connector fails Redundancy in power distribution
system/paths
Connector fails due to grounding Type (I, P or M): P
Electronics fail Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

If no redundant power source 1 1 1


exists, no alarms will be indicated
(no power). [Local Effects]

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Inverter feeds battery and load. 1 1 1


Loss of inverter switches system
to battery power. Autoswitch to
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). UPS automatically switch
to reserve line. [Local Effects]

Loss of redundancy. [Local 1 1 1

Enterprise B-37
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Effects]

Per API 16D, as long as 1 UPS is 1 1 1


fully functional, full redundancy
exists. [Local Effects]

UPSs are collocated in the same 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Enterprise B-38
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Enterprise B-39
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

6 Loss of Cable fails Alarms in all panels If no redundant power source 1 1 1


Function PDP Source select switch (One for Type (I, P or M): I exists, no alarms will be indicated
each Blue & Yellow Pod) fails Loss of Pod power for that side (no power). [Local Effects]
Breaker fails Type (I, P or M): I
Electronics fail Redundant UPS and other power
supplies
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Enterprise B-40
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Inverter feeds battery and load. 1 1 1


Loss of intverter switches system
to battery power. Autoswitch to
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). UPS automatically switch
to reserve line. [Local Effects]

Loss of redundancy [Local 1 1 1


Effects]

Per API 16D, as long as 1 UPS is 1 1 1


fully functional, full redundancy
exists. [Local Effects]

UPS is a tertiary redundancy with 1 1 1


a second UPS and rig power.
[Local Effects]

UPSs are collocated in the same 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Enterprise B-41
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

7 Ground Cable/wiring fails due to pinching Ground Fault alarm Alarm indicating ground fault 1 1 1
Faults Water ingress (subsea) Type (I, P or M): I (floats). Second alarm indicated
Quarterly electrical system circuit failure. [Local Effects]
Electronics fail
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

8 Loss of Transformer fails due to electrical Alarms (pod mismatch, pod Loss of pod corresponding to lost 1 1 1
subsea short circuit communications loss) subsea transformer [Local Effects]
transformer Transformer fails due to Type (I, P or M): I
mechanical damage Redundant pod with own subsea
Transformer fails due to loose transformer
connection Type (I, P or M): P
Electronics fail Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -

Enterprise B-42
LEADER
2.1.2 Equipment: Power - Surface Control Systems Power including Blue & Yellow Power Distribution Panels, Power Isolation J-box; Blue & Yellow
UPSs, Blue & Yellow Subsea Transformers, and yellow and blue distribution panels, umbilical J-
box; and connections to associated cabinets and equipment (e.g., MUX, control panels)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Enterprise B-43
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of, or No causes identified resulting in


Degraded Loss of, or Degraded Power of the
Power MUX System - Surface Control
Systems

2 Fails with no Media converter fails Communications alarms (serial Network outage (worst case is 1 1 1
output Cable fails and network) to/from CCU) [Local Effects]
signal/comm Type (I, P or M): I
unication Connection breaks
Pod mismatch if a command is
Software fails due to attempted
issues/anomalies/bugs Type (I, P or M): I
Network fails Multiple networks
Network switch fails Type (I, P or M): P
RS-485 communications cards fail Multiple operating stations (i.e.,
Loss of network communications can operate Pod commands from
CCU directly)
Board in any of the components
Type (I, P or M): P
fails (Driller's panel, CCU, Pod)
Multiple pods
Electronics fail
Type (I, P or M): P
Pod comms have 4 paths to each
(each pod has 2 SEMs, each CCU
communicates with both SEMs in
both pods)
Type (I, P or M): P
Redundancies within systems
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M
Weekly functional testing -
Alternate panels for test execution
Type (I, P or M): M

NOTE: Network Failures could be 1 1 1


local (to one node, more typical)
or more global (network 1) [Local
Effects]

Serial communications outage 1 1 1


Enterprise B-44
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(worst case is pod
communications) [Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Enterprise B-45
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Enterprise B-46
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

3 Fails with No credible causes resulting in


low or high fails with low or high output of the
output MUX System - Surface Control
Systems

4 Erratic Connections fails (e.g., loose) Processor load alarm Communications loss [Local 1 1 1
output Network storm Type (I, P or M): I Effects]
(Network) Closed system (controlled access)
Electronics (device) fail
- Rig initiated RSN limited to GE
Loss of network communications access to data logger, which can
Electronics fails THEN be routed into QNX.
Physical connection must be made
on rig by ethernet cable.
Type (I, P or M): P
Redundant networks
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M
Weekly functional testing -
Alternate panels for test execution
Type (I, P or M): M

Enterprise B-47
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Processor loading (slowed 1 1 1


network) [Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Enterprise B-48
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Enterprise B-49
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

5 Fails to Cable fails Substantial alarms/notifications Communications loss [Local 1 1 1


respond to Connection breaks Type (I, P or M): I Effects]
input E/H Backup
Software fails due to
issues/anomalies/bugs Type (I, P or M): P
Network fails Multiple networks
Type (I, P or M): P
Network switch fails
Multiple operating stations (i.e.,
RS-485 communications cards fail can operate Pod commands from
Media converter fails CCU directly)
Connections fail (e.g., loose) Type (I, P or M): P
Network storm Multiple pods
Type (I, P or M): P
Electronics (device) fail
Redundancies within systems
UPS fails
Type (I, P or M): P
Distribution panel fails
Second UPS
Transformer (in UPS and in Type (I, P or M): P
subsea power control system) fails
Batteries are replaced on a regular
Power cable fails basis (3 years, design life = 8
Breaker fails years, recommend replace every 4
to 6 years)
UPS battery fails (only a problem
Type (I, P or M): M
if power is also lost)
Daily, the UPS runs a battery test.
Loss of network communications
Type (I, P or M): M
Board in any of the components
Pod comms have 4 paths to each
fails (Driller's panel, CCU, Pod)
(each pod has 2 SEMs, each CCU
Enterprise B-50
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Electronics fails communicates with both SEMs in
both pods)
Type (I, P or M): P
Rig does test between well to
ensure UPSs will continue to run
and support panels for 2 hour
period
Type (I, P or M): M
Communications alarms (serial
and network)
Type (I, P or M): I
Pod mismatch if a command is
attempted
Type (I, P or M): I
Processor load alarm
Type (I, P or M): I
Closed system (controlled access)
- Rig initiated RSN limited to GE
access to data logger, which can
THEN be routed into QNX.
Physical connection must be made
on rig by ethernet cable.
Type (I, P or M): P
Redundant networks
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M
Weekly functional testing -
Alternate panels for test execution
Type (I, P or M): M

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Inverter feeds battery and load. 1 1 1


Loss of intverter switches system
to battery power. Autoswitch to
Enterprise B-51
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). UPS automatically switch
to reserve line. [Local Effects]

Loss of redundancy [Local Effects] 1 1 1

Network outage (worst case is 1 1 1


to/from CCU) [Local Effects]

NOTE: Network Failures could be 1 1 1


local (to one node, more typical)
or more global (network 1) [Local
Effects]

Processor loading (slowed 1 1 1


network) [Local Effects]

Per API 16D, as long as 1 UPS is 1 1 1 1


fully functional, full redundancy
exists. [Local Effects]

Serial communications outage 1 1 1 1


(worst case is pod
communications) [Local Effects]

UPS is a tertiary redundancy with 1 1 1 1


a second UPS and rig power.
[Local Effects]

UPSs are collocated in the same 1 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on

Enterprise B-52
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Enterprise B-53
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Enterprise B-54
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

6 Processing Not applicable for this definition of


error "MUX System"

7 Short MUX Cable fails due to damage Communications alarms (serial Network outage (worst case is 1 1 1
Cable fails and network) to/from CCU) [Local Effects]
Type (I, P or M): I
Software fails due to
issues/anomalies/bugs Pod mismatch if a command is
attempted
Network fails Type (I, P or M): I
Network switch fails Multiple networks
RS-485 communications cards fail Type (I, P or M): P
Media converter fails Multiple operating stations (i.e.,
Connection fails (e.g. Broken) can operate Pod commands from
CCU directly)
MUX cable fails due to a short
Type (I, P or M): P
Loss of network communications
Multiple pods
Board in any of the components Type (I, P or M): P
fails (Driller's panel, CCU, Pod)
Pod comms have 4 paths to each
Electronics fail (each pod has 2 SEMs, each CCU
communicates with both SEMs in
both pods)
Type (I, P or M): P
Redundancies within systems
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M
Weekly functional testing -
Alternate panels for test execution
Type (I, P or M): M

NOTE: Network Failures could be 1 1 1


local (to one node, more typical)
or more global (network 1) [Local
Effects]

Enterprise B-55
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Serial communications outage 1 1 1


(worst case is pod
communications) [Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip

Enterprise B-56
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Enterprise B-57
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

8 Loss of Slip ring fails Alarms Network outage (worst case is 1 1 1


function MUX cable fails Type (I, P or M): I to/from CCU) [Local Effects]
(general) Redundancy
J-box fails
Type (I, P or M): P
Cables fail
Between well maintenance on
Connection fails (e.g., loose) MUX cable
Software fails due to Type (I, P or M): M
issues/anomalies/bugs Between well testing on all
Network fails systems/redundancies
Network switch fails Type (I, P or M): M
RS-485 communications cards fail Testing (functional, and subsea
testing)
Media converter fails
Type (I, P or M): M
Network storm
Electronics (device) fail
UPS fails
Distribution panel fails
Transformer (in UPS and in
subsea power control system) fails
Power cable fails
Breaker fails
UPS Battery fails (only a problem
if power is also lost)
MUX cable fails due to a short
Enterprise B-58
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Loss of network communications
Board in any of the components
fails (Driller's panel, CCU, Pod)
Electronics fails

NOTE: Network Failures could be 1 1 1


local (to one node, more typical)
or more global (network 1) [Local
Effects]

Serial communications outage 1 1 1


(worst case is pod
communications) [Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Enterprise B-59
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Enterprise B-60
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

9 Mechanical Cable fails due to damage MUX cable reels are Network outage (worst case is 1 1 1
Failure Cable fails due to reel damage operated/checked and greased to/from CCU) [Local Effects]
weekly
Slip ring fails due to damage Type (I, P or M): M
Electronics fail Subsea engineer visually inspects
as part of daily walkthrough
Type (I, P or M): M
Redundant MUX cable deployment
systems (1 for each pod)
Type (I, P or M): P

NOTE: Network Failures could be 1 1 1


local (to one node, more typical)
or more global (network 1) [Local
Effects]

Serial communications outage 1 1 1


(worst case is pod
communications) [Local Effects]

Enterprise B-61
LEADER
2.1.3 Equipment: MUX System - Surface Control Systems MUX System, including Central Control Unit with process array, blue & yellow processor array,
and associate equipment and cabinets; MUX cable reels and MUX cables (to connections with
Blue & Yellow Pods)

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Enterprise B-62
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Rigid pipe hydraulic lines (drape Frequent cycling of pumps on/off Additional wear on pumps due to 1 1 1
Leak/Ruptur hoses in moon pool) fail Type (I, P or M): I more frequent pump cycling
e Elastomer seals in conduit lines on Low pressure alarms (system would not be run to this
riser fail Type (I, P or M): I point, pump isolated and removed
from service/problem corrected)
Moon Pool drape hoses - Flexible ROV inspection of riser/BOP every [Local Effects]
(API 7k) fails 3 days
Hydraulic line ruptures (rigid pipe) Type (I, P or M): I
Drape hose fails in moon pool Visual indication by presence of
fluid on rig/in water by
Seal/joint leaks personnel/ROV if sufficient
Seal fails on riser where stab is for amount exists
choke/kill Type (I, P or M): I
Flex hose inspection/testing
annually
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M

Continuous pumps running [Local 1 1 1


Effects]

Increased time to return to system 1 1 1


pressure (only if rupture exists
with continuous loss of fluid)
[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Enterprise B-63
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

External Leak - Loss of 8 3 3 72


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -

Enterprise B-64
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the

Enterprise B-65
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 4 1 40


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 4 1 40


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear

Enterprise B-66
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Enterprise B-67
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

External Leak - Loss of 8 3 3 72


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

External Leak - Loss of 8 3 3 72


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

2 Internal No credible cause resulting in an


Leak internal leak of Hydraulic Supply -
Surface Control Systems

3 Plugged No credible causes resulting in


plugging of the Hydraulic Supply -
Surface Control Systems

4 Mechanical No credible causes resulting in


Failure Mechanical Failure of the
Hydraulic Supply - Surface Control
Systems

5 Wear No credible causes resulting in


wear of the Hydraulic Supply -
Surface Control Systems

6 Corrosion/Er No credible causes resulting in


osion corrosion/erosion of the Hydraulic
Supply - Surface Control Systems

7 Loss of Rigid pipe hydraulic lines fails Frequent cycling of pumps on/off Additional wear on pumps due to 1 1 1
Function Elastomer seals in conduit lines on Type (I, P or M): I more frequent pump cycling
(general) riser fail Low pressure alarms (system would not be run to this
Type (I, P or M): I point, pump isolated and removed
Moon Pool drape hoses - Flexible from service/problem corrected)
(API 7k) fails ROV inspection of riser/BOP every [Local Effects]
Hydraulic line ruptures (rigid pipe) 3 days
Type (I, P or M): I
Seal fails on riser where stab is for
choke/kill Visual indication by presence of
fluid on rig/in water by
personnel/ROV if sufficient

Enterprise B-68
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
amount exists
Type (I, P or M): I
Flex hose inspection/testing
annually
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M

Continuous pumps running [Local 1 1 1


Effects]

Increased time to return to system 1 1 1


pressure (only if rupture exists
with continuous loss of fluid)
[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill

Enterprise B-69
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

External Leak - Loss of 8 3 3 72


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand

Enterprise B-70
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Enterprise B-71
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Enterprise B-72
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

External Leak - Loss of 8 3 3 72


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-73
LEADER
2.1.4 Equipment: Hydraulic Supply - Surface Control Systems Hydraulic Supply including blue & yellow hotline reels, hotline hoses (to connection at Blue &
Yellow Pods) and rigid conduit (to connection with subsea accumulator system).

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

External Leak - Loss of 8 3 3 72


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

Enterprise B-74
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of, or Power isolation J-box in driller's Redundant displays Loss of a CCU (CCU required in 1 1 1
Degraded panel (monitors purge Type (I, P or M): P this configuration due to setup
Power process/condition in panel) fails Redundant nodes (computers) and only way to communicated to
Power source fails Type (I, P or M): P pod control) [Local Effects]
Transformer(s) fails Redundant power supplies within
Connection fails the panels
Type (I, P or M): P
AC Transfer switch fails
Two independent and redundant
Loss of Power driller's panels where operations
Electronics fail could continue in the event of the
loss of one train
Type (I, P or M): P
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Loss of Driller's Panel (higher 1 1 1


temperature due to other factors,
loss of rig air, opened panel door,
etc.) [Local Effects]

Loss of Tool Pusher's Panel (per 1 1 1


API only 2 panels are required,
however its failure will result in
down time and reporting to BSEE)
[Local Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Enterprise B-75
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled

Enterprise B-76
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

Enterprise B-77
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

2 Fails to Touch screen (no input to node) Alarms Loss of a CCU [Local Effects] 1 1 1
respond fails Type (I, P or M): I
(with no Network fails Visual indication
output Type (I, P or M): I
signal/comm Software fails due to
unication or issues/anomalies/bugs Redundant panels/stations
to input) Computer fails Type (I, P or M): P
I/O board fails Redundant screens
Type (I, P or M): P
Loss of Touch Screen
Quarterly maintenance
Loss of network communications Type (I, P or M): M
Board in any of the components
fails (Driller's panel, CCU, Pod)
Electronics fail

Loss of Driller's Panel [Local 1 1 1


Effects]

Loss of Tool Pusher's Panel [Local 1 1 1


Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
Enterprise B-78
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to

Enterprise B-79
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

3 Fails with No credible causes resulting in


low or high fails with low or high output of the
output Control Panels - Surface Control
Systems

4 Erratic Floating electronics (digital I/O Design change/EB to correct issue No effect as the issue should be 1 1 1
output components) fails Type (I, P or M): P fixed as a result of implementing
Connections fail (e.g., loose) Rig disconnect from BOP the EB. [Local Effects]
Network storm Type (I, P or M): P
Electronics (device) fail
I/O board fails
Loss of network communications
Electronics fails

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on

Enterprise B-80
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore

Enterprise B-81
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Enterprise B-82
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

5 Fails to Touch screen fails Alarms Failure to Provide Control Signal to 9 2 1 18


respond to Cable fails Type (I, P or M): I Annular or C&K Valves When
input Visual indication Demanded - Failure to close on
Connection fails (e.g., drill pipe through annular(s) -
loose/broken) Type (I, P or M): I
Close and seal on the drill pipe
Software fails due to Redundant panels/stations and allow circulation on demand
issues/anomalies/bugs Type (I, P or M): P (linked to 1.1.1.1)
Network fails Redundant screens
Type (I, P or M): P
Network switch fails
Quarterly maintenance
RS-485 communications cards fail Type (I, P or M): M
Media converter fails
Network storm
Electronics (device) fail
UPS fails
Distribution panel fails
Transformers fail (in UPS and in
subsea power control system)
Power cable fails
Breakers fail
UPS Battery fail (only a problem if
power is also lost)
Loss of Power
Loss of network communications
Board in any of the components
fails (Driller's panel, CCU, Pod)
Electronics fail

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Enterprise B-83
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Enterprise B-84
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

6 Processing Software fails due to anomalies


error (not addressed)

7 Short Cabling fails Coordinated overcurrent If no redundant power source 1 1 1

Enterprise B-85
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Mechanical component (i.e., protection system exists, no alarms will be indicated
selector switch) fails in a panel Type (I, P or M): P (no power). [Local Effects]
Connectors fail Redundancy in power distribution
Connector fails system/paths
Type (I, P or M): P
Electronics fail
Quarterly electrical system
maintenance (visually inspect,
tighten connections,
rust/corrosion, general condition,
transformer condition, clean with
vacuum/low pressure air)
Type (I, P or M): M

Input/output transformers are 1 1 1


single points of failure for the
UPS. [Local Effects]

Inverter feeds battery and load. 1 1 1


Loss of intverter switches system
to battery power. Autoswitch to
direct pass-through. Manual
switch if autoswitch fails. [Local
Effects]

Lose a piece of UPS but not have 1 1 1


power loss (battery, converter,
rectifier). UPS automatically switch
to reserve line. [Local Effects]

Loss of redundancy [Local Effects] 1 1 1

Per API 16D, as long as 1 UPS is 1 1 1


fully functional, full redundancy
exists. [Local Effects]

UPS is a tertiary redundancy with 1 1 1


a second UPS and rig power.
[Local Effects]

UPSs are collocated in the same 1 1 1


room with both UPSs, CCUs, PDPs,
and E/H backup. [Local Effects]

Enterprise B-86
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18

Enterprise B-87
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Enterprise B-88
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

8 Loss of Touch screen fails (no input to Alarms Loss of a CCU [Local Effects] 1 1 1
function node) Type (I, P or M): I
(general) Network fails Visual indication
Software fails due to Type (I, P or M): I
issues/anomalies/bugs Redundant panels/stations
Computer fails Type (I, P or M): P
I/O board fails Redundant screens
Type (I, P or M): P
Loss of network communications
Quarterly maintenance
Electronics fail Type (I, P or M): M

Loss of Driller's Panel [Local 1 1 1


Effects]

Loss of Tool Pusher's Panel [Local 1 1 1


Effects]

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Enterprise B-89
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Enterprise B-90
LEADER
2.1.5 Equipment: Control Panels - Surface Control Systems Control Panels including drillers panel with system controller and tool pushers panel with
system controller

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

Enterprise B-91
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Valve fails (manifold isolation and Hydraulic fluid on rig Per regulation, cannot continue 1 1 1
Leak/Ruptur block & bleed) Type (I, P or M): I operations without surface
e Piping flange seal leaks Low accumulator pressure alarms accumulators (discontinue
Type (I, P or M): I operations until restored) [Local
Piping fails Effects]
Pressure gauge fails Subsea Engineer daily
walkthrough of room (collocated
Gas charging valves fail HPU, FRU, & accumulators)
Accumulator bottles fails Type (I, P or M): I
Accumulator gas valve leaks Unanticipated cycling of
Accumulator fails due to HPU/Pumps running
insufficient charge Type (I, P or M): I
Accumulator fails due to All pipework is secured/protected
insufficient fluid/pressure to Type (I, P or M): P
complete full/tight closure Isolate accumulator banks from
system and apply pressure to
system directly from HPU pumps
Type (I, P or M): P
Isolation valves
Type (I, P or M): P
Stack-mounted accumulator
bottles
Type (I, P or M): P
System is located inside, away
from elements
Type (I, P or M): P
Draw down tests between wells
Type (I, P or M): M
Five year wall thickness tests
Type (I, P or M): M
Precharge pressure test
Type (I, P or M): M

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
Enterprise B-92
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
Enterprise B-93
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Enterprise B-94
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 5 4 2 40


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Enterprise B-95
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
Enterprise B-96
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

2 Internal Accumulator bottle bladder fails Delta in draw down test end Insufficient usable volume in 1 1 1
Leak from fatigue, or precharge is too pressure system (if unable to complete
low. Type (I, P or M): I EDS) [Local Effects]
Accumulator bladder fails 60 surface accumulator bottles
Accumulator fails due to Type (I, P or M): P
insufficient charge Precharge testing
Accumulator fails due to Type (I, P or M): M
insufficient fluid/pressure to
complete full/tight closure

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
Enterprise B-97
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Enterprise B-98
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Enterprise B-99
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 5 4 2 40


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:

Enterprise B-100
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged Debris Unintentional Opening - 10 3 2 60


Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Enterprise B-101
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

4 Mechanical Loss of precharge in a single Delta in draw down test end Insufficient usable volume in 1 1 1
Failure bottle when bladder and poppet pressure system (if unable to complete
fail Type (I, P or M): I EDS) [Local Effects]
Accumulator bladder fails Sixty surface accumulator bottles
Accumulator fails due to Type (I, P or M): P
insufficient fluid/pressure to
complete full/tight closure

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Enterprise B-102
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Enterprise B-103
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Enterprise B-104
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
Enterprise B-105
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear Ball valve fails due to wear Between well draw down test Down time/System isolation [Local 1 1 1
Accumulator bladder fails due to Type (I, P or M): M Effects]
wear Precharge pressure test
Poppet fails due to wear Type (I, P or M): M
Gas charging valves fail
Accumulator bladder fails
Accumulator gas valve leaks
Accumulators fails due to
insufficient charge
Accumulator fails due to
insufficient fluid/pressure to
complete full/tight closure

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Enterprise B-106
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Enterprise B-107
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
Enterprise B-108
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 5 4 2 40


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and

Enterprise B-109
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-110
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

6 Corrosion/Er No credible causes resulting in


osion corrosion/erosion of the
Accumulators - Surface - Surface
Control Systems

7 Loss of Accumulator bladder fails Hydraulic fluid on rig Down time/System isolation [Local 1 1 1
Function Accumulator gas valve leaks Type (I, P or M): I Effects]
(general) Low accumulator pressure alarms
Valve fails (manifold isolation and
block & bleed) Type (I, P or M): I
Flange seal fails Subsea Engineer daily
walkthrough of room (collocated
Piping fails HPU, FRU, & accumulators)
Pressure gauges fail Type (I, P or M): I
Gas charging valves fail Unanticipated cycling of
Accumulator bottles fail HPU/Pumps running
Type (I, P or M): I
Accumulator bottle bladder fails
from fatigue, or precharge is too All pipework is secured/protected
low. Type (I, P or M): P
Loss of precharge in a single Isolate accumulator banks from
bottle when bladder and poppet system and apply pressure to
fail system directly from HPU pumps
Type (I, P or M): P
Ball valve fails due to wear
Isolation valves
Accumulator bladder fails due to
Type (I, P or M): P
wear
Sixty surface accumulator bottles
Poppet fails due to wear
Type (I, P or M): P
Accumulators fail due to
Stack-mounted accumulator
insufficient charge
bottles
Accumulator fails due to Type (I, P or M): P
insufficient fluid/pressure to
System is located inside, away
complete full/tight closure
from elements
Type (I, P or M): P
Draw down tests between wells
Type (I, P or M): M
Five year wall thickness tests
Type (I, P or M): M
Precharge pressure test
Type (I, P or M): M

Insufficient usable volume in 1 1 1


system (if unable to complete
EDS) [Local Effects]

Enterprise B-111
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Per regulation, cannot continue 1 1 1


operations without surface
accumulators (discontinue
operations until restored) [Local
Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-

Enterprise B-112
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Enterprise B-113
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 5 4 2 40


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Enterprise B-114
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Enterprise B-115
LEADER
2.1.6 Equipment: Accumulators - Surface - Surface Control Systems Accumulators - Surface including one 300 gal., 5K rack; one 180 gal 5K accumulator rack and
associated ball valve; and connectors to HPU

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-116
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Reservoir/tank leaks Low level alarms in tanks Inadequate fluid supply to HPU 1 1 1
Leak/Ruptur Pump leaks Type (I, P or M): I [Local Effects]
e Visual indication of fluid
Valve leaks (ball, check, needle)
Type (I, P or M): I
Connections/flanges leak
Periodic maintenance of hydraulic
Piping fails accumulator system (weekly,
Pneumatic equipment unit (PNEU) monthly, quarterly). Some
fails due to standard hard pipe specific to FRU.
PNEU failures Type (I, P or M): M
Tank drain ball valves leaks
Incoming air lubrication valve (LP-
1) leaks
Valve fails (ball, check, needle,
relief)
Seal/joint leaks

Incorrect mix ratios if leak occurs 1 1 1


between concentrate/water tank
and mix tank [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to

Enterprise B-117
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:

Enterprise B-118
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

2 Internal Pump relief valves leak Incorrect fluid composition Incorrect indication of 1 1 1
Leak Pump fails (i.e., internal leak) due Type (I, P or M): I concentration levels [Local Effects]
to wear of metal to metal seals Overflow of mix tank
Regulator leaks Type (I, P or M): I
Closed isolation valves (ball Hydraulic fluid sampled daily,
valves) tested monthly
Type (I, P or M): M
Flow control valve from Potable
Enterprise B-119
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
water (FC1-1) leaks
Regulator fails

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

3 Plugged Incoming air filter failsdue to Differential pressure on Inadequate fluid supply to HPU 1 1 1
plugging recirculation pump [Local Effects]
Potable water filter (FL5-1) fails Type (I, P or M): I
due to plugging Incorrect mix ratios
Concentrate Supply Filters fail due Type (I, P or M): I
to plugging Low level on mixed reservoir
Recirculation pump filter fails due Type (I, P or M): I
to plugging Pressurize/collapse tanks
Tank ventilation filters fails due to Type (I, P or M): I
plugging (i.e., FL8-1,2) Filters replaced between wells
Contamination/filtering Type (I, P or M): M
Filters/strainers fail due to Sample fluid daily, test monthly
plugging Type (I, P or M): M
Strainers cleaned weekly
Type (I, P or M): M

Incorrect mix ratios if leak occurs 1 1 1


between concentrate/water tank
and mix tank [Local Effects]

Enterprise B-120
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -

Enterprise B-121
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Enterprise B-122
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

4 Mechanical Pump fails Differential pressure on Reduced mixing efficiency [Local 1 1 1


Failure Check valve fails due to loss of recirculation pump Effects]
(CV3-9) Pneumatic Equipment Type (I, P or M): I
Unit (PNEU) Supply Incorrect mix ratios
Ball valve fails Type (I, P or M): I
Level switch fails Low level on mixed reservoir
Type (I, P or M): I
Valve fails (ball, check, needle,
relief) Reduced mixing efficiency
Type (I, P or M): I
Sample fluid daily, test monthly
Type (I, P or M): M

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
Enterprise B-123
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Enterprise B-124
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear Fluid Reservoir Unit fails due to Audible indication of pump wear Reduced mixing efficiency [Local 1 1 1
insufficient air lubrication Type (I, P or M): I Effects]
Pump fails due to internal wear Incorrect fluid mixing
Type (I, P or M): I
Quarterly pump oil change,
cleaned, inspected
Type (I, P or M): M
Weekly pump efficiency test
Type (I, P or M): M

Failure to Supply Hydraulic Fluid & 2 1 3 6


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

6 Corrosion/Er No credible causes resulting in


osion corrosion/erosion of the Fluid
Reservoir Unit - Surface Control
Systems

7 Loss of Regulator fails Audible indication of pump wear Inadequate fluid supply to HPU 1 1 1
Function Reservoir/tank leaks Type (I, P or M): I [Local Effects]
(general) Differential pressure on
Pump leaks
recirculation pump
Valve leaks (ball, check, needle) Type (I, P or M): I
Connections/flanges leak Incorrect fluid composition
Piping fails Type (I, P or M): I
Pneumatic Equipment Unit (PNEU) Incorrect mix ratios/fluid mixing
fails due to loss of air supply Type (I, P or M): I
Tank drain ball valves leaks Low level alarm on mixed
Enterprise B-125
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Incoming air lubrication valve (LP- reservoir
1) leaks Type (I, P or M): I
Pump relief valves leak Low level alarms in tanks
Pump fails (internal leak) due to Type (I, P or M): I
wear of metal to metal seals Overflow of mix tank
Regulator leaks Type (I, P or M): I
Closed isolation valves (ball Pressurize/collapse tanks
valves) Type (I, P or M): I
Flow control valve from Potable Reduced mixing efficiency
water (FC1-1) fails Type (I, P or M): I
Filters/strainers fail due to Visual indication of fluid
plugging Type (I, P or M): I
Incoming air filter fails due to Filters replaced between well
plugging Type (I, P or M): M
Potable water filter (FL5-1) fail Hydraulic fluid sampled daily,
due to plugging tested monthly
Type (I, P or M): M
Concentrate Supply Filters fail due
to plugging Periodic maintenance of hydraulic
accumulator system (weekly,
Recirculation pump filter fails due monthly, quarterly). Some
to plugging specific to FRU.
Tank ventilation filters fail due to Type (I, P or M): M
plugging (i.e., FL8-1,2) Quarterly pump oil change,
Pump fails cleaned, inspected
Check valve fails due to loss of Type (I, P or M): M
(CV3-9) Pneumatic Equipment Sample fluid daily, test monthly
Unit (PNEU) Supply Type (I, P or M): M
Ball valve fails Strainers cleaned weekly
Level switch fails Type (I, P or M): M
Fluid Reservoir Unit fails due to Weekly pump efficiency test
insufficient air lubrication Type (I, P or M): M
Pump fails due to internal wear
Valve fails (ball, check, needle,
relief)
Seal/joint leaks

Incorrect indication of 1 1 1
concentration levels [Local Effects]

Incorrect mix ratios if leak occurs 1 1 1


between concentrate/water tank

Enterprise B-126
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and mix tank [Local Effects]

Reduced mixing efficiency [Local 1 1 1


Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)

Enterprise B-127
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14

Enterprise B-128
LEADER
2.1.7 Equipment: Fluid Reservoir Unit - Surface Control Systems Fluid Reservoir Unit, including 650 gal. glycol, 550 gal concentrate, and 1350 gal mixed fluid
reservoirs; glycol, concentrate, and mixed fluid pumps; and associated piping,

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-129
LEADER
2.1.8 Equipment: Secondary & Emergency Control Systems - Surface Control Systems Secondary & Emergency Control Systems including associated MUX Control System equipment
& Surface ERA

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of, or UPS fails (own, separate UPS UPS does own self-diagnostic EH backup system would not 1 1 1
Degraded failure) testing, however it is NOT function (All other primary and
Power Cable/connection fails (EH panel is connected to main control system secondary means of
located next to EH UPS) and user would have to be in communications with well and well
room to know UPS has a failure control have been defeated prior
Loss of Power Type (I, P or M): I to EH attempt). EH backup would
Can directly connect generator primarily be used in a well control
power to EH system situation, not station keeping
Type (I, P or M): P where EDS would/could be used
[Local Effects]
Deadman or autoshear (assuming
it is armed)
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
EH backup is function tested
between wells only
Type (I, P or M): M
Quarterly maintenance for
electrical
Type (I, P or M): M

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Enterprise B-130
LEADER
2.1.8 Equipment: Secondary & Emergency Control Systems - Surface Control Systems Secondary & Emergency Control Systems including associated MUX Control System equipment
& Surface ERA

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

2 Fails with no Electrical power fails UPS does own self-diagnostic EH backup system would not 1 1 1
output Internal panel fails (electrical or testing, however it is NOT function (All other primary and
signal/comm mechanical) connected to main control system secondary means of
unication and user would have to be in communications with well and well
(Includes MUX cable fails room to know UPS has a failure control have been defeated prior
Short) MUX cable fails due to a short Type (I, P or M): I to EH attempt). EH backup would
Can directly connect generator primarily be used in a well control
power to EH system situation, not station keeping
Type (I, P or M): P where EDS would/could be used
[Local Effects]
Deadman or autoshear (assuming
it is armed)
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
EH backup is function tested
between wells only
Type (I, P or M): M
Quarterly maintenance for
electrical
Type (I, P or M): M

Enterprise B-131
LEADER
2.1.8 Equipment: Secondary & Emergency Control Systems - Surface Control Systems Secondary & Emergency Control Systems including associated MUX Control System equipment
& Surface ERA

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

3 Loss of UPS fails (own, separate UPS UPS does own self-diagnostic EH backup system would not 1 1 1
function failure) testing, however it is NOT function (All other primary and
(general) Cable/connection fails (EH panel is connected to main control system secondary means of
and user would have to be in communications with well and well
Enterprise B-132
LEADER
2.1.8 Equipment: Secondary & Emergency Control Systems - Surface Control Systems Secondary & Emergency Control Systems including associated MUX Control System equipment
& Surface ERA

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
located next to EH UPS) room to know UPS has a failure control have been defeated prior
Electrical power fails Type (I, P or M): I to EH attempt). EH backup would
EH backup is function tested primarily be used in a well control
Internal panel fails (electrical or situation, not station keeping
mechanical) between wells only
Type (I, P or M): M where EDS would/could be used
MUX cable fails [Local Effects]
Quarterly maintenance for
MUX cable fails due to a short electrical
Type (I, P or M): M
Can directly connect generator
power to EH system
Type (I, P or M): P
Deadman or autoshear (assuming
it is armed)
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
ROV intervention
Type (I, P or M): P

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Enterprise B-133
LEADER
2.1.8 Equipment: Secondary & Emergency Control Systems - Surface Control Systems Secondary & Emergency Control Systems including associated MUX Control System equipment
& Surface ERA

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

Enterprise B-134
LEADER
2- Subsea Control Systems

Enterprise B-135
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of, or MUX cable fails Alarms - Loss of a power supply Degraded control of the pod 1 1 1
Degraded Transformer fails Type (I, P or M): I (Degraded Power) [Local Effects]
Power Failure of individual functions of a
Power supply fails
controller do NOT necessarily
Loss of Power due to water constitute a failure or loss of the
ingress controller or pod's SEM
Subsea connector fails Type (I, P or M): P
MUX cable fails due to a short Redundant pod
Connector fails due to grounding Type (I, P or M): P
Loss of Power Redundant within the pod (with
the exception of a connector
Connector fails due to mechanical
failure). Multiple power supplies,
issues
transformers, controllers in each
Electronics fail pod.
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function tests
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Failure to Provide Control Signal to 9 2 4 72


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe

Enterprise B-136
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Enterprise B-137
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

2 Fails with no Controller A/B fails Alarms on solenoids, controllers, Controller failure [Local Effects] 1 1 1
output Controller A/B communications fail I/Os
signal/comm Type (I, P or M): I
unication SEM fails/communications fail
Pod mismatch alarms
I/O board fails Type (I, P or M): I
Solenoid driver board fails For solenoid failure - Annual
Solenoid fails to fire signature tests, constantly
Enterprise B-138
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Solenoid fails monitored
I/O board fails Type (I, P or M): I
Electronics fail One complete set of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Pod Failure [Local Effects] 1 1 1

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
Enterprise B-139
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.1.1)

Enterprise B-140
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

3 Erratic Solenoid fails due to bad Alarms (Solenoid monitoring) Loss of a single function in a pod 1 1 1
output connection in solenoid circuit Type (I, P or M): I [Local Effects]
Control system fails due to Pod mismatch & alarm
pinched wire Type (I, P or M): I
Control system fails due to Voltage monitoring Alarms
hydrostatic pressure on some Type (I, P or M): I
connectors Redundant controllers
Connector fails due to grounding Type (I, P or M): P
Connector fails due to mechanical Redundant pods
issues Type (I, P or M): P
Electronics fail Between well testing
Type (I, P or M): M

Enterprise B-141
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Weekly BOP function testing
Type (I, P or M): M

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
Enterprise B-142
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect

Enterprise B-143
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

4 Fails to Controller A/B fails Alarms on solenoids, controllers, Controller failure [Local Effects] 1 1 1
respond to Controller A/B communications fail I/Os
input - Type (I, P or M): I
Electrical SEM fails/communications fail
For solenoid failure - Annual
Solenoid driver board fails signature tests, constantly
Solenoid fails to fire monitored
Solenoid fails Type (I, P or M): I
I/O board fails Pod mismatch alarms
Type (I, P or M): I
Electronics fail
One complete set of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Pod Failure [Local Effects] 1 1 1

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
Enterprise B-144
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
Enterprise B-145
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect

Enterprise B-146
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

5 Processing SEM/Controller Lockup = loss of a Alarms on solenoids, controllers, Loss of a single controller within a 1 1 1
error controller I/Os pod [Local Effects]
Type (I, P or M): I
For solenoid failure - Annual
signature tests, constantly
monitored
Type (I, P or M): I
Pod mismatch alarms
Type (I, P or M): I
One complete set of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.1.1)

6 Ground Control system fails due to water Alarms - Monitoring systems Alarm [Local Effects] 1 1 1
Fault ingress Type (I, P or M): I
Control system fails due to wiring Loss of function
damage Type (I, P or M): I

Enterprise B-147
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Electronics fail Redundant Pods
Type (I, P or M): P

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

7 Loss of MUX cable fails Alarms (Solenoid monitoring) Controller failure [Local Effects] 1 1 1
function Transformer fails Type (I, P or M): I
(general) Alarms - Loss of a power supply
Power supply fails
Type (I, P or M): I
Control system fails due to water
ingress Alarms on solenoids, controllers,
I/Os
Subsea connector fails Type (I, P or M): I
Controller A/B fails For solenoid failure - Annual
Controller A/B communications fail signature tests, constantly
SEM fails/communications fail monitored
Type (I, P or M): I
I/O board fails
Pod mismatch alarms
Solenoid driver board fails
Type (I, P or M): I
Solenoid fails to fire
Voltage monitoring Alarms
Solenoid circuit fails due to bad Type (I, P or M): I
connection
Failure of individual functions of a
Control system fails due to controller does NOT necessarily
pinched wire constitute a failure or loss of the
Control system fails due to controller or pod's SEM
Hydrostatic pressure on some Type (I, P or M): P
connectors One complete set of solenoid
Solenoid fails control boards per controller
Type (I, P or M): P
MUX cable fails due to a short
Redundant pods
Connector fails due to grounding
Type (I, P or M): P
Loss of Power
Redundant within the pod (with
Enterprise B-148
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
I/O board fails the exception of a connector
Connector fails due to mechanical failure). Multiple power supplies,
issues transformers, controllers in each
pod.
Electronics fail Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Weekly BOP function tests
Type (I, P or M): M
Between well surface testing
Type (I, P or M): M
Between well testing
Type (I, P or M): M

Degraded control of the pod 1 1 1


(Degraded Power) [Local Effects]

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Loss of a single function in a pod 1 1 1


[Local Effects]

Pod Failure [Local Effects] 1 1 1 1

Failure to Provide Control Signal to 9 2 1 18


Annular or C&K Valves When
Demanded - Failure to close on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.1)

Failure to Provide Control Signal to 9 2 4 72


Pipe Ram or C&K Valves When
Demanded - Failure to close on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.2.1)

Enterprise B-149
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Operation - 6 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Provide Control Signal to 9 2 1 18


Annular / Blind-Shear Ram or C&K
Valves When Demanded - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.1)

Unintentional Closing - 6 2 3 36
Unintentional closing / opening -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.2.1)

Failure to Provide Control Signal to 9 2 1 18


Annulars When Demanded -
Failure to close annulars - Strip
the drill string using the annular
BOP(s) (linked to 1.3.1.1)

Failure to Provide Control Signal to 9 2 2 36


Hang-off Ram When Demanded -
Failure of hang-off ram to close -
Hang-off the drill pipe on a ram
BOP and control the wellbore
(linked to 1.4.1.1)

Failure to Provide Control Signal to 9 1 4 36


Shear Ram When Demanded -
Failure to close - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.1.1)

Failure to Provide Control Signal - 10 2 1 20


Failure to Arm - Emergency

Enterprise B-150
LEADER
2.2.1 Equipment: Blue & Yellow Control Systems - Electrical - Subsea Control Systems Blue & Yellow Control Systems including MUX control, MUX POD power & communication,
hydraulic connections within the pod, E/H section (hydraulics, power, communication, SEM
interface, pressure, temperature, and water sensors, transformer, pod cabling, solenoid
boards, solenoids.

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.1.1)

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to circulate - Circulate the
well after drill pipe disconnect
(linked to 1.9.1.1)

Failure to Provide Control Signal to 8 2 1 16


C&K Valves when Demanded -
Failure to seal wellbore - Circulate
the well after drill pipe disconnect
(linked to 1.9.4.1)

Failure to Provide Control Signal to 10 1 1 10


C&K Valves when Demanded -
Failure to circulate - Circulate
across the BOP stack to remove
trapped gas (linked to 1.10.1.1)

8 Fails to send
hydraulic
pilot signal

Enterprise B-151
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Pipe, tubing, valve fails Low pressure alarms Loss of a function [Local Effects] 1 1 1
Leak / Fittings & Seals (pipe, valve, flow Type (I, P or M): I
Rupture meter etc.) leak Pumps running and pump run
Shear seal valve leaks lights
Type (I, P or M): I
SPM valve leaks
Pressure transducers/transmitters
Shuttle valve leaks Type (I, P or M): I
Schrader valve leaks Surface and subsea flow meters
Packer seal leaks Type (I, P or M): I
Hydraulic cylinder leaks Cross connection valve between
Accumulator leaks yellow/blue supply and
yellow/blue pods
Relief valve leaks
Type (I, P or M): P
Regulator leaks
Redundant pod & pod supply
Check valve leaks Type (I, P or M): P
Accumulator fails due to ROV intervention
insufficient charge Type (I, P or M): P
Pod tubing fails/leaks Between well Soak test and stump
Pod regulator fails test
Type (I, P or M): M
SPM Spool valve fails
Weekly functions tests
Shear seal valve fails
Type (I, P or M): M
Hydraulic line ruptures (rigid pipe)
Every 6 years complete teardown
Shuttle valve fails (doesn't and rebuild including static seals
transition/move, stuck, leaks) Type (I, P or M): M
Check valve fails Visual inspection between wells
Regulator fails Type (I, P or M): M
Trigger valve (SPM valve) fails to Pod rotation every 2 years (1 year
open in shop as spare, 2 years on stack,
then rebuild valves)
Control system fails due to
Type (I, P or M): M
insufficient charge
ROV inspection every 3 days
Accumulator fails due to
Type (I, P or M): M
insufficient fluid/pressure to
complete full/tight closure Regulators are rebuilt every year
Type (I, P or M): M
SPMs rebuilt every 3 years
Type (I, P or M): M

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1

Enterprise B-152
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear

Enterprise B-153
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
Enterprise B-154
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

External Leak - Loss of 10 3 1 30


containment - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.6.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-

Enterprise B-155
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

External Leak - Loss of 10 2 2 40


containment - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.7.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-156
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

2 Internal Check valves leak in all regulator Cannot adjust pilot (pilot piston Loss of a function [Local Effects] 1 1 1
Leak circuits (i.e., upper annular seal leak)
pressure increase)...(new Type (I, P or M): I
drawings have dual checks) Low pressure alarms
Valve leaks Type (I, P or M): I
Accumulators fail due to bladder Manifold pressure monitoring
rupture Type (I, P or M): I
Regulator pilot piston seal leaks Pressure transducers/transmitters
All check valves leak Type (I, P or M): I
Check valve 11 leaks Pumps running (flow meters)

Enterprise B-157
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Pod regulator fails Type (I, P or M): I
Check valve fails Pumps running and pump run
Accumulator bladder fails lights
Type (I, P or M): I
Accumulators fails due to
insufficient charge Surface and subsea flow meters
Type (I, P or M): I
Accumulators fails due to
insufficient fluid/pressure to Cross connection valve between
complete full/tight closure yellow/blue supply and
yellow/blue pods
Type (I, P or M): P
Dual check valves on regulator
manifolds (not shown on current
drawings, but is on Rev. H)
Type (I, P or M): P
Redundant pod & pod supply
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
Between well Soak & Stump tests
Type (I, P or M): M
Every 6 years complete teardown
and rebuild including static seals
Type (I, P or M): M
Pod rotation every 2 years (1 year
in shop as spare, 2 years on stack,
then rebuild valves)
Type (I, P or M): M
Regulators are rebuilt every year
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
SPMs rebuild every 3 years
Type (I, P or M): M
Weekly Function test
Type (I, P or M): M
Visual inspection between wells
Type (I, P or M): M

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Enterprise B-158
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand

Enterprise B-159
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled

Enterprise B-160
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to

Enterprise B-161
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged Filter fails due to plugging Duration of function tests Loss of a function [Local Effects] 1 1 1
Plugged/restricted flow solenoid (comparison between)
Type (I, P or M): I
Bladder fails due to restriction in
lines Fluid recirculated in FRU tank,
fluid consumption ~1k gal per
Control system failure due to week
filters being bypassed (fluid not Type (I, P or M): I
being filtered before valves)
Gallon counts / Flow meters
Control system fails due to Type (I, P or M): I
overlubrication of conduit
Automatic bypass on filters
Organic fouling Type (I, P or M): P
Contamination/filtering Multiple filters in system between
Control system fails due to FRU to pod
clogged/plugged path (Includes Type (I, P or M): P

Enterprise B-162
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
filter, piping, tubing, etc.) Redundant pods
Control system fails due to Type (I, P or M): P
restriction in system (filter, hose, Fluid sampled daily, tested
ID of fitting) monthly
Type (I, P or M): M
Rigid conduit flushed after landing
LMRP, after running riser
Type (I, P or M): M
Standard Between well & Weekly
tests/maintenance (soak, stump,
function)
Type (I, P or M): M

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Slow response, on demand [Local 1 1 1


Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -

Enterprise B-163
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 4 108


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to

Enterprise B-164
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Actuates Too Slowly on Demand - 8 3 2 48


Closes too slowly - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.5.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -

Enterprise B-165
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Actuates Too Slowly on Demand - 9 3 4 108


Closes too slowly - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.6.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-166
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Moves too slowly to disconnect - 9 3 4 108


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 4 108


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

4 Mechanical Hydraulic lines clogged due to Low pressure alarms Loss of a function [Local Effects] 1 1 1
Failure particulate Type (I, P or M): I
Regulator (metal-metal) fails Pressure transducers/transmitters
Shear seals (cups, scoring in Type (I, P or M): I
metal-metal) fail Pumps running and pump run
Accumulator bladders fail lights
Type (I, P or M): I
SPM valve seat or spring fails
Surface and subsea flow meters
SPM valve springs fail due to Type (I, P or M): I
hydrogen embrittlement
(environmentally stressed Cross connection valve between

Enterprise B-167
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
corrosion) yellow/blue supply and
Shuttle valve stuck yellow/blue pods
Type (I, P or M): P
Shuttle valve fails to
transition/move Redundant pod & pod supply
Type (I, P or M): P
Shear seal valve fails due to
malfunctions ROV intervention
Type (I, P or M): P
Shear seal valve stuck
System design (material selection)
SPM Spool valve fails for environment and reliability
Pod regulator fails Type (I, P or M): P
Contamination/filtering Weekly functions tests
Accumulator bladder fails Type (I, P or M): M
Regulator fails Between well Soak test and stump
test
Springs fail
Type (I, P or M): M
Control system fails due to debris
Visual inspection between wells
in system
Type (I, P or M): M
Valve fails due to binding greater
ROV inspection every 3 days
than spring force (=stuck)
Type (I, P or M): M
Control system fails due to
Pod rotation every 2 years (1 year
hydraulic lock (=stuck)
in shop as spare, 2 years on stack,
Valve fails open so hydraulic then rebuild valves)
pressure doesn't bleed off Type (I, P or M): M
(=stuck)
Trigger valve spring fails
Valve seat fails (assumed trigger
valve)
Accumulators fails due to
insufficient charge
Accumulators fails due to
insufficient fluid/pressure to
complete full/tight closure

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand

Enterprise B-168
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Enterprise B-169
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to

Enterprise B-170
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120

Enterprise B-171
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear Not an issue, as components are


often swapped before wear
becomes a threat/problem. Other
relevant causes captured in
2.2.2.4 - Mechanical Failure

Enterprise B-172
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

6 Corrosion/Er SPM Spool valve fails Low pressure alarms Loss of a function [Local Effects] 1 1 1
osion SPM valve seat or spring fails Type (I, P or M): I
SPM valve springs fail due to Pumps running and pump run
hydrogen embrittlement lights
(environmentally stressed Type (I, P or M): I
corrosion) Pressure transducers/transmitters
Springs fail Type (I, P or M): I
Trigger valve spring fails Surface and subsea flow meters
Type (I, P or M): I
Valve seat fails (assumed trigger
valve) Cross connection valve between
yellow/blue supply and
yellow/blue pods
Type (I, P or M): P
Redundant pod & pod supply
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
System design (material selection)
for environment and reliability
Type (I, P or M): P
Weekly functions tests
Type (I, P or M): M
Between well Soak test and stump
test
Type (I, P or M): M
Visual inspection between wells
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Pod rotation every 2 years (1 year
in shop as spare, 2 years on stack,
then rebuild valves)
Type (I, P or M): M

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
Enterprise B-173
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and allow circulation on demand
(linked to 1.1.1.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
Enterprise B-174
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure

Enterprise B-175
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and

Enterprise B-176
LEADER
2.2.2 Equipment: Blue & Yellow Control Systems - Hydraulics - Subsea Control Systems Blue & Yellow Control Systems - Lower Valve Section including regulators and SPM valves

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

7 Loss of Not considered further as potential


Function causes have been reviewed under
(general) 2.2.2.1 through 2.2.2.6.

