Sei sulla pagina 1di 2

For RKCIPL 06.05.

2019
Name of The Contractor- M/S D B Kadam
Project- P-S

Name of The List of Free Issued List of Material Issued List of Material Issued
Sr No
Material Material on Debitable Basis on Returnable Basis

1 Cement ü
2 Steel �
3 Aggt �
4 Crushed Sand �
5 Rubble �
6 Concrete �
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Potrebbero piacerti anche