HAZARD IDENTIFICATION & RIS

Location: EXPANSION OF EXISTING DEPOT AT BAC ACTIVITY: TREE CUTTING/FELLING/BALLING SHIMIZU CORPORA
Prepared by: scpobre *Project
*Struck by employee
RISK LEVEL BEFORE MITIGATION
No. ACTIVITY HAZARD RISK Risk Owner
Likelihood
Consequence
Index
*Caught between
*Hit by/Hit against
Moving Of * Pinch
Materials/Equipment 3 3 9 *Project
Point employee
* Run over
Equipment RESULTS:
1 obilization at
Project site People: Head Injury,Trauma, *
RESULTS:
SoftTissue ( cuts,laceration) Third Party
Vehicular Accident 2 3 6 Employee
*Noise Pollution

People: death , fracture , laceration ,


* Noise
confusion *Project
* Air Pollution employee
Material/Adjacent Property: *
Third Party
Employee
* Hit by/Struck by felling tree
property damage
* Vibration * Hit by/Struck by tree RESULTS: 2 3 6

*
Caught in (from falling tree) People:
Tree Felling and *Felling of tree, tree
2 Balling Limbs
*Project *
employee
Third Party
* hearing problem, respiratory problem, Employee
* Fumes fracture , laceration
*Contact with Machinery

Adjacent Properties:

2 3 6
Property damage , tearRESULT:
off & breaks, total wreckage

People: fracture,Laceration, death


*
Third Party
Employee
Material /Adjacent Property:
* Falling Tree, Tree limbs
* Struck By *Project
employee

* Slips and Trips


* Noise * Noise &
Cutting of Trees & Vibration Vibration
3 & Shrubs 2 3 6
* RESULT:

People:
death, laceration,fracture,Complaint, Irritated ocous
* slips &
membrane
trips *Project *
Third Party
employee
* Saw Material/Adjacent Employee
Dust/Wood Dust Property:
* fall into the ground
wreckage,property damage

* Obstruction on the
RESULT:
3 3 9
Access
People: sprain, strain,
laceration

Adjacent Properties: * Falling/Slipping of *Project


Hauling of Cut & tree employee *
4 Balled Tree Third Party
Disturbed of adjacent Employee
properties/neighborhood *Struck By

Prolonged
* Overload work execution
Small and Large Trees 3 3 9
* Hit By

RESULT: *Project
employee
*
People: fracture,
* Third Party
laceration,death,
Air Contamination abrasion Employee

Material/Adjacent Property:
Broken limbs,property damage * Eye Injury
5 Housekeeping
*Dust
2 2 4

RESULT:

*
People: Irritated Mocous membrane, Eye, Nasal Third Party
*twigs & leave infection/congestion Employee
Consequence:
1 - Improbable - Extremely unlikely to occur in relevant period 5 - Catastrophic - Death or major loss; total systems failure
2 - Remote - Unlikely to occur in relevant period 4 - Critical - major injury, major damage to property/infrastractures, or major environment effect 16 - 25
3 - Occasional - Likely to occur in relevant period 3- Serious - Lost time injury or illness; minor damage to property/infrastracture or significant
4 - Probable - Likely to occur several times in relevant period environmental effect 9 - 15
5 - Frequent - Likely regular occurrence in relevant period 2 - Marginal - Minor First aid incident
1 - Insignificant - Unlikely to have impact on works. 6-8

1- 5

Edward C. Agustines
Samuel C. Pobre

ESH Project Manag


CONTRACTOR CONTRACTOR
SHIMIZU CORPORATION
MITIGATION MEASURE TO BE TAKEN BY RISK LEVEL AFTER MITIGATION
DESIGNER Likelihood Consequence Index

*Establishing Lay-down and staging area 1 3 3

* Only Certified, Trained & experience personnel to


involve in the activity
1 3 3
* Equipment in good condition

*Only certified,Trained & experience personnel


to involve in the activity

1 3 3

* Equipment in good
conditon

* Isolate the work


area 1 3 3

* Preacaution and notify all personnel


involve in the activity
*Isolate the work area

1 3 3

* Notify
about the possible disturbance

*Determine which areas to be


notified of the hazard

* Ensure the access fit for all activities it will 1 3


cover

*Provide valid training and certification

1 3 3
* Provide
equipment operational worthiness

1 3 3
* Dust Mask must
wear during the activity
INDEX
16 - 25 Very High Risk - unaccaptable. Re-examine activities to provide lower risk

9 - 15 High Risk - Apply further mitigation measures and/or alter method of work to reduce risk further. Seek Project Director approval if risk cannot be reduced.

6-8 Medium Risk - Tolerable only if further mitigation is not reasonably practical and there is need to continue activity with identified controls.

1- 5 Low Risk - Broadly acceptable if all reasonably practicable control measures in place.

ustines

Project Manager
CONTRACTOR CMX REPRESENTATIVE
ANTICIPATED MEASURE THAT COULD BE APPLIED BY THE CONTRACTOR (OR
OTHERS where stated)

*Place barrier at Lay-down and staging area and material movement exclusion area for materials

*Place warning signage from unauthorized access.

* Training of personnel in heavy equipment safety operation

* Accomplished Daily Walk Around Inspection

*Ensure all operator are certified and with TESDA NCII certification

*Ensure all operator are certified and with TESDA NCII certification

* Ensure all deploy heavy equipment with valid third party inspection
certification.

* Ensure to backfill immediately the hole


* Accomplished daily Walk Around Inspection

* Only workforce assigned at the activity is allowed within the area of


premises of the equipment
* Assign banksman to direct the operation/assist
the operator
* Communicate hazards to crew member
* Wear
complete PPE's on work site
* Provide signage, stragecally located with the highly affected areas. Install
safety protection to adjacent properties to be affected.: barrier,safety nets whichever is applcable
* Keep workers from dusty area
* Install chainsaws local
exhaust ventillation

* Ensure access are free from any obstruction *

* Operator & rigger Third party certification from TESDA NC II or ACCEL

* Equipment certification from TESDA and ACCEL for operational


wortiness

* Wear appropriate safety equipment & be worn at all times.


er risk

of work to reduce risk further. Seek Project Director approval if risk cannot be reduced.

practical and there is need to continue activity with identified controls.

easures in place.