Sei sulla pagina 1di 6

Microsoft Project Server 2010

Customer Solution Case Study

Volvo Group Increases Project Visibility and


Control While Saving Employees Time

Overview “We use Project Server 2010 to gain more control over
Country or Region: Europe
Industry: Manufacturing—Automotive which projects we are starting and stopping, and when.
and industrial manufacturing
This means we contract out fewer assignments based
Customer Profile on sudden demand fluctuations.”
The Volvo Group manufactures
Stéphane Perrin, Director, Product Planning and Project Management Solutions, Volvo IT
commercial vehicles, and it supplies
other technologies and services. Based in
Göteborg, Sweden, it has 90,000
employees.
The Volvo Group is a leading supplier of commercial and
consumer transport solutions and customer financial services.
Business Situation
The Volvo Group wanted to improve its
Volvo IT, which provides solutions to the Group to manage its
resource management to accommodate projects, wanted to improve employee efficiency by extending
its sophisticated time-reporting
processes.
current resource management, time reporting, portfolio
management, and other project management processes. The
Solution
The Volvo Group implemented Microsoft
Volvo Group implemented Microsoft Project Server 2010 and
Project Server 2010 and customized it to made customizations to adapt to various internal processes and
interact efficiently with other software
such as Microsoft Visual Studio Team
software applications. The Group is using Project Server 2010 to
System 2008 Team Foundation Server. improve capacity planning to build its long-term strengths.
Benefits
Because of the customizations and the rich but simple user
 Value-based capacity planning interface of the Microsoft Project Web App technology, the
 Time savings
 Simple user interface
Volvo Group has cut the time spent entering project data by 40
 Quicker routes to visibility and control percent. It also has improved project visibility and control, and
 Clarified, transparent resource
management
can now provide more transparent resource management.
Situation The Volvo Group was interested in
The Volvo Group produces commercial improving its resource management. “We
vehicles—such as Renault and Mack trucks are always looking to better anticipate
and Volvo buses—and construction demand on our resources,” Stéphane Perrin
equipment. It also includes companies says. “We seek to manage our capacity
responsible for marine and aeronautical planning and our hiring of contractors in
technologies, logistics, and financial the most efficient way.” The Group tries to
services. With headquarters in Göteborg, keep its in-house staff always working at
Sweden, the Group has more than 90,000 full capacity. “We like to make sure that we
global employees, production facilities in are using resources at their optimum
19 countries, and sales activities in 180 speed. Thus we try to keep everyone
countries. It had 2009 revenues of about occupied, to never have excess capacity,”
SEK218 billion (U.S.$29 billion). says Stéphane Perrin. This philosophy
means that the Group frequently employs
Volvo IT, a global company that is part of contractors to augment the in-house staff.
the Group, develops new technologies and Thus, to most effectively manage those
business solutions for Volvo companies, internal and external resources, the Volvo
and it works for external clients, including Group is always seeking to improve its
Volvo Car Corporation (a separate entity portfolio management and capacity
since its sale to Ford in 1999), ASSA ABLOY, planning.
and the City of Stockholm. Given the
diversity of its internal and external clients, Some internal software applications did not
Volvo IT provides solutions that manage interact successfully with Project Server
many different types of projects. “These 2003 and Office Project Server 2007, which
activities include product development sometimes resulted in employees having to
projects, manufacturing, maintenance enter duplicate information. For example,
activities, training, IT projects, and an some employees spent 25 minutes per
increasing number of activities that might week entering project summary or time-
not formerly have been thought of as reporting data into SAP enterprise resource
‘projects,’ but need to be managed that planning software. Others had to enter
way,” says Stéphane Perrin, Director of such data into Microsoft Visual Studio
Product Planning and Project Management Team System 2008 Team Foundation
Solutions at Volvo IT. Server, which Volvo IT uses to implement
familiar methodologies for developing IT
The Volvo Group has sophisticated, well- applications. “The developers who work
developed project management processes with Visual Studio Team System 2008 Team
that provide control and visibility. To Foundation Server tend to use it for day-to-
support those processes, Volvo IT was day tasks, for which it is very precise,” says
using Microsoft Office Project Server 2003 Stéphane Perrin. “But we sometimes had
and Microsoft Office Project Server 2007. difficulties mapping these details to the
Although the Volvo Group was generally broader summary tasks defined by project
satisfied with the Microsoft software, Office planners.”
Project Server 2007 did not have the
flexibility to adapt to the Group’s time- The Volvo Group also wanted to streamline
reporting processes. For that reason, only some of its project management
about half of the Group’s 2,200 users had procedures. For example, managers
upgraded to Office Project Server 2007. sometimes struggled to successfully
publish information in simple and clear RAM. It plans to migrate all 2,200 of its
reports. Some employees had problems users to the new software by the end of
with the speed of the Web client, Microsoft calendar year 2010. All employees will
