CONTENTS Design Life Extension of RC Structure

I. INTRODUCTION 7

II. OBJECTIVES OF RESEARCH 11

III. CLASSIFICATIONS OF CRACKS 15

IV. ASSESSMENT OF CONCRETE STRUCTURES 37

V. METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS 51

VI. METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE 65

VII. ESTIMATING SERVICE-LIFE 77

VIII. IMPROVING CORROSION RESISTANCE CHARACTERISTICS 99

IX. REPAIR AND STRENGTHENING OF STRCUCTURES 121

X. REPAIR OF POST-TENSION STRUCTURES 137

APPENDIX A – PHOTOS OF TYPICAL CONCRETE CRACKS 151

APPENDIX B – LOCAL REPAIR MATERIALS FOR DIFFERENT PROBLEMS 155

APPENDIX C – VISUAL INSPECTION SHEET 159

APPENDIX D – SITE VISITS 163

APPENDIX E – STRENGTHENING METHOD STATEMENTS 169

APPENDIX F – PREVENTIVE MAINTENANCE 183

English-1 New Final.indd 9 12/16/13 10:31 AM


English-1 New Final.indd 10 12/16/13 10:31 AM
I - INTRODUCTION Design Life Extension of RC Structure 07

I - INTRODUCTION

English-1 New Final.indd 11 12/16/13 10:31 AM


08 I - INTRODUCTION

A large number of existing reinforced concrete (RC) structures in Dubai, and the UAE at large, are
suffering from durability problems, leading to accelerated deterioration and cracking, thus reducing
the functional service life. The public funds are not generally available for the replacement of existing
deteriorated structures, and hence there is a need to establish preventive maintenance and corrective
actions to extend the service life in a cost-effective manner.

Design service life of structures depends primarily on concrete quality and surrounding environmental
conditions. Measures needed to extend the functional service life of RC structures depends on
whether the aim of the protection is to control corrosion damage rate, to upgrade the structural
capacity of the damaged structure, or both. The role of post-repair performance monitoring of the
structure on the design life, as well as the estimated extension of the design life needs to be evaluated.
Therefore, this research aims to develop a Repair Manual that summarizes causes of concrete
deterioration and cracking, different repair methods and prediction of service life. The manual also
includes guidelines for durable concrete structures.

How to use this manual


Figure 1 is for a flow chart that summarizes typical strategy to be followed for new and existing
reinforced concrete structures. This is linked to this manual so that each step is associated with
relevant chapters or appendices (shown between parentheses in this flowchart).

English-1 New Final.indd 12 12/16/13 10:31 AM


Design Life Extension of RC Structure
09

English-1 New Final.indd 13 12/16/13 10:31 AM


English-1 New Final.indd 14 12/16/13 10:31 AM
II - OBJECTIVES Design Life Extension of RC Structure 11

II - OBJECTIVES

English-1 New Final.indd 15 12/16/13 10:31 AM


English-1 New Final.indd 16 12/16/13 10:31 AM
II - OBJECTIVES Design Life Extension of RC Structure 13

The main goal of this research is to develop a “Repair Manual” for deteriorated reinforced concrete
structures and guidelines for durable concrete. The main objectives are to:
• Classify cracks in the concrete structures.
• Provide methods for repairing of cracks.
• Provide methods for estimating and evaluating the corrosion rate.
• Provide methods for estimating the remaining design life of the structures
• Provide recommendations for the selection of the type of corrosion inhibitor and methods of
application.
• Provide methods for the rehabilitation of corrosion-damaged RC structures.
• Provide methods for the structural assessment after repair.

English-1 New Final.indd 17 12/16/13 10:31 AM


CL

English-1 New Final.indd 18 12/16/13 10:31 AM


III - CLASSIFICATIONS OF CRACKS Design Life Extension of RC Structure 15

CLASSIFICATIONS OF CRACKS

III - CLASSIFICATIONS OF CRACKS

English-1 New Final.indd 19 12/16/13 10:31 AM


16 III -CLASSIFICATIONS OF CRACKS

1. INTRODUCTION
The cracks in buildings can be classified into two main types: cracks in block walls and cracks in
concrete elements.

2. CRACKS IN BLOCK WALLS


2.1 General
Most of the building materials that are subject to cracking, namely masonry, mortar etc are weak in
tension and shear and thus forces of even small magnitude are able to cause cracking. It is possible
to distinguish between tensile and shear cracks by closely examining their physical characteristics.
Figure 1shows the differences between tensile and shear cracks.

TENSILE CRACK IN MASONARY WALL

Shear crack at corner of


Wall due to expansion

SHEAR CRACK IN MASONARY WALL

Shear crack in masonry


Pillar due to expansion
Of R.C.C. beam

SHEAR CRACK IN MASONARY PILLAR


AT BEAM SUPPORT

Figure 1 Tension cracks and Shear cracks in bricks (Bureau of Indian Standards)

Cracks may vary appreciably in width from very thin hair cracks barely visible to naked eye (about
0.01 mm in width) to gaping cracks 5 mm or more in width. A commonly known classification of
cracks, based on their width is:
a) Thin - less than 1mm in width
b) Medium - 1 to 2 mm in width
c) Wide - more than 2 mm in width

English-1 New Final.indd 20 12/16/13 10:31 AM


Design Life Extension of RC Structure
17

Cracks may be of uniform width or may be narrow at one end. Cracks could be straight, toothed,
stepped, map pattern or random and may be vertical, horizontal or diagonal. Cracks may be only
at the surface or may extend to more than one layer of materials. Occurrence of closely spaced fine
cracks at the surface of a material is sometimes called crazing. Cracks from different causes have
varying characteristics and it is by careful observation of these characteristics that one can correctly
diagnose the cause or causes of cracking and adopt appropriate remedial measures.

Depending on certain properties of building materials, shrinkage cracks may be wider but further
apart, or may be thin but more closely spaced. As a general rule, thin cracks, even though closely
spaced and greater in number, are less damaging to the structure and are not so objectionable from
aesthetic and other considerations as a fewer number of wide cracks.

Modern structures are comparatively tall and slender, have thin walls are designed for higher stresses
and are built at a fast pace. These structures are therefore, more prone to cracks as compared with old
structures, which used to be low, had thick walls, were lightly stressed and were built at a slow pace.
Moreover moisture can easily reach the inside of the modern buildings due to the usage of thin walls.
Thus measures for control of cracks in buildings assume much greater importance than ever before.

Structural cracks mainly occur due to:


a) Defective design and defective load assumptions and perception of behavior of the structure.
b) In correct assessment of bearing capacity of foundation soil and soil properly.
c) Defective detailing of joints of components like roof with brick wall corner joints of walls
d) Defective detailing of structural detailing of steel reinforcement.
e) Lack of quality control during construction.

The cracks in block walls can be classified into two categories: non-structural cracks including
expansion and shrinkage cracks, and structural cracks including settlement cracks and loading cracks.

2.2 Non-structural Cracks in Block Walls


2.2.1 Expansion cracks
Expansion cracks can be initial expansion of the walls or the elements attached to the walls as shown
in Figures 2 and 3.

This end of wall A has due to


expansion oversailed at DPC
level and caused rotation of
return wall B.
Resulting in cracks at X.

PLAN

Figure 2 Cracks due to initial expansion of bricks (Bureau of Indian Standards)

English-1 New Final.indd 21 12/16/13 10:31 AM


18 III -CLASSIFICATIONS OF CRACKS

Figure 3 Cracks of due to thermal movement of the top most story beams and slabs above a load
bearing masonry walls structure (Bureau of Indian Standards)

In case of framed buildings due to thermal movement frames are distorted and cracks may
appear as shown in figure 4.

ENLARGED DETAIL AT A
Figure 4 Cracking in cladding and cross walls of a frame structure(Bureau of Indian Standards)

English-1 New Final.indd 22 12/16/13 10:31 AM


Design Life Extension of RC Structure
19

2.2.2 Shrinkage cracks


Shrinkage cracks show up in two basic locations in most walls; the approximate mid-point of a long
section of wall, and the narrowed section of the wall such as across a door or window head. Shrinkage
cracks are virtually uniform in width from top to bottom and typically extend from the top of the wall
to within a couple of feet of the foundation.

Shrinkage cracks are usually caused by an inadequate number of control or contraction joints
within the constructed wall. A common rule of thumb for the placement of these joints would have
them spaced no further apart than three times the height of the wall, or forty feet. There are several
conditions under which this spacing would be too great. One of those is an extremely irregular shaped
wall. This type of wall will require twice as many control joints as a normal flat, one-directional wall.
Another common cause for shrinkage cracks in concrete walls would be excessive water content
within the concrete. In general terms, higher water content within a concrete mix will result in a
greater amount of shrinkage. This is quite evident in some concrete walls where there are an excessive
number of cracks.

A common cause of shrinkage cracks in masonry walls is using uncured masonry units. When green,
or uncured units are used to construct a masonry wall, they will continue to cure once placed resulting
in excessive shrinkage of the wall. Masonry units experience a significant amount of shrinkage when
curing. In If this curing shrinkage is not virtually complete when the unit is placed within the wall;
it will result in an increased number of shrinkage cracks within the finished product. In a concrete
wall, a shrinkage crack will typically fall within the middle section of the wall length and run virtually
vertical in that wall. In a masonry wall, the shrinkage cracks will usually find a weakened point in the
wall such as a location of several penetrations for piping or conduit. From this point, they will run
vertically most often in a stair-stepping fashion following the mortar joints. If however, there is an
exceptionally good bond between the mortar joints and masonry units, the shrinkage crack may
extend through the masonry units themselves thereby making a vertical crack.

The cracks between masonry walls and concrete elements such as columns and beams are common
due to the different coefficient of expansion for both materials and due to the change in temperature.
The typical cracks are shown in figure 5.

Figure 5 Cracks due to differential temperature of masonry walls and concrete elements

English-1 New Final.indd 23 12/16/13 10:31 AM


20 III -CLASSIFICATIONS OF CRACKS

2.3 Structural Cracks in Block Walls


2.3.1 Settlement cracks
Settlement cracks, as the name implies, result from a settlement of a support condition. This support
condition can either be the soils on which a wall rests and depends for its support, or it could be the
crushing of a column or other support element which supports one end of the wall. In either case,
settlement cracks are caused by a change in the vertical location of one section of the wall relative
to the remainder of the wall.

Settlement cracks typically appear in two different locations. The first and primary location would
be at wall corners and wall ends. This type cracking is the result of settlement of the wall corner or
wall end and manifests itself as a diagonal crack beginning near the corner or end of the wall at the
top and progressing downward away from the corner. This type of cracking is illustrated in Figure 6.
Another characteristic of a normal settlement crack in this location is that it will be significantly wider
at the top, tapering to closure at the bottom in a uniform fashion.

Figure 6 settlement
settl
ttlleem
m ent of
meen of wall
alll end
wa e d (Cracks in Concrete)
en

There are two types of problems which create the majority of the settlement cracks described above. The first
is erosion which seems to occur more quickly at the end of a wall or the corner of a building. This erosion will
remove the supporting soils from underneath this corner and allow settlement to occur.
The second most common cause is that of a concentrated load being applied to the wall at the corner or
wall end. This load can come from a column above or from a beam bearing condition.When this additional
concentrated load is not accounted for in the foundation design, a much higher stress will exist under the
footing at the wall end or corner than along the remainder of the wall. This will often result in settlement of the
corner related to the remainder of the wall.Another type of settlement crack which occurs at the corner or end
of the wall will have the completely opposite orientation than the one just described. This would be a crack
which originates close to the corner at the bottom of the wall, proceeds upward and away from the corner, and
would be wider at the bottom than it is at the top. These crack characteristics indicate a condition where the
end or corner of the wall has a significantly stronger support condition than the remaining portion of the wall.
This allows the central portion of the wall to settle further into the ground or into its support while the corner
portion remains supported and held at a rigid location. Such a condition can occur when a wall is supported
by a beam and column system if the column is coincident with the end or corner of the wall and the central
portion of the wall is supported by a beam which has inadequate stiffness and deflects enough to allow wall
cracking. This cracking pattern is illustrated in Figure 7 and photo 1.

English-1 New Final.indd 24 12/16/13 10:31 AM


Design Life Extension of RC Structure
21
Design Life Extension of RC Structure

Figure 7 differential settlements of supports(Cracks in Concrete)

Photo 1 Differential settlement of boundary wall in UAE

Another location of commonly seen settlement cracking is within the central portion of a length
of a wall. This crack will normally appear as a vertical crack in a concrete wall and a stair-stepping
diagonal crack in a masonry wall. The width of this crack will be much larger at the base of the wall
than it is near the top when it reaches closure.

This type of cracking will most often occur when the central section of the wall is supported on
a flexible element such as interior floor framing which will allow too much flexing of the support
thereby generating a settlement type condition for the central portion of the wall resulting in the
cracks. See Figures 8 and 9 for an illustration of this type of cracking.

English-1 New Final.indd 25 12/16/13 10:31 AM


22 III -CLASSIFICATIONS OF CRACKS

Figure 8 Flexural cracks due to settlement at mid span of the wall(Cracks in Concrete)

Figure 9 Cracks in walls due to deflection of concrete beam.

Buildings on expansion clays are extremely crack prone. The soil movement in such clay is more
appreciable up to a depth of 1.5 to 2m and this cause swelling and shrinkage and results in crack in
the structure. The cracks due to settlement are usually diagonal in shape. Crack appearing due to
swelling is vertical figure 10.

English-1 New Final.indd 26 12/16/13 10:31 AM


Design Life Extension of RC Structure
23

Figure 10 Thermo-osmotic heaving of buildings on desiccated clay soils(Bureau of Indian Standards)

all and a stair-stepping diagonal crack in a masonry wall. The width of this crack will be much larger
at the base of the wall than it is near the top when it reaches closure.
This type of cracking will most often occur when the central section of the wall is supported on
a flexible element such as interior floor framing which will allow too much flexing of the support
thereby generating a settlement type condition for the central portion of the wall resulting in the
cracks. See Figures 8 and 9 for an illustration of this type of cracking.

2.3.2 Loading cracks


A loading crack is a result of the loading to which the wall is subjected. A properly designed wall
would not exhibit these cracks, but an improperly designed wall is very susceptible to this damage. A
loading crack is found more often in residential structures than in commercial or industrial structures
primarily due to the design effort that is put forth in commercial and industrial projects. There are
three basic types of loading cracks that occur repeatedly; vertical cracking at the end of a wall; vertical
cracking in the center of the wall and horizontal cracking in the center of the wall.

Vertical cracking at the end of a wall is typically due to a concentrated force being applied at the top
of a wall which exceeds the shear capacity within the end section of the wall. This results in a minute
amount of compression occurring within this end section which does not occur within the adjacent
section of the wall thus causing a vertical crack at the interface between the two segments. This type
crack typically maintains a tight appearance at the top and at the bottom but may show a wider
gap at approximately mid-height of the wall. This would tend to indicate a bulging effect of the end
segment of the wall away from the remainder of the wall. This crack is illustrated in Figure 11.

Figure 11 Cracks in wall due to heavy concentrated load at the end of the wall(Cracks in Concrete)

English-1 New Final.indd 27 12/16/13 10:31 AM


24 III -CLASSIFICATIONS OF CRACKS

Horizontal cracking within the center portion of the wall is typically caused by lateral pressures on
the wall which exceed the flexural capacity of the wall. These pressures are normally generated by
saturated soil conditions being applied to a basement type wall. When the pressures exerted by the
soils retained behind this wall exceed the flexural capacity of the wall, a crack is generated. Observing
within the crack, one will note that the crack on the exposed face of the wall is considerably wider
than the crack on the concealed face of the wall. Accompanying this crack, one will find a measurable
amount of bowing within the wall. This will exhibit itself as a bulge at mid-height into the basement
area. This type cracking is illustrated in Figure 12.

Figure 12 cracks due to lateral pressure on the wall(Cracks in Concrete)

A vertical loading crack within the center section of a wall is again, typically the result of lateral
pressures exceeding the flexural capacity of the wall. However, in this case the wall typically has
insufficient support at the top as compared to the wall discussed above. This condition generates
a bowing inward of the wall near the top of the wall. When the pressures exerted by the material
retained behind the wall generate stresses within the wall that are in excess of the capacity of the
wall, the vertical crack results. This crack will be much wider near the top than it is near the bottom
of the wall. Accompanying this crack will be the noticeable bowing of the upper section of the wall
inward at the location of the crack.

The repair for cracks may be undertaken after ascertaining the reasons for the appearance of the
crack. A few basic principles if followed will be more effective:
1. Rendering of minor crack less that 1mm wide may be done after observing the crack for some
time and then sealing it with weak mortar of cement and sand.
2. Cracks where width change with season should be filled up with elastic fillers like silicon or
polyurethene compound.
3. Where shear crack are observed shear keys made of RCC concrete with at least 1.5 percent steel
reinforcement may be provided at 1 to 1.5m intervals.
4. If cracks are due to movement of soil in black cotton once, prevention of moisture penetration in
the surrounding areas has to be ensured by providing a waterproof blanket around the plinth. The
masonry wall below ground level should also be separated from the adjoining soil by replacing
the existing soil with coarse grain material.

3. CRACKS IN CONCRETE ELEMENTS


The following table shows the general classification of the different types of cracks in concrete
together with the symptoms/diagnosis for each type. Also, the table includes the main causes and
effects for each type. The right column of the table includes the protective and preventive measures
to reduce cracks, and/or to prevent the cracks from occurring.

English-1 New Final.indd 28 12/16/13 10:31 AM


TABLE (1): CONCRETE CRACKS CLASSIFICATION

English-1 New Final.indd 29


Type Diagnoses Cause Effect Protective / Prevention Measures
Early age
Plastic • Shallow cracks of varying depths • Shrinkage of the surface layer due to • Provides • Reduce rate of evaporation by early curing
shrinkage in a form of a random map pat- evaporation of moisture from the surface route
tern or parallel to each other. of freshly placed concrete faster than it is into the • Use of fog nozzles to saturate the air above the surface
replaced by bleed water (rate of evapora- cover for
• Cracks are typically 1 – 2 mm tion exceeds the rate of bleeding). moisture, • Use of plastic sheeting to cover the surface be-
wide, 300 – 500 mm long, and 20 • Due to the restraint provided by the oxygen and tween finishing operations.
– 50 mm deep. concrete below the drying surface layer, chloride
tensile stresses develop in the weak, stiff- • Use of windbreaks to reduce the wind velocity and sun-
• In some circumstances they ening plastic concrete. The rapid loss of shades to reduce the surface temperature are also helpful.
extend through the full depth of moisture from the surface layer is caused
the member. by: high air and concrete temperature; • Avoid concrete placement during hot, windy
low relative humidity; high wind velocity weather with low humidity.
at the surface of the concrete.
• Good and correct trowel finishing of concrete surface
• Concrete with lower amounts of bleed
water, such as those containing mineral
• Apply necessary precautions to prevent rapid
admixtures (especially silica fume) have a
moisture loss due to hot weather and dry winds
greater tendency to undergo plastic shrink-
age cracking than concrete with a greater (ACI 224R, 302.1R, and 305R).
tendency to bleed.

Plastic • Cracks, voids or both appear in • High amount of bleeding and settlement • Loss of • Reduce bleeding and settlement by the addition
settlement plastic concrete adjacent to an ele- in the presence of a form of restraint to bond be- of fibers or air-entraining admixtures.
ment restraining consolidation of the settlement. tween top
concrete (e.g. steel bar, sub-grade bars and • Proper design of the formwork following ACI 347
hardened concrete, and formwork). • Consolidation of concrete (locally re- concrete
strained by reinforcing steel or formwork) • Proper concrete vibration (ACI 309R).
• Cracks are typically 1 mm wide at after initial placement, vibration, and • Provides
the surface and usually run from finishing. route • Use of the lowest possible slump.
the surface to the bars into the
• Insufficient vibration. cover for • Increasing the concrete cover.
• Cracks typically occur on the top moisture,
surface and usually follow the line • Use of leaking or highly flexible forms. oxygen and • Use of steel bars with a smaller diameter.
of the uppermost bars, giving a chloride
series of parallel cracks. • Settlement cracking increases with • Provision of a time interval between the place-
increasing bar size, increasing slump, and ment of concrete in columns or deep beams and
the placement of concrete in slabs and beams (ACI
Design Life Extension of RC Structure

• Shorter cracks may also appear decreasing cover.


over the bars running transversely 309.2R)
25

12/16/13 10:31 AM
English-1 New Final.indd 30
Type Diagnoses Cause Effect Protective / Prevention Measures
Early age
Early age • Surface cracks parallel to each • Heat of hydration will initially • Provides route • Provide movement joints to avoid external restraint
thermal other. rise the concrete temperature into the cover
movement for moisture, • Limiting the time interval between pours to avoid exces-
• Concrete cantilever walls are • After few days the concrete oxygen and sive dissimilarity between adjacent pours and external
very vulnerable to early ther- will cool causing contraction chloride restraint
mal cracks (service reservoirs, of the element.
retaining walls, bridge abut- • Delay removal of formwork to control rate of surface cool-
ments and basements) • Contraction, when restrained, ing and avoid internal restraint
will cause cracking. Types of
• Classical case: Vertical wall cast restraints include:External • Use of insulation to keep the surface warm, delay the
on stiff strip footing: cracks restraint: concrete is cast onto onset of cooling and avoid internal restraint
develop at the base and run previously hardened base or
vertically between hardened elements • Use of smaller bar diameter, decrease bar spacing, reduce
without movement joints; concrete cover to the minimum allowable values
• Cracks near the end of bays and Internal restraint: in thick
may be inclined at 45o sections, the surface will cool • The less massive the structure, the less the potential for
quicker causing differential temperature differential and restraint.
temperature and strains across
the section and thus cracking • Limestone and granite aggregate concrete have lower coef-
of the surface layer. ficient of thermal expansion than dense aggregate and
hence they would result in less thermal cracks.
26 III -CLASSIFICATIONS OF CRACKS

• Reduce the internal temperature by keeping the core


concrete cool (e.g. injection of liquid nitrogen)

• Increase tensile strength of concrete by using steel fibers


in concrete floors to help in controlling cracks.

• Use of blended cement (GGBS & PFA) to reduce the heat


development and therefore the rise in temperature in
concrete (this will however reduce the tensile strength and
strain capacity of concrete at early ages).

• Other methods used to reduce cracking in massive con-


crete are presented in ACI 207.1R, 207.2R,207.4R, and 224R

12/16/13 10:31 AM
Type Diagnoses Cause Effect Protective / Prevention Measures

English-1 New Final.indd 31


Environ-
mental
Drying Shrinkage: • Drying shrinkage occurs due to • Contraction • Reduce the water content (not the w/cm ratio)
shrinkage & reduction in volume of concrete and/or deflec-
Crazing • Shallow, closely spaced, fine caused by loss of water during the tion • Provide adequate reinforcement and sufficient joints
cracks on surface of walls or hardening process and subsequent
slabs exposure to unsaturated air. This • As the quantity and size of aggregate increases, the drying
will result in cracking of concrete if shrinkage decreases.
• Cracking of the surface layer of restrained in some way.
concrete into smaller irregu- • The higher the stiffness of the aggregate, the more effec-
larly shaped contiguous areas • Loss of moisture from restrained tive it is in reducing the shrinkage of the concrete
(surface crazing – alligator cement paste constituent, which
pattern) on surface of walls. can shrink by as much as 1%. • The shrinkage of concrete containing sandstone aggregate
Cracks are typically at right may be more than twice that of concrete with granite,
angle to direction of restraints • In massive concrete elements, basalt, or high-quality limestone.
tensile stresses inducing cracks
Crazing: are caused by differential shrink- • The lower the water and cement contents, the less the
age between the surface and amount of drying.
• Close pattern of narrow the interior concrete. The higher
(about 0.1 mm wide) shallow shrinkage at the surface causes • Shrinkage cracking can be controlled by using contraction
interconnected cracks usually cracks to develop that may, with joints and proper detailing of the reinforcement.
form closed polygonal loops. time, penetrate deeper into the
The polygonal areas are typi- concrete. • Shrinkage cracking may also be reduced or even eliminated
cally 10-75 mm across and the by using shrinkage-compensating cement or a shrinkage-
cracks are usually only few • Cracks may propagate at much compensating admixture.
millimeters deep. lower stresses than are required to
cause crack initiation (ACI 446.1R). • Adequate curing to exposed surfaces

• The amount of drying shrinkage is • Provide movement joints to eliminate external restraints
influenced mainly by the amount where applicable
and type of aggregate and the
cement paste (cement and water) • Sufficient crack control and steel distribution.
contents of the mixture.
• Use GGBS or PFA to reduce the water demand for a given
• Crazing usually occurs when the workability.
surface layer of the concrete has
higher water content than the
interior concrete due to over trowel-
Design Life Extension of RC Structure
Design Life Extension of RC Structure

ing for example. Discontinuity in


composition near exposed surface.
27

12/16/13 10:31 AM
English-1 New Final.indd 32
Type Diagnoses Cause Effect Protective / Prevention Measures
Chemical
Corrosion of • Rust stains • Exposure • Spalling of • The key for protecting metal from corrosion is to stop or reverse the chemical
steel to chlorides concrete cover reactions. This may be done by:
• Longitudinal destroying the
- Carbonation- cracks in a passivity of the • Loss of • Cutting off the supplies of oxygen or moisture
induced direction steel effective cross
parallel to sectional area • Supplying excess electrons at the anodes to prevent the formation of the metal ions
-Chloride- the steel • Reduction in of concrete (cathodic protection).
induced reinforcing the alkalinity
bars. For general concrete construction, the best protection against corrosion-induced splitting is the
of the concrete • Loss of
use of:
through reinforcement
• Spalling of carbonation cross-section • Concrete with low permeability and adequate cover.
concrete cover
• Local cracking • Loss of bond • Increased concrete cover over the reinforcement is effective in delaying the corrosion
• A broad crack due to high at steel/ process by limiting carbonation, as well as access by oxygen, moisture, and chlorides,
may form at bond stresses, concrete and also in resisting the splitting and spalling caused by corrosion.
a plane of transverse interface
bars parallel tension, • In the case of large bars and thick covers, it may be necessary to add small transverse
to a concrete shrinkage, and • Loss of load reinforcement (while maintaining the minimum cover requirements) to limit splitting
surface, settlement, carrying and to reduce the surface crack width (ACI 345R).
resulting in can initiate capacity
delamination, corrosion. • Concrete subjected to water-soluble salts should be amply air entrained
which is a
28 III -CLASSIFICATIONS OF CRACKS

well-known • Use of adequate cover of the reinforcing steel.


problem in
• The use of high-quality and low-permeability concrete.
bridge decks
In very severe exposure conditions, additional protective measures may be required. A number
of options are available, such as:

• Epoxy-coated reinforcement (should be used with caution and high quality control).

• Sealers or overlays on the concrete.

• Corrosion-inhibiting admixtures.

• Cathodic protection.

• In most cases, concrete must be allowed to breathe; that is, water must be allowed to
evaporate from the concrete.

12/16/13 10:31 AM
Type Diagnoses Cause Effect Protective / Prevention Measures

English-1 New Final.indd 33


Chemical
Alkali-silica • Network pat- • Concrete may crack with time as the • Loss of compressive strength • The use of non-reactive aggregates, low-alkali
reaction (ASR) tern of cracks result of slowly developing expansive of concrete cement, and pozzolans that consist principally
(map cracking) reactions between aggregate contain- of very fine, highly active silica. The first mea-
ing active silica and alkalis derived • Loss of tensile strength of sure may preclude the problem from occurring,
from cement hydration, admixtures, or concrete while the other two measures have the effect of
external sources (such as curing water, decreasing the alkali-reactive silica ratio, result-
groundwater, deicing chemicals, and • Loss of effective cross sec- ing in the formation of a nonexpanding calcium
alkaline solutions stored or used in the tional area of concrete alkali silicate hydrate.
finished structure). When the alkalis
in cement react with susceptible • Avoiding reactive aggregates, dilution with non-
aggregate particles, a reaction rim reactive aggregates,
of alkali-silica gel is formed around
the aggregate. If this gel is exposed • The use of a smaller maximum size aggregate,
to moisture, it expands, causing an
increase in volume of the concrete • The use of low-alkali cement (ACI 201.2R).
mass that will result in cracking and
may eventually result in the complete
deterioration of the structure.

