Welcome to the tutorial about SAP SD Availability Check. This tutorial is part of the
SAP SD training course. You will learn what is the availability check in SAP SD, how to
use it for determining quantities of materials that can be shipped to customers, and
difference backward and forward scheduling in the availability check.
In SAP ERP, SAP SD availability check is of vital importance in sales order processing.
It checks whether you are able to deliver the product to the customer on his required
date of delivery. It ensures your promise to the customer on timely delivery of the
goods. It helps you avoid making over-commitments to your customer so that your
professional and market reputation is not affected.
Advertisement
When SAP SD Availability Check is executed, it checks material’s availability on certain parameters. Following are the
parameters on which the SAP system checks whether the desired date of delivery of the customer can be met:
Order Date – the date on which the customer orders the goods to be delivered on a certain date
Material Staging – the lead time required to prepare the goods for dispatching; also includes the picking and packing
time
Transportation Planning – lead time required to arrange logistics and time required to deliver the goods at the
customer’s premises
Loading – the lead time required for making final arrangements to dispatch the product to the customer including the
time required to complete picking and packing
Goods Issue – the date on which the goods should leave the plant and the lead time required for dispatching the
goods to the customer and the transit time when the product reaches the customer at his premises
Required Delivery Date – the date requested by customer for the ordered goods
In order for the system to confirm the Required Date of Delivery of the customer, the system follows the following
strategies to ensure the delivery of the product to the customer from the plant which is maintained in the sales order.
BACKWARD SCHEDULING
When the Required Date of Delivery of the product is entered, the system runs the backward scheduling on the criteria
and parameters mentioned above. The system checks and takes the lead times into consideration. Based on the
Required Date of Delivery:
The system takes the goods issue lead time into account which includes the transit time and dispatching time.
Then, it takes the lead time for loading the goods onto the vehicle, time required to arrange logistics, and time
required to pick, pack and make product ready for dispatch.
Finally, it subtracts all the lead times from the Required Date of Delivery and obtains the date on which processing of
goods should begin. If this date is after the order data, then the customers’ Required Date of Delivery can be met.
Otherwise, the system opts for the second strategy.
Advertisement
FORWARD SCHEDULING
When the SAP system is unable to meet the customer’s Required Date of Delivery due to any reason, the system runs
forward scheduling and proposes a new delivery date. To calculate the new delivery date, the system takes into
consideration all the lead times for every stage:
S A P S D AVA I L A B I L I T Y C H E C K – S T O C K M OV E M E N T S
The forward and backward scheduling is based on the inventory movements within the plant (warehouse). These
movements are based on actual goods movement. Stock in hand can be of various nature:
Stock in transit
Safety stock which company keeps as a minimum stock level of SKUs
Stock which is in quality management for quality clearance decisions called Inspection Stock
Stock blocked due to any reason
Restricted-use stock for specific purposes
The following can be the examples of inward and outward movement of stock from a particular plant or a warehouse.
I N W A R D M OV E M E N T S
Open purchase orders which are due for delivery (Goods Receipt)
Purchase requisitions which have chances of getting converted to purchase orders
Planned orders
Production orders
O U T W A R D M OV E M E N T S
Transfer of Requirements
Whenever you create a Sales Order, a transfer of requirements is generated. It appears in the Materials Requirement
Planning (MRP). Based on the product ordered by the customer, the concerned department identifies whether the
ordered goods are produced in-house, whether we have sufficient raw material to convert the required product into the
finished goods, whether we need to procure the raw materials from the vendor and inquire about the time required by
the vendor to deliver the product in the production facility where the required product will be produced and then finally
dispatched to customer.
If the required product is not produced in-house, then it has to be procured externally from the vendor and then
delivered to the customer.
Advertisement
Let’s have a look how SAP SD Availability Check works. First, a Checking Group for Availability needs to be defined in
material masters of the materials that will be ordered by a customer.
