PROPOSED THREE(3) BEDROOM -ONE(1) STOREY RESIDENTIAL BUILDING

LOCATED AT COMMUNITY 25 EXTENSION,


NINGO-PRAMPRAM DISTRICT,GREATER ACCRA.

CLIENT: BENJAMIN AFAYIZU


DRAWN BY: EMMANUEL
CHECKED BY : ING. DR. C.K. WENYONU
7. THE VARIOUS SIZES OF PARTICLES OF WHICH AN AGGREGATE IS COMPOSED SHALL
BE UNIFORMLY DISTRIBUTED THROUGHOUT THE MASS.
LIST OF DRAWINGS
1. GROUND FLOOR PLAN-----------------------------------------------------------------SHEET 01 8. FINE AGGREGATES SHALL CONSIST OF SAND OR CRUSHED ROCK OF ONE OR MORE
OF TYPES GIVEN ABOVE AND MUST COMPLY WITH B.S. 882.
2. FIRST FLOOR PLAN--------------------------------------------------------------------SHEET 02 3 3
STRIP FOOTING - 20 N/mm 1:3:6 0.11m 0.21m 0.55 27.5 LITRES
3. ELEVATION----------------------------------------------------------------------------- SHEET 03 9. THE AGGREGATES (FINE & COARSE) SHALL NOT CONTAIN ANY HARMFUL MATERIAL
IN SUFFICIENT QUANTITY TO AFFECT ADVERSELY THE STRENGTH, FOUNDATIONS-PAD / 50 30 N/mm 1:2:4 0.07m
3
0.14m3 0.55
4. ELEVATION------------------------------------------------------------------------------SHEET 04 ISOLATED FOOTINGS 27.5 LITRES
WEAR RESISTANCE OR DURABILITY OF THE CONCRETE. 3 3
5. SECTION CC-CC------------------------------------------------------------------------SHEET 05 BEAMS 25 30 N/mm 1:2:4 0.07m 0.14m 0.55 27.5 LITRES
10. THE STRUCTURAL ENGINEER RESERVE THE RIGHT TO CHANGE THE GRADING OF THE
SLABS 25 30 N/mm 1:2:4 0.07m 0.14m3
3 0.55 27.5 LITRES
6. ROOF PLAN----------------------------------------------------------------------------SHEET 06 25
3 3
0.5
VARIOUS AGGREGATES. COLUMNS 40 N/mm 1:1 :3 0.053m 0.105m 25 LITRES
7. FOUNDATION PLAN-------------------------------------------------------------------SHEET 07
8. ELECTRICAL LAYOUT ON GROUND FLOOR ---------------------------------------SHEET 08 11. WATER SHALL BE CLEAN AND FREE FROM CHEMICALS AND HARMFUL MATTER.
9. ELECTRICAL LAYOUT ON FIRST FLOOR-------------------------------------------SHEET 09 2
12. CEMENT SHALL BE ORDINARY PORTLAND (OPC) AND PORTLAND LIMESTONE (PLC)
10. PLUMBING LAYOUT ON GROUND FLOOR------------------------------------------SHEET 10 AND MUST COMPLY WITH B.S.12.