• Certain carbonate rocks participate


in reactions with alkalis that, in some
instances, produce detrimental expan-
sion and cracking. These detrimental
alkali-carbonate reactions are usually
associated with argillaceous dolo-
mitic limestone that have a very fine-
grained (cryptocrystalline) structure
(ACI 201.2R). The reaction is distin-
guished from the alkali-silica reaction
by the general absence of silica gel
surface deposits at the crack.
Design Life Extension of RC Structure
29

12/16/13 10:31 AM
English-1 New Final.indd 34
Type Diagnoses Cause Effect Protective / Prevention Measures
Chemical
Sulfate Attack • Softening of • Certain Sulfates in soil and • Loss of concrete cover • The use of ASTM C 150 Types II and V Portland cement,
concrete sur- water are a special durability which are low in tricalcium aluminate, will minimize the
face layer problem for concrete. When • Loss of effective cross sec- formation of calcium sulfoaluminate.
sulfate penetrates hydrated tional area of concrete
• Closely spaced cement paste, it comes in • The use ofSulfate-resistant cements specified in ASTM
cracks contact with hydrated calcium • Reduction in mechanical prop- C 595 and C 1157 are also useful in improving sulfate
aluminate. Calcium sulfoalu- erties (stiffness, compressive & resistance.
minate is formed, which may tensile strengths)
• The useofPozzolans that have been tested and shown to
result in an increase in volume.
impart additional resistance to sulfate attack are benefi-
• Formation of expansive cial.
ettringite or gypsum in the
• The use of concrete with a low w/cm is important to
hardened concrete causing
providing protection against severe sulfate attack.
cracking and exfoliation

• Softening and dissolution


of the hydrated cementing
compounds due to direct at-
tack on these compounds by
sulfates or by their decomposi-
tion when calcium hydroxide
reacts with the sulfates and is
30 III -CLASSIFICATIONS OF CRACKS

removed

12/16/13 10:31 AM
Type Diagnoses Cause Effect Protective / Prevention Measures

English-1 New Final.indd 35


Structural
Flexural • Closely spaced cracks running • Error in design • Lower load carrying capacity • Proper design
perpendicular to the longitudi- than designed
nal main steel reinforcement. • Excessive loading • Thorough understanding of structural
behavior
• Uniformly distributed in
regions of maximum moments • Peer review of design

Shear / torsion • Cracks near supports inclined • Error in design • Lower load carrying capacity • Proper design
at 30 o to 45o. than designed
• Excessive loading • Thorough understanding of structural
• Shear cracks are inclined in the behavior
same direction on both sides
of the beam. • Peer review of design

• Torsional cracks are inclined


and parallel to one another
but run in opposite directions
on the beam sides forming a
spiral pattern
Punching shear • Cracks forms at tension side of • Error in design • Lower load carrying capacity • Proper design
the flat slab radiating out from than designed
the column. These may be • Excessive loading • Thorough understanding of structural
joined to a series of circum- behavior
ferential cracks at a distance
about 3 times the slab thick- • Peer review of design
ness from the column face
cracking in massive concrete are presented in
ACI 207.1R, 207.2R,207.4R, and 224R

Axial • Longitudinal cracks parallel • Error in design • Lower load carrying capacity • Proper design
to the steel reinforcement in than designed
columns • Excessive loading • Thorough understanding of structural
behavior

• Peer review of design


Design Life Extension of RC Structure
31

12/16/13 10:31 AM
English-1 New Final.indd 36
Type Diagnoses Cause Effect Protective / Prevention Measures
Chemical
Foundation Differential settlement: • Error in design of foundation • Differential settlement: • Proper soil investigation and subsur-
settlement face exploration
• Difficulty in operating doors or • Incorrect assumption about • Serviceability and functional
windows properties and distribution of damage • Thorough understanding of struc-
the soil below the structure tural behavior
• Cracking of plaster or gypsum • Impose significant stresses and
wall board inclined at approxi- • Proper design of foundation
• Error in structural design of alteration of the conditions
mately 45o elements such as pile caps on which the basic structural • Peer review of design
assumptions were made (e.g.
• Cracking in the masonry • Consolidation of a soft and/or regions of hogging moment
façade at approximately 45o organic soil may be subjected to sag-
on the diagonal in a stepwise ging moment instead). These
fashion along the brick-mortar • Presence of expansive soil. regions will be significantly
joints. under-strength
• Settlement from uncontrolled
• Series of diagonal cracks deep fill • Damage may affect the stabil-
between windows that are ity of the building such as
stacked vertically • Development of limestone cracking and distortions to
cavities or sink holes support members which may
• Inclined cracks at the corner of lead to complete collapse of
windows and doors • Soil subsidence Extraction of the building.
oil or ground water
32 III -CLASSIFICATIONS OF CRACKS

Uniform settlement: Uniform settlement:


• Water infiltration into the
• Damage of services connected ground that may cause un- • It will not normally cause
to the structure stable soil to collapse structural distress but it may
damage services connected to
• Yielding of adjacent excava- the structure
tions or collapse of limestone
cavities and underground
mines and tunnels

12/16/13 10:31 AM
Design Life Extension of RC Structure
33

4. PRECAUTIONS TO AVOID FOUNDATION SETTLEMENT


• Proper soil investigation and subsurface exploration
• Proper design of foundation and tie beams
• Proper compaction of soil layers as per the soil investigation report
• Avoid excessive irrigation near foundation to minimize water infiltration into the ground
• Avoid soil subsidence extraction of oil or ground water beside foundation
• Avoid deep excavation beside foundation of existing building unless proper earth retaining walls
are provided by means of Contiguous Bored Piled Wall, Secant Piled Wall, or Diaphragm (D-wall).
• Proper isolation of foundation to avoid deterioration due to presence of water table or aggressive
agents.
• Proper drainage system to avoid leaking and/or water infiltration into the ground.

5. REFERENCES
• ACI 201.1RGuide for Making a Condition Survey of Concrete in Service
• ACI 201.2RGuide to Durable Concrete
• ACI 201.3RGuide for Making a Condition Survey of Concrete Pavements
• ACI 207.1RGuide to Mass Concrete
• ACI 207.2REffect of Restraint, Volume Change, and Reinforcement on Cracking of Mass Concrete
• ACI 207.3RPractices for Evaluation of Concrete in Existing Massive Structures for Service Conditions
• ACI 207.4RCooling and Insulating Systems for Mass Concrete
• ACI 222RProtection in Metals in Concrete Against Corrosion
• ACI 224RControl of Cracking in Concrete Structures
• ACI 224.2RCracking of Concrete Members in Direct Tension
• ACI 224.3RJoints in Concrete Construction
• ACI 228.2RNondestructive Test Methods for Evaluation of Concrete in Structures
• ACI 302.1RGuide for Concrete Floor and Slab Construction
• ACI 304RGuide for Measuring, Mixing, Transporting, and Placing Concrete
• ACI 305RHot Weather Concreting
• ACI 308RGuide to Curing Concrete
• ACI 309RGuide for Consolidation of Concrete
• ACI 309.2RIdentification and Control of Visual Effects of Consolidation Formed Concrete Surfaces
• ACI 318Building Code Requirements for Structural Concrete343RAnalysis and Design of Reinforced
ConcreteBridge Structures
• ACI 345RGuide for Concrete Highway Bridge DeckConstruction
• ACI 345.1RGuide for Maintenance of Concrete Bridge Members
• ACI 347Guide to Formwork for Concrete
• ACI 446.1RFracture Mechanics of Concrete: Concepts,Models, and Determination of Material
Properties
• “Cracks in Concrete”,Au Yong TheanSeng , E-book, www.madisonvelocity.blogspot.com.

English-1 New Final.indd 37 12/16/13 10:31 AM


34 III -CLASSIFICATIONS OF CRACKS

• ACI 503RUse of Epoxy Compounds with Concrete


• ACI 504RGuide to Sealing Joints in Concrete Structures
• ACI 517.2RAccelerated Curing of Concrete at AtmosphericPressure
• ACI 546RConcrete Repair Guide
• ACI 546.1RGuide for Repair of Concrete Bridge Superstructures
• ACI 546.2RGuide to Underwater Repair of Concrete548.1RGuide for the Use of Polymers in
Concrete
• Bureau of Indian standards, “Handbook on Causes and Prevention of Cracks in Buildings”, SP
25:1984, pp68.

English-1 New Final.indd 38 12/16/13 10:31 AM


Design Life Extension of RC Structure
35

English-1 New Final.indd 39 12/16/13 10:31 AM


English-1 New Final.indd 40 12/16/13 10:31 AM
IV - ASSESSMENT OF CONCRETE STRUCTURES Design Life Extension of RC Structure 37

IV - ASSESSMENT OF
CONCRETE STRUCTURES

English-1 New Final.indd 41 12/16/13 10:31 AM


38 IV - ASSESSMENT OF CONCRETE STRUCTURES

1. INTRODUCTION
Structural assessment can be initiated, when there has been a change in resistance. Such as structural
deterioration due to time-depending processes (e.g. corrosion, fatigue) or structural damage by
accidental actions. Also when there will be a change in loading (e.g. increased traffic load) or an
extension of the design working life. Assessment can also be carried out to analyze the current
structural reliability (e.g. for environmental hazards like earthquake or extreme winds and/or waves).

This section of this report presents a methodological framework of the assessment of existing
structures and a summarization of the manifold methods developed in recent years for structural
assessment. It is intended to describe the coherency and difference between methods and to provide
an understanding and to help practicing engineers finding the suitable assessment procedure
depending on the assessment objectives as well as on different boundary conditions.

Within management of groups of structures it is necessary to assessment unify, so that different


structures are assessed in the same way and results are comparable between authorities, regions
or countries. The guideline is meant to provide a framework to achieve that goal. It is intended
to explain the principles of structural assessment and to feature the several levels of structural
assessment, starting with simple but conservative methods and progressing to more refined but
also more expensive methods.

The guideline can be applied to all kind of existing structures (e.g. bridges and tunnels, buildings,
industrial structures on- and offshore) of any type of structural material (concrete, steel, timber,
masonry, composite material). The structures to be assessed can be designed based on accepted
engineering principles or design rules as well as on good workmanship, historic experience and
accepted professional practice. Since fire resistance requires properties different from those of
structural safety and integrity, the assessment of fire resistance is not part of the guideline.

2. PRINCIPLES OF STRUCTURAL ASSESSMENT


2.1. Objectives
In general structural assessment is a process to determine, how reliable the existing structure is
able to carry current and future loads and to fulfill its task for a given time period. The first step of
the assessment process must always be the clear specification of the assessment objective. This is
essential to identify the most significant limit states. Associated with the limit states are the structural
variables to be investigated and with those the assessment procedure to be applied.

A wide range of different assessment procedures exists with varying complexity and the choice of
the appropriate procedure depends highly on the specified requirements of assessment. There are
two main objectives to conduct assessment of existing structures, the assurance of structural safety
and serviceability and the minimization of costs.

2.2. Structural safety and serviceability


The main task of assessment is to ensure that the structure or parts of the structure do not fail under
loading. The assessment is carried out for ultimate limit states, which are:
• Loss of equilibrium of the structure or parts of it as a rigid body (e.g. overturning)
• attainment of the maximum resistance capacity
transformation of the structure or part of it into a mechanism
• instability of the structure of part of it
• sudden change of the assumed structural system to a new system (e.g. snap through)

A reduction of serviceability may lead to a limitation of use and therefore serviceability assessment might
become necessary. Serviceability limit states include:
• local damage which may reduce the working life of the structure

English-1 New Final.indd 42 12/16/13 10:31 AM


Design Life Extension of RC Structure
39

• unacceptable deformations which affect the efficient use


• excessive vibrations which cause discomfort to people

Safety and serviceability can be evaluated for a variety of reasons, among others for changes in use
or increase of loads, effects of deterioration, damage as result of extreme loading events and concern
about design and construction errors and about the quality of building material and workmanship.
Increases of the maximum live load limits and changes of use are probably the main reasons for
structural assessment. For buildings such changes could result in the need to support higher floor
loadings. For bridges there is a worldwide demand to raise the limits for traffic loads.

Any structure is undergoing some degree of deterioration. The effects of deterioration are structure
and site specific. Concerning structural strength, corrosion and fatigue are the main deterioration
processes. Spalling, cracking, and degraded surface conditions are typical indications of deterioration.
Impact, earthquake or wind storms can result in structural damage. The remaining load carrying
capacity needs to be analyzed after such events. It may be necessary to assess an existing structure,
after concerns about the correct design and constructions arise, including low quality building
material or workmanship.

2.3. Methodology
The assessment of existing structures can be carried out with methods of varying sophistication and
effort. The core objectives, as described above, are to analyze the current load carrying capacity and
to predict the future performance with a maximum of accuracy and a minimum of effort. In most
cases it judiciously to start with simple conservative routines and use more sophisticated routines
only when the evaluated load carrying capacity is insufficient. Generally structural assessment should
be carried out using limit state principles with characteristic values and partial safety factors. If more
refined methods are necessary, the probabilistic approach has to be applied, if economic. If structures
have failed assessment to an acceptable capacity, the engineer can make a recommendation, but
the technical authority is likely to be ultimately responsible for public safety and therefore has to
do the final decision. A structure, failed in assessment, may remain in service if it presents a low risk,
subject to monitoring.

2.4. Measurement based serviceability assessment


Focusing on concrete structures, an important range of test methods is available for use during
inspection, or on samples extracted from the structure for laboratory investigation. For existing
structures, the need for testing may arise from a variety of causes which can include:
a) change of usage or extension of a structure
b) acceptability of a structure for purchase or insurance
c) assessment of structural integrity or safety following material deterioration, or structural damage
such as
caused by fire, blast or overload
d) serviceability or adequacy of members known or suspended to contain material which does not
meet
specifications, or with design faults
e) monitoring of strength development in relation to framework stripping, prestressing or load
application

The tests for concrete structures can also be classified as non-destructive (NDT), which are not
harmful, semi-destructive or minor destructive (MDT), which usually cause minor, but reversible,
damage to the structure, and destructive (D), which are the most invasive. In concrete structures,
there is usally a need for better understanding or assessing the properties of materials for restoration
and rehabilitation purposes, especially when not enough information, such as documentation, is
available. In such cases, only non-destructive tests should be regarded as suitable, in order not to
harm the material and not to cause any alteration to parts of the structure. However, NDT can give
qualitative results in most cases, and their calibration can be rather difficult. As a result of this, MDT
can also be used to form a basis for the calibration of NDT.

English-1 New Final.indd 43 12/16/13 10:31 AM


40 IV - ASSESSMENT OF CONCRETE STRUCTURES

According to the necessity of information, there is a variety of tests that are available. The principle
options can be presented in the following Table 1. These methods can generally be performed as
nondestructive, apart from chemical and petrographic methods which require cutting or drilling
small samples from the concrete. Many of these methods require expensive equipment, with
extensive safety precautions in some cases. Cost consideration, as well as the aspect of damage,
time and reliability can strongly influence the choice of the method to be executed. Table 2 indicates
the damage resulting from strength tests, along with the main restrictions in each case. While, Table
3 gives information about the relative cost, the speed, the damage and the reliability of calibration
for each test.

Table 1- In-situ tests on concrete

Methods available Information required


Load tests with deflections and strain measurements • Member behavior and strength
Cores Rebound hammer Pull-out and internal fracture • Concrete strength
Break-off and pull-off Penetration resistance Ultrasonic
pulse velocity
Ultrasonic pulse velocity Acoustic emission and hologra- • Cracking
phy
Ultrasonic pulse velocity γ-radiography Cores Pulse echo • Honeycombing and compaction
techniques
γ-radiometry • Density
Absorption, flow tests and capillary rise • Permeability
Nuclear methods Electrical resistivity Microwave absorp- • Moisture content
tion
Chemical analysis Nuclear methods • Cement content
Chemical analysis Cores Micrometric methods • Mix properties and constituents
Magnetic methods X-and γ-radiography • Reinforcement detection
Concrete deterioration • Chemical analysis

• Thermo-luminescence

• Ultrasonic pulse velocity

• Micrometric methods
Abrasion resistance and soundness • Rebound hammer

• Wear tests

• Physical methods

• Infrared thermo-graphy

English-1 New Final.indd 44 12/16/13 10:31 AM


Design Life Extension of RC Structure
41

Table 2- Strength tests: damage and restrictions

Test method Probable damage Major restrictions


Collapse load test Member destroyed • Member must be isolated, and
preferably removed from rest of
structure before the test
Overload test Possible loss of member • Member must be isolated, or
allowance made for load distri-
bution to adjacent parts of the
structure
Cores Holes to be made good • Limitation of cores size and pro-
portion
• Safety precautions for critical
members
Penetration resis- Cone approx. 50 mm dia. To be • Minimum edge distance
tance
made good • Minimum member thickness
(Windsor probe)
Pull-out Bolt hole remains • Preplanned
Internal fracture Bolt to be cropped or cone • Drilling difficulties

approx. 75 mm dia. To be made

good
Ultrasonics None • Two smooth surfaces necessary
Rebound hammer None (for mature concrete) • Smooth surface necessary

Table 3- Strength tests: relative merits

Reliability of
Test Damage to Representa-
Test method Cost strength calibra-
speed concrete tiveness
tions
Collapse load test High Slow Total Good Good
Overload test High Slow Variable Good Good
Cores High Slow Moderate Moderate Good
Penetration resis- Near surface
tance Moderate Fast Minor only Moderate
Pull-out/ Internal Near surface
fracture Moderate Fast Minor only Moderate
Ultrasonic Low Fast None Good Moderate
Rebound hammer Very low Fast Unlikely Surface only Poor

English-1 New Final.indd 45 12/16/13 10:31 AM


42 IV - ASSESSMENT OF CONCRETE STRUCTURES

3. CODES, STANDARDS, SPECIFICATIONS AND PROCEDURES


To provide guidance on test methods, a national standards organization may develop Guidelines or
Recommendations to assist users of a specific technology. These types of documents are not usually
called up in contracts between organizations.

3.1. American Society for Testing and Materials (ASTM)


(1) ASTM C 42 - 87, Standard Test Method (STM) for obtaining and testing Drilled Cores and
Sawed Beams of Concrete, Annual Book of ASTM Standards, 1988, ASTM,
Philadelphia, USA
(2) ASTM C85 - 66, “Cement content of hardened Portland cement concrete”, ASTM,
Philadelphia, USA
(3) ASTM C457 - 80 “Air void content in hardened concrete”, ASTM, Philadelphia, USA
(4) ASTM C823 - 75 “Examining and sampling of hardened concrete in constructions”
(5) ASTM C779- 76 “Abrasion resistance of horizontal concrete surfaces”
(6) ASTM C944 -80 “Abrasion resistance of concrete or mortar surfaces by the rotating cutter
method”
(7) ASTM C856 -77 “Petrographic examination of hardened concrete”
(8) ASTM D4788 - 88 Standard Test Method for detecting Delamination in Bridge Decks using
Infrared Thermography
(9) ASTM D6087 - 97 STM for Evaluating Asphalt covered Concrete Bridge Decks using Ground
Penetrating Radar
(10) ASTM D4580 - 86 (1997) Standard Practice for measuring Delamination in Concrete Bridge
Decks by Sounding
(11) ASTM D2950 - 91 (1997) STM for Density of Bituminous Concrete in place by Nuclear Methods
(12) ASTM C1383 - 98 a STM for measuring P wave Speed and the Thickness of Concrete Plates
using the Impact-Echo Method
(13) ASTM C1150 - 96 STM for the Break off Number of Concrete
(14) ASTM C1040- 93 STM for Density of Unhardened and Hardened Concrete in place by Nuclear
Methods
(15) ASTM C900- 94 STM for Pullout Strength of Hardened Concrete
(16) ASTM C876 -91 STM for Half-cell Potentials of Uncoated Reinforcing Steel in Concrete
(17) ASTM C805 - 97 STM for Rebound Number of Hardened Concrete
(18) ASTM C 803 - 82 STM for Penetration Resistance of Hardened Concrete
(19) ASTM C801- 98 STM for Determining the Mechanical Properties of Hardened Concrete under
Triaxial Load
(20) ASTM C597- 97 STM for the Pulse Velocity through Concrete

English-1 New Final.indd 46 12/16/13 10:31 AM


Design Life Extension of RC Structure
43

3.1.1. Tests to evaluate existing concrete structures according to the ASTM Standards
Table 4 Nondestructive test to determine materials properties of hardened concrete (ACI 228.2R-98

Possible Methods
Property Comment
Primary Secondary
Strength of in-place concrete;
Penetration resistance
Cores for compression testing comparison of strength in different
Compressive Strength (ASTM C803; pullout test-
(ASTM C42 and C39) locations; and drilled-in pullout test
ing drilled in)
not standardized
Rebound number influenced by near
Rebound number (ASTM
surface properties; ultrasonic pulse
Relative Compressive Strength C805); Ultrasonic pulse veloc- ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ velocity gives average result through
ity (ASTM C597)
thickness
Splitting –tensile strength of In-place pulloff test (ACI
Tensile Strength Assess tensile strength of concrete
core (ASTM C496) 503R; BS 1881:Part207)
Specific gravity of samples
Density Nuclear gage ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
(ASTM C642)
Moisture Content Moisture meter Nuclear gage ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
Compression test of cores
Static Modulus of Elasticity ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
(ASTM C469)
Requires knowledge of density and
Ultrasonic pulse velocity
Resonant frequency testing Poisson’s ratio (except ASTM C215);
(ASTM C597); Impact echo
of sawed specimens (ASTM dynamic elastic modulus is typi-
Dynamic Modulus of Elasticity spectral analysis of surface
C215) cally greater than the static elastic
waves (SAWS)
modulus
Length change of drilled or
Measure of incremental potential
Shrinkage/Expansion sawed specimens (ASTM C ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ length change
341)
Electric indication of Establishes relative susceptibility of
Resistance to Chloride Penetra- 90-day ponding test (AASH- concrete’s ability to resist concrete to chloride ion intrusion;
tion TO-T_259) chloride ion penetration assess effectiveness of chemical seal-
(ASTM C1202) ers, membranes and overlays
Air Content; Cement Content; Petrographic examination of
Assist in determination of cause(s) of
and Aggregate Properties (scal- concrete samples removed Petrographic examina-
distress; degree of damage; quality
ing alkali-aggregate reactivity, from structure (ASTM C856, tion of aggregates (ASTM
of concrete when originally cast and
freezing and thawing suscep- ASTM C457); Cement content C294, ASTM 295)
current
tibility) (ASTM C1084)
Cornell/SHRP rapid test Establish in field if observed deterio-
Alkali-Silica Reactivity ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
(SHRP-C-315) ration is due to alkali-silica reactivity
Assess corrosion protection value of
Phenolphthalein (qualitative Other pH indicators (e.g. concrete with depth and susceptibil-
Carbonation, pH
indication); pH meter litmus paper) ity of steel reinforcement to corro-
sion; depth of carbonation
SAES; Ultrasonic pulse
Petrography; rebound num- Rebound number permits demarca-
Fire Damage velocity; impact-echo;
ber (ASTM C805) tion of damaged concrete
Impulse-response
Freezing and Thawing Damage Petrography SAWS; Impulse response ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
Acid-soluble (ASTM C1152) Chloride ingress increases suscep-
Specific ion probe (SHRP-
Chloride Content and Water soluble (ASTM tibility of steel reinforcement to
S-328)
C1218) corrosion
SHRP Surface air flow method Measures in-place permeability in-
Air Permeability ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
(SHRP-S-329) dex of near surface concrete (15mm)
AC resistance useful for evaluating
effectiveness of admixtures and
AC resistance using four SHRP surface resistance
Electrical Resistance of Concrete cementing additions; SHRP method
probe resistance meter test (SHRP-S-327)
useful for evaluating effectiveness
of sealers

English-1 New Final.indd 47 12/16/13 10:31 AM


English-1 New Final.indd 48
Methods
concrete (ACI 228.2R-98)

Property Comment
Primary Secondary
Covermeter; Ground penetrating radar
Reinforcement Location X-ray and γ-ray radiography Steel location and distribution; concrete cover
(GPR) (ASTM D4748)
Verify thickness of concrete; provide more certainty in
Concrete Component Thickness Impact-echo (I-E); GPR (ASTM D 4748) Intrusive probing structural capacity calculations; I-E requires knowledge of
wave speed, and GPR of dielectric constant
Observe and measure rust and area reduction in steel;
Ultrasonic thickness gage (requires direct Intrusive probing; radiogra- Observe corrosion of embedded post-tensioning compo-
Steel Area Reduction
contact with steel) phy nents; Verify location and extent of deterioration; provide
more certainty in structural capacity calculations
Local or Global Strength and Load test, deflection or strain measure- Acceleration, strain, and dis- Ascertain acceptability without repair or strengthening;
Behavior ments placement measurement Determine accurate load rating
Identification of location of active reinforcement corro-
Corrosion Potentials Half-cell potential (ASTM C876) ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
sion
Linear polarization (SHRP-S-324 and Corrosion rate of embedded steel; rate influenced by
Corrosion Rate ȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮȮ
S-330) environmental conditions
Impact-echo; Infrared thermography Sounding (ASTM D4580); Assessment of reduced structural properties; extent and
Locations of Delamination,
(ASTM D4788); Impulse-response; Radi- Pulse-echo; SAWS; Intrusive location of internal damage and defects; Sounding lim-
Voids, and other hidden defects
ography; GPR drilling and borescope ited to shallow delamination
44 IV - ASSESSMENT OF CONCRETE STRUCTURES

Table 5 Nondestructive test methods to determine structural properties and assess conditions of

12/16/13 10:31 AM
Design Life Extension of RC Structure
45

3.2. British Standards Institution (BSI)


(1) BS 1881: Part 102: 1983 - Method for Determination of Slump
(2) BS 1881 Part 5:1970 - Testing Concrete. Methods of testing hardened concrete for other than
strength. Determination of dynamic modulus of elasticity by electromagnetic method
(3) BS 1881 Part 205:1970 - Testing Concrete. Recommendations for radiography of concrete
(4) BS 1881 Part 206:1986 - Testing Concrete. Recommendations for determination of strain in
concrete. Advice on the use of mechanical, electrical resistance and vibrating wire gauges and
electrical displacement gauges
(5) BS 1881 Part 202:1986 - Testing Concrete. Recommendations for surface hardness testing by
rebound hammer
(6) BS 1881: Part 114: 1983 - Methods for Determination of Density of Hardened Concrete
(7) BS 1881: Part 116: 1983 - Method for Determination of Compressive Strength of Concrete Cubes
(8) BS 1881: Part 117: 1983 - Method for Determination of Tensile Splitting Strength
(9) BS 1881: Part 118: 1983 - Method for Determination of Flexural Strength
(10) BS 1881: Part 120: 1983 - Method for Determination of Compressive Strength of Concrete Cores
(11) BS 1881: Part 121: 1983 - Method for Determination of Static Modulus of Elasticity in Compression
(12) BS 1881: Part 122: 1983 - Method for Determination of Water Absorption
(13) BS 1881: Part 201: 1986 - Guide to the Use of Non-Destructive Methods of Test for Hardened
Concrete
(14) BS 1881: Part 202: 1986 - Recommendations for Surface Hardness Testing by Rebound Hammer
(15) BS 1881: Part 203: 1986 - Measurement of the Velocity of Ultrasonic Pulses in Concrete
(16) BS 1881: Part 204: 1986 - Recommendations on the Use of Electromagnetic Covermeters
(17) BS 1881: Part 207 1992 - Recommendations for the Assessment of Concrete Strength by Near-
to-Surface Tests
(18) BS 8110: Part 1: 1985 - Structural Use of Concrete: Code of Practice for Design and Construction
(19) BS 8110: part 2: 1985 - Structural Use of Concrete: Code of Practice for Special Circumstances
(20) BS 4408: pt. 4, “Non-destructive methods of test for concrete - surface hardness methods” British
Standards Institution, London
(21) BS 1881: pt. 4, “Methods of testing concrete for strength”, British Standards Institution, London
(22) BS 4408: pt. 5, “Non-destructive methods of test for concrete - Measurement of the velocity of
ultrasonic pulses in concrete”, British Standards Institution, London
(23) BS 4408: pt. 2, “Recommendations for non-destructive methods of test for concrete – strain
gauges for concrete investigations”, British Standards Institution, London, 1969,(83)
(24) BS 4408: pt. 1, “Non-destructive methods of test for concrete-electromagnetic cover measuring
devices”, British Standards Institution, London
(25) BS 4408: pt. 3, 1970 “Non-destructive methods of test for concrete-gamma radiography of
concrete”, British Standards Institution, London
(26) BS 1881: pt. 6, “Methods of testing concrete: analysis of hardened concrete”, British Standards
Institution, London
(27) BS4551, “Methods of testing mortars, screeds and plasters”, British Standards Institution,
London
(28) BS 812: pt. 1, “Methods for sampling and testing of mineral aggregates, sands and fillers”, British
Standards Institution, London.

English-1 New Final.indd 49 12/16/13 10:31 AM


46 IV - ASSESSMENT OF CONCRETE STRUCTURES

4. METHODS OF STRUCTURAL ANALYSIS


In this category fall all those assessment routines, where the load effects are determined by model
based structural analysis. Using this method Ultimate Limit State and Serviceability State can be
modeled and therefore assessed. It is a three component-procedure where the components are the
follow:
• acquisition of data of loading and resistance
• calculation of load effects on structural models
• safety and serviceability verification

Structural performance shall be analyzed using models that reliably represent the loading on the
structure, the behavior of the structure and the resistance of its components. The analytical model
should reflect the actual condition of the existing structure.

1.1. Simple analysis methods


Here it is often effective to calculate load effects with basic conservative methods with simple structural
models, provided that the approximately large uncertainty is regarded with an adequate safety measure.
Typical simple analysis methods are among others space frame and grillage analysis combined with a
simple load distribution and linear elastic material behavior, which result in a lower bound equilibrium
solution.

1.2. Complex analysis methods


Here refined load effect calculation methods need to be accomplished. Refined methods include mainly
finite element analysis and non-linear methods such as yield line analysis, where these may lead to higher
capacities. Particularly a specified modelling of the material behavior such as time-variant behavior
(e.g. shrinkage and creeping of RC structures) and the consideration of interactions between material
components (e.g. bond, tension stiffening in RC) will uncover hidden capacity reserves and reduce
conservatism.

Applying full probability safety verification, stochastic finite elements can be used to model the structure.
The difference to conventional finite element models is that the stochastic elements take the spatial
correlation of the random variables into account. Figure 1 shows examples of modelling a slab of an
existing reinforced concrete structure. This slab is strengthened using FRP materials. In such a complex
analysis the bond between the FRP and the concrete is accounted for using special finite element
elements.

In Figure 2, an example of finite element model of a beam component of a structure that is also
strengthened using FRP to resist shear deficiency.

Figure 1 Finite element model of a slab (Elsayed et al 2009a)

English-1 New Final.indd 50 12/16/13 10:31 AM


Design Life Extension of RC Structure
47

Figure 2 Finite element model of a beam (Elsayed et al 2009b)

1.3. ACI Recommended mechanism for strength assessment of existing concrete buildings
Once the critical structural components have been identified through the condition assessment,
a structural assessment can be required to determine the current condition, to form the basis for
estimating future performance or service life, or both. As part of the assessment it is important to note
irregularities or inconsistencies in properties of materials, in design, in construction and maintenance
practices, and the presence and effects of environmental factors. Although the assessment of a
structure involves more than its load-carrying ability (for example, the permeability of hydraulic
structures), an assessment of structural demand versus capacity is the first step. Performance
requirements other than structural capacity are then addressed through supplementary tests to
establish characteristics, such as leakage rate or permeability.

Procedures to evaluate the strength of existing structures have been published (ACI 437R). The
recommendations developed are intended to establish the loads that can be sustained safely and
serviceably by an existing building under several conditions:

There is evidence of possible structural weakness (for example, excessive cracking or spalling);
• The building or a portion of it has undergone general or local damage (for example,
environmental or earthquake effects);
• There is doubt concerning the structure’s capacity; and
• Portions of a building are suspected to be deficient in design, detail, material, or construction.

Methods for strength evaluation of existing concrete structures include either an analytical assessment
or a load test as shown in Figure 3. An analytical assessment is recommended when sufficient
background information is not available (for example, sectional characteristics, material properties, and
construction quality), a static load test is impractical because of the test complexity or magnitude of
the load required, sudden failure during a static load test can endanger the integrity of the member or
the entire structure, or it is required by an authority.