Office Project Web Access, because it perform their work with the Web client,
depended on the ActiveX controls on their Microsoft Project Web App. “Even the 500
client machines. Finally, the Volvo Group who formerly used the full client, Microsoft
was always seeking to use employees’ time Office Project Professional 2007, will be
in meetings most effectively. “Too much able to access everything they need in
time in meetings is spent with people Project Server 2010 using Project Web
telling their manager what they have done,” App,” says Stéphane Perrin. Because users
says Stéphane Perrin. “Sometimes that can edit project data through Project Web
would take so much time that the meeting App, the Volvo Group is significantly
would end without a decision being made.” reducing the number of project managers
who need Microsoft Project Professional
Thus, the Volvo Group wanted project 2010. And because Project Web App does
management software that could more not depend on ActiveX controls, it
flexibly work with its time-reporting responds more quickly to user commands.
processes and support efforts to improve
resource management, portfolio For the project managers who are
management, and employee effectiveness. responsible for completing project plans,
reporting is important. Those managers can
Solution use the new Timeline view in Project
The Volvo Group participated in the Professional 2010 to easily create a high-
Technology Adoption Program for level view of a project plan. They can drag
Microsoft Project 2010 so that it would be tasks into the timeline and paste the
able to provide prerelease feedback on timeline into presentations or e-mail
process flexibility. The Group was intrigued messages.
by Microsoft Project Server 2010 because it
would offer better ways of planning Project Server 2010 incorporates and
resource deployment, more features in its improves the functions of Microsoft Office
Web client, and close interoperation with Project Portfolio Server 2007. “We will use
Microsoft SharePoint Server 2010. Project Server 2010 to both manage
ongoing projects and track new initiatives
In February 2010, the Volvo Group or new ideas,” says Stéphane Perrin. “With
implemented a pilot project with 50 users. everything in the same place, we will make
It worked with Teamsquare, a Microsoft sure that we take all factors into account
Certified Partner based in Lyon, France, that before making a decision.”
specializes in project management.
“Teamsquare worked with us from very The Volvo Group has deployed Microsoft
early in the process, looking at SharePoint Server 2010 to manage
requirements and design,” says Stéphane workflows as well as documents and forms.
Perrin. “Teamsquare is a small company, Because Project Server 2010 is built on
but with wide expertise.” SharePoint Server 2010, interoperation is
seamless. For example, a SharePoint Server
Volvo IT runs Project Server 2010 on a 2010 workflow automatically routes reports
mixture of virtual servers and quad-core to various managers who may need to view
physical servers featuring 4 gigabytes of information or perform actions on it. The
“With the tools in Project Volvo Group also uses SharePoint Server Value-Based Capacity Planning
2010 to assist in training. Users of Project The Volvo Group uses the resource and
Server 2010, we can Web App can directly access a SharePoint portfolio management functions of Project
site containing slide shows, cheat sheets, Server 2010 to better manage its capacity
manage our portfolio of and frequently asked questions about the planning. “With the tools in Project Server
projects and our project management software. 2010, we can manage our portfolio of
projects and our resources working on
resources working on Furthermore, Volvo IT has made several those projects to maximize our capacity,”
customizations to help Project Server 2010 Stéphane Perrin says.
those projects to interact with other software packages.
maximize our capacity.” “Some customizations are small, such as Furthermore, the Group manages that
macros in Microsoft Office Excel 2003 capacity to build the organization’s long-
Stéphane Perrin, Director, Product spreadsheet software,” says Stéphane term strengths. “We use Project Server
Planning and Project Management
Perrin. “Others are more complex. But we 2010 to gain more control over which
Solutions, Volvo IT
greatly appreciate the software’s flexibility projects we are starting and stopping, and
and the ability it gives us to do these when,” Stéphane Perrin says. “This means
customizations.” we contract out fewer assignments based
on sudden demand fluctuations. Instead we
For example, one customization provides base contracting decisions on the value the
Project Server 2010 scheduling and time- activities add to the organization.” By
reporting information to SAP. Another contracting out fewer strategic activities,
develops Project Server 2010 reports by the Volvo Group can use less costly
querying databases in Microsoft SQL Server contractors. And by assigning more
2008 R2 Enterprise data management strategic activities to its own employees,
software. A third improves the the Group builds internal strengths.
sophistication of the dashboards that
Project Server 2010 provides to executives. Time Savings
A fourth takes advantage of improved By automating more of the collection and
interoperation, which makes it easier to dissemination of project management data,
integrate information entered in Visual Project Server 2010 is saving employees
Studio Team System 2008 Team time. For example, because of the
Foundation Server into Project Server 2010. integration with Visual Studio Team System
Overall, the customizations fully adapt 2008 Team Foundation Server, employees
Project Server 2010 to the Group’s time- no longer have to enter information in
reporting processes. multiple software applications. “The
