Activity Description Number of Days

Project Guidance 5
Synopsis Preparation 5
Study of Existing Systems 5
Site Visit 10
Data Collection 7
Preliminary Project Preparation 5
Project Guidance 7
Preparation of Project Report as Per Comments from Project Guide 6
Final Project Report 5
N u m be r o f D ays

Estimated Period (in days) for various activities involve


12
10
8
6
4
2
0

Activiy Description
ious activities involved in Project.

Description
Manpower Requirement
S.No Description No's
1 E-Node-B Engineer 1
2 Technician 2
3 Rigger 2
WORK FLOW CHART FOR TELECOM SITE
      Site acquisition(Sharing or owned).

LOS Survey for TND(Tx Network Design) and RND(Radio Network Design).

    RFE/RFI Survey for existing and New sites.

Formulation of Material requisition note (MRN or MRF) and forwading this


to the Warehouse team for delivery of the required equipments/material on
the particular site.

Material delivery from warehouse on to the cell site.

Filling of reports like open case inspection, inventory form etc.

                  Checking of equipments/material for any sort of damage.

Starting the installation procedure.


   Installation of various Equipments.

Commissioning of Equipments.

                              Site handover to the Operations team(Acceptance testing).