Sei sulla pagina 1di 77

VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Estimated 12 M Launch Cradle Weight and CoG

REFERENCES COMPUTER RML CHK BY

Determine the Weight and CoG

915

Y
X
1250

Weight COG Induce Moment


No Description (MT) (mm) (MT.mm)
W Y X W.Y W.X
1 Side PL 6.03 482.5 0.00 2911 0
2 Base PL w=1250 mm 3.61 17.50 0.00 63 0
3 Base PL w=1400 mm 0.58 17.50 0.00 10 0
4 Stiffener 5.98 377.00 0.00 2256 0

Total 16.2 5240 0


Contingency 5% 17.0

CENTRAL OF GRAVITY LOCATION


Σ(W.x) 5240 Σ(W.Y) 0
Y = = X = =
W 16.20 W 16.20

= 323.5 mm = 0.00 mm
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Estimated 12 M Launch Cradle Weight and CoG

REFERENCES COMPUTER RML CHK BY


PAGE

DATE

Induce Moment
(MT.mm) Remarks
W.X
0
0
0
Assumed 31
0 Number of
Stiffener @ 400
mm

0
PAGE

DATE
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : 12 M Launch Cradle- Inertia and Section Modulus

REFERENCES COMPUTER RML CHK BY

The Moment Inertia and Section Modulus of the Launch Cradle is calculated as below

DEPTH d = 930 mm tw
WEB THICKNESS tw = 35 mm
FLANGE WIDTH bf = 1250 mm
FLANGE THICKNESS tf = 35 mm
Web Length h = 915 mm
tf

AXIS(X-X)
PIECE A Y A*Y IO d A*d2
LEFT WEB 32025 482.5 15452063 2234344219 189 1140548184
RIGHT WEB 32025 482.5 15452063 2234344219 189 1140548184
FLANGE 43750 17.5 765625 4466146 276 3339525082
A TOTAL = 107800 mm2 å 31669750 4473154583 5620621449
Y = 294 mm Ctop = 636 mm SX(TOP) = 15865291
Ix = 10093776032 mm 4 Cbot = 294 mm SX(BOTT) = 34357993
Awy = 64050

AXIS(Y-Y)
PIECE A X A*X IO d A*d2
LEFT WEB 32025.0 -677.60 -21700140.0 3269219 -677.6 14704014864
RIGHT WEB 32025.0 677.60 21700140.0 3269219 677.6 14704014864
FLANGE 43750.0 0.00 0.0 5696614583 0 0
A TOTAL = 107800 mm 2
å 0.0 5703153021 29408029728
X = 0 mm Ctop = 790.20 mm SX(TOP) = 44433286
Iy = 35111182749 mm 4 Cbot = 790.20 mm SX(BOTT) = 44433286
Awx = 43750
WEIGHT = 846 Kg/m'
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : 12 M Launch Cradle- Inertia and Section Modulus

REFERENCES COMPUTER RML CHK BY


PAGE

DATE

A*d2
1140548184
1140548184
3339525082
5620621449
15865291 mm3
34357993 mm3
64050 mm2

A*d2
14704014864
14704014864
0
29408029728
44433286 mm3
44433286 mm3
43750 mm2
PAGE

DATE
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Check Structure Integrity

REFERENCES COMPUTER RML CHK BY

The launch cradle structure integrity is checked based on the critical Bending and Shear stress, as shown be
The launch cradle is assumed lifted at the edges.

Lifting Point 1 Weight of the Launch cradle


Lifting Point 2

12 M

q = weight of the launch cradle = 17.0 / 12 = 1.42 MT /m


Lauch Cradle Material Properties
Fy = 345 Mpa Fb = 0.6 Fy = 207 Mpa
Fv = 0.4 Fy = 138 Mpa
- Check Bending
ql2 1.42 x 12 2
Max. Bending Moment = = = 25.51 MT.m
8 8
= 255.1 KN.m
check using minimum section modulus
M 255.1 x 1000000
fb = =
S 15865291
= 16.1 Mpa
fb 16.1
SR = = = 0.08 < 1 ……..OK
Fb 207

