Simplifying Cranes

Simplifying Cranes

Topics

• Universal encoder system U-ONE®


• Fibre optic signal transmission
• Existing solutions
• Problems of responsibilities
• Specifying systems
• Modernisations
• Support and service worldwide

www.huebner-giessen.com Slide 2 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Year of foundation: 1934


Employees: 95
Sales: 14 M EUR
Direct Export: 65%
Subsidiary: USA
International Representatives: 60 world-wide
Quality Management System: DIN EN ISO 9001:2008

www.huebner-giessen.com Slide 3 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Worldwide

www.huebner-giessen.com Slide 4 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Made in Germany

• Development
• Construction
• Production
• Sales
• Administration

100% MADE IN GERMANY

www.huebner-giessen.com Slide 5 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

GMP Le Havre - Retrofit reggiane cranes


Existing solution
3 couplings not
torsion resistant
(INACCURACY)

Mechanical Cam
Limit Switch Absolute encoder

Gear to meet the


required 2 driven shafts
for absolute encoder
and mech. Overspeed
switch
(INACCURACY)

Speed increasing gear with internal Mechanical base frame only Sockets for different
coupling (INACCURACY) neccessarry for the mounting! mounting levels
www.huebner-giessen.com Slide 6 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

Pusan Newport phase 1_1 - Retrofit ZPMC cranes


Existing solution Gear from ZPMC to
provide two shafts
(INACCURACY)

Speed increasing gear


EGS 4 K from ZPMC to meet the
required minimum
Provided by ABB
speed for Electrical
Cam Limit Switch
(INACCURACY)

4 Couplings to connect all thes single parts Mechanical base frame only Electrical Cam Limit
(INACCURACY) neccessarry for the mounting! Switch required by GBB
www.huebner-giessen.com Slide 7 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

GMP Le Havre - Retrofit ZPMC cranes


Existing solution

Gear to meet the 4 couplings not


required 3 driven torsion resistant
shafts for absolute
(INACCURACY)
encoder, overspeed
switch and cam limit
switch
(INACCURACY)

Mechanical Cam
Limit Switch

Soccets only for


different mounting
Absolute encoder Base frame only neccessarry for mounting! levels

www.huebner-giessen.com Slide 8 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Example: hoist

Existing Solution New Solution with U-ONE®

www.huebner-giessen.com Slide 9 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - New solution


Decoder Absolute CANBus Switchboard
UO-EM-D2 UO-EM-AMC

2 FOC

Incremental Absolute output


output PROFIBus UO-
UO-EM-FG EM-AMP

Overspeed switch 0,63 – Electronic position


4800 1/min UO-EM-EGS4 switch UO-EM-ERC
U-ONE UOM 4 L-1212

www.huebner-giessen.com Slide 10 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Further developments


Switchboard

2 FOC

• EtherCAT
• PROFISAFE
• Synchronization module for slip
compenzation
• Diagnostic module (Intranet suitable)

U-ONE UOM 4 L-1212

www.huebner-giessen.com Slide 11 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Comparison of installed discs

Pulse dic of an incremental encoder Main disc of an absolute encoder


(pulse encoder) pulse rate: e.g. 250 resoluttion: 4096 steps/rev. (12bit)
ppr
For ABS-series (Absolute encoder)
For FG-series (Incremental Encoder) AMC = Canbus
and EGS-series (Overspeed Switch) AMS = SSI
AMP= Profibus
AME = Ethernet
www.huebner-giessen.com Slide 12 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

U-ONE® SYSTEM - Function principle

+ = U-ONE® basic unit

FG-Module EGS-Module BUS-Module


Speed control overspeed Position
switch control

www.huebner-giessen.com Slide 13 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Basic unit mounted at the drum or the


motor

www.huebner-giessen.com Slide 14 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Electronic modules in the switch board

www.huebner-giessen.com Slide 15 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Inaccuracy 1
caused by drum coupling
Inaccuracy 2
caused by gear
Inaccuracy 3
caused by coupling
Inaccuracy 4
caused by mounting and
alignment

Total inaccuracy 1+2+3+4

www.huebner-giessen.com Slide 16 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

What is behind the old solution?