Some supplemental destructive or nondestructive tests described previously can be required to


obtain this information. For the evaluation it is recommended that the theoretical analyses follow
principles of strength design and that a structure be considered satisfactory if capacity, deformation,
and other serviceability criteria satisfy the requirements and intent of the ACI 318.

English-1 New Final.indd 51 12/16/13 10:31 AM


48 IV - ASSESSMENT OF CONCRETE STRUCTURES

Static-load tests should be utilized only when the analytical method is impractical or otherwise unsatisfactory.
Situations where a static load test of a bridge or building component is recommended include those where at
least one of the following cases and all of the following conditions apply (ACI 437R). Cases include incidences
where structural element details are not readily available; deficiencies in details, materials, or construction are best
evaluated by a load test; and the design is extremely complex with limited prior experience for a structure of this
type. Conditions include: 1) results of a static load test permit a reasonable interpretation of structural adequacy;
2) principal structural elements under investigation are primarily flexural members; and 3) adjacent structure’s
effects can be accounted for in the evaluation of the load test results. Before conduct of a load test, some repair
actions can be required and an approximate analysis should be conducted. After establishing the magnitude of
the test load, the load is applied incrementally with deflections measured. The structure is considered to have
passed the load test if it shows no visible evidence of failure, such as excessive cracking or spalling, and it meets
requirements for deflection. In certain applications, serviceability requirements, such as allowable leakage at
maximum load, can also be a criterion.

PROCEDURE APPLIES
TO ALL OR PART OF
EXISTING
CONCRETE BUILDINGS

EVALUATION BY EVALUATION BY
STATIC THEORETICAL STRESS
LOAD TEST ANALYSIS

• CONDUCT A PRELIMINARY • OBTAIN SECTIONAL CHARAC.


STRUCTURAL ANALYSIS TERISTICS AND DETAILS OF THE
STRUCTURAL MEMBERS AND
• PERFORM REPAIRS NECESSARY CONNECTIONS
FOR THE STATIC LOAD TEST
• IDENTIFY PROPERTES OF THE
• ESTABLISH THE MAGHNITUDE OF STRUCTURAL MATERIALS
THE TEST LOADS USING DESTRUCTIVE OR A
COMBINATII OF DESTRUCTIVE
• INSTALL DISPLACEMENT AND AND NONDESTRUCTIVE
STRAIN INSTRUMENTATION TESTING METHODS

• PROVIDE SCAFFOLDING TO • ASSESS THE QUALITY OF THE


SUPPORT THE STRUCTURE IN CONSTRUCTION AND THE
CASE OF FAILURE PRESENT CONDITION OF THE
STRUCTURE
• APPLY THE TEST LOADS WITH
OUT SHOCK OR VIBRATION AND • CONDUCT A THEORETICAL
RECORD THE DISPLACEMENT STRESS ANALYSIS TO
AND STRAIN DATA DETERMINE THE SAFE SERVICE
LOAD CARRYING CAPACITY OF
• AFTER 24 HOURS. RECORD THE THE STRUCTURE FOLLOWING
DISPLACEMENT AND STRAIN RECOGNIZED PRINCIPLES FOR
DATA STRENGTH DESIGH IN ACI 318

• REMOVE THE TEST LOADS AND


AFTER 24 HOURS. RECORD THE
DISPLACEMENT AND STRAIN
DATA
• IF THE PORTIONS OF THE
STRUCTURE THAT WERE
TESTED SHOW NO SIGNS OF
FAILURE. THE STRUCTURE
PASSES THE TEST

Figure 3: Recommended procedure for strength evaluation of existing concrete buildings (ACI 437).

English-1 New Final.indd 52 12/16/13 10:31 AM


Design Life Extension of RC Structure
49

2. REFERENCES
• ACI 437.1R-07, “Load Tests of Concrete Structures: Methods, Magnitude, Protocols, and
Acceptance Criteria”
• ACI 228.2R-98 (Reapproved 2004), “Nondestructive Test Methods for Evaluation of Concrete in
Structures”, ACI Manual of Concrete Practice 2008.
• Elsayed, W., Ebead, U.A. and Neale, K.W., “Mechanically fastened FRP-strengthened two-way
concrete slabs with and without cut-outs” Journal of Composites for Construction, ASCE, Vol. 13,
No. 3, pp. 198–207, May/June 2009a.
• Elsayed, W., Ebead, U.A. and Neale, K.W., “Studies on mechanically fastened fiber-reinforced
polymer strengthening systems” ACI Structural Journal, Vol. 106, No. 1, pp. 49–59,
January/February 2009b.
• fib 2000, ‘’Federation International du Beton (fib) (2000). Bond of Reinforcement in Concrete’’

English-1 New Final.indd 53 12/16/13 10:31 AM


English-1 New Final.indd 54 12/16/13 10:31 AM
V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF Design
REPAIR OPTIONS
Life Extension of RC Structure
51

V - METHODS OF CRACKS REPAIR


& CLASSIFICATION OF REPAIR OPTIONS

English-1 New Final.indd 55 12/16/13 10:31 AM


52 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

The repair of cracks can be classified into repair of cracks in block walls and repair of cracks in concrete
elements.

1. REPAIR OF CRACKS IN BLOCK WALLS


1.1 General Consideration
- Remove existing render/plaster in strips of 150 mm width, on either side where cracks or
openings occur in block wall and clean the surface from dust, loose materials etc.
- Chase out the crack in a V- shape to the full depth of the crack or minimum of 30 mm whichever
is greater. The V notes shall be of equal depth and width. Chased V- section shall be thoroughly
cleaned from any contamination, oil, grease, dirt, dust or fire particles of concrete.
Air compressor and mechanical water jet shall be used for cleaning. Wall surface shall be
allowed to dry thoroughly before proceeding with the works.
- Fill the chased V-shape with a thixotropic epoxy resin fairing coat (CONCRESSIVE 2200 from
BASF or Nitomartar FC from Fosroc, or similar approved. All works shall be as per manufacturer
instructions.
- 24 hours allowance shall be made before applying subsequent work.
- Fix galvanized expanded metal mesh (minimum 7.5 Kg/m2) bridging the crack location and
covering 100mm on each side, as manufactured by EXPAMET or similar approved with
galvanized nails at intervals not exceeding 300mm on both sides.
- Reinstate render/plaster with RENDEROC HB cementitious mortar as manufactured by FOSROC
or EMACO R303 from BASF or similar approved.
- Paint completed repairs to match existing.

1.2 Repair of Cracks Between Block Walls and Concrete Elements


- Remove existing plaster and painting along the column height covering 750mm on each side of
the crack (i.e. 150mm in total).
- Open the crack between the block wall and the concrete member (beam or column).
- Install galvanized steel mesh at the distance between the wall and the concrete member.
- Fill the distance between the block wall and the concrete member with cementitious base
mortar such as EMACO S22NB or Sikagrout 114.
- Reinstate plastering and painting.

1.3 Repair of Damaged Existing Joints Between Block Walls And Concrete Elements
- Make good edge of block wall as applicable.
- Repair the joint using cement base materials such as Emaco S22NB.
- Fix 2 nos. plaster beads at junction between column and walls to form movement joint in the
plaster layer.
- Reinstate plastering and painting.
- Apply approved sealant at two movement joints. Two part Polyurethane NB2 based sealants
shall be used to BS4254. MASTERFLEX 700 PG from BASF or Thioflex 600 from FOSROC, or \
approved similar shall be used.

English-1 New Final.indd 56 12/16/13 10:31 AM


Design Life Extension of RC Structure
53

2. REPAIR OF CRACKS IN CONCRETE ELEMENTS


2.1 General Consideration
2.1.1 Actions to be Taken Before Repairs are Specified
• Identify the location and extent of cracking.
• Determine whether the cracks are from structural problems or not.
• Take into consideration both present and anticipated loading conditions.
• Review drawings, specifications, and construction and maintenance records.
• Establish the cause of the cracking.
• If these documents, along with field observations, do not provide the needed information, afield
investigation and structural analysis should be completed before proceeding with repairs.

2.1.2 Why Cracks Shall Be Repaired?


Cracks need to be repaired if:
• They cause any reduction in the strength, stiffness, or durability of the structure.
• The function of the structure is seriously impaired.
• In some cases, such as cracking in water-retaining structures, the function of the structure will
dictate the need for repair, even if strength, stiffness, and appearance are not seriously impaired.
• Cracks in pavements and slabs-on-ground may require repair to prevent edge spalls or the
migration of water to the subgrade, or to maintain intended load-carrying capacity.
• Generally, repairs that improve the appearance

2.1.3 Field Observation


Information from field observations shall include:
• The locations and widths of cracks should be noted on a sketch of the structure.
• Crack widths can be measured to an accuracy of approximately 0.025 mm using a crack
comparator or hand-held microscope.
• Any displacement of the surface (change in elevation) across the crack should also be documented.
• Observations such as spalling, exposed reinforcement, surface deterioration, and rust staining
should be noted on the sketch.
• Internal conditions at specific crack locations can be observed with the use of flexible shaft
fiberscopes or rigid borescopes.
• Crack movement can be monitored with mechanical movement indicators.
• If more detailed time histories are desired, a wide range of transducers (most notably, linear
variable differential transformers [LVDTs]) and data-acquisition systems (ranging from strip chart
recorders to computer-based systems) could be used.
• Sketches can be supplemented by photographs documenting the condition of the structure at
the time of investigation.
• Guidance for making a condition survey of concrete in service is given in ACI 201.1R, 201.3R,
207.3R, 345.1R,and 546.1R.

Depending on the nature of the damage, one or more repair methods may be selected.

English-1 New Final.indd 57 12/16/13 10:31 AM


54 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

3. REPAIR METHODS
3.1 Epoxy Injection
• Cracks as narrow as 0.05mm can be bonded by the injection of epoxy.
• Epoxy injection has been successfully used in the repair of cracks in buildings, bridges, dams,
and other types of concrete structures (ACI 503R).
• With the exception of certain moisture-tolerant epoxies, this technique is not applicable if the
cracks are actively leaking and cannot be dried out.
• Wet cracks can be injected using moisture-tolerant materials that will cure and bond in
the presence of moisture, but contaminants in the cracks (including silt and water) can reduce
the effectiveness of the epoxy to structurally repair the cracks.
• Unless the cause of the cracking has been corrected, however, new cracks will probably form
near the original crack. If the cause of the cracks cannot be removed, then three options are
available:
o Rout and seal the crack, thus treating it as a joint.
o Establish a joint that will accommodate the movement and then inject the crack with epoxy
or other suitable material
o Install additional support or reinforcement at the crack location to minimize movement.

Procedure:
• The technique generally consists of (Figure 1):
o Cleaning the cracks.
o Sealing the crack on exposed surfaces
o Installing entry and venting ports at close intervals along the cracks
o Mixing the epoxy.
o Injecting the epoxy under pressure.
o Removing the surface seal.

Surface seal to contain epoxy adhesive

Figure 1Repair of crack by epoxy injection (Emmons 1993)

English-1 New Final.indd 58 12/16/13 10:31 AM


Design Life Extension of RC Structure
55

3.2 Routing and Sealing


• Routing and sealing of cracks can be used in conditions requiring repair where structural repair
is not necessary (Figure 2)
• Routing and sealing is used to treat both narrow and wide cracks.
• This is a common technique for crack treatment and is relatively simple compared with the
procedures and the training required for epoxy injection.
• The method is most applicable to approximately flat horizontal surfaces such as floors and
pavements.
• Routing and sealing can be accomplished on vertical surfaces (with a non-sag sealant) as well as
on curved surfaces (pipes, piles, and poles).
• A common and effective use is for waterproofing by sealing cracks on the concrete surface
where water stands or where hydrostatic pressure is applied.
• This treatment reduces the ability of moisture to reach the reinforcing steel or pass through the
concrete, causing surface stains or other problems.
• The sealants may be any of several materials, including epoxies, urethanes, silicones,
polysulfides, asphaltic materials, or polymer mortars. Cement grouts should be avoided due to
the likelihood of cracking.
• For floors, the sealant should be sufficiently rigid to support the anticipated traffic. Load transfer
at the floor crack should be provided by aggregate interlock or dowels; otherwise, traffic loads
moving across the crack may cause rigid sealants to de-bond.

Procedure:
• This method involves:
o Enlarging the crack along its exposed face by preparing a vertical walled groove at the surface
typically ranging in depth from 6 to 25 mm. A concrete saw or right-angle grinder may be used.
o The groove is then cleaned by air blasting, sandblasting, or water blasting, and dried.
o A sealant is placed into the dry groove and allowed to cure.
o The final step is to fill the vertical-walled groove with a high-viscosity, rigid epoxy.
o In some cases, over-banding (strip coating) is used independently of or in conjunction with
routing and sealing to ensure a waterproof repair. A typical procedure for over-banding is:
• Prepare an area approximately 25 to 75 mm on each side of the crack by sandblasting or other
means of surface preparation
• Applying a coating (such as urethane) 1 to 2 mm thick in a band over the crack.
• Before over-banding in non-traffic areas, a bond breaker is sometimes used over a crack that
has not been routed or over a crack previously routed and sealed. In traffic areas, a bond breaker
is not recommended. Cracks subject to minimal movement may be over-banded, but if significant
movements can take place, routing and sealing should be used in conjunction with overbanding
to ensure a waterproof repair.
• Active cracks should be repaired using a bond breaker at the base of the routed channel. A flexible
sealant is then placed in the routed channel. It is important that the width-to-depth ratio of the
channel is usually 2 or more. This permits the sealant to respond to movement of the crack with
high extensibility. This method is used to enhance protection from edge spalling and, for aesthetic
reasons, to create a more uniform-appearing treatment.

English-1 New Final.indd 59 12/16/13 10:31 AM


56 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

Figure 2 Repair of crack by routing and sealing (Johnson1965).

3.3 Near-surface Reinforcing


Near-surface reinforcing (NSR) is a method used to add tensile reinforcement perpendicular to the
line of the crack (Figure 3).

Procedure:
• This method involves:
o Slot is saw-cut across the crack, and the slot is then cleaned.
o Typically, an epoxy resin is placed in the slot to act as a bonding agent and protective barrier
to the bar that is subsequently placed.
o Both deformed steel reinforcing bars and pre-cured fiber-reinforced polymer (FRP) bars
are placed in the slot that is cut to approximately 3 mm wider and deeper than the diameter
of the reinforcement to be installed.
o The reinforcing needs to be designed to increase the capacity beyond the tensile forces at the
crack location.

NSR method is typically used when it is necessary to restrict widening of existing cracks. Engineering
judgment shall be exercised.

Figure 3 Repair of crack by near surface mounted reinforcement (Stratton et al. 1978)

English-1 New Final.indd 60 12/16/13 10:31 AM


Design Life Extension of RC Structure
57

3.4 Additional Reinforcement


3.4. 1 Internally placed conventional reinforcement
Cracked reinforced concrete bridge girders have been successfully repaired by inserting reinforcing
bars and bonding them in place with epoxy (Figure 4).

Procedure:
• This method involves:
o Sealing the crack, drilling internal holes that intersect the crack plane at approximately 9 degrees.
o Filling the hole and crack with injected epoxy, and placing a reinforcing bar into the drilled hole.
o Typically the additional bars extend at least 500mm each side of the crack.
o The reinforcing bars can be spaced to suit the needs of the repair. They can be placed in any
desired pattern, depending on the design criteria and the location of the in-place reinforcement.
o The epoxy bonds the bar to the walls of the hole, fills the crack plane, bonds the cracked concrete
surfaces back together in one monolithic form, and thus reinforces the section. The epoxy used to
rebond the crack should have a low viscosity and conform to ASTM C881 Type IV.

Figure 4 Crack repair by additional conventional reinforcement (Emmons 1993)

3.4.2 Prestressing steel


Post-tensioning is often the desirable solution when a major portion of a member must be
strengthened or when the cracks that have formed must be closed(Figure 5).
Procedure:
• Prestressing strands or bars are used to apply a compressive force.
• Adequate anchorage should be provided for the prestressing steel, and care is needed so that the
problem will not merely migrate to another part of the structure.
• The effects of the tensioning force (including eccentricity) on the stress within the structure should
be carefully analyzed.
• For indeterminate structures post-tensioned using this procedure, the effects of secondary moments
and induced reactions should be considered.

English-1 New Final.indd 61 12/16/13 10:31 AM


58 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

Figure 5 Repair of crack by external prestressing (Johnson 1965)

3.5 Drilling and Plugging


• This method is most often used to repair vertical cracks in retaining walls (Figure 6)
• This technique is only applicable when cracks run in reasonably straight lines and are accessible
at one end.

Drilling and plugging a crack consists:


• Drilling down the length of the crack and grouting it to form a key.
• A hole 50 to 75 mm in diameter should be drilled, centered on and following the crack. The hole
should be large enough to intersect the crack along its full length and provide enough repair
material to structurally take the loads exerted on the key.
• The drilled hole should then be cleaned, made tight, and filled with grout. The grout key
prevents transverse movements of the sections of concrete adjacent to the crack. The key will
also reduce heavy leakage through the crack and loss of soil from behind a leaking wall.
• If water tightness is essential and structural load transfer is not, the drilled hole should be filled
with a resilient material of low modulus instead of grout. If the keying effect is essential, the
resilient material can be placed in a second hole, with the first being grouted.

English-1 New Final.indd 62 12/16/13 10:31 AM


Design Life Extension of RC Structure
59

Figure 6 Repair of crack by plugging and drilling (ACI Concrete Repair Manual)

3.6 Gravity Filling and/or Polymer Impregnation


• Low-viscosity monomers and resins to seal cracks with surface widths of 0.03 to 2 mm by gravity
filling (ACI RAP-2).
• High-molecular-weight methacrylate, urethanes, and some low-viscosity epoxies have been
used successfully.
• The lower the viscosity, the finer the cracks that can be filled.

Procedure:
• This method involves:
o Clean the surface by air-blasting, water-blasting, or both.
o Wet surfaces should be permitted to dry for several days to obtain the best crack filling.
o Pour the monomer or resin onto the surface and spread them with brooms, rollers, or
squeegees.
o The material should be worked back and forth over the cracks to obtain maximum filling
because the monomer or resin recedes slowly into the cracks.
o The use of this method on elevated slabs will require sealing of the cracks on the bottom of the
slab to contain material from leaking through the crack.
o Excess material should be broomed off the surface to prevent slick, shining areas after curing.
o If surface friction is important, sand should be broadcast over the surface before the monomer
or resin cures.
o If the cracks contain significant amounts of silt, moisture, or other contaminants, the sealant
cannot fill them.
o Water-blasting followed by a drying time may be effective in cleaning and preparing these
cracks.
o Cores may be taken to verify crack filling and the depth of penetration measured.
o Caution should be employed to avoid cutting existing reinforcement during the coring
process.
o Cores can be tested to give an indication of the effectiveness of the repair method.
o The accuracy of the results may be limited, however, as a function of the crack orientation or
due to the presence of reinforcing steel in the core.
o For some polymers, the failure crack will occur outside the repaired crack.

English-1 New Final.indd 63 12/16/13 10:31 AM


60 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

3.7 GROUTING
3.7.1 Cement-based grouting
This method is effective in repairing wide cracks and stopping water leaks, but it will not structurally bond
cracked sections. Epoxy-based materials (recall Section 3.1) can be used in case cracked sections need to be
structurally bonded.

Procedure:
• This method involves:
o Clean the surface by cleaning the concrete along the crack
o Installing built-up seats (grout nipples) at intervals astride the crack (to provide a pressure-tight
connection with the injection apparatus)
o Sealing the crack between the seats with a cement paint, sealant, or grout
o Flushing the crack to clean it and test the seal
o Grouting the whole area.
o Grout mixtures may contain cement and water or cement plus sand and water, depending on the
width of the crack. The w/cm, however, should be kept as low as practical to maximize the strength
and minimize shrinkage. Water reducers or other admixtures may be used to improve the properties
of the grout.
o For small volumes, a manual injection gun may be used; for larger volumes, a pump may be used. After
the crack is filled, the pressure should be maintained for several minutes to ensure good penetration.

3.7.2 Chemical grouting


• Cracks in concrete as narrow as 0.05 mm have been filled with chemical grout.
• Chemical grouts, such as urethanes, are activated by catalysts or water to form a gel, a solid precipitate,
or foam that will fill void space within concrete. The materials are primarily used for sealing cracks from
water penetration.
Advantages:
• Applicability in moist environments (excess moisture available),
• Wide limits of control of gel time, and their ability to be applied in very fine fractures.
Disadvantages
• High degree of skill needed for satisfactory use
• Lack of strength.

3.8 DRYPACKING
• The use of drypack is not advisable for filling or repairing active cracks.
• Hand placement of a low water content mortar followed by tamping or ramming of the mortar into
place, producing intimate contact between the mortar and the existing concrete .
• Because of the low w/cm of the material, there is little shrinkage, and the patch remains tight and can
have good quality with respect to durability, strength, and water tightness.
• Drypack can be used for filling narrow slots cut for the repair of dormant cracks.

Procedure:
• This method involves:
o Before a crack is repaired by drypacking, the portion adjacent to the surface should be widened to a
slot about 25 mm wide and 25 mm deep.
o The slot should be undercut so that the base width is slightly greater than the surface width.
o After the slot is thoroughly cleaned and dried, a bond coat, consisting of cement slurry or equal
quantities of cement and fine sand mixed with water to a fluid paste consistency, or an appropriate
latex bonding compound, should be applied.

English-1 New Final.indd 64 12/16/13 10:31 AM


Design Life Extension of RC Structure
61

o Placing of the drypack mortar should begin immediately.


o The mortar consists of one part cement, one to three parts sand passing a No. 1.18 mm sieve,
and just enough water so that the mortar will stick together when molded into a ball by hand.
o If the patch must match the color of the surrounding concrete, a blend of gray Portland
cement and white Portland cement may be used. Normally, about 13/ white
cement is adequate, but the precise proportions can be determined only by trial.
o To minimize shrinkage in place, the mortar should stand for 12/ hour after mixing, and then
be remixed before use. The mortar should be placed in layers about 10 mm thick.
Each layer should be thoroughly compacted over the surface using a blunt stick or hammer
and each underlying layer scratched to facilitate bonding with the next layer. There need be
no time delays between layers. The repair should be cured by using either water or a curing
compound. The simplest method of moist curing is to support a strip of folded wet burlap
along the length of the crack.

4. Recommendations for Selection of Repair Option


• General classification of repair options is highlighted in the Table below. More details on repair
and strengthening methodology of structures are given in chaptersIX and X.

Table (1): General Classification of Repair Options:


Repair Option Recommendation

Structural Repairs
(a) Cutting out contaminated, cracked or defec- (a) Typically used when the damage has been caused by chemical
tive concrete and replacing it or physical actions

(b) Cutting out and replacing corroded rein- (b) Typically used when corrosion resulted in more than 10% reduc-
forcement tion in the cross sectional area of the steel rebar.

(c) Typically used in aggressive environment. Caution should be


(c) Cutting out concrete, adding protection to
taken to avoid damage of the protection layer to the steel during
the reinforcement and replacing the concrete application or handling.
External Strengthening
(a) Replacing complete element (a) Typically used when deterioration is extensive and disruption to
operations is minimal
(b) Plate of composite bonding
(b) Typically used when additional strength is required. Calculation
(c) External prestressing is needed. Bond and adhesion are important to ensure compos-
ite action.

(c) Typically used when additional strength is required. Calculation


is needed.
Surface Coatings and Impregnations
(a) Surface treatment Typically used to prevent ingress of adverse agents or to control
moisture penetration Surface treatment
(b) Coatings
(a) Involves making good minor defects followed by a coating
(c) Impregnations
(b) Smooth surface is needed to ensure effectiveness and to have
the ability to accommodate movement without fracture to the
protective film or barrier

(c) Must be able to penetrate the concrete to a minimum specified


depth
Filling Cracks and Voids Surface voids or defects can be treated as patch repairs. For the effective
filling of cracks injection is often used. The technique is often comple-
mented by surface coating or treatment
Electrochemical Techniques
(a) Re-alkalization These techniques require Performance Standards unlike other repair
options. Cathodic protection is typically the most common and successful
(b) Chloride extraction technique.
(c) Cathodic protection

English-1 New Final.indd 65 12/16/13 10:31 AM


62 V -METHODS OF CRACKS REPAIR & CLASSIFICATION OF REPAIR OPTIONS

5. REFERENCES
• ACI 201.1R Guide for Making a Condition Survey of Concrete in Service
• ACI 201.2R Guide to Durable Concrete
• ACI 201.3R Guide for Making a Condition Survey of Concrete Pavements
• ACI 207.1R Guide to Mass Concrete
• ACI 207.2R Effect of Restraint, Volume Change, and Reinforcement on Cracking of Mass Concrete
• ACI 207.3R Practices for Evaluation of Concrete in Existing Massive Structures for Service
Conditions
• ACI 207.4R Cooling and Insulating Systems for Mass Concrete
• ACI 222R Protection in Metals in Concrete Against Corrosion
• ACI 224R Control of Cracking in Concrete Structures
• ACI 224.2R Cracking of Concrete Members in Direct Tension
• ACI 224.3R Joints in Concrete Construction
• ACI 228.2R Nondestructive Test Methods for Evaluation of Concrete in Structures
• ACI 302.1R Guide for Concrete Floor and Slab Construction
• ACI 304R Guide for Measuring, Mixing, Transporting, and Placing Concrete
• ACI 305R Hot Weather Concreting
• ACI 308R Guide to Curing Concrete
• ACI 309R Guide for Consolidation of Concrete
• ACI 309.2R Identification and Control of Visual Effects of Consolidation Formed Concrete Surfaces
• ACI 318 Building Code Requirements for Structural Concrete343RAnalysis and Design of Reinforced
Concrete Bridge Structures
• ACI 345R Guide for Concrete Highway Bridge Deck Construction
• ACI 345.1R Guide for Maintenance of Concrete Bridge Members
• ACI 347 Guide to Formwork for Concrete
• ACI 446.1R Fracture Mechanics of Concrete: Concepts, Models, and Determination of Material
Properties
• ACI 503R Use of Epoxy Compounds with Concrete
• ACI 504R Guide to Sealing Joints in Concrete Structures
• ACI 517.2R Accelerated Curing of Concrete at Atmospheric Pressure
• ACI 546R Concrete Repair Guide
• ACI 546.1R Guide for Repair of Concrete Bridge Superstructures
• ACI 546.2R Guide to Underwater Repair of Concrete548.1RGuide for the Use of Polymers in
Concrete
• ACI RAP-1 Structural Crack Repair by Epoxy Injection, http://www.concrete.org/general/RAP-1.
pdf

English-1 New Final.indd 66 12/16/13 10:31 AM


Design Life Extension of RC Structure
63

• ACI RAP-2 Crack Repair by Gravity Feed by Resin, http://www.concrete.org/general/RAP-2.pdf


• Concrete RepairManual, 3rd edition, ACI.
• Emmons, P. H, 1993, Concrete Repair and Maintenance Illustrated, R.S. Means CMD Group.
• Johnson, S. M., 1965, Deterioration, Maintenance, and Repair of Structures, McGraw-Hill Book Co.,
New York,373 pp.
• Stratton, F. W.; Alexander, R.; and Nolting, W., 1978, “Cracked Structural Concrete Repair through
Epoxy Injection and Rebar Insertion,” ReportNo. FHWA-KS-RD.783-,Kansas Department of
Transportation, Topeka, Kans., Nov.,56 pp.

English-1 New Final.indd 67 12/16/13 10:31 AM


English-1 New Final.indd 68 12/16/13 10:31 AM
VI -METHODS FOR ESTIMATING AND EVALUATINGDesign
CORROSION RATE
Life Extension of RC Structure 65

VI - METHODS FOR ESTIMATING


& EVALUATING CORROSION RATE

English-1 New Final.indd 69 12/16/13 10:31 AM


66 VI -METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE

1. INTRODUCTION
The corrosion of steel is an electrochemical process that produces an electric current, measurable as
an electric field on the surface of the concrete. Most detection techniques currently used rely on the
electrochemical nature of corrosion for their data collection. A wide variety of instruments produced
by different manufacturers exists for this purpose. They may vary in size, cost, application methods,
underlying theories, and information given. In addition, visual inspections should complement any
monitoring program, but they may not detect corrosion early enough to prevent serious damage.
This section provides a review and detailed information of existing corrosion detection methods and
monitoring for future data collection that can be used in reinforced concrete structures to assess the
corrosion condition of the reinforcement.

These techniques can be used to detect electrochemical corrosion activity of metallic reinforcements.
The aim of their applications may be one of the following:
1. Quality control of new constructions
2. Condition evaluation of existing structures for:
- Identification of steel de-passivation
- Detecting corroding areas for rehabilitation purposes
- Prediction of the damage evolution
- Determination of the optimum time for repair.
3. Evaluation of repair technique

2. CORROSION MONITORING
Visual observation has been the common technique used to detect corrosion due to induced rust, which in
turn produces the cracking and spalling of cover. These damages are an indication of the corrosion activity
developed underneath the cover. However, due to the different degrees of aggressive environments, of
concrete quality and of structural geometry, the conclusions taken from visual inspection may be misleading.
Corrosion monitoring is the practice of measuring the degree of corrosion of reinforcement in concrete
structure under actual conditions. There are different methods used to quantify the process of corrosion
in concrete environments. The different methods used in corrosion monitoring can be classified into two
main categories; non electrochemical methods and electrochemical methods. Table (1) shows the different
methods for corrosion monitoring in reinforced concrete. The shaded methods in Table (1) are the most
widely used methods and will be described in this report.
All these techniques can be used individually or combined to provide an “instantaneous” condition of a
structure. However, if one is interested in the rate of deterioration of a structure, it is useful to monitor the
condition change with time. This should be done on structures with long lifetime requirements and older
structures when corrosion damage has been found and repair is being deferred to cost, logistical or other
reasons.

