Scope of Works:
1 GENERAL REQUIREMENTS
1.1 Mobilisation/ Demobilization
1.2 Clearing & Layout
2 SITE WORKS
2.1 Earthworks
2.1.1 Excavation
2.1.3 Filling, & Compaction
3 CONCRETE WORKS
3.1 Column Footing
3.2 Wall Footing
3.3 Rc Column
3.3.1 Ground Floor
3.3.2 Second Floor
3.4 Beams
3.4.1 Footing Tie Beam
3.4.2 Second Floor Beam
3.4.3 Roof Beam
3.5 Lintel Beams
3.5.1 Ground Floor
3.5.2 Second Floor
3.6 Slab
3.6.1 Ground Floor Slab
3.6.2 Second Floor Slab
4 MASONRY WORKS
4.1 CHB Laying (Ground Floor)
4.2 CHB Laying (Second Floor)
5 PLASTERING
5.1 Ground Floor
5.2 Second Floor
6 TILEWORKS
6.1 Ground Floor
6.2 Second Floor
7 PAINTING
7.1 Masonry
7.2 Carpentry
8 DOOR &ALUMINUM ASEMENT WINDOWS
9 PLUMBING WORKS
9.1 Ground Floor
9.1.1 Fixtures.Pipes & Fittings
9.1.2 Water lines (Rough-in)
9.2 Second Floor
9.2.1 Fixtures.Pipes & Fittings
9.2.2 Water lines (Rough-in)

10 CEILING
10.1 Ground Floor
10.2 Second Floor
11 ELECTRIAL WORKS
11.1 Eletrical Devices
11.2 Boxes
11.3 PVC Electrical Pipe ( Poly )
11.4 PVC Electrical Elbow Long Bond 90
11.5 PVC Electrical Adoptop
11.6 Wires
11.7 Panel Board
11.8 Others
12 CABINETS
13 ROOFING
13.1 Roofing Framing
13.2 Roofing
14 STAIRS