Enterprise B-177
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Accumulator gas valve leaks Hydraulic fluid on rig Per regulation, cannot continue 1 1 1
Leak/Ruptur Valve fails (manifold isolation and Type (I, P or M): I operations without surface
e block & bleed) Low accumulator pressure alarms accumulators (discontinue
Type (I, P or M): I operations until restored) [Local
Flange seal leaks Effects]
Piping fails Subsea Engineer daily
walkthrough of room (collocated
Pressure gauges fail HPU, FRU, & accumulators)
Gas charging valves fail Type (I, P or M): I
Accumulator bottles leak Unanticipated cycling of
Accumulators fail due to HPU/Pumps running
insufficient charge Type (I, P or M): I
Accumulators fail due to All pipework is secured/protected
insufficient fluid/pressure to Type (I, P or M): P
complete full/tight closure Isolate accumulator banks from
system and apply pressure to
system directly from HPU pumps
Type (I, P or M): P
Isolation valves
Type (I, P or M): P
Stack-mounted accumulator
bottles
Type (I, P or M): P
System is located inside, away
from elements
Type (I, P or M): P
Draw down tests between wells
Type (I, P or M): M
5 year wall thickness tests
Type (I, P or M): M
precharge pressure test
Type (I, P or M): M

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
Enterprise B-178
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
Enterprise B-179
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the

Enterprise B-180
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-181
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

2 Internal Accumulator bladder fails Delta in draw down test end Insufficient usable volume in 1 1 1
Leak Accumulator bottle bladder fails pressure system (if unable to complete
due to fatigue, or precharge is too Type (I, P or M): I EDS) [Local Effects]
low. Sixty surface accumulator bottles
Accumulators fail due to Type (I, P or M): P
insufficient charge Precharge testing
Accumulators fail due to Type (I, P or M): M
insufficient fluid/pressure to
complete full/tight closure

Enterprise B-182
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18

Enterprise B-183
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Enterprise B-184
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-185
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged No credible causes resulting in


plugging of the Accumulators -
Subsea Control Systems

4 Mechanical Accumulator bladder fails Delta in draw down test end Insufficient usable volume in 1 1 1
Failure Loss of precharge in a single pressure system (if unable to complete
bottle when bladder and poppet Type (I, P or M): I EDS) [Local Effects]
fail Sixty surface accumulator bottles
Accumulators fail due to Type (I, P or M): P
insufficient fluid/pressure to Precharge testing

Enterprise B-186
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
complete full/tight closure Type (I, P or M): M

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Enterprise B-187
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the

Enterprise B-188
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Enterprise B-189
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear Accumulator bladder fails Between well draw down test Down time/System isolation [Local 1 1 1
Accumulator gas valve leaks Type (I, P or M): M Effects]
Ball valve fails due to wear Precharge pressure test
Type (I, P or M): M
Accumulator bladder fails due to
wear
Poppet fails due to wear
Gas charging valve fails due to
wear
Accumulator fails due to
insufficient fluid/pressure to
complete full/tight closure
Accumulators fail due to
insufficient charge

Enterprise B-190
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18

Enterprise B-191
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Enterprise B-192
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-193
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

6 Corrosion/Er No credible causes resulting in


osion corrosion/erosion of the
Accumulators - Subsea Control
Systems

7 Loss of Accumulator bladder fails Hydraulic fluid on rig Down time/System isolation [Local 1 1 1
Function Accumulator gas valve leaks Type (I, P or M): I Effects]
(general) Low accumulator pressure alarms
Valve fails (manifold isolation and
block & bleed) Type (I, P or M): I
Flange seal fails Subsea Engineer daily

Enterprise B-194
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Piping fails walkthrough of room (collocated
Pressure gauge fails HPU, FRU, & accumulators)
Type (I, P or M): I
Gas charging valves fail
Unanticipated cycling of
Accumulator bottles fails HPU/Pumps running
Accumulator bottle bladder fails Type (I, P or M): I
due to fatigue, or precharge is too All pipework is secured/protected
low. Type (I, P or M): P
Loss of precharge in a single Isolate accumulator banks from
bottle when bladder and poppet system and apply pressure to
fail system directly from HPU pumps
Ball valve fails due to wear Type (I, P or M): P
Accumulator bladder fails due to Isolation valves
wear Type (I, P or M): P
Poppet fails due to wear Sixty surface accumulator bottles
Accumulators fails due to Type (I, P or M): P
insufficient fluid/pressure to Stack-mounted accumulator
complete full/tight closure bottles
Accumulators fails due to Type (I, P or M): P
insufficient charge System is located inside, away
from elements
Type (I, P or M): P
Draw down tests between wells
Type (I, P or M): M
Five year wall thickness tests
Type (I, P or M): M
precharge pressure test
Type (I, P or M): M

Insufficient usable volume in 1 1 1


system (if unable to complete
EDS) [Local Effects]

Per regulation, cannot continue 1 1 1


operations without surface
accumulators (discontinue
operations until restored) [Local
Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
Enterprise B-195
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
Enterprise B-196
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Enterprise B-197
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
Enterprise B-198
LEADER
2.2.3 Equipment: Accumulators - Subsea Control Systems Accumulators - Subsea including associated hydraulic piping and connections such as MUX pod
and rigid conduit connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-199
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Loss of, or Control system fails due to water Alarms - Loss of a power supply Degraded control of the pod 1 1 1
Degraded ingress Type (I, P or M): I (Degraded Power) [Local Effects]
Power Subsea connector fails Drill string weight
MUX cable fails Type (I, P or M): I
Transformer fails LMRP separation indication
Type (I, P or M): I
Power supply fails
Redundant pod
MUX cable fails due to a short Type (I, P or M): P
Connector fails due to grounding Failure of individual functions of a
Loss of Power controller do NOT necessarily
Connector fails due to mechanical constitute a failure or loss of the
issues controller or pod's SEM
Type (I, P or M): P
Redundant within the pod (with
the exception of a connector
failure). Multiple power supplies,
transformers, controllers in each
pod.
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function tests
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Unable to complete the EDS [Local 1 1 1


Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Enterprise B-200
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

2 Fails with no Controller A/B fails Alarms on solenoids, controllers, Loss of control of the pod 1 1 1
output Controller A/B communications fail I/Os (Assumes Loss of power) [Local
signal/comm Type (I, P or M): I Effects]
unication SEM fails/communications fail
For solenoid failure - Annual
I/O board fails signature tests, constantly
Solenoid driver board fails monitored
Solenoid fails to fire Type (I, P or M): I
Solenoid fails Pod mismatch alarms
Type (I, P or M): I
I/O board fails
One complete sets of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Unable to complete the EDS [Local 1 1 1


Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from

Enterprise B-201
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

3 Erratic Solenoid fails due to bad Alarms (Solenoid monitoring) Degraded control of the pod 1 1 1
output connection in circuit Type (I, P or M): I (Degraded Power) [Local Effects]
Control system fails due to Pod mismatch & alarm
pinched wire Type (I, P or M): I
Control system fails due to Voltage monitoring Alarms
hydrostatic pressure on some Type (I, P or M): I
connectors Redundant pods
Connector fails due to grounding Type (I, P or M): P
Redundant controllers
Type (I, P or M): P
Between well testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Unable to complete the EDS [Local 1 1 1


Effects]

Unintentional initiation of EDS was 1 1 1


a failure mode corrected by EB.
[Local Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from

Enterprise B-202
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

4 Fails to Controller A/B fails Alarms on solenoids, controllers, Degraded control of the pod 1 1 1
respond to Controller A/B communications fail I/Os (Degraded Power) [Local Effects]
input Type (I, P or M): I
SEM fails/communications fail
For solenoid failure - Annual
I/O board fails signature tests, constantly
Solenoid driver board fails monitored
Solenoid fails to fire Type (I, P or M): I
Solenoid fails Pod mismatch alarms
Type (I, P or M): I
I/O board fails
One complete set of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Unable to complete the EDS [Local 1 1 1


Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
Enterprise B-203
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

5 Processing SEM/Controller Lockup = loss of a Alarms on solenoids, controllers, Degraded control of the pod 1 1 1
error controller I/Os (Degraded Power) [Local Effects]
Type (I, P or M): I
For solenoid failure - Annual
signature tests, constantly
monitored
Type (I, P or M): I
Pod mismatch alarms
Type (I, P or M): I
One complete set of solenoid
control boards per controller
Type (I, P or M): P
ROV intervention for critical
operations
Type (I, P or M): P
Two controllers per pod
Type (I, P or M): P
Two pods
Type (I, P or M): P
Between well surface testing
Type (I, P or M): M
Weekly BOP function testing
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Unable to complete the EDS [Local 1 1 1


Effects]
Enterprise B-204
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.1.1)

6 Ground Control system fails due to water Alarms - Monitoring systems Alarm [Local Effects] 1 1 1
Fault ingress Type (I, P or M): I
Control system fails due to Loss of function
damaged wiring Type (I, P or M): I
Redundant Pods
Type (I, P or M): P

Failure to provide control signal, 2 7 1 14


when demanded - Failure to
receive EDS signal - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.1.1)

7 Loss of Transformer fails Alarms (Solenoid monitoring done Degraded control of the pod 1 1 1
function Power supply fails continuously) (Degraded Power) [Local Effects]
(general) Type (I, P or M): I
Control system fails due to water
ingress Alarms - Loss of a power supply
Type (I, P or M): I
Subsea connector fails
Alarms on solenoids (see No. 19,
Controller A/B fails below), controllers, I/Os
Controller A/B communications fail Type (I, P or M): I
SEM failure/communications fail Drill string weight
I/O board fails Type (I, P or M): I
Solenoid driver board fails LMRP separation indication
Type (I, P or M): I
Solenoid fails to fire
Pod mismatch alarms
Solenoid fails due to bad
Type (I, P or M): I
connection in circuit
Voltage monitoring Alarms
Control system fails due to
Type (I, P or M): I
pinched wire
One complete set of solenoid
Control system fails due to
control boards per controller
hydrostatic pressure on some
Type (I, P or M): P
connectors
Two pods
SEM/Controller Lockup = loss of a
Type (I, P or M): P
controller
Redundancy within a pod (with
Solenoid fails
the exception of a connector
MUX cable fails due to a short failure). Multiple power supplies,

Enterprise B-205
LEADER
2.2.4 Equipment: EDS - Subsea Control Systems Secondary and Emergency Disconnect System - Subsea including POD angle sensor,
inclinometer, acoustic, and deadman

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Connector fails due to grounding transformers, controllers (2) in
Loss of Power each pod.
Type (I, P or M): P
I/O board fails
ROV intervention for critical
Connector fails due to mechanical operations
issues Type (I, P or M): P
Failure of individual functions of a
controller does NOT necessarily
constitute a failure or loss of the
controller or pod's SEM
Type (I, P or M): P
Weekly BOP function tests
Type (I, P or M): M
Between well surface testing
Type (I, P or M): M
For solenoid failure - Annual
signature tests
Type (I, P or M): M

Loss of control of the pod 1 1 1


(Assumes Loss of power) [Local
Effects]

Unable to complete the EDS [Local 1 1 1


Effects]

Failure to provide control signal, 10 2 1 20


when demanded - Failure to
receive EDS signal prevents
disconnecting from stack during
emergency operation when using
the EDS (1.7) (linked to 1.7.1.1)

Failure to Provide Disconnect 10 2 1 20


Signal (automatically) - Failure to
disconnect the LMRP - Emergency
Operation: EDS - Disconnect from
the stack (linked to 1.7.2.1)

Failure to Provide Disconnect 9 2 1 18


Signal (automatically or manually)
- Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.1)

Enterprise B-206
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Pipe, tubing, valve fails Low pressure alarms Loss of Pod Supply [Local Effects] 1 1 1
leak/rupture Fittings & Seals (pipe, valve, flow Type (I, P or M): I
meter etc.) fail Pumps running and pump run
SPM valve leaks lights
Type (I, P or M): I
Shuttle valve leaks
Pressure transducers/transmitters
Hydraulic cylinder leaks Type (I, P or M): I
Relief valve fails/leaks Surface and subsea flow meters
Regulator leaks Type (I, P or M): I
Check valve leaks Cross connection valve between
Schrader valve leaks yellow/blue supply and
yellow/blue pods
5k hot stabs fails
Type (I, P or M): P
Hydraulic line ruptures (rigid pipe)
LMRP accumulators
SPM Spool valve fails Type (I, P or M): P
Pod tubing fails/leaks Redundant pods
Pod regulator fails Type (I, P or M): P
Check valve fails Redundant pod supply
Type (I, P or M): P
Shuttle valve fails (doesn't
transition/move, stuck, leaks) Stack accumulators & valve from
supply to accumulators typically
Regulator fails
closed
Trigger valve (SPM valve) does Type (I, P or M): P
not open
ROV intervention
Accumulator fails due to Type (I, P or M): P
insufficient fluid/pressure to
Weekly functions tests
complete full/tight closure
Type (I, P or M): M
Accumulator fails due to
Between well Soak test and stump
insufficient charge
test
Leak of LMRP (set = LMRP Type (I, P or M): M
failures)
All stack-mounted controls rebuilt
LMRP valve fails (manifold annually (including piping,
isolation and block & bleed) regulators, check, ball, and SPM
LMRP flange seal fails valves etc.)
Type (I, P or M): M
LMRP pressure gauges fails
ROV inspection every 3 days
LMRP gas charging valves fail
Type (I, P or M): M
LMRP accumulator bottles fail
Visual inspection between wells
LMRP accumulator gas valve leaks Type (I, P or M): M
LMRP accumulators fail due to Filters replaced between wells

Enterprise B-207
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
insufficient charge Type (I, P or M): M
LMRP accumulators fail due to
insufficient fluid/pressure to
complete full/tight closure

Loss of Stack Supply [Local 1 1 1


Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
Enterprise B-208
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

External Leak - Loss of 8 3 3 72


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 8 2 2 32


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32

Enterprise B-209
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

External Leak - Loss of 10 3 1 30


containment - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.6.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to

Enterprise B-210
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

External Leak - Loss of 10 3 1 30


containment - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.7.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54

Enterprise B-211
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

External Leak - Loss of 8 3 3 72


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

2 Internal leak Valve leaks Manifold pressure Loss of redundancy (pull LMRP) 1 1 1
Accumulators (bladder rupture) Type (I, P or M): I [Local Effects]
fails Pumps running (flow meters)
Rigid conduit pilot operated check Type (I, P or M): I
valves leak ROV intervention
Rigid conduit crossover SPM leak Type (I, P or M): P
LMRP accumulator charge SPM All stack-mounted controls rebuilt

Enterprise B-212
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
leaks annually (including piping,
Accumulators fail due to regulators, check, ball, and SPM
insufficient fluid/pressure to valves etc.)
complete full/tight closure Type (I, P or M): M
Accumulators fail due to Between well Soak & Stump tests
insufficient charge Type (I, P or M): M
LMRP (set = LMRP failures) leaks Weekly Function test
Type (I, P or M): M

Slower response times for LMRP 1 1 1


Functions [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 48


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and

Enterprise B-213
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 9 2 2 36


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to

Enterprise B-214
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Enterprise B-215
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged Filter fails due to plugging Fluid recirculated in FRU tank, Loss of Pod [Local Effects] 1 1 1
Bladder fails due to restriction in fluid consumption ~1k gal per
lines week
Type (I, P or M): I
Subsea Control System fails due to
filters bypassed (fluid not being Gallon counts / Flow meters
filtered before valves) Type (I, P or M): I
Subsea Control System fails due to Automatic bypass on filters
overlubrication of conduit Type (I, P or M): P
Organic fouling Multiple filters in system between
FRU to pod
Contamination/filtering Type (I, P or M): P
Subsea Control System fails due to Redundant pods and conduits
clogged/plugged path (includes Type (I, P or M): P
filter, piping, tubing, etc.)
Fluid sampled daily, tested
Subsea Control System fails due to monthly
restriction in system (filter, hose,
Enterprise B-216
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
ID of fitting) Type (I, P or M): M
Rigid conduit flushed after landing
LMRP, after running riser
Type (I, P or M): M
Standard Between well & Weekly
tests/maintenance (soak, stump,
function)
Type (I, P or M): M
Time of function tests
Type (I, P or M): M

Loss of Stack Supply [Local 1 1 1


Effects]

Loss of redundancy (LMRP) [Local 1 1 1


Effects]

Slow response, on demand [Local 1 1 1


Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe

Enterprise B-217
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and allow circulation on demand
(linked to 1.1.4.2)

Actuates Too Slowly on Demand - 9 3 4 108


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 8 2 2 32


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32

Enterprise B-218
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Actuates Too Slowly on Demand - 8 3 2 48


Closes too slowly - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.5.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore

Enterprise B-219
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.6.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Actuates Too Slowly on Demand - 9 3 4 108


Closes too slowly - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.6.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 4 108


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 4 108


Failure to disconnect the LMRP -

Enterprise B-220
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

External Leak - Loss of 8 3 3 72


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

4 Mechanical Hydraulic lines clogged due to Low pressure alarms Loss of a function [Local Effects] 1 1 1
Failure particulates Type (I, P or M): I
Regulator (metal-metal) fails Pumps running and pump run
Accumulator bladders fail lights
Type (I, P or M): I
SPM seat or spring fails
Pressure transducers/transmitters
SPM springs fails due to hydrogen Type (I, P or M): I
embrittlement (environmentally
stressed corrosion) Surface and subsea flow meters
Type (I, P or M): I
Regulator fails
Cross connection valve between
Shuttle valve fails stuck yellow/blue supply and
Shuttle valve fails to yellow/blue pods
transition/move Type (I, P or M): P
SPM Spool valve fails Design and material selection
Accumulator bladder fails Type (I, P or M): P
Contamination/filtering Redundant pod supply
Type (I, P or M): P
Springs fail
ROV intervention
Valve fails in stuck position due to
Type (I, P or M): P

Enterprise B-221
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
binding greater than spring force Weekly functions tests
Subsea Control System fails due to Type (I, P or M): M
debris in system Between well Soak test and stump
Subsea Control System fails due to test
hydraulic lock (=stuck) Type (I, P or M): M
Valve fails open when hydraulic Visual inspection between wells
pressure doesn't bleed off Type (I, P or M): M
(=stuck) ROV inspection every 3 days
Trigger valve spring fails Type (I, P or M): M
Valve seat fails (assumed trigger SPM valves rebuilt annually
valve) Type (I, P or M): M
Insufficient accumulator All stack-mounted controls rebuilt
fluid/pressure to complete annually (including piping,
full/tight closure regulators, check, ball, and SPM
valves etc.)
Accumulators are not sufficiently Type (I, P or M): M
charged

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Enterprise B-222
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Enterprise B-223
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 8 2 2 32


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
Enterprise B-224
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.6.2.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

5 Wear No credible causes resulting in


wear of the Hydraulic Supply:

Enterprise B-225
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Rigid Conduit and Manifold -
Subsea Control Systems

6 Corrosion/Er SPM valve seat or spring fails Low pressure alarms Loss of a function [Local Effects] 1 1 1
osion SPM valve springs fails due to Type (I, P or M): I
hydrogen embrittlement Pumps running and pump run
(environmentally stressed lights
corrosion) Type (I, P or M): I
SPM Spool valve fails Pressure transducers/transmitters
Springs fail Type (I, P or M): I
Trigger valve spring fails Surface and subsea flow meters
Type (I, P or M): I
Valve seat fails (assumed trigger
valve) Cross connection valve between
yellow/blue supply and
yellow/blue pods
Type (I, P or M): P
Redundant pod & pod supply
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
System design (material selection)
for environment and reliability
Type (I, P or M): P
Weekly functions tests
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Between well Soak test and stump
test
Type (I, P or M): M
Visual inspection between wells
Type (I, P or M): M
Pod rotation every 2 years (1 year
in shop as spare, 2 years on stack,
then rebuild valves)
Type (I, P or M): M

Loss of Pod [Local Effects] 1 1 1

Partial loss of manifold functions 1 1 1


[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves

Enterprise B-226
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Annular -
Failure to seal or partial seal on
drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.3.2)

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Adequate 9 2 3 54


Sealing Pressure on Pipe Ram -
Failure to seal or partial seal on
drill pipe through pipe rams -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.4.2)

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
Enterprise B-227
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 9 1 2 18


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Maintain Hydraulic Fluid 8 2 2 32


& Pressure to Annulars - Failure to
maintain stripping pressure - Strip
the drill string using the annular
BOP(s) (linked to 1.3.2.1)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled

Enterprise B-228
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 2 1 20


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Enterprise B-229
LEADER
2.2.5 Equipment: Hydraulic Supply: Rigid Conduit and Manifold - Subsea Control Systems

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

7 Loss of Not considered further as potential


Function causes have been reviewed under
(general) 2.2.5.1 through 2.2.5.5.

Enterprise B-230
LEADER
3- BOP Stack

Enterprise B-231
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External BB Gasket connections (top to flex Pressure loss in hydraulic system Control fluid leakage to 1 1 1
Leak/Ruptur joint, bottom to connector, blind Type (I, P or M): I environment [Local Effects]
e flanges and gas bleed) fail HPU pumps running
Head seal leaks to top chamber Type (I, P or M): I
head, exit through check valve. - Mud loss
Wellbore to environment Type (I, P or M): I
Upper packer (bag, annular For Asset/Personnel protection,
element) fails - Wellbore leakage leakage to environment as a
to riser protection
Lower piston seals fail - Wellbore Type (I, P or M): P
to closed side of operating system Redundant annulars and rams to
(control fluid) control pressure
Lower piston seals fail - Hydraulic Type (I, P or M): P
to wellbore Redundant pods
Chamber head seals fail, control Type (I, P or M): P
open fluid/pressure to Hydraulic system testing - Surface
environment and subsea
Shuttle valve leaks Type (I, P or M): M
Piping connections fail ROV inspection every 3 days
Seals fail due bad seal areas, Type (I, P or M): M
swarf, dimensional [mismatch] Weekly function testing
Scoring Type (I, P or M): M
Wear Wellbore testing
Type (I, P or M): M
Key seating
Soak and stump tests between
Shuttle valve fails (doesn't wells
transition/move, stuck, leaks) Type (I, P or M): M
Seal damage Undergoes annual annular
Wear seal damage/deformation at replacement for PM (based on
top and wedges annular piston calendar date from installation,
(larger tools) regardless of service time).
Piston seal leaks Industry practice is TYPICALLY
replacement between wells
Gasket fails between stack
Type (I, P or M): M
components (Wellhead to Stack to
LMRP to Riser) When an annular is opened, all
seals are replaced before return to
Swarf (metal cuttings from the
service
well)
Type (I, P or M): M
Wear on annular seal (bag)
5 year inspection of BOP
Dimensional discrepancy between Type (I, P or M): M
ram block and cavity (wear)

Enterprise B-232
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Control fluid leakage to wellbore 1 1 1


[Local Effects]

Wellbore fluid leakage to 1 1 1


environment (caught seal failures
in surface testing prior to
deployment, occurrence decreased
if cap to test upper head seal on
surface) [Local Effects]

Wellbore fluid leakage to controls 1 1 1


[Local Effects]

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure to Close Annulars on Drill 8 2 2 32


String on Demand - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.3)

Failure of Annulars to Seal on 8 2 2 32


Demand - Failure to seal - Strip
the drill string using the annular
BOP(s) (linked to 1.3.3.1)

Failure to Maintain Sealing 9 2 2 36


Pressure on Annulars - Failure to
seal - Strip the drill string using
the annular BOP(s) (linked to
1.3.3.2)

Failure to Close Annular on 10 2 2 40


Demand - Failure to close on drill
pipe through annular(s) - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.1.3)

Failure to Supply Hydraulic Fluid & 10 2 2 40


Pressure to Annular & C&K Valves
When Demanded - Failure to close

Enterprise B-233
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 10 2 2 40


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Close Pipe Ram on 10 2 2 40


Demand - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.3)

External Leak - Loss of 10 2 2 40


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure of Annular / Blind-Shear 9 2 2 36


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 2 2 36


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 10 2 2 40


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)

Enterprise B-234
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 10 2 2 40


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Close Hang-off Ram on 10 2 2 40


Demand - Failure of hang-off ram
to close - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.1.3)

Failure to Supply Hydraulic Fluid & 9 2 2 36


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Adequately Seal under 10 2 2 40


Fail-safe Conditions - Failure to
open / close fail-safe valves to
seal - Circulate the well after drill
pipe disconnect (linked to 1.9.3.2)

Failure to Adequately Seal under 9 2 2 40


Fail-safe Condition - Failure to
open / close fail-safe valves to
seal - Circulate across the BOP
stack to remove trapped gas
(linked to 1.10.3.2)

External Leak - Loss of 10 2 2 40


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

2 Internal Piston seal fails Flow meter Degraded function of annular 1 1 1


Leak Dimensional wear Type (I, P or M): I (Depending on severity of leak, on
HPU pumps running open side of seal, operations could
Swarf continue after approval from
Type (I, P or M): I
Scoring BSEE. Leak on close side is loss of
Pressure loss in hydraulic system function of annular) [Local Effects]
Shuttle valve fails (doesn't Type (I, P or M): I
transition/move, stuck, leaks)
Chamber test to full working
Wear seal damage/deformation at pressure (3k) and operating
top and wedges annular piston
Enterprise B-235
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(larger tools) pressure (1.5k) performed
Piston seal leaks annually per PM, or after annular
has been opened
Swarf (metal cuttings from the Type (I, P or M): P
well)
Redundant annulars and rams
Trash in the well (swarf, Type (I, P or M): P
concrete, etc.)
Redundant pods
Type (I, P or M): P
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Undergoes annual annular
replacement for PM (based on
calendar date from installation,
regardless of service time).
Industry practice is TYPICALLY
replacement between wells
Type (I, P or M): M
When an annular is opened, all
seals are replaced before return to
service
Type (I, P or M): M
5 year inspection of BOP
Type (I, P or M): M
5 year rebuild on shuttle valves
Type (I, P or M): M

Loss of function of annular 1 1 1


(Severity 9 if during well control
without redundancies, 7 if not
during well control) [Local Effects]

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and

Enterprise B-236
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure to Supply Hydraulic Fluid & 8 2 1 16


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 1 16


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Close Pipe Ram on 9 2 1 18


Demand - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.3)

Failure to Supply Hydraulic Fluid & 10 2 1 20


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure of Annular / Blind-Shear 10 2 1 20


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 10 2 1 20


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
Enterprise B-237
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Supply Hydraulic Fluid & 10 2 1 20


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 10 2 1 20


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Close Hang-off Ram on 9 2 1 18


Demand - Failure of hang-off ram
to close - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.1.3)

Failure to Supply Hydraulic Fluid & 9 2 1 18


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Adequately Seal under 10 2 1 20


Fail-safe Conditions - Failure to
open / close fail-safe valves to
seal - Circulate the well after drill
pipe disconnect (linked to 1.9.3.2)

Failure to Adequately Seal under 10 2 1 20


Fail-safe Condition - Failure to
open / close fail-safe valves to
seal - Circulate across the BOP
stack to remove trapped gas
(linked to 1.10.3.2)

3 Plugged Contamination/filtering Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -

Enterprise B-238
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

4 Mechanical Seal fails due to washout Redundant annulars and rams to Loss of function of annular 1 1 1
Failure Packer/bag fails control pressure (Severity 9 if during well control
Type (I, P or M): P without redundancies, 7 if not
Galling between piston and body during well control) [Local Effects]
Redundant pods
Galling between piston and sleeve Type (I, P or M): P
Packer erosion due to wellbore Hydraulic system testing - Surface
flow and subsea

Enterprise B-239
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Incorrect annular seal (bag) for Type (I, P or M): M
drilling mud being used, resulting Soak and stump tests between
in premature failure wells
Wear on annular seal (bag); Type (I, P or M): M
[assumed same as "packer"] Five year inspection of BOP
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
When an annular is opened, all
seals are replaced before return to
service
Type (I, P or M): M
Undergoes annual annular
replacement for PM (based on
calendar date from installation,
regardless of service time).
Industry practice is TYPICALLY
replacement between wells
Type (I, P or M): M
Inspection of wear plates when
annular is open. Wear plates
replaced on 5 overhaul
Type (I, P or M): M
Running of Drift Tool through
wellbore after performance of
weekly function tests
Type (I, P or M): M

Failure of Annular to Seal on 9 2 2 36


Demand - Failure to seal or partial
seal on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.3.1)

Failure of Annular / Blind-Shear 10 2 2 40


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
Enterprise B-240
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure of Annulars to Seal on 8 2 2 32


Demand - Failure to seal - Strip
the drill string using the annular
BOP(s) (linked to 1.3.3.1)

Failure to Maintain Sealing 9 2 2 36


Pressure on Annulars - Failure to
seal - Strip the drill string using
the annular BOP(s) (linked to
1.3.3.2)

5 Wear Seal fails due to age/storage Increased operating pressure Degraded function of annular (still 1 1 1
related issue (UV & heat) necessary to close element works but requires higher
Packer/bag fails due to wear from Type (I, P or M): I operating pressure or more cycles
operations (accelerated during Presence of rubber from annular before successful closure) [Local
stripping) in "Gumbo box" Effects]
Lower piston seal fails - Wellbore Type (I, P or M): I
to closed side of operating system Chamber test to full working
(control fluid) pressure (3k) and operating
Seal fails due to wear on annular pressure (1.5k) performed
seal (bag); [assumed same as annually per PM, or after annular
"packer"] has been opened
Type (I, P or M): P
Redundant annulars and rams to
control pressure
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Five year dimensional inspection
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Undergoes annual annular
Enterprise B-241
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
replacement for PM (based on
calendar date from installation,
regardless of service time).
Industry practice is TYPICALLY
replacement between wells
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M

Loss of function of annular 1 1 1


(Severity 9 if during well control
without redundancies, 7 if not
during well control) [Local Effects]

Failure to Maintain Sealing 9 2 2 36


Pressure on Annulars - Failure to
seal - Strip the drill string using
the annular BOP(s) (linked to
1.3.3.2)

Failure of Annular to Seal on 9 2 1 36


Demand - Failure to seal or partial
seal on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.3.1)

Failure of Annular / Blind-Shear 9 2 1 36


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 2 1 36


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal

Enterprise B-242
LEADER
2.3.1 Equipment: Annulars - BOP Stack Annulars including both lower and upper annulars, associated shuttle valves, and hydraulic
supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure of Annulars to Seal on 9 2 1 36


Demand - Failure to seal - Strip
the drill string using the annular
BOP(s) (linked to 1.3.3.1)

6 Erosion/Corr No additional causes identified


osion resulting in erosion/corrosion of
the Annulars - BOP Stack

7 Loss of No additional causes identified


Function beyond those reviewed in
(general) Annulars - BOP Stack - External
Leak/Rupture - Failure of lower
piston seals - Hydraulic to
wellbore (2.3.1.1-5)

Enterprise B-243
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Clutch plate and bearing fails HPU pumps running Control fluid leakage to 1 1 1
Leak/Ruptur Spring fails to hold clutch plates Type (I, P or M): I environment [Local Effects]
e together/locked Pressure loss in hydraulic system
Seals on the chamber ring fail to Type (I, P or M): I
allow the transfer ring to move Mud loss
freely & doesn't allow the springs Type (I, P or M): I
to fully engage clutch For Asset/Personnel protection,
MPL assembly fails due to leakage to environment as a
mechanical issues protection
Anti-rotation pin fails due to Type (I, P or M): P
shearing off Redundant pods
BX Gasket connections (top and Type (I, P or M): P
bottom and side-outs) fail Redundant annulars and rams to
Scoring control pressure
Type (I, P or M): P
Dimensional wear
Chamber test completed at 5k and
Key seating operated at 1500 psi
Bonnet door seals fail Type (I, P or M): P
Rod packer seal fails ROV inspection every 3 days
Top seal plate fails Type (I, P or M): M
Fluid hinge seal assembly fails Wellbore testing
Type (I, P or M): M
Damage from shearing
Hydraulic system testing - Surface
MPL fails
and subsea
Operating cylinder seal leaks Type (I, P or M): M
Ram block seals fail Routine function testing
Shuttle valve leaks (Requirement is weekly however
exception from BSEE requested if
Piping connections fails
pipe is across shears at test time)
Seal damage (Elastomer) - Ram Type (I, P or M): M
block or BOP seal plate
Soak and stump tests between
Shuttle valve fails (doesn't wells
transition/move, stuck, leaks) Type (I, P or M): M
Damaged hinge seals fail 5 year inspection and
Cylinder seal fails maintenance of BOP
Type (I, P or M): M
Bonnet fails on doors
Between Wells - Replace all
Gasket fails between stack
seals/rubber goods on ram blocks
components (Wellhead to Stack to
Type (I, P or M): M
LMRP to Riser)
Annual - Dimensional checks,
Elastomer damage on blind shear
chamber testing, MPL signature

Enterprise B-244
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
ram testing (predictive), MPL bearings
Dimensional issues replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Unable to shear tubular [Local 1 1 1


Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure of Annular / Blind-Shear 10 2 2 40


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Enterprise B-245
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Enterprise B-246
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
Enterprise B-247
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
- (linked to 1.10.4.1)

2 Internal Rod piston seals fail HPU pumps running Control fluid leakage to 1 1 1
Leak Dimensional wear Type (I, P or M): I environment [Local Effects]
Scoring Flow meter
Type (I, P or M): I
Shuttle valve fails
Pressure loss in hydraulic system
Transfer piston seals fail Type (I, P or M): I
Dimensional discrepancy between Chamber test completed at 5k and
ram block and cavity (wear) operated at 1500 psi
Shuttle valve fails (doesn't Type (I, P or M): P
transition/move, stuck, leaks) Redundant annulars and rams
Piston seal leaks Type (I, P or M): P
Dimensional issues Redundant pods
Type (I, P or M): P
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
5 year inspection of BOP
Type (I, P or M): M
5 year rebuild on shuttle valves
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Clutch plate replaced every 3

Enterprise B-248
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE. Leak on close side is loss of
function of ram) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 8 if not during well
control) [Local Effects]

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe

Enterprise B-249
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Enterprise B-250
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

3 Plugged No credible causes resulting in


plugging of the Blind Shear Ram -
BOP Stack

4 Mechanical Off center loading Mud loss Loss of function of ram (Severity 9 1 1 1
Failure MPL assembly (springs, etc.) fails Type (I, P or M): I if during well control without
Pressure loss in hydraulic system redundancies, 8 if not during well
Contaminated fluid control) [Local Effects]
Type (I, P or M): I
Galling
Chamber test completed at 5k and
MPL seizure operated at 1500 psi
Shear blade fails Type (I, P or M): P
Shear blade bolt fails Redundant annulars and rams
Bonnet fails on doors Type (I, P or M): P
Ram foot/button breaking off, Redundant pods
separating ram block from stem Type (I, P or M): P
MPL fails to release when needed Hydraulic system testing - Surface
(=MPL seizure) and subsea
Type (I, P or M): M
Off-centered pipe
ROV inspection every 3 days
Clutch plate and bearing fails
Type (I, P or M): M
Spring fails to hold clutch plates
Soak and stump tests between
together/locked
wells
Seals on the chamber ring fail to Type (I, P or M): M
allow the transfer ring to move
Wellbore testing
freely & doesn't allow the springs
Type (I, P or M): M
to fully engage clutch
Weekly function testing
MPL assembly fails due to
Type (I, P or M): M
mechanical issues
5 year inspection of BOP
Anti-rotation pin fails due to
Type (I, P or M): M
shearing off
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Thrust plate replaced every 3

Enterprise B-251
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Blades replaced after a shear
Type (I, P or M): M

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure of Annular / Blind-Shear 10 2 2 40


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
on open hole through blind-shear
rams or annular - Close and seal
Enterprise B-252
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Enterprise B-253
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

5 Wear Wear on packers on ram blocks Mud loss Control fluid leakage to 1 1 1
Operation/use of ram Type (I, P or M): I environment [Local Effects]
Dirty fluid Pressure loss in hydraulic system
Type (I, P or M): I
Off center loading
Chamber test completed at 5k and
MPL assembly (springs, etc.) fails operated at 1500 psi
Contaminated fluid Type (I, P or M): P
Galling Redundant annulars and rams
MPL fails to release when needed Type (I, P or M): P
(=MPL seizure) Redundant pods
Shear blade fails Type (I, P or M): P
Shear blade bolt fails Hydraulic system testing - Surface
and subsea
Bonnet fails on doors
Type (I, P or M): M
Dimensional wear
ROV inspection every 3 days
Scoring Type (I, P or M): M
Shuttle valve fails Soak and stump tests between
Rod piston seals fail wells
Type (I, P or M): M
Transfer piston seals fail
Weekly function testing
Ram foot/button breaking off,
Type (I, P or M): M
separating ram block from stem
Wellbore testing
Seal damage (Elastomer) - Ram
Type (I, P or M): M
block or BOP seal plate
5 year inspection of BOP
Ram blocks fail due to wear
Enterprise B-254
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
BX Gasket connections (top and Type (I, P or M): M
bottom and side-outs) fail Routine function testing
Ram block seals fail (Requirement is weekly however
Piping connections fail exception from BSEE requested if
pipe is across shears at test time)
Key seating Type (I, P or M): M
Bonnet door seals fail Between Wells - Replace all
Rod packer seal fails seals/rubber goods on ram blocks
Top seal plate fails Type (I, P or M): M
Fluid hinge seal assembly fails Overhauling nuts replaced every 2
years
Damage from shearing
Type (I, P or M): M
Operating cylinder seal leaks
Thrust plate replaced every 3
Shuttle valve fails (doesn't years
transition/move, stuck, leaks) Type (I, P or M): M
Piston seal leaks Annual - Dimensional checks,
Damaged hinge seals fails chamber testing, MPL signature
testing (predictive), MPL bearings
Cylinder seal fails
replaced, NDT on ram blocks,
MPL fails to release when needed connecting rods, and blades.
(=MPL seizure) Type (I, P or M): M
Bonnet fails on doors Blades replaced after a shear
Gasket fails between stack Type (I, P or M): M
components (Wellhead to Stack to
LMRP to Riser)
Elastomer damage on blind shear
ram
Dimensional issues
Off-centered pipe
Clutch plate and bearing fails
Spring fails to hold clutch plates
together/locked
Seals on the chamber ring fail to
not allowing the transfer ring to
move freely & doesn't allow the
springs to fully engage clutch
MPL assembly fails due to
mechanical issues
Anti-rotation pin fails due to
shearing off

Enterprise B-255
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE.) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 7 if not during well
control) [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure of Annular / Blind-Shear 10 2 2 40


Ram to Seal on Demand - Failure
to close on open hole through
blind-shear rams or annular -
Close and seal on open hole and
allow volumetric well control
operations on demand (linked to
1.2.1.4)

Failure to Maintain Adequate 9 1 2 18


Sealing Pressure on Annular /
Blind-Shear Ram - Failure to close
Enterprise B-256
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on open hole through blind-shear
rams or annular - Close and seal
on open hole and allow volumetric
well control operations on demand
(linked to 1.2.1.5)

Failure to Maintain Closing 9 2 1 18


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe

Enterprise B-257
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and seal the wellbore (linked to
1.6.2.1)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

6 Corrosion/Er Mud flow Appropriate material selection Control fluid leakage to 1 1 1

Enterprise B-258
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
osion (rubber goods) for operating environment [Local Effects]
environment
Type (I, P or M): P
Chamber test completed at 5k and
operated at 1500 psi
Type (I, P or M): P
Enhanced coatings and inlays in
some areas
Type (I, P or M): P
Protection/compatibility studies
between rubber goods and various
drilling fluids
Type (I, P or M): P
BOP rinsed as soon as it is pulled
from water
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
5 year inspection of BOP
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M

Enterprise B-259
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Thrust plate replaced every 3
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Blades replaced after a shear
Type (I, P or M): M

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE.) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 7 if not during well
control) [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -

Enterprise B-260
LEADER
2.3.2 Equipment: Blind Shear Ram - BOP Stack Blind Shear Ram including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

7 Loss of No additional causes beyond those


Function reviewed in Blind Shear RAM -
(general) BOP Stack External Leak/Rupture -
Dimensional wear (2.3.2.1 - 6)

Enterprise B-261
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External BX Gasket connections (top and Pressure loss in hydraulic system Control fluid leakage to 1 1 1
Leak/Ruptur bottom and side-outs) leak Type (I, P or M): I environment [Local Effects]
e Shuttle valve leak HPU pumps running
Piping connections fail Type (I, P or M): I
Key seating Mud loss
Type (I, P or M): I
Bonnet door seals fail
Chamber test completed at 5k and
Rod packer seal fails operated at 1500 psi
Fluid hinge seal assembly fails Type (I, P or M): P
Damage from shearing For Asset/Personnel protection,
MPL fails leakage to environment as a
protection
Operating cylinder seal leaks
Type (I, P or M): P
Clutch plate and bearing fails
Redundant pods
Shuttle valve fails (doesn't Type (I, P or M): P
transition/move, stuck, leaks)
Redundant annulars and rams to
Damaged hinge seals fail control pressure - this is the only
Cylinder seal fails casing shear ram
Type (I, P or M): P
Bonnet fails on doors
Between Wells - Replace all
Gasket fails between stack
seals/rubber goods on door
components (Wellhead to Stack to
interface
LMRP to Riser)
Type (I, P or M): M
Spring fails to hold clutch plates
Five year inspection and
together/locked
maintenance of BOP
Seals on the chamber ring fail to Type (I, P or M): M
allow the transfer ring to move
Hydraulic system testing - Surface
freely & doesn't allow the springs
and subsea
to fully engage clutch
Type (I, P or M): M
MPL assembly fails due to
Soak and stump tests between
mechanical issues
wells
Anti-rotation pin fails due to Type (I, P or M): M
shearing off
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Wellbore testing - Wellbore
containing components above

Enterprise B-262
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
casing shear rams
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Unable to shear tubular [Local 1 1 1


Effects]

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -

Enterprise B-263
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the

Enterprise B-264
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Lower BOP stack (linked to
1.8.1.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

2 Internal Dimensional wear Pressure loss in hydraulic system Control fluid leakage to 1 1 1
Leak Scoring Type (I, P or M): I environment [Local Effects]
Shuttle valve fails HPU pumps running
Type (I, P or M): I
Rod piston seals fail
Chamber test completed at 5k and
Transfer piston seals fail operated at 1500 psi
Dimensional discrepancy between Type (I, P or M): P
ram block and cavity (wear) Redundant annulars and rams to
Shuttle valve fails (doesn't control pressure - this is the only
transition/move, stuck, leaks) casing shear ram
Piston seal leaks Type (I, P or M): P
Redundant pods
Type (I, P or M): P
ROV inspection every 3 days
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Flow meter
Type (I, P or M): M
Five year rebuild on shuttle valves
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if

