SAP PM/QM Consultant Mob: 9535493227
Professional Experience
Having 4 years, in SAP Plant Maintenance.
Maintained Field Selection for Plant Maintenance Work center, created parameters for formula and defined
Standard value keys, person responsible and capacity category.
Worked on work center usage to the specific task list types.
Created General Maintenance Task Lists for Inspection, Maintenance and Repair Processes of equipments
and used these task lists for Preventive Maintenance Instead of creating Equipment Task Lists.
Worked on Order Processing for Notifications, Orders, Catalog Profile, Costing, Order Settlement.
Created Maintenance Task Lists, Maintenance Items, Maintenance Plans and Scheduling for Preventive
Maintenance.
Performed Configuration for processing malfunction report, maintenance request and activity reports in
Maintenance Notification and Configured Maintenance Order processes from creation to settlement for
Breakdown Maintenance.
Configured Completion Confirmation of Maintenance and Service Order Processing and defined Control
parameters, set up screen templates and field selection.
Information flow between PM and QM, MM, PP, FICO was taken care through integration settings.
Imparting training to the end user, Data collection and validation, Data uploading through BDC/LSMW
Testing and after Go-Live support.
Worked on QM Master Data: Inspection plan, MIC, Codes, Code groups.
Worked on inspection plans for equipment in Plant Maintenance and test generation of calibration orders
with inspection lots, results recording of inspection characteristics and usage decisions.
Functional specification for reports and enhancement.
Supplied training material and guidelines for the use of the SAP PM module
QM Incoming/Raw Material Inspection received against Purchase Order.
Quality inspections follow up Actions
Worked on CWBQM workbench.
PP/PM – Integration for Measuring Documents.
Work Experience
Responsibilities:
Responsibilities:
Full life cycle implementation of SAP Plant Maintenance module using ASAP methodology - project
preparation, business blueprint, realization, final preparation, go live and post implementation
support.
Created hierarchy levels using structure indicator for functional locations to represent operational
structures according to company's functionality.
Configured and created PM Master Data - Functional Locations, Equipment's, BOMs and Work Centers,
Work Permits, Catalogs, Task list, Measuring point/Counter.
Planning & execution of maintenance plan Preventive, Breakdown, Corrective, Sub-Order, Calibration,
Refurbishment, Capital/improvement Maintenance.
Created General Maintenance Task Lists for inspection, maintenance and repair processes of
equipment's and used these task lists for Preventive Maintenance.
. 2 of 3
Preventive Maintenance - performed necessary configuration for creating time-based and performance-
based maintenance plans, scheduled maintenance plans for defined cycles to generate maintenance
calls and processing of maintenance calls.
Configured Completion Confirmation of Maintenance and Order processing - defined control
parameters, set up screen templates and field selection.
Performed data migration from Legacy system to SAP Plant Maintenance tables using Legacy System
Migration Workbench (LSMW).
Defined QM inspection plans for equipment in PM and test generation of calibration orders with
inspection lots, results recording of inspection characteristics and usage decisions.
Created test scenarios, performed Unit testing and Integration testing and involved during String
testing and Archive testing.
Created detailed documentation, trained end users and provided post implementation support.
Integration Test with MM, PP, QM & FI-CO.
Functional specification for reports and enhancement.
Responsibilities:
Resolving the issues raised by the user and giving the solution by using Servicenow ticketing tool.
Planning & execution of maintenance plan Preventive, Breakdown, Corrective, Sub-Order Maintenance
Process, and Calibration Maintenance.
Responsible for PM module support - Technical Objects (Serialized and Non-Serialized Equipment,
Functional Locations, Material Bill of Materials, Equipment BOM), Order Processing (Notifications,
Orders, Catalog profiles, Costing, Order Settlement), Preventive Maintenance (Task Lists, Maintenance
Items, Maintenance Plans, Scheduling).
Configuring the Master data for Equipment, Functional Locations and General Task lists, BOM,
Maintenance Plan and Maintenance Item, Work Permits.
Measurement documents were used to evaluate equipment by using measuring points and counters.
Configured object codes, damage codes and activity codes and assigned the code groups to catalog
profiles for use in notifications.
Responsible for issues on TECO, stock transfer orders, inbound and outbound delivery activities.
Reconfigured resources to maintain status profile and made enhancements to maintain screen groups.
Developed customization reports.
Trained super users and end-users and developed training documentation
Wrote Functional specification documents (FSD) and worked with ABAP team. Worked on preparing test
scripts, executing test cycles, documenting test results, integration testing and user acceptance test.
Developed Test scripts for various enhancement projects.
Provided extensive training to the super users and end users in handling critical production break down
issues independently and efficiently.
Education:
. 3 of 3