Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
NOTE :
1. Downpayment 15% prior to mobilize equipment
2. Payment based on monthly progress
3. PPN and PPH Taxes are included, includes SCF/ SKBDN interest
4. The sub contractor is not responsible for the pile design structural strength and bearing capacity
5. This quotation valid up to 60 days from the date of quotation
Page 1 of 1