Sei sulla pagina 1di 12

PROJECT : PAGE :

CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Lateral Loads of 4 Level Shelving, with Hilti Anchorage, Based on ASCE 7-16

Dimensions
D= 3.5 ft
( 1.1 m)
L= 9 ft
( 2.7 m)
h4 = 18.5 ft
( 5.6 m)

Determine Shelving Base Shear (Derived from ASCE 7-16 15.5.3 & 13.3)

1   0.4 a p S DS I pW p  z 
V F p  Max 0.3S DS I pW p , Min   1  2  , 1.6 S DS I pW p   0.34 Wp, ASD
1.5   Rp  h  
= 437.2 lbs,
(ASD level force at each L Shelving)
Where SDS = 1.121 (ASCE 7-16 11.5.4)
Ip = 1.5 (ASCE 7-16 15.3.3.1)
Wp = W1 + W2 + W3 = 1300.0 lbs, each L shelving
ap = 2.5 (ASCE 7-16 13.3.1.1)
Rp = 4 (ASCE 7-16 13.3.1.1)
z= 0 ft, shelving floor height from building ground (ASCE 7-16 13.3.1.1)
h= 36 ft, average building roof height (ASCE 7-16 13.3.1.1)
( 11.0 m)
Calculate Vertical Distribution of Shelving Base Shear (lbs) & Allowable Elastic Drift (ASCE 7-16 12.8.3 & 15.5.3)

Level Wx hx hxk Wxhxk Fx , ASD (12.8-11) d xe,allowable, in, ASD


4 300 18.5 18.5 5550 206.5 ( 0.69 Wx ) 7.929
3 300 12.5 12.5 3750 139.5 ( 0.47 Wx ) 5.357
2 350 6.5 6.5 2275 84.6 ( 0.24 Wx ) 2.786
1 350 0.5 0.5 175 6.5 ( 0.02 Wx ) 0.214
1300.0 11750 437.2
( 1 ft = 0.305 m , 1 in = 25.4 mm , 1 kips = 4.448 kN , 1 ft-k = 1.356 kN-m)
Where k= 1 (ASCE 7-16 15.5.3)
d xe,allowable, ASD = 5% hx/1.4, (ASCE 7-16 15.5.3)
(cont'd)
Calculate Lateral Forces (lbs), at Each Joint of Both Directions, and Max Reactions (lbs) (ASCE 7-16 15.5.3)

Case a, (ASCE 7-16 15.5.3.3.2 a)


Level ex (ft) Wx F M RT RC RV
4 3 201 69.2 208
3 3 201 46.7 140
2 3 234.5 28.4 85
1 3 234.5 2.2 7
871.0 146.5 439.4 986.7 1857.7 146.5

Case b, (ASCE 7-16 15.5.3.3.2 b)


Level ex (ft) Wx F M RT RC RV
4 3 300 50.4 151
3 0 0.0 0
2 0 0.0 0
1 0 0.0 0
300.0 50.4 151.3 469.8 769.8 50.4

Anchorage & Summary


4 - 1/2" f, w/ 2" emb in 2.5 ksi conc, KWIK Bolt-TZ required at each column base. (ICC ESR-1917)
(W0 Ps / Pt) + (Vs / Vt) = 0.709 < 1.20 [SATISFACTORY]
Where Ps = 250.0 (RMI 7.1.2), Pt = 730 lbs / bolt, (ICC ESR-1917)
Vs = 36.6 lbs, Vt = 1500 lbs / bolt, (ICC ESR-1917)
W0 = 2.0 , ASCE 7-16 15.5.3.1.1
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Lateral Loads of Storage Racks, with Red Head Anchorage, Based on ASCE 7-10

Dimensions
D= 4 ft
L= 10 ft
h3 = 20 ft

Determine Rack Base Shear (Derived from ASCE 7-10 15.5.3 & 13.3)

1   0.4a p S DS I pW p  z 
V F p  Max 0.3S DS I pW p , Min   1  2  , 1.6 S DS I pW p   0.46
1.5   Rp  h  
= 542.8
(ASD level force at each L rac
Where SDS = 1.173 (ASCE 7-10 11.4.4)
Ip = 1.5 (ASCE 7-10 15.5.3.1)
Wp = W1 + W2 + W3 = 1190.0 lbs, each L rack
ap = 2.5 (ASCE 7-10 15.5.3)
Rp = 4 (ASCE 7-10 15.5.3)
z= 20 ft, rack floor height from building ground (ASCE 7-10 13.3.3.1)
h= 36 ft, average building roof height (ASCE 7-10 13.3.3.1)

Calculate Vertical Distribution of Rack Base Shear (lbs) & Allowable Elastic Drift (ASCE 7-10 12.8.3 & 15.5.3.3)

Level Wx hx hxk Wxhxk Fx , ASD (12.8-11) d xe,allowable, in, ASD


3 1170 20 20.0 23400 540.9 ( 0.46 Wx ) 8.571
2 10 8 8.0 80 1.8 ( 0.18 Wx ) 3.429
1 10 0.5 0.5 5 0.1 ( 0.01 Wx ) 0.214
1190.0 23485 542.8

Where k= 1 (ASCE 7-10 15.5.3.2)


d xe,allowable, ASD = 5% hx/1.4, (ASCE 7-10 15.5.3.4)

Calculate Lateral Forces (lbs), at Each Joint of Both Directions, and Max Reactions (lbs) (ASCE 7-10 15.5.3.2)