- Check Shear
qxl 1.42 x 12
Max. Shear = = = 8.5 MT = 85.0 KN
2 2
check using minimum shear area
V 85.0 x 1000
fv = =
A 43750
= 1.9 Mpa
fv 1.9
SR = = = 0.01 < 1 ……..OK
Fv 138
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Check Structure Integrity

REFERENCES COMPUTER RML CHK BY


PAGE

DATE

ed based on the critical Bending and Shear stress, as shown below


PAGE

DATE
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

The padeye will be designed for the flip over and lifting. The critical designed of the padeye is assumed only
one padeye (on each lifting point) working which resist the lifting load (critical condition during flip over). Durin
lifting one pair of padeye will be used on each lifting point .

Lifting Point 1 Weight of the Launch cradle


Lifting Point 2

12 M

Due to many variation during fabrication assumed distribution 60:40 on the lifting points
Thus the max load on the lifting points is
0.6 x 17.0 = 10.2 MT = 102.1 KN

The Padeye design will be verified on the 3 conditions, when the sling is at 0 Deg, 45 Deg and 90 Deg
the padeye

Lifting Reaction = 400.0 KN SF = 2


Padeye design (F) = 800.0 KN
Out of Plane = 5% x Lifting Reaction
= 20.0 KN
Padeye Material Property
Steel Yield Stress, Fy = 50 Ksi = 345 Mpa
Padeye Thickness, t = 35 mm

Using 12 MT Crosby Shackle -Bolt Type


Pin Dia = 70.0 mm
Pin Hole Dia = 75.0 mm

Main Plate Radius = 140 mm Pin Hole Height = 77 mm


Main Plate Length = 280 mm

Padeye 1 welding to the side Pl is full pen, thus no need to check


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

- Condition 1 F
R100 x 35 Thk Main Pl
Padeye Section Section A X
D 40 Pin Hole
Y
35
Y
Z 280 Launch Cradle
77 Side PL
A

280
Check Hole Bearing
Pin Dia. = 75 mm 75 % Pin Dia = 56 mm
75% Abearing = 56 x 35 = 1969 mm2 `
800.0 x 1000
fbearing = = 406.3 Mpa < 0.9 Fy = 311 Mpa
1969

Check Hole Shear Through Plates


Av = 103 x 35 x 2 = 7175 mm2
800.0 x 1000
fv = = 111.50 Mpa < 0.4 Fy = 138 Mpa ……..OK
7175

Check Stress Across The Hole

800.0 x 1000
ft = = 111.5 Mpa < 0.6 Fy = 207 Mpa
2 x 103 x 35

0.00 x 1000
fvy = = 0.0 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35

20.00 x 1000
fvz = = 2.8 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

Combined Stress

( F2 + 3 Fs2 )0.5
F = 111.5 + 0.0 = 111.5 Mpa
Fs = 0.0 + 2.8 = 2.8 Mpa

= ( 111.5 2
+ 3 x 2.8 2
)0.5

= 111.6 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

Check Stress At Base

Mz = 0.0 x 0.08
= 0.0 KNm
0.0 x 1000000
fbz = = 0.0 Mpa < 0.6 Fy = 207 Mpa
35 x 280 2
6
My = 20.0 x 0.08
= 1.5 KNm
1.5 x 1000000
fby = = 26.9 Mpa < 0.6 Fy = 207 Mpa
280 x 35 2
6

800.0 x 1000
ft = = 81.6 Mpa < 0.6 Fy = 207 Mpa
280 x 35

0.0 x 1000
fvy = = 0.0 Mpa < 0.4 Fy = 138 Mpa
280 x 35

20.0 x 1000
fvz = = 2.0 Mpa < 0.4 Fy = 138 Mpa
280 x 35

Combined Stress
( F2 + 3 Fs2 )0.5

F = 0.0 + 26.9 + 81.6 = 108.6 Mpa


Fs = 0.0 + 2.0 = 2.0 Mpa

= ( 108.6 2
+ 3 x 2.0 2
)0.5

= 108.6 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

- Condition 2
F
R100 x 35 Thk Main Pl
Padeye Section Section A X
Y D 40 Pin Hole

35
Y 45
o

Z
280 Launch Cradle
77 Side PL
A

280

Fx = F x Cos 45 = 565.7 KN
Fy F x Sin 45 = 565.7 KN

Check Stress Across The Hole

565.7 x 1000
ft = = 78.8 Mpa < 0.6 Fy = 207 Mpa
2 x 103 x 35

565.7 x 1000
fvy = = 78.8 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35