Table 1: Methods for corrosion monitoring in reinforced concrete

Non Electrochemical Electrochemical


Visual Inspection Static Measurements
Acoustic Emission - Half Cell Potential (handheld & em-
Infrared Thermography bedded devices)
Radiography and Radiometry Radar - Macrocell Current (embedded de-
Seismic Method vices)
Electric Resistivity - Electrochemical Noise
Optical Fiber Sensors
Microwave Thermoreflectometry Polarization Measurements
- Linear Polarization (handheld & em-
bedded devices)
- Impedance Spectroscopy
- Glavanostatic Pulse
- Scanning Reference Electrode

English-1 New Final.indd 70 12/16/13 10:31 AM


Design Life Extension of RC Structure
67

The portable or handheld field test devices are extremely useful and convenient; however in some
applications it may be preferable to have a permanent, nondestructive testing procedure. Embedded
devices are designed to be cast into the concrete or repair material matrix to allow repeated testing at
probe locations. The wires from the probe may be combined in a cable extending out of the concrete
member for ease of measurement. The devices will be categorized into two sections:
- External monitoring devices
- Embedded continued monitoring devices

3. EXTERNAL MONITORING DEVICES


3.1 Electrical Resistivity
The electrical resistivity is defined as the ratio between the applied potential and the current
circulating between two electrodes providing the arrangement enables the calculation of the
geometrical characteristics. The electrical resistivity is an indirect measurement of the porosity
and the connectivity of the pores. It is used to detect wet areas in the concrete and therefore the
measurement provides information about the risk of corrosion. Although it is inversely related to the
corrosion rate, results cannot be used to calculate corrosion rates due to the big scatter detected in
the measurements.

The four point method does not need a direct contact with the reinforcement. Concrete resistivity
can be measured directly on the surface of the structure by means of Wenner technique. This method
uses four equally spaced point electrodes in contact with the concrete surface, as shown in Figure 1.
Figure 2 shows a photo of the equipment and the equipment in use.

Figure 1 Schematic diagram for Wenner technique for resistivity measurement

The resistivity is calculated as follows:

English-1 New Final.indd 71 12/16/13 10:31 AM


68 VI -METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE

Where; ρconcrete is the resistivity of the concrete (in Ωm), Rmeasured the resistance from the four-electrode
measurement (the voltage divided by the current, in Ω), and (a) is the distance between the measuring
electrodes.

Figure 2 Wenner resistivity meter

The measurement on-site of the resistivity is carried out directly on the surface of the structure. First
it is necessary to moisten the electrode tips with a conducting liquid in order to provide a good
contact with concrete. An alternating current with a frequency between 50 and 1000 Hz is passed
between the outer electrodes and the potential difference is measured between the inner ones.
Resistivity is obtained as a function of voltage, current and distance between tips (usually 50 mm).

One of the most important problems arising for the measurement of concrete resistivity is its
variability with changes in the environment. The factors which influence the resistivity are:
a) Humidity content: The ρ decreases when concrete moisture increases and vice versa. The ρ is an
indirect measure of saturation of the concrete.
b) Temperature: The effect of temperature is controversial, as its effect on ρ depends on whether
the concrete is shielded or not. That is, whether the water can evaporate or condensate.
c) Chloride content: The presence of chlorides or any other inorganic compound induces a certain
decrease of the ρ.
d) Carbonation: It aims into an increase in ρ due the densification that the formation of calcium
carbonates usually induces.
e) Type of cement: Blending agents (fly ash, slag or silica fume) in general induce an increase of ρ
when compared with ordinary Portland cement.
f ) Porosity: The porosity is a consequence of the w/c ratio and to the compaction and curing. An
increase in w/c leads into a decrease of ρ.

Resistivity does not show, by itself, whether or not steel in concrete is in an active state of corrosion.
It informs on the risk of corrosion due to the humidity content in the concrete. Table 2 shows the
ranges of resistivity that can be related to the corrosion rate.

Table 2: Resistivity ranges related to the risk of corrosion


Resistivity (kW.cm) Corrosion Risk
> 100
Nil
50 – 100 Low
10 – 50 Moderate
< 10 High

English-1 New Final.indd 72 12/16/13 10:31 AM


Design Life Extension of RC Structure
69

3.2. Half Cell Potential


The corrosion or half cell potential, Ecorr, is defined as the voltage difference between the reinforcement
and a reference electrode (RE). Figure 3 shows a schematic diagram for the half cell potential measurement.
It characterizes the state of the metal in its environment. Figure 4 shows a photo of the equipment and
the equipment in use. Different devices are commercially available for single electrode or multiple (wheel)
electrodes.

The potential Ecorr can only qualitatively inform on the risk of corrosion. It cannot account for it. The
main objective of potential measurements on a structure is to locate areas in which reinforcement has
become depassivated and hence, is able to corrode if appropriate oxygen and moisture conditions
occur.

Figure 3 Schematic diagram for half cell potential measurement

Figure 4 Half cell potential device

The most common procedure involves the mapping of the structure. The standard test method is
given in ASTM C87691-. As mentioned, the objective of potential measurement is to determine those
areas of corroding reinforcement. To achieve this goal, first it is completely necessary to define a work
strategy that provides a fast and economical overview on the state of the structure. This strategy
must involve the definition of a co-ordinate system to correlate readings and measuring points.
A grid usually makes it with a cell size that varies from 15 square centimeters to 2 square meters,
depending on the type of the structure, its characteristics and the scope of the work. The size of this
co-ordinate system will determine the accuracy of the measurements. Measurements made with
a big grid cell size could not detect corrosion activity whereas minimum spacing generally should
provide high differences between readings. The spacing must be adequate to the type of structure
surveyed (cover and moisture content) and the expected use of measurements.

English-1 New Final.indd 73 12/16/13 10:31 AM


70 VI -METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE

A good electrical connection to the reinforcement has to be made. It could be made by means of a
compression-type ground clamp or by brazing or welding a protruding rod, but a direct contact should not be
made if reinforcement steel is connected to an exposed steel member. The other input of the high impedance
voltmeter must be a suitable external reference electrode placed on the concrete surface by a wet sponge
in order to provide a good electrolytic contact between them. The sponge should be always wetted with a
diluted solution of detergent. Copper/Copper sulfate (Cu/CuSO4) electrode is the most used reference for in-
situ potential measurement, whereas silver/silver chloride (Ag/AgCl) electrodes are used more in lab works.

It is completely necessary to assure the electrical continuity of the reinforcement steel. Measuring the resistance
between separated areas checks it. If resistance values are less or equal than 0.3 Ω, electrical continuity is
indicated.

Potential measurements can be performed with a single electrode or with one or several wheel electrodes.
Once the data are obtained, the best way to their representation depends on their number and the type of the
structure. So it varies from tables to a colored grid map of the potential field (i.e. contour line map). The color
gradation step should not be greater than 50 mV in order to provide a clearest way to result interpretation. A
3-D surface can also be represented both by measured and interpolated values.

The interpretation of the potential readings, according to ASTM C87691- standard, a threshold potential value of
–350 mV CSE was established. Lower values of potential suggested corrosion with 95% probability; if potentials
are more positive than -200 mV CSE, there is a greater than 90% probability that no reinforcement steel corrosion
occurs, and for those potentials between -200 mV and - 350 mV corrosion activity is uncertain. Table 3 shows the
interpretation of the corrosion potential measurements.

Table 3: Interpretation of corrosion potential measurement for half cell device (ASTM C876 -91)

Reference Electrode
Cu/CuSO4 (CSE) Interpretation
Ag/AgCl
More than 90% probability that no
More positive than -200mV More positive than -119mV
corrosion is occurring
Between -200mV & -350mV Between -119mV & -269mV Corrosion activity is uncertain
More than 90% probability that corro-
More negative than -350mV More negative than -269mV
sion is occurring

Practical experiences have shown that different potential values indicate corrosion for different
conditions so absolute values cannot be taken into account to indicate corrosion hazard, that is, the
relationship between concrete condition and potential values is not well-defined enough, with the
exception of those potentials at extreme ends. The statistical representation of the data by means of
cumulative frequency plots as indicated in the ASTM standard gives a better indication of the boundary
potential between active and passive zones and of their percentage in the tested area. A wide range of
factors influences the corrosion potentials as:
a) Concrete moisture content: Changes in moisture content may lead to a difference of potentials up to 200
mV. It is important to consider not only different moisture conditions in a determined point but changes
along the whole structure. Potential values become more negative as concrete moisture increases.
b) Cover thickness: As concrete cover increases, the difference between active and passive potential
values diminishes, resulting on a uniform potential value at infinite. Thus, the location of small
corrosion spots gets more difficult with increasing cover depth.
c) Concrete carbonation: As carbonation process leads to an increase of concrete resistivity, potential
measurements show more positive values on both passive and corroding rebars.
d) Polarization effects: The corroding zones polarize the passive rebars in their vicinity to more negative
potentials. This shift is higher in lower resistivity concrete.

English-1 New Final.indd 74 12/16/13 10:31 AM


Design Life Extension of RC Structure
71

e) Oxygen content: Conditions of aeration, i.e. oxygen access, strongly determine rest potential values of passive
steel in concrete. Low oxygen content leads to a pronounced decrease of the rest potential. In wet concrete
due to very low oxygen diffusivity coefficient, conditions may arise in a shift of potential to comparably
negative values so passive steel may show negative potentials similar to those of corroding steel. This leads
to the risk that passive areas under low aeration conditions could be considered as corroding areas.
f) Chloride content: Field experience on a large number of bridge decks has shown a certain correlation
between concrete chloride content and the potential values. The most negative values coincide with the
areas of higher chloride content.

3.3. Linear Polarization


The linear polarization method, or polarization resistance method, is an electrochemical method
for determining corrosion rate. Polarization is defined as the potential change in a metal due to a
change in electron flow, and therefore a change in the reaction rates, at the corroding surface. Linear
polarization has become a rather widely used method because of the ease and efficiency of the
testing. Linear polarization takes a short time and is both nondestructive and repeatable. This allows
more versatile and continuous use in engineering and/or quality control applications.

A number of portable devices use the concept of linear polarization for in-service testing. There are two
common probe types for linear polarization measurement: two-electrode probes and three-electrode
probes.

Polarization resistance techniques have other inherent limitations that must be considered. The corrosion
rate determination is an instantaneous test and gives only the value of the rate at that particular time. For
an accurate measurement of the deterioration caused by corrosion, the rate should be taken at intervals
over a period of time.

There are two distinct instrumentation methods for polarization resistance: glavanostatic and
potentiodynamic. Glavanostatic methods involve the application of polarizing currents in a step-by-step
fashion. Potentiodynamic testing is similar, except over voltages are applied in steps. Both are steady
state methods. Glavanostatic instrumentation has wider use in conventional corrosion rate measurement
equipment. Polarization resistance, or linear polarization, appears to be the preferred method for measuring
the corrosion rate of steel reinforcement.

Corrosion current (Icorr) represents the instantaneous value when referred to the corroding area and its
units are μA/cm2. It is converted into corrosion rate (Vcorr) when measured periodically and refers to a
particular period in order to characterize the development of the process. The Vcorr units are mm/year.

The main precaution which has to be taken into consideration when measuring Rp in the case of the
steel embedded in concrete are:
- Achievement of a quasi steady-state response. This requires waiting times between 30 an 100 seconds
during measurements.The shorter waiting times or faster scan rates are suitable for the case of active
corrosion, while if the steel is passive, the quasi steady state is achieved at longer times or slower scans.
The main aims of the measurement of corrosion current through the Rp technique are:
a) The identification of corroding zones. Corrosion maps enable to identify the corrosion zones in the same
manner than the potential mapping.
b) The evaluation of the efficiency of repair techniques.

The measurement of the corrosion current is made by means of a reference electrode, which indicates the
electrical potential, and an auxiliary electrode, which gives the current. In site measurements, a second auxiliary
electrode (guard ring) is being used in order to confine the current into a limited reinforcement surface. Figure
5 shows the photo of the PR-monitor device. The instrumentation needed for measuring linear polarization
is now relatively simple, and devices such as Gecor 6 and Gecor 8 are commercially available devices for PR-
measurement.

English-1 New Final.indd 75 12/16/13 10:31 AM


72 VI -METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE

Figure 5 The PR-monitor device

With some small variants among the different devices, the procedure for measuring the corrosion
rate is as follows:
• Locate the reinforcing steel grid with a cover meter and mark it on the concrete surface.
• Selection of the measurement locations. Record the cover depth and bar diameters in these
locations.
• Proper connection to the rebar and between the concrete surface and the measuring probe.
• Measure the corrosion potential.
• Application of the electrical current, and recording of the response.
The execution of the Rp measurement may take from few seconds to 5 minutes, depending upon the
used equipment. Repetition of the measurement in the same location is recommended in order to
check on the reproducibility of the method. Table 4 gives the range of values for the interpretation of
the measured corrosion currents (Icorr).

Table 4 Correlation between measured corrosion current and corrosion level


Icorr (mA/cm2) Corrosion level
< 0.1 Negligible
0.1 – 0.5 Low
0.5 – 1.0 Moderate
> 1.0 High

Other influencing parameters related to the environment of the concrete itself are:
a) Moisture content: The moisture or liquid water in the concrete pores is the most relevant parameter
influencing the corrosion current. It is responsible of the electrolyte continuity (pore connectivity)
and of the oxygen availability at the steel surface. Moisture fixes the electrical resistivity, which is
the most comprehensive parameter determining the corrosion current. Oxygen content is more
secondary unless below a certain level.
b) Temperature: It has an opposite effect on the corrosion rate. When the temperature increases, the
moisture evaporates, which may counter-balance the trend to increase the corrosion rate. Only in
water saturated structures, the temperature may present a direct relationship with the corrosion
rate.
c) Chloride content: The chlorides not only act by depassivating the steel, but also enhance the
corrosion rate.

English-1 New Final.indd 76 12/16/13 10:31 AM


Design Life Extension of RC Structure
73

4. EMBEDDED CONTINUED MONITORING DEVICES


Any external protection application will prevent contact with the concrete surface. Contact is required
for all of the field corrosion rate measurements, as is electrical contact with the reinforcement.
Therefore, the performance of field corrosion rate tests on wrapped structures would necessitate
removal of the external protection system at test locations. The tests would also demand either the
installation of lead-wire connections to the reinforcement during the repair process, or core drilling
to achieve electrical contact during the test. In effect, portable field corrosion rate tests would be
destructive and could compromise the integrity of the externally applied protective systems at
locations where the environment was most corrosive. A nondestructive corrosion rate measurement
technique is required.
Embedded corrosion rate probes and sensors could be installed during the construction or repair
processes. Embedded probes are considered to be desirable devices for use in structures repaired
using externally protective systems, such as surface treatments, because it is important to keep the
system intact.

4.1. Half Cell Potential


Half cells can be embedded in concrete close to the reinforcing steel. Different reference electrodes
are commercially available. Figure 6 shows a schematic diagram for a reference electrode consisting
of mixed metal oxide activated titanium which is cast in specially developed cementitious body. The
probe is wrapped around the reinforcing steel to be monitored. Figure 7 shows a photo of the probe
installed beside a reinforcing steel bar. The wires from the probe can be wrapped and extended
outside the concrete surface. The potential between the electrode and the reinforcing steel can be
measured by using a half cell.
Probe
Cable

Cementitious backfill

Heat shrinkable cover

Figure 6 Schematic diagram for the reference electrode Figure 7 The probe installed beside a
reinforcing bar

4.2. Macrocell Measurement


During the corrosion process, corrosion macrocells are formed with a distribution of anodic and cathodic
areas. Voltage in a macrocell element equal to potential difference between active and passive steel gives
the corrosion current. A macrocell current device can be set up using a configuration with a series of mild
steel working electrodes and a stainless steel cathode instead of a half cell. The sensor can be embedded
inside the concrete during new construction or repair. The sensor is fixed in such a way the first working
electrode is near the concrete surface, and the last at the rebar depth. As each working electrode is
depassivated with incoming chlorides or carbonation, there is a step up in the current flow between the
depassivated working electrodes as it becomes an anode, and the stainless steel cathode. Figure 8 shows
a different macrocell embedded sensors (i.e. sometimes known as the corrosion ladder meter).

Figure 8 Macrocell embedded sensors (ladder meter)

English-1 New Final.indd 77 12/16/13 10:31 AM


74 VI -METHODS FOR ESTIMATING AND EVALUATING CORROSION RATE

4.3. Linear Polarization


Based on the linear polarization principle, embedded sensors are developed. Different types of sensors are
commercially available. Figure 9 shows typical sensors installed besides reinforcing steel. The embedded
linear polarization sensors can measure corrosion potentials, polarization resistance and electrolyte
resistance. They can also monitor the advance of the carbonation or the chloride front and the availability
of oxygen at the sensor level by using special types of sensors. These sensors have possibility of automated
measurements using computer controlled equipment.

Figure 9 Typical embedded linear polarization sensors installed in concrete

The embedded probes should be placed and oriented to allow current flow from the counter electrode to
the reinforcement under evaluation. Generally probes are placed next to the longitudinal reinforcement and
are connected electrically to the reinforcement cage, as shown in Figure 9. Electrical connection should be
established by means of silver soldering the copper ground wire from the probe to the reinforcement. The
steel surface should be prepared for the soldering procedure. The steel surface should be ground for a length
of about 2.5 to 5 cm until bright steel is produced, a cleaning agent (flux) is applied to all surfaces and the
copper ground wire is placed in contact with the steel reinforcement. A connection of about 2.5 cm should be
provided to prevent detachment during subsequent construction. The probe is installed some distance away
from the solder point to prevent the erroneous measurement of corrosion due to the other metals and the
heat-treated steel.

The area of steel polarized by the probes is essentially the surface area of the portion of the bar receiving current
from the probe. This area is calculated as the circumference of each reinforcing bar facing the counter electrode
times the length of the probe. The connector on the end of the connection cable could be used with any
portable linear polarization monitor corrosion rate device.

The electrodes are encased in a mortar block. The mortar block protects the electrodes and houses them in a
consistent cementitious environment. The wires are wrapped together and extended outside the concrete for
access to the measurement device.

5. LONG-TERM EVALUATION
The measurements taken with the corrosion meter give information on the corrosion potential and corrosion
rate. These values are only valid for the time of the test, requiring a repeated test schedule for accurate long-
term evaluation. Depending to the life expectancy of the repaired structures the time interval should be
determined. However, a six-month test interval would be appropriate.

6. SELECTION OF MONITORING LOCATIONS


The selection of monitoring points is of significant importance as corrosion factors to be considered are often
related to the geometry of systems and components. Selection of these points should be based on a thorough
knowledge of process conditions, materials of construction, geometrical details of the system, external factors
and historical records. The number of points will depend upon:
a) The amount of time available.
b) Access and size of structure.
c) The aim of the inspection.

English-1 New Final.indd 78 12/16/13 10:31 AM


Design Life Extension of RC Structure
75

As only a finite number of points can be considered, it is usually desirable to monitor the «worst-case»
conditions, at points where corrosion damage is expected to be most severe. Often, such locations can
be identified by reasoning with basic corrosion principles, analysis of in-service failure records and in
consultation with operational personnel. With regard to the duration of each measurement, each reading
may take from less than 1 minute to about 5 minutes depending upon the actual corrosion conditions
and the method of measurement. There may also be a set up time of 25- minutes due to the physical
processing of placing the sensor. So the operator must allow 5 to 15 minutes per location. The operator
must also account for time taken to get access to each location, other measurements taken and other
logistical factors associated with site work. This will control the total number of readings that can be taken.
The previous measurement of chloride concentration, rust staining, cover, carbonation depths, etc. can
also be used as indications for selecting the measurement points. With regard to the spatial frequency, the
structure has to be divided in sections attending:
a) The severity of the ambient
b) The structural typology
c) The aim of the inspection.

The groups of structural elements will be then statistically treated in order to obtain a representation value of
each elements group or on the opposite; they will be mapped to obtain a pattern of the damage.

The lack of measurements along the time is recommended to be balanced by taking the larger possible number
of readings in different locations of the structure, selected regarding several degrees of apparent damage or
exposure severity.
When the appraisal of the load-bearing capacity of the structure is required, then, it is necessary to obtain an
accurate enough representative value of the corrosion rate (Icorr), by performing several measurements along
a whole year or a suitable period of time following the seasonal changes.

7. SUMMARY
The use of performance monitoring equipment is essential in understanding the corrosion process
in concrete structures in aggressive environment. The tests should be conducted during the
assessment of concrete structures in service and/or after the rehabilitation of concrete structures
to assess the effectiveness of the method and materials used in rehabilitation.

Portable devices are especially useful and allow for extensive and repeatable testing. It is important
that the equipment is well maintained and working properly. Embedded sensors are for continued
in-service evaluation.
The following observations are based on the purpose and applicability of the described devices:
• Corrosion rate values from field testing are qualitative, but not quantitative.
• Embedded corrosion rate probes are convenient for in-service testing.
• A continuous monitoring is essential to quantify the corrosion process of reinforcing steel.
• Determination of reinforcement steel corrosion with nondestructive methods is complex and may
lead to wrong interpretation of results. To avoid misinterpretation it is recommended to combine several
nondestructive testing methods, before making any conclusion about reinforcement corrosion.

8. REFERENCES
• Polder, R.B., Bamforth, P.B., Basheen, M., Chapmas-Andrews J. et al- «Reinforcement Corrosion and
Concrete Resistivity-State of the Art Laboratory and Field Results», Int. Conf. on Corrosion and Corrosion
Protection of steel in concrete. Ed. R.N. Swamy, Sheffield, July (1994), pp.571- 580.
• ASTM C876- 91 «Standard test method for half-cell potentials of uncoated reinforcing steel in concrete».
• González, J.A., Molina, A., Escudero, M.L. & Andrade, C. «Errors in the Electrochemical Evaluation of Very
Small Corrosion Rates. Part I. Polarization Resistance Method Applied to Corrosion of Steel in Concrete»,
Corrosion Science (UK), Vol.25, 1985, pp.917- 930.

English-1 New Final.indd 79 12/16/13 10:31 AM


English-1 New Final.indd 80 12/16/13 10:31 AM
VII - ESTIMATING SERVICE-LIFE Design Life Extension of RC Structure
77

VII - ESTIMATING SERVICE-LIFE

English-1 New Final.indd 81 12/16/13 10:31 AM


78 VII - ESTIMATING SERVICE-LIFE

1. INTRODUCTION
Concrete is the primary construction and repair material of many structural systems in the UAE,
such as bridges and high-rise buildings. Today, many of the concrete structures, which have been
exposed to aggressive environments, suffer from durability problems and fail to fulfill their design
service life requirements. The problem is particularly serious in reinforced concrete structures where
corrosion of reinforcing steel can impair their safety. Carbonation and chloride-induced corrosion
are two major causes of deterioration of concrete structures in Dubai. The limited knowledge of the
field performance of corrosion-damaged structures and the lack of systematic approaches for their
inspection, maintenance and repair contribute to the increase of their life-cycle costs, and result in
the loss of functionality and safety. There is a need for the implementation of a systematic approach
for inspection and rehabilitation of concrete structures in order to ensure their safety and durability
and minimize their life cycle costs.

The corrosion of embedded steel reinforcement in concrete due to the penetration of chlorides from
groundwater or seawater is the most prevalent form of premature concrete deterioration in the
UAE. There are currently numerous strategies available for increasing the service life of reinforced
structures exposed to chloride salts, including the use of:
• low-permeability (high-performance) concrete,
• chemical corrosion inhibitors,
• protective coatings on steel reinforcement (e.g. epoxy-coated or galvanized steel),
• corrosion-resistant steel (e.g. stainless steel),
• non-ferrous reinforcement (e.g. fiber-reinforced plastics),
• waterproofing membranes or sealants applied to the exposed surface of the concrete,
• cathodic protection (applied at the time of construction), and
• combinations of the above.

Each of these strategies has different technical merits and costs associated with their use. Selecting
the optimum strategy requires the means to weigh all associated costs against the potential
extension to the life of the structure.

2. LIFE-365 SERVICE LIFE PREDICTION MODEL


The Life-365™ v1.0 program and manual were written by E. C. Bentz and M. D. A. Thomas. The Life-
365™ v2.0 program and manual are adaptations of these documents, and were written by M. A. Ehlen
under contract to the Life-365 Consortium II, which consists of the Concrete Corrosion Inhibitors
Association, the National Ready Mix Concrete Association, the Slag Cement Association, and the
Silica Fume Association.

Life-cycle cost analysis (LCCA) is being used more and more frequently for this purpose. Life-365
LCCA uses estimated initial construction costs, protection costs, and future repair costs to compute
the costs over the design life of the structure. Many concrete protection strategies may reduce future
repair costs by reducing the extent of future repairs or by extending the time between repairs. Thus,
even though the implementation of a protection strategy may increase initial construction costs, it
may still reduce life-cycle cost by lowering future repair costs.

A number of models for predicting the service life of concrete structures exposed to chloride
environments or for estimating life-cycle cost of different corrosion protection strategies have been
developed recently and some of these are available on a commercial basis. The approaches adopted
by the different models vary considerably and consequently there can be significant variances
between the solutions produced by individual models.

English-1 New Final.indd 82 12/16/13 10:31 AM


Design Life Extension of RC Structure
79

The current version of the software has many limitations in that a number of assumptions or
simplifications have been made to deal with some of the more complex phenomena or areas where
there is insufficient knowledge to permit a more rigorous analysis. Users are encouraged to run their
own user-defined scenarios in tandem with minor adjustments to the values (e.g. D28, m, Ct, Cs,
tp) selected by Life-365. This will aid in the development of an understanding of the roles of these
parameters and the sensitivity of the solution to the values.

This version of Life-365 as all software is a closed book and therefore cannot be modified to includes
parameters that are not originally included by the developers of the software. Yet, Life-365 is deemed
the most comprehensive Service Life and Life Cycle Cost Analysis software available in the market. It
can be used to determine the service life and the life cycle cost of a building, part of a building, or a
structural member of the building.

Figure 1 shows a schematic of conceptual model of corrosion of steel reinforcement in concrete.


Based on this graph, the program evaluates two key periods, the initiation period and the propagation
period.

Figure 1: Schematic of conceptual model of corrosion of steel reinforcement in concrete

2.1. Using the Life 365 software


Life 365 is easy to use software for predicting the service life and life cycle cost for:
1- An entire structure where its structural elements are all subjected to the same environmental
conditions
2- Part of the structure that may be subjected to different environmental conditions and is expected
to be severely affected more than the rest of the structure
3- One element of the structure that is service subjected to different environmental conditions and
is expected to be severely affected more than the rest of the structure.
The estimation of the service life can be done to one of the three cases mentioned above. Therefore
the estimation of the entire service life of the entire structure can only be made using option 1 above.

2.2. Predicting the Initiation Period


The initiation period, ti, defines the time it takes for sufficient chlorides to penetrate the concrete
cover and accumulate in sufficient quantity at the depth of the embedded steel to initiate corrosion
of the steel. Specifically, it represents the time taken for the critical threshold concentration of
chlorides, Ct, to reach the depth of cover, xd. Life-365 uses a simplified approach based on Fickian
diffusion that requires only simple inputs from the user.

English-1 New Final.indd 83 12/16/13 10:31 AM


80 VII - ESTIMATING SERVICE-LIFE

2.3. Predicting Chloride Ingress due to Diffusion


The model predicts the initiation period assuming diffusion to be the dominant mechanism. Fick’s
second law is the governing differential equation:

Eq. 1
whereC= the chloride content,
D = the apparent diffusion coefficient,
x = the depth from the exposed surface, and
t = time.
The chloride diffusion coefficient is a function of both time and temperature, and Life-365 uses the
following relationship to account for time-dependent changes in diffusion:

Eq. 2
whereD(t) = diffusion coefficient at time t,
Dref= diffusion coefficient at time tref(= 28 days in Life-
365), and m = diffusion decay index, a constant.
Life-365 selects values of Drefandmbased on the mixture design details (i.e., water-cementitious
material ratio, w/cm, and the type and proportion of cementitious materials) input by the user. In
order to prevent the diffusion coefficient decreasing with time indefinitely, the relationship shown in
Eq. 2 is assumed to be only valid up to 25 years, beyond which D(t) stays constant at the D(25 years) value.

Life-365 uses the following relationship to account for temperature-dependent changes in diffusion:

Eq. 3
WhereD(T) = diffusion coefficient at time t and
temperature T, Dref= diffusion coefficient at time
trefand temperature Tref, U = activation energy of the
diffusion process (35000 J/ mol), R = gas constant, and T
= absolute temperature.

The temperature T of the concrete varies with time according to the geographic location selected by
the user. If the required location cannot be found in model database, the user can input one’s own
temperature data.
The chloride exposure conditions (e.g., rate of chloride build up at the surface and maximum
chloride content) are selected by the model based on the type of structure (e.g., bridge deck, parking
structure), the type of exposure (e.g., to marine or deicing salts) and the geographic location.
The solution for time to initiation of corrosion is carried out using a finite difference implementation
of Eq. 1 where the value of D is modified at every time step using Eqs. 2 and 3.

2.4. Input Parameters for Predicting the Initiation Period


The following inputs are required to predict the initiation period:
• Geographic location;
• Type of structure and nature of exposure;
• Depth of clear concrete cover to the reinforcing steel (xd), and
Details of each protection strategy scenario, such as water-cement ratio, type and quantity of
mineral admixtures and corrosion inhibitors, type of steel and coatings, and type and properties of
membranes or sealers. From these input parameters the model selects the necessary coefficients for
calculating the time to corrosion, as detailed above.

English-1 New Final.indd 84 12/16/13 10:31 AM


Design Life Extension of RC Structure
81

2.5. Surface Chloride Build Up


The model determines a maximum surface chloride concentration, Cs, and the time taken to reach
that maximum, tmax, based on the type of structure, its geographic location, and exposure, as input
by the user. For example, if the user selects a bridge deck in an urban area, the model will use the
surface concentration profile shown in the left panel of Figure 2. The user can input his own profile,
in terms of maximum surface concentration and the time (in years) to reach that maximum as shown
in Figure 1.

Figure 2: Examples of Concrete Surface History and Environmental Temperatures (Life 365v2.0)

2.6. Temperature Profile


The model determines yearly temperature profiles based on the user’s input for geographical location
using a database compiled from meteorological data. For example, if the user selects Moline, Illinois,
the model will use the temperature profile in the right panel in Figure 1. The user can input one’s own
temperature profile, in terms of monthly average temperatures in Celsius degrees.

2.7. Base Case Concrete Mixture


The base case concrete mixture assumed by the model is plain Portland cement concrete with no
special corrosion protection strategy. For the base case, the following values are assumed:
D28 = 1 x 10(-12.06 + 2.40w/cm) meters-squared per second (m2/s)
m = 0.20
Ct = 0.05 percent (% wt. of concrete)

The relationship between D28 and the water-cementitious materials ratio (w/cm) is based on a large
database of bulk diffusion tests. The nature of the relationship is shown in Figure 3 (corrected to
20οC). The value of m is based on data from the University of Toronto and other published data and
decreases the diffusion coefficient over the course of 25 years, after which point Life-365 holds it
constant at the 25-year value, to reflect the assumption that hydration is complete. The value of Ct is
commonly used for service-life prediction purposes (and is close to a value of 0.40 percent chloride
based on the mass of cementitious materials for a typical structural concrete mixture).

