Sei sulla pagina 1di 1

13

14

15
10

16
12
11
5

9
6

8
3
1

4
2
NOTES
A 315159.85 m E

A
1)All Dimension Are In METER.
3370482.87 m N 2)The Drawings Prepared Based On
The Clients Information.
3)The Foundation Of The Cranes
Should Have Required Bearing Capacity
(Prepared By Client).
4)The Specification Of Equipment
Details Of C.O.G And Lifting Points Are
Specified By Client .
5)Marked Points On The Drawings

B
B Should Be Cleared Before Lifting
Operation .
6) Client Should Provide The Contractor
With Weather Information Of The Site
Before Lifting Operation .

Abbreviation:

C
HYDRANTS & MANWAYS

DYKE WALLS APPROVED BY NGS


PETROCHEMICAL INPUT PIPERACK 120
POWER CABLE 367
D

D
RAILWAY BRIDGE 148 SWEETENING UNIT NEW PIPERACK
563 APPROVED BY HSE Heavy Lifting

229 78
175
SPECIAL ECONOMIC ZONE GATE

E
E
APPROVED BY SUPERVISION

138

131
F

F
317470.41 m E
3369201.83 m N

00 2018.SEP.8 Information R.Navardi R.Nademi SH.Faghihi

OFF-SITE PLAN FOR TRANSPORTATION

G
G Rev Date Issue For PER CHKD AUTHORIZED Approved

BOUALI SINA PETROCHEMICAL


Scale 1:770 Drawing Title:
OFF-SITE PLAN FOR
TRANSPORTATION
T-8001
Size A3
IMS Code: IMSD-EN-DR-001-00
Client Project Doc. Unit Tag Weight Sheets
LP
Drawing No. Ton No

H
No.
H
No. L.P 11 of 11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16