(1) - Inhouse water supply - Design standard (TCVN 4513 - 88)
(2) - Inhouse water drainage - Design standard (TCVN 4474 - 87)
(3) - Uniform Plumbing Code, issued together with decision No.47/1999/Q§-BXD
dated 21th December 1999 of Ministry of Construction.
(4) - Water supply handbook. NXB KHKT 1998 . TrÇn HiÕu NhuÖ, TrÇn §øc H¹, §ç
H¶i, ¦ng Quèc Dòng, NguyÔn V¨n TÝn.
(5) - Preliminary architect design drawing.
Septic tank capacity were calculated base on the assumption that it will be
cleaned every 6 months (about 180 days). According to sub-item 25.1.1, page
311, document (4)
Water flow rate for calculation of septic tank base on following formular :
QN = qng x N (l/day)
Where:
QN : Design drainage water flow rate (l/day)
qng : Water supply flow rate for 1 person/day. For factory, qng = 25
(l/day.person). According to sub-item 1.2 page 7, document (4)
N : Number of people working in 1 day. N = 2shift x 236 = 472
person
Then:
QN = 25 x 472 = 11.800 (l/day) = 11.8 m3/day.
Total volume of the septic tank base on formular:
W = Wn + Wc (m3)
Where:
Wn : Water volume of the septic tank, equal to 1.5 times the daily water
drain (m3).
Wc : Solid volume of the septic tank (m3)
Wc = a.T.(100-N1).b.c.N / (100-W2).1000
a : Solid (amount of seed) from 1 person/day, equal to 0.6 l/day.person.
T : Cleaning interval, T = 180 days.
W1 : Water content ratio of the raw solid, W1 = 95%
W2 : Water content ratio of the treated solid, W2 = 90%
b : Factor taking into account the reduction of the solid volume after
treated, b = 0.7.
c : Factor taking into account the left-behind volume of the solid after
clean, c = 1.2
N : Number of people, N = 472 person.
Then:
W = 1.5x11.8 + 21.4 = 39.1 (m3)
Volume of the septic tank at each toilet depend on the number of WC of that
toilet on total number of WC in the whole factory. Result of caculation are as
follows:
(We considered to typicalize the tank)
+ WC1 near G.L 10-11: W1 = 10 (m3)
+ WC2 near G.L 5-6: W2 = 10 (m3)
+ WC3,4 for 1st & 2nd floor office: W3,4 = 15 (m3)
+ WC5 near Canteen: W5 = 6 (m3)