It should be noted that these relationships pertain to concrete produced with aggregates of normal
density and may not be appropriate for lightweight concrete.

Figure 3: Relationship between D28 and w/cm (Life 365v2.0)

English-1 New Final.indd 85 12/16/13 10:31 AM


82 VII - ESTIMATING SERVICE-LIFE

2.8. Effect of Silica Fume


The addition of silica fume is known to produce significant reductions in the permeability and
diffusivity of concrete. Life-365 applies a reduction factor to the value calculated for Portland cement,
DPC, based on the level of silica fume (%SF) in the concrete. The following relationship, which is
again based on bulk diffusion data, is used: DSF = DPC ·e-0.165·SF.

Eq. 4
The relationship is only valid up to replacement levels of 15 percent silica fume. The model will not
compute diffusion values (or make service life predictions) for higher levels of silica fume. Life-365
assumes that silica fume has no effect on either Ct or m.

Figure 4: Effect of Silica Fume on DSF (Life 365v2.0)

2.9. Effect of Fly Ash and Slag


Neither fly ash nor slag are assumed to effect the early-age diffusion coefficient, D28, or the chloride
threshold, Ct. However, both materials impact the rate of reduction in diffusivity and hence the value
of m. The following equation is used to modify m based on the level of fly ash (%FA) or slag (%SG) in
the mixture: M = 0.2 + 0.4(%FA/50 + %SG/70) Eq. 5

The relationship is only valid up to replacement levels of 50 percent fly ash or 70 percent slag and m
itself cannot exceed 0.60 (which would occur if fly ash and slag were used at these maximum levels),
that is, m must satisfy m ≤0.60 . Life-365 will not compute diffusion values (or make service life
predictions) for higher levels of these materials, and after 25 years holds the diffusion constant at the
25-year value to reflect that hydration is complete.

Figure 5 shows the effect of m for three mixtures with w/cm = 0.40 and with plain Portland cement
(PC), 30 percent slag, and 40 percent fly ash. Table 1 lists these mixture proportions and their
computed the diffusion coefficients, for 28 days, 10 years, and 25 years. For years greater than 25,
Life-365 uses the computed 25-year diffusion coefficient.

Figure 5: Effects of Fly Ash and Slag on Dt (Life 365v2.0)

English-1 New Final.indd 86 12/16/13 10:31 AM


Design Life Extension of RC Structure
83

Table (1): Effects of Slag and Fly Ash on Diffusion Coefficients

2.10. Effect of Corrosion Inhibitors


The model accounts for two chemical corrosion inhibitors with documented performance: calcium
nitrite inhibitor (CNI) and Rheocrete 222+ (a proprietary product from Master Builders; in the Life-
365 software, it is referred to as “A&E,” for “amines and esters”). It is intended that more inhibitors be
included when appropriate documentation of their performance becomes available.

Ten dosage levels of 30 percent solution calcium nitrite are permitted in Life-365. The inclusion of
CNI is assumed to have no effect on the diffusion coefficient, D28, or the diffusion decay coefficient,
m. The effect of CNI on the chloride threshold, Ct, varies with dose as shown in Table 2.

In addition, a single dose of Rheocrete 222+ (or amines and esters, as it is referred to in the software)
is permitted in the model; the dose is 5 litres/m3 concrete. This dose of the admixture is assumed
to modify the corrosion threshold to Ct = 0.12 percent (by mass of concrete). Furthermore, it is also
assumed that the initial diffusion coefficient is reduced to 90 percent of the value predicted for the
concrete without the admixture and that the rate of chloride build up at the surface is decreased by
half (in other words it takes twice as long for Cs to reach its maximum value). These modifications are
made to take account of the pore modifications induced by Rheocrete 222+ (or amines and esters),
which tend to reduce capillary effects (i.e. sorptivity) and diffusivity.

2.11. Effect of Membranes and Sealers


Membranes and sealers are dealt with in a simplified manner: Life-365 assumes that both membranes
and sealers only impact the rate of chloride build-up, and can only be reapplied up to the time of the
first repair.

English-1 New Final.indd 87 12/16/13 10:31 AM


84 VII - ESTIMATING SERVICE-LIFE

Membranes start with an efficiency of 100 percent, which deteriorates over the lifetime of the
membrane, a lifetime of 20 years, and no re-applications. This means that the rate of build-up starts at
zero and increases linearly to the same rate as that for an unprotected concrete at 20 years. As shown
in the left panel of Figure 6, surface chlorides for unprotected concrete (labeled “PC”) increases at a
rate of 0.04 percent per annum and reaches a maximum concentration of 0.60 percent at 15 years.
In the right panel, surface chlorides for concrete protected by a default membrane increase at a
lower rate, but then reach the same rate after 20 years. The user can also set his own values for initial
efficiency, lifetime of the membrane, and re-applications.

Sealers are dealt with in the same way, except that the default lifetime is only 5 years. The example in
Figure 6 shows the effect of reapplying the sealer every 5 years. Each time the sealer is applied, the
build-up rate is reset to zero and then allowed to build up back to the unprotected rate (0.04 percent
per annum in the example) at the selected lifetime of the sealer (5 years in the example).

Age year

Figure 6: Effects of Membranes and Sealers (Life 365v2.0)

2.12. Effect of Epoxy-Coated Steel


Epoxy-coated reinforcing bars have been widely used in aggressive environments since about 1973
and have generally met with success in delaying corrosion due to the ingress of chlorides. ASTM
A 775 standard specifications were developed that outlined coating application and testing. The
standard has the following requirements (ASTM A 775):
1) the coating thickness should be in the range of 130 to 300 microns;
2) bending of the coated bar around a standard mandrel should not lead to formation of cracks;
3) the number of pinhole defects should be no more than six per meter; and
4) the damage area on the bar should not exceed 2%.

According to the ASTM A775, Standard Specification for Epoxy-Coated Steel Reinforcing Bars, the
epoxy coatings with thicknesses in the range of 160 to 510 μm reduce the bond strength of deformed
reinforcing bars to concrete. Epoxy coatings with a thickness between 160 and 420 μm differences
in coating thickness have little effect on the amount of bond strength reduction and, by extension,
larger bars. Coatings thicker than 420 μm cause an additional drop in bond strength relative to the
bond strength obtained with thinner coatings. The maximum allowable coating thickness should be
increased from 300 μm to 420 μm to meet the requirements of ASTM A 775. It should be emphasized
here that the aforementioned Standards should be used in the structural design when the epoxy
coating is to be used for protecting the steel reinforcement from corrosion. This is particularly
important to avoid over-coating the bars so that bond with concrete will not be affected.
The main disadvantage of using epoxy is that it has to be done very carefully to assure that the coating
will not be scratched or damaged. Perhaps the best-known instance of poor field performance
of epoxy-coated bars was in several of the rebuilt bridges in the Florida Keys. Florida researchers
established that the primary causes of corrosion were inattention to preparation of the bars before
coating and debonding of the coating before placement in the structures.

English-1 New Final.indd 88 12/16/13 10:31 AM


Design Life Extension of RC Structure
85

Since 1991, a substantial improvement in the quality of epoxy-coated bars and understanding of
adhesion of coatings to steel has developed, primarily as a result of additional research and plant
certification programs. Considerable research has been conducted on epoxy-coated reinforcing bars
over the last 10 years, and field investigations have been conducted by many state agencies all over
the world. These studies have found that structures containing epoxy-coated bars are more durable
than structures with uncoated bars. Laboratory research has shown that new coating products
and test methods may improve the long-term durability of concrete structures. To assess the long-
term durability of epoxy coating products, these new test methods should be put in the form of
consensus standards. The Life 365 software increases accordingly the service life due to coating steel
reinforcement.

2.13. Effect of Stainless Steel


In the current version of Life-365 it is assumed that grade 316 stainless steel has a corrosion threshold
of Ct = 0.50 percent (i.e., ten times the black steel Ct of 0.05 percent).

2.14. Predicting the Propagation Period


The propagation period, tp, is fixed at 6 years. In other words, the time to repair, tr, is simply given by
tr= ti+ 6 years. The only protection strategy that influences the duration of the propagation period
is the use of epoxy-coated steel, which increases the period to tp= 20 years. The propagation period
can be changed by the user.

3. ESTIMATING LIFE-CYCLE COST


To estimate life-cycle cost, Life-365 follows the guidance and terminology in ASTM E-917 Standard
Practice for Estimating the Life-Cycle Cost of Building Systems. This includes the process of
1. Defining a base year, study period, rates of inflation and discount and project requirements;
2. Calculating the present value of future costs;
3. Reporting results in present value (constant dollar) and current dollar terms; and
4. Conducting uncertainty and sensitivity analysis.

3.1. User Input Parameters


The user is responsible for providing the following cost information needed for the lifecycle cost
analysis:
• Cost of concrete mixtures (including corrosion inhibitors) for the various corrosion protection
strategies under consideration,
• Cost, coverage, and timing of repairs,
• Inflation rate, i, and
• Real discount rate, r.
• Life-365 provides the following default costs for the included rebars:
• Black steel = $1.00/kg ($0.45/lb)
• Epoxy-coated rebar = $1.33/kg ($0.60/lb)
• Stainless steel = $6.60/kg ($2.99/lb)

The user should review and if necessary change the costs of these materials to better reflect actual
project costs in his area. Here the currency is expressed in US dollars. The software allows only the
use of the US currency in its calculations of the LCC. In fact the user may just enter the data in AED
and the evaluated cost will be expressed using the $ sign, which then will mean AED. For example,
a user wants to use this software to evaluate the service life cost needs first to enter the cost of the
aforementioned cost information of which for instance for the cost of the black steel that happens to
be 4 AED per kg in the local market at the time the analysis was done.

English-1 New Final.indd 89 12/16/13 10:31 AM


86 VII - ESTIMATING SERVICE-LIFE

Then the user will input it in the field for the black steel as 4. The software understands it as $4; but
the user is putting it and keeping in mind that the sign for a dirham is now $. Therefore the total cost
will be in dirham. It is important to know that the user cannot add any additional parameters as the
software does not allow such addition since it is a “closed book” to the user.

4. CALCULATING LIFE-CYCLE COST


4.1. Present Worth Calculations
Life-cycle cost is calculated as the sum of the initial construction costs and the discounted future
repair costs over the life of the structure. The initial construction costs are calculated as the sum of
concrete costs, steel (or other reinforcement) costs, and any surface protection (membrane or sealer)
costs. Life-cycle cost is expressed in either total dollars or dollars per unit area of the structure (e.g.
dollars per square meter). Future repair costs are calculated on a “present worth” basis using the
inflation rate, i, and the real discount rate, r, both provided by the user. The present worth, PW, of a
future cost c in year t is calculated as
Eq. 6

All future repair costs over the entire design life of the structure are calculated in this manner.

5. EXAMPLE
A hypothetical example of a building located in Dubai will be presented to introduce the features of
the program using a step-by-step approach.

5.1. Step 1- Project Tab


In this tab, the user defines the following parameters:
• Identify Project
• Select Structure Type and Dimensions (Figures 7 through 9)
• Define Economic Parameters (Figure 10)
o Base year
o Analysis period
o Inflation rate (%)
o Real discount rate (%)
• Define Alternatives

Figure 7: Defining the type of structure as Slabs and Walls (Life 365v2.0)

English-1 New Final.indd 90 12/16/13 10:31 AM


Design Life Extension of RC Structure
87

Figure 8: Defining the type of structure as rectangular columns (Life 365v2.0)

Figure 9: Defining the type of structure as circular columns (Life 365v2.0)

Figure 10: Defining the base year, analysis period, inflation rate and real discount rate (Life 365v2.0)

English-1 New Final.indd 91 12/16/13 10:31 AM


88 VII - ESTIMATING SERVICE-LIFE

5.2. Step-2: Exposure Tab


In this tab, the user defines the following parameters:
• Select Location
• Define Chloride Exposure (Figure 11)
o Max surface conc.
• Time to build to max (yrs)
• Define Temperature Cycle (Figure 12)

Figure 11: Defining maximum surface chloride concentration and time to build
to maximum (Life 365v2.0)

Figure 12: Defining the temperature history in Dubai (Life 365v2.0)

5.3. Step 3: Concrete Mixes


In this tab, the user defines the following parameters for a new structure, part of a structure, or a
structural element (Figures 13, 14): For repaired structures, Life 365 allows including the repair effect
only when section enlargement is used using additional concrete or cementitious material. The Life
365 software does not support any other materials for repair. It is believed that newer version of
the software can take into consideration the life cycle prediction for repaired structures using other
materials.

English-1 New Final.indd 92 12/16/13 10:31 AM


Design Life Extension of RC Structure
89

• Define Concrete Mixes and Steel used (Figures 13, 14):


• Selected mix and corrosion inhibitors or external barrier (Figures 15, 16):
• Service Life Graphs (Figures 17):

Figure 13: Defining W/C ratio, Slab %, Fly ash % and Silica fume % (Life 365v2.0)

Figure 14: Defining % of steel in section and type of used steel (Life 365v2.0)

English-1 New Final.indd 93 12/16/13 10:31 AM


90 VII - ESTIMATING SERVICE-LIFE

Figure 15: Defining dosage of corrosion inhibitor (Life 365v2.0)

Figure 16: Defining external barrier type (Life 365v2.0)

English-1 New Final.indd 94 12/16/13 10:31 AM


Design Life Extension of RC Structure
91

Figure 17: Obtaining the initiation period, propagation period and total service life (Life 365v2.0)

5.4. Individual Costs tab


The Individual Costs tab (Figures 18, 19) allows you to edit the different constituent concrete costs,
and view the effects they have on the constituent costs that make up life-cycle cost. The following
parameters can be defined:
• Set Concrete Costs
• Default Concrete and Repair Costs
• Costs for Each Mix Design
• Cost Timeline

Figure 18: Default Concrete and Repair Costs (Life 365v2.0)

English-1 New Final.indd 95 12/16/13 10:31 AM


92 VII - ESTIMATING SERVICE-LIFE

Figure 19: Defining individual costs (Life 365v2.0)

5.5. Life-Cycle Costs tab


Once the general, environmental, concrete mix, and individual costs have been entered, the resulting
life-cycle costs of the mixes can be compared in the Life-Cycle Costs tab, Figure 20.

Figure 20: Life cycle cost (Life 365v2.0)

English-1 New Final.indd 96 12/16/13 10:31 AM


Design Life Extension of RC Structure
93

5.6. Service Life and Life-Cycle Cost Reports


Finally, Life-365 provides two pre-defined reports of your project: a SL Report (for «Service Life
Report»; Figure 20) and an LCC Report (or «Life-Cycle Cost Report»; Figure 21). These two reports list
many but not all of the parameters used in your analysis. Each report can be printed by pressing the
Print button at the bottom of the window. (If you do not have a printer installed, then Life-365 will
ask you to install one first.)

Figure 21: Service life report (Life 365v2.0)

Figure 22: Life cycle cost report (Life 365v2.0)

English-1 New Final.indd 97 12/16/13 10:31 AM


94 VII - ESTIMATING SERVICE-LIFE

5.7. Effect of the different parameters on the Service life


Here, a hypothetical example is presented for the sake of running the Life 365 software. The software
is easy to use; just follow the procedure presented in the previous sections of this chapter. Such
a procedure can be followed for the entire concrete structure, part of it, or a structural member,
i.e., slab, beam column, wall, etc.). We used here the data for the same building presented for
the demonstration of the procedure in Section 5. Therefore, for the same building locations and
condition, the effect of different parameters on the service life can be obtained. Table 3 list the service
life estimated for 36 alternatives. The user can certainly prepare a different list of alternatives that
suit the actual building structure. It should be emphasized here that this is a demonstration of the
capability of the software that the research team see as the most appropriate and comprehensive
tool available for the evaluation of the service life and the life cycle cost. In these alternatives the
effect of the following parameters has been obtained:
• W/C ratio, Slag %, Fly ash %, Silica fume %
• Rebar type
• Barrier type, Inhibitor type
• Diffusion decay index, Chloride concentration

English-1 New Final.indd 98 12/16/13 10:31 AM


Design Life Extension of RC Structure
95

Table 3: Service life estimated for 36 alternatives

Ser-
Silica
Slag Fly Ash Inhibitor, vice
Alt. W/C Fume Rebar type Barrier m Ct
% % L/m3 Life
%
(yrs)
Alt. 0 0.35 0 0 10 black steel non non 0.2 1.175 15.3
Alt. 1 0.4 0 10 0 black steel non non 0.28 1.175 8.7
Alt. 2 0.45 0 0 10 black steel non non 0.2 1.175 12
Alt. 3 0.35 10 10 0 black steel non non 0.34 1.175 9.7
Alt. 4 0.4 10 0 10 black steel non non 0.26 1.175 14.9
Alt. 5 0.45 10 10 0 black steel non non 0.34 1.175 8.5
Alt. 6 0.35 0 0 10 black steel non 15 0.2 5.64 27.1
Alt. 7 0.4 0 10 0 black steel non 15 0.28 5.64 11.8
Alt. 8 0.45 0 0 10 black steel non 15 0.2 5.64 18.5
Alt. 9 0.35 10 10 0 black steel non 15 0.34 5.64 14.1
Alt. 10 0.4 10 0 10 black steel non 15 0.26 5.64 26.9
Alt. 11 0.45 10 10 0 black steel non 15 0.34 5.64 11.6
Alt. 12 0.35 0 0 10 black steel membrane non 0.2 1.175 23
Alt. 13 0.4 0 10 0 black steel membrane non 0.28 1.175 13.9
Alt. 14 0.45 0 0 10 black steel membrane non 0.2 1.175 18.7
Alt. 15 0.35 10 10 0 black steel membrane non 0.34 1.175 16
Alt. 16 0.4 10 0 10 black steel membrane non 0.26 1.175 23
Alt. 17 0.45 10 10 0 black steel membrane non 0.34 1.175 13.8
Alt. 18 0.35 0 0 10 Epoxy coated non non 0.2 1.175 29.3
Alt. 19 0.4 0 10 0 Epoxy coated non non 0.28 1.175 22.7
Alt. 20 0.45 0 0 10 Epoxy coated non non 0.2 1.175 26
Alt. 21 0.35 10 10 0 Epoxy coated non non 0.34 1.175 23.7
Alt. 22 0.4 10 0 10 Epoxy coated non non 0.26 1.175 28.9
Alt. 23 0.45 10 10 0 Epoxy coated non non 0.34 1.175 22.5
Alt. 24 0.35 0 0 10 Epoxy coated sealer non 0.2 1.175 31.8
Alt. 25 0.4 0 10 0 Epoxy coated sealer non 0.28 1.175 24.6
Alt. 26 0.45 0 0 10 Epoxy coated sealer non 0.2 1.175 28.2
Alt. 27 0.35 10 10 0 Epoxy coated sealer non 0.34 1.175 25.9
Alt. 28 0.4 10 0 10 Epoxy coated sealer non 0.26 1.175 31.6
Alt. 29 0.45 10 10 0 Epoxy coated sealer non 0.34 1.175 24.4
Alt. 30 0.35 0 0 10 Epoxy coated sealer 15 0.2 5.64 43.9
Alt. 31 0.4 0 10 0 Epoxy coated sealer 15 0.28 5.64 28.2
Alt. 32 0.45 0 0 10 Epoxy coated sealer 15 0.2 5.64 35.2
Alt. 33 0.35 10 10 0 Epoxy coated sealer 15 0.34 5.64 30.9
Epoxy
Alt. 34* 0.4 10 0 10 sealer 15 0.26 5.64 44.2
coated
Alt. 35 0.45 10 10 0 Epoxy coated sealer 15 0.34 5.64 28.1

* The alternative with highest service life prediction

English-1 New Final.indd 99 12/16/13 10:31 AM


96 VII - ESTIMATING SERVICE-LIFE

6. REFERENCES
• A 775/A 775 M Standard Specification for Epoxy- Coated Reinforcing Steel Bars Steel Corrosion in
Concrete, E & FN Spon, London, 1997, pp. 136 -139.

• Bamforth, P.B. 1998. “Spreadsheet model for reinforcement corrosion in structures exposed to
chlorides.” In Concrete Under Severe Conditions 2 (Ed. O.E. Gjørv, K. Sakai and N. Banthia), E&FN
Spon, London, pp. 64- 75.

• Bentz, E.C. 2003. “Probabilistic modeling of service life for structures subjected to chlorides,”
Materials Journal, Vol. 100 (5), pp. 391 -397.

• Berke, N.S. and Rosenberg, A. 1989. «Technical Review of Calcium Nitrite Corrosion Inhibitor in
Concrete», Transportation Research Record 1211, Concrete Bridge Design and Maintenance, Steel
Corrosion in Concrete, Transportation Research Board, National Research Council, Washington
D.C.

• Boddy, A., Bentz, E., Thomas, M.D.A. and Hooton, R.D. 1999. “An overview and sensitivity study of
a multi-mechanistic chloride transport model.” Cement and Concrete Research, Vol. 29, pp. 827-
837.

• Concrete Reinforcing Steel Institute. 1998. “Life-cycle costs reinforce epoxy-coated bar use,”
Concrete Products, Penton Media, Inc., p. 82.

• Frederiksen, J.M., Sorensen, H.E., Andersen, A., and Klinghoffer, O. 1997. HETEK, The Effect of the
w/c ration on Chloride Transport into Concrete -Immersion, Migration and Resistivity Tests, Report
No. 54.

• Frohnsdorff, G., 1999, Modeling Service Life and Life-Cycle Cost of Steel Reinforced Concrete,
Report from the NIST/ACI/ASTM Workshop, November 91998 ,10-, National Institute of Standards
and Technology Report NISTIR 6327, 43 p.

• Gjorv, O.E., Tan, K., and Zhang, M-H. 1994. «Diffusivity of Chlorides from Seawater into High-
Strength Lightweight Concrete» ACI Materials Journal, Vol. 91 (5), pp. 447- 452.

• Glass, G.K. and Buenfeld, N.R. 1995. “Chloride threshold levels for corrosion induced deterioration
of steel in concrete.” Chloride Penetration into Concrete, (Ed. L.-O. Nilsson and J. Ollivier), pp. 429
-440.

• Life-365 v2.0: Service Life Prediction Model and Computer Program for Predicting the Service Life
and Life-Cycle Costs of Reinforced Concrete Exposed to Chlorides, written by E. C. Bentz and M. D.
A. Thomas, 2010.

• McDonald, D. B., and Pfeifer, D. W., “Epoxy-Coated Bars—State-of-the-Art,” Proceedings of the


Second Regional Conference and Exhibition, ASTM, Saudi Arabian Section, V. 2, Nov. 1995.

• Maage, M., Helland, S. and Carlsen, J.E. 1995. “Practical non-steady state chloride transport as a
part of a model for predicting the initiation period.” Chloride Penetration into Concrete, (Ed. L.-O.
Nilsson and J. Ollivier), pp. 398 -406.

English-1 New Final.indd 100 12/16/13 10:31 AM


Design Life Extension of RC Structure
97

• MacDonald, D., Pfeiffer, D. and Sherman, M. 1998. “Corrosion evaluation of epoxy coated, metallic-
clad, and solid metallic reinforcing bars in concrete.” FHWA-RD-98153-, Federal Highways
Administration, Washington, D.C.

• Gerald G. Miller, Jennifer L. Kepler, and David Darwin, 2003. “ Effect of Epoxy Coating Thickness on
Bond Strength of Reinforcing Bars”, ACI Structural Journal, V. 100, No. 3, 1 -7.

• Samples, L. M., and Ramirez, J. A., Field Investigations of Existing and New Construction Concrete
Bridge Decks, Research Series 6, Concrete Reinforcing Steel Institute, Schaumburg, Ill., 1999.

• Virmani, P., “Corrosion Evaluation of Epoxy Coated, Metallic Clad, and Solid Metallic Reinforcing
Bars in Concrete”, FHWA-RD-98- 153.

English-1 New Final.indd 101 12/16/13 10:31 AM


English-1 New Final.indd 102 12/16/13 10:31 AM
VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS 99
Design Life Extension of RC Structure

VIII - IMPROVING CORROSION


RESISTANCE CHARACTERISTICS

English-1 New Final.indd 103 12/16/13 10:31 AM


100 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

1. INTRODUCTION
In recent years, more emphasis has been given to creating more durable and cost effective concrete
structures. This is due to the increase cost of repair and maintenance, which may be similar to the cost of
building a new structure in many cases. “Cost optimal design” of new concrete structures is no longer a
strange terminology to owners, specifiers and engineers.

Ensuring durability of concrete structure is definitely not a simple and static process. It requires clear
definitions, understanding of responsibilities and collaborations. Design for durability of concrete structure
needs to be considered on case-by-case basis depending on the exposure environment and intended
structure service life.

Corrosion-induced deterioration of reinforced concrete structures occurs when the environmental loading
on the structure is greater than the ability of the structure to resist the environmental loading (environmental
resistance). One can either decrease the loading or increase the resistance or do a combination of both.

Corrosion can also occur as a result of other deterioration processes: expansive reactions such as; sulfate
attack, thermal cracking, etc., excessive deflections, etc. These processes cause the concrete to crack, which
subsequently allows water and chlorides easy access to the interior of the concrete and the steel reinforcing
bars. These other deterioration mechanisms create conditions more conducive to the corrosion of the
embedded steel reinforcing bars, which leads to further deterioration of the concrete.

The factors that influence the corrosion of steel reinforcing bars embedded in concrete are the amount of
chloride ions at the steel level, the resistivity of the concrete, temperature, relative humidity (both internal
and external), and the concrete microstructure. In general, by controlling these factors to an acceptable level,
the corrosion of the steel reinforcing bars and resulting concrete deterioration can be minimized. This is
the first step in most corrosion-control strategies in addition to other suitable corrosion-protection systems.
Corrosion-control methods or systems are classified as mechanical or electrochemical.

Mechanical methods are physical barriers that prevent or delay the ingress of chlorides, oxygen, and moisture
through the concrete cover to the reinforcing steel. They include admixtures, sealers and membranes,
overlays, and coatings on steel reinforcing bars. Sealers and membranes made with materials such as resins,
epoxies, emulsions, etc. are used to reduce the ingress of deleterious species. Portland cement concrete,
low-slump dense concrete, latex-modified concrete, silica fume-modified concrete, and polymer concrete
overlays are commonly used. Coatings used on steel reinforcing bars are either organic or metallic. Organic
coatings include the non-metallic and epoxy coatings. Metallic coatings include materials such as nickel,
stainless steel, and zinc. The nickel and stainless steel coatings protect steel by being a barrier system and
more noble, i.e., have a lower potential than iron to corrode. The zinc coating protects steel by being sacrificial
or more active (i.e., it has a greater potential than iron to corrode). Corrosion-resistant materials include fiber-
reinforced polymer (FRP) rebars.

Electrochemical methods force the steel reinforcing bars to be cathodic. They include chloride extraction and
cathodic protection. Chloride ion extraction and cathodic protection are typically used in the rehabilitation
of reinforced concrete structures and not as a corrosion-control measure for new construction.

There are three categories of variables that influence the corrosion and deterioration processes and the
extent of the corrosion-induced deterioration of reinforced and prestressed concrete members:
- Environmental variables.
- Materials.
- Design.

Material variables for making durable concrete include cement type, supplementary cementing materials
(SCM) such as silica fume, slag and fly ash, admixtures, aggregate quality, and the water-cement ratio.

Design variables include the depth of concrete cover, properties of the hardened concrete; mainly
compressive strength, the size and spacing of the steel reinforcing bars, and the efficiency of drainage from
the structure.

English-1 New Final.indd 104 12/16/13 10:32 AM


Design Life Extension of RC Structure
101

Environmental variables include the source of chloride ions; sulfate ions, temperature extremes; wet-dry
cycles; relative humidity; and, to a certain extent, applied live loading. Although little can be done to control
environmental variables, material and design variables can be adjusted to build durable concrete structures
that can resist corrosion-induced deterioration in environments conducive to the initiation and sustenance
of the corrosion process.

The durability of concrete structure especially in aggressive environments has been the focus for almost
the last two decades. The deterioration of concrete structures due to induced reinforcement corrosion is
classified as the number one cause worldwide. The main issues that should be taken into consideration to
improve the protection of concrete to the reinforcement corrosion includes design, construction practice
and materials.

The following sections give a review for the design provisions and construction provisions. Also, a review
of the concrete materials selection is included. The report will provide information on corrosion protection
systems such as corrosion inhibitors, external protection barriers and cathodic protection.

2. SELECTION OF PROTECTION SYSTEMS


The proper corrosion-protection strategy will vary from structure to structure. Some factors to be considered
during the design of a structure include:
• Intended design life of the structure.
• Effects of corrosion and corrosion induced deterioration (i.e. including cost due to closure either
permanent or temporary repair).
• Quality of workmanship in construction (i.e. including good consolidation, proper rebar placement,
sufficient concrete cover over the steel reinforcing bars, and other measures).
• Possible rehabilitation methods (i.e. the design of structures should include provisions for the possible
future rehabilitation of corrosion-induced deterioration).
• Initial costs (i.e. life-cycle costs).

As the rehabilitation and replacement costs increase, corrosion-control measures become more cost
effective. Multiple protection strategies may be cost-effective for long-term corrosion protection. One such
strategy is the use of galvanized steel reinforcement or FRP rebar or the use of surface corrosion inhibitors or
surface sealants in combination with durable concrete containing having low permeability, and maintaining
adequate concrete cover during construction. However, there is a need to balance the costs of the additional
control measures against how much additional service life can be expected as a result of the added control
measures.

The additional costs can usually be justified based on a life-cycle cost analysis. Some factors to be considered when
choosing a corrosion-control measure include:
• How aggressive the environment is where the structure will be located.
• Effectiveness of the protective system(s).
• Possibility of future installation of other control measures.
• Life expectancy of the measure.
• Any incremental costs over the “do nothing” option
• Any impacts on the cost of other elements in the structure.

Corrosion-protection strategies for steel reinforcing bars embedded in concrete can be grouped into the following
categories:
• Design.
• Concrete.
• Corrosion inhibitors.
• Surface sealants.
• Reinforcement type.

English-1 New Final.indd 105 12/16/13 10:32 AM


102 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

The design category includes:


• Compressive strength.
• Concrete cover.
• Maximum allowable crack widths in service.
• Reinforcement distribution (crack control provisions).