20.0 x 1000
fvz = = 2.8 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35

Combined Stress
( F2 + 3 Fs2 )0.5

F = 78.8 + 0.00 = 78.8 Mpa


Fs = 78.8 + 2.8 = 81.6 Mpa

= ( 78.8 2
+ 3 x 81.6 2
)0.5
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

= 161.9 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

Check Stress At Base

Mz = 565.7 x 0.08
= 43.6 KNm
43.6 x 1000000
fbz = = 95.2 Mpa < 0.6 Fy = 207 Mpa
35 x 280 2
6
My = 20.0 x 0.08
= 1.5 KNm
1.5 x 1000000
fby = = 26.9 Mpa < 0.6 Fy = 207 Mpa
280 x 35 2
6

565.7 x 1000
ft = = 57.7 Mpa < 0.6 Fy = 207 Mpa
280 x 35

565.7 x 1000
fvy = = 57.7 Mpa < 0.4 Fy = 138 Mpa
280 x 35

20.0 x 1000
fvz = = 2.0 Mpa < 0.4 Fy = 138 Mpa
280 x 35

Combined Stress
( F2 + 3 Fs2 )0.5

F = 95.2 + 26.9 + 57.7 = 179.9 Mpa


Fs = 57.7 + 2.0 = 59.8 Mpa

= ( 179.9 2
+ 3 x 59.8 2
)0.5

= 207.6 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

- Condition 3

R100 x 35 Thk Main Pl


Padeye Section A X
Y D 40 Pin Hole

35
F Y
Z
280 Launch Crad
Side PL
77

280

Fx = 0.0 KN
Fy = 800.0 KN

Check Stress Across The Hole

0.0 x 1000
ft = = 0.0 Mpa < 0.6 Fy = 207 Mpa
2 x 103 x 35

800.0 x 1000
fvy = = 111.5 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35

20.0 x 1000
fvz = = 2.8 Mpa < 0.4 Fy = 138 Mpa
2 x 103 x 35

Combined Stress
( F2 + 3 Fs2 )0.5

F = 0.0 + 0.0 = 0.0 Mpa


Fs = 111.5 + 2.8 = 114.3 Mpa

= ( 0.0 2
+ 3 x 114.3 2
)0.5
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

= 197.9 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY

Check Stress At Base

Mz = 800.0 x 0.08
= 61.6 KNm
61.6 x 1000000
fbz = = 134.7 Mpa < 0.6 Fy = 207 Mpa
35 x 280 2
6
My = 20.0 x 0.08
= 1.5 KNm
1.5 x 1000000
fby = = 26.9 Mpa < 0.6 Fy = 207 Mpa
280 x 35 2
6

0.0 x 1000
ft = = 0.0 Mpa < 0.6 Fy = 207 Mpa
280 x 35

800.0 x 1000
fvy = = 81.6 Mpa < 0.4 Fy = 138 Mpa
280 x 35

20.0 x 1000
fvz = = 2.0 Mpa < 0.4 Fy = 138 Mpa
280 x 35

Combined Stress
( F2 + 3 Fs2 )0.5

F = 134.7 + 26.9 + 0.0 = 161.6 Mpa


Fs = 81.6 + 2.0 = 83.7 Mpa

= ( 161.6 2
+ 3 x 83.7 2
)0.5

= 217.1 Mpa < 0.66 Fy = 228 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 1 - For Lifting

REFERENCES COMPUTER RML CHK BY


PAGE

DATE

and lifting. The critical designed of the padeye is assumed only


ich resist the lifting load (critical condition during flip over). During
h lifting point .

