Sei sulla pagina 1di 1

Exhaust ducts shall be

field measured and


fabricated.
Final tie-in between equipment and piping to be field adjusted.

Condensate drain 1 inch

Compressed air 2 inch


Existing air compressor New air compressor # 1 New air compressor # 2

Existing air dryer New air dryer

4 inch header:
- 2 inch tie-in with valve x 6 ea
- 1 inch drain with valve x 1 ea

Existing condensate New condensate


treatment "CF9" treatment "CF19"

FOR BIDDING
9:57 am, Jun 21, 2019
. yPongsak.C / Mec&Pip_Film L3
B

Potrebbero piacerti anche