The concrete category includes:


• Water-cement ratio.
• SCM; such as silica fume, fly ash, slag.
• Latex, epoxy, and polymer admixtures.
• Cement type.
• Aggregate quality.

The inhibitor category and surface treatment includes:


• Corrosion inhibitors systems (organic-inorganic).
• Surface sealants.

The reinforcement category includes such items as:


• Galvanized bars.
• Stainless steel bars.
• Non-metallic bars (FRP rebars).

3. GENERAL DESIGN PROVISIONS


It is generally the design details that influence the overall performance and durability of concrete
structures. Some design factors that affect the durability of concrete structures include:
• Environmental exposure.
• Tendency of concrete to crack.
• Compressive Strength.
• Concrete cover.
• Architectural and structural details (i.e. joints (if any), drainage, access for inspection &
maintenance, etc.).

The environmental exposure to which the structure will be exposed to should be carefully identified
in order to identify the severity of exposure to different aggressive species. This step is very important
at the beginning of the design process in order to establish the concrete grade suitable for such
exposure. In some cases, the strength needed for certain exposure level will override that required
for structural design. Also, minimum concrete quality, expressed in the form of maximum w/c ratio
and/or minimum cementitious content and/or cementitious type, will be specified to be considered
in the project specification and during construction. Table 1, from BS 81101:1997- and BS 5328-
1:1997, lists the different exposure conditions for RC structures. Table 2, from BS 81101:1997-, lists
the minimum concrete quality needed for each exposure condition. Similar tables are listed in EN
2061:2000-. Similarly, the different exposure conditions and minimum concrete quality, according
to CIRIA C5772002-, are listed in Tables 4 and 5. While, requirements for special exposure conditions
according to ACI 318M-05 are listed in Tables 5, 6, 7 and 8. While, the minimum concrete cover for
reinforcement protection according to ACI 318M-05 is listed in Table 9.

English-1 New Final.indd 106 12/16/13 10:32 AM


Design Life Extension of RC Structure
103

Environmental conditions in Dubai are characterized with the following:


• High average temperature and relative humidity around the year as shown in Figure 1.
• High ground water table (12- meters below ground level) which is high in sulfates and/or chlorides
concentration.
• High windborne salts.
• Gulf water is considered to be one of the highest in the world with respect to chloride concentration.

Therefore, exterior parts of, and underground structures in Dubai could be classified to be exposed
to severe to very severe exposure conditions.

Monthly Average Tempearure in Dubai, UAE Monthy Average Relative Humidity in Dubai, UAE
45 94

40 Average High 92
Average Low

Relative Humidity (%)


35 90
30 88
Temperature oC

25 86
20 84
15 82
10 80
5 78
0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Figure 1. Annual average weather conditions in Dubai

Table 1: Classification of exposure condition (BS 81101:1997- and BS 53281:1997-)

English-1 New Final.indd 107 12/16/13 10:32 AM


104 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

Table 2: Minimum concrete quality for different exposure conditions (BS 53281:1997-)

Table 3: Classification of exposure condition (CIRIA C557- 2002)

Exposure Location
condition
a Superstructure iniand with no risk of
windbome stats
b Superstructures in areas of salt ĸats, inland
or near the coast, exposed to windbome
salts
c Parts of structures in contact with soil, well
above capillary rise zone, with no risk of
water introduced at the surface by imigation,
faulty drainage systems, washing down ets.
d Parts of structures in contact with the soil,
whin the capilary rise zone, below
groundwater level, or where water may may be
introduced at the surface by irigation,
discharge of wastes, wasting down etc.
These situations all lead to a potential for
the concentration of aggressive salts by
evaporation
(i) Sigriķcant sulfate contamination only
(ii) Sigriķcant chloride contamination only
(iii) Sigriķcantcontamination with both
sulfates and chorides
e Marine structures (splash zone)
f Waterretaining structures (inctuding
sewage treatment plants)

English-1 New Final.indd 108 12/16/13 10:32 AM


Design Life Extension of RC Structure
105

Table 4: Minimum concrete quality for different exposure conditions (CIRIA C577 -2002)

Table 5: Requirements for special exposure conditions (ACI 318M-05)

Table 6: Requirements for concrete exposed to deicing chemicals (ACI 318M-05)

English-1 New Final.indd 109 12/16/13 10:32 AM


106 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

Table 7: Requirements for concrete exposed to sulfate containing solutions


(ACI 318M-05 & ACI 201.2R-01)

Table 8: Requirements for minimum concrete quality exposed to special exposure conditions
(ACI 318M-05)
Exposure Condition Max w/c Min. Strength (MPa)
Concrete intended to be watertight:
•Exposed to fresh water 0.50 25
•Exposed to sea water 0.45 30
Concrete exposed to F/T in moist
conditions:
•Thin sections 0.45 30
•Other elements 0.50 25
•Presence of de-icing salt 0.45 30
For corrosion protection of RC
structures exposed to de-icing salts, 0.40 33
or sea water

Table 9: Minimum concrete cover for reinforcement protection (ACI 318M-05)

Min. Cover (mm)


Exposure Condition Cast Precast Prestressed
in Situ
Concrete cast against or permanently
70 --- 70
exposed to earth
Concrete exposed to earth or weather:
•Wall panels 40-50 20-40 30
•Slabs 40-50 ---- 30
•Other members 40-50 30-50 40
Concrete NOT exposed to weather or
in contact with earth:
•Slabs 20-40 15-30 20
•Beams, columns 40 10-40 20-40
•Shells, folded plates 15-20 10-15 10
•Non prestressed reinforcement ---- ---- 20
Concrete exposed to de-icing salt or
sea water:
•Walls and slabs 50 40 ----
•Other elements 60 50 ----

English-1 New Final.indd 110 12/16/13 10:32 AM


Design Life Extension of RC Structure
107

Cracks may be thermal or shrinkage. Proper care in the layout and sequencing of concrete pours
should be exercised to minimize the risk of cracking. Several design parameters can be adjusted
as cost-effective corrosion-control measures. These include the use of adequate concrete cover,
reinforcement distribution, the size and spacing of reinforcing steel for crack control. Care should be
taken to minimize any cracks that may help in transmitting water and other aggressive species (BS
81101:1997-).

The width of cracks in concrete is more of a concern than the number of cracks. The use of an increased
number of well-distributed reinforcing steel bars is more effective in controlling crack widths than
a smaller number of larger bars. Maximum crack width is set to 0.3mm according to BS 81101:1997-
and BS 81102:1997- in aggressive environment for corrosion protection. In the assessment of the
behavior of prestressed concrete members (Class 3 according to BS 81101:1997-) in very severe
environment the crack width is limited to 0.1mm. For Class 1 no flexural tensile cracks are allowed
while for Class 2 no visible cracks are allowed. According to ACI 224R-01, the crack width ranges
from 0.10 to 0.40mm depending on the exposure condition, for seawater and wetting and drying
condition it is set to 0.15mm. Meanwhile, according to CIRIA C5772002-, the maximum crack width
ranges from 0.10 to 0.30mm according to the exposure condition. It should be highlighted that the
maximum crack width could be increased in cases where external finishing layers or barriers are
used.

The use of well-consolidated, low-permeability adequate concrete cover is a cost-effective corrosion


control measure. The amount of concrete cover significantly influences the time-to-corrosion of
the steel reinforcing bars and its quality influences the diffusion rate of chloride ions through the
concrete. Since the diffusion of chloride ions in concrete is non-linear with increasing cover thickness,
there is a significant increase in the time required for the chloride ions to reach the steel reinforcing
bars. As a rule of thumb the cover to a main bar should not be less than the main bar size or where
bars are in pairs or bundles the size of a single bars of cross-sectional area equal to the sum of their
cross-sectional areas (BS 81101:1997-).

However, with increased concrete cover, there is an increase in the potential for concrete cracking
from shrinkage and thermal effects. The reinforcing steel bars become less effective for crack control
with increasing cover thickness. Chloride concentrations in the top 10 mm of a concrete element can
be very high when compared to the concentrations at depths of 25 to 50 mm. A concrete cover of
25 mm has been shown to be inadequate in severe environments, even with a water-cement ratio as
low as 0.30. For moderate to severe environments, the amount of concrete cover should be at least
40 mm and, preferably, 50 mm (ACI 201.2R-01). The minimum cover for the main reinforcing steel
with no positive corrosion protection in concrete structures frequently exposed to chlorides is 65
mm (ACI 201.2R-01). The minimum concrete cover for reinforcing steel embedded in concrete with
direct exposure to saltwater is 100 mm; and 75 mm for concrete cast against earth (ACI 201.2R-01).

There are some precautions that can be taken during the design of a structure to help minimize the
potential for corrosion. The number of joints should be as few as possible and unnecessary joints
should be eliminated. Open joints should be located as far as is practical from critical structural
components.
The coupling of dissimilar metals should be avoided to minimize galvanic corrosion. High performance
concrete has been used to help prevent the penetration of salt-contaminated water into structural
components. This will extend the repair-free life of the concrete structure (i.e., the time period before
the structure needs to be repaired).

4. GENERAL CONSTRUCTION PROVISIONS


There are several construction variables that influence the durability of concrete structures. These
include concrete materials, placing, consolidating, curing and rebar placement. Poor construction
practices can easily negate the best design provisions taken to produce a durable concrete structure.
Good consolidation practices help to avoid segregation and honeycombing, while yielding a uniform
concrete with low permeability. A well-consolidated concrete can be achieved through the use of
proper construction techniques and equipment. Poor consolidation results in concrete with higher
permeability and voids, cavities, and poor bonding. Voids, cavities, and areas of poor bonding aid in
the corrosion process.

English-1 New Final.indd 111 12/16/13 10:32 AM


108 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

Proper consolidation of the concrete ensures that it is in intimate contact with the steel reinforcing bars.
A good bond between the steel reinforcing bars and the surrounding concrete is critical for corrosion
control. As a result of the intimate contact between the steel reinforcing bars and the concrete, the steel
will be in the high-alkaline environment, necessary for the formation and maintenance of the passive
oxide film. Exercise extra care when placing and consolidating concrete around embedded or partially
embedded items so that water and chlorides do not have easy access to the steel reinforcing bars.

Concrete curing procedures are an important part of workmanship. Proper and adequate curing
provides durable concrete through increased cement hydration. A minimum of 7 days of uninterrupted
moist cure is recommended. Whatever the curing method used, the surface of the concrete must
be kept wet. Alternating wet-dry cycles promotes cracking in the concrete. There are three general
categories of curing methods. A continuous water cure is done by a continuous spray, ponded water,
or saturated surface coverings (burlap). Curing compounds seal the surface of the concrete. Moisture
barrier materials, such as plastic sheets or waterproof paper, cover the surface of the concrete. A
continuous water cure supplies sufficient water to prevent the surface of the concrete from drying.
Both membranes and moisture barriers work by preventing evaporation of the mix water from the
surface of the concrete (ACI 222R-01).

The accurate placement of steel reinforcing bars ensures that an adequate concrete cover over the bars
will be obtained. Methods for placing and tying bars to ensure proper cover include the use of chairs,
spacers, and form ties. Allowances for tolerances in bending bars may also be needed. Reinforcing
steel should be adequately tied to prevent it from moving from the desired location during concrete
placement and consolidation. Reinforcement support and ties should have adequate strength to carry
construction loading before and during concrete placement and to avoid excessive deflection of the
reinforcing steel. All intersections around the perimeter of the reinforcing steel mat should be tied.
Elsewhere within the reinforcing steel mat, the tie spacing should be not less than 0.6-m centers or
every intersection, whichever is greater. Work platforms should be supported on the forms and not the
reinforcing steel.

Mechanical finishing machines (screeds) are used to strike off the concrete to the desired profile grades.
In order to not reduce the amount of concrete cover over the reinforcing steel bars, allowances for
deflection, settlement, and camber need to be made. When the finishing machine is supported on
rails, the rail supports need to be placed to minimize or eliminate any deflection of the rail between rail
supports due to the weight of the finishing machine.

4.1. Concrete
In new structures with good-quality concrete, the concrete can protect the steel reinforcing bars from
corrosion for the service life of the structure. For steel in good-quality sound concrete –»uncontaminated»
(little or no chlorides), un-carbonated, and un-cracked – the steel is passivated and no corrosion, or a
corrosion rate that is very low, can be expected. Any corrosion-induced concrete deterioration is not
likely to reach a point where repair or rehabilitation will be required during the expected service life of
the structure.
However, the concrete quality can be violated by either chemical or mechanical means. Chemical
means are chloride diffusion, carbonation, sulfate attack, and alkali aggregate reaction, while the
primary mechanical means is cracking. Cracks in concrete allow water, oxygen, and chlorides to enter
the concrete at a faster rate and reach the reinforcing steel sooner than by the diffusion process alone.
The material variables included:
- Cementitious materials; mainly type, content and inclusion of SCM.
- Aggregate type; mainly quality and chloride ion content.
- Water-cement ratio.

The key to long-term durability of reinforced concrete structures is the use of Portland cement concrete
with low permeability and adequate concrete cover. A concrete with low permeability has an improved
resistance to chloride ion penetration or diffusion. This keeps chlorides, as well as water and oxygen,
from reaching the steel reinforcing bars. An adequate concrete cover increases the amount of time
required for any chlorides to reach the steel reinforcing bars.

English-1 New Final.indd 112 12/16/13 10:32 AM


Design Life Extension of RC Structure
109

A lower water-cement ratio generally makes concrete less permeable. Although a low water-cement
ratio does not ensure that the concrete will have a low permeability. Concretes with the proper gradation
and type of fine and coarse aggregates, supplementary cementing materials and low water to cement
ratio will have a higher resistance to chloride penetration compared with those with low water-cement
ratio alone. Concrete also needs to be properly proportioned and well-consolidated. A decrease in the
water-cement ratio results in concrete with a reduced porosity and a reduced permeability. A reduction
in water-cement ratio and the use of supplementary cementing materials, especially silica fume, are
very effective strategies for reducing the permeability of the hardened concrete. With adequate cover,
concrete with lower water-cement ratios perform better than those with higher water-cement ratios.
Changes in the water-cement ratio do not significantly influence resistivity at an earlier age but
significantly affect it at later age. Table 10 show the risk of corrosion as related to concrete resistivity. The
improved performance of concretes with lower water-cement ratios is due to a reduction in concrete
permeability and an increase in resistivity.

Table 10: Resistivity ranges related to the risk of corrosion


Resistivity (kW.cm) Corrosion Risk
> 100 Nil
50 – 100 Low
10 – 50 Moderate
< 10 High

Supplementary cementing materials (SCM) can be used to enhance the corrosion-control potential of
the concrete by reducing permeability. Some common admixtures used are fly ash, blast-furnace slag,
and silica fume. SCM contribute to a reduction in permeability and a reduced chloride diffusion rate.
The sources of ground granulated blast-furnace slag and fly ash should be evaluated for changes in
their chemistry. Any changes can significantly affect the characteristics of the concrete and ultimately
its performance. Concrete mixes containing silica fume are highly impermeable to chloride penetration
and are resistant to the flow of corrosion currents due to their high electrical resistivity. Compressive
strengths are also higher. Silica fume has been shown to offer the largest and most consistent reduction
in penetration rates for chloride ions in concrete. However, these mixes are more susceptible to cracking.
For silica fume mixes, a superplasticizer is needed to improve workability without increasing the water
demand of the mix. Also, the use of ternary blends of mineral admixtures with Portland cement, such
as slag and silica fume, proved to be very efficient in very aggressive environments.

Cement type appears to influence the diffusion of chloride ions through concrete. This is achieved by
binding chloride ions and reducing its concentration from the pore water and reduces the amount
of free chlorides available to participate in the depassivation and corrosion processes. The amount of
free chloride ions in the pore water is more important than the amount of total chloride ions. Concrete
mixes containing cements with high C3A contents and ground granulated blast-furnace slag exhibit
a significantly greater ability to bind chlorides. Table 11 shows the limits set for chlorides in the ACI
318M-05. When concrete members are expected to be exposed to chlorides, it is advisable to keep any
chlorides added to the concrete from the mix ingredients to a minimum. The chloride limits in concrete
for new construction given by ACI 318M-05, are intended to minimize the risk of chloride-induced
corrosion.

Table 11 Recommended chloride limits for new construction (ACI 318M-05)

English-1 New Final.indd 113 12/16/13 10:32 AM


110 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

Corrosion can initiate at chloride concentrations as low as 0.71 kg/m3, approximately 0.15% for 400
kg of cement mix in dry conditions. For wet conditions and 400 kg of cement mix, the ACI criteria
allows for chloride concentrations up to 0.40 kg/m3, which leaves little room for the ingress of
additional chlorides from the surrounding environment.

4.2. Concrete Admixtures


Lowering water-cement ratio and the inclusion of supplementary cementing materials generally
makes concrete less permeable. All these will have a significant impact on the concrete’s workability.
Reduced workability and the inability to produced well compacted concrete will negate the effect
desired by lowering water-cement ratio and the inclusion of supplementary cementing materials.
As partial compaction increases the porosity and reduced the concrete quality. Therefore, the
use of concrete admixtures such as normal range water reducers (Type A, ASTM C494) and high
range water reducers (Type F, ASTM C494) and superplasticizer (Type I, ASTM C1017) will help
regain the concrete workability. Also, it is frequently the use of retarders in combination with
workability enhancing admixtures, such as Type D admixtures (ASTM C494) and Type II (ASTM
C1017). It should be emphasized that the dosage of the admixture to be used should be determined
in accordance of the concrete mixture proportions and the manufacturer data sheet of the used
admixture. Manufacturers are to be consulted regarding the type and dosage of each admixture
type with respect to the concrete mixture proportions and the required property improvement. Also,
manufacturers and admixtures data sheet are to be consulted regarding overdose of the admixture
and the expected side effects. The side effect of the overdose differs from one type of admixture
to other and for different manufacturer as well.In case of combining more than one admixture in a
concrete mixture, manufacturer should be consulted as for the compatibility of proposed admixtures
and also according to recommendations of ASTM C494.

Also, waterproofing admixtures could be used to improve the concrete impermeability characteristics.
It is highly recommended to consult manufacturers for the compatibility of such admixtures with
cement type and other admixtures used in the mix. Improper selection with respect to compatibility
or over dosage of such admixtures usually results in unrecoverable side effects.

4.3. Corrosion Inhibitors


Corrosion inhibitors are chemical admixtures added to Portland cement concrete mixes during
batching, usually in very small concentrations, as a corrosion-protection measure. Corrosion inhibitors
are a viable corrosion-protection measure for the long-term durability of both conventionally
reinforced and prestressed concrete bridge structures. When used as part of a multiple-strategy
corrosion-protection system, they are promising materials to delay the onset of steel corrosion.

Inhibitors are often used in combination with low-permeability concrete and usually they have the
effect of increasing the threshold chloride concentration needed to initiate corrosion. Inhibitors may
also reduce the subsequent corrosion rate after the initiation of corrosion, which ultimately leads to
less corrosion-induced concrete deterioration.

Inhibitors may have an effect on the corrosion process after corrosion initiation. An insufficient
dosage will have a negative impact on corrosion progression. Some inhibitors will have an effect on
chloride transport and can reduce the rate of chloride ion migration.

Corrosion inhibitors are either inorganic or organic and, in general, are classified based on their
protection mechanism. They can protect by affecting the anodic reaction, the cathodic reaction, or
both reactions (mixed). An active type of inhibitor (anodic) facilitates the formation of an oxide film
on the surface of the steel reinforcing bars.

English-1 New Final.indd 114 12/16/13 10:32 AM


Design Life Extension of RC Structure
111

There are different major commercially available corrosion inhibitors:


• Rheocrete 222+ • PROTECTOSIL CIT
• Ferrogard 901 • Sika CNI
• Ferrogard 903 • Conplast CN
• Conplast CNI

Also, there is imbedded corrosion inhibiting systems such as; Vector Galvashield XP (from Vector
Corrosion Technologies – www.vector-corrosion.com), Mapeshield I (from MAPEI – ww.mapei.com),
and SENTINEL-GL (from The Euclid Chemical Company – www.euclidchemical.com), which could be
embedded in the concrete or the repaired portions besides the reinforcing steel to prevent corrosion
of the reinforcement. These systems could be used in new construction and repaired structures.
• Rheocrete 222+
Rheocrete 222+ is an organic corrosion-inhibiting concrete admixture. It is manufactured and
marketed by BASF. The recommended dosage rate Rheocrete 222+ is 5 liters/m3. The dosage rate
is not adjusted for the anticipated corrosiveness of the expected service environment. The dosage
rate is designed to provide optimum corrosion protection of reinforced concrete structures in severe
corrosion environments. It is typically added to the concrete batch water.
• PROTECTOSIL CIT
PROTECTOSIL CIT is an advanced organo functional silane based corrosion inhibitor. It is manufactured
and marketed by BASF. It is low viscosity clear liquid, designed to be applied to the surface of
reinforced concrete structures. The recommended dosage rate of PROTECTOSIL CIT is 600ml/m²
applied in two or three coats Horizontal surfaces: 2 coats @300ml/m² Vertical or overhead surfaces:
3 coats @ 200ml/m².
• Ferrogard 901
Ferrogard 901 is manufactured and marketed by Sika Corporation. It is combination of organic and
inorganic inhibitors. It protects the steel reinforcing bars by forming a continuous monomolecular
film on the steel surface and covers both the anodic and cathodic sites (mixed type). This film consists
of an adsorbed layer of amino-alcohol that leads to the formation of insoluble iron oxide complexes.
These stabilize the oxide surface and inhibit further corrosion. The film is typically 108- μm thick and
also acts as a barrier to aggressive ions migrating through the concrete.

The recommended dosage rate for Ferrogard 901 is 12 kg/m3 of concrete. The admixture is typically
added with the mixing water or added at the same time into the concrete mixer.
• Sika CNI
Sika CNI is manufactured and marketed by Sika Corporation. It is a calcium nitrite-based admixture.
The recommended dosage rate for Sika CNI is 10 to 30 lit/m3 of concrete depending on the severity
of the corrosion environment. The admixture is typically added with the mixing water or added at
the same time into the concrete mixer.
• Ferrogard 903
Ferrogard 903 is manufactured and marketed by Sika Corporation. It is a surface applied corrosion
inhibitor. It is based on organic and inorganic compounds. Its use both delays the start of the corrosion
and reduces the corrosion rate. It is suitable for use in hot and tropical climates. The recommended
dosage rate is 0.50 kg/m², and for very dense low permeability concrete lower dosage could be used
but should not be less than 0.30 kg/m².
• ConplastCN & Conplast CNI
Conplast CN and Conplast CNI are manufactured and marketed by FOSROC. Both are inorganic
inhibitors based on calcium nitrite. Both are supplied in solution form that could be dissolved in
the mixing water. Conplast CNI is modified for good slump retention and retardation to offset the
acceleration setting normally associated with calcium nitrite. Typical dosage levels range from 7.5 to
22.5 lit/m3 of concrete. Because of the high dosage level, the w/c ratio should be adjusted to include
the water added to the mix in the admixture.

English-1 New Final.indd 115 12/16/13 10:32 AM


112 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

4.4. Externally Applied Protective Barriers


The application of external coating, surface treatment or barrier on the existing concrete provides a barrier
that prevents the intrusion of chloride ions, moisture, and oxygen that are necessary for corrosion to
continue. Coatings and surface treatments are effective means of achieving the design life and controlling
concrete degradation (ACI 201.2R-01).

In selection of surface treatments/coatings for concrete durability, focus should be paid to field data/
experience. The protection strategy will influence the selection of the concrete surface treatment systems.
With a strategy where additional protection measures are used as “insurance”, the permanence of the surface
treatments/coating is important but not critical. With a strategy where additional protection measures are
integral parts in durability risk evaluation, the surface treatments/coatings may require to last the design life
of the structure.

To be effective in protecting concrete, a barrier material should have certain basic properties as follows:
• When the barrier material is exposed to chemicals from the environment, the chemicals should not
cause swelling, dissolution, cracking, or embrittlement of the barrier material.
• The chemicals should not permeate or diffuse through the barrier to destroy the adhesion between it
and concrete.
• The abrasion resistance should be adequate to prevent the barrier material from being removed during
normal service.
• The adhesive bond strength of a non-bituminous barrier to the concrete should be at least equal to the
tensile strength of the concrete at the surface; this bond is affected by the cleanliness of the interface
when the barrier material is being applied.

There is no guarantee that materials made by different manufacturers will perform similarly, even when
classified as the same generic type. In addition, the application characteristics, such as ease of applying the
material to concrete, sensitivity to moisture on a concrete surface, or limited temperature application range,
will affect performance.

The thickness of the barrier required will depend on the severity of the environment. Table 12 shows the
general categories for protective barrier systems (ACI 201.2R-01). Barrier selection should be based on
testing or past experience. If tests are to be conducted, the entire barrier system should be applied to
concrete specimens before exposing them to the actual environment or one that simulates as closely as
possible this environment. If a selection must be made before tests of sufficient duration (as agreed between
manufacturer and user) can be conducted, the barrier supplier should be asked to supply fully documented
case histories where his or her system has protected concrete under the same or similar environmental
conditions. The selection of a reliable barrier manufacturer and applicator is as important as the selection of
the barrier itself.

Most barrier materials are formulated for use over concrete will develop and maintain adhesive bond strength
greater than the tensile strength of the concrete, provided that the surface is properly prepared. The surface
should be free of loose particles, dirt, dust, oil, waxes, and other chemicals that prevent adhesion. Moisture
within the concrete can affect the ability of a barrier system to adhere to the surface if water vapor diffusing
out of the concrete condenses at the concrete-barrier interface before the barrier has had an opportunity to
cure. Concrete should be dry before the barrier material is applied. Not only is surface moisture, but moisture
within the concrete can also affect the ability of a coating to adhere to the surface. For some barrier systems,
a qualitative moisture test for concrete is recommended and helpful.

Moisture content is considered excessive if moisture collects at the bond line between the concrete and
the barrier material before the barrier has cured. This is evaluated by taping a 1.2 x 1.2 m clear polyethylene
sheet to the concrete surface and determining the time required for moisture to collect on the underside
of the sheet. The time for moisture to collect should be compared with the time required for the barrier
material to cure, a value that should be supplied by the material manufacturer. If it cures in a time that is less
than that required for moisture to collect, it can be concluded that the concrete is adequately dry. Also the
ambient conditions, that is sunlight, temperature, and humidity, during the test should simulate, as much as
practicable, the conditions existing during application and curing of the barrier.

English-1 New Final.indd 116 12/16/13 10:32 AM


Design Life Extension of RC Structure
113

Table 12: General categories for protective barrier systems (ACI 201.2R-01)

severity of chemical Total nominal thickness Typical protective barrier systems Typical but not exclusive uses of protective systems
environment range in order of severity
• Protection against deicing salts
• Improve freezing-thawing resisance
Polyvinyly butyral, polyurethane, epoxy, acrylic, • Prevent staining of concrete
styrene-acrylic copolymer asphalt, coal tar, • Use for high-purity water service
Mild Under 40 mil (1mm)
chlorinated rubber, vinyl, neoprene, coal-tar • Protect concrete in contact with chemical
epoxy, coal-tar urethane solutions haveing a pH as low as ȋ, depending
on the chernical
• Protect concrete from abrasion and
Sand-Àlled epoxy, sand-Àlled polyester, sand-
Intermediate 125 to 375 mil (3 to 9 mm) intermittens exposure to dilute acids in
Àlled polyurethane, bituminous materials
chemical, dairy,and food-processing plants
• Protect concrete tanks and Áoors during
Glass-reinforced epoxy, glass-reinforced polyester, continuous exposure to dilute material (PH is
Severe 20 to 350 mil (1/2 to 6mm) procured neoprene sheet, plasticized polyvinyl
chloride sheet bleow 3) organic acids, salt solutions, strong
askalies
Composite systems: • Protect concrete tanks during continuous or
20 to 280 mil (1/2 to 7mm) (a) Sand-Àlled epoxy system topcoated with a intermittent immersion, exposure to water,
Severe pigmented but unÀlied epoxy dilute acids, strong alkalies, and salt solutions
Over 250 mil (6mm) (b) Asphalt membrane covered with acid-proof • Protect concrete from concentrated acids or
brick using chemical-resistant mortar combinations of acids and solvents.

4.5. Corrosion-Resistant Reinforcement


Steel reinforcing bars are subject to various severe environments before being placed in concrete
(during transportation, storage, and installation) and in service while embedded in the concrete.
During storage, reinforcing bars can be exposed to condensation, rain, harmful chemicals, and
seawater. After the reinforcing bars are embedded in concrete, they are initially exposed to a high
pH and moist environment, which, over time, is changed to high and low pH areas, high chloride,
and moist environment.

The use of corrosion-resistant reinforcing bars can provide an additional layer of corrosion protection
for reinforced concrete structures. Although there is a significant initial cost for corrosion resistant
reinforcing bars, the increase in overall initial structure cost may be justified. An extended service life
decreases life-cycle costs. When considering the consequences of unintended low concrete cover,
poor curing, permeable concrete, concrete cracking, and harsh service environments, the use of
corrosion-resistant materials may be very cost-effective, especially when repair of corrosion-induced
deterioration is costly and/or hard to do. A 75 to 100 years design life can be achieved by extending
the corrosion initiation period and reducing corrosion rates. The use of reinforcing material that is less
sensitive to depassivation can extend the corrosion initiation period. A reduced corrosion rate results in
a decreased amount of metal loss and extends the time period until subsequent cracking. The corrosion
resistant reinforcing bars include galvanized steel bars, stainless steel bars and non-metallic reinforcing
bars (FRP).

• Stainless steel bars


Stainless steel (eg. type 304 and 316) bar is undoubtedly more resistance than normal black steel
bar against chloride induced corrosion of reinforcement (ACI 201.2R-01, ACI 222R-01, ACI 362.1R-
00, ACI 365.1R-00 & ACI 301M-05). The selection of stainless steel reinforcement or normal steel
reinforcement depends on cost and protection strategy. It is wasteful to consider stainless steel
reinforcement as an insurance type protection.

Stainless steel reinforcement can be used in conjunction with black steel reinforcement. Practically
there has been no reported problem of galvanic corrosion due to stainless steel/black steel connection
in chloride-free concrete. In the presence of chloride, this can be a serious issue. Therefore, specifiers
must ensure that in mixed usage mode, the black steel is situated beyond the estimated zone of
chloride affected area in concrete during the design life.