Lifting Point 2

3 conditions, when the sling is at 0 Deg, 45 Deg and 90 Deg on


PAGE

DATE
PAGE

DATE

Launch Cradle
Side PL

……….NOT OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

……..OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

Launch Cradle
Side PL

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

……..OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

Launch Cradle
Side PL

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

……..OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

Check weld on launch cradle stiffener due to load on


SUBJECT :
the padeye 1
REFERENCES COMPUTER RML CHK BY

The weld between side pl and stiffener shall be verified due load transmission from the padeye

- Condition 1
F
F = 800.0 KN
R100 x 35 Thk Main Pl
X
D 40 Pin Hole
Y
35
Y
Z
280
280
77
Launch Cradle Si

35
lw

Weld to be checke
length of the stiffener welds (to be checked ) :
lw = 280 + 5.0 x 35 + 0 Fillet Size = 15 mm
= 455 mm Throat Length = 10.6 mm
Welding Using Reduced due to rat hole
Electrode used = E70XX
Fu = 483 Mpa
0.3 Fu = 145 Mpa
Aw = 9651 mm2
Sbwz = 731833 mm3 Sbwy = 158888 mm3

Check Tension
800.0 x 1000
ftw = = 82.9 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Bending Out of Plane


My = 20.0 x 0.08 = 1.5 KNm
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

Check weld on launch cradle stiffener due to load on


SUBJECT :
the padeye 1
REFERENCES COMPUTER RML CHK BY

1.5 x 1000000
fbwy = = 9.7 Mpa < 0.3 Fu = 145 Mpa ……..OK
158888

Check Shear z Direction


20.0 x 1000
fvwz = = 2.1 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Resultant

frw = ( ( 82.9 + 9.7 )2 + 2.1 2


) 0.5

= 92.6 Mpa < 145 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

Check weld on launch cradle stiffener due to load on


SUBJECT :
the padeye 1
REFERENCES COMPUTER RML CHK BY

- Condition 2

R100 x 35 Thk Main Pl


F X
D 40 Pin Hole
Y
35 45o
Y
Z
280
77
Launch Cradle Side P

35
lw

Fx = F x Cos 45 = 565.7 KN
Fy F x Sin 45 = 565.7 KN

Check Tension
565.7 x 1000
ftw = = 58.6 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Bending In Plane


Mz = 565.7 x 0.08 = 43.6 KNm
43.6 x 1000000
fbwz = = 59.5 Mpa < 0.3 Fu = 145 Mpa ……..OK
731833

Check Shear Y Direction


565.7 x 1000
fvwy = = 58.6 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Resultant

frw = ( ( 58.6 + 59.5 + 9.7 )2 + 58.6 2


+ 2.1 2
) 0.5

= 140.6 Mpa < 145 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

Check weld on launch cradle stiffener due to load on


SUBJECT :
the padeye 1
REFERENCES COMPUTER RML CHK BY

= 140.6 Mpa < 145 Mpa ……..OK

- Condition 3

R100 x 35 Thk Main Pl


X
D 40 Pin Hole

Y
35 45o
F Y

Z 280
77
Launch Cradle Side P

35
lw

Check Tension
0.0 x 1000
ftw = = 0.0 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Bending In Plane


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

Check weld on launch cradle stiffener due to load on


SUBJECT :
the padeye 1
REFERENCES COMPUTER RML CHK BY

Mz = 800.0 x 0.08 = 61.6 KNm


61.6 x 1000000
fbwz = = 84.2 Mpa < 0.3 Fu = 145 Mpa ……..OK
731833

Check Shear Y Direction


800.0 x 1000
fvwy = = 82.9 Mpa < 0.3 Fu = 145 Mpa ……..OK
9651

Check Resultant

frw = ( ( 0.0 + 84.2 + 9.7 )2 + 82.9 2


+ 2.1 2
) 0.5

= 125.2 Mpa < 145 Mpa ……..OK


PAGE

DATE

be verified due load transmission from the padeye

D 40 Pin Hole

77
Launch Cradle Side PL

Weld to be checked

……..OK
PAGE

DATE

……..OK

……..OK
PAGE

DATE

D 40 Pin Hole

Launch Cradle Side PL

……..OK

……..OK

……..OK
PAGE

DATE

D 40 Pin Hole

Launch Cradle Side PL

……..OK
PAGE

DATE

……..OK

……..OK
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY

The padeye will be designed for the pulling, during flip over. After the lifting point and CoG achieved angle of
balance, the launch cradle need to be pulled , to continue the flip over process.