To edit a material master, start MM02 transaction from the command bar. Alternatively, you can navigate to the
following menu path:
Logistics > Sales and Distribution > Master Data > Products > Material > Other Material > MM02 – Change
The SAP system will take you to the initial screen of MM02 transaction. Here you need to enter the material number
that you would like to edit.
Material Master – Initial Screen
Once you press Enter button on the keyboard, a dialog box will appear to select views that you wish to maintain. In this
case, we will select “Sales: General/Plan Data” and click OK button.
Material Master – Initial Screen with ‘Views’ Selected in the Dialog Box
Next, another dialog box will appear. Enter relevant Plant, Sales Organization and Distribution Channel for which you
wish to maintain SD’s Material Master values and press OK button.
Hint: If you either press F4 or button, the SAP system will display all possible values of Plant, Sales Organization
and Distribution Channel where the selected material is already maintained.
Material Master – Sales: General / Plant > General data > Availability Checking Group
Now, let’s check how much stock of this material we have at our plant. We can do this check using the stock report
(transaction MMBE).
Availability Check in SAP SD – Stock Overview – Initial Screen
Enter the selection criteria for the report and press F8 on the keyboard or button to continue.
We can see that no stock of this material is available. Now let’s try to create a sales order and see the system’s
functionality. As you remember, we create new sales orders in the transaction VA01.
SAP SD Availability Check – Creating Sales Order – VA01
As soon as the material and quantity are entered, the SAP system will prompt that no stock is available.
SAP SD Availability Check – Creating Sales Order – Availability Control
Press button to proceed without confirming. Next, select the relevant line item (with the unavailable
material) and press button to view Schedule Lines for this item.
Since there are no upcoming inward movements, the SAP system has not confirmed the order quantity (confirmed
quantity = 0 ST). Otherwise, the system would have created another line with a confirmed quantity and date.
Advertisement
Now, let’s imagine that the production department manufactured some stock of the required material and informed us
that it should be available now. We can go to the transaction MMBE to check if the stock is indeed available.
In MMBE, we can see that the stock is available. Now, let’s try to create a sales order again and see the system’s
functionality.
SAP SD Availability Check – Creating Sales Order
Since the stock is available, the system has confirmed the quantity. To view details of scheduling of the shipment click
on “Shipping” button.
SAP SD Availability Check – Creating Sales Order – Schedule Lines – Shipping Details
If the material is not available on the customer’s desired delivery date, the system will propose a new delivery date.
The system will create a new schedule line with confirmed quantity on the new delivery date.
Did you like this tutorial? Have any questions or comments? We would love to hear your feedback in the comments
section below. It’d be a big help for us, and hopefully it’s something we can address for you in improvement of our free
SAP SD tutorials.
Navigation Links
Butterdog
September 12, 2017 at 5:44 am
Raju
November 9, 2017 at 4:42 pm
Ibn e Raheed
November 10, 2017 at 9:18 am
Hi
If you mean on front end, it is in Sales Order: VA01 / VA02 / VA03.. double click the line item and then on tab:
‘Schedule Lines’..
Thanks..
Aji Kumar
April 25, 2019 at 2:22 pm
ente ponnu Raju, ithokke basic question alle!
Aushman Chowdhury
February 7, 2019 at 3:16 pm
Hi,
In case there is no stock for the material, SAP can provide confirmed date as per the mentioned lead time of the
material in the material master??
Thanks
prasanna kumar
June 17, 2019 at 9:16 am
Motsamai:
is it possible that I can get a link where I can download a free
demo sap system (sa...
Contributors This is an unofficial blog about SAP certification, SAP training, and other
things related to one of the world's leading ERP system.
Terms and Conditions
This blog is independent and NOT affiliated with SAP SE (the company
Privacy Policy
behind SAP ERP system). Your usage of this website signifies your
Contact Us agreement with our terms and conditions. We would be happy to hear your
feedback or questions.
ERProof / Blog About All Things Related to SAP / © 2011-2019 ERProof All Rights Reserved