www.huebner-giessen.com Slide 17 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Drum, Gear or Motor Shaft

www.huebner-giessen.com Slide 18 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Drum coupling (1)

www.huebner-giessen.com Slide 19 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Base frame 1

www.huebner-giessen.com Slide 20 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Distribution gear

www.huebner-giessen.com Slide 21 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Coupling 2

www.huebner-giessen.com Slide 22 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Coupling 3

www.huebner-giessen.com Slide 23 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Coupling 4

www.huebner-giessen.com Slide 24 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Base frame 2

www.huebner-giessen.com Slide 25 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Base frame 3

www.huebner-giessen.com Slide 26 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Base frame 4

www.huebner-giessen.com Slide 27 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Mechanical cam limit switch

www.huebner-giessen.com Slide 28 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Electronic overspeed switch

www.huebner-giessen.com Slide 29 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

Absolute encoder

www.huebner-giessen.com Slide 30 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Problems old solution

4 cable connections

www.huebner-giessen.com Slide 31 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Our solution

www.huebner-giessen.com Slide 32 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - Programming

U-One®Pro
Select the module you like to program

EGS4Pro
Parameter setting for
UO-EGS4-Module

ERCPro
Parameter setting for
UO-ERC + UO-AMC + UO-AME

www.huebner-giessen.com Slide 33 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM – U-ONE®Pro

Select the module you


like to program

www.huebner-giessen.com Slide 34 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - EGSPro

Setting of overspeed
switches
• Overspeed switch 1
• Overspeed switch 2
• System switch S
(error switch)

www.huebner-giessen.com Slide 35 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® SYSTEM - ERCPro

Parameter setting of position switches

www.huebner-giessen.com Slide 36 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Complete solutions

www.huebner-giessen.com Slide 37 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Hoist
Pulse encoder
FG(H) 40L with
1. U-ONE Multiturn
UOM 41L 1212
fiber optic
2. GTES transmission
Motor
Mecanical cam-limit switch

Gear
Rope drum
box
Power supply
12-30 VDC 2 1
Fiber optic
cable

3. UO-EM-D41
3 4 5 Decoder
4. UO-EM-EGS 41
Overspeed switch
5. UO-EM-AMP
Absolute output interface

www.huebner-giessen.com Slide 38 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Boom lifting gear


Pulse encoder
FG(H) 40L with
1. U-ONE Multiturn
UOM 41L 1212
fiber optic
transmission
Motor

Gear
Rope drum
box
Power supply
12-30 VDC 1
Fiber optic
cable

2. UO-EM-D41
2 3 4 5 Decoder
3. UO-EM-EGS 41
Overspeed switch
4. UO-EM-AMP
Absolute output interface
5. UO-EM-ERC
Electronic position switch
www.huebner-giessen.com Slide 39 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

Rope-driven trolley
Motor
Pulse encoder
FG(H) 40 L with
Gear
Rope drum
box fiber optic
transmission
Power 1
supply
12-30 VDC

1. U-ONE Multiturn
UOM 41L 1212
Trolley

Fiber optic
cable

2. UO-EM-D41
2 3 4 Decoder
3. UO-EM-ERC
Electronic position switch
4. UO-EM-AMP
Absolute output interface

www.huebner-giessen.com Slide 40 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Trolley
Motor
Digital Encoder
FGH 40L-1024G-90G
(hollow shaft version)

Fiber optic
NON DRIVEN WHEEL OR DRUM signal transmission
U-ONE System for positioning

www.huebner-giessen.com Slide 41 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Traversing gear
Digital Encoder FG 40 L-1024G-90G
mounted on non-drive end of motor

Fiber optic
signal transmission
NON DRIVEN WHEEL
U-ONE System for positioning
www.huebner-giessen.com Slide 42 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

Fibre optics signal transmission

Possible problems in installations


• Electrical or magnetic interferences on control cables caused by:
• Power cable too narrow (e. g. on cranes or any festoon cabling)
• High starting current of powerful motors
• Influence of high-power magnetic brakes
• Long distances to the control room e. g.:
• in steel works
• in harbours, mining and other large plants
• Any problem with signals of Incremental encoders in existing
installations

