6.1 RF ADJUSTMENT....................................................................................................... 13
7 ATTACHMENT .............................................................................................................. 15
Total Sites xx xx
UE lock in GSM only mode and do idle mode test for Rx-level
Fig: Pre Swap Cluster 1 DT Route Fig: Post Swap Cluster 1 DT Route
Pre and Post plot of drive result need to be provided for all parameters like BCCH, Rx-level, RxQual,
Throughput etc..
Below KPIs are for monitoring and record purpose and may not be used for acceptance.
Major deviation need to be discussed with Vendor for reasons and if deviation is because of
swap then Vendor has to rectify the same
Pre Swap Post Swap
Performance Indicator (3 Days (3 Days
Average) Average)
DL hard blocking(DBBH)<=2%
6.1 RF Adjustment
*Records of engineering parameter Adjustments done during the optimization process should be
attached here*
Parameter
Training_G1
Training_G2
reduce CRO
111262-D1 12365 Channel Type TCHF, PDTCH, To improve PS service, make all
[Congestion]
[Call Drop]
drop rate.
7 Attachment
Engineering parameter table and RF tuning record table