ROOF PROJECT BID PRICING WORKSHEET National 2017

Customer Address Rep Date

OPTION OPTION
PRODUCT Unit Meas. Retail Price Total Price
#1 #2
(A) SHINGLE REMOVAL AND APPLICATION
Royal Sovereign 25 3-tab OC 25 yr 3-tab Square $ 495.00 $ -
Timberline HD
Square $ 575.00 $ -
OC Duration True Def
Composition Shingles Camelott II Square $ 695.00 $ -
Timberline Ultra HD Square $ 600.00 $ -
Roof System Package Timberline Ultra HD (Signature Colors) Square $ 600.00 $ -
Timberline Cool Series Square $ 700.00 $ -
Actual Roof Square’s plus 10-
20 percent waste must be Timberline Armor Shield IR or OC Duration Storm Square $ 610.00 $ -
added to get the number of Slateline Square $ 650.00 $ -
units for the multiplier. Grand Sequoia (Value Series) Square $ 695.00 $ -
Grand Canyon
Presidential TL Ultimate Square $ 750.00 $ -
Camelott-Original
System Plus Warranty Square Included $ -
Warranty Upgrade Silver Pledge
Square $ 12.00 $ -
OC Platinum Warranty
Synthetic Underlayment Economy Brand Square $ 10.00 $ -
Surcharge Tigerpaw Square $ 12.00 $ -
Additional Leak Barrier Ice and Water Sq Ft. $ 1.60 $ -
1st Layer Removal Surcharge Wood Shingle Square $ 25.00 $ -
Composition Square $ 35.00 $ -
Additional Layer Removal Wood Shingle
Square $ 55.00 $ -
Composition
(A) SUBTOTAL $ 6,520.60 - $ - -
(B) DECKING
CDX/OSB Decking Sheet $ 60.00 $ -
Plank Decking Lin Ft. $ 10.00 $ -
Full Roof Re-Deck no tear off Square $ 165.00 $ -
Full Re-Deck Only Square $ 165.00 $ -
(B) SUBTOTAL $ 400.00 - $ - -
(C) VENTILATION
Ventilation Ridge Vent Lin Ft. Included $ -
Turbine Vent – Install New Each Included $ -
Reasonable Basic Low Profile Vent Airhawk – Install New Each Included $ -
Turbine Vent – Replace Existing Vent Each Included $ -
Ventilation is Included Low Profile Vent – Replace Existing Vent Each Included $ -
Soffit Vent 4x8 soffit vent Each $ 50.00 $ -
(C) SUBTOTAL $ 50.00 - $ - -
(D) FLASHING
Drip Edge Round up to whole 10’ Per Piece Piece $ 11.00 $ -
Chimney/Skylight Flashing Each $ 185.00 $ -
Step, Counter or Base Lin. Ft. $ 5.00 $ -
(D) SUBTOTAL $ 201.00 - $ -
(E) MISCELLANEOUS
Steep Charge Over 7/12 to 12/12 Square $ 44.00 $ -
12/12 and Over Square $ 55.00 $ -
Additional Stories Square $ 20.00 $ -
Poor Access Square $ 16.00 $ -
Cricket Average Size Each $ 176.00 $ -
Stone Coated Steel Decra or Metro Square $ 1,100.00 $ -
Standard Flat Tile (concrete) Monier Tile Saxony Slate or Shake Square $ 975.00 $ -
Replace skylight 2X2 Fixed Each $ 846.00 $ -
2X2 Vented Each $ 1,237.00 $ -
2X4 Fixed Each $ 945.00 $ -
2X4 Vented Each $ 1,350.00 $ -
Misc. Labor Hour $ 75.00 $ -
(E) SUBTOTAL $ 6,839.00 - $ - -

TOTAL PROJECT AMOUNT (A+B+C+D+E): $ 14,010.60 - $ - -

1 Minimum Roofing Project Amount Per Job = $3000


2 All Measurements used to figure units must include an added 10%-20% for waste. Example: 30 squares of actual sq footage
with 15% added for waste is 34.5 squares. In this example you would use the 34.5 squares as the unit measurement multiplier.
Total Price

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ -

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ -
$ -
$ -
$ -
$ -

$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ -
$ -
$ -
$ -

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ -
ROOFING PROJECT BID PRICING WORKSHEET

Customer Address Rep Date

PRODUCT Unit Meas.

(D) FLASHING
Composition Shingles

Roof System Package

Actual Roof Square’s plus 10-


Round up to whole 10’ Per Piece Piece
20 percent waste must be
added to get the number of
units for the multiplier.

Chimney/Skylight Flashing Each


Step, Counter or Base Lin. Ft.
(D) SUBTOTAL
(E) MISCELLANEOUS
Over 7/12 to 12/12 Square
Steep Charge
12/12 and Over Square
Additional Stories Square
Poor Access Square
Cricket Average Size Each
Stone Coated Steel Decra or Metro Square
Standard Flat Tile (concrete) Monier Tile Saxony Slate or Shake Square
2X2 Fixed Each
Synthetic Underlayment 2X2 Vented Each
Surcharge 2X4 Fixed Each
2X4 Vented Each
Misc. Labor Hour
(E) SUBTOTAL

TOTAL PROJECT AMOUNT (A+B+C+D+E):

1 Minimum Roofing Project Amount Per Job = $3000


2 All Measurements used to figure units must include an added 10%-20% for waste. Example: 30 squares of actual sq footage with 15% adde

Ventilation

Reasonable Basic

Ventilation is Included
National 2015

Date
OPTION #1 OPTION #2
Retail Price
Units Total Price Units Total Price

$ 11.00 $ -

$ 185.00 $ -
$ 5.00 $ -
$ 201.00 - $ -

$ 44.00 $ -
$ 55.00 $ -
$ 20.00 $ -
$ 16.00 $ -
$ 176.00 $ -
$ 1,100.00 $ -
$ 975.00 $ -
$ 846.00 $ -
$ 1,237.00 $ -
$ 945.00 $ -
$ 1,350.00 $ -
$ 75.00 $ -
$ 6,839.00 - $ -

uares of actual sq footage with 15% added for waste is 34.5 squares. In this example you would use the 34.5 squares as the unit measurement multiplier.
unit measurement multiplier.