Solution: Fibre optics signal transmission

www.huebner-giessen.com Slide 43 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Fibre optics signal transmission

Princip of fibre optic signal transmission

www.huebner-giessen.com Slide 44 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Pulse encoder with integrated fiber optic converter

Fiber optic decoder


with 2 output blocks
Pulse encoder with
integrated transmitter HTL and/or TTL
(converter)

Copper cable

Fiber optic cable

Available for all encoder series


www.huebner-giessen.com Slide 45 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

Pulse encoder with separate fibre optics converter


for new installations and upgradings

Fiber optic decoder


Copper cable with 2 output blocks
Fibre optics transmitter HTL and/or TTL
for installation in
switchboard

Copper cable
Fiber optic cable

Digital encoder with


electrical signal output
Fiber optic transmitter protection class IP66

www.huebner-giessen.com Slide 46 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Pulse encoder with separate fibre optics converter


for new installations and upgradings

Fiber optic decoder


with 2 output blocks
Fiber optic transmitter HTL and/or TTL
Copper cable
for installation in
switchboard

Fiber optic cable Copper cable

Digital encoder with


electrical signal output
Fiber optic transmitter protection class IP66

www.huebner-giessen.com Slide 47 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

References

DP WORLD Jebel Ali with fiber optic signal transmission

www.huebner-giessen.com Slide 48 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Fibre optics signal transmission

Main advantages of
• EMI proof
• Long distances
• Snap-on mounting modules
• One fiber optics cable for all channels
• Decoder with 2 output blocks (TTL/HTL)
• Alternative solutions

www.huebner-giessen.com Slide 49 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

New standard incremental encoder FG 2 ECOCODER®

www.huebner-giessen.com Slide 50 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Main features FG 2 AK-1024G-90G-NG

• axial terminal box


• 1024 pulses (option: 2048)
• two HTL/TTL signals displaced
by 90° (track A and B)
• additional marker pulse
• additional inverted signals
• shaft diameter 11 mm
• temperature range -25° ... +85°
• max. speed 7.000 rpm
• protection class IP 66 / IP 67
• standard protection against salty
ambient conditions

www.huebner-giessen.com Slide 51 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Product classification: main differences to the approved FG


40 / FG 4

• smaller size
• no second shaft end
• no other pulse rates than 1024 or
2048
• no other temperature ranges
than -25° ... +85°
• no other protection classes than
IP 66 / IP 67

www.huebner-giessen.com Slide 52 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Unique selling points / advantages against POG 10

• Standard pulse encoder with newest scanning


technology for high signal precision
• Higher mechanical reliability because of stronger
bearings (overdimensioned) and special heavy duty
housing
• Easier electrical connection because of bigger terminal
box
• Higher connection reliability because of spring forced
connector block
• Higher protection class IP 66 and IP 67 (for usage under
permanent wet conditions)
• Compact design with axial terminal box
• Attractive price level with quantity scale
• Very good price-performance ratio („value for money“)

www.huebner-giessen.com Slide 53 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Magnetic encoder MAG

Major features and advantages


• only one scanning head for speed and position signals possible

Scanning head MAG 200

www.huebner-giessen.com Slide 54 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Magnetic encoder MAG

Major features and advantages


• optional split construction for easy retrofitting and maintenance

www.huebner-giessen.com Slide 55 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Magnetic encoder MAG

Example tandem motor

www.huebner-giessen.com Slide 56 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Magnetic encoder MAG

Example measurement roll CSM

After installation After 8 month operating time


under hard conditions without
any problems

www.huebner-giessen.com Slide 57 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Complete solutions

www.huebner-giessen.com Slide 58 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

PSA EXOLGAN TERMINAL BUENOS AIRES - Retrofit RTG


cranes

Mechanical cam limit switch against U-ONE®

www.huebner-giessen.com Slide 59 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

PSA EXOLGAN TERMINAL BUENOS AIRES - Retrofit RTG


cranes

- Additional overspeed protection through electronic module UO-EM-EGS4

www.huebner-giessen.com Slide 60 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