English-1 New Final.indd 117 12/16/13 10:32 AM


114 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

• Galvanized Reinforcing Steel Bars


Hot-dipped galvanized coatings for reinforcing steel in concrete have been used since the 1940s. ASTM
A767, “Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement”
specifies the requirements for the galvanized coating. A Class I coating has a zinc coating weight of
approximately 1,070 g/m2 and a Class II zinc coating has a coating weight of approximately 610 g/m2.

Both laboratory experiments and ongoing field surveys of existing structures has demonstrated that
the galvanizing of steel rebar extends the service life of many types of reinforced concrete structures
(ACI 201.2R-01, ACI 222R-01, ACI 362.1R-00, ACI 301M-05 & ACI 222.2R-01).

Though the cost of galvanizing may double the price of the reinforcing steel itself, the overall
premium for the use of galvanized rebar in mass concrete is often less than 10% of total concreting
costs. This premium reduces considerably in buildings and large constructions.

Hot-dip galvanizing produces a tough and adherent coating on steel which resists abrasion and
fairly heavy handling, and which can be stored, handled and transported in much the same way
as black steel. Other than following general guidelines when bending and fabricating galvanized
steel, no special precautions are required to protect the coating against light mechanical damage.
In the design and construction of reinforced concrete utilizing galvanized rebar, the same design
parameters and construction practices are used that apply to conventional black steel reinforcement.

Though zinc can be applied to steel by a number of commercial processes, each producing a
characteristic range of thickness and coating structure, hot dipping should always be specified. Hot
dipping involves the immersion of the steel bars in molten zinc at about 450°C and holding for a
sufficient period to allow the development of a metallurgically bonded coating of zinc and zinc-iron
alloys on the base steel. The minimum specified coating thickness on steel products greater than 5
mm thick should be 84 microns, which is equivalent to a coating mass of 600g/m2 per surface. In
routine processing, hot dipping results in coatings that would generally be at least 100120- microns
thick. Each successive layer of the coating from the steel substrate outwards contains a higher
proportion of zinc and the layers are harder than ordinary steels. This feature, combined with the
good adherence of the coating, gives the coating its good abrasion and impact resistance.

It is generally most economical to process straight lengths of reinforcing bar with all fabrication being
done after galvanizing. During fabrication, the tendency for cracking and flaking of the coating in the
area of the bend increases with bar diameter and the severity and rate of bend. The use of large bend
diameters, typically 58-X the bar diameter, can minimize damage to the coating. Some cracking and
flaking of the coating at the bend is common, and shall not be the cause for rejection. Should repairs
be required, an organic zinc rich paint containing a high proportion of metallic zinc is generally used.
As an alternative, to post-galvanizing fabricating, bars bent to special shapes (ties, stirrups etc) or
complete sections such as prefabricated column forms or precast cages can be galvanized. This offers
the distinct advantage of little or no fabrication-related damage to the coating. Difficulties in the
marking, handing and transportation of prefabricated pieces or sections, and possible scheduling
delays, make this option somewhat more expensive.

• Non-Metallic Reinforcing Bars


Recently, composite materials made of fibers embedded in a polymeric resin, also known as fiber-
reinforced polymers (FRP), have become an alternative to steel reinforcement for concrete structures.
Non-metallic reinforcements are alternative solution to solving the problem of managing chloride
attack. These include glass, carbon or aramid set in a suitable resin to form a rod or a grid. The use of
these non-metallic reinforcements has shown good performance in several projects worldwide (ACI
440R-07 & ACI 440.1R-06).

Fiber reinforced polymer (FRP) composite rebar have the potential to address the corrosion deficiency.
FRP rebar can be used as non-prestressed reinforcement in concrete for members subjected to
flexure, shear, and compression loadings. FRP composite rebars are totally resistant to chloride ion
attack, offer a tensile strength of 1½ - 2 times that of steel, and weigh only 25% of the weight of
equivalent size steel rebar. The following are the main features and benefits for FRP reinforcing rebars:

English-1 New Final.indd 118 12/16/13 10:32 AM


Design Life Extension of RC Structure
115

• Non-Corrosive: will not corrode when exposed to a wide variety of corrosive elements
including chloride ions.
• High Strength-to-Weight Ratio: provides good reinforcement in weight sensitive applications.
• Non-Conductive: provide excellent electrical and thermal insulation.
• Excellent Fatigue Resistance: performs very well in cyclic loading situations.
• Good Impact Resistance: resists sudden and severe point loading.
• Magnetic Transparency: not affected by electromagnetic fields; excellent for use in MRI and other
types of electronic testing facilities.
• Lightweight: easily transported in the field without need for expensive heavy lifting equipment.

Commercially available FRP reinforcing materials are made of continuous aramid (AFRP), carbon
(CFRP), or glass (GFRP) fibers embedded in a resin matrix. Typical FRP reinforcement products are
grids, bars, fabrics, and ropes. The bars have various types of cross-sectional shapes (square, round,
solid, and hollow) and deformation systems (exterior wound fibers, sand coatings, and separately
formed deformations). Figure 2 shows samples of different GFRP reinforcing bars.

The physical characteristic of the surface of the FRP bar is an important property for mechanical
bond with concrete. Three types of surface deformation patterns for FRP bars commercially available
are shown in Figure 3.

Bending FRP rebars made of thermoset resin should be carried out before the resin is fully cured. After
the bars have cured, bending or alteration is not possible due to the inflexibility or rigid nature of a
cured FRP bar. Because thermoset polymers are highly cross-linked, heating the bar is not allowed as
it would lead to a decomposition of the resin, thus a loss of strength in the FRP.

The mechanical behavior of FRP reinforcement differs from the behavior of steel reinforcement.
Therefore, changes in the design philosophy of concrete structures using FRP reinforcement are
needed. FRP materials are anisotropic and are characterized by high tensile strength only in the
direction of the reinforcing fibers. This anisotropic behavior affects the shear strength and dowel
action of FRP bars, as well as the bond performance of FRP bars to concrete. Furthermore, FRP
materials do not exhibit yielding; rather, they are elastic until failure. Design procedures should
account for a lack of ductility in concrete reinforced with FRP bars.

Figure 2. Commercially available GFRP

Figure 3. Surface deformation patterns for commercially


FRP rebar (ribbed-sand coated-ribbed and sand coated)

English-1 New Final.indd 119 12/16/13 10:32 AM


116 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

4.6. Cathodic prevention and protection


Cathodic protection (CP) is a corrosion control method that imposes an external voltage on the steel
surface in a manner that forces the steel to become cathodic (reduction reactions are favored and
anodic reactions, which result in metal loss, are decreased), thereby mitigating corrosion. In simple
terms, CP transfers the oxidation (anodic) reactions, which result in metal loss (and thereby corrosion)
of the rebar, over to the anode of the CP system. Therefore, selection of the proper anode material for
the application is critical, since anode failure results in CP system failure (ACI 201.2R-01, ACI 362.1R-
00, ACI 365.1R-00 & ACI 222.2R-01).

However, while maintenance cost can be low, installation of this measure needs high capital
investment. The high capital cost may be “justifiable” for new structures of high importance (disruption
in service can result in high economic loss) or repair and maintenance is difficult or impossible due
to limited access.

The primary strength of CP is that it can mitigate corrosion after it has been initiated. Although CP
is often placed on pipelines, underground storage tanks, and other structures during construction,
it is generally installed on bridge members only after corrosion has initiated and some amount of
deterioration has occurred. The primary reason for not installing CP systems on bridge components
during construction is that corrosion often does not initiate for 10 to 20 years following construction;
therefore, the CP system maintenance and a large portion of the CP system design life would be used
on a structure that is not corroding. When properly applied and maintained, CP mitigates corrosion
of the reinforcing steel and extends the performance life of concrete structures.

CP systems are characterized by the source of the driving voltage that forces the rebar to become
cathodic with respect to the anode. The two principal methods for applying CP are impressed-current
CP and sacrificial (galvanic) anode CP. In an impressed-current CP system, an external power source
is used to apply the proper driving voltage between the rebar and the anode. For impressed-current
systems, the anode can be a wide range of materials since the driving voltage can be adjusted to suit
the application and anode material selected. For a sacrificial anode CP system, the driving voltage
is created by the electrochemical potential difference between the anode and the rebar. Therefore,
selection of the anode material is more limited.

Two features of cathodic protection, which can be usefully adopted in formulating protection
measures for concrete structures, are continuous monitoring of steel condition and preparation of
reinforcement for electrical continuity. These are simple procedures involving embedding reference
electrode (or corrosion sensor or even some indirect means such as embedded studs for resistivity
measurement) in concrete at areas of high corrosion risk of reinforcement. Continuous/regular
monitoring of the corrosion condition of the reinforcement can provide critical inputs into the
decision making process.

5. SUMMARY
To enhance the durability of existing and future concrete structures can be summarized in the following:
• Exposure conditions for exterior and underground structures in Dubai are classified as severe to
very severe depending on the availability of moisture.
• Specification of minimum concrete quality (i.e. minimum strength, or max w/c ratio, or minimum
cement content, or cement type or minimum concrete cover or maximum crack width) for
expected exposure conditions.
• Guideline for mix design of minimum concrete quality for Dubai exposure conditions are:
o Minimum cement content of 350 kg/m3, maximum w/c ratio of 0.45, and minimum
compressive strength of 30 MPa are considered the minimum concrete quality for severe
exposure conditions in Dubai.
o Minimum cement content of 375 kg/m3, maximum w/c ratio of 0.40 and minimum compressive
strength of 35 MPa are considered the minimum concrete quality for very severe exposure
conditions in Dubai.

English-1 New Final.indd 120 12/16/13 10:32 AM


Design Life Extension of RC Structure
117

o Implementation of supplementary cementing materials (SCM) such as slag, silica fume and
fly ash is highly recommended in very severe exposure conditions and for desired extended
service life.
• Guideline for structural design for Dubai exposure conditions are:
o A minimum concrete cover of 30 – 50 mm is required for exterior, underground and
unprotected structures. For Protected Structures a minimum concrete cover of 20 – 30 mm is
required.
o For interior air conditioned sealed environment the minimum concrete cover is 15 – 20 mm.
o A maximum crack width of 0.20 mm is allowed for underground structures without water
table. In case of surface applied protection such as finishes and surface sealants and barriers
the crack width could be increased to 0.30 mm.
o A maximum crack width of 0.20 mm is allowed for underground structures with water table
and water retaining structures provided the application of surface protection such as finishes,
surface sealants and barriers.
o A maximum crack width of 0.10 mm is allowed for prestressed concrete structures.
o For un-exposed superstructure elements the maximum crack width allowed is 0.30 mm.
o For surface finished or protected concrete structures, it is required the removal of the surface
finish/protection (i.e. window opening) in order to assess the crack width at the concrete
surface.
• Poor quality construction is a frequent source of inadequacies in most of concrete structures.
• Improvements in construction practice and supervision. Priority should be given to quality
control during construction.
• Durability tests should be specified for concrete acceptance besides strength tests, such as
Rapid Chloride Permeability Test (ASTM C1202), Rate of Water Absorption (ASTM C1585), Water
Absorption Test (ASTM C642) and Water Penetration Test (DIN 1048).
• Concrete resistivity is a reasonable test to evaluate reinforcement corrosion protection for the
concrete.
• Implementation of corrosion protection system(s).
• A multiple corrosion protection systems incorporating more than one protection system in
conjunction with each other can be implemented in concrete structures in extremely severe
environment or for desired extended service life.

English-1 New Final.indd 121 12/16/13 10:32 AM


118 VIII - IMPROVING CORROSION RESISTANCE CHARACTERISTICS

6. REFERENCES
• ACI 201.2R-01, «Guide to Durable Concrete», ACI Manual of Concrete Practice 2008.
• ACI 222R-01, «Protection of Metals in Concrete against Corrosion», ACI Manual of Concrete
Practice 2008.
• ACI 222.2R-01, «Corrosion of Prestressing Steel», ACI Manual of Concrete Practice 2008.
• ACI 224R-01, “Control of Cracking in Concrete Structures”, ACI Manual of Concrete Practice 2008.
• ACI 301M-05, «Specifications for Structural Concrete», ACI Manual of Concrete Practice 2008.
• ACI 318M-05, “Building Code Requirements for Structural Concrete & Commentary”, ACI Manual
of Concrete Practice 2008.
• ACI 362.1R-00, «Guide for the Design of Durable Parking Structures», ACI Manual of Concrete
Practice 2008.
• ACI 365.1R-00, «Service-Life Prediction – State-of-the-Art Report», ACI Manual of Concrete Practice
2008.
• ACI 440R-07, «State-of-the-Art Report on Fiber Reinforced Plastic (FRP) Reinforcement for
Concrete», ACI Manual of Concrete Practice 2008.
• ACI 440.1R-06, «Guide for the Design and Construction of Concrete Reinforced with FRP Bars», ACI
Manual of Concrete Practice 2008.
• BS 53281:1997-, “Concrete-Part 1: Guide to Specifying Concrete”.
• BS 81101:1997-, “Structural Use of Concrete-Part 1: Code Practice for Design and Construction”.
• BS 81102:1997-, “Structural Use of Concrete-Part 1: Code Practice for Special Circumstances”.
• BS-EN 2061:2000-, “Concrete-Part 1: Specification, Performance, Production and Conformity”.
• CIRIA C5772002-, “Guide to the Construction of Reinforced Concrete in the Arabian Peninsula”, the
Concrete Society Special Publication CS 136, Editor Mike Walker.

English-1 New Final.indd 122 12/16/13 10:32 AM


Design Life Extension of RC Structure
119

English-1 New Final.indd 123 12/16/13 10:32 AM


English-1 New Final.indd 124 12/16/13 10:32 AM
IX –REPAIR AND STRENGTHENING OF STRCUCTURES Design Life Extension of RC Structure 121

IX - REPAIR AND STRENGTHENING


OF STRCUCTURES

English-1 New Final.indd 125 12/16/13 10:32 AM


122 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

3. INTRODUCTION
Although durable, buildings constructed using reinforced and prestressed concrete have a finite
service life. When exposed to harsh environments and chemicals, these structures may experience
significant deterioration, which typically occurs in the form of steel corrosion, concrete spalls,
delamination and cracks. Some of the reinforced or prestressed concrete structures in Dubai have
reached the end of their planned service life and shown deterioration in the form of steel corrosion,
concrete cracking and spalling. In addition, much of the concrete is custom made for almost every
job, using local materials of varying quality, some designs that are not standard and accelerated
construction processes that sometimes sacrifice quality in the interest of meeting a schedule. In
addition, many of these structures were built to carry loads that are significantly smaller than the
current needs. These factors indeed leave Dubai Municipality with the challenge of the assessment
of and adopting effective and economical repair and strengthening techniques and systems.
Implementing such systems and techniques is rather complicated as most of the affected structures
are occupied. However, success can be obtained if the strengthening techniques are tailored to
serve the structural use without interfering with its occupants. The concrete repair, protection and
strengthening industry is driven by deterioration of, damage to, and defects in concrete structures.

A typical value of corrosion related loss in the area of the reinforcement of 10% is the trigger for
repair of the reinforced concrete structure, otherwise adding reinforcement will be required as part
of the repair. Therefore it is a wise decision to start repair before reaching such corrosion related
steel reinforcement area loss. Most of the repair strategies presented here are for such a case where
corrosion related loss is less than 10%.

4. STRATEGY OF STRUCTURAL REPAIR AND REHABILITATION


Flow chart in Figure 1 provides useful guidance for the strategy that can be followed for structural
repair. Interestingly, one of the most severe and widespread problems in concrete is the internal
damage caused by the corrosive action of external chlorides on reinforcing or prestressing steel
embedded in concrete. Corrosion problems are basically caused by corrosion-process by-product
(rust) that expands up to eight times its original volume, thus creating internal pressure, which
causes the concrete to crack and spall. If not addressed at early stages, corrosion will continue to
grow rapidly, ultimately creating a safety issue due to falling concrete and loss of strength.

The assessment, design and implementation of a durable repair to an existing structure are indeed
more complex than for new construction. In addition to the unknown state of existing structural
materials, the degree to which repair materials and the existing material will act as a composite and
share loads must be addressed. Below are the steps for the repair, protection and strengthening of a
reinforced concrete structure.
Step 1: Assess damage Step 2: Management Strategy Options
• Health and Safety risks • Do nothing and monitor
• Present condition • Re-analyse the structural capacity and
• Original design approach downgrade as necessary
• Environment and contamination • Prevent or reduce further deterioration
• Conditions during construction and service • Strengthen, repair or protect all or pat of
• Conditions of use the structure
• Future use • Reconstruct all or part of the structure
• Demolish all or part of the structure

English-1 New Final.indd 126 12/16/13 10:32 AM


Design Life Extension of RC Structure
123

Figure 1. Strategy of Structural Repair


Step 3: Factors affecting Management Strategy
• Consider intended use, design life, service life, appearance and performance
• Compare with service life of the protection & repair works and repeat cycles
• Whole life cost of the strategies, including future inspection & maintenance
• Condition of substrate and methods of preparation
• Effect on structural load paths during and after repair
• Health & Safety considerations for occupiers, users & third parties
• Future environmental exposure of the structure and its mitigation

English-1 New Final.indd 127 12/16/13 10:32 AM


124 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

Step 4: Choose Repair Principle(s)


Defects in Concrete
• Protection against ingress
• Moisture control
• Concrete restoration
• Structural strengthening
• Physical resistance
• Resistance to chemicals

Reinforcement corrosion
• Preserving or restoring passivity
• Increasing resistivity
• Cathodic control
• Cathodic protection
• Control of anodic areas

Step 5: Choose Method(s)


• Choose separate principles or in combination
• Appropriate to type and cause (or combinations) and extent of defects
• Appropriate to future service conditions
• Appropriate to protection or repair option chosen
• Availability of products and systems

Step 6: Choose Materials


• Minimum performance characteristics for all intended uses
• Minimum performance characteristics for certain intended uses
• Performance characteristics for specific applications
• Health & Safety of materials and compliance with fire regulations
• Competence of personnel in using materials

Step 7: Specify ongoing requirements


• Record of protection or repair works carried out including any testing
• Instructions on inspection and maintenance to be undertaken during the remaining design life of
the repaired part of the concrete structure

4.1. Concrete Repair Steps


The steps for repair can be summarized to three main steps, these are:
• Concrete surface preparation
• Application of a suitable repair system
• After repair

4.2. Concrete Surface Preparation


Surface preparation provides a reasonable strong concrete surface, which is free from harmful
substances. The repair surface must be free of loose, weak, cracked or otherwise damaged concrete.

English-1 New Final.indd 128 12/16/13 10:32 AM


Design Life Extension of RC Structure
125

Mechanical techniques for surface treatment of concrete:


• Chipping: Jackhammer, hammer and chisel
• Hammering: Needle gun, hammering machine
• Milling: Miller
• Grinding: Grinder
• Brushing: Wire brushing, brushing machine
• Shotblasting: Shotblasting machine
• Free blasting: Gritblasting, sandblasting
• Vacu-blasting: Gritblasting with suction unit attached
• Water-abrasive blasting: Water-grit/sand blasting
• Pressure water blasting: < 40 MPa
• High pressure water blasting: 40 – 120 MPa
• Ultra high pressure water blast.: 150 – 300 MPa
• Water-vacu blasting

The figures below show demonstrative photos of some of the aforementioned techniques.

• Grinding (Figure 2)

Figure 2: Grinding

• Shot-blasting (Figure 3)

Figure 3: Shot-blasting

English-1 New Final.indd 129 12/16/13 10:32 AM


126 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

• Ultra high pressure water blasting (Figure 4

Figure 4: Ultra high pressure water blasting

• Injection with Epoxy systems (EP) or injection with Microcement (CEM) (Figure 5)

Figure 5: Epoxy injection

• Sealing crack repair: Injection with Polyurethane Systems or Injection with Acrylic Systems (Figure 6)

Figure 6: Crack sealing

• Re-bonding crack repairs: Stitch pinning with Epoxy Systems (EP) (Figure 7)

Figure 7: Crack re-bonding

English-1 New Final.indd 130 12/16/13 10:32 AM


Design Life Extension of RC Structure
127

4.3. Application of a suitable repair system


It is found convenient here to categorize repair into two types; namely crack repair and structural
repair. Crack repair is used when the defected structural member can be treated using crack
injection, sealing, or re-bonding. If the cracks are severe or as a result of structural damage where
the aforementioned crack repairs will not be effective; then we can use structural repair. In structural
repair, additional strengthening materials are usually applied to the defected structural member to
restore its capacity.

a. Crack repair
The choice of a crack repair system depends on the overall requirements regarding the concrete
crack repair. The following table provides different alternatives for crack repair:

Table (1): Alternatives for Crack Repair


Repair with Concrete
Repair with Shotcrete

Repair with Polymer Cement Concrete (PCC)


Repair with Polymer Concrete (PC)

After repair
All cement based repair systems require after treatment by means of keeping the surface moist for a certain
time after application. If after treatment is not carried out properly this can jeopardize the success of the
repair.

b. Structural Repair
Repairing the damaged surfaces of concrete can restore the structural function; protect the surface
itself or the underlying concrete and reinforcement from aggressive environments, or restore any
lost performance requirements including drainage and abrasive resistance. All repairs require initial
surface preparation, which might include abrasive or hydro blasting, chipping, milling, sanding or
chemical treatments. Systems for repairing surfaces include overlaying, resurfacing, formed repairs,
hand-troweled mortars, cast-in-place repairs, shotcrete and, in some cases, full section replacement
in case of member collapse as shown in Figure 8.

English-1 New Final.indd 131 12/16/13 10:32 AM


128 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

Figure 8: Cloumn Failure

4.4. Protection
Protection techniques are designed to extend the life of the structure by protecting it from
the attack of an aggressive environment. Systems are available in the form of coatings, sealers,
membranes, liners, cathodic protection and overlays.

4.5. Waterproofing
Waterproofing techniques prevent water from entering or exiting structures through cracks, joints
or failed water stops (Figure 9 left). Systems include replacement joints and sealants, waterproofing
membranes and crack grouting (Figure 9 right).

Figure
Figu
Fi gure 9:: Wa
re 9 Water
Wat proofing
ter pr
te p ro
ooofin and
fing an
a ccrack
nd cr grouting
racck g
grrouti
tinng ((Vision
ing Vissiion
Vi 2020)
on 2 02
0 20)
0)

4.6. Common Structural Strengthening Techniques


Strengthening is the process of adding or restoring capacity to a member or structure (Figure
10). Techniques include the addition of steel, FRP composite systems, concrete or other special
materials to existing members providing for additional strength and capacity of the structure.

English-1 New Final.indd 132 12/16/13 10:32 AM


Design Life Extension of RC Structure
129

Figure 10: Structural repair example (Vision 2020)

Structural strengthening can be subcategorized to two main cases:


A) Repair: where there is
• Insufficient reinforcement
• Corrosion of reinforcement
• Structural/fire damage

B) Adjustment to changing service conditions such as:


• Excessive deflections
• Change in use
• Seismic upgrade
• Design mistakes

Many school buildings that were originally constructed for a specific use now are being renovated or
upgraded for a different application that may require higher load-carrying capacity. Typical examples
of changing uses include the upgrade of parking garages and access ramps to carry the heavier loads
of fire trucks and emergency vehicles; the conversion of administrative buildings to storage areas or
classes with heavier load demands; and the installation of high-density filing systems in schools and
education administrative offices. As a result of these higher load demands, existing structures need
to be reassessed and may require strengthening to meet heavier load requirements.

The structural upgrade of concrete structures can be achieved using one of many different upgrading
methods such as span shortening, externally bonded steel, fiber-reinforced polymer (FRP) composites,
external or internal post-tensioning systems, section enlargement, or a combination of these techniques.
Similar to concrete repair, strengthening systems must perform in a composite manner with the existing
structure to be effective and share the applied loads. The following gives a brief description of these
methods and case-study applications. The following table includes demonstrative photos of structural
repairs.

4.6.1. Strengthening with FRP composites


Fiber-reinforced polymer (FRP) systems are paper-thin fabric sheets bonded to concrete members
with epoxy adhesive to increase their load-carrying capacity significantly. Usually carbon-based, these
systems have been used extensively in the aerospace, automotive and sport-equipment industries,
and are now becoming a mainstream technology for the structural upgrade of concrete structures.
Important characteristic of FRPs for structural repair and strengthening applications include their
non-corrosive properties, speed and ease of installation, lower cost, and aesthetic appeal. Examples
of FRP strengthening are demonstrated in figure (11) below.

English-1 New Final.indd 133 12/16/13 10:32 AM


130 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

Figure 11: FRP Strengthening

• Column Strengthening • Beam strengthening • Slab strengthening

As with any other externally bonded system, the bond between the FRP system and the existing
concrete is critical, and surface preparation is very important. Typically, installation is achieved by
applying an epoxy adhesive to the prepared surface, installing the FRP fabric into the epoxy and
then applying a second layer of the epoxy adhesive. After curing, the FRP composite will add
considerable capacity to the element despite the fact that it is a very thin laminate. This is because
the carbon FRP has tensile strength approximately 10 times that of steel. Figure 12 shows a schematic
for the structural strengthening of a utility tunnel. The utility tunnel roof originally functioned as a
pedestrian walkway.

Figure 12: Tunnel slab FRP strengthening (Vision 2020)

A new dormitory structure required the walkway to be the primary access for emergency vehicles.
Analysis of the tunnel›s top slab revealed it did not have adequate strength to carry loads from
fire trucks and other emergency vehicles. A structurally efficient, easy to install and cost-effective
strengthening option was achieved by using externally bonded FRP sheets. The strengthening
solution consisted of carbon FRP sheets bonded to the bottom of the slab, serving as additional
bottom tension reinforcement, as shown in Figure 13.

Figure 13: Carbon FRP fabric on slab underside (Vision 2020)

English-1 New Final.indd 134 12/16/13 10:32 AM


Design Life Extension of RC Structure
131

In addition, the overhanging portions of a slab were strengthened using carbon FRP bars epoxy-
bonded in grooves made on the slab›s top side. This technique is more appropriate than FRP sheets,
because the bars were bonded below the surface, thereby avoiding traffic damage to the externally
bonded reinforcement (see Figure 14).

Figure 14: Installation of FRP rod (Vision 2020)

4.6.2. Span shortening


Span shortening is accomplished by installing additional supports underneath existing members
to reduce the span length. Materials used for span-shortening applications include structural steel
members and cast-in-place reinforced concrete members, which are quick to install. Connections
can be designed easily using bolts and adhesive anchors. Span shortening may result in loss of space
and reduced headroom. An example of this upgrading method is shown in Figure 15. The structural
steel system shown was installed on a parking deck to shorten the span and carry part of the load,
transferring it to the existing supporting system.

Figure 15: Parking garage using span shortening (Vision 2020)

4.6.3. Bonded steel elements


Strengthening concrete members by using bonded steel plates was developed in the 1960s in
Switzerland and Germany. In this method, steel elements are glued to the concrete surface by a two-
component epoxy adhesive to create a composite system. The steel elements can be steel plates,
channels, angles or built-up members. Steel elements bonded to the sides or bottom of a structural
member can improve its shear or flexural strength.

English-1 New Final.indd 135 12/16/13 10:32 AM


132 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

In addition to epoxy adhesive, mechanical anchors typically are used to ensure the steel element will
share external loads in case of adhesive failure. The exposed steel elements must be protected with a
suitable system immediately following installation. Regardless of the specified corrosion protection
system, its long-term durability properties and maintenance requirements must be fully considered.

Figure 16 illustrates a schematic for the strengthening of a roof system of an elementary school in New
Jersey. The school administration wanted to install skylights on the existing roof. The roof consisted
of prestressed concrete hollow planks. Installation of the skylights required cutting openings in
the planks that would reduce their load-carrying capacity. This issue was resolved by designing a
hybrid strengthening system composed of FRP fabric and steel elements. The externally bonded
FRP strengthened the planks to be cut, while the steel elements tied the plank to the adjacent ones,
thus creating a new unit consisting of three planks with adequate capacity. In addition to the fast
application of this system, this was a less expensive solution that was also aesthetically pleasing.

Figure 16: Schematic of the hybrid strengthening system (Vision 2020)

4.6.4. External post-tensioning


The external post-tensioning technique has been effectively used to increase the flexural and shear
capacity of both reinforced and prestressed concrete members since the 1950s. With this type
of upgrading, active external forces are applied to the structural member using post-tensioned
(stressed) cables to resist new loads. Because of the minimal additional weight of the repair system,
this technique is effective and economical, and has been employed with great success to correct
excessive deflections and cracking in beams and slabs, parking structures and cantilevered members.
The post-tensioning forces are delivered by means of standard prestressing tendons or high-strength
steel rods, usually located outside the original section. The tendons are connected to the structure at
anchor points, typically located at the ends of the member. End-anchors can be made of steel fixtures
bolted to the structural member, or reinforced concrete blocks that are cast in-situ. The desired uplift
force is provided by deviation blocks, fastened at the high or low points of the structural element.
Prior to external prestressing, all existing cracks are epoxy-injected and spalls are patched to ensure
prestressing forces are distributed uniformly across the section of the member.

Figure 17 illustrates an external post-tensioning system used to strengthen prestressed double tees
damaged by vehicular impact. Four double-tee stems on an overpass located on the premises of
a university in Washington, D.C., were damaged when the driver of an over-height truck failed to
observe the posted height restriction.

English-1 New Final.indd 136 12/16/13 10:32 AM


Design Life Extension of RC Structure
133

Figure 17: Schematic for external post-tensioning system (Vision 2020)

The four stems suffered excessive concrete cracking and spalling, and damage occurred to some of
the internal prestressing steel.

Proposed solutions included replacing the damaged double tees with new ones and installing a
steel frame underneath for support. Both options would render the overpass out of service for a
longer-than-desired period. The option of an external post-tensioning system was more economical,
required less time to complete, and allowed for a strengthening system that provided active forces
and therefore was more compatible with the existing construction.

After all cracks were injected, the sides of the stems were formed and new concrete was cast to restore the
integrity of the stems. The strengthening system was then installed, and - after the concrete cured - the
external strands were stressed according to the engineer-specified forces. This structural-strengthening
option was fast and effective, saving the owner a considerable amount in construction and operation
costs.

