kw PV 6 60 600
one house cost 650,000 200,000 180,000
project cost 650,000 2,000,000 18,000,000
cost per watt 108.33 33.33 30.00
Notes:
A working week is 4 days to allow for holidays, leave, etc
Besides the people required for the teams, we'll also need team managers, procurement people, stakeholders, etc
In 2024 to 2025, I have left the Scale as "South Africa" because IMHO, South Africa needs 200 GW to be able to beneficiat
How to build a new utility, embedded inside the existing utility
Battery Based System with one day of battery backup and LPG Gas Engine (Generator) to backup the battery