U-ONE® system needs to be specified in the crane


specification / tender!
To measure the speed, position and overspeed for following motions one single device
called U-ONE® by Johannes Huebner Giessen / Germany shall be provided and installed
in the back side of drum.
Main Hoist: Up-Slowdown, Up-Stop, Up-Hoist Stop, Dock-Slowdown, Down-Slowdown,
Down-Stop, Sill beam protection and overspeed of the load.
Trolley Travel: Waterside slow downs, waterside stops, waterside over travel stops, land
side slowdown, landside stop, landside over travel stop.
Boom Hoist: Lower Stop, Upper Stop, Lower slowdown, Upper slowdown, End positions.
The device shall consist of an universal basic unit and electronic function modules to be
installed in the control panel (cabinet). The basic unit and modules shall be connected by
optical fibre cables which are immune to EMI. The modules are linked by an internal bus
structure and can be freely connected and extended in series by integrated plugs.
To maximize the function of the device the input signal from motor side incremental
encoders supplied by Johannes Huebner shall be compared by the PLC with the
incremental output signal from drum side U-ONE®.
For speed control the encoders of Johannes Huebner have to use fibre optic signal
transmission.
www.huebner-giessen.com Slide 61 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

Project handling - Project Pusan Newport

Old solution - responsibilities not clear...

Mechanical OEM

Electrical OEM

...if the system is not specified!


www.huebner-giessen.com Slide 62 © 2013 Johannes Huebner GmbH, Giessen - Germany
Simplifying Cranes

U-ONE® SYSTEM

Main advantages U-ONE®


• Compact design
• EMI immune fiber optics signal
transmission
• Switchboard mounted electronics
• Central programming
• Extreme reduction of cable costs
• Extreme reduction of
commissioning time
• Easy to extend
• High flexibility
• Saving spares

www.huebner-giessen.com Slide 63 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

1. Development target
Universal encoder system (second generation) U-ONE® SAFETY with different standardized
function modules and interfaces, among others certified switches (position, overspeed,
speed difference) and certified absolute encoders for functional safety applications
according to EN 61508: SIL CL2 and EN ISO 13849: PL d. Resolution Singleturn/Multiturn
will be up to 13/15 bit for all absolute encoders (except SSI: 13/12 bit).

Two different design types:

U-ONE® SAFETY Compact U-ONE® SAFETY LWL


Universal basic unit with direct Universal basic unit connected to electronic
mounted electronic function modules function modules in the control cabinet
in a compact heavy duty housing. via fiber optic cable.

www.huebner-giessen.com Slide 64 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

2. System overview – Planned modules


Central unit Absolute encoders Switches
UOS U-ONE® SAFETY basic unit SPB Safe Profibus (Profisafe) SRC-R Safe position switch (relais
contacts)
SCU Safety control unit with fiber SPN Safe Profinet (Profisafe) SGS-R Safe overspeed switch (relais
optic decoder and interfaces, e.g.: contacts)
 fatal error exit for internal (device) SOE Safety over Ethercat SDS-R Safe speed difference switch
failures; restart via USB on site (relais contacts)
 warning error exit for external (envi- ESI Standard SSI SDC Safe incremental entry (for
ronment) failures; restart via reset speed difference calculation)
 Incremental output (1024 or 4096 EPB Standard Profibus SRC-HL Safe position switch (solid-
pulses) state relais)
 Analog output 4-20 mA (position or EPN Standard Profinet SGS-HL Safe overspeed switch
speed signal) (solid-state relais)
 USB programming interface EOE Standard Ethercat SDS-HL Safe speed difference
switch (solid-state relais)
 Reset and Preset input EIP Standard Ethernet/IP

Grey colour: Standard interfaces without safety certification

Yellow colour: Certified for functional safety according to EN 61508: SIL CL2 and EN ISO 13849: PL d

www.huebner-giessen.com Slide 65 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Electronic overspeed switch EGS® 41

www.huebner-giessen.com Slide 66 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

Absolute Encoder

For extreme operation conditions in steel mills,


Mining and Cranes
Optional with SIL/Ple-certification

www.huebner-giessen.com Slide 67 © 2013 Johannes Huebner GmbH, Giessen - Germany


Simplifying Cranes

www.huebner-giessen.com Slide 68 © 2013 Johannes Huebner GmbH, Giessen - Germany

Potrebbero piacerti anche