Location: EXPANSION OF EXISTING DEPOT AT BAC ACTIVITY: TREE CUTTING/FELLING/BALLING SHIMIZU CORPORA
Prepared by: scpobre *Project
*Struck by employee
RISK LEVEL BEFORE MITIGATION
No. ACTIVITY HAZARD RISK Risk Owner
Likelihood
Consequence
Index
*Caught between
*Hit by/Hit against
Moving Of * Pinch
Materials/Equipment 3 3 9 *Project
Point employee
* Run over
Equipment RESULTS:
1 obilization at
Project site People: Head Injury,Trauma, *
RESULTS:
SoftTissue ( cuts,laceration) Third Party
Vehicular Accident 2 3 6 Employee
*Noise Pollution
*
Caught in (from falling tree) People:
Tree Felling and *Felling of tree, tree
2 Balling Limbs
*Project *
employee
Third Party
* hearing problem, respiratory problem, Employee
* Fumes fracture , laceration
*Contact with Machinery
Adjacent Properties:
2 3 6
Property damage , tearRESULT:
off & breaks, total wreckage
People:
death, laceration,fracture,Complaint, Irritated ocous
* slips &
membrane
trips *Project *
Third Party
employee
* Saw Material/Adjacent Employee
Dust/Wood Dust Property:
* fall into the ground
wreckage,property damage
* Obstruction on the
RESULT:
3 3 9
Access
People: sprain, strain,
laceration
Prolonged
* Overload work execution
Small and Large Trees 3 3 9
* Hit By
RESULT: *Project
employee
*
People: fracture,
* Third Party
laceration,death,
Air Contamination abrasion Employee
Material/Adjacent Property:
Broken limbs,property damage * Eye Injury
5 Housekeeping
*Dust
2 2 4
RESULT:
*
People: Irritated Mocous membrane, Eye, Nasal Third Party
*twigs & leave infection/congestion Employee
Consequence:
1 - Improbable - Extremely unlikely to occur in relevant period 5 - Catastrophic - Death or major loss; total systems failure
2 - Remote - Unlikely to occur in relevant period 4 - Critical - major injury, major damage to property/infrastractures, or major environment effect 16 - 25
3 - Occasional - Likely to occur in relevant period 3- Serious - Lost time injury or illness; minor damage to property/infrastracture or significant
4 - Probable - Likely to occur several times in relevant period environmental effect 9 - 15
5 - Frequent - Likely regular occurrence in relevant period 2 - Marginal - Minor First aid incident
1 - Insignificant - Unlikely to have impact on works. 6-8
1- 5
Edward C. Agustines
Samuel C. Pobre
1 3 3
* Equipment in good
conditon
1 3 3
* Notify
about the possible disturbance
1 3 3
* Provide
equipment operational worthiness
1 3 3
* Dust Mask must
wear during the activity
INDEX
16 - 25 Very High Risk - unaccaptable. Re-examine activities to provide lower risk
9 - 15 High Risk - Apply further mitigation measures and/or alter method of work to reduce risk further. Seek Project Director approval if risk cannot be reduced.
6-8 Medium Risk - Tolerable only if further mitigation is not reasonably practical and there is need to continue activity with identified controls.
1- 5 Low Risk - Broadly acceptable if all reasonably practicable control measures in place.
ustines
Project Manager
CONTRACTOR CMX REPRESENTATIVE
ANTICIPATED MEASURE THAT COULD BE APPLIED BY THE CONTRACTOR (OR
OTHERS where stated)
*Place barrier at Lay-down and staging area and material movement exclusion area for materials
*Ensure all operator are certified and with TESDA NCII certification
*Ensure all operator are certified and with TESDA NCII certification
* Ensure all deploy heavy equipment with valid third party inspection
certification.
of work to reduce risk further. Seek Project Director approval if risk cannot be reduced.
easures in place.
CMX REPRESENTATIVE