Enterprise B-265
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
pipe is across shears at test time)
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Five year inspection and
maintenance of BOP
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE. Leak on close side is loss of
function of ram) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 8 if not during well
control) [Local Effects]

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Enterprise B-266
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

3 Plugged No credible causes resulting in


plugging of the Casing Shear Ram
- BOP Stack

4 Mechanical Off center loading Pressure loss in hydraulic system Degraded function of ram (MPL 1 1 1
Failure MPL Assembly fails (springs, Type (I, P or M): I fails to keep ram closed, but does
retaining plate, etc.) Mud loss not prevent ram from closing with
Type (I, P or M): I full pressure) [Local Effects]
Contaminated fluid

Enterprise B-267
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Wear in overhauling nut to the tail Chamber test completed at 5k and
screw - MPL operated at 1500 psi
Galling Type (I, P or M): P
MPL seizure Redundant annulars and rams
Type (I, P or M): P
Shear blade fails
Redundant pods
Shear blade bolt fails Type (I, P or M): P
Bonnet fails on doors Blades replaced after a shear
Ram foot/button breaking off, Type (I, P or M): M
separating ram block from stem Five year inspection of BOP
MPL fails to release when needed Type (I, P or M): M
(=MPL seizure) Hydraulic system testing - Surface
Off-centered pipe and subsea
Clutch plate and bearing fails Type (I, P or M): M
Spring fails to hold clutch plates Routine function testing
together/locked (Requirement is weekly however
exception from BSEE requested if
Seals on the chamber ring fail to
pipe is across shears at test time)
allow the transfer ring to move
Type (I, P or M): M
freely & doesn't allow the springs
to fully engage clutch Wellbore testing
Type (I, P or M): M
MPL assembly due to mechanical
issues Weekly function testing
Type (I, P or M): M
Anti-rotation pin fails due to
shearing off Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3

Enterprise B-268
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
years
Type (I, P or M): M

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 8 if not during well
control) [Local Effects]

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore

Enterprise B-269
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

5 Wear BX Gasket connections (top and Pressure loss in hydraulic system Control fluid leakage to 1 1 1
bottom and side-outs) fail Type (I, P or M): I environment [Local Effects]
Operation/use of ram Mud loss
Dirty fluid Type (I, P or M): I
Wear on packers on ram blocks Chamber test completed at 5k and
operated at 1500 psi
Wear of ram blocks Type (I, P or M): P
Piping connections fail Redundant pods
Key seating Type (I, P or M): P
Bonnet door seals fail Redundant annulars and rams
Rod packer seal fails Type (I, P or M): P
Fluid hinge seal assembly fails Between Wells - Replace all
seals/rubber goods on ram blocks

Enterprise B-270
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Damage from shearing Type (I, P or M): M
MPL fails Blades replaced after a shear
Operating cylinder seal leaks Type (I, P or M): M
Dimensional wear Five year inspection of BOP
Type (I, P or M): M
Scoring
Routine function testing
Shuttle valve fails (Requirement is weekly however
Rod piston seals fail exception from BSEE requested if
Transfer piston seals fail pipe is across shears at test time)
Type (I, P or M): M
Off center loading
ROV inspection every 3 days
Contaminated fluid
Type (I, P or M): M
Galling
Wellbore testing
MPL fails to release when needed Type (I, P or M): M
(=MPL seizure)
Weekly function testing
Shear blade fails Type (I, P or M): M
Shear blade bolt fails Hydraulic system testing - Surface
Bonnet fails on doors and subsea
Type (I, P or M): M
Wear in overhauling nut to the tail
screw - MPL Soak and stump tests between
wells
Shuttle valve fails (doesn't
Type (I, P or M): M
transition/move, stuck, leaks)
Overhauling nuts replaced every 2
Piston seal leaks
years
Cylinder seal fails Type (I, P or M): M
MPL fails to release when needed Annual - Dimensional checks,
(=MPL seizure) chamber testing, MPL signature
Bonnet fails on doors testing (predictive), MPL bearings
replaced, NDT on ram blocks,
Gasket fails between stack
connecting rods, and blades.
components (Wellhead to Stack to
Type (I, P or M): M
LMRP to Riser)
Clutch plate replaced every 3
Off-centered pipe
years
Clutch plate and bearing fails Type (I, P or M): M
Spring fails to hold clutch plates
together/locked
Seals on the chamber ring fail to
allow the transfer ring to move
freely & doesn't allow the springs
to fully engage clutch
MPL assembly fails due to

Enterprise B-271
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
mechanical issues
Anti-rotation pin fails due to
shearing off

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE.) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 7 if not during well
control) [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Maintain Closing 9 2 1 18


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

Failure to Engage Lock on Hang- 8 5 2 80


off Ram - Failure to maintain
locking - Hang-off the drill pipe on
a ram BOP and control the
wellbore (linked to 1.4.3.1)

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Enterprise B-272
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Unintentional Opening - 6 1 4 24
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Unintentional Opening - 10 2 2 40
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.2)

Enterprise B-273
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

6 Corrosion/Er Mud flow Appropriate material selection Control fluid leakage to 1 1 1


osion (rubber goods/metals) for environment [Local Effects]
operating environment...shear
blade corrodes, but is inspected
for such
Type (I, P or M): P
Chamber test completed at 5k and
operated at 1500 psi
Type (I, P or M): P
Enhanced coatings and inlays in
some areas
Type (I, P or M): P
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
BOP rinsed as soon as they are
pulled from water
Type (I, P or M): M
Five year inspection of BOP
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
Enterprise B-274
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Blades replaced after a shear
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE.) [Local Effects]

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 7 if not during well
control) [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Enterprise B-275
LEADER
2.3.3 Equipment: Casing Shear Ram - BOP Stack Shear Ram associated shuttle valves, and hydraulic supply to/from SPM valves including SPM
valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Shear Pipe - Failure to 6 1 1 6


shear the drill pipe - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.2.1)

Failure of Shear Ram to Seal On 6 1 1 6


Demand - Failure to seal the
wellbore - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.3.1)

Failure to Shear Pipe - Failure to 9 1 2 18


shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

7 Loss of No additional causes identified


Function resulting in Loss of Function of the
(general) Casing Shear Ram - BOP Stack

Enterprise B-276
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Damage from closure on a tool Pressure loss in hydraulic system Control fluid leakage to 1 1 1
Leak/Ruptur joint Type (I, P or M): I environment [Local Effects]
e Operating cylinder seal leaks HPU pumps running
BX Gasket connections (top and Type (I, P or M): I
bottom and side-outs) fail Mud loss
Ram block seals fail Type (I, P or M): I
Shuttle valve leaks Chamber test completed at 5k and
operated at 1500 psi
Piping connections fail Type (I, P or M): P
Scoring For Asset/Personnel protection,
Dimensional wear leakage to environment as a
Key seating protection
Type (I, P or M): P
Bonnet door seals fail
Redundant annulars and rams to
Rod packer seal fails
control pressure - this is the only
Top & Bottom seal plates fail casing shear ram
Fluid hinge seal assembly fails Type (I, P or M): P
Damage from hanging off Redundant pods
Type (I, P or M): P
MPL fails
Annual - Dimensional checks,
Seal damage (Elastomer) - Ram
chamber testing, MPL signature
block or BOP seal plate
testing (predictive), MPL bearings
Shuttle valve fails (doesn't replaced, NDT on ram blocks,
transition/move, stuck, leaks) connecting rods.
Damaged hinge seals fail Type (I, P or M): M
Cylinder seal fails Between Wells - Replace all
seals/rubber goods on ram blocks
Bonnet fails on doors
Type (I, P or M): M
Gasket fails between stack
Clutch plate replaced every 3
components (Wellhead to Stack to
years
LMRP to Riser)
Type (I, P or M): M
Five year inspection and
maintenance of BOP
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
ROV inspection every 3 days

Enterprise B-277
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Wellbore testing - Wellbore
containing components above
casing shear rams
Type (I, P or M): M

Unable to close and seal on pipe, 1 1 1


on demand [Local Effects]

Unable to maintain seal with pipe 1 1 1


ram [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

External Leak - Loss of 9 3 3 54


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

2 Internal Dimensional wear Pressure loss in hydraulic system Control fluid leakage to 1 1 1
Leak Scoring Type (I, P or M): I environment [Local Effects]
Shuttle valve fails HPU pumps running
Type (I, P or M): I
Rod piston seals fail
Redundant pods
Transfer piston seals fail Type (I, P or M): P
Dimensional discrepancy between
Enterprise B-278
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
ram block and cavity (wear) Redundant annulars and rams to
Shuttle valve fails (doesn't control pressure - this is the only
transition/move, stuck, leaks) casing shear ram
Type (I, P or M): P
Piston seal leaks
Chamber test completed at 5k and
operated at 1500 psi
Type (I, P or M): P
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Flow meter
Type (I, P or M): M
Five year rebuild on shuttle valves
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
5 year inspection and
maintenance of BOP
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods.
Type (I, P or M): M
Clutch plate replaced every 3
Enterprise B-279
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
years
Type (I, P or M): M

Loss of function of ram (Severity 9 1 1 1


if during well control without
redundancies, 8 if not during well
control) [Local Effects]

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE. Leak on close side is loss of
function of ram) [Local Effects]

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

3 Plugged No credible causes resulting in


plugging of the Pipe & Test Rams
- BOP Stack

4 Mechanical Off center loading Pressure loss in hydraulic system Loss of function of ram (Severity 9 1 1 1
Failure MPL assembly (springs, etc.) fails Type (I, P or M): I if during well control without
Mud loss redundancies, 8 if not during well
Contaminated fluid control) [Local Effects]
Type (I, P or M): I
Galling
Chamber test completed at 5k and
MPL fails to release when needed operated at 1500 psi
(=MPL seizure) Type (I, P or M): P
Bonnet door fails Pipe guides to assist pipe to
MPL fails to release when needed center of rams
(=MPL seizure) Type (I, P or M): P
Bonnet fails on doors Redundant annulars and rams
Off-centered pipe Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Five year inspection of BOP
Type (I, P or M): M
Per PM, seals are replaced
annually. However, typically
replaced between wells.

Enterprise B-280
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

5 Wear Test ram seal plate fails due to Pressure loss in hydraulic system Control fluid leakage to 1 1 1
exposure to cuttings (more likely Type (I, P or M): I environment [Local Effects]
seen in longer wells) Mud loss
Operation/use of ram Type (I, P or M): I

Enterprise B-281
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Dirty fluid Chamber test completed at 5k and
Seal damage (Elastomer) - Ram operated at 1500 psi
block or BOP seal plate Type (I, P or M): P
Wear of ram blocks Pipe guides to assist pipe to
center of rams
Wear on packers on ram blocks Type (I, P or M): P
Redundant annulars and rams
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Five year inspection of BOP
Type (I, P or M): M
Per PM, seals are replaced
annually. However, typically
replaced between wells.
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature

Enterprise B-282
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Degraded function of ram 1 1 1


(Depending on severity of leak, on
open side of seal, operations could
continue after approval from
BSEE.) [Local Effects]

Loss of function of pipe ram 1 1 1


(Severity 9 if during well control
without redundancies, 8 if not
during well control). Test ram
severity is up to a 4 to 5, water
depth dependent, as a test plug
has to be run for pressure tests.
[Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

Failure to Maintain Closing 9 2 1 18


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.2.1)

6 Corrosion/Er Mud flow Pressure loss in hydraulic system Control fluid leakage to 1 1 1
osion Type (I, P or M): I environment [Local Effects]
Mud loss
Type (I, P or M): I
Appropriate material selection
(rubber goods/metals) for
operating environment.
Enterprise B-283
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): P
BOP rinsed as soon as they are
pulled from water
Type (I, P or M): P
Chamber test completed at 5k and
operated at 1500 psi
Type (I, P or M): P
Enhanced coatings and inlays in
some areas
Type (I, P or M): P
Pipe guides to assist pipe to
center of rams
Type (I, P or M): P
Protection/compatibility studies
between rubber goods and various
drilling fluids
Type (I, P or M): P
Redundant annulars and rams
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Per PM, seals are replaced
annually. However, typically
replaced between wells.
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
5 year inspection of BOP
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M

Enterprise B-284
LEADER
2.3.4 Equipment: Pipe & Test Rams - BOP Stack Pipe & Test Rams including associated shuttle valves, and hydraulic supply to/from SPM valves
including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M

Unable to close and seal on pipe, 1 1 1


on demand [Local Effects]

Unable to maintain seal with pipe 1 1 1


ram [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Failure of Pipe Ram to Seal on 9 3 2 54


Demand - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.1)

7 Loss of No additional causes beyond those


Function reviewed in Pipe & Test RAMS
(general) External Leak/Rupture -
Dimensional wear (2.3.4.1-6)

Enterprise B-285
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External BX Gasket connections (top and Control system fluid counts/flow Control fluid leakage to 1 1 1
Leak/Ruptur bottom and side-outs) fail meter environment [Local Effects]
e Grease fitting leaks Type (I, P or M): I
Shuttle valve leaks Pressure loss in hydraulic system
Type (I, P or M): I
Piping connections fail
HPU pumps running
Scoring Type (I, P or M): I
Dimensional wear Mud loss
Bonnet seals fail Type (I, P or M): I
Stem packing seals fail Chamber test completed at 3k and
Operating cylinder seal leaks operated at 1500 psi
Type (I, P or M): P
Shuttle valve fails (doesn't
transition/move, stuck, leaks) For Asset/Personnel protection,
leakage to environment as a
Stem packing fails
protection
Cylinder seal fails Type (I, P or M): P
Bonnet fails on doors Redundant annulars and rams
Gasket fails between stack Type (I, P or M): P
components (Wellhead to Stack to Redundant pods
LMRP to Riser) Type (I, P or M): P
Bleeding off choke & kill valves fail Redundant C&K valves
to safe close with loss of Type (I, P or M): P
hydraulics
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Between wells - grease
Type (I, P or M): M
C&K valves are cycled & flushed
2x daily
Type (I, P or M): M
Five year inspection and
maintenance of C&K valves
Type (I, P or M): M
Replace all seals/rubber goods
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
Enterprise B-286
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wells
Type (I, P or M): M
Testing is done in accordance with
OEM to cover stem packing and
bonnet gasket connections.
Between wells, body/shell test.
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M

Wellbore fluid leakage to 1 1 1


environment - Lower kill valve
[Local Effects]

Wellbore fluid leakage to 1 1 1


environment - 'Other' C&K valves
[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Inability to Operate (an individual) 7 3 2 42


C&K Valves as Needed - Failure to
close on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.1.4)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Close Pipe Ram on 9 1 6 63


Demand - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.3)

Enterprise B-287
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Inability to Operate C&K Valves as 7 3 2 42


Needed - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.4)

Inability to Operate C&K Valves as 7 3 2 42


needed - Failure to seal or partial
seal on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.3.3)

Inability to Operate C&K Valves as 9 3 2 54


Needed - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.3)

Unintentional Operation - 8 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations

Enterprise B-288
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
on demand (linked to 1.2.1.3)

Inability to Operate C&K Valves as 9 2 2 36


Needed - Failure to close on open
hole through blind-shear rams or
annular - Close and seal on open
hole and allow volumetric well
control operations on demand
(linked to 1.2.1.6)

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Close Hang-off Ram on 5 1 6 30


Demand - Failure of hang-off ram
to close - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.1.3)

Failure to Supply Hydraulic Fluid & 10 3 1 30


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

External Leak - Loss of 10 3 1 30


containment - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.6.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Enterprise B-289
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

External Leak - Loss of 10 2 3 60


containment - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.7.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Inability to Operate C&K Valves as 7 4 2 56


Needed - Failure to circulate -
Circulate the well after drill pipe
disconnect (linked to 1.9.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Inability to Operate C&K Valves as 7 4 2 56


Needed - Failure to seal wellbore -
Circulate the well after drill pipe
disconnect (linked to 1.9.4.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure

Enterprise B-290
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Inability to Operate C&K Valves as 10 4 2 80


Needed - Failure to circulate -
Circulate across the BOP stack to
remove trapped gas (linked to
1.10.1.3)

External Leak - Loss of 10 3 3 90


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

2 Internal Dimensional wear - Operator Control system fluid counts/flow Control fluid leakage to 1 1 1
Leak failure meter environment [Local Effects]
Scoring - Operator Type (I, P or M): I
Shuttle valve fails Flow meter
Type (I, P or M): I
Rod piston seals - Operator fails
HPU pumps running
Gate & seat leaks Type (I, P or M): I
Shuttle valve fails (doesn't Pressure loss in hydraulic system
transition/move, stuck, leaks) Type (I, P or M): I
Piston seal fails Chamber test completed at 3k and
Seal seat fails due to defects operated at 1500 psi
Bleeding off choke & kill valves Type (I, P or M): P
fails to safe close with loss of Fail-safe close operation of valve
hydraulics due to spring closure
Type (I, P or M): P
Multiple entry points of C&K into
Stack
Type (I, P or M): P
Redundant C&K valves
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Redundant annulars and rams
Type (I, P or M): P
Between wells - grease
Type (I, P or M): M
Five year rebuild on shuttle valves
Type (I, P or M): M

Enterprise B-291
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Five year inspection of C&K valves
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M
Replace all seals/rubber goods
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
C&K valves are cycled & flushed
2x daily
Type (I, P or M): M
Testing is done in accordance with
OEM to cover stem packing and
bonnet gasket connections.
Between wells, body/shell test.
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
Test fail-safe closing spring -
when BOP is pulled and during
between well surface wellbore
testing
Type (I, P or M): M
Test upstream and downstream
seat to ensure redundancy within
each valve - Between well &
subsea
Type (I, P or M): M

Leak of lower kill valves [Local 1 1 1


Effects]

Leak of 'other' kill valves [Local 1 1 1


Effects]

Loss of function of lower Kill 1 1 1


valves [Local Effects]

Loss of function of 'other' kill 1 1 1

Enterprise B-292
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
valves [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Inability to Operate (an individual) 7 3 2 42


C&K Valves as Needed - Failure to
close on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.1.4)

Failure to Supply Hydraulic Fluid & 9 2 5 90


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Inability to Operate C&K Valves as 7 3 2 42


Needed - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.4)

Inability to Operate C&K Valves as 7 3 2 42


needed - Failure to seal or partial
seal on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.3.3)

Inability to Operate C&K Valves as 9 3 2 54


Needed - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.3)

Unintentional Operation - 8 2 4 48
Unintentional closing / opening -

Enterprise B-293
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Inability to Operate C&K Valves as 9 2 2 36


Needed - Failure to close on open
hole through blind-shear rams or
annular - Close and seal on open
hole and allow volumetric well
control operations on demand
(linked to 1.2.1.6)

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure of Hydraulic Fluid to 9 1 3 27

Enterprise B-294
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Inability to Operate C&K Valves as 7 4 2 56


Needed - Failure to circulate -
Circulate the well after drill pipe
disconnect (linked to 1.9.1.3)

Failure to Adequately Seal under 10 3 3 90


Fail-safe Conditions - Failure to
open / close fail-safe valves to
seal - Circulate the well after drill
pipe disconnect (linked to 1.9.3.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Inability to Operate C&K Valves as 7 4 2 56


Needed - Failure to seal wellbore -
Circulate the well after drill pipe
disconnect (linked to 1.9.4.3)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Inability to Operate C&K Valves as 10 4 2 80


Needed - Failure to circulate -

Enterprise B-295
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Circulate across the BOP stack to
remove trapped gas (linked to
1.10.1.3)

Failure to Adequately Seal under 10 3 3 90


Fail-safe Condition - Failure to
open / close fail-safe valves to
seal - Circulate across the BOP
stack to remove trapped gas
(linked to 1.10.3.2)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

3 Plugged Barite settling in lines Control system fluid counts/flow Loss of function of lower Kill 1 1 1
Swarf & other contaminants in meter valves [Local Effects]
mud Type (I, P or M): I
Contamination/filtering Increased pressure in C&K lines
when drilling pumping fluid down
Clogged/plugged path (Includes the lines
filter, piping, tubing, etc.) Type (I, P or M): I
Trash in the well (swarf, Multiple entry points of C&K into
concrete, etc.) Stack
Restriction in system (filter, hose, Type (I, P or M): P
ID of fitting) C&K valves are cycled & flushed
Bleeding off choke & kill valves fail 2x daily
to safe close with loss of Type (I, P or M): M
hydraulics Routine function testing
(Requirement is weekly)
Type (I, P or M): M

Loss of function of 'other' kill 1 1 1


valves [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
Enterprise B-296
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Unintentional Operation - 9 2 4 72
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Actuates Too Slowly on Demand - 10 4 4 160


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Actuates Too Slowly on Demand - 8 3 2 48


Closes too slowly - Controlled
operation - Shear the drill pipe

Enterprise B-297
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
and seal the wellbore (linked to
1.5.5.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Actuates Too Slowly on Demand - 10 4 4 160


Closes too slowly - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.6.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 10 4 4 160


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 10 4 4 160


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Enterprise B-298
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

4 Mechanical Interface between operator and Control system fluid counts/flow Loss of function of lower Kill 1 1 1
Failure gate (design change meter valves [Local Effects]
implemented) fails Type (I, P or M): I
Springs break Pressure loss in hydraulic system
Contaminated fluid - swarf Type (I, P or M): I
Galling HPU pumps running
Type (I, P or M): I
Bonnet fails
Mud loss
Contamination/filtering Type (I, P or M): I
Springs fail Chamber test completed at 3k and
Bonnet fails on doors operated at 1500 psi
Trash in the well (swarf, Type (I, P or M): P
concrete, etc.) Redundant annulars and rams
Bleeding off choke & kill valves fail Type (I, P or M): P
to safe close with loss of Redundant C&K valves
hydraulics Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Between wells - grease
Type (I, P or M): M
C&K valves are cycled & flushed
2x daily
Type (I, P or M): M
Five year inspection and
maintenance of C&K valves

Enterprise B-299
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Replace all seals/rubber goods
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Testing is done in accordance with
OEM to cover stem packing and
bonnet gasket connections.
Between wells, body/shell test.
Type (I, P or M): M

Loss of function of 'other' kill 1 1 1


valves [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Unintentional Operation - 9 2 4 72
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Enterprise B-300
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Actuate Under Fail-safe 9 2 4 72


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Actuates Too Slowly on Demand - 9 3 2 54


Closes too slowly - Close and seal
on the drill pipe and allow
circulation on demand (linked to
1.1.7.1)

External Leak - Loss of 9 5 3 135


containment - Close and seal on
the drill pipe and allow circulation
on demand (linked to 1.1.8.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
Enterprise B-301
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Emergency Operation: EDS -
Disconnect from the stack (linked
to 1.7.2.4)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Enterprise B-302
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

5 Wear BX Gasket connections (top and Control system fluid counts/flow Leak of lower kill valves [Local 1 1 1
bottom and side-outs) fail meter Effects]
Operation/use of valve Type (I, P or M): I
Dirty fluid HPU pumps running
Type (I, P or M): I
Bonnet fails
Mud loss
Interface between operator and Type (I, P or M): I
gate (design change
implemented) fails Pressure loss in hydraulic system
Type (I, P or M): I
Springs break
Chamber test completed at 3k and
Shuttle valve leaks externally operated at 1500 psi
Piping connections fail Type (I, P or M): P
Scoring Redundant pods
Dimensional wear Type (I, P or M): P
Bonnet seals fail Redundant C&K valves
Type (I, P or M): P
Stem packing seals fail
Redundant annulars and rams
Operating cylinder seal leaks
Type (I, P or M): P
Grease fitting leaks
Between wells - grease
Dimensional wear - Operator fails Type (I, P or M): M
Scoring - Operator C&K valves are cycled & flushed
Shuttle valve leaks internally 2x daily
Type (I, P or M): M
Rod piston seals - Operator fails
Five year inspection and
Gate & seat leaks
maintenance of C&K valves
Barite settling in lines Type (I, P or M): M
Swarf & other contaminants in Hydraulic system testing - Surface

Enterprise B-303
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
mud and subsea
Contaminated fluid - swarf Type (I, P or M): M
Galling Replace all seals/rubber goods
Type (I, P or M): M
Shuttle valve fails (doesn't
transition/move, stuck, leaks) Routine function testing
(Requirement is weekly)
Piston seal fails Type (I, P or M): M
Stem packing fails Soak and stump tests between
Cylinder seal fails wells
Springs fail Type (I, P or M): M
Bonnet fails on doors Testing is done in accordance with
OEM to cover stem packing and
Gasket fails between stack
bonnet gasket connections.
components (Wellhead to Stack to
Between wells, body/shell test.
LMRP to Riser)
Type (I, P or M): M
Seal seat fails due to defects
Wellbore testing
Trash in the well (swarf, Type (I, P or M): M
concrete, etc.)
Bleeding off choke & kill valves fail
to safe close with loss of
hydraulics

Leak of 'other' kill valves [Local 1 1 1


Effects]

Loss of function of lower Kill 1 1 1


valves [Local Effects]

Loss of function of 'other' kill 1 1 1


valves [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Inability to Operate (an individual) 7 3 2 42


C&K Valves as Needed - Failure to
close on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.1.4)

Enterprise B-304
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Close Pipe Ram on 9 1 6 63


Demand - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.3)

Inability to Operate C&K Valves as 7 3 2 42


Needed - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.4)

Inability to Operate C&K Valves as 7 3 2 42


needed - Failure to seal or partial
seal on drill pipe through
annular(s) - Close and seal on the
drill pipe and allow circulation on
demand (linked to 1.1.3.3)

Inability to Operate C&K Valves as 9 3 2 54


Needed - Failure to seal or partial
seal on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.4.3)

Unintentional Operation - 8 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

Failure to Actuate Under Fail-safe 9 2 4 72


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to

Enterprise B-305
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
1.1.6.1)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Inability to Operate C&K Valves as 9 2 2 36


Needed - Failure to close on open
hole through blind-shear rams or
annular - Close and seal on open
hole and allow volumetric well
control operations on demand
(linked to 1.2.1.6)

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Close Hang-off Ram on 5 1 6 30


Demand - Failure of hang-off ram
to close - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.1.3)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to

Enterprise B-306
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Inability to Operate C&K Valves as 7 4 2 56


Needed - Failure to circulate -
Circulate the well after drill pipe
disconnect (linked to 1.9.1.3)

Failure to Adequately Seal under 10 3 3 90


Fail-safe Conditions - Failure to
open / close fail-safe valves to
seal - Circulate the well after drill
pipe disconnect (linked to 1.9.3.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Inability to Operate C&K Valves as 7 4 2 56

Enterprise B-307
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Needed - Failure to seal wellbore -
Circulate the well after drill pipe
disconnect (linked to 1.9.4.3)

External Leak - Loss of 10 4 3 120


containment - Circulate the well
after drill pipe disconnect (linked
to 1.9.5.1)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Inability to Operate C&K Valves as 10 4 2 80


Needed - Failure to circulate -
Circulate across the BOP stack to
remove trapped gas (linked to
1.10.1.3)

Failure to Adequately Seal under 10 3 3 90


Fail-safe Condition - Failure to
open / close fail-safe valves to
seal - Circulate across the BOP
stack to remove trapped gas
(linked to 1.10.3.2)

External Leak - Loss of 10 4 3 120


containment - Circulate across the
BOP stack to remove trapped gas
- (linked to 1.10.4.1)

6 Corrosion/Er Mud flow Control system fluid counts/flow Leak of lower kill valves [Local 1 1 1
osion Bleeding off choke & kill valves fail meter Effects]
to safe close with loss of Type (I, P or M): I
hydraulics Pressure loss in hydraulic system
Type (I, P or M): I
HPU pumps running
Type (I, P or M): I
Mud loss
Type (I, P or M): I
Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
Redundant annulars and rams

Enterprise B-308
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): P
Redundant C&K valves
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Between wells - grease
Type (I, P or M): M
C&K valves are cycled & flushed
2x daily
Type (I, P or M): M
Five year inspection and
maintenance of C&K valves
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Replace all seals/rubber goods
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Testing is done in accordance with
OEM to cover stem packing and
bonnet gasket connections.
Between wells, body/shell test.
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M

Leak of 'other' kill valves [Local 1 1 1


Effects]

Wellbore fluid leakage to 1 1 1


environment - Lower kill valve
[Local Effects]

Wellbore fluid leakage to 1 1 1


environment - 'Other' C&K valves
[Local Effects]

Enterprise B-309
LEADER
2.3.5 Equipment: Choke & Kill Lines & Valves - BOP Stack Choke & Kill Lines & Valves on both LMRP & Stack including associated shuttle valves, and
hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Unintentional Operation - 8 2 4 48
Unintentional closing / opening -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.5.1)

7 Loss of No additional causes identified


Function beyond those reviewed in Choke &
(general) Kill Lines & Valves - BOP Stack -
External Leak/Rupture - Bonnet
seals failure (2.3.5.1-6)

Enterprise B-310
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External BX connection to the BOP fails Flow meter Control fluid leakage to 1 1 1
Leak/Ruptur VX connection to well head fails Type (I, P or M): I environment [Local Effects]
e HPU pumps running
AX connection on BOP mandrel
fails - LMRP to BOP Type (I, P or M): I
Hydraulic connections fails Lock indicator
Type (I, P or M): I
Pilot Operated check valves fails
Loss of mud volume in trip tank
Shuttle valve fails Type (I, P or M): I
Hydraulic piping fails Key slots
Ball valve for POCV fails Type (I, P or M): I
Shuttle valve fails (doesn't Pressure loss in hydraulic system
transition/move, stuck, leaks) Type (I, P or M): I
Damaged LMRP connector face POCV
Leak of LMRP (set = LMRP Type (I, P or M): I
failures) Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
For Asset/Personnel protection,
leakage to environment as a
protection
Type (I, P or M): P
Maintain latch-lock pressure 100%
of time during operation
Type (I, P or M): P
Minimum differential pressure
required on surface of transfer
plate to unlock BOP
Type (I, P or M): P
ROV intervention
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Redundant unlock circuits
Type (I, P or M): P
VGX-2 gaskets with higher
external pressure rating
Type (I, P or M): P
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Wellbore testing
Enterprise B-311
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
5 year inspection and
maintenance of BOP
Type (I, P or M): M
Overpull test on the BOP after
landing
Type (I, P or M): M
Overpull on LMRP after each time
it is reconnected
Type (I, P or M): M
New gaskets are used for each
connection
Type (I, P or M): M
ROV cleans connectors directly
prior to connection
Type (I, P or M): M
Between well - OEM
recommendation, backdraft,
unlock pressure testing...
Type (I, P or M): M
Test the BOP using a test plug in
the wellhead to the maximum
pressure the BOP will be tested
Type (I, P or M): M
Required ROV inspection every 3
day, however ROV is subsea more
often
Type (I, P or M): M
Pressure test every 14 days (if no
test ram, connector is tested)
Type (I, P or M): M
Between well clean, grease,
inspect
Type (I, P or M): M
ROV inspection of connection &
frame
Type (I, P or M): M

Inability to latch/unlatch, on 1 1 1

Enterprise B-312
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
demand [Local Effects]

Wellbore fluid leakage to 1 1 1


environment [Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Maintain Closing 8 1 2 16


Pressure on Hang-off Ram -
Failure to maintain closing
pressure - Hang-off the drill pipe
on a ram BOP and control the

Enterprise B-313
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
wellbore (linked to 1.4.2.1)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Maintain Sealing 6 1 2 12


Pressure on Shear Ram - Failure
to seal the wellbore - Controlled
operation - Shear the drill pipe
and seal the wellbore (linked to
1.5.3.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of LMRP / BOP Connector 8 3 2 48


to Disengage - Failure to
disconnect the LMRP - Controlled
Operation - Disconnect the LMRP
from the Lower BOP stack (linked
to 1.8.1.2)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Enterprise B-314
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Failure of Wellhead Connector to 2 5 3 30


Properly Lock and Seal -
Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.1)

Failure of Connector Integrity - 6 2 2 24


Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.2)

Failure of LMRP Connector to 6 2 2 24


Properly Lock and Seal (auxiliary
connections) - Inadequate LMRP
Connection - Connect BOP and
LMRP at Landing (linked to
1.11.2.1)

Failure of Connector Integrity - 6 2 2 24


Inadequate LMRP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.2.2)

2 Internal Shuttle valve fails Control system fluid counts/flow Inability to latch/unlatch, on 1 1 1
Leak Piston seal fails meter demand [Local Effects]
Type (I, P or M): I
Check valve leaks
HPU pumps running
Check valve fails Type (I, P or M): I
Shuttle valve fails (doesn't Lock indicator

Enterprise B-315
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
transition/move, stuck, leaks) Type (I, P or M): I
Cylinder seal fails Key slots
Piston seal leaks Type (I, P or M): I
Loss of mud volume in trip tank
Type (I, P or M): I
Overpull (pull on BOP/wellhead to
ensure connection)
Type (I, P or M): I
POCV
Type (I, P or M): I
Pressure loss in hydraulic system
Type (I, P or M): I
Alloy selection in corrosion prone
areas
Type (I, P or M): P
Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
Minimum differential pressure
required on surface of transfer
plate to unlock BOP
Type (I, P or M): P
Place resilient (metal gasket with
elastomeric component) seal on
wellhead and/or BOP
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Between well clean, grease,
inspect
Type (I, P or M): M
Clean wellhead mating surface
with ROV prior to landing
Type (I, P or M): M
Five year inspection & rebuild of
connectors
Type (I, P or M): M
Five year rebuild on shuttle valves
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea

Enterprise B-316
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Pressure test every 14 days (if no
test ram, connector is tested)
Type (I, P or M): M
Replace all gaskets/seals between
each connection
Type (I, P or M): M
Required ROV inspection every 3
day, however ROV is subsea more
often
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
ROV inspection of connection &
frame
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Test the BOP using a test plug in
the wellhead to the maximum
pressure the BOP will be tested
Type (I, P or M): M

Unable to maintain lock pressure 1 1 1


in hydraulic system (assuming
BSEE does not approve exception)
[Local Effects]

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 8 2 3 48


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on

Enterprise B-317
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
demand (linked to 1.1.2.2)

Failure to Close Pipe Ram on 9 1 6 63


Demand - Failure to close on drill
pipe through pipe rams - Close
and seal on the drill pipe and
allow circulation on demand
(linked to 1.1.2.3)

Failure to Supply Hydraulic Fluid & 9 1 2 18


Pressure to Annular / Blind-Shear
Ram or C&K Valves - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.2)

Failure to Close Annular / Blind- 10 2 2 40


Shear Ram on Demand - Failure to
close on open hole through blind-
shear rams or annular - Close and
seal on open hole and allow
volumetric well control operations
on demand (linked to 1.2.1.3)

Failure to Supply Hydraulic Fluid & 8 3 3 72


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Close Hang-off Ram on 5 1 6 30


Demand - Failure of hang-off ram
to close - Hang-off the drill pipe
on a ram BOP and control the
wellbore (linked to 1.4.1.3)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -

Enterprise B-318
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of LMRP / BOP Connector 8 3 2 48


to Disengage - Failure to
disconnect the LMRP - Controlled
Operation - Disconnect the LMRP
from the Lower BOP stack (linked
to 1.8.1.2)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
(linked to 1.9.4.2)

Enterprise B-319
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

3 Plugged No credible causes resulting in


plugging of the Connectors - BOP
Stack

4 Mechanical Galling between piston and body Flow meter Inability to latch/unlatch, on 1 1 6
Failure Scoring or galling between piston Type (I, P or M): I demand [Local Effects]
and fingers Key slots
Breakdown in everslick connection Type (I, P or M): I
Debris in the piston Lock indicator
Type (I, P or M): I
Contaminated fluid
Loss of mud volume in trip tank
Connector fails due to mechanical Type (I, P or M): I
issues
Overpull (pull on BOP/wellhead to
Debris in system ensure connection)
Type (I, P or M): I
POCV
Type (I, P or M): I
Alloy selection in corrosion prone
areas
Type (I, P or M): P
Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
Minimum differential pressure
required on surface of transfer
plate to unlock BOP
Type (I, P or M): P
Place resilient (metal gasket with
elastomeric component) seal on
wellhead and/or BOP
Type (I, P or M): P
Between well clean, grease,
inspect
Type (I, P or M): M
Between well connector
maintenance

Enterprise B-320
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): M
Control fluid management -
Filtered, clean fluid
Type (I, P or M): M
Clean wellhead mating surface
with ROV prior to landing
Type (I, P or M): M
Five year inspection & rebuild of
connectors
Type (I, P or M): M
New metal gasket for each landing
Type (I, P or M): M
Pressure test every 14 days (if no
test ram, connector is tested)
Type (I, P or M): M
Replace all gaskets/seals between
each connection
Type (I, P or M): M
Required ROV inspection every 3
day, however ROV is subsea more
often
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Test the BOP using a test plug in
the wellhead to the maximum
pressure the BOP will be tested
Type (I, P or M): M
Tested on surface and subsea
Type (I, P or M): M
ROV inspection of connection &
frame
Type (I, P or M): M

Unable to maintain lock pressure 1 1 1


in hydraulic system (assuming
BSEE does not approve exception)
[Local Effects]

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and

Enterprise B-321
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of LMRP / BOP Connector 8 3 2 48


to Disengage - Failure to
disconnect the LMRP - Controlled
Operation - Disconnect the LMRP
from the Lower BOP stack (linked
to 1.8.1.2)

Failure of Wellhead Connector to 2 5 3 30


Properly Lock and Seal -
Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.1)

Failure of Connector Integrity - 6 2 2 24


Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.2)

Failure of LMRP Connector to 6 2 2 24


Properly Lock and Seal (auxiliary
connections) - Inadequate LMRP
Connection - Connect BOP and
LMRP at Landing (linked to
1.11.2.1)

Failure of Connector Integrity - 6 2 2 24


Inadequate LMRP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.2.2)

5 Wear Breakdown of everslick coating Control system fluid counts/flow Inability to latch/unlatch, on 1 1 1
(surface treatments) meter demand [Local Effects]
Type (I, P or M): I
Flow meter
Type (I, P or M): I
HPU pumps running
Type (I, P or M): I

Enterprise B-322
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Key slots
Type (I, P or M): I
Lock indicator
Type (I, P or M): I
Loss of mud volume in trip tank
Type (I, P or M): I
POCV
Type (I, P or M): I
Pressure loss in hydraulic system
Type (I, P or M): I
Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
Minimum differential pressure
required on surface of transfer
plate to unlock BOP
Type (I, P or M): P
Pipe guides to assist pipe to
center of rams
Type (I, P or M): P
Redundant annulars and rams
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
VGX-2 gaskets with higher
external pressure rating
Type (I, P or M): P
Five year inspection and
maintenance of BOP
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Overpull on LMRP after each time
it is reconnected
Type (I, P or M): M
Overpull test on the BOP after
landing to ensure connection
Type (I, P or M): M
Required ROV inspection every 3
day, however ROV is subsea more

Enterprise B-323
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
often
Type (I, P or M): M
ROV cleans connectors directly
prior to connection
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Test the BOP using a test plug in
the wellhead to the maximum
pressure the BOP will be tested
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M
Between well - OEM
recommendation, backdraft,
unlock pressure testing...
Type (I, P or M): M
Pressure test every 14 days (if no
test ram, connector is tested)
Type (I, P or M): M
Between well clean, grease,
inspect
Type (I, P or M): M
ROV inspection of connection &
frame
Type (I, P or M): M
5 year rebuild on shuttle valves
Type (I, P or M): M
Replace all gaskets/seals between
each connection
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
5 year inspection & rebuild of
connectors
Type (I, P or M): M
Clean wellhead mating surface
with ROV prior to landing
Type (I, P or M): M

Enterprise B-324
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Between well connector
maintenance
Type (I, P or M): M
Control fluid management -
Filtered, clean fluid
Type (I, P or M): M
New metal gasket for each landing
Type (I, P or M): M
Tested on surface and subsea
Type (I, P or M): M
Annual - Dimensional checks,
chamber testing, MPL signature
testing (predictive), MPL bearings
replaced, NDT on ram blocks,
connecting rods, and blades.
Type (I, P or M): M
Between Wells - Replace all
seals/rubber goods on ram blocks
Type (I, P or M): M
Chamber test completed at 5k and
operated at 1500 psi
Type (I, P or M): M
Clutch plate replaced every 3
years
Type (I, P or M): M
Five year inspection of BOP
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Overhauling nuts replaced every 2
years
Type (I, P or M): M
Per PM, seals are replaced
annually. However, typically
replaced between wells.
Type (I, P or M): M
Routine function testing
(Requirement is weekly however
exception from BSEE requested if
pipe is across shears at test time)
Type (I, P or M): M

Enterprise B-325
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
ROV inspection every 3 days
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
Weekly function testing
Type (I, P or M): M
Wellbore testing
Type (I, P or M): M

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of LMRP / BOP Connector 8 3 2 48


to Disengage - Failure to
disconnect the LMRP - Controlled
Operation - Disconnect the LMRP
from the Lower BOP stack (linked
to 1.8.1.2)

6 Corrosion/Er Corrosive/erosive environment Control system fluid counts/flow Control fluid leakage to 1 1 1
osion meter environment [Local Effects]
Type (I, P or M): I
Flow meter
Type (I, P or M): I
HPU pumps running
Type (I, P or M): I
Key slots
Type (I, P or M): I
Lock indicator
Type (I, P or M): I
Loss of mud volume in trip tank
Type (I, P or M): I
POCV
Type (I, P or M): I
Pressure loss in hydraulic system
Type (I, P or M): I
Cathodic protection (anodes)
Type (I, P or M): P
Material coatings (paint)

Enterprise B-326
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): P
Material/Alloy selection in
corrosion prone areas
Type (I, P or M): P
Minimum differential pressure
required on surface of transfer
plate to unlock BOP
Type (I, P or M): P
Redundant pods
Type (I, P or M): P
Chamber test completed at 3k and
operated at 1500 psi
Type (I, P or M): P
VGX-2 gaskets with higher
external pressure rating
Type (I, P or M): P
Wellbore testing
Type (I, P or M): M
Hydraulic system testing - Surface
and subsea
Type (I, P or M): M
Soak and stump tests between
wells
Type (I, P or M): M
5 year inspection and
maintenance of BOP
Type (I, P or M): M
Overpull test on the BOP after
landing to ensure connection
Type (I, P or M): M
Overpull on LMRP after each time
it is re-connected
Type (I, P or M): M
ROV cleans connectors directly
prior to connection
Type (I, P or M): M
Between well - OEM
recommendation, backdraft,
unlock pressure testing...
Type (I, P or M): M
Test the BOP using a test plug in

Enterprise B-327
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
the wellhead to the maximum
pressure the BOP will be tested
Type (I, P or M): M
Required ROV inspection every 3
day, however ROV is subsea more
often
Type (I, P or M): M
Pressure test every 14 days (if no
test ram, connector is tested)
Type (I, P or M): M
Between well clean, grease,
inspect
Type (I, P or M): M
ROV inspection of connection &
frame
Type (I, P or M): M
5 year rebuild on shuttle valves
Type (I, P or M): M
Replace all gaskets/seals between
each connection
Type (I, P or M): M
Routine function testing
(Requirement is weekly)
Type (I, P or M): M
5 year inspection & rebuild of
connectors
Type (I, P or M): M
Clean wellhead mating surface
with ROV prior to landing
Type (I, P or M): M
Between well connector
maintenance
Type (I, P or M): M
Control fluid management -
Filtered, clean fluid
Type (I, P or M): M
New metal gasket for each landing
Type (I, P or M): M
Tested on surface and subsea
Type (I, P or M): M

Wellbore fluid leakage to 1 1 1

Enterprise B-328
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
environment [Local Effects]

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of LMRP / BOP Connector 8 3 2 48


to Disengage - Failure to
disconnect the LMRP - Controlled
Operation - Disconnect the LMRP
from the Lower BOP stack (linked
to 1.8.1.2)

7 Loss of Hydrates Glycol injection ports Inability to latch/unlatch, on 1 1 1


Function Connector fails due to mechanical Type (I, P or M): P demand [Local Effects]
(general) issues Hydrate seals
Type (I, P or M): P
ROV injects glycol on weekly basis
Type (I, P or M): M
ROV inspection every 3 days
Type (I, P or M): M

Failure LMRP / BOP to Connect or 9 3 2 54


Disengage - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.2)

Failure of Wellhead Connector to 2 5 3 30


Properly Lock and Seal -
Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.1)

Failure of Connector Integrity - 6 2 2 24


Inadequate BOP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.1.2)

Failure of LMRP Connector to 6 2 2 24


Properly Lock and Seal (auxiliary
connections) - Inadequate LMRP
Connection - Connect BOP and
LMRP at Landing (linked to
1.11.2.1)

Enterprise B-329
LEADER
2.3.6 Equipment: Connectors - BOP Stack Connectors at Wellhead and LMRP/BOP Stack; and Hydraulic Stabs including associated
shuttle valves, and hydraulic supply to/from SPM valves including SPM valve connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure of Connector Integrity - 6 2 2 24


Inadequate LMRP Connection -
Connect BOP and LMRP at
Landing (linked to 1.11.2.2)

Enterprise B-330
LEADER
2.3.7 Equipment: Autoshear System - BOP Stack Autoshear System including shear ram, autoshear arming, autoshear valve, and associated
hydraulic connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 External Piping connections fail Accumulator pressure Fails to activate/shut-in well [Local 1 1 1
Leak/Ruptur SPM valve seals fail monitoring/read-back Effects]
e Type (I, P or M): I
SPM - Pilot system leak past
piston HPU pumps running
Type (I, P or M): I
SPM - Spool/Seat damage
Initial latch up on wellhead
Shuttle valve fails Type (I, P or M): I
Trigger valve fails due to loss of Pressure loss in hydraulic system
pilot pressure Type (I, P or M): I
Shuttle valve fails (doesn't Mud loss
transition/move, stuck, leaks) Type (I, P or M): I
Autoshear trigger valve fails Visual
SPM (Autoshear will activate, as Type (I, P or M): I
designed) fails due to loss of pilot Annual rebuild
signal to controls Type (I, P or M): M
Trigger valve (SPM valve) fails to Function test between well
open Type (I, P or M): M
Valve seat fails (assumed trigger ROV inspection every 3 days
valve) Type (I, P or M): M

Unplanned activation [Local 1 1 1


Effects]

Unintentional Closing - 9 3 3 54
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 3 1 30


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
Enterprise B-331
LEADER
2.3.7 Equipment: Autoshear System - BOP Stack Autoshear System including shear ram, autoshear arming, autoshear valve, and associated
hydraulic connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