flexibility of Project Server 2010 has led to a
great productivity enhancement for the
Benefits employees who use Visual Studio Team
The Volvo Group uses Microsoft Project System 2008 Team Foundation Server,”
Server 2010 to make better capacity- says Florent Gayet, Senior Consultant at
planning decisions. It also saves time for Teamsquare. Likewise, because of the
employees through automated processes integration between Project Server 2010
and a simple user interface, gains more and SAP, time entered by Volvo Group
visibility into projects, and improves personnel in Project Web App is
resource management. automatically routed to the proper SAP
module. Such customized links have
reduced the time spent on these tasks from
“With Project Server an average of 25 minutes per employee per The result of these improvements in
week to 15 minutes (a savings of 40 information and communication is a better
2010, we are better able percent). At the same time, the reduced risk understanding of projects, and thus more
of mistakes has improved quality. control over them. For example, Stéphane
to anticipate whether a Most important, Project Server 2010 Perrin says, “With Project Server 2010, we
project will be delayed. performs the data collection function that are better able to anticipate whether a
too often takes place in meetings. “Our project will be delayed. This gives us the
This gives us the employees can use Project Server 2010 to opportunity to shape future contracting
assign resources and activities, estimate and distribution strategies.”
opportunity to shape completion dates, and report on progress.
future contracting and This means that none of these activities Clarified, Transparent Resource
have to be done in meetings,” Stéphane Management
distribution strategies.” Perrin says. “The data already exists, With Project Server 2010, the Volvo Group
providing a base as the meeting starts. So gains a better view of its resourcing needs.
Stéphane Perrin, Director, Product
Planning and Project Management now people can spend their time in “We can use Project Server 2010 to better
Solutions, Volvo IT meetings analyzing data, rather than anticipate whether we need more
collecting it, and making good decisions resources,” says Stéphane Perrin. With that
based on that analysis.” anticipation, the Group can better manage
staff and contractors. “For example, if you
Simple User Interface have to stop a project, Project Server 2010
Volvo Group employees appreciate the makes it much easier to reassign people,
simple user interface of Project Server 2010. because you know where they are and what
The rich feature set in Project Web App they’re doing. With better visibility into our
makes it easier for managers to perform resource assignments, we are able to
their work. “In Project Web App it’s very reassign our engineers and contractors in
easy to find the action you want to only a few weeks compared to a few
perform,” says Gayet. “For example, the months in the past.”
Timeline view makes it easy to report
project status information.” Also, Project Furthermore, the Volvo Group can more
Web App is more responsive and more effectively communicate with members of
stable than previous Web clients, because it the team. “It’s important that resources see
does not depend on ActiveX controls. how their activities relate to a project as a
whole,” says Stéphane Perrin. “Too often
Quicker Routes to Visibility and Control you are asked to do something, and you do
The Volvo Group uses Project Server 2010 it, but you don’t have the awareness of why
to gain better visibility into projects. For you are doing it or where it fits in the
example, Gayet says, “With the Timeline overall project. Now, with Project Server
view in Project Server 2010, managers can 2010, our resources can see that
easily display project status, even pasting information for themselves.”
the timeline into a spreadsheet or an e-mail
message, which results in much better
transfer of information.” And with
SharePoint workflows, they can publish
reports and link to data throughout the
system.
For More Information Microsoft Project Server 2010
For more information about Microsoft Microsoft Project Server 2010 brings
products and services, call the Microsoft together the business collaboration
Sales Information Center at (800) 426- platform services of Microsoft SharePoint
9400. In Canada, call the Microsoft Server 2010 with structured execution
Canada Information Centre at (877) 568- capabilities to provide flexible work
2495. Customers in the United States and management solutions. Project Server 2010
Canada who are deaf or hard-of-hearing unifies project and portfolio management
can reach Microsoft text telephone to help organizations align resources and
(TTY/TDD) services at (800) 892-5234. investments with business priorities, gain
Outside the 50 United States and control across all types of work, and
Canada, please contact your local visualize performance through powerful
Microsoft subsidiary. To access dashboards.
information using the World Wide Web,
go to: For more information about Microsoft
www.microsoft.com Project Server 2010, go to:
www.microsoft.com/project/2010

For more information about the Volvo


Group, call (46) 31 322 38 79 or visit the
Web site at:
www.volvogroup.com

Software and Services  Microsoft Visual Studio


 Microsoft Server Product Portfolio − Microsoft Visual Studio Team System
− Microsoft Project Server 2010 2008 Team Foundation Server
− Microsoft SharePoint Server 2010  Technologies
− Microsoft SQL Server 2008 R2 − Microsoft Project Web App
Enterprise
 Microsoft Office
− Microsoft Office Excel 2003
 Microsoft Project Professional 2010

This case study is for informational purposes only.


MICROSOFT MAKES NO WARRANTIES, EXPRESS OR
IMPLIED, IN THIS SUMMARY.
Document published July 2010

Potrebbero piacerti anche