Case a, (ASCE 7-10 15.5.3.2 a)


Level ex (ft) Wx F M RT RC
3 3 783.9 181.2 544
2 3 6.7 0.6 2
1 3 6.7 0.0 0
797.3 181.9 545.6 1688.5 2485.8

Case b, (ASCE 7-10 15.5.3.2 b)


Level ex (ft) Wx F M RT RC
3 3 1170 270.4 811
2 0 0.0 0
1 0 0.0 0
1170.0 270.4 811.3 2525.0 3695.0
Anchorage & Summary
2 - 1/2" f, w/ 1 7/8" emb in 2.5 ksi conc, ITW Red Head Wedge required at each column base. (ICC ESR-2251
(Ps / Pt) + (Vs / Vt) = 2.397 > 1.20 [UNSATISFACTORY]
Where Ps = 1262.5 lbs Pt = 557 lbs / bolt, (ICC ESR-2251)
Vs = 135.2 lbs, Vt = 1033.5 lbs / bolt, (ICC ESR-2251)
Notes:
1. Input W2 & e2 zero for only 2 level rack, or lump some levels together at their top for more than 3 levels.
2. Rack self should be designed by Manufacturers Institute Specifications (RMI), or from ICC report.
a. Vertical impact load factor is 1.25 (RMI 2.4)
b. Max beam deflection is 1/180 (RMI 2.5)
c. Allowable soil capacity for slab on grade is 500 psf.
Wp, ASD

lbs,
ASD level force at each L rack)

10 12.8.3 & 15.5.3.3)


d xe,allowable, in, ASD

ASCE 7-10 15.5.3.2)

RV
181.9

RV

270.4
(cont'd)

ch column base. (ICC ESR-2251)

s / bolt, (ICC ESR-2251)


s / bolt, (ICC ESR-2251)

op for more than 3 levels.


or from ICC report.
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Lateral Loads of Storage Racks Based on ASCE 7-05

Determine Rack Base Shear (Derived from ASCE 7-05 15.5.3 & 13.3)

1   0.4a p S DS I pW p  z 
V F p  Max  0.3S DS I pW p , Min   1  2  , 1.6 S DS I pW p   0.34
1.5   Rp  h  
= 100.9
(ASD level force at each L ra
Where SDS = 1.121 (ASCE 7-05 11.4.4)
Ip = 1.5 (ASCE 7-05 15.5.3.1)
Wp = W1 + W2 + W3 = 300.0 lbs, each L rack
ap = 2.5 (ASCE 7-05 15.5.3)
Rp = 4 (ASCE 7-05 15.5.3)
z= 0 ft, rack floor height from building ground (ASCE 7-05 13.3.3.1)
h= 36 ft, average building roof height (ASCE 7-05 13.3.3.1)

Calculate Vertical Distribution of Rack Base Shear (lbs) & Allowable Elastic Drift (ASCE 7-05 12.8.3 & 15.5.3.3)

Level Wx hx hxk Wxhxk Fx , ASD (12.8-11) d xe,allowable, in, ASD


3 300 18.5 18.5 5550 100.9 ( 0.34 Wx ) 7.929
2 0.01 6.5 6.5 0 0.0 ( 0.12 Wx ) 2.786
1 0.01 0.5 0.5 0 0.0 ( 0.01 Wx ) 0.214
300.0 5550 100.9

Where k= 1 (ASCE 7-05 15.5.3.2)


d xe,allowable, ASD = 5% hx/1.4, (ASCE 7-05 15.5.3.4)
Wp, ASD

lbs,
ASD level force at each L rack)

d xe,allowable, in, ASD


PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Lateral Loads of Storage Racks Based on ASCE 7-05

Determine Rack Base Shear (Derived from ASCE 7-05 15.5.3 & 13.3)

1   0.4a p S DS I pW p  z 
V F p  Max  0.3S DS I pW p , Min   1  2  , 1.6 S DS I pW p   0.46
1.5   Rp  h  
= 542.8
(ASD level force at each L ra
Where SDS = 1.173 (ASCE 7-05 11.4.4)
Ip = 1.5 (ASCE 7-05 15.5.3.1)
Wp = W1 + W2 + W3 = 1190.0 lbs, each L rack
ap = 2.5 (ASCE 7-05 15.5.3)
Rp = 4 (ASCE 7-05 15.5.3)
z= 20 ft, rack floor height from building ground (ASCE 7-05 13.3.3.1)
h= 36 ft, average building roof height (ASCE 7-05 13.3.3.1)

Calculate Vertical Distribution of Rack Base Shear (lbs) & Allowable Elastic Drift (ASCE 7-05 12.8.3 & 15.5.3.3)

Level Wx hx hxk Wxhxk Fx , ASD (12.8-11) d xe,allowable, in, ASD


3 1170 20 20.0 23400 540.9 ( 0.46 Wx ) 8.571
2 10 8 8.0 80 1.8 ( 0.18 Wx ) 3.429
1 10 0.5 0.5 5 0.1 ( 0.01 Wx ) 0.214
1190.0 23485 542.8

Where k= 1 (ASCE 7-05 15.5.3.2)


d xe,allowable, ASD = 5% hx/1.4, (ASCE 7-05 15.5.3.4)
Wp, ASD

lbs,
ASD level force at each L rack)

d xe,allowable, in, ASD

Potrebbero piacerti anche