PRODUCT Unit Meas. Retail Price Total Price
#1 #2
(A) SHINGLE REMOVAL AND APPLICATION
Royal Sovereign 25 3-tab OC 25 yr 3-tab Square $ 495.00 $ -
Timberline HD
Square $ 575.00 $ -
OC Duration True Def
Composition Shingles Camelott II Square $ 695.00 $ -
Timberline Ultra HD Square $ 600.00 $ -
Roof System Package Timberline Ultra HD (Signature Colors) Square $ 600.00 $ -
Timberline Cool Series Square $ 700.00 $ -
Actual Roof Square’s plus 10-
20 percent waste must be Timberline Armor Shield IR or OC Duration Storm Square $ 610.00 $ -
added to get the number of Slateline Square $ 650.00 $ -
units for the multiplier. Grand Sequoia (Value Series) Square $ 695.00 $ -
Grand Canyon
Presidential TL Ultimate Square $ 750.00 $ -
Camelott-Original
System Plus Warranty Square Included $ -
Warranty Upgrade Silver Pledge
Square $ 12.00 $ -
OC Platinum Warranty
Synthetic Underlayment Economy Brand Square $ 10.00 $ -
Surcharge Tigerpaw Square $ 12.00 $ -
Additional Leak Barrier Ice and Water Sq Ft. $ 1.60 $ -
1st Layer Removal Surcharge Wood Shingle Square $ 25.00 $ -
Composition Square $ 35.00 $ -
Additional Layer Removal Wood Shingle
Square $ 55.00 $ -
Composition
(A) SUBTOTAL $ 6,520.60 - $ - -
(B) DECKING
CDX/OSB Decking Sheet $ 60.00 $ -
Plank Decking Lin Ft. $ 10.00 $ -
Full Roof Re-Deck no tear off Square $ 165.00 $ -
Full Re-Deck Only Square $ 165.00 $ -
(B) SUBTOTAL $ 400.00 - $ - -
(C) VENTILATION
Ventilation Ridge Vent Lin Ft. Included $ -
Turbine Vent – Install New Each Included $ -
Reasonable Basic Low Profile Vent Airhawk – Install New Each Included $ -
Turbine Vent – Replace Existing Vent Each Included $ -
Ventilation is Included Low Profile Vent – Replace Existing Vent Each Included $ -
Soffit Vent 4x8 soffit vent Each $ 50.00 $ -
(C) SUBTOTAL $ 50.00 - $ - -
(D) FLASHING
Drip Edge Round up to whole 10’ Per Piece Piece $ 11.00 $ -
Chimney/Skylight Flashing Each $ 185.00 $ -
Step, Counter or Base Lin. Ft. $ 5.00 $ -
(D) SUBTOTAL $ 201.00 - $ -
(E) MISCELLANEOUS
Steep Charge Over 7/12 to 12/12 Square $ 44.00 $ -
12/12 and Over Square $ 55.00 $ -
Additional Stories Square $ 20.00 $ -
Poor Access Square $ 16.00 $ -
Cricket Average Size Each $ 176.00 $ -
Stone Coated Steel Decra or Metro Square $ 1,100.00 $ -
Standard Flat Tile (concrete) Monier Tile Saxony Slate or Shake Square $ 975.00 $ -
Replace skylight 2X2 Fixed Each $ 846.00 $ -
2X2 Vented Each $ 1,237.00 $ -
2X4 Fixed Each $ 945.00 $ -
2X4 Vented Each $ 1,350.00 $ -
Misc. Labor Hour $ 75.00 $ -
(E) SUBTOTAL $ 6,839.00 - $ - -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
ROOFING PROJECT BID PRICING WORKSHEET
(D) FLASHING
Composition Shingles
Ventilation
Reasonable Basic
Ventilation is Included
National 2015
Date
OPTION #1 OPTION #2
Retail Price
Units Total Price Units Total Price
$ 11.00 $ -
$ 185.00 $ -
$ 5.00 $ -
$ 201.00 - $ -
$ 44.00 $ -
$ 55.00 $ -
$ 20.00 $ -
$ 16.00 $ -
$ 176.00 $ -
$ 1,100.00 $ -
$ 975.00 $ -
$ 846.00 $ -
$ 1,237.00 $ -
$ 945.00 $ -
$ 1,350.00 $ -
$ 75.00 $ -
$ 6,839.00 - $ -
uares of actual sq footage with 15% added for waste is 34.5 squares. In this example you would use the 34.5 squares as the unit measurement multiplier.