4.6.5. Section enlargement


This method of strengthening involves placing additional «bonded» reinforced concrete to an
existing structural member in the form of an overlay or a jacket. With section enlargement, columns,
beams, slabs and walls can be enlarged to increase their load-carrying capacity or stiffness. A typical
enlargement is approximately 50 to 75mm for slabs and 75 to 150mm for beams and columns.

Figure 18 depicts details of a section enlargement used to increase the capacity of a main girder in a
university parking garage. The girder was re-evaluated because of a change in the required loading
and found to be deficient in flexure and shear. To correct the deficiency, additional flexural and shear
steel were added. The entire beam was then formed and a 4-inch jacket of concrete was cast to
enlarge the section.

Figure 18: Beam strengthening using section enlargement (Vision 2020)

English-1 New Final.indd 137 12/16/13 10:32 AM


134 IX –REPAIR AND STRENGTHENING OF STRCUCTURES

Caution
The effects of strengthening or removing part or all of a structural element - such as penetrations
or deteriorated materials - must be carefully analyzed to determine its influence on the global
behavior of the structure. Failure to do so may overstress the structural element surrounding the
affected area, which can lead to a bigger problem and even localized failure. With upgrade projects,
contractors also must deal with critical issues related to access to the work area, constructability of
the repair, noise and dust control, and type of construction materials that may not be as critical for
new construction projects.

4.7. Effect of Corrosion on Bond Characteristics


The bond strength typically increases with an increase in corrosion level up to a certain level prior to
cracking of the concrete cover after which the bond strength took place, Figure 19. This reduction
is significant in the absence of a confining reinforcement. The point where the trend of the bond
strength changes from an increase to a decrease with an increase in corrosion depends on the cover-
to-bar diameter (c/d) ratio. The change typically occurs at almost half of the amount of corrosion
required to cause cracking of the concrete cover.

Figure 19: Effect of corrosion on bond strength (fib 2000)

English-1 New Final.indd 138 12/16/13 10:32 AM


Design Life Extension of RC Structure
135

5. REFERENCES
• fib 2000, ‘’Federation International du Beton (fib) (2000). Bond of Reinforcement in Concrete’’
• International Code Council, 2003 International Building Code, International Code Council, Country
Club Hills, IL, 2002, 656pp.
• International Code Council, 2000 International Building Code, International Code Council, Falls
Church, VA, 2000, 756 pp.
• International Code Council, 2006 International Existing Building Code, International Code Council,
Country Club Hills, IL, 2006, 288pp.
• MacGregor, D.C., and Riley, G.J., «New Requirements for Old Buildings,» Structure, V.13, No.9, Sept.
2006, pp.4447-.
• Vision 2020: A Vision for the Concrete Repair, Protection, and Strengthening Industry, ACI Strategic
Development Council, Farmington Hills, MI, 2006, p.17.

English-1 New Final.indd 139 12/16/13 10:32 AM


English-1 New Final.indd 140 12/16/13 10:32 AM
X - REPAIR OF POST-TENSION STRUCTURES Design Life Extension of RC Structure
137

X - REPAIR OF POST-TENSION
STRUCTURES

English-1 New Final.indd 141 12/16/13 10:32 AM


138 X - REPAIR OF POST-TENSION STRUCTURES

1. INTRODUCTION
Evaluation of grouted post-tensioned tendons is a difficult undertaking and no single method can
be used to fully describe the damage or life expectancy of a tendon.

Corrosion of unbonded and even the bonded tendons is common for post-tensioned structures
exposed to aggressive environments. Insufficient cover over the tendons and lack of corrosion
protection at anchorages combined with exposure to chlorides through deicing materials and
coastal air lead to the corrosion of post-tensioning systems.

Barrier cables used in parking garages are similar to post-tension cables in concrete slabs and are
subject to the similar deterioration mechanisms. In some cases the failures occur more quickly since
the cables are directly exposed to the elements and do not have the added protection provided by
concrete cover. Replacing barrier cables and anchors requires the same expertise as repairing post-
tensioning tendons.

2. TYPES OF CRACKS IN POST-TENSIONED STRUCTURES


Crack types presented in section 3 of chapter III may occur also in post-tensioned structures. Post-
tensioned structures are also susceptible to the following additional crack types:

• Cracks due to Corrosion of the Post-tensioning Tendons:


o Post-tensioning tendons may corroded due to penetration of water and/or chlorides through
broken sheathing at locations where the concrete cover is eroded or broken as shown in
figure 1. Parking garages and waterfront buildings are very vulnerable to corrosion of
tendons. Figures2 and 3 show concrete spalling and the tendons corrosion.

• Cracks due to Incorrect Placement of the Post-tensioning Cables


o Concrete cracking along the lines of tendons may occur due to incorrect placing of the post-
tensioning cables as shown in figure 4. Improper placement of the cables can damage the
member by magnifying the stresses from service loads rather than counteracting these
stresses.

• Cracks due to Elastic & Plastic Shortening


o Lack of design consideration of volume changes in members caused by elastic and plastic
(creep) shortening would also result in cracking of the post-tensioned members. Cast-in-
place post-tensioned construction that does not permit shortening of the prestressed
member is susceptible to cracking in both the member and the supporting structure
as shown in figure 5. The columns supporting the post-tensioned element are subjected to
horizontal pulling in opposite directions thereby causing severe shear cracks. The shear is
also aggravated by the daytime solar heating if the structure is directly exposed to sun.

• Cracks due to Improper Design


o Concentration of high compressive stresses at the end anchorage block due to improper
design would cause crushing of concrete (figure 6).
o Insufficient amount of post-tensioned cables or insufficient stressing of cable would cause
excessive deflection and/or flexural cracking at tension side
o Over stressing of cables or unnecessary increase in the amount of tendons would result in
crushing of concrete at compression side.
o Insufficient stirrups would result in shear cracks

• Accidental Damage
o Careless floor coring during utility installation or maintenance would cause damage to the
post-tensioned cables.

English-1 New Final.indd 142 12/16/13 10:32 AM


Design Life Extension of RC Structure
139

Unprotected strand without


Protective Sheathing

Figure 1: Corrosion of unbounded post-tensioning strands (Emmons 1993)

Figure 2: Spalling of concrete (Bondy 2006)

English-1 New Final.indd 143 12/16/13 10:32 AM


140 X - REPAIR OF POST-TENSION STRUCTURES

Figure 3: Corroded tendons (Bondy 2006)

Figure 4: Concrete cracking caused by improper draping of post tensioning cables (Emmons 1993)

Figure 5: Shear cracking in concrete columns due to horizontal pulling caused by pre-stressing
(Emmons 1993)

3. REQUIREMENTS FOR NEW POST TENSION CONSTRUCTION


3.1. Grouting requirements
The PTI Specification (PTI Committee on Grouting Specifications 2003) classified the requirements
into four requirements:
1. Materials requirements— Grout consists of cement and water and may also include chemical
or mineral admixtures as well as fine sand. Pozzolans used in concrete may also be used in grout.
Silica fume and fly ash, both Class C and Class F, are the most commonly used. Because fly ash may
vary considerably from different sources, a consistent source should be used to achieve similar field
properties to the ones found during mixture development in the lab. Fly ash can potentially reduce
bleed, increase workability, and reduce permeability.

English-1 New Final.indd 144 12/16/13 10:32 AM


Design Life Extension of RC Structure
141

Silica fume has been shown to improve corrosion protection in concrete by reducing the permeability
of the concrete. In grouts, however, the particles may agglomerate because the coarse aggregate
that aids in mixing is absent. Recent testing has shown better performance with interground silica
fume cements.

Figure 6: Crushing of concrete due to concentration of stresses at the end anchorage of tendons

Chemical admixtures used in grout have included high range water-reducing admixtures, anti-bleed
admixtures, expansive admixtures, and corrosion inhibitors. High-range water-reducing admixtures
help achieve workability at low water-cementitious material ratios. For constant water content,
adding only water reducers or high-range water reducing admixtures usually increases bleed, so the
admixture should not be added beyond the mixture design amount.

Anti-bleed admixtures, also called gelling agents or stabilizers, are necessary for applications
requiring strong bleed resistance or water retention in grout. Silica fume and fly ash mildly improve
bleed resistance, but are not adequate alone for the high water-retentive properties needed for
many applications.

Expansive agents were used in grouts for many years with the premise of counteracting bleed
and voids with expansion of the grout. A small amount of expansion to offset settlement may be
desirable, but the use of foaming-type expansion admixtures should be avoided. These admixtures
may have widely varying levels of expansion when combined with different cements. They also may
cause an interconnected air void system, leading to higher permeability. The perceived benefit of
counteracting bleeding does not occur because bleeding continues until the grout is set.

Corrosion inhibitors have not been shown to be effective in grouts. Accelerated testing has indicated
a reduction in corrosion protection. A well-designed anti-bleed grout with low water content is
preferable over the addition of corrosion inhibitors in grout.

For any grout design, care should be taken to use consistent materials between lab testing, mixture
development, and field mixing. Materials should be stored per manufacturer’s directions and care
should be taken to make sure materials are not past their expiration date.

Grout material properties and grouting practices should be in conformance with PTI specifications
to ensure a successful grouting operation. The grout must have appropriate fluidity to pump and
retain this fluidity in a wide range of temperatures over the time frame of pumping. Bleed resistance,
is critical in preventing voided areas. Set time, chloride penetration resistance, and strength are
also important properties and are covered by the PTI Specification (PTI Committee on Grouting
Specifications 2003).

English-1 New Final.indd 145 12/16/13 10:32 AM


142 X - REPAIR OF POST-TENSION STRUCTURES

Mixing procedures and equipment can have a significant effect on grout behavior. Thixotropic grouts
tend to be mixed much more effectively with a high shear or colloidal mixer. A holding tank is then
needed to keep the grout agitated. All grouts will have different properties when mixed with various
types of mixers and different mixing times. Both over-mixing and under-mixing can be problematic.
The same equipment that will be used in the field should be used for property testing and any field
mockup tests. Backup equipment should be on hand in case of equipment malfunction during
pumping.

Proper inlets, outlets, and vents are necessary to facilitate complete filling of the duct. Vents are
placed at intermediate high points and at locations slightly downstream of the high points to ensure
that air can be expelled, particularly in a backflow situation. A vent should also be included in the
end cap at both the fixed and stressing ends of the tendon. Vents included at low points will aid in
draining out moisture. This is particularly critical in situations where entrapped water may freeze.
All inlets, outlets, and vents should have a positive shut-off valve. Past practice of bending over vent
tubes and tying with tie wire is not sufficient. Vents should be shut off in successive downstream
order, with the exception of the vents located slightly downstream of the intermediate high points,
which should be closed prior to their associated high point vent. Grout should be allowed to flow
from the vents until all visible air and water pockets are gone from the flow stream. At least 1 gal.
(3.8 L) of grout should be expelled from each vent and 5 gal. (19 L) from the outlet. The vents should
not be reopened prior to grout set. Vents should be cut flush with the concrete surface and sealed
to make sure that they do not provide a method of ingress for chloride and moisture. If grouting of
a tendon is interrupted, the continuation of the grouting process should be done in a manner that
ensures complete filling of the duct. This may require injecting grout into the last vent from which
grout has flowed, tapping a new inlet adjacent to the blockage, and/or vacuum grouting.

2. Design requirements — The design section of the PTI Specification (PTI Committee on Grouting
Specifications 2003) covers requirements for grouts divided by classes. Class A grouts are for
nonaggressive exposure applications, Class B grouts are for aggressive exposure applications, Class
C grouts are prepackaged grouts suitable for aggressive environments, and Class D grouts are for
special applications. For example, a stay cable application with grouting lifts greater than 100 ft
(30.5 m) would be considered a Class D grout. The PTI Specification (PTI Committee on Grouting
Specifications 2003) provides performance requirements for each grout class.

3. Testing requirements — Laboratory testing must be performed at a constant water content


for a given grout design. Prepackaged materials must state a maximum and minimum water-to
cementitious material ratio on the bag and laboratory testing must be performed at both water
contents. Property testing includes: set time, strength, permeability, volume change, fluidity,
bleed resistance, corrosion resistance, and wet density. Fluidity testing gives an indication of the
pumpability of the grout. A flow cone test is used to estimate fluidity. A modification is made for
thixotropic grouts because these grouts require additional energy to flow. Bleed testing includes
a wick-induced bleed test that indicates a grout’s ability to resist the filtering effects of the strand
in low vertical rise bleed situations. For more severe bleed situations, the “Test Method for Bleed
Stability of Cementitious Post-Tensioning Tendon Grout (ACI 423.9M-10)” is more appropriate (Joint
ACI-ASCE Committee 423 2010). This test requires pressurization of a cylinder of grout against a filter
to separate the water. Various pressure levels are used to give an indication of the grout’s bleed
resistance at different vertical heights (columns of grout). Field testing may include fluidity, wet
density, sampling for strength, and bleed resistance. Field mock-up tests may be required by the
engineer.

4. Construction requirements — The construction section of the PTI Specification (PTI Committee
on Grouting Specifications 2003) covers material storage, preparation for grouting, the grouting
operation, and post-grouting procedures.

English-1 New Final.indd 146 12/16/13 10:32 AM


Design Life Extension of RC Structure
143

3.2. Ducts Requirements


Traditionally, post-tensioning ducts have been fabricated of galvanized steel. Often the seams in
the metal duct are easily opened, particularly when bent. This type of duct has not proven to be an
effective barrier. In addition, once the sacrificial zinc layer is gone, the underlying steel duct has no
corrosion protection and may corrode rapidly. The corrosion product from the duct may also cause
cracking in the surrounding concrete, providing an additional direct path for moisture and chlorides.
In an aggressive environment, a ribbed plastic duct is preferred for internal tendons. The duct itself
can provide an effective barrier against ingress of aggressive agents to the grout and strand. Support
of the duct prior to concreting should be adequate to ensure the duct holds the proper profile and
concrete cover.

External ducts are typically smooth black plastic. Care must be taken that the material used in these
ducts meets specific environmental stress ratings. Poor lots of plastic duct may be prone to splitting,
effectively removing the duct as a protection barrier. Care must be taken with duct splicing to ensure
that the splice does not become an entrance point for corrodents. A splice made up of ethylene
propylene diene monomer (EPDM) marine exhaust hose with stainless steel bands used to clamp the
hose to the duct has been used as an effective splice for plastic duct. Duct tape wrapping is not an
adequate splice method for plastic duct systems.

Although galvanized steel duct is not recommended in aggressive environments, it is often used in
non-aggressive environments. The typical splice for metallic duct is a piece of oversized duct over
the splice area with each end of the splice wrapped in duct tape. Another option is a heat-shrink
splice. Both splice types are shown in Figure 7. Research has shown problems with the heat-shrink
splices on metallic duct (Salas et al. 2004) due to trapped moisture causing corrosion of the splice.

1. Duct testing—Ducts should be leak tested with compressed air prior to grouting. This testing is
done with oil-free air to assure the continuity and pressure tightness of the duct system. Guidance
for pressure testing of ducts can be found in the FDOT Specification 2007 and the fib’s Bulletin 7
article 2000. Note that methods for leak testing of assembled components for system approval differ
from methods used in field testing on in-place ducts.

Primarily, the difference relates to the air pressure used and the acceptable values for pressure loss.
If it is determined that cross-grouting is likely between two tendons and it cannot be repaired, the
affected tendons should be grouted in a single operation.

Figure 7: Galvanized duct. Top: heat-shrink splice; and bottom: duct-type splice

English-1 New Final.indd 147 12/16/13 10:32 AM


144 X - REPAIR OF POST-TENSION STRUCTURES

2. Flushing of ducts—Flushing of ducts is not recommended. Ducts should be sealed from debris prior to
tendon stressing and then again after stressing, prior to grouting. Water flushing is not effective in removing
debris and often results in pockets of entrapped water in the strand bundle. While flushing may help increase
grout flow, it is an inappropriate way to do so. The grout will often mix with the remaining water, except
where strong thixotropic grouts are used. The resulting grout can have a significantly higher water-cement
ratio and, thus, higher bleed than intended. Pockets of water may also be trapped in the duct. Flushing
of ducts is sometimes used as a means to remove water-soluble oils applied to the strand for temporary
corrosion protection. Studies have proved this not to be an effective means of removing water-soluble oils,
and this practice should be avoided. Past practice included flushing ducts with water to remove debris,
removing temporary corrosion protection products, or cooling or lubricating the ducts prior to pumping.

4. POTENTIAL PROBLEM AREAS DUE TO GROUTING IN EXISTING POST TENSION STRUCTURES


Grout properties such as fluidity, bleed resistance, low permeability, reasonable set time, stability,
and others, are all desirable in a quality grout for post-tensioning. The property that has caused the
most problems and has the biggest potential for allowing corrosion in the tendon is bleed resistance.
Bleed water from the grout is trapped in the duct and tends to rise to the highest vertical point. In
a draped tendon, this may be at a high-end anchor or an intermediate crest. In a vertical tendon,
the bleed water may only migrate to a certain intermediate height prior to grout set and thus bleed
lenses may form at several locations along the height of the tendon in addition to the top of the
tendon. In a horizontal tendon, the bleed lens may be shallow and extend over a long horizontal
distance. The tendency of a grout to bleed is accentuated by the filtering effect of seven-wire strand,
particularly in large, multi-strand tendons. The pressure head developed over vertical distances
further accentuates the bleed. Bleed should be a consideration in all grouted tendons, but the most
severe bleed situations arise from large multi-strand tendons and tall vertical tendons (such as in
bridge piers).

After the grout sets, the bleed lenses leave an ungrouted area full of bleed water. This water may
reabsorb into the grout in some cases, or may partially remain for long periods of time in the void.
The strand in the void has no protection from the high-pH grout environment and may corrode even
without outside ingress of chlorides. If chlorides or outside moisture are able to reach the duct, the
voided area provides a collection point and a potential hot spot for corrosion.

To combat the bleed problem, an anti-bleed admixture, also known as a gelling agent or stabilizer, is
often added to the grout formulation. Fly ash and silica fume can reduce bleed to some extent, but
typically a chemical anti-bleed agent is needed for multi-strand tendons and tendons with vertical
rises (including draped tendons). The amount of anti-bleed admixture required is dependent on
the vertical pressure head and number of strands in the duct. Prepackaged grouts that have bleed-
resistant properties typically contain some form of anti-bleed agent.

Many anti-bleed or water-retentive grouts also exhibit thixotropic properties. Thixotropic grouts will
be fluid when agitated, but will appear gel-like at rest. These grouts may appear too stiff to those
unaccustomed to their behavior, but a good thixotropic grout will have stable fluid behavior when
mixed or agitated. Thixotropic grouts tend to flow through the duct with a steep front, which should
fill all cavities as the grout front advances (Figure 8(a)). This type of flow can push out air and moisture
as the front passes. In contrast, water cement grout is generally more fluid and self-leveling than
thixotropic grout during injection. Consequently, water cement grout may fill the bottom of the duct
first as illustrated in Figure 8(b). In some cases, backflow may result, which is when the grout front
turns and flows back on top of the grout layer in the bottom of the duct. Backflow can entrap air in
the duct, causing voids if it is not expelled through proper venting. Draped tendon configurations
are particularly susceptible to backflow.

Voids may also result from poor construction practices and lack of quality assurance. Examples of
poor construction practices that may result in voids are listed in the following:

English-1 New Final.indd 148 12/16/13 10:32 AM


Design Life Extension of RC Structure
145

• Lack of high point vents in ducts, or improper placement of the high point vents;
• Use of improper mixing equipment for the grout leading to poor grout quality and fluidity;
• Inaccurate measurement of water for mixing of the grout;
• Lack of shut-off valves that can hold pressure on the grout when grouting is complete; and
• Blockages within the duct or grout that leaks out of the duct.

Other potential problem areas are related primarily to providing multiple robust layers of protection
between the environment and the strand. These barriers include concrete cover, membranes, anchor
protection, and the duct.

Figure 8: Typical flow patterns for: (a) thixotropic grout in high viscosity state; and (b)
plain water-cement grout

5. EVALUATING CORROSION DAMAGE


The multiple levels of protection in a grouted post tensioning system can make inspection difficult.
While duct, grout caps at anchorages, and concrete cover represent physical barriers to visual inspection
of the prestressing steel, they can also hinder the performance of non-destructive evaluation (NDE)
methods.

Visual inspection may reveal corrosion, cracking, or spalling of concrete. Substantial corrosion may be
present in the duct, even without visual signs. Visual inspection should include a focus on potential
problem areas, such as run off from a roadway onto the anchorage area, or locations where voids may
exist such as tendon high points.

Visual inspection of external tendons can reveal split duct or some indication of voided areas through
hammer sounding. It is difficult to determine the difference between a small area where the duct has
separated from the grout, versus a voided area with hammer sounding. Breaching the duct with
nails to determine whether a void exists is counterproductive, as it allows oxygen into the duct and
provides a path for ingress of contaminants. If the duct is opened or breached in any way, it should
be inspected and then repaired immediately.

5.1. Monitoring
Electrically isolated systems have been implemented in Europe for enhanced corrosion protection
and for monitoring corrosion in post-tensioned structures. In this type of system, an electrical contact
is made with the tendon and used to monitor changes in potential (voltage), indicating corrosion
activity. An isolated system requires a nonmetallic duct as well as special anchorage details that
electrically insulate the anchorage from the surrounding concrete. Corrosion measurements can
be made at any time during the life of the structure and can be valuable even without continuous
monitoring. Acoustic emission has been used in some cases to detect prestressing steel breakage in
post-tensioning tendons. While these systems can be effective, they entail continuous monitoring of
the structure to provide beneficial information.

English-1 New Final.indd 149 12/16/13 10:32 AM


146 X - REPAIR OF POST-TENSION STRUCTURES

5.2. Nondestructive methods


Although many nondestructive evaluation (NDE) methods have been successful on reinforced
concrete structures, none have proven to be comprehensive for locating voids and corrosion in
post-tensioned structures. Post-tensioned structures are typically very complex with congested
reinforcement and multi-strand tendons encased in concrete. Evaluation at the critical anchorage
zones is further complicated by congested spiral reinforcement and often large cover concrete.
NDE methods can be divided into several categories, although many permutations of these exist.
Ultrasonic methods have been successful in the medical industry as well as in the aerospace
industry. A large number of methods are included under the heading of ultrasonic, including both
two-dimensional and now three-dimensional imaging. All methods are based on high-frequency
sound waves and their echoes. Ultrasonic techniques have been evaluated in laboratory testing
for use in void detection in post-tensioning tendons, including C-Scan imaging. Although the
method shows promise in preliminary investigations, many items need to be addressed, such as
transducer type and compensation for various tendon duct cross-section curvatures, transducing
medium, limitations on depth, use in multi-strand systems, signal processing, and advanced pattern
recognition. The impact-echo technique has been useful in flaw detection in concrete including
promising results for detecting voids in post-tensioned structures. A major drawback of the impact-
echo method for use in post-tensioned structures is that it cannot detect voids inside plastic ducts.
Radiography or x-ray has been effective at detecting voids in both concrete and grouted tendons, but
radiation safety concerns and expense have limited its use. The equipment also needs access from
both sides of the tested area. Ground-penetrating radar is effective in locating embedded objects
in concrete, including non-prestressed reinforcement, tendons, and voids. Although promising
for detecting voids in plastic duct, it cannot penetrate steel duct to detect voids. Duct detection is
also complicated by the presence of non-prestressed reinforcement. Remnant magnetism has met
success in detecting fractures in prestressing steel strands, while the magnetic flux method has been
used to detect small flaws and corrosion in post-tensioning tendons. The magnetic flux equipment
must run along the duct itself, so it is limited to use in the free length of external tendons. Both
methods have limitations for potential use in internal tendons due to difficulties with interference
from non-prestressed reinforcement and tie wire. Reflectometrical impulse measurement (RIMT)
and time domain reflectometry (TDR) methods send an electrical signal along the tendon from the
anchor to detect flaws in the tendon. The anchor must be exposed to use these methods.

TDR has been used successfully for many years to detect defects in transmission lines, but only
recently evaluated for post-tensioning applications. Lab testing indicated promise for detecting
both corrosion and voids, but testing focused on specimens with a sensor wire running alongside
the steel strand. The method shows promise, but at this time requires that the sensor wire be in
place at the time of construction or destructive methods be used to place the sensor and make
contact with the tendon. Electrochemical methods, such as half-cell potential monitoring and linear
polarization for corrosion rate measurement, have been used successfully to help understand the
corrosion state of the reinforcement within a concrete structure. Other methods common in the
corrosion industry, such as electrochemical impedance spectroscopy (EIS) also have been considered
for reinforced concrete. Due to the many variables affecting each of these methods, they must be
used in coordination with other data such as visual inspection, chloride penetration samples, and
concrete resistivity to establish the likelihood and severity of corrosion. Temperature, humidity,
concrete type, bar coatings, duct type and other factors can significantly affect readings.

5.3. Exploratory methods


Because NDE methods have met only limited success in evaluation of post-tensioning tendons,
exploratory methods are often necessary. The NDE methods may be useful for focusing the invasive
methods in areas where corrosion is most likely.

Drilling may be required to determine where voids exist in the tendon and to evaluate the extent
of corrosion. A less invasive procedure involves drilling into the anchorage area through the grout
port (not into the anchorage itself ) and inserting a borescope to investigate the status of the tendon
(photo 1). Post-tensioning anchorage manufacturers have recently adapted their anchor ages so
that the grout port provides easier access for the borescope into the tendon. The borescope allows
the user to see inside the tendon with a video camera. From this perspective, even small amounts of
corrosion may appear disproportionately large, so an operator experienced with the procedure is needed.

English-1 New Final.indd 150 12/16/13 10:32 AM


Design Life Extension of RC Structure
147

Photo 1: inspection of tendons

6. REPAIR SCHEMES AND METHODS


Methods of cracks repair and strengthening systems for conventional RC structures presented earlier
in chapters V and IX can be used to repair cracks and/or strengthening of post-tensioned structures.
Additional repair schemes and methods for post-tensioned structures are given in the following
sections. Because grouted post-tensioned structures have generally performed well, there is limited
experience with their repair. The most comprehensive document in this area is available from the
Florida DOT.

6.1. Grouting of voids


Repair of grout voids is the most common type of repair encountered in grouted post-tensioned
structures. Even if no corrosion is evident, eliminating voids that expose strand is desirable. The voids
can either be filled with a cement-based grout or a resin type of product. Although a cement-based
product can restore the alkaline environment, a resin product can also be effective if it fully coats
the strand. One method of filling the void is gravity filling with a tube and funnel. This method can
effectively cover the strand bundle depending on the location of the void, but may not be able to
completely fill the void due to trapped air.

Another method is vacuum grouting. Special equipment is needed for this method. A vacuum
measuring technique is used to determine the volume of the void after which a vacuum is pulled on
the tendon and the same volume of grout is injected into the void. This method is effective in filling the
void. It does require that the void is sealed off so that the vacuum is effective.

A third method for repairing a grout void is pressure grouting. This method is effective when the
void is very large and an inlet and outlet can be drilled into the duct. This method allows the use of
conventional pressure grouting methods for the repair.

6.2. Tendon repair


Split or breached ducts should be repaired to restore the protective envelope for the tendon. In case
of heavy corrosion resulting in strand failure, the entire tendon may need to be replaced. This is a
very specialized operation that has only been completed in a few instances. The FDOT has performed
tendon replacements and has detailed information on this process. Strengthening options may include
external post-tensioning to counteract cracking, deflections, and to increase capacity. Detailed tendon
replacement and strengthening strategies are beyond the scope of this report as they tend to be project
specific. Repair design should not be undertaken without significant knowledge and experience with
grouted multistrand and bar tendon systems.

7. STRUCTURAL REPAIRS
These repairs address system failures. Signs of structural post-tensioning system distress disclosed in
the inspection can include the following and will require immediate repairs to restore strength and
integrity to the structure:

English-1 New Final.indd 151 12/16/13 10:32 AM


148 X - REPAIR OF POST-TENSION STRUCTURES

• Broken strands which can be seen coming out of the structure


• End anchorage which has lifted out of the concrete
• Cracking concrete which is running parallel to the strands
• Excessive deflections
• Punching shear cracks in slabs
• Diagonal shear / flexure cracks in beams and joists

Methods of repairing post-tensioning tendons depend upon the type of problem the system is
experiencing, as well as the type of post-tension system utilized in the original construction. The options
to be considered are:
• Full-strand replacement - Feeding new strand from one anchorage location to another existing
anchorage location. The type of sheathing used in original construction may affect the use of full-
strand replacement. For example, if a paper wrap system was used in the original construction, it
will be difficult to push the strand the full length required for the repair.
• Partial-strand replacement utilizing a variety of splicing techniques:
- Using an existing anchorage in case of good condition, splicing and stressing coupler. The
anchors may need sandblasting, painting and waterproofing.
- Installing a new anchorage in case of corroded anchors and splicing coupler (stressing at the
new anchorage location)
- Installing a new stressing coupler while utilizing a dead-end anchor location
• Replacement of broken strands with external strengthening systems, such as new post-
tensioning, CFRP, steel or concrete. The external post-tensioning system consisted of external
tendons placed on both sides of the beams with anchors located in heavily reinforced cast-in-
place concrete column collars. In addition, composite strengthening with CFRP was installed to
further strengthen the slab.

8. PREVENTATIVE MAINTENANCE
Regular inspection of strand systems for signs of distress is one of the best ways for a building owner
to prevent costly repairs. Items to be considered in the inspection of post-tensioned structures:
• Appropriate concrete cover over strands exposed to aggressive environments
• Condition of protective grease and sheathing
• Cracking near strands (P-T systems are designed to reduce or eliminate cracking, so any excess
cracking may indicate a problem)
• Condition of concrete at anchorage pockets
• Rust staining on the concrete near strands
• Grease staining on slab soffits

English-1 New Final.indd 152 12/16/13 10:32 AM


Design Life Extension of RC Structure
149

9. REFERENCES
• ACI 423.8R-10 Report on Corrosion and Repair of Grouted Multistrand and Bar Tendon Systems
American Concrete Institute, Farmington Hills, MI, 10 pp.

• PTI Committee on Grouting Specifications, 2003, “Specification for Grouting of Post-Tensioned


Structures,” second edition, Post-Tensioning Institute, Farmington Hills, MI, 60 pp.

• Emmons, concrete Repair and Maintenance Illustrated, 1993

• Bondy, K. Dirk, Evaluation and repair of existing post tensioned buildings with paper wrapped
tendons experiencing corrosion damage” PCI Journal, Vol. 4, No. 2, December 200, p. 2429-.