2 Internal Trigger valve leaks (past Accumulator pressure Unplanned activation [Local 1 1 1
Leak spool/seat), when closed & armed monitoring/read-back Effects]
would send pressure to ram Type (I, P or M): I
POCV fails - would vent arm signal Drill string weight
Autoshear trigger valve fails Type (I, P or M): I
Trigger valve (SPM valve) fails to Flow meter
open Type (I, P or M): I
HPU pumps running
Type (I, P or M): I
Initial latch up on wellhead
Type (I, P or M): I
Pressure loss in hydraulic system
Type (I, P or M): I
Annual valve rebuild
Type (I, P or M): M
Function test between well
Type (I, P or M): M

Unintentional Closing - 9 3 3 54
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.1)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -

Enterprise B-332
LEADER
2.3.7 Equipment: Autoshear System - BOP Stack Autoshear System including shear ram, autoshear arming, autoshear valve, and associated
hydraulic connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure to initiate autoshear 10 3 1 30


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure to Supply Hydraulic Fluid & 9 3 2 54


Pressure to Shear Ram - Failure to
shear the drill pipe - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.3.1)

Moves too slowly to disconnect - 9 3 2 54


Failure to disconnect the LMRP -
Controlled Operation - Disconnect
the LMRP from the Lower BOP
stack (linked to 1.8.1.4)

3 Plugged No credible causes resulting in


plugging of the Autoshear System
- BOP Stack

4 Mechanical Particulate in hydraulic lines Accumulator pressure Fails to activate/shut-in well [Local 1 1 1
Failure Accumulator bladders fail monitoring/read-back Effects]
Type (I, P or M): I
SPM seat or spring fails
Drill string weight
SPM springs fails due to hydrogen Type (I, P or M): I
embrittlement (environmentally
stressed corrosion) Initial latch up on wellhead
Type (I, P or M): I
Shear seals (cups, scoring in
metal-metal) - If failed, would Pilot signal to trigger &
affect the pilot signal for trigger arm/disarm valve sent from both
valve...If system is armed and pods
pilot lost, could activate. Pilot Type (I, P or M): I
signal is sent from both pods Function test between well
simultaneously. Type (I, P or M): P
Springs fail Annual valve rebuild
SPM (Autoshear will activate, as Type (I, P or M): M
designed) fails due to loss of plot ROV intervention
control signals Type (I, P or M): M

Enterprise B-333
LEADER
2.3.7 Equipment: Autoshear System - BOP Stack Autoshear System including shear ram, autoshear arming, autoshear valve, and associated
hydraulic connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Autoshear trigger valve fails
Trigger valve spring fails
Valve seat fails (assumed trigger
valve)
Accumulator fails due to
insufficient fluid/pressure to
complete full/tight closure
Accumulators fail due to
insufficient charge

Unplanned activation [Local 1 1 1


Effects]

Failure to Actuate Under Fail-safe 9 2 7 126


Conditions - Failure to open /
close fail-safe valves - Close and
seal on the drill pipe and allow
circulation on demand (linked to
1.1.6.1)

Unintentional Closing - 9 3 3 54
Unintentional closing / opening -
Controlled operation - Shear the
drill pipe and seal the wellbore
(linked to 1.5.4.1)

Failure to initiate autoshear 10 3 1 30


sequence - Failure to close -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.2.2)

Failure of Shear Ram to Seal On 10 2 6 120


Demand - Failure to seal the
wellbore - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.4.1)

Failure to Maintain Sealing 10 2 6 120


Pressure on Shear Ram - Failure
to seal the wellbore - Emergency
Operation - Auto-Shear - Shear
the drill pipe and seal the wellbore
(linked to 1.6.4.2)

Enterprise B-334
LEADER
2.3.7 Equipment: Autoshear System - BOP Stack Autoshear System including shear ram, autoshear arming, autoshear valve, and associated
hydraulic connections

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

5 Wear Friction Change out components before 1 1 1


wear occurs [Local Effects]

6 Corrosion/Er Corrosion/Erosion Fails to activate/shut-in well [Local 1 1 1


osion Effects]

Unplanned activation [Local 1 1 1


Effects]

Unintentional Closing - 5 2 1 10
Unintentional closing / opening -
Emergency Operation - Auto-
Shear - Shear the drill pipe and
seal the wellbore (linked to
1.6.5.1)

7 Loss of No additional causes identified Unintentional Closing - 5 2 1 10


Function beyond those reviewed in Unintentional closing / opening -
(general) Autoshear System - BOP Stack - Emergency Operation - Auto-
External Leak/Rupture - SPM - Shear - Shear the drill pipe and
Spool/Seat damage (2.3.7.1-4) seal the wellbore (linked to
Autoshear arm valve fails so that it 1.6.5.1)
retains the arm signal but the
electrical signal indicates the
system is disarmed

Enterprise B-335
LEADER
2.3.8 Equipment: ROV Intervention Interface - BOP Stack

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

1 Internal Shuttle valve fails - ROV pressure Frequent cycling of pumps Unable to perform 1 1 1
Leak applied elsewhere Type (I, P or M): I desired/designed function, where
Low pressure alarms ROV is called upon as a backup
Type (I, P or M): I measure. [Local Effects]
ROV will not be able to build
pressure in system
Type (I, P or M): I
Visual indication by presence of
fluid on rig
Type (I, P or M): I
Daily inspection/walkthrough of
HPU room/system
Type (I, P or M): M
Pumps on OEM-based
maintenance schedule
Type (I, P or M): M
ROV intervention system tested
between wells, on surface
Type (I, P or M): M
ROV intervention system tested
subsea on latch-up
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M
Strainers checked on regular basis
(weekly)
Type (I, P or M): M
Surface drawdown, before BOP
deployment, after latch-up, every
6 months subsea
Type (I, P or M): M

2 External Shuttle valve fails - ROV pressure Frequent cycling of pumps Unable to perform 1 1 1
Leak applied elsewhere Type (I, P or M): I desired/designed function, where
Poor seal between receptacle and Low pressure alarms ROV is called upon as a backup
ROV hot stab Type (I, P or M): I measure. [Local Effects]
Function connector (hard pipe, or ROV unable to build pressure in
hose depending on function) fails system/function
Type (I, P or M): I
Seals located on ROV hot stab
Enterprise B-336
LEADER
2.3.8 Equipment: ROV Intervention Interface - BOP Stack

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
Type (I, P or M): I
Visual indication by presence of
fluid on rig
Type (I, P or M): I
Daily inspection/walkthrough of
HPU room/system
Type (I, P or M): M
ROV intervention system tested
between wells, on surface
Type (I, P or M): M
ROV intervention system tested
subsea on latch-up
Type (I, P or M): M
System pump-up capacity tested
between wells (30 minutes for
single pump, 15 minutes for
complete system)
Type (I, P or M): M
Surface drawdown, before BOP
deployment, after latch-up, every
6 months subsea
Type (I, P or M): M
Strainers checked on regular basis
(weekly)
Type (I, P or M): M
Pumps on OEM-based
maintenance schedule
Type (I, P or M): M

3 Loss of Shuttle valve fails to Failure to Supply Hydraulic Fluid & 8 3 2 36


Function transition/move Pressure to Annular & C&K Valves
When Demanded - Failure to close
on drill pipe through annular(s) -
Close and seal on the drill pipe
and allow circulation on demand
(linked to 1.1.1.2)

Failure to Supply Hydraulic Fluid & 9 2 5 90


Pressure to Pipe Ram or C&K
Valves When Demanded - Failure
to close on drill pipe through pipe
rams - Close and seal on the drill
pipe and allow circulation on
demand (linked to 1.1.2.2)

Enterprise B-337
LEADER
2.3.8 Equipment: ROV Intervention Interface - BOP Stack

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers

Failure to Supply Hydraulic Fluid & 8 3 2 36


Pressure to Annulars - Failure to
close annulars - Strip the drill
string using the annular BOP(s)
(linked to 1.3.1.2)

Failure to Supply Hydraulic Fluid & 8 1 4 32


Pressure to Hang-off Ram - Failure
of hang-off ram to close - Hang-
off the drill pipe on a ram BOP
and control the wellbore (linked to
1.4.1.2)

Failure to Supply Hydraulic Fluid & 6 1 4 24


Pressure to Shear Ram - Failure to
close - Controlled operation -
Shear the drill pipe and seal the
wellbore (linked to 1.5.1.2)

Failure to Supply Hydraulic Fluid & 9 1 4 36


Pressure to Shear Ram - Failure to
close - Emergency Operation -
Auto-Shear - Shear the drill pipe
and seal the wellbore (linked to
1.6.2.1)

Failure of Hydraulic Fluid to 9 1 3 27


disconnect - Failure to disconnect
the LMRP - Emergency Operation:
EDS - Disconnect from the stack
(linked to 1.7.2.3)

Failure of Hydraulic Fluid to 7 1 2 14


Disconnect - Failure to disconnect
the LMRP - Controlled Operation -
Disconnect the LMRP from the
Lower BOP stack (linked to
1.8.1.3)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to circulate - Circulate the well
after drill pipe disconnect (linked
to 1.9.1.2)

Failure to Supply Hydraulic Fluid & 6 1 2 12


Pressure to C&K Valves - Failure
to seal wellbore - Circulate the
well after drill pipe disconnect
Enterprise B-338
LEADER
2.3.8 Equipment: ROV Intervention Interface - BOP Stack

Item Failure Causes Indications/Protections/Main Effects Severity Occurrence Detection Risk


Mode tenance Ratings Ratings Ratings Priority
Numbers
(linked to 1.9.4.2)

Failure to Supply Hydraulic Fluid & 10 1 2 20


Pressure to C&K Valves - Failure
to circulate - Circulate across the
BOP stack to remove trapped gas
(linked to 1.10.1.2)

Enterprise B-339
LEADER
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
External Leak/ Valves When Demanded - Failure to close and seal on the drill
11 2.1.1.1 Control 8 3 2 48
Rupture pipe and allow circulation on demand due to failure to close on
Systems
drill pipe through annular(s) (1.1) (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
External Leak/ Valves When Demanded - Failure to close on drill pipe through
12 2.1.1.1 Control 8 3 2 48
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
HPU - Surface
External Leak/ Valves When Demanded - Failure to close on drill pipe through
13 2.1.1.1 Control 8 3 2 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.2.2)
HPU - Surface Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak/
14 2.1.1.1 Control seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Systems pipe and allow circulation on demand (linked to 1.1.4.1)
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
HPU - Surface
External Leak/ Failure to seal or partial seal on drill pipe through pipe rams -
15 2.1.1.1 Control 9 3 2 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.4.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak/
16 2.1.1.1 Control seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Systems 1.1.7.1)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
HPU - Surface Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
17 2.1.1.1 Control blind-shear rams or annular - Close and seal on open hole and 9 3 2 54
Rupture
Systems allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
HPU - Surface
External Leak/ to close on open hole through blind-shear rams or annular - Close
18 2.1.1.1 Control 9 3 2 54
Rupture and seal on open hole and allow volumetric well control
Systems
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
HPU - Surface
External Leak/ Shear Ram - Failure to close on open hole through blind-shear
19 2.1.1.1 Control 9 3 2 54
Rupture rams or annular - Close and seal on open hole and allow
Systems
volumetric well control operations on demand (linked to 1.2.1.5)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak/
20 2.1.1.1 Control to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 48
Rupture
Systems (linked to 1.3.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak/
21 2.1.1.1 Control Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 3 2 48
Rupture
Systems BOP and control the wellbore (linked to 1.4.1.2)

2650788-DFMECA-2-D2 C-1
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
External Leak/
22 2.1.1.1 Control maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 3 2 48
Rupture
Systems and control the wellbore (linked to 1.4.2.1)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
23 2.1.1.1 Control operation - Shear the drill pipe and seal the wellbore (linked to 6 3 2 36
Rupture
Systems 1.5.2.1)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
24 2.1.1.1 Control wellbore - Controlled operation - Shear the drill pipe and seal the 6 3 2 36
Rupture
Systems wellbore (linked to 1.5.3.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
25 2.1.1.1 Control seal the wellbore - Controlled operation - Shear the drill pipe and 6 3 2 36
Rupture
Systems seal the wellbore (linked to 1.5.3.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
External Leak/
26 2.1.1.1 Control Controlled operation - Shear the drill pipe and seal the wellbore 6 3 2 36
Rupture
Systems (linked to 1.5.4.2)
HPU - Surface
External Leak/ External Leak - Loss of containment - Controlled operation -
27 2.1.1.1 Control 10 3 1 30
Rupture Shear the drill pipe and seal the wellbore (linked to 1.5.6.1)
Systems
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
28 2.1.1.1 Control Failure to close - Emergency Operation - Auto-Shear - Shear the 9 3 2 54
Rupture
Systems drill pipe and seal the wellbore (linked to 1.6.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
29 2.1.1.1 Control Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Systems - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
30 2.1.1.1 Control Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 2 54
Rupture
Systems (linked to 1.6.3.2)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
31 2.1.1.1 Control wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 3 2 60
Rupture
Systems pipe and seal the wellbore (linked to 1.6.4.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
32 2.1.1.1 Control seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 3 2 60
Rupture
Systems drill pipe and seal the wellbore (linked to 1.6.4.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
External Leak/
33 2.1.1.1 Control Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 2 60
Rupture
Systems the wellbore (linked to 1.6.5.2)
HPU - Surface External Leak - Loss of containment - Emergency Operation -
External Leak/
34 2.1.1.1 Control Auto-Shear - Shear the drill pipe and seal the wellbore (linked to 10 3 2 60
Rupture
Systems 1.6.7.1)
HPU - Surface Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
35 2.1.1.1 Control LMRP - Emergency Operation: EDS - Disconnect from the stack 9 3 2 54
Rupture
Systems (linked to 1.7.2.3)

2650788-DFMECA-2-D2 C-2
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak/
36 2.1.1.1 Control Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Systems 1.7.2.4)
HPU - Surface Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
37 2.1.1.1 Control LMRP - Controlled Operation - Disconnect the LMRP from the 7 3 2 42
Rupture
Systems Lower BOP stack (linked to 1.8.1.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
38 2.1.1.1 Control - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Systems BOP stack (linked to 1.8.1.4)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
39 2.1.1.1 Control Failure to circulate - Circulate the well after drill pipe disconnect 6 3 2 36
Rupture
Systems (linked to 1.9.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
40 2.1.1.1 Control Failure to seal wellbore - Circulate the well after drill pipe 6 3 2 36
Rupture
Systems disconnect (linked to 1.9.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
41 2.1.1.1 Control Failure to circulate - Circulate across the BOP stack to remove 10 3 2 60
Rupture
Systems trapped gas (linked to 1.10.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
42 2.1.1.1 Control Failure to close - Controlled operation - Shear the drill pipe and 10 3 2 60
Rupture
Systems seal the wellbore (linked to 1.5.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
44 2.1.1.2 Control Internal Leak 8 3 3 72
annular(s) - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
45 2.1.1.2 Control Internal Leak 8 3 3 72
pipe rams - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.2.2)
Failure to Maintain Adequate Sealing Pressure on Annular -
HPU - Surface
Failure to seal or partial seal on drill pipe through annular(s) -
46 2.1.1.2 Control Internal Leak 9 3 3 81
Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.3.2)
HPU - Surface Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
47 2.1.1.2 Control Internal Leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 3 81
Systems pipe and allow circulation on demand (linked to 1.1.4.1)
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
HPU - Surface
Failure to seal or partial seal on drill pipe through pipe rams -
48 2.1.1.2 Control Internal Leak 9 3 3 81
Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.4.2)

2650788-DFMECA-2-D2 C-3
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
HPU - Surface Shear Ram or C&K Valves - Failure to close on open hole through
49 2.1.1.2 Control Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 3 3 81
Systems allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
HPU - Surface
to close on open hole through blind-shear rams or annular - Close
50 2.1.1.2 Control Internal Leak 9 3 3 81
and seal on open hole and allow volumetric well control
Systems
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
HPU - Surface
Shear Ram - Failure to close on open hole through blind-shear
51 2.1.1.2 Control Internal Leak 9 3 3 81
rams or annular - Close and seal on open hole and allow
Systems
volumetric well control operations on demand (linked to 1.2.1.5)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
52 2.1.1.2 Control Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Systems (linked to 1.3.1.2)
HPU - Surface Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
53 2.1.1.2 Control Internal Leak Failure to maintain stripping pressure - Strip the drill string using 9 3 3 81
Systems the annular BOP(s) (linked to 1.3.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
54 2.1.1.2 Control Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 3 3 81
Systems BOP and control the wellbore (linked to 1.4.1.2)
HPU - Surface Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
55 2.1.1.2 Control Internal Leak maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 3 3 72
Systems and control the wellbore (linked to 1.4.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
56 2.1.1.2 Control Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 3 3 54
Systems seal the wellbore (linked to 1.5.1.2)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
57 2.1.1.2 Control Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 3 3 54
Systems 1.5.2.1)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
58 2.1.1.2 Control Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 3 3 54
Systems wellbore (linked to 1.5.3.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
59 2.1.1.2 Control Internal Leak seal the wellbore - Controlled operation - Shear the drill pipe and 6 3 3 54
Systems seal the wellbore (linked to 1.5.3.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
60 2.1.1.2 Control Internal Leak Controlled operation - Shear the drill pipe and seal the wellbore 6 3 3 54
Systems (linked to 1.5.4.2)

2650788-DFMECA-2-D2 C-4
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
61 2.1.1.2 Control Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 3 3 81
Systems drill pipe and seal the wellbore (linked to 1.6.2.1)
HPU - Surface Failure to initiate autoshear sequence - Failure to close -
62 2.1.1.2 Control Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 3 90
Systems the wellbore (linked to 1.6.2.2)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
63 2.1.1.2 Control Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 3 81
Systems (linked to 1.6.3.2)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
64 2.1.1.2 Control Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 3 3 90
Systems pipe and seal the wellbore (linked to 1.6.4.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
65 2.1.1.2 Control Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 3 3 90
Systems drill pipe and seal the wellbore (linked to 1.6.4.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
66 2.1.1.2 Control Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 3 90
Systems the wellbore (linked to 1.6.5.2)
HPU - Surface Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
67 2.1.1.2 Control Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 3 3 90
Systems (linked to 1.7.2.3)
HPU - Surface Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
68 2.1.1.2 Control Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 3 3 63
Systems Lower BOP stack (linked to 1.8.1.3)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
69 2.1.1.2 Control Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 3 3 54
Systems (linked to 1.9.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
70 2.1.1.2 Control Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 3 3 54
Systems disconnect (linked to 1.9.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
71 2.1.1.2 Control Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 3 3 90
Systems trapped gas (linked to 1.10.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
74 2.1.1.3 Control Plugged 8 3 3 72
annular(s) - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
75 2.1.1.3 Control Plugged 8 3 3 72
pipe rams - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.2.2)

2650788-DFMECA-2-D2 C-5
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
76 2.1.1.3 Control Plugged seal on drill pipe through pipe rams - Close and seal on the drill 9 3 3 81
Systems pipe and allow circulation on demand (linked to 1.1.4.1)
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
HPU - Surface
Failure to seal or partial seal on drill pipe through pipe rams -
77 2.1.1.3 Control Plugged 9 3 3 81
Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.4.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Close and
78 2.1.1.3 Control Plugged seal on the drill pipe and allow circulation on demand (linked to 9 3 3 81
Systems 1.1.7.1)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
HPU - Surface Shear Ram or C&K Valves - Failure to close on open hole through
79 2.1.1.3 Control Plugged blind-shear rams or annular - Close and seal on open hole and 9 3 3 81
Systems allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
HPU - Surface
to close on open hole through blind-shear rams or annular - Close
80 2.1.1.3 Control Plugged 9 3 3 81
and seal on open hole and allow volumetric well control
Systems
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
HPU - Surface
Shear Ram - Failure to close on open hole through blind-shear
81 2.1.1.3 Control Plugged 9 3 3 81
rams or annular - Close and seal on open hole and allow
Systems
volumetric well control operations on demand (linked to 1.2.1.5)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
82 2.1.1.3 Control Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Systems (linked to 1.3.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
83 2.1.1.3 Control Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 3 3 72
Systems BOP and control the wellbore (linked to 1.4.1.2)
HPU - Surface Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
84 2.1.1.3 Control Plugged maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 3 3 72
Systems and control the wellbore (linked to 1.4.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
85 2.1.1.3 Control Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 3 3 72
Systems seal the wellbore (linked to 1.5.1.2)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
86 2.1.1.3 Control Plugged operation - Shear the drill pipe and seal the wellbore (linked to 6 3 3 54
Systems 1.5.2.1)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
87 2.1.1.3 Control Plugged wellbore - Controlled operation - Shear the drill pipe and seal the 6 3 3 54
Systems wellbore (linked to 1.5.3.1)

2650788-DFMECA-2-D2 C-6
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
88 2.1.1.3 Control Plugged seal the wellbore - Controlled operation - Shear the drill pipe and 6 3 3 54
Systems seal the wellbore (linked to 1.5.3.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
89 2.1.1.3 Control Plugged Controlled operation - Shear the drill pipe and seal the wellbore 6 3 3 54
Systems (linked to 1.5.4.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Controlled
90 2.1.1.3 Control Plugged operation - Shear the drill pipe and seal the wellbore (linked to 8 3 3 72
Systems 1.5.5.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
91 2.1.1.3 Control Plugged Failure to close - Emergency Operation - Auto-Shear - Shear the 9 3 3 81
Systems drill pipe and seal the wellbore (linked to 1.6.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
92 2.1.1.3 Control Plugged Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 3 81
Systems - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
93 2.1.1.3 Control Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 3 81
Systems (linked to 1.6.3.2)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
94 2.1.1.3 Control Plugged wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 3 3 90
Systems pipe and seal the wellbore (linked to 1.6.4.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
95 2.1.1.3 Control Plugged seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 3 3 90
Systems drill pipe and seal the wellbore (linked to 1.6.4.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
96 2.1.1.3 Control Plugged Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 3 90
Systems the wellbore (linked to 1.6.5.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Emergency
97 2.1.1.3 Control Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 3 81
Systems (linked to 1.6.6.1)
HPU - Surface Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
98 2.1.1.3 Control Plugged LMRP - Emergency Operation: EDS - Disconnect from the stack 9 3 3 81
Systems (linked to 1.7.2.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP -
99 2.1.1.3 Control Plugged Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 3 81
Systems 1.7.2.4)
HPU - Surface Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
100 2.1.1.3 Control Plugged LMRP - Controlled Operation - Disconnect the LMRP from the 7 3 3 63
Systems Lower BOP stack (linked to 1.8.1.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP -
101 2.1.1.3 Control Plugged Controlled Operation - Disconnect the LMRP from the Lower BOP 9 3 3 81
Systems stack (linked to 1.8.1.4)

2650788-DFMECA-2-D2 C-7
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
102 2.1.1.3 Control Plugged Failure to circulate - Circulate the well after drill pipe disconnect 6 3 3 54
Systems (linked to 1.9.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
103 2.1.1.3 Control Plugged Failure to seal wellbore - Circulate the well after drill pipe 6 3 3 54
Systems disconnect (linked to 1.9.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
104 2.1.1.3 Control Plugged Failure to circulate - Circulate across the BOP stack to remove 10 3 3 90
Systems trapped gas (linked to 1.10.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
107 2.1.1.4 Control Mechanical Failure 8 4 2 64
annular(s) - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
HPU - Surface
Valves When Demanded - Failure to close on drill pipe through
108 2.1.1.4 Control Mechanical Failure 8 4 2 64
pipe rams - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.2.2)
HPU - Surface Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
109 2.1.1.4 Control Mechanical Failure seal on drill pipe through pipe rams - Close and seal on the drill 9 4 2 72
Systems pipe and allow circulation on demand (linked to 1.1.4.1)
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
HPU - Surface
Failure to seal or partial seal on drill pipe through pipe rams -
110 2.1.1.4 Control Mechanical Failure 9 4 2 72
Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.4.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Close and
111 2.1.1.4 Control Mechanical Failure seal on the drill pipe and allow circulation on demand (linked to 9 4 2 72
Systems 1.1.7.1)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
HPU - Surface Shear Ram or C&K Valves - Failure to close on open hole through
112 2.1.1.4 Control Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 4 2 72
Systems allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
HPU - Surface
to close on open hole through blind-shear rams or annular - Close
113 2.1.1.4 Control Mechanical Failure 9 4 2 72
and seal on open hole and allow volumetric well control
Systems
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
HPU - Surface
Shear Ram - Failure to close on open hole through blind-shear
114 2.1.1.4 Control Mechanical Failure 9 4 2 72
rams or annular - Close and seal on open hole and allow
Systems
volumetric well control operations on demand (linked to 1.2.1.5)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
115 2.1.1.4 Control Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 4 2 64
Systems (linked to 1.3.1.2)

2650788-DFMECA-2-D2 C-8
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
116 2.1.1.4 Control Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 4 2 64
Systems BOP and control the wellbore (linked to 1.4.1.2)
HPU - Surface Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
117 2.1.1.4 Control Mechanical Failure maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 4 2 64
Systems and control the wellbore (linked to 1.4.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
118 2.1.1.4 Control Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 4 2 48
Systems seal the wellbore (linked to 1.5.1.2)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
119 2.1.1.4 Control Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 4 2 48
Systems 1.5.2.1)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
120 2.1.1.4 Control Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 4 2 48
Systems wellbore (linked to 1.5.3.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
121 2.1.1.4 Control Mechanical Failure seal the wellbore - Controlled operation - Shear the drill pipe and 6 4 2 48
Systems seal the wellbore (linked to 1.5.3.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
122 2.1.1.4 Control Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 6 4 2 48
Systems (linked to 1.5.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
123 2.1.1.4 Control Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 4 2 72
Systems drill pipe and seal the wellbore (linked to 1.6.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
124 2.1.1.4 Control Mechanical Failure Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 4 2 72
Systems - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
125 2.1.1.4 Control Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 4 2 72
Systems (linked to 1.6.3.2)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
126 2.1.1.4 Control Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 4 2 80
Systems pipe and seal the wellbore (linked to 1.6.4.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
127 2.1.1.4 Control Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 4 2 80
Systems drill pipe and seal the wellbore (linked to 1.6.4.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
128 2.1.1.4 Control Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 4 2 80
Systems the wellbore (linked to 1.6.5.2)
HPU - Surface Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
129 2.1.1.4 Control Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 4 2 72
Systems (linked to 1.7.2.3)

2650788-DFMECA-2-D2 C-9
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP -
130 2.1.1.4 Control Mechanical Failure Emergency Operation: EDS - Disconnect from the stack (linked to 9 4 2 72
Systems 1.7.2.4)
HPU - Surface Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
131 2.1.1.4 Control Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 4 2 56
Systems Lower BOP stack (linked to 1.8.1.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP
132 2.1.1.4 Control Mechanical Failure - Controlled Operation - Disconnect the LMRP from the Lower 9 4 2 72
Systems BOP stack (linked to 1.8.1.4)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
133 2.1.1.4 Control Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 4 2 48
Systems (linked to 1.9.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
134 2.1.1.4 Control Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 4 2 48
Systems disconnect (linked to 1.9.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
135 2.1.1.4 Control Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 4 2 80
Systems trapped gas (linked to 1.10.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
HPU - Surface
Loss of Function Valves When Demanded - Failure to close on drill pipe through
146 2.1.1.7 Control 8 3 2 48
(general) annular(s) - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
HPU - Surface
Loss of Function Valves When Demanded - Failure to close on drill pipe through
147 2.1.1.7 Control 8 3 2 48
(general) pipe rams - Close and seal on the drill pipe and allow circulation
Systems
on demand (linked to 1.1.2.2)
HPU - Surface Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
Loss of Function
148 2.1.1.7 Control seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
(general)
Systems pipe and allow circulation on demand (linked to 1.1.4.1)
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
HPU - Surface
Loss of Function Failure to seal or partial seal on drill pipe through pipe rams -
149 2.1.1.7 Control 9 3 2 54
(general) Close and seal on the drill pipe and allow circulation on demand
Systems
(linked to 1.1.4.2)
HPU - Surface Actuates Too Slowly on Demand - Closes too slowly - Close and
Loss of Function
150 2.1.1.7 Control seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
(general)
Systems 1.1.7.1)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
HPU - Surface Shear Ram or C&K Valves - Failure to close on open hole through
Loss of Function
151 2.1.1.7 Control blind-shear rams or annular - Close and seal on open hole and 9 3 2 54
(general)
Systems allow volumetric well control operations on demand (linked to
1.2.1.2)

2650788-DFMECA-2-D2 C-10
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
HPU - Surface
Loss of Function to close on open hole through blind-shear rams or annular - Close
152 2.1.1.7 Control 9 3 2 54
(general) and seal on open hole and allow volumetric well control
Systems
operations on demand (linked to 1.2.1.4)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Loss of Function
153 2.1.1.7 Control to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 48
(general)
Systems (linked to 1.3.1.2)
HPU - Surface Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
Loss of Function
154 2.1.1.7 Control Failure to maintain stripping pressure - Strip the drill string using 8 3 2 48
(general)
Systems the annular BOP(s) (linked to 1.3.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Loss of Function
155 2.1.1.7 Control Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 3 2 48
(general)
Systems BOP and control the wellbore (linked to 1.4.1.2)
HPU - Surface Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
Loss of Function
156 2.1.1.7 Control maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 3 2 48
(general)
Systems and control the wellbore (linked to 1.4.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
157 2.1.1.7 Control Failure to close - Controlled operation - Shear the drill pipe and 6 3 2 36
(general)
Systems seal the wellbore (linked to 1.5.1.2)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
Loss of Function
158 2.1.1.7 Control operation - Shear the drill pipe and seal the wellbore (linked to 6 3 2 36
(general)
Systems 1.5.2.1)
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
159 2.1.1.7 Control wellbore - Controlled operation - Shear the drill pipe and seal the 6 3 2 36
(general)
Systems wellbore (linked to 1.5.3.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
160 2.1.1.7 Control seal the wellbore - Controlled operation - Shear the drill pipe and 6 3 2 36
(general)
Systems seal the wellbore (linked to 1.5.3.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
Loss of Function
161 2.1.1.7 Control Controlled operation - Shear the drill pipe and seal the wellbore 6 3 2 36
(general)
Systems (linked to 1.5.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
162 2.1.1.7 Control Failure to close - Emergency Operation - Auto-Shear - Shear the 9 3 2 54
(general)
Systems drill pipe and seal the wellbore (linked to 1.6.2.1)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
163 2.1.1.7 Control Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
(general)
Systems - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
HPU - Surface Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
Loss of Function
164 2.1.1.7 Control Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 2 54
(general)
Systems (linked to 1.6.3.2)

2650788-DFMECA-2-D2 C-11
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
HPU - Surface Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
165 2.1.1.7 Control wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 3 2 60
(general)
Systems pipe and seal the wellbore (linked to 1.6.4.1)
HPU - Surface Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
166 2.1.1.7 Control seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 3 2 60
(general)
Systems drill pipe and seal the wellbore (linked to 1.6.4.2)
HPU - Surface Unintentional Opening - Unintentional closing / opening -
Loss of Function
167 2.1.1.7 Control Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 2 60
(general)
Systems the wellbore (linked to 1.6.5.2)
HPU - Surface Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Loss of Function
168 2.1.1.7 Control LMRP - Emergency Operation: EDS - Disconnect from the stack 9 3 2 54
(general)
Systems (linked to 1.7.2.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP -
Loss of Function
169 2.1.1.7 Control Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
(general)
Systems 1.7.2.4)
HPU - Surface Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Loss of Function
170 2.1.1.7 Control LMRP - Controlled Operation - Disconnect the LMRP from the 7 3 2 42
(general)
Systems Lower BOP stack (linked to 1.8.1.3)
HPU - Surface Moves too slowly to disconnect - Failure to disconnect the LMRP
Loss of Function
171 2.1.1.7 Control - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
(general)
Systems BOP stack (linked to 1.8.1.4)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
172 2.1.1.7 Control Failure to circulate - Circulate the well after drill pipe disconnect 6 3 2 36
(general)
Systems (linked to 1.9.1.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
173 2.1.1.7 Control Failure to seal wellbore - Circulate the well after drill pipe 6 3 2 36
(general)
Systems disconnect (linked to 1.9.4.2)
HPU - Surface Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
174 2.1.1.7 Control Failure to circulate - Circulate across the BOP stack to remove 10 3 2 60
(general)
Systems trapped gas (linked to 1.10.1.2)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
HPU - Surface
Loss of Function Shear Ram - Failure to close on open hole through blind-shear
175 2.1.1.7 Control 10 3 2 60
(general) rams or annular - Close and seal on open hole and allow
Systems
volumetric well control operations on demand (linked to 1.2.1.5)
Power - Failure to Provide Control Signal to Annular or C&K Valves When
Loss of Power (UPS
Surface Demanded - Failure to close on drill pipe through annular(s) -
186 2.1.2.1 Shuts down with 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
power degradation)
Systems (linked to 1.1.1.1)
Power - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Loss of Power (UPS
Surface When Demanded - Failure to close on drill pipe through pipe rams
187 2.1.2.1 Shuts down with 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
power degradation)
Systems (linked to 1.1.2.1)

2650788-DFMECA-2-D2 C-12
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Power -
Loss of Power (UPS Unintentional Operation - Unintentional closing / opening - Close
Surface
188 2.1.2.1 Shuts down with and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
power degradation) to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Power -
Loss of Power (UPS C&K Valves When Demanded - Failure to close on open hole
Surface
189 2.1.2.1 Shuts down with through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
power degradation) hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Power -
Loss of Power (UPS Unintentional Closing - Unintentional closing / opening - Close
Surface
190 2.1.2.1 Shuts down with and seal on open hole and allow volumetric well control 6 2 3 36
Control
power degradation) operations on demand (linked to 1.2.2.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Control Signal to Annulars When Demanded -
Surface
191 2.1.2.1 Shuts down with Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
power degradation) BOP(s) (linked to 1.3.1.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Control Signal to Hang-off Ram When
Surface
192 2.1.2.1 Shuts down with Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
power degradation) pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Control Signal to Shear Ram When Demanded
Surface
193 2.1.2.1 Shuts down with - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
power degradation) seal the wellbore (linked to 1.5.1.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Control Signal - Failure to Arm - Emergency
Surface
194 2.1.2.1 Shuts down with Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
power degradation) (linked to 1.6.1.1)
Systems
Power -
Loss of Power (UPS Failure to provide control signal, when demanded - Failure to
Surface
195 2.1.2.1 Shuts down with receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
power degradation) emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Disconnect Signal (automatically) - Failure to
Surface
196 2.1.2.1 Shuts down with disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
power degradation) from the stack (linked to 1.7.2.1)
Systems
Power - Failure to Provide Disconnect Signal (automatically or manually) -
Loss of Power (UPS
Surface Failure to disconnect the LMRP - Controlled Operation -
197 2.1.2.1 Shuts down with 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
power degradation)
Systems 1.8.1.1)
Power -
Loss of Power (UPS Failure to Provide Control Signal to C&K Valves when Demanded
Surface
198 2.1.2.1 Shuts down with - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
power degradation) (linked to 1.9.1.1)
Systems

2650788-DFMECA-2-D2 C-13
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Power -
Loss of Power (UPS Failure to Provide Control Signal to C&K Valves when Demanded
Surface
199 2.1.2.1 Shuts down with - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
power degradation) disconnect (linked to 1.9.4.1)
Systems
Power -
Loss of Power (UPS Failure to Provide Control Signal to C&K Valves when Demanded
Surface
200 2.1.2.1 Shuts down with - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
power degradation) trapped gas (linked to 1.10.1.1)
Systems
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface
209 2.1.2.2 Fails with no output and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface
210 2.1.2.2 Fails with no output and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface Erratic output
213 2.1.2.3 and seal on the drill pipe and allow circulation on demand (linked 3 2 1 6
Control (Erratic, Intermittent)
to 1.1.5.1)
Systems
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface Erratic output
214 2.1.2.3 and seal on open hole and allow volumetric well control 3 2 1 6
Control (Erratic, Intermittent)
operations on demand (linked to 1.2.2.1)
Systems
Power - Failure to Provide Control Signal to Annular or C&K Valves When
Surface Demanded - Failure to close on drill pipe through annular(s) -
224 2.1.2.5 Electrical Short 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Power - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Surface When Demanded - Failure to close on drill pipe through pipe rams
225 2.1.2.5 Electrical Short 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface
226 2.1.2.5 Electrical Short and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Power -
C&K Valves When Demanded - Failure to close on open hole
Surface
227 2.1.2.5 Electrical Short through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface
228 2.1.2.5 Electrical Short and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems

2650788-DFMECA-2-D2 C-14
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Power -
Failure to Provide Control Signal to Annulars When Demanded -
Surface
229 2.1.2.5 Electrical Short Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
BOP(s) (linked to 1.3.1.1)
Systems
Power -
Failure to Provide Control Signal to Hang-off Ram When
Surface
230 2.1.2.5 Electrical Short Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Power -
Failure to Provide Control Signal to Shear Ram When Demanded
Surface
231 2.1.2.5 Electrical Short - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
seal the wellbore (linked to 1.5.1.1)
Systems
Power -
Failure to Provide Control Signal - Failure to Arm - Emergency
Surface
232 2.1.2.5 Electrical Short Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
(linked to 1.6.1.1)
Systems
Power -
Failure to provide control signal, when demanded - Failure to
Surface
233 2.1.2.5 Electrical Short receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Power -
Failure to Provide Disconnect Signal (automatically) - Failure to
Surface
234 2.1.2.5 Electrical Short disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
from the stack (linked to 1.7.2.1)
Systems
Power - Failure to Provide Disconnect Signal (automatically or manually) -
Surface Failure to disconnect the LMRP - Controlled Operation -
235 2.1.2.5 Electrical Short 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Power -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
236 2.1.2.5 Electrical Short - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
(linked to 1.9.1.1)
Systems
Power -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
237 2.1.2.5 Electrical Short - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
disconnect (linked to 1.9.4.1)
Systems
Power -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
238 2.1.2.5 Electrical Short - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
trapped gas (linked to 1.10.1.1)
Systems
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface
247 2.1.2.6 Loss of Function and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems

2650788-DFMECA-2-D2 C-15
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface
248 2.1.2.6 Loss of Function and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface
250 2.1.2.7 Ground Faults and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface
251 2.1.2.7 Ground Faults and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Power -
Unintentional Operation - Unintentional closing / opening - Close
Surface Loss of subsea
253 2.1.2.8 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control transformer
to 1.1.5.1)
Systems
Power -
Unintentional Closing - Unintentional closing / opening - Close
Surface Loss of subsea
254 2.1.2.8 and seal on open hole and allow volumetric well control 6 2 3 36
Control transformer
operations on demand (linked to 1.2.2.1)
Systems
MUX System - Failure to Provide Control Signal to Annular or C&K Valves When
Fails with no output
Surface Demanded - Failure to close on drill pipe through annular(s) -
262 2.1.3.2 signal/ 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
communication
Systems (linked to 1.1.1.1)
MUX System - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Fails with no output
Surface When Demanded - Failure to close on drill pipe through pipe rams
263 2.1.3.2 signal/ 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
communication
Systems (linked to 1.1.2.1)
MUX System -
Fails with no output Unintentional Operation - Unintentional closing / opening - Close
Surface
264 2.1.3.2 signal/ and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
communication to 1.1.5.1)
Systems
MUX System -
Fails with no output Failure to provide control signal, when demanded - Failure to
Surface
265 2.1.3.2 signal/ receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
communication emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
MUX System -
Fails with no output C&K Valves When Demanded - Failure to close on open hole
Surface
266 2.1.3.2 signal/ through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
communication hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
MUX System -
Fails with no output Unintentional Closing - Unintentional closing / opening - Close
Surface
267 2.1.3.2 signal/ and seal on open hole and allow volumetric well control 6 2 3 36
Control
communication operations on demand (linked to 1.2.2.1)
Systems

2650788-DFMECA-2-D2 C-16
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Fails with no output Failure to Provide Control Signal to Annulars When Demanded -
Surface
268 2.1.3.2 signal/ Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
communication BOP(s) (linked to 1.3.1.1)
Systems
MUX System -
Fails with no output Failure to Provide Control Signal to Hang-off Ram When
Surface
269 2.1.3.2 signal/ Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
communication pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
MUX System -
Fails with no output Failure to Provide Control Signal to Shear Ram When Demanded
Surface
270 2.1.3.2 signal/ - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
communication seal the wellbore (linked to 1.5.1.1)
Systems
MUX System -
Fails with no output Failure to Provide Control Signal - Failure to Arm - Emergency
Surface
271 2.1.3.2 signal/ Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
communication (linked to 1.6.1.1)
Systems
MUX System -
Fails with no output Failure to Provide Disconnect Signal (automatically) - Failure to
Surface
272 2.1.3.2 signal/ disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
communication from the stack (linked to 1.7.2.1)
Systems
MUX System - Failure to Provide Disconnect Signal (automatically or manually) -
Fails with no output
Surface Failure to disconnect the LMRP - Controlled Operation -
273 2.1.3.2 signal/ 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
communication
Systems 1.8.1.1)
MUX System -
Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
Surface
274 2.1.3.2 signal/ - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
communication (linked to 1.9.1.1)
Systems
MUX System -
Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
Surface
275 2.1.3.2 signal/ - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
communication disconnect (linked to 1.9.4.1)
Systems
MUX System -
Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
Surface
276 2.1.3.2 signal/ - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
communication trapped gas (linked to 1.10.1.1)
Systems
MUX System - Failure to Provide Control Signal to Annular or C&K Valves When
Surface Erratic output Demanded - Failure to close on drill pipe through annular(s) -
280 2.1.3.4 9 2 1 18
Control (Network) Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
MUX System - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Surface Erratic output When Demanded - Failure to close on drill pipe through pipe rams
281 2.1.3.4 9 2 4 72
Control (Network) - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)

2650788-DFMECA-2-D2 C-17
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Unintentional Operation - Unintentional closing / opening - Close
Surface Erratic output
282 2.1.3.4 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control (Network)
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
MUX System -
C&K Valves When Demanded - Failure to close on open hole
Surface Erratic output
283 2.1.3.4 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control (Network)
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
MUX System -
Unintentional Closing - Unintentional closing / opening - Close
Surface Erratic output
284 2.1.3.4 and seal on open hole and allow volumetric well control 6 2 3 36
Control (Network)
operations on demand (linked to 1.2.2.1)
Systems
MUX System -
Failure to Provide Control Signal to Annulars When Demanded -
Surface Erratic output
285 2.1.3.4 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control (Network)
BOP(s) (linked to 1.3.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Hang-off Ram When
Surface Erratic output
286 2.1.3.4 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control (Network)
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Shear Ram When Demanded
Surface Erratic output
287 2.1.3.4 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control (Network)
seal the wellbore (linked to 1.5.1.1)
Systems
MUX System -
Failure to Provide Control Signal - Failure to Arm - Emergency
Surface Erratic output
288 2.1.3.4 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control (Network)
(linked to 1.6.1.1)
Systems
MUX System -
Failure to provide control signal, when demanded - Failure to
Surface Erratic output
289 2.1.3.4 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control (Network)
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
MUX System -
Failure to Provide Disconnect Signal (automatically) - Failure to
Surface Erratic output
290 2.1.3.4 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control (Network)
from the stack (linked to 1.7.2.1)
Systems
MUX System - Failure to Provide Disconnect Signal (automatically or manually) -
Surface Erratic output Failure to disconnect the LMRP - Controlled Operation -
291 2.1.3.4 9 2 1 18
Control (Network) Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Erratic output
292 2.1.3.4 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control (Network)
(linked to 1.9.1.1)
Systems

2650788-DFMECA-2-D2 C-18
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Erratic output
293 2.1.3.4 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control (Network)
disconnect (linked to 1.9.4.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Erratic output
294 2.1.3.4 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control (Network)
trapped gas (linked to 1.10.1.1)
Systems
MUX System -
Failure to provide control signal, when demanded - Failure to
Surface Fails to respond to
307 2.1.3.5 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control input
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
MUX System - Failure to Provide Control Signal to Annular or C&K Valves When
Surface Fails to respond to Demanded - Failure to close on drill pipe through annular(s) -
308 2.1.3.5 9 2 1 18
Control input Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
MUX System - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Surface Fails to respond to When Demanded - Failure to close on drill pipe through pipe rams
309 2.1.3.5 9 2 4 72
Control input - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
MUX System -
Unintentional Operation - Unintentional closing / opening - Close
Surface Fails to respond to
310 2.1.3.5 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control input
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
MUX System -
C&K Valves When Demanded - Failure to close on open hole
Surface Fails to respond to
311 2.1.3.5 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control input
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
MUX System -
Unintentional Closing - Unintentional closing / opening - Close
Surface Fails to respond to
312 2.1.3.5 and seal on open hole and allow volumetric well control 6 2 3 36
Control input
operations on demand (linked to 1.2.2.1)
Systems
MUX System -
Failure to Provide Control Signal to Annulars When Demanded -
Surface Fails to respond to
313 2.1.3.5 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control input
BOP(s) (linked to 1.3.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Hang-off Ram When
Surface Fails to respond to
314 2.1.3.5 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control input
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Shear Ram When Demanded
Surface Fails to respond to
315 2.1.3.5 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control input
seal the wellbore (linked to 1.5.1.1)
Systems

2650788-DFMECA-2-D2 C-19
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Failure to Provide Control Signal - Failure to Arm - Emergency
Surface Fails to respond to
316 2.1.3.5 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control input
(linked to 1.6.1.1)
Systems
MUX System -
Failure to Provide Disconnect Signal (automatically) - Failure to
Surface Fails to respond to
317 2.1.3.5 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control input
from the stack (linked to 1.7.2.1)
Systems
MUX System - Failure to Provide Disconnect Signal (automatically or manually) -
Surface Fails to respond to Failure to disconnect the LMRP - Controlled Operation -
318 2.1.3.5 9 2 1 18
Control input Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Fails to respond to
319 2.1.3.5 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control input
(linked to 1.9.1.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Fails to respond to
320 2.1.3.5 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control input
disconnect (linked to 1.9.4.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Fails to respond to
321 2.1.3.5 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control input
trapped gas (linked to 1.10.1.1)
Systems
MUX System - Failure to Provide Control Signal to Annular or C&K Valves When
Surface Demanded - Failure to close on drill pipe through annular(s) -
326 2.1.3.7 Short 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
MUX System - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Surface When Demanded - Failure to close on drill pipe through pipe rams
327 2.1.3.7 Short 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
MUX System -
Unintentional Operation - Unintentional closing / opening - Close
Surface
328 2.1.3.7 Short and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
MUX System -
C&K Valves When Demanded - Failure to close on open hole
Surface
329 2.1.3.7 Short through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
MUX System -
Unintentional Closing - Unintentional closing / opening - Close
Surface
330 2.1.3.7 Short and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems

2650788-DFMECA-2-D2 C-20
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Failure to Provide Control Signal to Annulars When Demanded -
Surface
331 2.1.3.7 Short Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
BOP(s) (linked to 1.3.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Hang-off Ram When
Surface
332 2.1.3.7 Short Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
MUX System -
Failure to Provide Control Signal - Failure to Arm - Emergency
Surface
333 2.1.3.7 Short Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
(linked to 1.6.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Shear Ram When Demanded
Surface
334 2.1.3.7 Short - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
seal the wellbore (linked to 1.5.1.1)
Systems
MUX System -
Failure to provide control signal, when demanded - Failure to
Surface
335 2.1.3.7 Short receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
MUX System -
Failure to Provide Disconnect Signal (automatically) - Failure to
Surface
336 2.1.3.7 Short disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
from the stack (linked to 1.7.2.1)
Systems
MUX System - Failure to Provide Disconnect Signal (automatically or manually) -
Surface Failure to disconnect the LMRP - Controlled Operation -
337 2.1.3.7 Short 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
338 2.1.3.7 Short - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
(linked to 1.9.1.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
339 2.1.3.7 Short - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
disconnect (linked to 1.9.4.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface
340 2.1.3.7 Short - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
trapped gas (linked to 1.10.1.1)
Systems
MUX System - Failure to Provide Control Signal to Annular or C&K Valves When
Surface Loss of function Demanded - Failure to close on drill pipe through annular(s) -
344 2.1.3.8 9 2 1 18
Control (general) Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)

2650788-DFMECA-2-D2 C-21
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System - Failure to Provide Control Signal to Pipe Ram or C&K Valves
Surface Loss of function When Demanded - Failure to close on drill pipe through pipe rams
345 2.1.3.8 9 2 4 72
Control (general) - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
MUX System -
Unintentional Operation - Unintentional closing / opening - Close
Surface Loss of function
346 2.1.3.8 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control (general)
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
MUX System -
C&K Valves When Demanded - Failure to close on open hole
Surface Loss of function
347 2.1.3.8 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control (general)
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
MUX System -
Unintentional Closing - Unintentional closing / opening - Close
Surface Loss of function
348 2.1.3.8 and seal on open hole and allow volumetric well control 6 2 3 36
Control (general)
operations on demand (linked to 1.2.2.1)
Systems
MUX System -
Failure to Provide Control Signal to Annulars When Demanded -
Surface Loss of function
349 2.1.3.8 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control (general)
BOP(s) (linked to 1.3.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Hang-off Ram When
Surface Loss of function
350 2.1.3.8 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control (general)
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
MUX System -
Failure to Provide Control Signal to Shear Ram When Demanded
Surface Loss of function
351 2.1.3.8 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control (general)
seal the wellbore (linked to 1.5.1.1)
Systems
MUX System -
Failure to Provide Control Signal - Failure to Arm - Emergency
Surface Loss of function
352 2.1.3.8 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control (general)
(linked to 1.6.1.1)
Systems
MUX System -
Failure to provide control signal, when demanded - Failure to
Surface Loss of function
353 2.1.3.8 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control (general)
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
MUX System -
Failure to Provide Disconnect Signal (automatically) - Failure to
Surface Loss of function
354 2.1.3.8 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control (general)
from the stack (linked to 1.7.2.1)
Systems
MUX System - Failure to Provide Disconnect Signal (automatically or manually) -
Surface Loss of function Failure to disconnect the LMRP - Controlled Operation -
355 2.1.3.8 9 2 1 18
Control (general) Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)

2650788-DFMECA-2-D2 C-22
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Loss of function
356 2.1.3.8 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control (general)
(linked to 1.9.1.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Loss of function
357 2.1.3.8 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control (general)
disconnect (linked to 1.9.4.1)
Systems
MUX System -
Failure to Provide Control Signal to C&K Valves when Demanded
Surface Loss of function
358 2.1.3.8 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control (general)
trapped gas (linked to 1.10.1.1)
Systems
MUX System -
Unintentional Operation - Unintentional closing / opening - Close
Surface
362 2.1.3.9 Mechanical Failure and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
MUX System -
Unintentional Closing - Unintentional closing / opening - Close
Surface
363 2.1.3.9 Mechanical Failure and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Hydraulic
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Supply -
External Leak/ Valves When Demanded - Failure to close on drill pipe through
370 2.1.4.1 Surface 8 3 2 36
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Hydraulic
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Supply -
External Leak/ Valves When Demanded - Failure to close on drill pipe through
371 2.1.4.1 Surface 8 2 3 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Annular -
Supply -
External Leak/ Failure to seal or partial seal on drill pipe through annular(s) -
372 2.1.4.1 Surface 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.3.2)
Systems
Hydraulic
Supply - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak/
373 2.1.4.1 Surface seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Supply -
External Leak/ Failure to seal or partial seal on drill pipe through pipe rams -
374 2.1.4.1 Surface 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems

2650788-DFMECA-2-D2 C-23
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply - Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak/
375 2.1.4.1 Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Control 1.1.7.1)
Systems
Hydraulic
Supply -
External Leak/ External Leak - Loss of containment - Close and seal on the drill
376 2.1.4.1 Surface 8 3 3 72
Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Control
Systems
Hydraulic Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Supply - Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
377 2.1.4.1 Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Hydraulic
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Supply -
External Leak/ to close on open hole through blind-shear rams or annular - Close
378 2.1.4.1 Surface 9 1 2 18
Rupture and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Supply -
External Leak/ Shear Ram - Failure to close on open hole through blind-shear
379 2.1.4.1 Surface 9 1 2 18
Rupture rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak/
380 2.1.4.1 Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Rupture
Control (linked to 1.3.1.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak/
381 2.1.4.1 Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Rupture
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Hydraulic
Supply - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
External Leak/
382 2.1.4.1 Surface maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Rupture
Control and control the wellbore (linked to 1.4.2.1)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
383 2.1.4.1 Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Rupture
Control seal the wellbore (linked to 1.5.1.2)
Systems

2650788-DFMECA-2-D2 C-24
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
384 2.1.4.1 Surface operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Control 1.5.2.1)
Systems
Hydraulic
Supply - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
385 2.1.4.1 Surface wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Control wellbore (linked to 1.5.3.1)
Systems
Hydraulic
Supply - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
386 2.1.4.1 Surface seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Control seal the wellbore (linked to 1.5.3.2)
Systems
Hydraulic
Supply - Unintentional Opening - Unintentional closing / opening -
External Leak/
387 2.1.4.1 Surface Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Rupture
Control (linked to 1.5.4.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
388 2.1.4.1 Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
389 2.1.4.1 Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Hydraulic
Supply - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
390 2.1.4.1 Surface Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Control (linked to 1.6.3.2)
Systems
Hydraulic
Supply - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
391 2.1.4.1 Surface wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Hydraulic
Supply - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
392 2.1.4.1 Surface seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems

2650788-DFMECA-2-D2 C-25
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply - Unintentional Opening - Unintentional closing / opening -
External Leak/
393 2.1.4.1 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Rupture
Control the wellbore (linked to 1.6.5.2)
Systems
Hydraulic
Supply - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
394 2.1.4.1 Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Control (linked to 1.7.2.3)
Systems
Hydraulic
Supply - Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak/
395 2.1.4.1 Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Control 1.7.2.4)
Systems
Hydraulic
Supply - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
396 2.1.4.1 Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Hydraulic
Supply - Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
397 2.1.4.1 Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Control BOP stack (linked to 1.8.1.4)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
398 2.1.4.1 Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Rupture
Control (linked to 1.9.1.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
399 2.1.4.1 Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Rupture
Control disconnect (linked to 1.9.4.2)
Systems
Hydraulic
Supply -
External Leak/ External Leak - Loss of containment - Circulate the well after drill
400 2.1.4.1 Surface 8 3 3 72
Rupture pipe disconnect (linked to 1.9.5.1)
Control
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
401 2.1.4.1 Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Rupture
Control trapped gas (linked to 1.10.1.2)
Systems

2650788-DFMECA-2-D2 C-26
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply -
External Leak/ External Leak - Loss of containment - Circulate across the BOP
402 2.1.4.1 Surface 8 3 3 72
Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Control
Systems
Hydraulic
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Supply -
Loss of Function Valves When Demanded - Failure to close on drill pipe through
411 2.1.4.7 Surface 8 3 2 36
(general) annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Hydraulic
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Supply -
Loss of Function Valves When Demanded - Failure to close on drill pipe through
412 2.1.4.7 Surface 8 2 3 48
(general) pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Annular -
Supply -
Loss of Function Failure to seal or partial seal on drill pipe through annular(s) -
413 2.1.4.7 Surface 9 2 3 54
(general) Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.3.2)
Systems
Hydraulic
Supply - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
Loss of Function
414 2.1.4.7 Surface seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
(general)
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Supply -
Loss of Function Failure to seal or partial seal on drill pipe through pipe rams -
415 2.1.4.7 Surface 9 2 3 54
(general) Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Hydraulic
Supply - Actuates Too Slowly on Demand - Closes too slowly - Close and
Loss of Function
416 2.1.4.7 Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
(general)
Control 1.1.7.1)
Systems
Hydraulic
Supply -
Loss of Function External Leak - Loss of containment - Close and seal on the drill
417 2.1.4.7 Surface 8 3 3 72
(general) pipe and allow circulation on demand (linked to 1.1.8.1)
Control
Systems
Hydraulic Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Supply - Shear Ram or C&K Valves - Failure to close on open hole through
Loss of Function
418 2.1.4.7 Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
(general)
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)

2650788-DFMECA-2-D2 C-27
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Supply -
Loss of Function to close on open hole through blind-shear rams or annular - Close
419 2.1.4.7 Surface 9 1 2 18
(general) and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems
Hydraulic
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Supply -
Loss of Function Shear Ram - Failure to close on open hole through blind-shear
420 2.1.4.7 Surface 9 1 2 18
(general) rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Loss of Function
421 2.1.4.7 Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
(general)
Control (linked to 1.3.1.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Loss of Function
422 2.1.4.7 Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
(general)
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Hydraulic
Supply - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
Loss of Function
423 2.1.4.7 Surface maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
(general)
Control and control the wellbore (linked to 1.4.2.1)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
424 2.1.4.7 Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
(general)
Control seal the wellbore (linked to 1.5.1.2)
Systems
Hydraulic
Supply - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
Loss of Function
425 2.1.4.7 Surface operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
(general)
Control 1.5.2.1)
Systems
Hydraulic
Supply - Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
426 2.1.4.7 Surface wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
(general)
Control wellbore (linked to 1.5.3.1)
Systems
Hydraulic
Supply - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
427 2.1.4.7 Surface seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
(general)
Control seal the wellbore (linked to 1.5.3.2)
Systems

2650788-DFMECA-2-D2 C-28
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply - Unintentional Opening - Unintentional closing / opening -
Loss of Function
428 2.1.4.7 Surface Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
(general)
Control (linked to 1.5.4.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
429 2.1.4.7 Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
(general)
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
430 2.1.4.7 Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
(general)
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Hydraulic
Supply - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
Loss of Function
431 2.1.4.7 Surface Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
(general)
Control (linked to 1.6.3.2)
Systems
Hydraulic
Supply - Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
432 2.1.4.7 Surface wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
(general)
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Hydraulic
Supply - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
433 2.1.4.7 Surface seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
(general)
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Hydraulic
Supply - Unintentional Opening - Unintentional closing / opening -
Loss of Function
434 2.1.4.7 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
(general)
Control the wellbore (linked to 1.6.5.2)
Systems
Hydraulic
Supply - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Loss of Function
435 2.1.4.7 Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
(general)
Control (linked to 1.7.2.3)
Systems
Hydraulic
Supply - Moves too slowly to disconnect - Failure to disconnect the LMRP -
Loss of Function
436 2.1.4.7 Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
(general)
Control 1.7.2.4)
Systems

2650788-DFMECA-2-D2 C-29
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Loss of Function
437 2.1.4.7 Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
(general)
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Hydraulic
Supply - Moves too slowly to disconnect - Failure to disconnect the LMRP
Loss of Function
438 2.1.4.7 Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
(general)
Control BOP stack (linked to 1.8.1.4)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
439 2.1.4.7 Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
(general)
Control (linked to 1.9.1.2)
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
440 2.1.4.7 Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
(general)
Control disconnect (linked to 1.9.4.2)
Systems
Hydraulic
Supply -
Loss of Function External Leak - Loss of containment - Circulate the well after drill
441 2.1.4.7 Surface 8 3 3 72
(general) pipe disconnect (linked to 1.9.5.1)
Control
Systems
Hydraulic
Supply - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
442 2.1.4.7 Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
(general)
Control trapped gas (linked to 1.10.1.2)
Systems
Hydraulic
Supply -
Loss of Function External Leak - Loss of containment - Circulate across the BOP
443 2.1.4.7 Surface 8 3 3 72
(general) stack to remove trapped gas - (linked to 1.10.4.1)
Control
Systems
Control Panels Failure to Provide Control Signal to Annular or C&K Valves When
- Surface Loss of, or Degraded Demanded - Failure to close on drill pipe through annular(s) -
450 2.1.5.1 9 2 1 18
Control Power Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Control Panels Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface Loss of, or Degraded When Demanded - Failure to close on drill pipe through pipe rams
451 2.1.5.1 9 2 4 72
Control Power - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
Control Panels
Unintentional Operation - Unintentional closing / opening - Close
- Surface Loss of, or Degraded
452 2.1.5.1 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control Power
to 1.1.5.1)
Systems

2650788-DFMECA-2-D2 C-30
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels
C&K Valves When Demanded - Failure to close on open hole
- Surface Loss of, or Degraded
453 2.1.5.1 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control Power
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Control Panels
Unintentional Closing - Unintentional closing / opening - Close
- Surface Loss of, or Degraded
454 2.1.5.1 and seal on open hole and allow volumetric well control 6 2 3 36
Control Power
operations on demand (linked to 1.2.2.1)
Systems
Control Panels
Failure to Provide Control Signal to Annulars When Demanded -
- Surface Loss of, or Degraded
455 2.1.5.1 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control Power
BOP(s) (linked to 1.3.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Hang-off Ram When
- Surface Loss of, or Degraded
456 2.1.5.1 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control Power
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface Loss of, or Degraded
457 2.1.5.1 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control Power
seal the wellbore (linked to 1.5.1.1)
Systems
Control Panels
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface Loss of, or Degraded
458 2.1.5.1 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control Power
(linked to 1.6.1.1)
Systems
Control Panels
Failure to provide control signal, when demanded - Failure to
- Surface Loss of, or Degraded
459 2.1.5.1 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control Power
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Control Panels
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface Loss of, or Degraded
460 2.1.5.1 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control Power
from the stack (linked to 1.7.2.1)
Systems
Control Panels Failure to Provide Disconnect Signal (automatically or manually) -
- Surface Loss of, or Degraded Failure to disconnect the LMRP - Controlled Operation -
461 2.1.5.1 9 2 1 18
Control Power Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of, or Degraded
462 2.1.5.1 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control Power
(linked to 1.9.1.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of, or Degraded
463 2.1.5.1 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control Power
disconnect (linked to 1.9.4.1)
Systems

2650788-DFMECA-2-D2 C-31
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of, or Degraded
464 2.1.5.1 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control Power
trapped gas (linked to 1.10.1.1)
Systems
Control Panels Fails to respond (with Failure to Provide Control Signal to Annular or C&K Valves When
- Surface no output signal/ Demanded - Failure to close on drill pipe through annular(s) -
468 2.1.5.2 9 2 1 18
Control communication or to Close and seal on the drill pipe and allow circulation on demand
Systems input) (linked to 1.1.1.1)
Control Panels Fails to respond (with Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface no output signal/ When Demanded - Failure to close on drill pipe through pipe rams
469 2.1.5.2 9 2 4 72
Control communication or to - Close and seal on the drill pipe and allow circulation on demand
Systems input) (linked to 1.1.2.1)
Control Panels Fails to respond (with
Unintentional Operation - Unintentional closing / opening - Close
- Surface no output signal/
470 2.1.5.2 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control communication or to
to 1.1.5.1)
Systems input)
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels Fails to respond (with
C&K Valves When Demanded - Failure to close on open hole
- Surface no output signal/
471 2.1.5.2 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control communication or to
hole and allow volumetric well control operations on demand
Systems input)
(linked to 1.2.1.1)
Control Panels Fails to respond (with
Unintentional Closing - Unintentional closing / opening - Close
- Surface no output signal/
472 2.1.5.2 and seal on open hole and allow volumetric well control 6 2 3 36
Control communication or to
operations on demand (linked to 1.2.2.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal to Annulars When Demanded -
- Surface no output signal/
473 2.1.5.2 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control communication or to
BOP(s) (linked to 1.3.1.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal to Hang-off Ram When
- Surface no output signal/
474 2.1.5.2 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control communication or to
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface no output signal/
475 2.1.5.2 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control communication or to
seal the wellbore (linked to 1.5.1.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface no output signal/
476 2.1.5.2 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control communication or to
(linked to 1.6.1.1)
Systems input)
Control Panels Fails to respond (with
Failure to provide control signal, when demanded - Failure to
- Surface no output signal/
477 2.1.5.2 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control communication or to
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems input)

2650788-DFMECA-2-D2 C-32
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels Fails to respond (with
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface no output signal/
478 2.1.5.2 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control communication or to
from the stack (linked to 1.7.2.1)
Systems input)
Control Panels Fails to respond (with Failure to Provide Disconnect Signal (automatically or manually) -
- Surface no output signal/ Failure to disconnect the LMRP - Controlled Operation -
479 2.1.5.2 9 2 1 18
Control communication or to Disconnect the LMRP from the Lower BOP stack (linked to
Systems input) 1.8.1.1)
Control Panels Fails to respond (with
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface no output signal/
480 2.1.5.2 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control communication or to
(linked to 1.9.1.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface no output signal/
481 2.1.5.2 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control communication or to
disconnect (linked to 1.9.4.1)
Systems input)
Control Panels Fails to respond (with
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface no output signal/
482 2.1.5.2 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control communication or to
trapped gas (linked to 1.10.1.1)
Systems input)
Control Panels Failure to Provide Control Signal to Annular or C&K Valves When
- Surface Demanded - Failure to close on drill pipe through annular(s) -
485 2.1.5.4 Erratic output 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Control Panels Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface When Demanded - Failure to close on drill pipe through pipe rams
486 2.1.5.4 Erratic output 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
Control Panels
Unintentional Operation - Unintentional closing / opening - Close
- Surface
487 2.1.5.4 Erratic output and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels
C&K Valves When Demanded - Failure to close on open hole
- Surface
488 2.1.5.4 Erratic output through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Control Panels
Unintentional Closing - Unintentional closing / opening - Close
- Surface
489 2.1.5.4 Erratic output and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Control Panels
Failure to Provide Control Signal to Annulars When Demanded -
- Surface
490 2.1.5.4 Erratic output Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
BOP(s) (linked to 1.3.1.1)
Systems

2650788-DFMECA-2-D2 C-33
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Failure to Provide Control Signal to Hang-off Ram When
- Surface
491 2.1.5.4 Erratic output Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface
492 2.1.5.4 Erratic output - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
seal the wellbore (linked to 1.5.1.1)
Systems
Control Panels
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface
493 2.1.5.4 Erratic output Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
(linked to 1.6.1.1)
Systems
Control Panels
Failure to provide control signal, when demanded - Failure to
- Surface
494 2.1.5.4 Erratic output receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Control Panels
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface
495 2.1.5.4 Erratic output disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
from the stack (linked to 1.7.2.1)
Systems
Control Panels Failure to Provide Disconnect Signal (automatically or manually) -
- Surface Failure to disconnect the LMRP - Controlled Operation -
496 2.1.5.4 Erratic output 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
497 2.1.5.4 Erratic output - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
(linked to 1.9.1.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
498 2.1.5.4 Erratic output - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
disconnect (linked to 1.9.4.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
499 2.1.5.4 Erratic output - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
trapped gas (linked to 1.10.1.1)
Systems
Control Panels Failure to Provide Control Signal to Annular or C&K Valves When
- Surface Fails to respond to Demanded - Failure to close on drill pipe through annular(s) -
500 2.1.5.5 9 2 1 18
Control input Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Control Panels Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface Fails to respond to When Demanded - Failure to close on drill pipe through pipe rams
501 2.1.5.5 9 2 4 72
Control input - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)

2650788-DFMECA-2-D2 C-34
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Unintentional Operation - Unintentional closing / opening - Close
- Surface Fails to respond to
502 2.1.5.5 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control input
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels
C&K Valves When Demanded - Failure to close on open hole
- Surface Fails to respond to
503 2.1.5.5 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control input
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Control Panels
Unintentional Closing - Unintentional closing / opening - Close
- Surface Fails to respond to
504 2.1.5.5 and seal on open hole and allow volumetric well control 6 2 3 36
Control input
operations on demand (linked to 1.2.2.1)
Systems
Control Panels
Failure to Provide Control Signal to Annulars When Demanded -
- Surface Fails to respond to
505 2.1.5.5 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control input
BOP(s) (linked to 1.3.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Hang-off Ram When
- Surface Fails to respond to
506 2.1.5.5 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control input
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface Fails to respond to
507 2.1.5.5 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control input
seal the wellbore (linked to 1.5.1.1)
Systems
Control Panels
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface Fails to respond to
508 2.1.5.5 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control input
(linked to 1.6.1.1)
Systems
Control Panels
Failure to provide control signal, when demanded - Failure to
- Surface Fails to respond to
509 2.1.5.5 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control input
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Control Panels
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface Fails to respond to
510 2.1.5.5 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control input
from the stack (linked to 1.7.2.1)
Systems
Control Panels Failure to Provide Disconnect Signal (automatically or manually) -
- Surface Fails to respond to Failure to disconnect the LMRP - Controlled Operation -
511 2.1.5.5 9 2 1 18
Control input Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Fails to respond to
512 2.1.5.5 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control input
(linked to 1.9.1.1)
Systems

2650788-DFMECA-2-D2 C-35
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Fails to respond to
513 2.1.5.5 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control input
disconnect (linked to 1.9.4.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Fails to respond to
514 2.1.5.5 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control input
trapped gas (linked to 1.10.1.1)
Systems
Control Panels
Failure to provide control signal, when demanded - Failure to
- Surface
524 2.1.5.7 Short receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Control Panels Failure to Provide Control Signal to Annular or C&K Valves When
- Surface Demanded - Failure to close on drill pipe through annular(s) -
525 2.1.5.7 Short 9 2 1 18
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Control Panels Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface When Demanded - Failure to close on drill pipe through pipe rams
526 2.1.5.7 Short 9 2 4 72
Control - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
Control Panels
Unintentional Operation - Unintentional closing / opening - Close
- Surface
527 2.1.5.7 Short and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels
C&K Valves When Demanded - Failure to close on open hole
- Surface
528 2.1.5.7 Short through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Control Panels
Unintentional Closing - Unintentional closing / opening - Close
- Surface
529 2.1.5.7 Short and seal on open hole and allow volumetric well control 6 2 3 36
Control
operations on demand (linked to 1.2.2.1)
Systems
Control Panels
Failure to Provide Control Signal to Annulars When Demanded -
- Surface
530 2.1.5.7 Short Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control
BOP(s) (linked to 1.3.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Hang-off Ram When
- Surface
531 2.1.5.7 Short Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface
532 2.1.5.7 Short - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control
seal the wellbore (linked to 1.5.1.1)
Systems

2650788-DFMECA-2-D2 C-36
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface
533 2.1.5.7 Short Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control
(linked to 1.6.1.1)
Systems
Control Panels
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface
534 2.1.5.7 Short disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control
from the stack (linked to 1.7.2.1)
Systems
Control Panels Failure to Provide Disconnect Signal (automatically or manually) -
- Surface Failure to disconnect the LMRP - Controlled Operation -
535 2.1.5.7 Short 9 2 1 18
Control Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
536 2.1.5.7 Short - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control
(linked to 1.9.1.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
537 2.1.5.7 Short - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control
disconnect (linked to 1.9.4.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface
538 2.1.5.7 Short - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control
trapped gas (linked to 1.10.1.1)
Systems
Control Panels Failure to Provide Control Signal to Annular or C&K Valves When
- Surface Loss of function Demanded - Failure to close on drill pipe through annular(s) -
542 2.1.5.8 9 2 1 18
Control (general) Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.1.1)
Control Panels Failure to Provide Control Signal to Pipe Ram or C&K Valves
- Surface Loss of function When Demanded - Failure to close on drill pipe through pipe rams
543 2.1.5.8 9 2 4 72
Control (general) - Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.2.1)
Control Panels
Unintentional Operation - Unintentional closing / opening - Close
- Surface Loss of function
544 2.1.5.8 and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Control (general)
to 1.1.5.1)
Systems
Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Control Panels
C&K Valves When Demanded - Failure to close on open hole
- Surface Loss of function
545 2.1.5.8 through blind-shear rams or annular - Close and seal on open 9 2 1 18
Control (general)
hole and allow volumetric well control operations on demand
Systems
(linked to 1.2.1.1)
Control Panels
Unintentional Closing - Unintentional closing / opening - Close
- Surface Loss of function
546 2.1.5.8 and seal on open hole and allow volumetric well control 6 2 3 36
Control (general)
operations on demand (linked to 1.2.2.1)
Systems

2650788-DFMECA-2-D2 C-37
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Control Panels
Failure to Provide Control Signal to Annulars When Demanded -
- Surface Loss of function
547 2.1.5.8 Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Control (general)
BOP(s) (linked to 1.3.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Hang-off Ram When
- Surface Loss of function
548 2.1.5.8 Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Control (general)
pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Systems
Control Panels
Failure to Provide Control Signal to Shear Ram When Demanded
- Surface Loss of function
549 2.1.5.8 - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Control (general)
seal the wellbore (linked to 1.5.1.1)
Systems
Control Panels
Failure to Provide Control Signal - Failure to Arm - Emergency
- Surface Loss of function
550 2.1.5.8 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Control (general)
(linked to 1.6.1.1)
Systems
Control Panels
Failure to provide control signal, when demanded - Failure to
- Surface Loss of function
551 2.1.5.8 receive EDS signal prevents disconnecting from stack during 10 2 1 20
Control (general)
emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Systems
Control Panels
Failure to Provide Disconnect Signal (automatically) - Failure to
- Surface Loss of function
552 2.1.5.8 disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Control (general)
from the stack (linked to 1.7.2.1)
Systems
Control Panels Failure to Provide Disconnect Signal (automatically or manually) -
- Surface Loss of function Failure to disconnect the LMRP - Controlled Operation -
553 2.1.5.8 9 2 1 18
Control (general) Disconnect the LMRP from the Lower BOP stack (linked to
Systems 1.8.1.1)
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of function
554 2.1.5.8 - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Control (general)
(linked to 1.9.1.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of function
555 2.1.5.8 - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Control (general)
disconnect (linked to 1.9.4.1)
Systems
Control Panels
Failure to Provide Control Signal to C&K Valves when Demanded
- Surface Loss of function
556 2.1.5.8 - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Control (general)
trapped gas (linked to 1.10.1.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Surface -
External Leak/ Valves When Demanded - Failure to close on drill pipe through
561 2.1.6.1 Surface 8 3 2 36
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems

2650788-DFMECA-2-D2 C-38
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Surface -
External Leak/ Valves When Demanded - Failure to close on drill pipe through
562 2.1.6.1 Surface 8 2 3 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Accumulators
- Surface - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak/
563 2.1.6.1 Surface seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Surface -
External Leak/ Failure to seal or partial seal on drill pipe through pipe rams -
564 2.1.6.1 Surface 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Accumulators
- Surface - Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak/
565 2.1.6.1 Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Control 1.1.7.1)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
- Surface - Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
566 2.1.6.1 Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Accumulators
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Surface -
External Leak/ to close on open hole through blind-shear rams or annular - Close
567 2.1.6.1 Surface 9 1 2 18
Rupture and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Surface -
External Leak/ Shear Ram - Failure to close on open hole through blind-shear
568 2.1.6.1 Surface 9 1 2 18
Rupture rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak/
569 2.1.6.1 Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Rupture
Control (linked to 1.3.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak/
570 2.1.6.1 Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Rupture
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems

2650788-DFMECA-2-D2 C-39
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
External Leak/
571 2.1.6.1 Surface maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Rupture
Control and control the wellbore (linked to 1.4.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
572 2.1.6.1 Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Rupture
Control seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
573 2.1.6.1 Surface operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Control 1.5.2.1)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
574 2.1.6.1 Surface wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Control wellbore (linked to 1.5.3.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
575 2.1.6.1 Surface seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Control seal the wellbore (linked to 1.5.3.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
External Leak/
576 2.1.6.1 Surface Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Rupture
Control (linked to 1.5.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
577 2.1.6.1 Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
- Surface - Failure to initiate autoshear sequence - Failure to close -
External Leak/
578 2.1.6.1 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 4 4 160
Rupture
Control the wellbore (linked to 1.6.2.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
579 2.1.6.1 Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems

2650788-DFMECA-2-D2 C-40
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
580 2.1.6.1 Surface Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Control (linked to 1.6.3.2)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
581 2.1.6.1 Surface wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
582 2.1.6.1 Surface seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
External Leak/
583 2.1.6.1 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Rupture
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
584 2.1.6.1 Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Control (linked to 1.7.2.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak/
585 2.1.6.1 Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Control 1.7.2.4)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
586 2.1.6.1 Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
587 2.1.6.1 Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Control BOP stack (linked to 1.8.1.4)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
588 2.1.6.1 Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Rupture
Control (linked to 1.9.1.2)
Systems

2650788-DFMECA-2-D2 C-41
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
589 2.1.6.1 Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Rupture
Control disconnect (linked to 1.9.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
590 2.1.6.1 Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Rupture
Control trapped gas (linked to 1.10.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
592 2.1.6.2 Surface Internal Leak 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
593 2.1.6.2 Surface Internal Leak 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Accumulators
- Surface - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
594 2.1.6.2 Surface Internal Leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Surface -
Failure to seal or partial seal on drill pipe through pipe rams -
595 2.1.6.2 Surface Internal Leak 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Accumulators
- Surface - Actuates Too Slowly on Demand - Closes too slowly - Close and
596 2.1.6.2 Surface Internal Leak seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control 1.1.7.1)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
- Surface - Shear Ram or C&K Valves - Failure to close on open hole through
597 2.1.6.2 Surface Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Accumulators
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Surface -
to close on open hole through blind-shear rams or annular - Close
598 2.1.6.2 Surface Internal Leak 9 1 2 18
and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems

2650788-DFMECA-2-D2 C-42
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Surface -
Shear Ram - Failure to close on open hole through blind-shear
599 2.1.6.2 Surface Internal Leak 9 1 2 18
rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
600 2.1.6.2 Surface Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (linked to 1.3.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
601 2.1.6.2 Surface Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
- Surface - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
602 2.1.6.2 Surface Internal Leak maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Control and control the wellbore (linked to 1.4.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
603 2.1.6.2 Surface Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
604 2.1.6.2 Surface Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control 1.5.2.1)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
605 2.1.6.2 Surface Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control wellbore (linked to 1.5.3.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
606 2.1.6.2 Surface Internal Leak seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Control seal the wellbore (linked to 1.5.3.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
607 2.1.6.2 Surface Internal Leak Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Control (linked to 1.5.4.2)
Systems

2650788-DFMECA-2-D2 C-43
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
608 2.1.6.2 Surface Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
- Surface - Failure to initiate autoshear sequence - Failure to close -
609 2.1.6.2 Surface Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 4 4 160
Control the wellbore (linked to 1.6.2.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
610 2.1.6.2 Surface Internal Leak Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
611 2.1.6.2 Surface Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control (linked to 1.6.3.2)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
612 2.1.6.2 Surface Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
613 2.1.6.2 Surface Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
614 2.1.6.2 Surface Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
615 2.1.6.2 Surface Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (linked to 1.7.2.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP -
616 2.1.6.2 Surface Internal Leak Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control 1.7.2.4)
Systems

2650788-DFMECA-2-D2 C-44
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
617 2.1.6.2 Surface Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP
618 2.1.6.2 Surface Internal Leak - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control BOP stack (linked to 1.8.1.4)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
619 2.1.6.2 Surface Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (linked to 1.9.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
620 2.1.6.2 Surface Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control disconnect (linked to 1.9.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
621 2.1.6.2 Surface Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control trapped gas (linked to 1.10.1.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
622 2.1.6.3 Surface Plugged Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 2 60
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
624 2.1.6.4 Surface Mechanical Failure 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
625 2.1.6.4 Surface Mechanical Failure 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Accumulators
- Surface - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
626 2.1.6.4 Surface Mechanical Failure seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems

2650788-DFMECA-2-D2 C-45
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Surface -
Failure to seal or partial seal on drill pipe through pipe rams -
627 2.1.6.4 Surface Mechanical Failure 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Accumulators
- Surface - Actuates Too Slowly on Demand - Closes too slowly - Close and
628 2.1.6.4 Surface Mechanical Failure seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control 1.1.7.1)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
- Surface - Shear Ram or C&K Valves - Failure to close on open hole through
629 2.1.6.4 Surface Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Accumulators
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Surface -
to close on open hole through blind-shear rams or annular - Close
630 2.1.6.4 Surface Mechanical Failure 9 1 2 18
and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Surface -
Shear Ram - Failure to close on open hole through blind-shear
631 2.1.6.4 Surface Mechanical Failure 9 1 2 18
rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
632 2.1.6.4 Surface Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (linked to 1.3.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
633 2.1.6.4 Surface Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
- Surface - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
634 2.1.6.4 Surface Mechanical Failure maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Control and control the wellbore (linked to 1.4.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
635 2.1.6.4 Surface Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control seal the wellbore (linked to 1.5.1.2)
Systems

2650788-DFMECA-2-D2 C-46
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
636 2.1.6.4 Surface Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control 1.5.2.1)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
637 2.1.6.4 Surface Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control wellbore (linked to 1.5.3.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
638 2.1.6.4 Surface Mechanical Failure seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Control seal the wellbore (linked to 1.5.3.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
639 2.1.6.4 Surface Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Control (linked to 1.5.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
640 2.1.6.4 Surface Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
641 2.1.6.4 Surface Mechanical Failure Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
642 2.1.6.4 Surface Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control (linked to 1.6.3.2)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
643 2.1.6.4 Surface Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
644 2.1.6.4 Surface Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems

2650788-DFMECA-2-D2 C-47
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
645 2.1.6.4 Surface Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
646 2.1.6.4 Surface Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (linked to 1.7.2.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP -
647 2.1.6.4 Surface Mechanical Failure Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control 1.7.2.4)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
648 2.1.6.4 Surface Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP
649 2.1.6.4 Surface Mechanical Failure - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control BOP stack (linked to 1.8.1.4)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
650 2.1.6.4 Surface Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (linked to 1.9.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
651 2.1.6.4 Surface Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control disconnect (linked to 1.9.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
652 2.1.6.4 Surface Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control trapped gas (linked to 1.10.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
654 2.1.6.5 Surface Wear 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems

2650788-DFMECA-2-D2 C-48
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Surface -
Valves When Demanded - Failure to close on drill pipe through
655 2.1.6.5 Surface Wear 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Accumulators
- Surface - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
656 2.1.6.5 Surface Wear seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Surface -
Failure to seal or partial seal on drill pipe through pipe rams -
657 2.1.6.5 Surface Wear 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Accumulators
- Surface - Actuates Too Slowly on Demand - Closes too slowly - Close and
658 2.1.6.5 Surface Wear seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control 1.1.7.1)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
- Surface - Shear Ram or C&K Valves - Failure to close on open hole through
659 2.1.6.5 Surface Wear blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Accumulators
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Surface -
to close on open hole through blind-shear rams or annular - Close
660 2.1.6.5 Surface Wear 9 1 2 18
and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Surface -
Shear Ram - Failure to close on open hole through blind-shear
661 2.1.6.5 Surface Wear 9 1 2 18
rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
662 2.1.6.5 Surface Wear to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (linked to 1.3.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
663 2.1.6.5 Surface Wear Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems

2650788-DFMECA-2-D2 C-49
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
664 2.1.6.5 Surface Wear maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Control and control the wellbore (linked to 1.4.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
665 2.1.6.5 Surface Wear Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
666 2.1.6.5 Surface Wear operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control 1.5.2.1)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
667 2.1.6.5 Surface Wear wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control wellbore (linked to 1.5.3.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
668 2.1.6.5 Surface Wear seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Control seal the wellbore (linked to 1.5.3.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
669 2.1.6.5 Surface Wear Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Control (linked to 1.5.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
670 2.1.6.5 Surface Wear Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
- Surface - Failure to initiate autoshear sequence - Failure to close -
671 2.1.6.5 Surface Wear Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 4 4 160
Control the wellbore (linked to 1.6.2.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
672 2.1.6.5 Surface Wear Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems

2650788-DFMECA-2-D2 C-50
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
673 2.1.6.5 Surface Wear Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control (linked to 1.6.3.2)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
674 2.1.6.5 Surface Wear wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
675 2.1.6.5 Surface Wear seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
676 2.1.6.5 Surface Wear Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
677 2.1.6.5 Surface Wear LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (linked to 1.7.2.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP -
678 2.1.6.5 Surface Wear Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control 1.7.2.4)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
679 2.1.6.5 Surface Wear LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP
680 2.1.6.5 Surface Wear - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control BOP stack (linked to 1.8.1.4)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
681 2.1.6.5 Surface Wear Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (linked to 1.9.1.2)
Systems

2650788-DFMECA-2-D2 C-51
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
682 2.1.6.5 Surface Wear Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control disconnect (linked to 1.9.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
683 2.1.6.5 Surface Wear Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control trapped gas (linked to 1.10.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Surface -
Loss of Function Valves When Demanded - Failure to close on drill pipe through
688 2.1.6.7 Surface 8 3 2 36
(general) annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Surface -
Loss of Function Valves When Demanded - Failure to close on drill pipe through
689 2.1.6.7 Surface 8 2 3 48
(general) pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Accumulators
- Surface - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
Loss of Function
690 2.1.6.7 Surface seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
(general)
Control pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Surface -
Loss of Function Failure to seal or partial seal on drill pipe through pipe rams -
691 2.1.6.7 Surface 9 2 3 54
(general) Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Accumulators
- Surface - Actuates Too Slowly on Demand - Closes too slowly - Close and
Loss of Function
692 2.1.6.7 Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
(general)
Control 1.1.7.1)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
- Surface - Shear Ram or C&K Valves - Failure to close on open hole through
Loss of Function
693 2.1.6.7 Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
(general)
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Accumulators
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Surface -
Loss of Function to close on open hole through blind-shear rams or annular - Close
694 2.1.6.7 Surface 9 1 2 18
(general) and seal on open hole and allow volumetric well control
Control
operations on demand (linked to 1.2.1.4)
Systems

2650788-DFMECA-2-D2 C-52
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Surface -
Loss of Function Shear Ram - Failure to close on open hole through blind-shear
695 2.1.6.7 Surface 9 1 2 18
(general) rams or annular - Close and seal on open hole and allow
Control
volumetric well control operations on demand (linked to 1.2.1.5)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Loss of Function
696 2.1.6.7 Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
(general)
Control (linked to 1.3.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Loss of Function
697 2.1.6.7 Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
(general)
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
- Surface - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
Loss of Function
698 2.1.6.7 Surface maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
(general)
Control and control the wellbore (linked to 1.4.2.1)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
699 2.1.6.7 Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
(general)
Control seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
Loss of Function
700 2.1.6.7 Surface operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
(general)
Control 1.5.2.1)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
701 2.1.6.7 Surface wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
(general)
Control wellbore (linked to 1.5.3.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
702 2.1.6.7 Surface seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
(general)
Control seal the wellbore (linked to 1.5.3.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
Loss of Function
703 2.1.6.7 Surface Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
(general)
Control (linked to 1.5.4.2)
Systems

2650788-DFMECA-2-D2 C-53
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
704 2.1.6.7 Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
(general)
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
- Surface - Failure to initiate autoshear sequence - Failure to close -
Loss of Function
705 2.1.6.7 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 4 4 160
(general)
Control the wellbore (linked to 1.6.2.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
706 2.1.6.7 Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
(general)
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
- Surface - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
Loss of Function
707 2.1.6.7 Surface Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
(general)
Control (linked to 1.6.3.2)
Systems
Accumulators
- Surface - Failure of Shear Ram to Seal On Demand - Failure to seal the
Loss of Function
708 2.1.6.7 Surface wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
(general)
Control pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
- Surface - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Loss of Function
709 2.1.6.7 Surface seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
(general)
Control drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
- Surface - Unintentional Opening - Unintentional closing / opening -
Loss of Function
710 2.1.6.7 Surface Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
(general)
Control the wellbore (linked to 1.6.5.2)
Systems
Accumulators
- Surface - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Loss of Function
711 2.1.6.7 Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
(general)
Control (linked to 1.7.2.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP -
Loss of Function
712 2.1.6.7 Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
(general)
Control 1.7.2.4)
Systems

2650788-DFMECA-2-D2 C-54
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
- Surface - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Loss of Function
713 2.1.6.7 Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
(general)
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
- Surface - Moves too slowly to disconnect - Failure to disconnect the LMRP
Loss of Function
714 2.1.6.7 Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
(general)
Control BOP stack (linked to 1.8.1.4)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
715 2.1.6.7 Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
(general)
Control (linked to 1.9.1.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
716 2.1.6.7 Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
(general)
Control disconnect (linked to 1.9.4.2)
Systems
Accumulators
- Surface - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
717 2.1.6.7 Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
(general)
Control trapped gas (linked to 1.10.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Reservoir Unit
External Leak/ Valves When Demanded - Failure to close on drill pipe through
723 2.1.7.1 - Surface 8 3 2 36
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Reservoir Unit
External Leak/ Valves When Demanded - Failure to close on drill pipe through
724 2.1.7.1 - Surface 8 2 3 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Fluid
Reservoir Unit Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak/
725 2.1.7.1 - Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Control 1.1.7.1)
Systems
Fluid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Reservoir Unit Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
726 2.1.7.1 - Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)

2650788-DFMECA-2-D2 C-55
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak/
727 2.1.7.1 - Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Rupture
Control (linked to 1.3.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak/
728 2.1.7.1 - Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Rupture
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
729 2.1.7.1 - Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Rupture
Control seal the wellbore (linked to 1.5.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
730 2.1.7.1 - Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
731 2.1.7.1 - Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Fluid
Reservoir Unit Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
732 2.1.7.1 - Surface Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Control (linked to 1.6.3.2)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
733 2.1.7.1 - Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Control (linked to 1.7.2.3)
Systems
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak/
734 2.1.7.1 - Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Control 1.7.2.4)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
735 2.1.7.1 - Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Control Lower BOP stack (linked to 1.8.1.3)
Systems

2650788-DFMECA-2-D2 C-56
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
736 2.1.7.1 - Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Control BOP stack (linked to 1.8.1.4)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
737 2.1.7.1 - Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Rupture
Control (linked to 1.9.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
738 2.1.7.1 - Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Rupture
Control disconnect (linked to 1.9.4.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
739 2.1.7.1 - Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Rupture
Control trapped gas (linked to 1.10.1.2)
Systems
Fluid
Failure to Maintain Adequate Sealing Pressure on Annular -
Reservoir Unit
Failure to seal or partial seal on drill pipe through annular(s) -
741 2.1.7.2 - Surface Internal Leak 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.3.2)
Systems
Fluid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Reservoir Unit
Failure to seal or partial seal on drill pipe through pipe rams -
742 2.1.7.2 - Surface Internal Leak 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Fluid
Reservoir Unit Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
743 2.1.7.2 - Surface Internal Leak Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Control the annular BOP(s) (linked to 1.3.2.1)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Reservoir Unit
Valves When Demanded - Failure to close on drill pipe through
746 2.1.7.3 - Surface Plugged 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Reservoir Unit
Valves When Demanded - Failure to close on drill pipe through
747 2.1.7.3 - Surface Plugged 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems

2650788-DFMECA-2-D2 C-57
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Actuates Too Slowly on Demand - Closes too slowly - Close and
748 2.1.7.3 - Surface Plugged seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control 1.1.7.1)
Systems
Fluid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Reservoir Unit Shear Ram or C&K Valves - Failure to close on open hole through
749 2.1.7.3 - Surface Plugged blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
750 2.1.7.3 - Surface Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (linked to 1.3.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
751 2.1.7.3 - Surface Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
752 2.1.7.3 - Surface Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control seal the wellbore (linked to 1.5.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
753 2.1.7.3 - Surface Plugged Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
754 2.1.7.3 - Surface Plugged Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
755 2.1.7.3 - Surface Plugged LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (linked to 1.7.2.3)
Systems
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP -
756 2.1.7.3 - Surface Plugged Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control 1.7.2.4)
Systems

2650788-DFMECA-2-D2 C-58
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
757 2.1.7.3 - Surface Plugged LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP
758 2.1.7.3 - Surface Plugged - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control BOP stack (linked to 1.8.1.4)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
759 2.1.7.3 - Surface Plugged Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (linked to 1.9.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
760 2.1.7.3 - Surface Plugged Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control disconnect (linked to 1.9.4.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
761 2.1.7.3 - Surface Plugged Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control trapped gas (linked to 1.10.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Reservoir Unit
Valves When Demanded - Failure to close on drill pipe through
763 2.1.7.4 - Surface Mechanical Failure 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Reservoir Unit
Valves When Demanded - Failure to close on drill pipe through
764 2.1.7.4 - Surface Mechanical Failure 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.2.2)
Systems
Fluid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Reservoir Unit Shear Ram or C&K Valves - Failure to close on open hole through
765 2.1.7.4 - Surface Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
766 2.1.7.4 - Surface Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (linked to 1.3.1.2)
Systems

2650788-DFMECA-2-D2 C-59
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
767 2.1.7.4 - Surface Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
768 2.1.7.4 - Surface Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control seal the wellbore (linked to 1.5.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
769 2.1.7.4 - Surface Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
770 2.1.7.4 - Surface Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (linked to 1.7.2.3)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
771 2.1.7.4 - Surface Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
772 2.1.7.4 - Surface Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (linked to 1.9.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
773 2.1.7.4 - Surface Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control disconnect (linked to 1.9.4.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
774 2.1.7.4 - Surface Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control trapped gas (linked to 1.10.1.2)
Systems
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Reservoir Unit
Valves When Demanded - Failure to close on drill pipe through
776 2.1.7.5 - Surface Wear 2 1 3 6
annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems

2650788-DFMECA-2-D2 C-60
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Reservoir Unit
Loss of Function Valves When Demanded - Failure to close on drill pipe through
782 2.1.7.7 - Surface 8 3 2 36
(general) annular(s) - Close and seal on the drill pipe and allow circulation
Control
on demand (linked to 1.1.1.2)
Systems
Fluid
Failure to Maintain Adequate Sealing Pressure on Annular -
Reservoir Unit
Loss of Function Failure to seal or partial seal on drill pipe through annular(s) -
783 2.1.7.7 - Surface 9 2 3 54
(general) Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.3.2)
Systems
Fluid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Reservoir Unit
Loss of Function Failure to seal or partial seal on drill pipe through pipe rams -
784 2.1.7.7 - Surface 9 2 3 54
(general) Close and seal on the drill pipe and allow circulation on demand
Control
(linked to 1.1.4.2)
Systems
Fluid
Reservoir Unit Actuates Too Slowly on Demand - Closes too slowly - Close and
Loss of Function
785 2.1.7.7 - Surface seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
(general)
Control 1.1.7.1)
Systems
Fluid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Reservoir Unit Shear Ram or C&K Valves - Failure to close on open hole through
Loss of Function
786 2.1.7.7 - Surface blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
(general)
Control allow volumetric well control operations on demand (linked to
Systems 1.2.1.2)
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Loss of Function
787 2.1.7.7 - Surface to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
(general)
Control (linked to 1.3.1.2)
Systems
Fluid
Reservoir Unit Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
Loss of Function
788 2.1.7.7 - Surface Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
(general)
Control the annular BOP(s) (linked to 1.3.2.1)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Loss of Function
789 2.1.7.7 - Surface Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
(general)
Control BOP and control the wellbore (linked to 1.4.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
790 2.1.7.7 - Surface Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
(general)
Control seal the wellbore (linked to 1.5.1.2)
Systems

2650788-DFMECA-2-D2 C-61
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
791 2.1.7.7 - Surface Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
(general)
Control drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Loss of Function
792 2.1.7.7 - Surface Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
(general)
Control - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Loss of Function
793 2.1.7.7 - Surface LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
(general)
Control (linked to 1.7.2.3)
Systems
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP -
Loss of Function
794 2.1.7.7 - Surface Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
(general)
Control 1.7.2.4)
Systems
Fluid
Reservoir Unit Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Loss of Function
795 2.1.7.7 - Surface LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
(general)
Control Lower BOP stack (linked to 1.8.1.3)
Systems
Fluid
Reservoir Unit Moves too slowly to disconnect - Failure to disconnect the LMRP
Loss of Function
796 2.1.7.7 - Surface - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
(general)
Control BOP stack (linked to 1.8.1.4)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
797 2.1.7.7 - Surface Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
(general)
Control (linked to 1.9.1.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
798 2.1.7.7 - Surface Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
(general)
Control disconnect (linked to 1.9.4.2)
Systems
Fluid
Reservoir Unit Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Loss of Function
799 2.1.7.7 - Surface Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
(general)
Control trapped gas (linked to 1.10.1.2)
Systems

2650788-DFMECA-2-D2 C-62
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Secondary &
Emergency
Control Failure to Provide Control Signal - Failure to Arm - Emergency
Loss of, or Degraded
804 2.1.8.1 Systems - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Power
Surface (linked to 1.6.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to provide control signal, when demanded - Failure to
Loss of, or Degraded
805 2.1.8.1 Systems - receive EDS signal prevents disconnecting from stack during 10 2 1 20
Power
Surface emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of, or Degraded
806 2.1.8.1 Systems - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Power
Surface from the stack (linked to 1.7.2.1)
Control
Systems
Secondary &
Emergency
Failure to Provide Disconnect Signal (automatically or manually) -
Control
Loss of, or Degraded Failure to disconnect the LMRP - Controlled Operation -
807 2.1.8.1 Systems - 9 2 1 18
Power Disconnect the LMRP from the Lower BOP stack (linked to
Surface
1.8.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
808 2.1.8.1 Systems - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Power
Surface (linked to 1.9.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
809 2.1.8.1 Systems - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Power
Surface disconnect (linked to 1.9.4.1)
Control
Systems

2650788-DFMECA-2-D2 C-63
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
810 2.1.8.1 Systems - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Power
Surface trapped gas (linked to 1.10.1.1)
Control
Systems
Secondary &
Emergency
Fails with no output
Control Failure to Provide Control Signal - Failure to Arm - Emergency
signal/
812 2.1.8.2 Systems - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
communication
Surface (linked to 1.6.1.1)
(Includes Short)
Control
Systems
Secondary &
Emergency
Fails with no output
Control Failure to provide control signal, when demanded - Failure to
signal/
813 2.1.8.2 Systems - receive EDS signal prevents disconnecting from stack during 10 2 1 20
communication
Surface emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
(Includes Short)
Control
Systems
Secondary &
Emergency
Fails with no output
Control Failure to Provide Disconnect Signal (automatically) - Failure to
signal/
814 2.1.8.2 Systems - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
communication
Surface from the stack (linked to 1.7.2.1)
(Includes Short)
Control
Systems
Secondary &
Emergency
Fails with no output Failure to Provide Disconnect Signal (automatically or manually) -
Control
signal/ Failure to disconnect the LMRP - Controlled Operation -
815 2.1.8.2 Systems - 9 2 1 18
communication Disconnect the LMRP from the Lower BOP stack (linked to
Surface
(Includes Short) 1.8.1.1)
Control
Systems
Secondary &
Emergency
Fails with no output
Control Failure to Provide Control Signal to C&K Valves when Demanded
signal/
816 2.1.8.2 Systems - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
communication
Surface (linked to 1.9.1.1)
(Includes Short)
Control
Systems

2650788-DFMECA-2-D2 C-64
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Secondary &
Emergency
Fails with no output
Control Failure to Provide Control Signal to C&K Valves when Demanded
signal/
817 2.1.8.2 Systems - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
communication
Surface disconnect (linked to 1.9.4.1)
(Includes Short)
Control
Systems
Secondary &
Emergency
Fails with no output
Control Failure to Provide Control Signal to C&K Valves when Demanded
signal/
818 2.1.8.2 Systems - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
communication
Surface trapped gas (linked to 1.10.1.1)
(Includes Short)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Control Signal - Failure to Arm - Emergency
Loss of function
820 2.1.8.3 Systems - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
(general)
Surface (linked to 1.6.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to provide control signal, when demanded - Failure to
Loss of function
821 2.1.8.3 Systems - receive EDS signal prevents disconnecting from stack during 10 2 1 20
(general)
Surface emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of function
822 2.1.8.3 Systems - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
(general)
Surface from the stack (linked to 1.7.2.1)
Control
Systems
Secondary &
Emergency
Failure to Provide Disconnect Signal (automatically or manually) -
Control
Loss of function Failure to disconnect the LMRP - Controlled Operation -
823 2.1.8.3 Systems - 9 2 1 18
(general) Disconnect the LMRP from the Lower BOP stack (linked to
Surface
1.8.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-65
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
824 2.1.8.3 Systems - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
(general)
Surface (linked to 1.9.1.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
825 2.1.8.3 Systems - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
(general)
Surface disconnect (linked to 1.9.4.1)
Control
Systems
Secondary &
Emergency
Control Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
826 2.1.8.3 Systems - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
(general)
Surface trapped gas (linked to 1.10.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Annular or C&K Valves When
Systems -
Loss of, or Degraded Demanded - Failure to close on drill pipe through annular(s) -
834 2.2.1.1 Electrical - 9 2 4 72
Power Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Pipe Ram or C&K Valves
Systems -
Loss of, or Degraded When Demanded - Failure to close on drill pipe through pipe rams
835 2.2.1.1 Electrical - 9 2 4 72
Power - Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Operation - Unintentional closing / opening - Close
Loss of, or Degraded
836 2.2.1.1 Electrical - and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Power
Subsea to 1.1.5.1)
Control
Systems

2650788-DFMECA-2-D2 C-66
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Systems - C&K Valves When Demanded - Failure to close on open hole
Loss of, or Degraded
837 2.2.1.1 Electrical - through blind-shear rams or annular - Close and seal on open 9 2 1 18
Power
Subsea hole and allow volumetric well control operations on demand
Control (linked to 1.2.1.1)
Systems
Blue & Yellow
Control
Systems - Unintentional Closing - Unintentional closing / opening - Close
Loss of, or Degraded
838 2.2.1.1 Electrical - and seal on open hole and allow volumetric well control 6 2 3 36
Power
Subsea operations on demand (linked to 1.2.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Annulars When Demanded -
Loss of, or Degraded
839 2.2.1.1 Electrical - Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Power
Subsea BOP(s) (linked to 1.3.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Hang-off Ram When
Loss of, or Degraded
840 2.2.1.1 Electrical - Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Power
Subsea pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Shear Ram When Demanded
Loss of, or Degraded
841 2.2.1.1 Electrical - - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Power
Subsea seal the wellbore (linked to 1.5.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal - Failure to Arm - Emergency
Loss of, or Degraded
842 2.2.1.1 Electrical - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Power
Subsea (linked to 1.6.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-67
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to provide control signal, when demanded - Failure to
Loss of, or Degraded
843 2.2.1.1 Electrical - receive EDS signal prevents disconnecting from stack during 10 2 1 20
Power
Subsea emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of, or Degraded
844 2.2.1.1 Electrical - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Power
Subsea from the stack (linked to 1.7.2.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Disconnect Signal (automatically or manually) -
Systems -
Loss of, or Degraded Failure to disconnect the LMRP - Controlled Operation -
845 2.2.1.1 Electrical - 9 2 1 18
Power Disconnect the LMRP from the Lower BOP stack (linked to
Subsea
1.8.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
846 2.2.1.1 Electrical - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Power
Subsea (linked to 1.9.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
847 2.2.1.1 Electrical - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Power
Subsea disconnect (linked to 1.9.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of, or Degraded
848 2.2.1.1 Electrical - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Power
Subsea trapped gas (linked to 1.10.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-68
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Provide Control Signal to Annular or C&K Valves When
Systems - Fails with no output
Demanded - Failure to close on drill pipe through annular(s) -
851 2.2.1.2 Electrical - signal/ 9 2 1 18
Close and seal on the drill pipe and allow circulation on demand
Subsea communication
(linked to 1.1.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Pipe Ram or C&K Valves
Systems - Fails with no output
When Demanded - Failure to close on drill pipe through pipe rams
852 2.2.1.2 Electrical - signal/ 9 2 4 72
- Close and seal on the drill pipe and allow circulation on demand
Subsea communication
(linked to 1.1.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Unintentional Operation - Unintentional closing / opening - Close
853 2.2.1.2 Electrical - signal/ and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Subsea communication to 1.1.5.1)
Control
Systems
Blue & Yellow
Control Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Systems - Fails with no output C&K Valves When Demanded - Failure to close on open hole
854 2.2.1.2 Electrical - signal/ through blind-shear rams or annular - Close and seal on open 9 2 1 18
Subsea communication hole and allow volumetric well control operations on demand
Control (linked to 1.2.1.1)
Systems
Blue & Yellow
Control
Systems - Fails with no output Unintentional Closing - Unintentional closing / opening - Close
855 2.2.1.2 Electrical - signal/ and seal on open hole and allow volumetric well control 6 2 3 36
Subsea communication operations on demand (linked to 1.2.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to Annulars When Demanded -
856 2.2.1.2 Electrical - signal/ Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Subsea communication BOP(s) (linked to 1.3.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-69
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to Hang-off Ram When
857 2.2.1.2 Electrical - signal/ Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Subsea communication pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to Shear Ram When Demanded
858 2.2.1.2 Electrical - signal/ - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Subsea communication seal the wellbore (linked to 1.5.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal - Failure to Arm - Emergency
859 2.2.1.2 Electrical - signal/ Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Subsea communication (linked to 1.6.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to provide control signal, when demanded - Failure to
860 2.2.1.2 Electrical - signal/ receive EDS signal - Emergency Operation: EDS - Disconnect 10 2 1 20
Subsea communication from the stack (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Disconnect Signal (automatically) - Failure to
861 2.2.1.2 Electrical - signal/ disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Subsea communication from the stack (linked to 1.7.2.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Disconnect Signal (automatically or manually) -
Systems - Fails with no output
Failure to disconnect the LMRP - Controlled Operation -
862 2.2.1.2 Electrical - signal/ 9 2 1 18
Disconnect the LMRP from the Lower BOP stack (linked to
Subsea communication
1.8.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-70
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
863 2.2.1.2 Electrical - signal/ - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Subsea communication (linked to 1.9.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
864 2.2.1.2 Electrical - signal/ - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Subsea communication disconnect (linked to 1.9.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Fails with no output Failure to Provide Control Signal to C&K Valves when Demanded
865 2.2.1.2 Electrical - signal/ - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Subsea communication trapped gas (linked to 1.10.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Annular or C&K Valves When
Systems -
Demanded - Failure to close on drill pipe through annular(s) -
867 2.2.1.3 Electrical - Erratic output 9 2 1 18
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Pipe Ram or C&K Valves
Systems -
When Demanded - Failure to close on drill pipe through pipe rams
868 2.2.1.3 Electrical - Erratic output 9 2 4 72
- Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Operation - Unintentional closing / opening - Close
869 2.2.1.3 Electrical - Erratic output and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Subsea to 1.1.5.1)
Control
Systems

2650788-DFMECA-2-D2 C-71
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Systems - C&K Valves When Demanded - Failure to close on open hole
870 2.2.1.3 Electrical - Erratic output through blind-shear rams or annular - Close and seal on open 9 2 1 18
Subsea hole and allow volumetric well control operations on demand
Control (linked to 1.2.1.1)
Systems
Blue & Yellow
Control
Systems - Unintentional Closing - Unintentional closing / opening - Close
871 2.2.1.3 Electrical - Erratic output and seal on open hole and allow volumetric well control 6 2 3 36
Subsea operations on demand (linked to 1.2.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Annulars When Demanded -
872 2.2.1.3 Electrical - Erratic output Failure to close annulars - Strip the drill string using the annular 9 2 1 18
Subsea BOP(s) (linked to 1.3.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Hang-off Ram When
873 2.2.1.3 Electrical - Erratic output Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
Subsea pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Shear Ram When Demanded
874 2.2.1.3 Electrical - Erratic output - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
Subsea seal the wellbore (linked to 1.5.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal - Failure to Arm - Emergency
875 2.2.1.3 Electrical - Erratic output Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
Subsea (linked to 1.6.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-72
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to provide control signal, when demanded - Failure to
876 2.2.1.3 Electrical - Erratic output receive EDS signal prevents disconnecting from stack during 10 2 1 20
Subsea emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Disconnect Signal (automatically) - Failure to
877 2.2.1.3 Electrical - Erratic output disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Subsea from the stack (linked to 1.7.2.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Disconnect Signal (automatically or manually) -
Systems -
Failure to disconnect the LMRP - Controlled Operation -
878 2.2.1.3 Electrical - Erratic output 9 2 1 18
Disconnect the LMRP from the Lower BOP stack (linked to
Subsea
1.8.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
879 2.2.1.3 Electrical - Erratic output - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
Subsea (linked to 1.9.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
880 2.2.1.3 Electrical - Erratic output - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
Subsea disconnect (linked to 1.9.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
881 2.2.1.3 Electrical - Erratic output - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
Subsea trapped gas (linked to 1.10.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-73
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Provide Control Signal to Annular or C&K Valves When
Systems -
Fails to respond to Demanded - Failure to close on drill pipe through annular(s) -
884 2.2.1.4 Electrical - 9 2 1 18
input - Electrical Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Pipe Ram or C&K Valves
Systems -
Fails to respond to When Demanded - Failure to close on drill pipe through pipe rams
885 2.2.1.4 Electrical - 9 2 4 72
input - Electrical - Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Operation - Unintentional closing / opening - Close
Fails to respond to
886 2.2.1.4 Electrical - and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
input - Electrical
Subsea to 1.1.5.1)
Control
Systems
Blue & Yellow
Control Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Systems - C&K Valves When Demanded - Failure to close on open hole
Fails to respond to
887 2.2.1.4 Electrical - through blind-shear rams or annular - Close and seal on open 9 2 1 18
input - Electrical
Subsea hole and allow volumetric well control operations on demand
Control (linked to 1.2.1.1)
Systems
Blue & Yellow
Control
Systems - Unintentional Closing - Unintentional closing / opening - Close
Fails to respond to
888 2.2.1.4 Electrical - and seal on open hole and allow volumetric well control 6 2 3 36
input - Electrical
Subsea operations on demand (linked to 1.2.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Annulars When Demanded -
Fails to respond to
889 2.2.1.4 Electrical - Failure to close annulars - Strip the drill string using the annular 9 2 1 18
input - Electrical
Subsea BOP(s) (linked to 1.3.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-74
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Hang-off Ram When
Fails to respond to
890 2.2.1.4 Electrical - Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
input - Electrical
Subsea pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Shear Ram When Demanded
Fails to respond to
891 2.2.1.4 Electrical - - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
input - Electrical
Subsea seal the wellbore (linked to 1.5.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal - Failure to Arm - Emergency
Fails to respond to
892 2.2.1.4 Electrical - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
input - Electrical
Subsea (linked to 1.6.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to provide control signal, when demanded - Failure to
Fails to respond to
893 2.2.1.4 Electrical - receive EDS signal prevents disconnecting from stack during 10 2 1 20
input - Electrical
Subsea emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Disconnect Signal (automatically) - Failure to
Fails to respond to
894 2.2.1.4 Electrical - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
input - Electrical
Subsea from the stack (linked to 1.7.2.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Disconnect Signal (automatically or manually) -
Systems -
Fails to respond to Failure to disconnect the LMRP - Controlled Operation -
895 2.2.1.4 Electrical - 9 2 1 18
input - Electrical Disconnect the LMRP from the Lower BOP stack (linked to
Subsea
1.8.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-75
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Fails to respond to
896 2.2.1.4 Electrical - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
input - Electrical
Subsea (linked to 1.9.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Fails to respond to
897 2.2.1.4 Electrical - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
input - Electrical
Subsea disconnect (linked to 1.9.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Fails to respond to
898 2.2.1.4 Electrical - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
input - Electrical
Subsea trapped gas (linked to 1.10.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to provide control signal, when demanded - Failure to
900 2.2.1.5 Electrical - Processing error receive EDS signal - Emergency Operation: EDS - Disconnect 10 2 1 20
Subsea from the stack (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Operation - Unintentional closing / opening - Close
902 2.2.1.6 Electrical - Ground Fault and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
Subsea to 1.1.5.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Closing - Unintentional closing / opening - Close
903 2.2.1.6 Electrical - Ground Fault and seal on open hole and allow volumetric well control 6 2 3 36
Subsea operations on demand (linked to 1.2.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-76
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Provide Control Signal to Annular or C&K Valves When
Systems -
Loss of function Demanded - Failure to close on drill pipe through annular(s) -
909 2.2.1.7 Electrical - 9 2 1 18
(general) Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Control Signal to Pipe Ram or C&K Valves
Systems -
Loss of function When Demanded - Failure to close on drill pipe through pipe rams
910 2.2.1.7 Electrical - 9 2 4 72
(general) - Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Operation - Unintentional closing / opening - Close
Loss of function
911 2.2.1.7 Electrical - and seal on the drill pipe and allow circulation on demand (linked 6 2 4 48
(general)
Subsea to 1.1.5.1)
Control
Systems
Blue & Yellow
Control Failure to Provide Control Signal to Annular / Blind-Shear Ram or
Systems - C&K Valves When Demanded - Failure to close on open hole
Loss of function
912 2.2.1.7 Electrical - through blind-shear rams or annular - Close and seal on open 9 2 1 18
(general)
Subsea hole and allow volumetric well control operations on demand
Control (linked to 1.2.1.1)
Systems
Blue & Yellow
Control
Systems - Unintentional Closing - Unintentional closing / opening - Close
Loss of function
913 2.2.1.7 Electrical - and seal on open hole and allow volumetric well control 6 2 3 36
(general)
Subsea operations on demand (linked to 1.2.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Annulars When Demanded -
Loss of function
914 2.2.1.7 Electrical - Failure to close annulars - Strip the drill string using the annular 9 2 1 18
(general)
Subsea BOP(s) (linked to 1.3.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-77
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Hang-off Ram When
Loss of function
915 2.2.1.7 Electrical - Demanded - Failure of hang-off ram to close - Hang-off the drill 9 2 2 36
(general)
Subsea pipe on a ram BOP and control the wellbore (linked to 1.4.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to Shear Ram When Demanded
Loss of function
916 2.2.1.7 Electrical - - Failure to close - Controlled operation - Shear the drill pipe and 9 1 4 36
(general)
Subsea seal the wellbore (linked to 1.5.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal - Failure to Arm - Emergency
Loss of function
917 2.2.1.7 Electrical - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 2 1 20
(general)
Subsea (linked to 1.6.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to provide control signal, when demanded - Failure to
Loss of function
918 2.2.1.7 Electrical - receive EDS signal prevents disconnecting from stack during 10 2 1 20
(general)
Subsea emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of function
919 2.2.1.7 Electrical - disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
(general)
Subsea from the stack (linked to 1.7.2.1)
Control
Systems
Blue & Yellow
Control
Failure to Provide Disconnect Signal (automatically or manually) -
Systems -
Loss of function Failure to disconnect the LMRP - Controlled Operation -
920 2.2.1.7 Electrical - 9 2 1 18
(general) Disconnect the LMRP from the Lower BOP stack (linked to
Subsea
1.8.1.1)
Control
Systems

2650788-DFMECA-2-D2 C-78
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
921 2.2.1.7 Electrical - - Failure to circulate - Circulate the well after drill pipe disconnect 8 2 1 16
(general)
Subsea (linked to 1.9.1.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
922 2.2.1.7 Electrical - - Failure to seal wellbore - Circulate the well after drill pipe 8 2 1 16
(general)
Subsea disconnect (linked to 1.9.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Provide Control Signal to C&K Valves when Demanded
Loss of function
923 2.2.1.7 Electrical - - Failure to circulate - Circulate across the BOP stack to remove 10 1 1 10
(general)
Subsea trapped gas (linked to 1.10.1.1)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Systems -
External Leak / Valves When Demanded - Failure to close on drill pipe through
931 2.2.2.1 Hydraulics - 8 3 2 36
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Systems -
External Leak / Valves When Demanded - Failure to close on drill pipe through
932 2.2.2.1 Hydraulics - 8 2 3 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular -
Systems -
External Leak / Failure to seal or partial seal on drill pipe through annular(s) -
933 2.2.2.1 Hydraulics - 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.3.2)
Control
Systems

2650788-DFMECA-2-D2 C-79
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak /
934 2.2.2.1 Hydraulics - seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Systems -
External Leak / Failure to seal or partial seal on drill pipe through pipe rams -
935 2.2.2.1 Hydraulics - 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak /
936 2.2.2.1 Hydraulics - seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Subsea 1.1.7.1)
Control
Systems
Blue & Yellow
Control Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Systems - Shear Ram or C&K Valves - Failure to close on open hole through
External Leak /
937 2.2.2.1 Hydraulics - blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Blue & Yellow
Control
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Systems -
External Leak / to close on open hole through blind-shear rams or annular - Close
938 2.2.2.1 Hydraulics - 9 1 2 18
Rupture and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Systems -
External Leak / Shear Ram - Failure to close on open hole through blind-shear
939 2.2.2.1 Hydraulics - 9 1 2 18
Rupture rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems

2650788-DFMECA-2-D2 C-80
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak /
940 2.2.2.1 Hydraulics - to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Rupture
Subsea (linked to 1.3.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
External Leak /
941 2.2.2.1 Hydraulics - Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Rupture
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak /
942 2.2.2.1 Hydraulics - Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Rupture
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
External Leak /
943 2.2.2.1 Hydraulics - maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Rupture
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak /
944 2.2.2.1 Hydraulics - Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Rupture
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak /
945 2.2.2.1 Hydraulics - operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Subsea 1.5.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-81
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak /
946 2.2.2.1 Hydraulics - wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak /
947 2.2.2.1 Hydraulics - seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
External Leak /
948 2.2.2.1 Hydraulics - Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Rupture
Subsea (linked to 1.5.4.2)
Control
Systems
Blue & Yellow
Control
Systems -
External Leak / External Leak - Loss of containment - Controlled operation -
949 2.2.2.1 Hydraulics - 10 3 1 30
Rupture Shear the drill pipe and seal the wellbore (linked to 1.5.6.1)
Subsea
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak /
950 2.2.2.1 Hydraulics - Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to initiate autoshear sequence - Failure to close -
External Leak /
951 2.2.2.1 Hydraulics - Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Rupture
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems

2650788-DFMECA-2-D2 C-82
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak /
952 2.2.2.1 Hydraulics - Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Subsea - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak /
953 2.2.2.1 Hydraulics - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Subsea (linked to 1.6.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak /
954 2.2.2.1 Hydraulics - wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak /
955 2.2.2.1 Hydraulics - seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
External Leak /
956 2.2.2.1 Hydraulics - Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Rupture
Subsea the wellbore (linked to 1.6.5.2)
Control
Systems
Blue & Yellow
Control
Systems - External Leak - Loss of containment - Emergency Operation -
External Leak /
957 2.2.2.1 Hydraulics - Auto-Shear - Shear the drill pipe and seal the wellbore (linked to 10 2 2 40
Rupture
Subsea 1.6.7.1)
Control
Systems

2650788-DFMECA-2-D2 C-83
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak /
958 2.2.2.1 Hydraulics - LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Subsea (linked to 1.7.2.3)
Control
Systems
Blue & Yellow
Control
Systems - Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak /
959 2.2.2.1 Hydraulics - Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Subsea 1.7.2.4)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak /
960 2.2.2.1 Hydraulics - LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Blue & Yellow
Control
Systems - Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak /
961 2.2.2.1 Hydraulics - - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Subsea BOP stack (linked to 1.8.1.4)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak /
962 2.2.2.1 Hydraulics - Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Rupture
Subsea (linked to 1.9.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak /
963 2.2.2.1 Hydraulics - Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Rupture
Subsea disconnect (linked to 1.9.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-84
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak /
964 2.2.2.1 Hydraulics - Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Rupture
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
968 2.2.2.2 Hydraulics - Internal Leak 8 3 2 48
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
969 2.2.2.2 Hydraulics - Internal Leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Systems -
Failure to seal or partial seal on drill pipe through pipe rams -
970 2.2.2.2 Hydraulics - Internal Leak 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Blue & Yellow
Control Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Systems - Shear Ram or C&K Valves - Failure to close on open hole through
971 2.2.2.2 Hydraulics - Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Blue & Yellow
Control
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Systems -
to close on open hole through blind-shear rams or annular - Close
972 2.2.2.2 Hydraulics - Internal Leak 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems

2650788-DFMECA-2-D2 C-85
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Systems -
Shear Ram - Failure to close on open hole through blind-shear
973 2.2.2.2 Hydraulics - Internal Leak 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
974 2.2.2.2 Hydraulics - Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
975 2.2.2.2 Hydraulics - Internal Leak Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
976 2.2.2.2 Hydraulics - Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
977 2.2.2.2 Hydraulics - Internal Leak maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
978 2.2.2.2 Hydraulics - Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-86
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
979 2.2.2.2 Hydraulics - Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
980 2.2.2.2 Hydraulics - Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
981 2.2.2.2 Hydraulics - Internal Leak seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
982 2.2.2.2 Hydraulics - Internal Leak Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Subsea (linked to 1.5.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
983 2.2.2.2 Hydraulics - Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to initiate autoshear sequence - Failure to close -
984 2.2.2.2 Hydraulics - Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems

2650788-DFMECA-2-D2 C-87
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
985 2.2.2.2 Hydraulics - Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
986 2.2.2.2 Hydraulics - Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
987 2.2.2.2 Hydraulics - Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
988 2.2.2.2 Hydraulics - Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Subsea the wellbore (linked to 1.6.5.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
989 2.2.2.2 Hydraulics - Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
990 2.2.2.2 Hydraulics - Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems

2650788-DFMECA-2-D2 C-88
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
991 2.2.2.2 Hydraulics - Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
992 2.2.2.2 Hydraulics - Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
993 2.2.2.2 Hydraulics - Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
998 2.2.2.3 Hydraulics - Plugged 8 3 2 48
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
999 2.2.2.3 Hydraulics - Plugged 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1000 2.2.2.3 Hydraulics - Plugged seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems

2650788-DFMECA-2-D2 C-89
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Systems -
Failure to seal or partial seal on drill pipe through pipe rams -
1001 2.2.2.3 Hydraulics - Plugged 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Actuates Too Slowly on Demand - Closes too slowly - Close and
1002 2.2.2.3 Hydraulics - Plugged seal on the drill pipe and allow circulation on demand (linked to 9 3 4 108
Subsea 1.1.7.1)
Control
Systems
Blue & Yellow
Control Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Systems - Shear Ram or C&K Valves - Failure to close on open hole through
1003 2.2.2.3 Hydraulics - Plugged blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Blue & Yellow
Control
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Systems -
to close on open hole through blind-shear rams or annular - Close
1004 2.2.2.3 Hydraulics - Plugged 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Systems -
Shear Ram - Failure to close on open hole through blind-shear
1005 2.2.2.3 Hydraulics - Plugged 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1006 2.2.2.3 Hydraulics - Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-90
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1007 2.2.2.3 Hydraulics - Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1008 2.2.2.3 Hydraulics - Plugged maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1009 2.2.2.3 Hydraulics - Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1010 2.2.2.3 Hydraulics - Plugged operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1011 2.2.2.3 Hydraulics - Plugged wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1012 2.2.2.3 Hydraulics - Plugged seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems

2650788-DFMECA-2-D2 C-91
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1013 2.2.2.3 Hydraulics - Plugged Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Subsea (linked to 1.5.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Actuates Too Slowly on Demand - Closes too slowly - Controlled
1014 2.2.2.3 Hydraulics - Plugged operation - Shear the drill pipe and seal the wellbore (linked to 8 3 2 48
Subsea 1.5.5.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1015 2.2.2.3 Hydraulics - Plugged Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1016 2.2.2.3 Hydraulics - Plugged Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Subsea - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1017 2.2.2.3 Hydraulics - Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1018 2.2.2.3 Hydraulics - Plugged wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems

2650788-DFMECA-2-D2 C-92
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1019 2.2.2.3 Hydraulics - Plugged seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1020 2.2.2.3 Hydraulics - Plugged Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Subsea the wellbore (linked to 1.6.5.2)
Control
Systems
Blue & Yellow
Control
Systems - Actuates Too Slowly on Demand - Closes too slowly - Emergency
1021 2.2.2.3 Hydraulics - Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 4 108
Subsea (linked to 1.6.6.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1022 2.2.2.3 Hydraulics - Plugged LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Blue & Yellow
Control
Systems - Moves too slowly to disconnect - Failure to disconnect the LMRP -
1023 2.2.2.3 Hydraulics - Plugged Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 4 108
Subsea 1.7.2.4)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1024 2.2.2.3 Hydraulics - Plugged LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems

2650788-DFMECA-2-D2 C-93
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Moves too slowly to disconnect - Failure to disconnect the LMRP
1025 2.2.2.3 Hydraulics - Plugged - Controlled Operation - Disconnect the LMRP from the Lower 9 3 4 108
Subsea BOP stack (linked to 1.8.1.4)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1026 2.2.2.3 Hydraulics - Plugged Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1027 2.2.2.3 Hydraulics - Plugged Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1028 2.2.2.3 Hydraulics - Plugged Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
1032 2.2.2.4 Hydraulics - Mechanical Failure 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
1033 2.2.2.4 Hydraulics - Mechanical Failure 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems

2650788-DFMECA-2-D2 C-94
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular -
Systems -
Failure to seal or partial seal on drill pipe through annular(s) -
1034 2.2.2.4 Hydraulics - Mechanical Failure 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1035 2.2.2.4 Hydraulics - Mechanical Failure seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Systems -
Failure to seal or partial seal on drill pipe through pipe rams -
1036 2.2.2.4 Hydraulics - Mechanical Failure 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Actuate Under Fail-safe Conditions - Failure to open /
1037 2.2.2.4 Hydraulics - Mechanical Failure close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
Subsea circulation on demand (linked to 1.1.6.1)
Control
Systems
Blue & Yellow
Control Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Systems - Shear Ram or C&K Valves - Failure to close on open hole through
1038 2.2.2.4 Hydraulics - Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Blue & Yellow
Control
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Systems -
to close on open hole through blind-shear rams or annular - Close
1039 2.2.2.4 Hydraulics - Mechanical Failure 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems

2650788-DFMECA-2-D2 C-95
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Systems -
Shear Ram - Failure to close on open hole through blind-shear
1040 2.2.2.4 Hydraulics - Mechanical Failure 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1041 2.2.2.4 Hydraulics - Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1042 2.2.2.4 Hydraulics - Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1043 2.2.2.4 Hydraulics - Mechanical Failure maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1044 2.2.2.4 Hydraulics - Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1045 2.2.2.4 Hydraulics - Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-96
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1046 2.2.2.4 Hydraulics - Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1047 2.2.2.4 Hydraulics - Mechanical Failure seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1048 2.2.2.4 Hydraulics - Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Subsea (linked to 1.5.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1049 2.2.2.4 Hydraulics - Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to initiate autoshear sequence - Failure to close -
1050 2.2.2.4 Hydraulics - Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1051 2.2.2.4 Hydraulics - Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems

2650788-DFMECA-2-D2 C-97
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1052 2.2.2.4 Hydraulics - Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1053 2.2.2.4 Hydraulics - Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1054 2.2.2.4 Hydraulics - Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Subsea the wellbore (linked to 1.6.5.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1055 2.2.2.4 Hydraulics - Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1056 2.2.2.4 Hydraulics - Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1057 2.2.2.4 Hydraulics - Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-98
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1058 2.2.2.4 Hydraulics - Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1059 2.2.2.4 Hydraulics - Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Blue & Yellow
Control
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Systems -
Valves When Demanded - Failure to close on drill pipe through
1064 2.2.2.6 Hydraulics - Corrosion/ Erosion 8 3 2 48
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1065 2.2.2.6 Hydraulics - Corrosion/ Erosion seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Systems -
Failure to seal or partial seal on drill pipe through pipe rams -
1066 2.2.2.6 Hydraulics - Corrosion/ Erosion 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Actuate Under Fail-safe Conditions - Failure to open /
1067 2.2.2.6 Hydraulics - Corrosion/ Erosion close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
Subsea circulation on demand (linked to 1.1.6.1)
Control
Systems

2650788-DFMECA-2-D2 C-99
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Systems - Shear Ram or C&K Valves - Failure to close on open hole through
1068 2.2.2.6 Hydraulics - Corrosion/ Erosion blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Blue & Yellow
Control
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Systems -
to close on open hole through blind-shear rams or annular - Close
1069 2.2.2.6 Hydraulics - Corrosion/ Erosion 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Blue & Yellow
Control
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Systems -
Shear Ram - Failure to close on open hole through blind-shear
1070 2.2.2.6 Hydraulics - Corrosion/ Erosion 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1071 2.2.2.6 Hydraulics - Corrosion/ Erosion to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
1072 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1073 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-100
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1074 2.2.2.6 Hydraulics - Corrosion/ Erosion maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1075 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1076 2.2.2.6 Hydraulics - Corrosion/ Erosion operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1077 2.2.2.6 Hydraulics - Corrosion/ Erosion wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1078 2.2.2.6 Hydraulics - Corrosion/ Erosion seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1079 2.2.2.6 Hydraulics - Corrosion/ Erosion Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Subsea (linked to 1.5.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-101
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1080 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to initiate autoshear sequence - Failure to close -
1081 2.2.2.6 Hydraulics - Corrosion/ Erosion Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1082 2.2.2.6 Hydraulics - Corrosion/ Erosion Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Shear Ram to Seal On Demand - Failure to seal the
1083 2.2.2.6 Hydraulics - Corrosion/ Erosion wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1084 2.2.2.6 Hydraulics - Corrosion/ Erosion seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Unintentional Opening - Unintentional closing / opening -
1085 2.2.2.6 Hydraulics - Corrosion/ Erosion Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Subsea the wellbore (linked to 1.6.5.2)
Control
Systems

2650788-DFMECA-2-D2 C-102
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1086 2.2.2.6 Hydraulics - Corrosion/ Erosion LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Blue & Yellow
Control
Systems - Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1087 2.2.2.6 Hydraulics - Corrosion/ Erosion LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1088 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1089 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Blue & Yellow
Control
Systems - Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1090 2.2.2.6 Hydraulics - Corrosion/ Erosion Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Subsea External Leak/ Valves When Demanded - Failure to close on drill pipe through
1096 2.2.3.1 8 3 2 36
Control Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.1.2)
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Subsea External Leak/ Valves When Demanded - Failure to close on drill pipe through
1097 2.2.3.1 8 2 3 48
Control Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.2.2)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular -
- Subsea External Leak/ Failure to seal or partial seal on drill pipe through annular(s) -
1098 2.2.3.1 9 2 3 54
Control Rupture Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.3.2)

2650788-DFMECA-2-D2 C-103
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
- Subsea External Leak/
1099 2.2.3.1 seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control Rupture
pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Subsea External Leak/ Failure to seal or partial seal on drill pipe through pipe rams -
1100 2.2.3.1 9 2 3 54
Control Rupture Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.4.2)
Accumulators
Actuates Too Slowly on Demand - Closes too slowly - Close and
- Subsea External Leak/
1101 2.2.3.1 seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control Rupture
1.1.7.1)
Systems
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Accumulators
Shear Ram or C&K Valves - Failure to close on open hole through
- Subsea External Leak/
1102 2.2.3.1 blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control Rupture
allow volumetric well control operations on demand (linked to
Systems
1.2.1.2)
Accumulators Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Subsea External Leak/ to close on open hole through blind-shear rams or annular - Close
1103 2.2.3.1 9 1 2 18
Control Rupture and seal on open hole and allow volumetric well control
Systems operations on demand (linked to 1.2.1.4)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Subsea External Leak/ Shear Ram - Failure to close on open hole through blind-shear
1104 2.2.3.1 9 1 2 18
Control Rupture rams or annular - Close and seal on open hole and allow
Systems volumetric well control operations on demand (linked to 1.2.1.5)
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
- Subsea External Leak/
1105 2.2.3.1 to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control Rupture
(linked to 1.3.1.2)
Systems
Accumulators
Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
- Subsea External Leak/
1106 2.2.3.1 Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Control Rupture
the annular BOP(s) (linked to 1.3.2.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
- Subsea External Leak/
1107 2.2.3.1 Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control Rupture
BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea External Leak/
1108 2.2.3.1 Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control Rupture
seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
- Subsea External Leak/
1109 2.2.3.1 operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control Rupture
1.5.2.1)
Systems

2650788-DFMECA-2-D2 C-104
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea External Leak/
1110 2.2.3.1 wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control Rupture
wellbore (linked to 1.5.3.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea External Leak/
1111 2.2.3.1 Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control Rupture
drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
Failure to initiate autoshear sequence - Failure to close -
- Subsea External Leak/
1112 2.2.3.1 Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Control Rupture
the wellbore (linked to 1.6.2.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea External Leak/
1113 2.2.3.1 Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control Rupture
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
- Subsea External Leak/
1114 2.2.3.1 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control Rupture
(linked to 1.6.3.2)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea External Leak/
1115 2.2.3.1 wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control Rupture
pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
- Subsea External Leak/
1116 2.2.3.1 seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control Rupture
drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
- Subsea External Leak/
1117 2.2.3.1 LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control Rupture
(linked to 1.7.2.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP -
- Subsea External Leak/
1118 2.2.3.1 Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control Rupture
1.7.2.4)
Systems
Accumulators
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
- Subsea External Leak/
1119 2.2.3.1 LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control Rupture
Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP
- Subsea External Leak/
1120 2.2.3.1 - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control Rupture
BOP stack (linked to 1.8.1.4)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea External Leak/
1121 2.2.3.1 Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control Rupture
(linked to 1.9.1.2)
Systems

2650788-DFMECA-2-D2 C-105
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea External Leak/
1122 2.2.3.1 Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control Rupture
disconnect (linked to 1.9.4.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea External Leak/
1123 2.2.3.1 Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control Rupture
trapped gas (linked to 1.10.1.2)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1125 2.2.3.2 Internal Leak 8 3 2 36
Control annular(s) - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.1.2)
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1126 2.2.3.2 Internal Leak 8 2 3 48
Control pipe rams - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.2.2)
Accumulators
Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
- Subsea
1127 2.2.3.2 Internal Leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control
pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Subsea Failure to seal or partial seal on drill pipe through pipe rams -
1128 2.2.3.2 Internal Leak 9 2 3 54
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.4.2)
Accumulators
Actuates Too Slowly on Demand - Closes too slowly - Close and
- Subsea
1129 2.2.3.2 Internal Leak seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control
1.1.7.1)
Systems
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Accumulators
Shear Ram or C&K Valves - Failure to close on open hole through
- Subsea
1130 2.2.3.2 Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control
allow volumetric well control operations on demand (linked to
Systems
1.2.1.2)
Accumulators Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Subsea to close on open hole through blind-shear rams or annular - Close
1131 2.2.3.2 Internal Leak 9 1 2 18
Control and seal on open hole and allow volumetric well control
Systems operations on demand (linked to 1.2.1.4)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Subsea Shear Ram - Failure to close on open hole through blind-shear
1132 2.2.3.2 Internal Leak 9 1 2 18
Control rams or annular - Close and seal on open hole and allow
Systems volumetric well control operations on demand (linked to 1.2.1.5)
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
- Subsea
1133 2.2.3.2 Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control
(linked to 1.3.1.2)
Systems

2650788-DFMECA-2-D2 C-106
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
- Subsea
1134 2.2.3.2 Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control
BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1135 2.2.3.2 Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control
seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
- Subsea
1136 2.2.3.2 Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control
1.5.2.1)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1137 2.2.3.2 Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control
wellbore (linked to 1.5.3.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1138 2.2.3.2 Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control
drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
Failure to initiate autoshear sequence - Failure to close -
- Subsea
1139 2.2.3.2 Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Control
the wellbore (linked to 1.6.2.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1140 2.2.3.2 Internal Leak Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
- Subsea
1141 2.2.3.2 Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control
(linked to 1.6.3.2)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1142 2.2.3.2 Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control
pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
- Subsea
1143 2.2.3.2 Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control
drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
- Subsea
1144 2.2.3.2 Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control
(linked to 1.7.2.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP -
- Subsea
1145 2.2.3.2 Internal Leak Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control
1.7.2.4)
Systems

2650788-DFMECA-2-D2 C-107
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
- Subsea
1146 2.2.3.2 Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control
Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP
- Subsea
1147 2.2.3.2 Internal Leak - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control
BOP stack (linked to 1.8.1.4)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1148 2.2.3.2 Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control
(linked to 1.9.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1149 2.2.3.2 Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control
disconnect (linked to 1.9.4.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1150 2.2.3.2 Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control
trapped gas (linked to 1.10.1.2)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1153 2.2.3.4 Mechanical Failure 8 3 2 36
Control annular(s) - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.1.2)
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1154 2.2.3.4 Mechanical Failure 8 2 3 48
Control pipe rams - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.2.2)
Accumulators
Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
- Subsea
1155 2.2.3.4 Mechanical Failure seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control
pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Subsea Failure to seal or partial seal on drill pipe through pipe rams -
1156 2.2.3.4 Mechanical Failure 9 2 3 54
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.4.2)
Accumulators
Actuates Too Slowly on Demand - Closes too slowly - Close and
- Subsea
1157 2.2.3.4 Mechanical Failure seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control
1.1.7.1)
Systems
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Accumulators
Shear Ram or C&K Valves - Failure to close on open hole through
- Subsea
1158 2.2.3.4 Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control
allow volumetric well control operations on demand (linked to
Systems
1.2.1.2)

2650788-DFMECA-2-D2 C-108
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Subsea to close on open hole through blind-shear rams or annular - Close
1159 2.2.3.4 Mechanical Failure 9 1 2 18
Control and seal on open hole and allow volumetric well control
Systems operations on demand (linked to 1.2.1.4)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Subsea Shear Ram - Failure to close on open hole through blind-shear
1160 2.2.3.4 Mechanical Failure 9 1 2 18
Control rams or annular - Close and seal on open hole and allow
Systems volumetric well control operations on demand (linked to 1.2.1.5)
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
- Subsea
1161 2.2.3.4 Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control
(linked to 1.3.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
- Subsea
1162 2.2.3.4 Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control
BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1163 2.2.3.4 Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control
seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
- Subsea
1164 2.2.3.4 Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control
1.5.2.1)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1165 2.2.3.4 Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control
wellbore (linked to 1.5.3.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1166 2.2.3.4 Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control
drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1167 2.2.3.4 Mechanical Failure Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
- Subsea
1168 2.2.3.4 Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control
(linked to 1.6.3.2)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1169 2.2.3.4 Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control
pipe and seal the wellbore (linked to 1.6.4.1)
Systems

2650788-DFMECA-2-D2 C-109
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
- Subsea
1170 2.2.3.4 Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control
drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
- Subsea
1171 2.2.3.4 Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control
(linked to 1.7.2.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP -
- Subsea
1172 2.2.3.4 Mechanical Failure Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control
1.7.2.4)
Systems
Accumulators
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
- Subsea
1173 2.2.3.4 Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control
Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP
- Subsea
1174 2.2.3.4 Mechanical Failure - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control
BOP stack (linked to 1.8.1.4)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1175 2.2.3.4 Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control
(linked to 1.9.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1176 2.2.3.4 Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control
disconnect (linked to 1.9.4.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1177 2.2.3.4 Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control
trapped gas (linked to 1.10.1.2)
Systems
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1179 2.2.3.5 Wear 8 3 2 36
Control annular(s) - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.1.2)
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Subsea Valves When Demanded - Failure to close on drill pipe through
1180 2.2.3.5 Wear 8 2 3 48
Control pipe rams - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.2.2)
Accumulators
Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
- Subsea
1181 2.2.3.5 Wear seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control
pipe and allow circulation on demand (linked to 1.1.4.1)
Systems

2650788-DFMECA-2-D2 C-110
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Subsea Failure to seal or partial seal on drill pipe through pipe rams -
1182 2.2.3.5 Wear 9 2 3 54
Control Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.4.2)
Accumulators
Actuates Too Slowly on Demand - Closes too slowly - Close and
- Subsea
1183 2.2.3.5 Wear seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control
1.1.7.1)
Systems
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Accumulators
Shear Ram or C&K Valves - Failure to close on open hole through
- Subsea
1184 2.2.3.5 Wear blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control
allow volumetric well control operations on demand (linked to
Systems
1.2.1.2)
Accumulators Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Subsea to close on open hole through blind-shear rams or annular - Close
1185 2.2.3.5 Wear 9 1 2 18
Control and seal on open hole and allow volumetric well control
Systems operations on demand (linked to 1.2.1.4)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Subsea Shear Ram - Failure to close on open hole through blind-shear
1186 2.2.3.5 Wear 9 1 2 18
Control rams or annular - Close and seal on open hole and allow
Systems volumetric well control operations on demand (linked to 1.2.1.5)
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
- Subsea
1187 2.2.3.5 Wear to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control
(linked to 1.3.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
- Subsea
1188 2.2.3.5 Wear Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control
BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1189 2.2.3.5 Wear Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control
seal the wellbore (linked to 1.5.1.2)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
- Subsea
1190 2.2.3.5 Wear operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control
1.5.2.1)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1191 2.2.3.5 Wear wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control
wellbore (linked to 1.5.3.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1192 2.2.3.5 Wear Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control
drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems

2650788-DFMECA-2-D2 C-111
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to initiate autoshear sequence - Failure to close -
- Subsea
1193 2.2.3.5 Wear Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Control
the wellbore (linked to 1.6.2.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea
1194 2.2.3.5 Wear Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
- Subsea
1195 2.2.3.5 Wear Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control
(linked to 1.6.3.2)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea
1196 2.2.3.5 Wear wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control
pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
- Subsea
1197 2.2.3.5 Wear seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control
drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
- Subsea
1198 2.2.3.5 Wear LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control
(linked to 1.7.2.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP -
- Subsea
1199 2.2.3.5 Wear Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control
1.7.2.4)
Systems
Accumulators
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
- Subsea
1200 2.2.3.5 Wear LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control
Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP
- Subsea
1201 2.2.3.5 Wear - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control
BOP stack (linked to 1.8.1.4)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1202 2.2.3.5 Wear Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control
(linked to 1.9.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1203 2.2.3.5 Wear Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control
disconnect (linked to 1.9.4.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea
1204 2.2.3.5 Wear Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control
trapped gas (linked to 1.10.1.2)
Systems

2650788-DFMECA-2-D2 C-112
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
- Subsea Loss of Function Valves When Demanded - Failure to close on drill pipe through
1209 2.2.3.7 8 3 2 36
Control (general) annular(s) - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.1.2)
Accumulators Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
- Subsea Loss of Function Valves When Demanded - Failure to close on drill pipe through
1210 2.2.3.7 8 2 3 48
Control (general) pipe rams - Close and seal on the drill pipe and allow circulation
Systems on demand (linked to 1.1.2.2)
Accumulators
Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
- Subsea Loss of Function
1211 2.2.3.7 seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Control (general)
pipe and allow circulation on demand (linked to 1.1.4.1)
Systems
Accumulators Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
- Subsea Loss of Function Failure to seal or partial seal on drill pipe through pipe rams -
1212 2.2.3.7 9 2 3 54
Control (general) Close and seal on the drill pipe and allow circulation on demand
Systems (linked to 1.1.4.2)
Accumulators
Actuates Too Slowly on Demand - Closes too slowly - Close and
- Subsea Loss of Function
1213 2.2.3.7 seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Control (general)
1.1.7.1)
Systems
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Accumulators
Shear Ram or C&K Valves - Failure to close on open hole through
- Subsea Loss of Function
1214 2.2.3.7 blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Control (general)
allow volumetric well control operations on demand (linked to
Systems
1.2.1.2)
Accumulators Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
- Subsea Loss of Function to close on open hole through blind-shear rams or annular - Close
1215 2.2.3.7 9 1 2 18
Control (general) and seal on open hole and allow volumetric well control
Systems operations on demand (linked to 1.2.1.4)
Accumulators Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
- Subsea Loss of Function Shear Ram - Failure to close on open hole through blind-shear
1216 2.2.3.7 9 1 2 18
Control (general) rams or annular - Close and seal on open hole and allow
Systems volumetric well control operations on demand (linked to 1.2.1.5)
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
- Subsea Loss of Function
1217 2.2.3.7 to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Control (general)
(linked to 1.3.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
- Subsea Loss of Function
1218 2.2.3.7 Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Control (general)
BOP and control the wellbore (linked to 1.4.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea Loss of Function
1219 2.2.3.7 Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Control (general)
seal the wellbore (linked to 1.5.1.2)
Systems

2650788-DFMECA-2-D2 C-113
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
- Subsea Loss of Function
1220 2.2.3.7 operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Control (general)
1.5.2.1)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea Loss of Function
1221 2.2.3.7 wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Control (general)
wellbore (linked to 1.5.3.1)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea Loss of Function
1222 2.2.3.7 Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Control (general)
drill pipe and seal the wellbore (linked to 1.6.2.1)
Systems
Accumulators
Failure to initiate autoshear sequence - Failure to close -
- Subsea Loss of Function
1223 2.2.3.7 Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Control (general)
the wellbore (linked to 1.6.2.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
- Subsea Loss of Function
1224 2.2.3.7 Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Control (general)
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Systems
Accumulators
Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
- Subsea Loss of Function
1225 2.2.3.7 Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Control (general)
(linked to 1.6.3.2)
Systems
Accumulators
Failure of Shear Ram to Seal On Demand - Failure to seal the
- Subsea Loss of Function
1226 2.2.3.7 wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Control (general)
pipe and seal the wellbore (linked to 1.6.4.1)
Systems
Accumulators
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
- Subsea Loss of Function
1227 2.2.3.7 seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Control (general)
drill pipe and seal the wellbore (linked to 1.6.4.2)
Systems
Accumulators
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
- Subsea Loss of Function
1228 2.2.3.7 LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Control (general)
(linked to 1.7.2.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP -
- Subsea Loss of Function
1229 2.2.3.7 Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Control (general)
1.7.2.4)
Systems
Accumulators
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
- Subsea Loss of Function
1230 2.2.3.7 LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Control (general)
Lower BOP stack (linked to 1.8.1.3)
Systems
Accumulators
Moves too slowly to disconnect - Failure to disconnect the LMRP
- Subsea Loss of Function
1231 2.2.3.7 - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Control (general)
BOP stack (linked to 1.8.1.4)
Systems

2650788-DFMECA-2-D2 C-114
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea Loss of Function
1232 2.2.3.7 Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Control (general)
(linked to 1.9.1.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea Loss of Function
1233 2.2.3.7 Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Control (general)
disconnect (linked to 1.9.4.2)
Systems
Accumulators
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
- Subsea Loss of Function
1234 2.2.3.7 Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Control (general)
trapped gas (linked to 1.10.1.2)
Systems
EDS - Subsea Failure to provide control signal, when demanded - Failure to
Loss of, or Degraded
1241 2.2.4.1 Control receive EDS signal prevents disconnecting from stack during 10 2 1 20
Power
Systems emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
EDS - Subsea Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of, or Degraded
1242 2.2.4.1 Control disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Power
Systems from the stack (linked to 1.7.2.1)
Failure to Provide Disconnect Signal (automatically or manually) -
EDS - Subsea
Loss of, or Degraded Failure to disconnect the LMRP - Controlled Operation -
1243 2.2.4.1 Control 9 2 1 18
Power Disconnect the LMRP from the Lower BOP stack (linked to
Systems
1.8.1.1)
EDS - Subsea Fails with no output Failure to provide control signal, when demanded - Failure to
1246 2.2.4.2 Control signal/ receive EDS signal prevents disconnecting from stack during 10 2 1 20
Systems communication emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
EDS - Subsea Fails with no output Failure to Provide Disconnect Signal (automatically) - Failure to
1247 2.2.4.2 Control signal/ disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Systems communication from the stack (linked to 1.7.2.1)
Failure to Provide Disconnect Signal (automatically or manually) -
EDS - Subsea Fails with no output
Failure to disconnect the LMRP - Controlled Operation -
1248 2.2.4.2 Control signal/ 9 2 1 18
Disconnect the LMRP from the Lower BOP stack (linked to
Systems communication
1.8.1.1)
EDS - Subsea Failure to provide control signal, when demanded - Failure to
1253 2.2.4.3 Control Erratic output receive EDS signal prevents disconnecting from stack during 10 2 1 20
Systems emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
EDS - Subsea Failure to Provide Disconnect Signal (automatically) - Failure to
1254 2.2.4.3 Control Erratic output disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
Systems from the stack (linked to 1.7.2.1)
Failure to Provide Disconnect Signal (automatically or manually) -
EDS - Subsea
Failure to disconnect the LMRP - Controlled Operation -
1255 2.2.4.3 Control Erratic output 9 2 1 18
Disconnect the LMRP from the Lower BOP stack (linked to
Systems
1.8.1.1)

2650788-DFMECA-2-D2 C-115
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
EDS - Subsea Failure to provide control signal, when demanded - Failure to
Fails to respond to
1259 2.2.4.4 Control receive EDS signal prevents disconnecting from stack during 10 2 1 20
input
Systems emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
EDS - Subsea Failure to Provide Disconnect Signal (automatically) - Failure to
Fails to respond to
1260 2.2.4.4 Control disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
input
Systems from the stack (linked to 1.7.2.1)
Failure to Provide Disconnect Signal (automatically or manually) -
EDS - Subsea
Fails to respond to Failure to disconnect the LMRP - Controlled Operation -
1261 2.2.4.4 Control 9 2 1 18
input Disconnect the LMRP from the Lower BOP stack (linked to
Systems
1.8.1.1)
EDS - Subsea Failure to provide control signal, when demanded - Failure to
1265 2.2.4.5 Control Processing error receive EDS signal - Emergency Operation: EDS - Disconnect 10 2 1 20
Systems from the stack (linked to 1.7.1.1)
EDS - Subsea Failure to provide control signal, when demanded - Failure to
1267 2.2.4.6 Control Ground Fault receive EDS signal - Emergency Operation: EDS - Disconnect 2 7 1 14
Systems from the stack (linked to 1.7.1.1)
EDS - Subsea Failure to provide control signal, when demanded - Failure to
Loss of function
1271 2.2.4.7 Control receive EDS signal prevents disconnecting from stack during 10 2 1 20
(general)
Systems emergency operation when using the EDS (1.7) (linked to 1.7.1.1)
EDS - Subsea Failure to Provide Disconnect Signal (automatically) - Failure to
Loss of function
1272 2.2.4.7 Control disconnect the LMRP - Emergency Operation: EDS - Disconnect 10 2 1 20
(general)
Systems from the stack (linked to 1.7.2.1)
Failure to Provide Disconnect Signal (automatically or manually) -
EDS - Subsea
Loss of function Failure to disconnect the LMRP - Controlled Operation -
1273 2.2.4.7 Control 9 2 1 18
(general) Disconnect the LMRP from the Lower BOP stack (linked to
Systems
1.8.1.1)
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Conduit and
External Leak/ Valves When Demanded - Failure to close on drill pipe through
1279 2.2.5.1 Manifold - 8 3 2 36
Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Conduit and
External Leak/ Valves When Demanded - Failure to close on drill pipe through
1280 2.2.5.1 Manifold - 8 2 3 48
Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems

2650788-DFMECA-2-D2 C-116
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular -
Conduit and
External Leak/ Failure to seal or partial seal on drill pipe through annular(s) -
1281 2.2.5.1 Manifold - 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak/
1282 2.2.5.1 Manifold - seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Conduit and
External Leak/ Failure to seal or partial seal on drill pipe through pipe rams -
1283 2.2.5.1 Manifold - 9 2 3 54
Rupture Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Actuates Too Slowly on Demand - Closes too slowly - Close and
External Leak/
1284 2.2.5.1 Manifold - seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Rupture
Subsea 1.1.7.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
External Leak/ External Leak - Loss of containment - Close and seal on the drill
1285 2.2.5.1 Manifold - 8 3 3 72
Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Subsea
Control
Systems
Hydraulic
Supply: Rigid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Conduit and Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
1286 2.2.5.1 Manifold - blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems

2650788-DFMECA-2-D2 C-117
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Conduit and
External Leak/ to close on open hole through blind-shear rams or annular - Close
1287 2.2.5.1 Manifold - 9 1 2 18
Rupture and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Conduit and
External Leak/ Shear Ram - Failure to close on open hole through blind-shear
1288 2.2.5.1 Manifold - 9 1 2 18
Rupture rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
External Leak/
1289 2.2.5.1 Manifold - to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Rupture
Subsea (linked to 1.3.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
External Leak/
1290 2.2.5.1 Manifold - Failure to maintain stripping pressure - Strip the drill string using 8 2 2 32
Rupture
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
External Leak/
1291 2.2.5.1 Manifold - Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Rupture
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
External Leak/
1292 2.2.5.1 Manifold - maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Rupture
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-118
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1293 2.2.5.1 Manifold - Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Rupture
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
1294 2.2.5.1 Manifold - operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Subsea 1.5.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1295 2.2.5.1 Manifold - wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1296 2.2.5.1 Manifold - seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and
External Leak/ External Leak - Loss of containment - Controlled operation -
1297 2.2.5.1 Manifold - 10 3 1 30
Rupture Shear the drill pipe and seal the wellbore (linked to 1.5.6.1)
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1298 2.2.5.1 Manifold - Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-119
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to initiate autoshear sequence - Failure to close -
External Leak/
1299 2.2.5.1 Manifold - Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Rupture
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1300 2.2.5.1 Manifold - Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Subsea - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
1301 2.2.5.1 Manifold - Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Subsea (linked to 1.6.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1302 2.2.5.1 Manifold - wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1303 2.2.5.1 Manifold - seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and External Leak - Loss of containment - Emergency Operation -
External Leak/
1304 2.2.5.1 Manifold - Auto-Shear - Shear the drill pipe and seal the wellbore (linked to 10 3 1 30
Rupture
Subsea 1.6.7.1)
Control
Systems

2650788-DFMECA-2-D2 C-120
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
1305 2.2.5.1 Manifold - LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Subsea (linked to 1.7.2.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Moves too slowly to disconnect - Failure to disconnect the LMRP -
External Leak/
1306 2.2.5.1 Manifold - Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Rupture
Subsea 1.7.2.4)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
1307 2.2.5.1 Manifold - LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
1308 2.2.5.1 Manifold - - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Subsea BOP stack (linked to 1.8.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
1309 2.2.5.1 Manifold - Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Rupture
Subsea (linked to 1.9.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
1310 2.2.5.1 Manifold - Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Rupture
Subsea disconnect (linked to 1.9.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-121
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and
External Leak/ External Leak - Loss of containment - Circulate the well after drill
1311 2.2.5.1 Manifold - 8 3 3 72
Rupture pipe disconnect (linked to 1.9.5.1)
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
External Leak/
1312 2.2.5.1 Manifold - Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Rupture
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1315 2.2.5.2 Manifold - Internal leak 8 3 2 48
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1316 2.2.5.2 Manifold - Internal leak 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1317 2.2.5.2 Manifold - Internal leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Conduit and
Failure to seal or partial seal on drill pipe through pipe rams -
1318 2.2.5.2 Manifold - Internal leak 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-122
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Conduit and
to close on open hole through blind-shear rams or annular - Close
1319 2.2.5.2 Manifold - Internal leak 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Conduit and
Shear Ram - Failure to close on open hole through blind-shear
1320 2.2.5.2 Manifold - Internal leak 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1321 2.2.5.2 Manifold - Internal leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
1322 2.2.5.2 Manifold - Internal leak Failure to maintain stripping pressure - Strip the drill string using 9 2 2 36
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1323 2.2.5.2 Manifold - Internal leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1324 2.2.5.2 Manifold - Internal leak maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
Subsea and control the wellbore (linked to 1.4.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-123
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1325 2.2.5.2 Manifold - Internal leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1326 2.2.5.2 Manifold - Internal leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1327 2.2.5.2 Manifold - Internal leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1328 2.2.5.2 Manifold - Internal leak seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Subsea seal the wellbore (linked to 1.5.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1329 2.2.5.2 Manifold - Internal leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to initiate autoshear sequence - Failure to close -
1330 2.2.5.2 Manifold - Internal leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems

2650788-DFMECA-2-D2 C-124
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1331 2.2.5.2 Manifold - Internal leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1332 2.2.5.2 Manifold - Internal leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1333 2.2.5.2 Manifold - Internal leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1334 2.2.5.2 Manifold - Internal leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1335 2.2.5.2 Manifold - Internal leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1336 2.2.5.2 Manifold - Internal leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-125
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1337 2.2.5.2 Manifold - Internal leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1338 2.2.5.2 Manifold - Internal leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1343 2.2.5.3 Manifold - Plugged 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1344 2.2.5.3 Manifold - Plugged 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1345 2.2.5.3 Manifold - Plugged seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Conduit and
Failure to seal or partial seal on drill pipe through pipe rams -
1346 2.2.5.3 Manifold - Plugged 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-126
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Actuates Too Slowly on Demand - Closes too slowly - Close and
1347 2.2.5.3 Manifold - Plugged seal on the drill pipe and allow circulation on demand (linked to 9 3 4 108
Subsea 1.1.7.1)
Control
Systems
Hydraulic
Supply: Rigid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Conduit and Shear Ram or C&K Valves - Failure to close on open hole through
1348 2.2.5.3 Manifold - Plugged blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Hydraulic
Supply: Rigid
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Conduit and
to close on open hole through blind-shear rams or annular - Close
1349 2.2.5.3 Manifold - Plugged 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Conduit and
Shear Ram - Failure to close on open hole through blind-shear
1350 2.2.5.3 Manifold - Plugged 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1351 2.2.5.3 Manifold - Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
1352 2.2.5.3 Manifold - Plugged Failure to maintain stripping pressure - Strip the drill string using 8 2 2 32
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-127
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1353 2.2.5.3 Manifold - Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1354 2.2.5.3 Manifold - Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1355 2.2.5.3 Manifold - Plugged operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1356 2.2.5.3 Manifold - Plugged wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Actuates Too Slowly on Demand - Closes too slowly - Controlled
1357 2.2.5.3 Manifold - Plugged operation - Shear the drill pipe and seal the wellbore (linked to 8 3 2 48
Subsea 1.5.5.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1358 2.2.5.3 Manifold - Plugged Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-128
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to initiate autoshear sequence - Failure to close -
1359 2.2.5.3 Manifold - Plugged Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1360 2.2.5.3 Manifold - Plugged Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Subsea - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1361 2.2.5.3 Manifold - Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1362 2.2.5.3 Manifold - Plugged wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1363 2.2.5.3 Manifold - Plugged seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Actuates Too Slowly on Demand - Closes too slowly - Emergency
1364 2.2.5.3 Manifold - Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 3 4 108
Subsea (linked to 1.6.6.1)
Control
Systems

2650788-DFMECA-2-D2 C-129
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1365 2.2.5.3 Manifold - Plugged LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Moves too slowly to disconnect - Failure to disconnect the LMRP -
1366 2.2.5.3 Manifold - Plugged Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 4 108
Subsea 1.7.2.4)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1367 2.2.5.3 Manifold - Plugged LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Moves too slowly to disconnect - Failure to disconnect the LMRP
1368 2.2.5.3 Manifold - Plugged - Controlled Operation - Disconnect the LMRP from the Lower 9 3 4 108
Subsea BOP stack (linked to 1.8.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1369 2.2.5.3 Manifold - Plugged Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1370 2.2.5.3 Manifold - Plugged Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems

2650788-DFMECA-2-D2 C-130
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and
External Leak - Loss of containment - Circulate the well after drill
1371 2.2.5.3 Manifold - Plugged 8 3 3 72
pipe disconnect (linked to 1.9.5.1)
Subsea
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1372 2.2.5.3 Manifold - Plugged Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1376 2.2.5.4 Manifold - Mechanical Failure 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1377 2.2.5.4 Manifold - Mechanical Failure 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular -
Conduit and
Failure to seal or partial seal on drill pipe through annular(s) -
1378 2.2.5.4 Manifold - Mechanical Failure 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1379 2.2.5.4 Manifold - Mechanical Failure seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems

2650788-DFMECA-2-D2 C-131
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Conduit and
Failure to seal or partial seal on drill pipe through pipe rams -
1380 2.2.5.4 Manifold - Mechanical Failure 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Actuate Under Fail-safe Conditions - Failure to open /
1381 2.2.5.4 Manifold - Mechanical Failure close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
Subsea circulation on demand (linked to 1.1.6.1)
Control
Systems
Hydraulic
Supply: Rigid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Conduit and Shear Ram or C&K Valves - Failure to close on open hole through
1382 2.2.5.4 Manifold - Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Hydraulic
Supply: Rigid
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Conduit and
to close on open hole through blind-shear rams or annular - Close
1383 2.2.5.4 Manifold - Mechanical Failure 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Conduit and
Shear Ram - Failure to close on open hole through blind-shear
1384 2.2.5.4 Manifold - Mechanical Failure 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1385 2.2.5.4 Manifold - Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-132
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
1386 2.2.5.4 Manifold - Mechanical Failure Failure to maintain stripping pressure - Strip the drill string using 8 2 2 32
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1387 2.2.5.4 Manifold - Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1388 2.2.5.4 Manifold - Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1389 2.2.5.4 Manifold - Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1390 2.2.5.4 Manifold - Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1391 2.2.5.4 Manifold - Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-133
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to initiate autoshear sequence - Failure to close -
1392 2.2.5.4 Manifold - Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1393 2.2.5.4 Manifold - Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1394 2.2.5.4 Manifold - Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1395 2.2.5.4 Manifold - Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1396 2.2.5.4 Manifold - Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1397 2.2.5.4 Manifold - Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-134
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1398 2.2.5.4 Manifold - Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1399 2.2.5.4 Manifold - Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1404 2.2.5.6 Manifold - Corrosion/ Erosion 8 3 2 36
annular(s) - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Conduit and
Valves When Demanded - Failure to close on drill pipe through
1405 2.2.5.6 Manifold - Corrosion/ Erosion 8 2 3 48
pipe rams - Close and seal on the drill pipe and allow circulation
Subsea
on demand (linked to 1.1.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular -
Conduit and
Failure to seal or partial seal on drill pipe through annular(s) -
1406 2.2.5.6 Manifold - Corrosion/ Erosion 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1407 2.2.5.6 Manifold - Corrosion/ Erosion seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Subsea pipe and allow circulation on demand (linked to 1.1.4.1)
Control
Systems

2650788-DFMECA-2-D2 C-135
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Pipe Ram -
Conduit and
Failure to seal or partial seal on drill pipe through pipe rams -
1408 2.2.5.6 Manifold - Corrosion/ Erosion 9 2 3 54
Close and seal on the drill pipe and allow circulation on demand
Subsea
(linked to 1.1.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Actuate Under Fail-safe Conditions - Failure to open /
1409 2.2.5.6 Manifold - Corrosion/ Erosion close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
Subsea circulation on demand (linked to 1.1.6.1)
Control
Systems
Hydraulic
Supply: Rigid Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Conduit and Shear Ram or C&K Valves - Failure to close on open hole through
1410 2.2.5.6 Manifold - Corrosion/ Erosion blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Subsea allow volumetric well control operations on demand (linked to
Control 1.2.1.2)
Systems
Hydraulic
Supply: Rigid
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Conduit and
to close on open hole through blind-shear rams or annular - Close
1411 2.2.5.6 Manifold - Corrosion/ Erosion 9 1 2 18
and seal on open hole and allow volumetric well control
Subsea
operations on demand (linked to 1.2.1.4)
Control
Systems
Hydraulic
Supply: Rigid
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Conduit and
Shear Ram - Failure to close on open hole through blind-shear
1412 2.2.5.6 Manifold - Corrosion/ Erosion 9 1 2 18
rams or annular - Close and seal on open hole and allow
Subsea
volumetric well control operations on demand (linked to 1.2.1.5)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
1413 2.2.5.6 Manifold - Corrosion/ Erosion to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
Subsea (linked to 1.3.1.2)
Control
Systems

2650788-DFMECA-2-D2 C-136
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Hydraulic Fluid & Pressure to Annulars -
1414 2.2.5.6 Manifold - Corrosion/ Erosion Failure to maintain stripping pressure - Strip the drill string using 8 2 2 32
Subsea the annular BOP(s) (linked to 1.3.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
1415 2.2.5.6 Manifold - Corrosion/ Erosion Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Subsea BOP and control the wellbore (linked to 1.4.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1416 2.2.5.6 Manifold - Corrosion/ Erosion Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Subsea seal the wellbore (linked to 1.5.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1417 2.2.5.6 Manifold - Corrosion/ Erosion operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Subsea 1.5.2.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1418 2.2.5.6 Manifold - Corrosion/ Erosion wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Subsea wellbore (linked to 1.5.3.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1419 2.2.5.6 Manifold - Corrosion/ Erosion Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Subsea drill pipe and seal the wellbore (linked to 1.6.2.1)
Control
Systems

2650788-DFMECA-2-D2 C-137
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to initiate autoshear sequence - Failure to close -
1420 2.2.5.6 Manifold - Corrosion/ Erosion Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 1 20
Subsea the wellbore (linked to 1.6.2.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1421 2.2.5.6 Manifold - Corrosion/ Erosion Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Subsea (linked to 1.6.3.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Shear Ram to Seal On Demand - Failure to seal the
1422 2.2.5.6 Manifold - Corrosion/ Erosion wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Subsea pipe and seal the wellbore (linked to 1.6.4.1)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1423 2.2.5.6 Manifold - Corrosion/ Erosion seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Subsea drill pipe and seal the wellbore (linked to 1.6.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1424 2.2.5.6 Manifold - Corrosion/ Erosion LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Subsea (linked to 1.7.2.3)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1425 2.2.5.6 Manifold - Corrosion/ Erosion LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Subsea Lower BOP stack (linked to 1.8.1.3)
Control
Systems

2650788-DFMECA-2-D2 C-138
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1426 2.2.5.6 Manifold - Corrosion/ Erosion Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Subsea (linked to 1.9.1.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1427 2.2.5.6 Manifold - Corrosion/ Erosion Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Subsea disconnect (linked to 1.9.4.2)
Control
Systems
Hydraulic
Supply: Rigid
Conduit and Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
1428 2.2.5.6 Manifold - Corrosion/ Erosion Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Subsea trapped gas (linked to 1.10.1.2)
Control
Systems
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Annulars - External Leak/ to close on open hole through blind-shear rams or annular - Close
1439 2.3.1.1 10 2 2 40
BOP Stack Rupture and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.3)
Failure to Close Annulars on Drill String on Demand - Failure to
Annulars - External Leak/
1440 2.3.1.1 close annulars - Strip the drill string using the annular BOP(s) 8 2 2 32
BOP Stack Rupture
(linked to 1.3.1.3)
Annulars - External Leak/ Failure of Annulars to Seal on Demand - Failure to seal - Strip the
1441 2.3.1.1 8 2 2 32
BOP Stack Rupture drill string using the annular BOP(s) (linked to 1.3.3.1)
Annulars - External Leak/ Failure to Maintain Sealing Pressure on Annulars - Failure to seal
1442 2.3.1.1 9 2 2 36
BOP Stack Rupture - Strip the drill string using the annular BOP(s) (linked to 1.3.3.2)
Failure to Close Annular on Demand - Failure to close on drill pipe
Annulars - External Leak/
1443 2.3.1.1 through annular(s) - Close and seal on the drill pipe and allow 10 2 2 40
BOP Stack Rupture
circulation on demand (linked to 1.1.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Annulars - External Leak/ Valves When Demanded - Failure to close on drill pipe through
1444 2.3.1.1 10 2 2 40
BOP Stack Rupture annular(s) - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Annulars - External Leak/ Valves When Demanded - Failure to close on drill pipe through
1445 2.3.1.1 10 2 2 40
BOP Stack Rupture pipe rams - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.2.2)

2650788-DFMECA-2-D2 C-139
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Close Pipe Ram on Demand - Failure to close on drill
Annulars - External Leak/
1446 2.3.1.1 pipe through pipe rams - Close and seal on the drill pipe and allow 10 2 2 40
BOP Stack Rupture
circulation on demand (linked to 1.1.2.3)
Annulars - External Leak/ External Leak - Loss of containment - Close and seal on the drill
1447 2.3.1.1 10 2 2 40
BOP Stack Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Annulars - External Leak/ to close on open hole through blind-shear rams or annular - Close
1448 2.3.1.1 9 2 2 36
BOP Stack Rupture and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Annulars - External Leak/ Shear Ram - Failure to close on open hole through blind-shear
1449 2.3.1.1 9 2 2 36
BOP Stack Rupture rams or annular - Close and seal on open hole and allow
volumetric well control operations on demand (linked to 1.2.1.5)
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Annulars - External Leak/
1450 2.3.1.1 to close annulars - Strip the drill string using the annular BOP(s) 10 2 2 40
BOP Stack Rupture
(linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Annulars - External Leak/
1451 2.3.1.1 Failure of hang-off ram to close - Hang-off the drill pipe on a ram 10 2 2 40
BOP Stack Rupture
BOP and control the wellbore (linked to 1.4.1.2)
Failure to Close Hang-off Ram on Demand - Failure of hang-off
Annulars - External Leak/
1452 2.3.1.1 ram to close - Hang-off the drill pipe on a ram BOP and control 10 2 2 40
BOP Stack Rupture
the wellbore (linked to 1.4.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Annulars - External Leak/
1453 2.3.1.1 Failure to close - Controlled operation - Shear the drill pipe and 9 2 2 36
BOP Stack Rupture
seal the wellbore (linked to 1.5.1.2)
Failure to Adequately Seal under Fail-safe Conditions - Failure to
Annulars - External Leak/
1454 2.3.1.1 open / close fail-safe valves to seal - Circulate the well after drill 10 2 2 40
BOP Stack Rupture
pipe disconnect (linked to 1.9.3.2)
Failure to Adequately Seal under Fail-safe Condition - Failure to
Annulars - External Leak/
1455 2.3.1.1 open / close fail-safe valves to seal - Circulate across the BOP 9 2 2 40
BOP Stack Rupture
stack to remove trapped gas (linked to 1.10.3.2)
Annulars - External Leak/ External Leak - Loss of containment - Circulate across the BOP
1456 2.3.1.1 10 2 2 40
BOP Stack Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Annulars - to close on open hole through blind-shear rams or annular - Close
1459 2.3.1.2 Internal Leak 10 2 2 40
BOP Stack and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Annulars - Valves When Demanded - Failure to close on drill pipe through
1460 2.3.1.2 Internal Leak 8 2 1 16
BOP Stack annular(s) - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.1.2)

2650788-DFMECA-2-D2 C-140
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Annulars - Valves When Demanded - Failure to close on drill pipe through
1461 2.3.1.2 Internal Leak 8 2 1 16
BOP Stack pipe rams - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.2.2)
Failure to Close Pipe Ram on Demand - Failure to close on drill
Annulars -
1462 2.3.1.2 Internal Leak pipe through pipe rams - Close and seal on the drill pipe and allow 9 2 1 18
BOP Stack
circulation on demand (linked to 1.1.2.3)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Shear Ram or C&K Valves - Failure to close on open hole through
Annulars -
1463 2.3.1.2 Internal Leak blind-shear rams or annular - Close and seal on open hole and 10 2 1 20
BOP Stack
allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Annulars - to close on open hole through blind-shear rams or annular - Close
1464 2.3.1.2 Internal Leak 10 2 1 20
BOP Stack and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Annulars - Shear Ram - Failure to close on open hole through blind-shear
1465 2.3.1.2 Internal Leak 10 2 1 20
BOP Stack rams or annular - Close and seal on open hole and allow
volumetric well control operations on demand (linked to 1.2.1.5)
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Annulars -
1466 2.3.1.2 Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 10 2 1 20
BOP Stack
(linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Annulars -
1467 2.3.1.2 Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 10 2 1 20
BOP Stack
BOP and control the wellbore (linked to 1.4.1.2)
Failure to Close Hang-off Ram on Demand - Failure of hang-off
Annulars -
1468 2.3.1.2 Internal Leak ram to close - Hang-off the drill pipe on a ram BOP and control 9 2 1 18
BOP Stack
the wellbore (linked to 1.4.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Annulars -
1469 2.3.1.2 Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 9 2 1 18
BOP Stack
seal the wellbore (linked to 1.5.1.2)
Failure to Adequately Seal under Fail-safe Conditions - Failure to
Annulars -
1470 2.3.1.2 Internal Leak open / close fail-safe valves to seal - Circulate the well after drill 10 2 1 20
BOP Stack
pipe disconnect (linked to 1.9.3.2)
Failure to Adequately Seal under Fail-safe Condition - Failure to
Annulars -
1471 2.3.1.2 Internal Leak open / close fail-safe valves to seal - Circulate across the BOP 10 2 1 20
BOP Stack
stack to remove trapped gas (linked to 1.10.3.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Annulars - Valves When Demanded - Failure to close on drill pipe through
1472 2.3.1.3 Plugged 8 3 2 36
BOP Stack annular(s) - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.1.2)

2650788-DFMECA-2-D2 C-141
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Annulars - Valves When Demanded - Failure to close on drill pipe through
1473 2.3.1.3 Plugged 8 2 3 48
BOP Stack pipe rams - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.2.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Shear Ram or C&K Valves - Failure to close on open hole through
Annulars -
1474 2.3.1.3 Plugged blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
BOP Stack
allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Annulars -
1475 2.3.1.3 Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
BOP Stack
(linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Annulars -
1476 2.3.1.3 Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
BOP Stack
BOP and control the wellbore (linked to 1.4.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Annulars -
1477 2.3.1.3 Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
BOP Stack
seal the wellbore (linked to 1.5.1.2)
Failure of Annular to Seal on Demand - Failure to seal or partial
Annulars -
1479 2.3.1.4 Mechanical Failure seal on drill pipe through annular(s) - Close and seal on the drill 9 2 2 36
BOP Stack
pipe and allow circulation on demand (linked to 1.1.3.1)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Annulars - to close on open hole through blind-shear rams or annular - Close
1480 2.3.1.4 Mechanical Failure 10 2 2 40
BOP Stack and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Annulars - Shear Ram - Failure to close on open hole through blind-shear
1481 2.3.1.4 Mechanical Failure 9 1 2 18
BOP Stack rams or annular - Close and seal on open hole and allow
volumetric well control operations on demand (linked to 1.2.1.5)
Annulars - Failure of Annulars to Seal on Demand - Failure to seal - Strip the
1482 2.3.1.4 Mechanical Failure 8 2 2 32
BOP Stack drill string using the annular BOP(s) (linked to 1.3.3.1)
Annulars - Failure to Maintain Sealing Pressure on Annulars - Failure to seal
1483 2.3.1.4 Mechanical Failure 9 2 2 36
BOP Stack - Strip the drill string using the annular BOP(s) (linked to 1.3.3.2)
Annulars - Failure to Maintain Sealing Pressure on Annulars - Failure to seal
1486 2.3.1.5 Wear 9 2 2 36
BOP Stack - Strip the drill string using the annular BOP(s) (linked to 1.3.3.2)
Failure of Annular to Seal on Demand - Failure to seal or partial
Annulars -
1487 2.3.1.5 Wear seal on drill pipe through annular(s) - Close and seal on the drill 9 2 1 36
BOP Stack
pipe and allow circulation on demand (linked to 1.1.3.1)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Annulars - to close on open hole through blind-shear rams or annular - Close
1488 2.3.1.5 Wear 9 2 1 36
BOP Stack and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.4)

2650788-DFMECA-2-D2 C-142
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Annulars - Shear Ram - Failure to close on open hole through blind-shear
1489 2.3.1.5 Wear 9 2 1 36
BOP Stack rams or annular - Close and seal on open hole and allow
volumetric well control operations on demand (linked to 1.2.1.5)
Annulars - Failure of Annulars to Seal on Demand - Failure to seal - Strip the
1490 2.3.1.5 Wear 9 2 1 36
BOP Stack drill string using the annular BOP(s) (linked to 1.3.3.1)
Blind Shear
External Leak/ External Leak - Loss of containment - Close and seal on the drill
1499 2.3.2.1 Ram - BOP 9 5 3 135
Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Blind Shear Shear Ram or C&K Valves - Failure to close on open hole through
External Leak/
1500 2.3.2.1 Ram - BOP blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Rupture
Stack allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Blind Shear
External Leak/ to close on open hole through blind-shear rams or annular - Close
1501 2.3.2.1 Ram - BOP 10 2 2 40
Rupture and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.3)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Blind Shear
External Leak/ to close on open hole through blind-shear rams or annular - Close
1502 2.3.2.1 Ram - BOP 10 2 2 40
Rupture and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Blind Shear
External Leak/ Shear Ram - Failure to close on open hole through blind-shear
1503 2.3.2.1 Ram - BOP 9 1 2 18
Rupture rams or annular - Close and seal on open hole and allow
Stack
volumetric well control operations on demand (linked to 1.2.1.5)
Blind Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
External Leak/
1504 2.3.2.1 Ram - BOP locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Rupture
Stack wellbore (linked to 1.4.3.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
1505 2.3.2.1 Ram - BOP operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Stack 1.5.2.1)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1506 2.3.2.1 Ram - BOP wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Stack wellbore (linked to 1.5.3.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1507 2.3.2.1 Ram - BOP seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Stack seal the wellbore (linked to 1.5.3.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
External Leak/
1508 2.3.2.1 Ram - BOP Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Rupture
Stack (linked to 1.5.4.2)

2650788-DFMECA-2-D2 C-143
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blind Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1509 2.3.2.1 Ram - BOP Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
1510 2.3.2.1 Ram - BOP Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Stack (linked to 1.6.3.2)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1511 2.3.2.1 Ram - BOP wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1512 2.3.2.1 Ram - BOP seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
External Leak/
1513 2.3.2.1 Ram - BOP Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Rupture
Stack the wellbore (linked to 1.6.5.2)
Blind Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
1514 2.3.2.1 Ram - BOP LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Stack (linked to 1.7.2.3)
Blind Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
1515 2.3.2.1 Ram - BOP LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Stack Lower BOP stack (linked to 1.8.1.3)
Blind Shear
External Leak/ External Leak - Loss of containment - Circulate the well after drill
1516 2.3.2.1 Ram - BOP 10 4 3 120
Rupture pipe disconnect (linked to 1.9.5.1)
Stack
Blind Shear
External Leak/ External Leak - Loss of containment - Circulate across the BOP
1517 2.3.2.1 Ram - BOP 10 4 3 120
Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Blind Shear Shear Ram or C&K Valves - Failure to close on open hole through
1521 2.3.2.2 Ram - BOP Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Stack allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Blind Shear
to close on open hole through blind-shear rams or annular - Close
1522 2.3.2.2 Ram - BOP Internal Leak 10 2 2 40
and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.3)
Blind Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
1523 2.3.2.2 Ram - BOP Internal Leak locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Stack wellbore (linked to 1.4.3.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1524 2.3.2.2 Ram - BOP Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)

2650788-DFMECA-2-D2 C-144
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1525 2.3.2.2 Ram - BOP Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Blind Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1526 2.3.2.2 Ram - BOP Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1527 2.3.2.2 Ram - BOP Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1528 2.3.2.2 Ram - BOP Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1529 2.3.2.2 Ram - BOP Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Blind Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1530 2.3.2.2 Ram - BOP Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Stack (linked to 1.7.2.3)
Blind Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1531 2.3.2.2 Ram - BOP Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Stack Lower BOP stack (linked to 1.8.1.3)
Blind Shear
External Leak - Loss of containment - Close and seal on the drill
1534 2.3.2.4 Ram - BOP Mechanical Failure 9 5 3 135
pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Blind Shear Shear Ram or C&K Valves - Failure to close on open hole through
1535 2.3.2.4 Ram - BOP Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Stack allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Blind Shear
to close on open hole through blind-shear rams or annular - Close
1536 2.3.2.4 Ram - BOP Mechanical Failure 10 2 2 40
and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.3)
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Blind Shear
to close on open hole through blind-shear rams or annular - Close
1537 2.3.2.4 Ram - BOP Mechanical Failure 10 2 2 40
and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Blind Shear
Shear Ram - Failure to close on open hole through blind-shear
1538 2.3.2.4 Ram - BOP Mechanical Failure 9 1 2 18
rams or annular - Close and seal on open hole and allow
Stack
volumetric well control operations on demand (linked to 1.2.1.5)

2650788-DFMECA-2-D2 C-145
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blind Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
1539 2.3.2.4 Ram - BOP Mechanical Failure locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Stack wellbore (linked to 1.4.3.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1540 2.3.2.4 Ram - BOP Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1541 2.3.2.4 Ram - BOP Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1542 2.3.2.4 Ram - BOP Mechanical Failure seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Stack seal the wellbore (linked to 1.5.3.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
1543 2.3.2.4 Ram - BOP Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Stack (linked to 1.5.4.2)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1544 2.3.2.4 Ram - BOP Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1545 2.3.2.4 Ram - BOP Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1546 2.3.2.4 Ram - BOP Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
1547 2.3.2.4 Ram - BOP Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Stack the wellbore (linked to 1.6.5.2)
Blind Shear
External Leak - Loss of containment - Circulate the well after drill
1548 2.3.2.4 Ram - BOP Mechanical Failure 10 4 3 120
pipe disconnect (linked to 1.9.5.1)
Stack
Blind Shear
External Leak - Loss of containment - Close and seal on the drill
1553 2.3.2.5 Ram - BOP Wear 9 5 3 135
pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Blind Shear Shear Ram or C&K Valves - Failure to close on open hole through
1554 2.3.2.5 Ram - BOP Wear blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Stack allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Blind Shear
to close on open hole through blind-shear rams or annular - Close
1555 2.3.2.5 Ram - BOP Wear 10 2 2 40
and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.3)

2650788-DFMECA-2-D2 C-146
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure of Annular / Blind-Shear Ram to Seal on Demand - Failure
Blind Shear
to close on open hole through blind-shear rams or annular - Close
1556 2.3.2.5 Ram - BOP Wear 10 2 2 40
and seal on open hole and allow volumetric well control
Stack
operations on demand (linked to 1.2.1.4)
Failure to Maintain Adequate Sealing Pressure on Annular / Blind-
Blind Shear
Shear Ram - Failure to close on open hole through blind-shear
1557 2.3.2.5 Ram - BOP Wear 9 1 2 18
rams or annular - Close and seal on open hole and allow
Stack
volumetric well control operations on demand (linked to 1.2.1.5)
Blind Shear Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1558 2.3.2.5 Ram - BOP Wear maintain closing pressure - Hang-off the drill pipe on a ram BOP 9 2 1 18
Stack and control the wellbore (linked to 1.4.2.1)
Blind Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
1559 2.3.2.5 Ram - BOP Wear locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Stack wellbore (linked to 1.4.3.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1560 2.3.2.5 Ram - BOP Wear operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1561 2.3.2.5 Ram - BOP Wear wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1562 2.3.2.5 Ram - BOP Wear seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Stack seal the wellbore (linked to 1.5.3.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
1563 2.3.2.5 Ram - BOP Wear Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Stack (linked to 1.5.4.2)
Blind Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1564 2.3.2.5 Ram - BOP Wear Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1565 2.3.2.5 Ram - BOP Wear wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1566 2.3.2.5 Ram - BOP Wear seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Blind Shear Unintentional Opening - Unintentional closing / opening -
1567 2.3.2.5 Ram - BOP Wear Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Stack the wellbore (linked to 1.6.5.2)
Blind Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1568 2.3.2.5 Ram - BOP Wear LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Stack (linked to 1.7.2.3)

2650788-DFMECA-2-D2 C-147
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Blind Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1569 2.3.2.5 Ram - BOP Wear LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Stack Lower BOP stack (linked to 1.8.1.3)
Blind Shear
External Leak - Loss of containment - Circulate the well after drill
1570 2.3.2.5 Ram - BOP Wear 10 4 3 120
pipe disconnect (linked to 1.9.5.1)
Stack
Blind Shear
External Leak - Loss of containment - Circulate across the BOP
1571 2.3.2.5 Ram - BOP Wear 10 4 3 120
stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1576 2.3.2.6 Ram - BOP Corrosion/ Erosion operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1577 2.3.2.6 Ram - BOP Corrosion/ Erosion wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Blind Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1578 2.3.2.6 Ram - BOP Corrosion/ Erosion Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Blind Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1579 2.3.2.6 Ram - BOP Corrosion/ Erosion wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Blind Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1580 2.3.2.6 Ram - BOP Corrosion/ Erosion seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Casing Shear
External Leak/ External Leak - Loss of containment - Close and seal on the drill
1588 2.3.3.1 Ram - BOP 9 5 3 135
Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
External Leak/
1589 2.3.3.1 Ram - BOP operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Rupture
Stack 1.5.2.1)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1590 2.3.3.1 Ram - BOP wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Rupture
Stack wellbore (linked to 1.5.3.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1591 2.3.3.1 Ram - BOP seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Rupture
Stack seal the wellbore (linked to 1.5.3.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
External Leak/
1592 2.3.3.1 Ram - BOP Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Rupture
Stack (linked to 1.5.4.2)
Casing Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1593 2.3.3.1 Ram - BOP Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)

2650788-DFMECA-2-D2 C-148
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
External Leak/
1594 2.3.3.1 Ram - BOP Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Rupture
Stack (linked to 1.6.3.2)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
External Leak/
1595 2.3.3.1 Ram - BOP wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Rupture
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
External Leak/
1596 2.3.3.1 Ram - BOP seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Rupture
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
External Leak/
1597 2.3.3.1 Ram - BOP Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Rupture
Stack the wellbore (linked to 1.6.5.2)
Casing Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
External Leak/
1598 2.3.3.1 Ram - BOP LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Rupture
Stack (linked to 1.7.2.3)
Casing Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
1599 2.3.3.1 Ram - BOP LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Stack Lower BOP stack (linked to 1.8.1.3)
Casing Shear
External Leak/ External Leak - Loss of containment - Circulate the well after drill
1600 2.3.3.1 Ram - BOP 10 4 3 120
Rupture pipe disconnect (linked to 1.9.5.1)
Stack
Casing Shear
External Leak/ External Leak - Loss of containment - Circulate across the BOP
1601 2.3.3.1 Ram - BOP 10 4 3 120
Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1605 2.3.3.2 Ram - BOP Internal Leak operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1606 2.3.3.2 Ram - BOP Internal Leak wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Casing Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1607 2.3.3.2 Ram - BOP Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1608 2.3.3.2 Ram - BOP Internal Leak Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1609 2.3.3.2 Ram - BOP Internal Leak wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1610 2.3.3.2 Ram - BOP Internal Leak seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)

2650788-DFMECA-2-D2 C-149
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Casing Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1611 2.3.3.2 Ram - BOP Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Stack (linked to 1.7.2.3)
Casing Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1612 2.3.3.2 Ram - BOP Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Stack Lower BOP stack (linked to 1.8.1.3)
Casing Shear
External Leak - Loss of containment - Close and seal on the drill
1616 2.3.3.4 Ram - BOP Mechanical Failure 9 5 3 135
pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Casing Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
1617 2.3.3.4 Ram - BOP Mechanical Failure locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Stack wellbore (linked to 1.4.3.1)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1618 2.3.3.4 Ram - BOP Mechanical Failure operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1619 2.3.3.4 Ram - BOP Mechanical Failure wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1620 2.3.3.4 Ram - BOP Mechanical Failure seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Stack seal the wellbore (linked to 1.5.3.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
1621 2.3.3.4 Ram - BOP Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Stack (linked to 1.5.4.2)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1622 2.3.3.4 Ram - BOP Mechanical Failure Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1623 2.3.3.4 Ram - BOP Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1624 2.3.3.4 Ram - BOP Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
1625 2.3.3.4 Ram - BOP Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Stack the wellbore (linked to 1.6.5.2)
Casing Shear
External Leak - Loss of containment - Circulate the well after drill
1626 2.3.3.4 Ram - BOP Mechanical Failure 10 4 3 120
pipe disconnect (linked to 1.9.5.1)
Stack
Casing Shear
External Leak - Loss of containment - Circulate across the BOP
1627 2.3.3.4 Ram - BOP Mechanical Failure 10 4 3 120
stack to remove trapped gas - (linked to 1.10.4.1)
Stack