To Crane

Padeye 1 Padeye 2

Pulling (Using Chain Block)

CoG

Rotation
Pivot

Pulling Load = 16.7 KN SF = 2 (Estimated 10%of Weig


Padeye design (F) = 33.4 KN
Out of Plane = 5% x Lifting Reaction
= 0.8 KN
Padeye Material Property
Steel Yield Stress, Fy = 36 Ksi = 248 Mpa
Padeye Thickness, t = 20 mm

Using 4.75 MT Crosby Shackle -Bolt Type


Pin Dia = 22.4 mm
Pin Hole Dia = 28.0 mm

Main Plate Radius = 35 mm Pin Hole Height = 35 mm


Main Plate Length = 70 mm
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY

R35 x 20 Thk Main Pl


Padeye Section A X
Y D 28 Pin Hole

20
F Y
Z
70 Launch Crad
Side PL
35

70

Fy = 33.4 KN

Check Hole Bearing


Pin Dia. = 28 mm 75 % Pin Dia = 21 mm
75% Abearing = 21 x 20 = 420 mm2 `
33.4 x 1000
fbearing = = 79.4 Mpa < 0.9 Fy = 224 Mpa
420

Check Stress Across The Hole

0.0 x 1000
ft = = 0.0 Mpa < 0.6 Fy = 149 Mpa
2 x 21 x 20

33.4 x 1000
fvy = = 39.7 Mpa < 0.4 Fy = 99 Mpa
2 x 21 x 20

0.8 x 1000
fvz = = 1.0 Mpa < 0.4 Fy = 99 Mpa
2 x 21 x 20
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY

Combined Stress
( F2 + 3 Fs2 )0.5

F = 0.0 + 0.0 = 0.0 Mpa


Fs = 39.7 + 1.0 = 40.7 Mpa

= ( 0.0 2
+ 3 x 40.7 2
)0.5

= 70.5 Mpa < 0.66 Fy = 164 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY

Check Stress At Base

Mz = 33.4 x 0.04
= 1.2 KNm
1.2 x 1000000
fbz = = 71.5 Mpa < 0.6 Fy = 149 Mpa
20 x 70 2
6
My = 0.8 x 0.04
= 0.03 KNm
0.03 x 1000000
fby = = 6.3 Mpa < 0.6 Fy = 149 Mpa
70 x 20 2
6

0.0 x 1000
ft = = 0.0 Mpa < 0.6 Fy = 149 Mpa
70 x 20

33.4 x 1000
fvy = = 23.8 Mpa < 0.4 Fy = 99 Mpa
70 x 20

0.8 x 1000
fvz = = 0.6 Mpa < 0.4 Fy = 99 Mpa
70 x 20

Combined Stress
( F2 + 3 Fs2 )0.5

F = 71.5 + 6.3 + 0.0 = 77.8 Mpa


Fs = 23.8 + 0.6 = 24.4 Mpa

= ( 77.8 2
+ 3 x 24.4 2
)0.5

= 88.5 Mpa < 0.66 Fy = 164 Mpa ……..OK

Welding to Side PL
Welding Using
Electrode used = E70XX
Fu = 483 Mpa Fillet Size = 10 mm
0.3 Fu = 145 Mpa Throat Length = 7.1 mm
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY

Aw = 990 mm2 Weld Length = 70 mm


Sbwz = 11548 mm3 Sbwy = 10864 mm3

Check Tension
0.0 x 1000
ftw = = 0.0 Mpa < 0.3 Fu = 145 Mpa ……..OK
990

Check Bending In Plane


Mz = 33.4 x 0.04 = 1.2 KNm
1.2 x 1000000
fbwz = = 101.1 Mpa < 0.3 Fu = 145 Mpa ……..OK
11548

Check Bending Out of Plane


My = 0.8 x 0.04 = 0.03 KNm
0.03 x 1000000
fbwy = = 2.7 Mpa < 0.3 Fu = 145 Mpa ……..OK
10864

