The Way To The

Technical Limit

Case Study:
Drilling In Vata Field

Bucharest, April 2015


The Way To The Technical Limit

Technical Limit in Drilling is defined as:

“A theoretical limit representing a stretched target of


what is theoretically possible in a perfect world where
both ideal and optimized drilling conditions are fulfilled.”

| 2 OMV Petrom S.A. The Way To The Technical Limit presentation


The Way To The Technical Limit

Learn Plan

Improve

Monitor &
Implement
Evaluate

3| OMV Petrom S.A. The Way To The Technical Limit presentation


Plan

 Establish and develop the baseline

 Set the project goal, objective and target

 Risk evaluation

 Get management support

 Communicate and establish Key Performance Indicators (KPI's)

4| OMV Petrom S.A. The Way To The Technical Limit presentation


Implement

Implement KPI’s

Have the best team in charge with the project

Have meetings with all the people involved. Communication is the key

Implement new technologies in order to deliver sustainable results

5| OMV Petrom S.A. The Way To The Technical Limit presentation


Monitor & Evaluate

 Facilitate periodic checks to ensure that the process is a success

 Analysis and review actual versus planned performance

 Compare with the best in class [well] drilling performance and see if the
Technical Limit was achieved

6| OMV Petrom S.A. The Way To The Technical Limit presentation


Learn

 Provide feedback regarding the project

 Identify NPT & ILT

 Manage lessons learned in order to improve the efficiency in the planning


phase of the new wells

7| OMV Petrom S.A. The Way To The Technical Limit presentation


Real metrics show real improvements

 Non productive time (NPT)

 Invisible lost time (ILT)

 ROP

 Flat time

 Actual time < Planned time

 Cost reduction

 Implementation of lessons learned

 Others

8| OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

| 9 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

| 10 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

| 11 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

| 12 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

| 13 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

Flat Time was reduced using the following:

 Casing while drilling technology for the first section

 “C” Plate for suspending the casing

 Minimize time for BOP works

 For wells with inclination > 30 deg. used pipe conveyed logging

 Reamer shoe for 7’’ casing

| 14 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field
“C” Plate

| 15 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field

The ROP was increased using the following:

 8 ½’’ PDC bit, Type MSi519LHUBPX

 PDM motor in BHA

 Optimized drilling parameters

 Drilling fluid: KCl Polymer Glycol

| 16 OMV Petrom S.A. The Way To The Technical Limit presentation


Case Study: Vata Field
Average saving for all wells drilled in 2014

| 17 OMV Petrom S.A. The Way To The Technical Limit presentation


Conclusion

 Wells drilled in 2014 were included on this analysis

 Improving drilling activities is a goal of any operator while the costs increases
from year to year

 The approach to Technical Limit as a tool of continuous improving needs the


involvement of all contractors to achieve the objective

18 | OMV Petrom S.A. The Way To The Technical Limit presentation


Contact Viorel Dragomir & Alina - Elena Samoila
OMV Petrom S.A. Viorel.Dragomir1@petrom.com
Str. Coralilor, nr.22, Sector 1 Alina-Elena.Nistor@petrom.com
București www.petrom.com