2650788-DFMECA-2-D2 C-150
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Casing Shear
External Leak - Loss of containment - Close and seal on the drill
1632 2.3.3.5 Ram - BOP Wear 9 5 3 135
pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Casing Shear Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1633 2.3.3.5 Ram - BOP Wear maintain closing pressure - Hang-off the drill pipe on a ram BOP 9 2 1 18
Stack and control the wellbore (linked to 1.4.2.1)
Casing Shear Failure to Engage Lock on Hang-off Ram - Failure to maintain
1634 2.3.3.5 Ram - BOP Wear locking - Hang-off the drill pipe on a ram BOP and control the 8 5 2 80
Stack wellbore (linked to 1.4.3.1)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1635 2.3.3.5 Ram - BOP Wear operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1636 2.3.3.5 Ram - BOP Wear wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1637 2.3.3.5 Ram - BOP Wear seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
Stack seal the wellbore (linked to 1.5.3.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
1638 2.3.3.5 Ram - BOP Wear Controlled operation - Shear the drill pipe and seal the wellbore 6 1 4 24
Stack (linked to 1.5.4.2)
Casing Shear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1639 2.3.3.5 Ram - BOP Wear Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1640 2.3.3.5 Ram - BOP Wear Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1641 2.3.3.5 Ram - BOP Wear wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1642 2.3.3.5 Ram - BOP Wear seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Casing Shear Unintentional Opening - Unintentional closing / opening -
1643 2.3.3.5 Ram - BOP Wear Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 2 2 40
Stack the wellbore (linked to 1.6.5.2)
Casing Shear Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
1644 2.3.3.5 Ram - BOP Wear LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Stack (linked to 1.7.2.3)
Casing Shear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
1645 2.3.3.5 Ram - BOP Wear LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Stack Lower BOP stack (linked to 1.8.1.3)

2650788-DFMECA-2-D2 C-151
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Casing Shear
External Leak - Loss of containment - Circulate the well after drill
1646 2.3.3.5 Ram - BOP Wear 10 4 3 120
pipe disconnect (linked to 1.9.5.1)
Stack
Casing Shear
External Leak - Loss of containment - Circulate across the BOP
1647 2.3.3.5 Ram - BOP Wear 10 4 3 120
stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Controlled
1652 2.3.3.6 Ram - BOP Corrosion/ Erosion operation - Shear the drill pipe and seal the wellbore (linked to 6 1 1 6
Stack 1.5.2.1)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1653 2.3.3.6 Ram - BOP Corrosion/ Erosion wellbore - Controlled operation - Shear the drill pipe and seal the 6 1 1 6
Stack wellbore (linked to 1.5.3.1)
Casing Shear Failure to Shear Pipe - Failure to shear the drill pipe - Emergency
1654 2.3.3.6 Ram - BOP Corrosion/ Erosion Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 9 1 2 18
Stack (linked to 1.6.3.2)
Casing Shear Failure of Shear Ram to Seal On Demand - Failure to seal the
1655 2.3.3.6 Ram - BOP Corrosion/ Erosion wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Casing Shear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1656 2.3.3.6 Ram - BOP Corrosion/ Erosion seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Pipe & Test Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
External Leak/
1665 2.3.4.1 Rams - BOP seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Rupture
Stack pipe and allow circulation on demand (linked to 1.1.4.1)
Pipe & Test
External Leak/ External Leak - Loss of containment - Close and seal on the drill
1666 2.3.4.1 Rams - BOP 9 5 3 135
Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Pipe & Test
External Leak/ External Leak - Loss of containment - Circulate across the BOP
1667 2.3.4.1 Rams - BOP 9 3 3 54
Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Pipe & Test Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1671 2.3.4.2 Rams - BOP Internal Leak seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Stack pipe and allow circulation on demand (linked to 1.1.4.1)
Pipe & Test
External Leak - Loss of containment - Close and seal on the drill
1674 2.3.4.4 Rams - BOP Mechanical Failure 9 5 3 135
pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Pipe & Test Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1679 2.3.4.5 Rams - BOP Wear seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Stack pipe and allow circulation on demand (linked to 1.1.4.1)
Pipe & Test Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
1680 2.3.4.5 Rams - BOP Wear maintain closing pressure - Hang-off the drill pipe on a ram BOP 9 2 1 18
Stack and control the wellbore (linked to 1.4.2.1)

2650788-DFMECA-2-D2 C-152
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Pipe & Test Failure of Pipe Ram to Seal on Demand - Failure to seal or partial
1685 2.3.4.6 Rams - BOP Corrosion/ Erosion seal on drill pipe through pipe rams - Close and seal on the drill 9 3 2 54
Stack pipe and allow circulation on demand (linked to 1.1.4.1)
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Lines & External Leak/ Valves When Demanded - Failure to close on drill pipe through
1693 2.3.5.1 8 3 2 36
Valves - BOP Rupture annular(s) - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.1.2)
Choke & Kill Inability to Operate (an individual) C&K Valves as Needed -
Lines & External Leak/ Failure to close on drill pipe through annular(s) - Close and seal
1694 2.3.5.1 7 3 2 42
Valves - BOP Rupture on the drill pipe and allow circulation on demand (linked to
Stack 1.1.1.4)
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Lines & External Leak/ Valves When Demanded - Failure to close on drill pipe through
1695 2.3.5.1 8 2 3 48
Valves - BOP Rupture pipe rams - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.2.2)
Choke & Kill
Failure to Close Pipe Ram on Demand - Failure to close on drill
Lines & External Leak/
1696 2.3.5.1 pipe through pipe rams - Close and seal on the drill pipe and allow 9 1 6 63
Valves - BOP Rupture
circulation on demand (linked to 1.1.2.3)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to close on
Lines & External Leak/
1697 2.3.5.1 drill pipe through pipe rams - Close and seal on the drill pipe and 7 3 2 42
Valves - BOP Rupture
allow circulation on demand (linked to 1.1.2.4)
Stack
Choke & Kill
Inability to Operate C&K Valves as needed - Failure to seal or
Lines & External Leak/
1698 2.3.5.1 partial seal on drill pipe through annular(s) - Close and seal on the 7 3 2 42
Valves - BOP Rupture
drill pipe and allow circulation on demand (linked to 1.1.3.3)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal or
Lines & External Leak/
1699 2.3.5.1 partial seal on drill pipe through pipe rams - Close and seal on the 9 3 2 54
Valves - BOP Rupture
drill pipe and allow circulation on demand (linked to 1.1.4.3)
Stack
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines & External Leak/
1700 2.3.5.1 and seal on the drill pipe and allow circulation on demand (linked 8 2 4 48
Valves - BOP Rupture
to 1.1.5.1)
Stack
Choke & Kill
Lines & External Leak/ External Leak - Loss of containment - Close and seal on the drill
1701 2.3.5.1 9 5 3 135
Valves - BOP Rupture pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Choke & Kill
Shear Ram or C&K Valves - Failure to close on open hole through
Lines & External Leak/
1702 2.3.5.1 blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Valves - BOP Rupture
allow volumetric well control operations on demand (linked to
Stack
1.2.1.2)

2650788-DFMECA-2-D2 C-153
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Lines & External Leak/ to close on open hole through blind-shear rams or annular - Close
1703 2.3.5.1 10 2 2 40
Valves - BOP Rupture and seal on open hole and allow volumetric well control
Stack operations on demand (linked to 1.2.1.3)
Choke & Kill Inability to Operate C&K Valves as Needed - Failure to close on
Lines & External Leak/ open hole through blind-shear rams or annular - Close and seal
1704 2.3.5.1 9 2 2 36
Valves - BOP Rupture on open hole and allow volumetric well control operations on
Stack demand (linked to 1.2.1.6)
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Lines & External Leak/
1705 2.3.5.1 to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Valves - BOP Rupture
(linked to 1.3.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Lines & External Leak/
1706 2.3.5.1 Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Valves - BOP Rupture
BOP and control the wellbore (linked to 1.4.1.2)
Stack
Choke & Kill
Failure to Close Hang-off Ram on Demand - Failure of hang-off
Lines & External Leak/
1707 2.3.5.1 ram to close - Hang-off the drill pipe on a ram BOP and control 5 1 6 30
Valves - BOP Rupture
the wellbore (linked to 1.4.1.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines & External Leak/
1708 2.3.5.1 Failure to close - Controlled operation - Shear the drill pipe and 10 3 1 30
Valves - BOP Rupture
seal the wellbore (linked to 1.5.1.2)
Stack
Choke & Kill
Lines & External Leak/ External Leak - Loss of containment - Controlled operation -
1709 2.3.5.1 10 3 1 30
Valves - BOP Rupture Shear the drill pipe and seal the wellbore (linked to 1.5.6.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines & External Leak/
1710 2.3.5.1 Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Valves - BOP Rupture
drill pipe and seal the wellbore (linked to 1.6.2.1)
Stack
Choke & Kill
External Leak - Loss of containment - Emergency Operation -
Lines & External Leak/
1711 2.3.5.1 Auto-Shear - Shear the drill pipe and seal the wellbore (linked to 10 2 3 60
Valves - BOP Rupture
1.6.7.1)
Stack
Choke & Kill
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Lines & External Leak/
1712 2.3.5.1 LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Valves - BOP Rupture
(linked to 1.7.2.3)
Stack
Choke & Kill
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Lines & External Leak/
1713 2.3.5.1 LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Valves - BOP Rupture
Lower BOP stack (linked to 1.8.1.3)
Stack

2650788-DFMECA-2-D2 C-154
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines & External Leak/
1714 2.3.5.1 Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Valves - BOP Rupture
(linked to 1.9.1.2)
Stack
Choke & Kill
Lines & External Leak/ Inability to Operate C&K Valves as Needed - Failure to circulate -
1715 2.3.5.1 7 4 2 56
Valves - BOP Rupture Circulate the well after drill pipe disconnect (linked to 1.9.1.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines & External Leak/
1716 2.3.5.1 Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Valves - BOP Rupture
disconnect (linked to 1.9.4.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal
Lines & External Leak/
1717 2.3.5.1 wellbore - Circulate the well after drill pipe disconnect (linked to 7 4 2 56
Valves - BOP Rupture
1.9.4.3)
Stack
Choke & Kill
Lines & External Leak/ External Leak - Loss of containment - Circulate the well after drill
1718 2.3.5.1 10 4 3 120
Valves - BOP Rupture pipe disconnect (linked to 1.9.5.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines & External Leak/
1719 2.3.5.1 Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Valves - BOP Rupture
trapped gas (linked to 1.10.1.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to circulate -
Lines & External Leak/
1720 2.3.5.1 Circulate across the BOP stack to remove trapped gas (linked to 10 4 2 80
Valves - BOP Rupture
1.10.1.3)
Stack
Choke & Kill
Lines & External Leak/ External Leak - Loss of containment - Circulate across the BOP
1721 2.3.5.1 10 3 3 90
Valves - BOP Rupture stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1727 2.3.5.2 Internal Leak 8 3 2 36
Valves - BOP annular(s) - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.1.2)
Choke & Kill Inability to Operate (an individual) C&K Valves as Needed -
Lines & Failure to close on drill pipe through annular(s) - Close and seal
1728 2.3.5.2 Internal Leak 7 3 2 42
Valves - BOP on the drill pipe and allow circulation on demand (linked to
Stack 1.1.1.4)
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1729 2.3.5.2 Internal Leak 9 2 5 90
Valves - BOP pipe rams - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.2.2)

2650788-DFMECA-2-D2 C-155
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to close on
Lines &
1730 2.3.5.2 Internal Leak drill pipe through pipe rams - Close and seal on the drill pipe and 7 3 2 42
Valves - BOP
allow circulation on demand (linked to 1.1.2.4)
Stack
Choke & Kill
Inability to Operate C&K Valves as needed - Failure to seal or
Lines &
1731 2.3.5.2 Internal Leak partial seal on drill pipe through annular(s) - Close and seal on the 7 3 2 42
Valves - BOP
drill pipe and allow circulation on demand (linked to 1.1.3.3)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal or
Lines &
1732 2.3.5.2 Internal Leak partial seal on drill pipe through pipe rams - Close and seal on the 9 3 2 54
Valves - BOP
drill pipe and allow circulation on demand (linked to 1.1.4.3)
Stack
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines &
1733 2.3.5.2 Internal Leak and seal on the drill pipe and allow circulation on demand (linked 8 2 4 48
Valves - BOP
to 1.1.5.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Choke & Kill
Shear Ram or C&K Valves - Failure to close on open hole through
Lines &
1734 2.3.5.2 Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Valves - BOP
allow volumetric well control operations on demand (linked to
Stack
1.2.1.2)
Choke & Kill Inability to Operate C&K Valves as Needed - Failure to close on
Lines & open hole through blind-shear rams or annular - Close and seal
1735 2.3.5.2 Internal Leak 9 2 2 36
Valves - BOP on open hole and allow volumetric well control operations on
Stack demand (linked to 1.2.1.6)
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Lines &
1736 2.3.5.2 Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Valves - BOP
(linked to 1.3.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Lines &
1737 2.3.5.2 Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Valves - BOP
BOP and control the wellbore (linked to 1.4.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1738 2.3.5.2 Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Valves - BOP
seal the wellbore (linked to 1.5.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1739 2.3.5.2 Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Valves - BOP
drill pipe and seal the wellbore (linked to 1.6.2.1)
Stack
Choke & Kill
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Lines &
1740 2.3.5.2 Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Valves - BOP
(linked to 1.7.2.3)
Stack

2650788-DFMECA-2-D2 C-156
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Lines &
1741 2.3.5.2 Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Valves - BOP
Lower BOP stack (linked to 1.8.1.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1742 2.3.5.2 Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Valves - BOP
(linked to 1.9.1.2)
Stack
Choke & Kill
Lines & Inability to Operate C&K Valves as Needed - Failure to circulate -
1743 2.3.5.2 Internal Leak 7 4 2 56
Valves - BOP Circulate the well after drill pipe disconnect (linked to 1.9.1.3)
Stack
Choke & Kill
Failure to Adequately Seal under Fail-safe Conditions - Failure to
Lines &
1744 2.3.5.2 Internal Leak open / close fail-safe valves to seal - Circulate the well after drill 10 3 3 90
Valves - BOP
pipe disconnect (linked to 1.9.3.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1745 2.3.5.2 Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Valves - BOP
disconnect (linked to 1.9.4.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal
Lines &
1746 2.3.5.2 Internal Leak wellbore - Circulate the well after drill pipe disconnect (linked to 7 4 2 56
Valves - BOP
1.9.4.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1747 2.3.5.2 Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Valves - BOP
trapped gas (linked to 1.10.1.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to circulate -
Lines &
1748 2.3.5.2 Internal Leak Circulate across the BOP stack to remove trapped gas (linked to 10 4 2 80
Valves - BOP
1.10.1.3)
Stack
Choke & Kill
Failure to Adequately Seal under Fail-safe Condition - Failure to
Lines &
1749 2.3.5.2 Internal Leak open / close fail-safe valves to seal - Circulate across the BOP 10 3 3 90
Valves - BOP
stack to remove trapped gas (linked to 1.10.3.2)
Stack
Choke & Kill
Lines & External Leak - Loss of containment - Circulate across the BOP
1750 2.3.5.2 Internal Leak 10 4 3 120
Valves - BOP stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1753 2.3.5.3 Plugged 8 3 2 36
Valves - BOP annular(s) - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.1.2)

2650788-DFMECA-2-D2 C-157
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1754 2.3.5.3 Plugged 8 2 3 48
Valves - BOP pipe rams - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.2.2)
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines &
1755 2.3.5.3 Plugged and seal on the drill pipe and allow circulation on demand (linked 9 2 4 72
Valves - BOP
to 1.1.5.1)
Stack
Choke & Kill
Actuates Too Slowly on Demand - Closes too slowly - Close and
Lines &
1756 2.3.5.3 Plugged seal on the drill pipe and allow circulation on demand (linked to 10 4 4 160
Valves - BOP
1.1.7.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Choke & Kill
Shear Ram or C&K Valves - Failure to close on open hole through
Lines &
1757 2.3.5.3 Plugged blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Valves - BOP
allow volumetric well control operations on demand (linked to
Stack
1.2.1.2)
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Lines &
1758 2.3.5.3 Plugged to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Valves - BOP
(linked to 1.3.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Lines &
1759 2.3.5.3 Plugged Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Valves - BOP
BOP and control the wellbore (linked to 1.4.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1760 2.3.5.3 Plugged Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Valves - BOP
seal the wellbore (linked to 1.5.1.2)
Stack
Choke & Kill
Actuates Too Slowly on Demand - Closes too slowly - Controlled
Lines &
1761 2.3.5.3 Plugged operation - Shear the drill pipe and seal the wellbore (linked to 8 3 2 48
Valves - BOP
1.5.5.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1762 2.3.5.3 Plugged Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Valves - BOP
drill pipe and seal the wellbore (linked to 1.6.2.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1763 2.3.5.3 Plugged Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Valves - BOP
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Stack
Choke & Kill
Actuates Too Slowly on Demand - Closes too slowly - Emergency
Lines &
1764 2.3.5.3 Plugged Operation - Auto-Shear - Shear the drill pipe and seal the wellbore 10 4 4 160
Valves - BOP
(linked to 1.6.6.1)
Stack

2650788-DFMECA-2-D2 C-158
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Lines &
1765 2.3.5.3 Plugged LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Valves - BOP
(linked to 1.7.2.3)
Stack
Choke & Kill
Moves too slowly to disconnect - Failure to disconnect the LMRP -
Lines &
1766 2.3.5.3 Plugged Emergency Operation: EDS - Disconnect from the stack (linked to 10 4 4 160
Valves - BOP
1.7.2.4)
Stack
Choke & Kill
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Lines &
1767 2.3.5.3 Plugged LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Valves - BOP
Lower BOP stack (linked to 1.8.1.3)
Stack
Choke & Kill
Moves too slowly to disconnect - Failure to disconnect the LMRP
Lines &
1768 2.3.5.3 Plugged - Controlled Operation - Disconnect the LMRP from the Lower 10 4 4 160
Valves - BOP
BOP stack (linked to 1.8.1.4)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1769 2.3.5.3 Plugged Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Valves - BOP
(linked to 1.9.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1770 2.3.5.3 Plugged Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Valves - BOP
disconnect (linked to 1.9.4.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1771 2.3.5.3 Plugged Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Valves - BOP
trapped gas (linked to 1.10.1.2)
Stack
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1774 2.3.5.4 Mechanical Failure 8 3 2 36
Valves - BOP annular(s) - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.1.2)
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1775 2.3.5.4 Mechanical Failure 8 2 3 48
Valves - BOP pipe rams - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.2.2)
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines &
1776 2.3.5.4 Mechanical Failure and seal on the drill pipe and allow circulation on demand (linked 9 2 4 72
Valves - BOP
to 1.1.5.1)
Stack
Choke & Kill
Failure to Actuate Under Fail-safe Conditions - Failure to open /
Lines &
1777 2.3.5.4 Mechanical Failure close fail-safe valves - Close and seal on the drill pipe and allow 9 2 4 72
Valves - BOP
circulation on demand (linked to 1.1.6.1)
Stack

2650788-DFMECA-2-D2 C-159
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Actuates Too Slowly on Demand - Closes too slowly - Close and
Lines &
1778 2.3.5.4 Mechanical Failure seal on the drill pipe and allow circulation on demand (linked to 9 3 2 54
Valves - BOP
1.1.7.1)
Stack
Choke & Kill
Lines & External Leak - Loss of containment - Close and seal on the drill
1779 2.3.5.4 Mechanical Failure 9 5 3 135
Valves - BOP pipe and allow circulation on demand (linked to 1.1.8.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Choke & Kill
Shear Ram or C&K Valves - Failure to close on open hole through
Lines &
1780 2.3.5.4 Mechanical Failure blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Valves - BOP
allow volumetric well control operations on demand (linked to
Stack
1.2.1.2)
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Lines &
1781 2.3.5.4 Mechanical Failure to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Valves - BOP
(linked to 1.3.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Lines &
1782 2.3.5.4 Mechanical Failure Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Valves - BOP
BOP and control the wellbore (linked to 1.4.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1783 2.3.5.4 Mechanical Failure Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Valves - BOP
seal the wellbore (linked to 1.5.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1784 2.3.5.4 Mechanical Failure Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Valves - BOP
drill pipe and seal the wellbore (linked to 1.6.2.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1785 2.3.5.4 Mechanical Failure Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Valves - BOP
- Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Stack
Choke & Kill
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Lines &
1786 2.3.5.4 Mechanical Failure LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Valves - BOP
(linked to 1.7.2.3)
Stack
Choke & Kill
Moves too slowly to disconnect - Failure to disconnect the LMRP -
Lines &
1787 2.3.5.4 Mechanical Failure Emergency Operation: EDS - Disconnect from the stack (linked to 9 3 2 54
Valves - BOP
1.7.2.4)
Stack
Choke & Kill
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Lines &
1788 2.3.5.4 Mechanical Failure LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Valves - BOP
Lower BOP stack (linked to 1.8.1.3)
Stack

2650788-DFMECA-2-D2 C-160
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Moves too slowly to disconnect - Failure to disconnect the LMRP
Lines &
1789 2.3.5.4 Mechanical Failure - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Valves - BOP
BOP stack (linked to 1.8.1.4)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1790 2.3.5.4 Mechanical Failure Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Valves - BOP
(linked to 1.9.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1791 2.3.5.4 Mechanical Failure Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Valves - BOP
disconnect (linked to 1.9.4.2)
Stack
Choke & Kill
Lines & External Leak - Loss of containment - Circulate the well after drill
1792 2.3.5.4 Mechanical Failure 10 4 3 120
Valves - BOP pipe disconnect (linked to 1.9.5.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1793 2.3.5.4 Mechanical Failure Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Valves - BOP
trapped gas (linked to 1.10.1.2)
Stack
Choke & Kill
Lines & External Leak - Loss of containment - Circulate across the BOP
1794 2.3.5.4 Mechanical Failure 10 4 3 120
Valves - BOP stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1799 2.3.5.5 Wear 8 3 2 36
Valves - BOP annular(s) - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.1.2)
Choke & Kill Inability to Operate (an individual) C&K Valves as Needed -
Lines & Failure to close on drill pipe through annular(s) - Close and seal
1800 2.3.5.5 Wear 7 3 2 42
Valves - BOP on the drill pipe and allow circulation on demand (linked to
Stack 1.1.1.4)
Choke & Kill Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Lines & Valves When Demanded - Failure to close on drill pipe through
1801 2.3.5.5 Wear 8 2 3 48
Valves - BOP pipe rams - Close and seal on the drill pipe and allow circulation
Stack on demand (linked to 1.1.2.2)
Choke & Kill
Failure to Close Pipe Ram on Demand - Failure to close on drill
Lines &
1802 2.3.5.5 Wear pipe through pipe rams - Close and seal on the drill pipe and allow 9 1 6 63
Valves - BOP
circulation on demand (linked to 1.1.2.3)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to close on
Lines &
1803 2.3.5.5 Wear drill pipe through pipe rams - Close and seal on the drill pipe and 7 3 2 42
Valves - BOP
allow circulation on demand (linked to 1.1.2.4)
Stack

2650788-DFMECA-2-D2 C-161
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Inability to Operate C&K Valves as needed - Failure to seal or
Lines &
1804 2.3.5.5 Wear partial seal on drill pipe through annular(s) - Close and seal on the 7 3 2 42
Valves - BOP
drill pipe and allow circulation on demand (linked to 1.1.3.3)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal or
Lines &
1805 2.3.5.5 Wear partial seal on drill pipe through pipe rams - Close and seal on the 9 3 2 54
Valves - BOP
drill pipe and allow circulation on demand (linked to 1.1.4.3)
Stack
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines &
1806 2.3.5.5 Wear and seal on the drill pipe and allow circulation on demand (linked 8 2 4 48
Valves - BOP
to 1.1.5.1)
Stack
Choke & Kill
Failure to Actuate Under Fail-safe Conditions - Failure to open /
Lines &
1807 2.3.5.5 Wear close fail-safe valves - Close and seal on the drill pipe and allow 9 2 4 72
Valves - BOP
circulation on demand (linked to 1.1.6.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Choke & Kill
Shear Ram or C&K Valves - Failure to close on open hole through
Lines &
1808 2.3.5.5 Wear blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
Valves - BOP
allow volumetric well control operations on demand (linked to
Stack
1.2.1.2)
Choke & Kill Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Lines & to close on open hole through blind-shear rams or annular - Close
1809 2.3.5.5 Wear 10 2 2 40
Valves - BOP and seal on open hole and allow volumetric well control
Stack operations on demand (linked to 1.2.1.3)
Choke & Kill Inability to Operate C&K Valves as Needed - Failure to close on
Lines & open hole through blind-shear rams or annular - Close and seal
1810 2.3.5.5 Wear 9 2 2 36
Valves - BOP on open hole and allow volumetric well control operations on
Stack demand (linked to 1.2.1.6)
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Lines &
1811 2.3.5.5 Wear to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Valves - BOP
(linked to 1.3.1.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Lines &
1812 2.3.5.5 Wear Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Valves - BOP
BOP and control the wellbore (linked to 1.4.1.2)
Stack
Choke & Kill
Failure to Close Hang-off Ram on Demand - Failure of hang-off
Lines &
1813 2.3.5.5 Wear ram to close - Hang-off the drill pipe on a ram BOP and control 5 1 6 30
Valves - BOP
the wellbore (linked to 1.4.1.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1814 2.3.5.5 Wear Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Valves - BOP
seal the wellbore (linked to 1.5.1.2)
Stack

2650788-DFMECA-2-D2 C-162
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Lines &
1815 2.3.5.5 Wear Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Valves - BOP
drill pipe and seal the wellbore (linked to 1.6.2.1)
Stack
Choke & Kill
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Lines &
1816 2.3.5.5 Wear LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Valves - BOP
(linked to 1.7.2.3)
Stack
Choke & Kill
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Lines &
1817 2.3.5.5 Wear LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Valves - BOP
Lower BOP stack (linked to 1.8.1.3)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1818 2.3.5.5 Wear Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Valves - BOP
(linked to 1.9.1.2)
Stack
Choke & Kill
Lines & Inability to Operate C&K Valves as Needed - Failure to circulate -
1819 2.3.5.5 Wear 7 4 2 56
Valves - BOP Circulate the well after drill pipe disconnect (linked to 1.9.1.3)
Stack
Choke & Kill
Failure to Adequately Seal under Fail-safe Conditions - Failure to
Lines &
1820 2.3.5.5 Wear open / close fail-safe valves to seal - Circulate the well after drill 10 3 3 90
Valves - BOP
pipe disconnect (linked to 1.9.3.2)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1821 2.3.5.5 Wear Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Valves - BOP
disconnect (linked to 1.9.4.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to seal
Lines &
1822 2.3.5.5 Wear wellbore - Circulate the well after drill pipe disconnect (linked to 7 4 2 56
Valves - BOP
1.9.4.3)
Stack
Choke & Kill
Lines & External Leak - Loss of containment - Circulate the well after drill
1823 2.3.5.5 Wear 10 4 3 120
Valves - BOP pipe disconnect (linked to 1.9.5.1)
Stack
Choke & Kill
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Lines &
1824 2.3.5.5 Wear Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Valves - BOP
trapped gas (linked to 1.10.1.2)
Stack
Choke & Kill
Inability to Operate C&K Valves as Needed - Failure to circulate -
Lines &
1825 2.3.5.5 Wear Circulate across the BOP stack to remove trapped gas (linked to 10 4 2 80
Valves - BOP
1.10.1.3)
Stack
Choke & Kill
Failure to Adequately Seal under Fail-safe Condition - Failure to
Lines &
1826 2.3.5.5 Wear open / close fail-safe valves to seal - Circulate across the BOP 10 3 3 90
Valves - BOP
stack to remove trapped gas (linked to 1.10.3.2)
Stack

2650788-DFMECA-2-D2 C-163
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Choke & Kill
Lines & External Leak - Loss of containment - Circulate across the BOP
1827 2.3.5.5 Wear 10 4 3 120
Valves - BOP stack to remove trapped gas - (linked to 1.10.4.1)
Stack
Choke & Kill
Unintentional Operation - Unintentional closing / opening - Close
Lines &
1832 2.3.5.6 Corrosion/ Erosion and seal on the drill pipe and allow circulation on demand (linked 8 2 4 48
Valves - BOP
to 1.1.5.1)
Stack
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Connectors - External Leak/ Valves When Demanded - Failure to close on drill pipe through
1840 2.3.6.1 8 3 2 36
BOP Stack Rupture annular(s) - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Connectors - External Leak/ Valves When Demanded - Failure to close on drill pipe through
1841 2.3.6.1 8 2 3 48
BOP Stack Rupture pipe rams - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.2.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Shear Ram or C&K Valves - Failure to close on open hole through
Connectors - External Leak/
1842 2.3.6.1 blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
BOP Stack Rupture
allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Connectors - External Leak/
1843 2.3.6.1 to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
BOP Stack Rupture
(linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Connectors - External Leak/
1844 2.3.6.1 Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
BOP Stack Rupture
BOP and control the wellbore (linked to 1.4.1.2)
Failure to Maintain Closing Pressure on Hang-off Ram - Failure to
Connectors - External Leak/
1845 2.3.6.1 maintain closing pressure - Hang-off the drill pipe on a ram BOP 8 1 2 16
BOP Stack Rupture
and control the wellbore (linked to 1.4.2.1)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Connectors - External Leak/
1846 2.3.6.1 Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
BOP Stack Rupture
seal the wellbore (linked to 1.5.1.2)
Failure to Maintain Sealing Pressure on Shear Ram - Failure to
Connectors - External Leak/
1847 2.3.6.1 seal the wellbore - Controlled operation - Shear the drill pipe and 6 1 2 12
BOP Stack Rupture
seal the wellbore (linked to 1.5.3.2)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Connectors - External Leak/
1848 2.3.6.1 Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
BOP Stack Rupture
drill pipe and seal the wellbore (linked to 1.6.2.1)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors - External Leak/
1849 2.3.6.1 disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack Rupture
from the stack (linked to 1.7.2.2)

2650788-DFMECA-2-D2 C-164
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Connectors - External Leak/
1850 2.3.6.1 LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
BOP Stack Rupture
(linked to 1.7.2.3)
Failure of LMRP / BOP Connector to Disengage - Failure to
Connectors - External Leak/
1851 2.3.6.1 disconnect the LMRP - Controlled Operation - Disconnect the 8 3 2 48
BOP Stack Rupture
LMRP from the Lower BOP stack (linked to 1.8.1.2)
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Connectors - External Leak/
1852 2.3.6.1 LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
BOP Stack Rupture
Lower BOP stack (linked to 1.8.1.3)
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors - External Leak/
1853 2.3.6.1 Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
BOP Stack Rupture
(linked to 1.9.1.2)
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors - External Leak/
1854 2.3.6.1 Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
BOP Stack Rupture
disconnect (linked to 1.9.4.2)
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors - External Leak/
1855 2.3.6.1 Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
BOP Stack Rupture
trapped gas (linked to 1.10.1.2)
Failure of Wellhead Connector to Properly Lock and Seal -
Connectors - External Leak/
1856 2.3.6.1 Inadequate BOP Connection - Connect BOP and LMRP at 2 5 3 30
BOP Stack Rupture
Landing (linked to 1.11.1.1)
Connectors - External Leak/ Failure of Connector Integrity - Inadequate BOP Connection -
1857 2.3.6.1 6 2 2 24
BOP Stack Rupture Connect BOP and LMRP at Landing (linked to 1.11.1.2)
Failure of LMRP Connector to Properly Lock and Seal (auxiliary
Connectors - External Leak/
1858 2.3.6.1 connections) - Inadequate LMRP Connection - Connect BOP and 6 2 2 24
BOP Stack Rupture
LMRP at Landing (linked to 1.11.2.1)
Connectors - External Leak/ Failure of Connector Integrity - Inadequate LMRP Connection -
1859 2.3.6.1 6 2 2 24
BOP Stack Rupture Connect BOP and LMRP at Landing (linked to 1.11.2.2)
Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Connectors - Valves When Demanded - Failure to close on drill pipe through
1862 2.3.6.2 Internal Leak 8 3 2 36
BOP Stack annular(s) - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Connectors - Valves When Demanded - Failure to close on drill pipe through
1863 2.3.6.2 Internal Leak 8 2 3 48
BOP Stack pipe rams - Close and seal on the drill pipe and allow circulation
on demand (linked to 1.1.2.2)
Failure to Close Pipe Ram on Demand - Failure to close on drill
Connectors -
1864 2.3.6.2 Internal Leak pipe through pipe rams - Close and seal on the drill pipe and allow 9 1 6 63
BOP Stack
circulation on demand (linked to 1.1.2.3)

2650788-DFMECA-2-D2 C-165
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to Annular / Blind-
Shear Ram or C&K Valves - Failure to close on open hole through
Connectors -
1865 2.3.6.2 Internal Leak blind-shear rams or annular - Close and seal on open hole and 9 1 2 18
BOP Stack
allow volumetric well control operations on demand (linked to
1.2.1.2)
Failure to Close Annular / Blind-Shear Ram on Demand - Failure
Connectors - to close on open hole through blind-shear rams or annular - Close
1866 2.3.6.2 Internal Leak 10 2 2 40
BOP Stack and seal on open hole and allow volumetric well control
operations on demand (linked to 1.2.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Connectors -
1867 2.3.6.2 Internal Leak to close annulars - Strip the drill string using the annular BOP(s) 8 3 3 72
BOP Stack
(linked to 1.3.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Connectors -
1868 2.3.6.2 Internal Leak Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
BOP Stack
BOP and control the wellbore (linked to 1.4.1.2)
Failure to Close Hang-off Ram on Demand - Failure of hang-off
Connectors -
1869 2.3.6.2 Internal Leak ram to close - Hang-off the drill pipe on a ram BOP and control 5 1 6 30
BOP Stack
the wellbore (linked to 1.4.1.3)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Connectors -
1870 2.3.6.2 Internal Leak Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
BOP Stack
seal the wellbore (linked to 1.5.1.2)
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Connectors -
1871 2.3.6.2 Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
BOP Stack
drill pipe and seal the wellbore (linked to 1.6.2.1)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors -
1872 2.3.6.2 Internal Leak disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack
from the stack (linked to 1.7.2.2)
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Connectors -
1873 2.3.6.2 Internal Leak LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
BOP Stack
(linked to 1.7.2.3)
Failure of LMRP / BOP Connector to Disengage - Failure to
Connectors -
1874 2.3.6.2 Internal Leak disconnect the LMRP - Controlled Operation - Disconnect the 8 3 2 48
BOP Stack
LMRP from the Lower BOP stack (linked to 1.8.1.2)
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Connectors -
1875 2.3.6.2 Internal Leak LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
BOP Stack
Lower BOP stack (linked to 1.8.1.3)
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors -
1876 2.3.6.2 Internal Leak Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
BOP Stack
(linked to 1.9.1.2)
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors -
1877 2.3.6.2 Internal Leak Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
BOP Stack
disconnect (linked to 1.9.4.2)

2650788-DFMECA-2-D2 C-166
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Connectors -
1878 2.3.6.2 Internal Leak Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
BOP Stack
trapped gas (linked to 1.10.1.2)
Failure to Actuate Under Fail-safe Conditions - Failure to open /
Connectors -
1882 2.3.6.4 Mechanical Failure close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
BOP Stack
circulation on demand (linked to 1.1.6.1)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors -
1883 2.3.6.4 Mechanical Failure disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack
from the stack (linked to 1.7.2.2)
Failure of LMRP / BOP Connector to Disengage - Failure to
Connectors -
1884 2.3.6.4 Mechanical Failure disconnect the LMRP - Controlled Operation - Disconnect the 8 3 2 48
BOP Stack
LMRP from the Lower BOP stack (linked to 1.8.1.2)
Failure of Wellhead Connector to Properly Lock and Seal -
Connectors -
1885 2.3.6.4 Mechanical Failure Inadequate BOP Connection - Connect BOP and LMRP at 2 5 3 30
BOP Stack
Landing (linked to 1.11.1.1)
Connectors - Failure of Connector Integrity - Inadequate BOP Connection -
1886 2.3.6.4 Mechanical Failure 6 2 2 24
BOP Stack Connect BOP and LMRP at Landing (linked to 1.11.1.2)
Failure of LMRP Connector to Properly Lock and Seal (auxiliary
Connectors -
1887 2.3.6.4 Mechanical Failure connections) - Inadequate LMRP Connection - Connect BOP and 6 2 2 24
BOP Stack
LMRP at Landing (linked to 1.11.2.1)
Connectors - Failure of Connector Integrity - Inadequate LMRP Connection -
1888 2.3.6.4 Mechanical Failure 6 2 2 24
BOP Stack Connect BOP and LMRP at Landing (linked to 1.11.2.2)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors -
1890 2.3.6.5 Wear disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack
from the stack (linked to 1.7.2.2)
Failure of LMRP / BOP Connector to Disengage - Failure to
Connectors -
1891 2.3.6.5 Wear disconnect the LMRP - Controlled Operation - Disconnect the 8 3 2 48
BOP Stack
LMRP from the Lower BOP stack (linked to 1.8.1.2)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors -
1894 2.3.6.6 Corrosion/ Erosion disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack
from the stack (linked to 1.7.2.2)
Failure of LMRP / BOP Connector to Disengage - Failure to
Connectors -
1895 2.3.6.6 Corrosion/ Erosion disconnect the LMRP - Controlled Operation - Disconnect the 8 3 2 48
BOP Stack
LMRP from the Lower BOP stack (linked to 1.8.1.2)
Failure LMRP / BOP to Connect or Disengage - Failure to
Connectors - Loss of Function
1897 2.3.6.7 disconnect the LMRP - Emergency Operation: EDS - Disconnect 9 3 2 54
BOP Stack (general)
from the stack (linked to 1.7.2.2)
Failure of Wellhead Connector to Properly Lock and Seal -
Connectors - Loss of Function
1898 2.3.6.7 Inadequate BOP Connection - Connect BOP and LMRP at 2 5 3 30
BOP Stack (general)
Landing (linked to 1.11.1.1)

2650788-DFMECA-2-D2 C-167
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Connectors - Loss of Function Failure of Connector Integrity - Inadequate BOP Connection -
1899 2.3.6.7 6 2 2 24
BOP Stack (general) Connect BOP and LMRP at Landing (linked to 1.11.1.2)
Failure of LMRP Connector to Properly Lock and Seal (auxiliary
Connectors - Loss of Function
1900 2.3.6.7 connections) - Inadequate LMRP Connection - Connect BOP and 6 2 2 24
BOP Stack (general)
LMRP at Landing (linked to 1.11.2.1)
Connectors - Loss of Function Failure of Connector Integrity - Inadequate LMRP Connection -
1901 2.3.6.7 6 2 2 24
BOP Stack (general) Connect BOP and LMRP at Landing (linked to 1.11.2.2)
Autoshear Unintentional Closing - Unintentional closing / opening -
External Leak/
1907 2.3.7.1 System - BOP Controlled operation - Shear the drill pipe and seal the wellbore 9 3 3 54
Rupture
Stack (linked to 1.5.4.1)
Autoshear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1908 2.3.7.1 System - BOP Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Rupture
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Autoshear Failure to initiate autoshear sequence - Failure to close -
External Leak/
1909 2.3.7.1 System - BOP Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 1 30
Rupture
Stack the wellbore (linked to 1.6.2.2)
Autoshear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
External Leak/
1910 2.3.7.1 System - BOP Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Rupture
Stack - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Autoshear Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
External Leak/
1911 2.3.7.1 System - BOP LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Rupture
Stack Lower BOP stack (linked to 1.8.1.3)
Autoshear Moves too slowly to disconnect - Failure to disconnect the LMRP
External Leak/
1912 2.3.7.1 System - BOP - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Rupture
Stack BOP stack (linked to 1.8.1.4)
Autoshear Unintentional Closing - Unintentional closing / opening -
1914 2.3.7.2 System - BOP Internal Leak Controlled operation - Shear the drill pipe and seal the wellbore 9 3 3 54
Stack (linked to 1.5.4.1)
Autoshear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1915 2.3.7.2 System - BOP Internal Leak Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Stack drill pipe and seal the wellbore (linked to 1.6.2.1)
Autoshear Failure to initiate autoshear sequence - Failure to close -
1916 2.3.7.2 System - BOP Internal Leak Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 1 30
Stack the wellbore (linked to 1.6.2.2)
Autoshear Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
1917 2.3.7.2 System - BOP Internal Leak Failure to shear the drill pipe - Emergency Operation - Auto-Shear 9 3 2 54
Stack - Shear the drill pipe and seal the wellbore (linked to 1.6.3.1)
Autoshear Moves too slowly to disconnect - Failure to disconnect the LMRP
1918 2.3.7.2 System - BOP Internal Leak - Controlled Operation - Disconnect the LMRP from the Lower 9 3 2 54
Stack BOP stack (linked to 1.8.1.4)

2650788-DFMECA-2-D2 C-168
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
Autoshear Failure to Actuate Under Fail-safe Conditions - Failure to open /
1922 2.3.7.4 System - BOP Mechanical Failure close fail-safe valves - Close and seal on the drill pipe and allow 9 2 7 126
Stack circulation on demand (linked to 1.1.6.1)
Autoshear Unintentional Closing - Unintentional closing / opening -
1923 2.3.7.4 System - BOP Mechanical Failure Controlled operation - Shear the drill pipe and seal the wellbore 9 3 3 54
Stack (linked to 1.5.4.1)
Autoshear Failure to initiate autoshear sequence - Failure to close -
1924 2.3.7.4 System - BOP Mechanical Failure Emergency Operation - Auto-Shear - Shear the drill pipe and seal 10 3 1 30
Stack the wellbore (linked to 1.6.2.2)
Autoshear Failure of Shear Ram to Seal On Demand - Failure to seal the
1925 2.3.7.4 System - BOP Mechanical Failure wellbore - Emergency Operation - Auto-Shear - Shear the drill 10 2 6 120
Stack pipe and seal the wellbore (linked to 1.6.4.1)
Autoshear Failure to Maintain Sealing Pressure on Shear Ram - Failure to
1926 2.3.7.4 System - BOP Mechanical Failure seal the wellbore - Emergency Operation - Auto-Shear - Shear the 10 2 6 120
Stack drill pipe and seal the wellbore (linked to 1.6.4.2)
Autoshear Unintentional Closing - Unintentional closing / opening -
1930 2.3.7.6 System - BOP Corrosion/ Erosion Emergency Operation - Auto-Shear - Shear the drill pipe and seal 5 2 1 10
Stack the wellbore (linked to 1.6.5.1)
Autoshear Unintentional Closing - Unintentional closing / opening -
Loss of Function
1931 2.3.7.7 System - BOP Emergency Operation - Auto-Shear - Shear the drill pipe and seal 5 2 1 10
(general)
Stack the wellbore (linked to 1.6.5.1)
ROV Failure to Supply Hydraulic Fluid & Pressure to Annular & C&K
Intervention Valves When Demanded - Failure to close on drill pipe through
1937 2.3.8.3 Loss of Function 8 3 2 36
Interface - annular(s) - Close and seal on the drill pipe and allow circulation
BOP Stack on demand (linked to 1.1.1.2)
ROV Failure to Supply Hydraulic Fluid & Pressure to Pipe Ram or C&K
Intervention Valves When Demanded - Failure to close on drill pipe through
1938 2.3.8.3 Loss of Function 9 2 5 90
Interface - pipe rams - Close and seal on the drill pipe and allow circulation
BOP Stack on demand (linked to 1.1.2.2)
ROV
Failure to Supply Hydraulic Fluid & Pressure to Annulars - Failure
Intervention
1939 2.3.8.3 Loss of Function to close annulars - Strip the drill string using the annular BOP(s) 8 3 2 36
Interface -
(linked to 1.3.1.2)
BOP Stack
ROV
Failure to Supply Hydraulic Fluid & Pressure to Hang-off Ram -
Intervention
1940 2.3.8.3 Loss of Function Failure of hang-off ram to close - Hang-off the drill pipe on a ram 8 1 4 32
Interface -
BOP and control the wellbore (linked to 1.4.1.2)
BOP Stack
ROV
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Intervention
1941 2.3.8.3 Loss of Function Failure to close - Controlled operation - Shear the drill pipe and 6 1 4 24
Interface -
seal the wellbore (linked to 1.5.1.2)
BOP Stack

2650788-DFMECA-2-D2 C-169
APPENDIX C (sorted by RPN)

Risk
Sorting Item Severity Occurrence Detection Priority
Index Index EXF2 Failure Mode Effects Ratings Ratings Ratings Numbers
ROV
Failure to Supply Hydraulic Fluid & Pressure to Shear Ram -
Intervention
1942 2.3.8.3 Loss of Function Failure to close - Emergency Operation - Auto-Shear - Shear the 9 1 4 36
Interface -
drill pipe and seal the wellbore (linked to 1.6.2.1)
BOP Stack
ROV
Failure of Hydraulic Fluid to disconnect - Failure to disconnect the
Intervention
1943 2.3.8.3 Loss of Function LMRP - Emergency Operation: EDS - Disconnect from the stack 9 1 3 27
Interface -
(linked to 1.7.2.3)
BOP Stack
ROV
Failure of Hydraulic Fluid to Disconnect - Failure to disconnect the
Intervention
1944 2.3.8.3 Loss of Function LMRP - Controlled Operation - Disconnect the LMRP from the 7 1 2 14
Interface -
Lower BOP stack (linked to 1.8.1.3)
BOP Stack
ROV
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Intervention
1945 2.3.8.3 Loss of Function Failure to circulate - Circulate the well after drill pipe disconnect 6 1 2 12
Interface -
(linked to 1.9.1.2)
BOP Stack
ROV
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Intervention
1946 2.3.8.3 Loss of Function Failure to seal wellbore - Circulate the well after drill pipe 6 1 2 12
Interface -
disconnect (linked to 1.9.4.2)
BOP Stack
ROV
Failure to Supply Hydraulic Fluid & Pressure to C&K Valves -
Intervention
1947 mmix Loss of Function Failure to circulate - Circulate across the BOP stack to remove 10 1 2 20
Interface -
trapped gas (linked to 1.10.1.2)
BOP Stack

2650788-DFMECA-2-D2 C-170