Check Shear z Direction


0.8 x 1000
fvwz = = 0.8 Mpa < 0.3 Fu = 145 Mpa ……..OK
990

Check Shear Y Direction


33.4 x 1000
fvwy = = 33.7 Mpa < 0.3 Fu = 145 Mpa ……..OK
990

Check Resultant

frw = ( ( 0.0 + 101 + 2.7 )2 + 0.8 2


+ 33.7 2
) 0.5

= 109.2 Mpa < 145 Mpa ……..OK


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Padeye 2 - For Pulling

REFERENCES COMPUTER RML CHK BY


PAGE

DATE

uring flip over. After the lifting point and CoG achieved angle of
, to continue the flip over process.

Pulling (Using Chain Block)

(Estimated 10%of Weight)


PAGE

DATE
PAGE

DATE

Launch Cradle
Side PL

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
PAGE

DATE

……..OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE

……..OK

……..OK

……..OK

……..OK

……..OK
PAGE

DATE
VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Welding Padeye to the Side PL

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Welding Padeye to the Side PL

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Welding Padeye to the Side PL

REFERENCES COMPUTER RML CHK BY


VOLUME

COMPANY : Mubadala Petroleum SHEET No.

PROJECT : Pegaga Development Project - Jacket

SUBJECT : Design Welding Padeye to the Side PL

REFERENCES COMPUTER RML CHK BY


PAGE

DATE
PAGE

DATE
PAGE

DATE
PAGE

DATE
Weight for Flare Boom Lift

SB DECK Module : PFB : SD2 PROCESS TOPSIDES FLARE BOOM


DRY Current Report(P23)
Discipline Net Weight %Cont'y Gross Weight
EL : Electrical 0.800 5.00 0.840

MC : Equipment / Mechanical 3.490 1.00 3.525

PI : Piping 66.867 3.00 68.873

ST : Structural 392.613 3.37 405.831

ST : Temporary Items

Installation Pin Assembly 3.439 3.00 3.542

ST: PFP on Flare Boom (Assumed applied before lift)


AR : Architectural 8.000 3.00 8.240

ST: Excluded in the lifting


#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!

Total for Flare Boom Lift #REF! 3.33 490.851


SB DECK Module : PFB : SD2 PROCESS TOPSIDES FLARE BOOM
DRY Current Report(P23)
Discipline Net Weight %Cont'y Gross Weight
EL : Electrical 0.800 5.00 0.840
MC : Equipment / Mechanical 3.490 1.00 3.525
PI : Piping 66.867 3.00 68.873
ST : Structural 392.613 3.37 405.831

Total for Module PFB 463.770 3.30 479.069


SIDES FLARE BOOM
Current Net COG Current Gross COG
Northing Easting Elevation Northing Easting Elevation
465.121 662.386 67.576 465.121 662.386 67.576

427.443 662.428 143.555 427.443 662.428 143.555

455.890 662.272 91.727 455.890 662.272 91.727

465.094 662.352 68.695 465.100 662.352 68.692

489.633 662.500 35.828 489.633 662.500 35.828

480.116 662.500 34.200 480.116 662.500 34.200

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!


SIDES FLARE BOOM
Current Net COG Current Gross COG
Northing Easting Elevation Northing Easting Elevation
465.121 662.386 67.576 465.121 662.386 67.576
427.443 662.428 143.555 427.443 662.428 143.555
455.890 662.272 91.727 455.890 662.272 91.727
465.094 662.352 68.695 465.100 662.352 68.692

463.484 662.341 72.578 463.500 662.342 72.552


Net Gross
Mom(N) Mom(E) Mom(U) Mom(N) Mom(E) Mom(U)
372.1 529.9 54.1 390.7 556.4 56.8

1491.8 2311.9 501.0 1506.7 2335.0 506.0


30484.0 44284.2 6133.5 31398.5 45612.7 6317.5

182602.1 260048.0 26970.6 188752.1 268802.8 27877.3

1683.8 2278.3 123.2

3840.9 5300.0 273.6


0.0 0.0 0.0
0.0 0.0 0.0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!