11. PLUMBING LAYOUT ON FIRST FLOOR---------------------------------------------SHEET 11 13. CEMENT OF GRADE 42.5 N EXTRA (SUPER STRENGTH) SHALL BE USED FOR ALL
12. GENERAL ARRANGEMRNT ON ROOF PLAN----------------------------------------SHEET 12 REINFORCED CONCRETE WORKS AND GRADE 32.5R (SUPER RAPID) FOR MASONRY
WORKS.
13. FENCEWALL DESIGN-----------------------------------------------------------------SHEET 13 29. ALL BLOCKWORK SHALL BE NON-LOAD BEARING WITH A MINIMUM COMPRESSIVE
14. GENERAL ARRANGEMENT OF GROUND FLOOR PLAN --------------------------SHEET 14 14. THE REINFORCEMENT SHALL UNLESS SPECIFIED OTHERWISE BE MILD STEEL STRENGTH OF 5N/mm
15. GENERAL ARRANGEMENT ON FIRST FLOOR PLAN------------------------------SHEET 15 COMPLYING WITH B.S. 4449 WITH YIELD STRESS 250N/mm OR SIMILAR
APPROVED. 30. STRUCTURAL TIMBER SHALL BE WELL SEASONED ODUM FREE FROM ALL DEFECTS AND
16. GENERAL ARRANGEMENT OF ROOF BEAMS--------------------------------------SHEET 16 COMPLYING WITH THE CURRENT B.S. 112 OR SIMILAR APPROVED.
17. SEPTIC TANK DETAILS---------------------------------------------------------------SHEET 17 15. ANY CONSIGNMENT OF STEEL INTENDED TO BE USED ON THIS PROJECT SHALL BE
18. DOORS & WINDOWS SCHEDULE---------------------------------------------------SHEET 18 CERTIFIED STIPULATING THAT THE ABOVE SPECIFICATION HAS BEEN COMPLIED 31. ALL STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUCTION WITH THE
19. FIRST FLOOR SLAB DETAILS--------------------------------------------------------SHEET 19 WITH. ARCHITECTURAL DRAWINGS AND ANY DISCRIPANCIES MUST BE REPORTED TO THE
20. COLUMN BASE DETAILS-------------------------------------------------------------SHEET 20 STRUCTURAL ENGINEER.
21. COLUMN DETAILS---------------------------------------------------------------------SHEET 21 16. NOTWITHSTANDING THE PROVISION OF No. 15 ABOVE, THE CONTRACTOR SHALL AT
22. BEAMS DETAILS-----------------------------------------------------------------------SHEET 22 HIS OWN COST AND AS DIRECTED BY THE ENGINEER SUPPLY SAMPLES FOR THE 32. ALL STRUCTURAL WORKS MUST BE INSPECTED BY THE STRUCTURAL ENGINEER
23. STAIRCASE DETAILS------------------------------------------------------------------SHEET 23 TENSILE AND OTHER RELEVANT TESTS. PRIOR TO ANY CONSTRUCTION THERE UPON.
24. BLOCK & SITE PLAN------------------------------------------------------------------SHEET 24
17. ANY CONSIGNMENT NOT MEETING THE SPECIFICATION ABOVE SHALL BE REMOVED 33. REFER TO ARCHITECTS DRAWINGS FOR CONCRETE FINISHES, GROOVES, CHAMFERS,
FROM THE SITE WITHIN 24 HOURS UPON NOTIFICATION TO DO SO BY THE SLEEVES AND OTHER ITEMS TO BE CAST IN.
STRUCTURAL ENGINEER.
GENERAL NOTES 34. WHEN IN DOUBT OF ANY STRUCTURAL DETAIL,
18. NO REINFORCEMENT SHALL BE WELDED WITHOUT THE WRITTEN PERMISSION CONSULT THE STRUCTURAL ENGINEER.
1. EXCAVATION FOR ISOLATED FOOTING/PAD FOUNDATION, EXCAVATION SHALL BE DONE OF THE STRUCTURAL ENGINEER. BEFORE ANY WELDING IS CARRIED OUT, DETAILS
TO A DEPTH NOT EXCEEDING 950mm OF WELDING PROCESS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR 35. EXPANSION JOINT MATERIAL SHALL BE 50mm THICK POLYSTERENE.
HIS APPROVAL OR OTHERWISE.
2. EXCAVATION FOR STRIP FOOTING SHALL BE DONE TO A DEPTH NOT EXCEEDING 36. DAMP PROOF MEMBRANE
500mm. 19. REINFORCEMENT WILL BE INSPECTED BY THE ENGINEER ONLY AFTER IT HAS BEEN
DAMP PROOF MEMBRANE MATERIAL SHALL BE TRANSPARENT POLYTHENE SHEET LAID
COMPLETELY FIXED IN POSITION WITH COVER BLOCKS IN PLACE
ON TOP OF HARDCORE FILL MATERIAL AT SUB-STRUCTURE LEVEL BEFORE OVERSITE
3. CONTRACTOR MAY BE REQUIRED TO EXCAVATE FURTHER DEEP TO A FIRM GROUND IF AND AFTER THE CONTRACTOR HAS INSPECTED EVERYTHING HIMSELF.
2 CONCRETE IS CAST
SOIL AT FOUNDATION LEVEL IS FOUND UNSUITABLE. HENCE ADDITIONAL WORK
NOTE:
MEASURED AND REIMBURSED ACCORDINGLY. 20. STEEL MESH FABRIC REINFORCEMENT (B.R.C MESH No. 65) TO B.S. 4483 WITH
37. ABBREVIATIONS
300mm LAPS AT JOINTS.
B1 - OUTER BOTTOM REINFORCEMENT
4. IF THE EXCAVATED MATERIAL IS CLAYEY IT SHALL BE REMOVED FROM SITE TO A
21. BLINDING SHALL BE OF GRADE C10/40 AND MASS CONCRETE OF GRADE C20/40. B2 - INNER BOTTOM REINFORCEMENT
DUMP AS DIRECTED BY THE STRUCTURAL ENGINEER.
T1 - OUTER TOP REINFORCEMENT
22. ALL FORMWORK MUST BE CLEAN AND SUFFICIENTLY RIGID.
T2 - INNER TOP REINFORCEMENT
5. IF THE EXCAVATED MATERIAL IS CLAYEY, THEN THE BACK-FILL MATERIAL SHALL BE 23. REINFORCED CONCRETE FOR ALL SUB-STRUCTURAL & SUPER-STRUCTURAL R - ROUND MILD STEEL REINFORCEMENT BAR
IMPORTED, FREE DRAINING, GRANULAR AND PLACED AND COMPACTED TO 98% EW - EACH WAY
WORKS SHALL HAVE A CHARACTERISTIC COMPRESSIVE STRENGTH fcu=30N/mm
MAXIMUM DRY DENSITY(MDD) AT OPTIMUM MOISTURE CONTENT(OMC) IN LAYERS ST - STEEL
AT 28DAYS.
NOT EXCEEDING 300mm IN COMPACTED THICKNESS USING A SUITABLE INT - INTERCHANGE
COMPACTION EQUIPMENT TO ACHIEVE COMPACTION LEVELS IN ACCORDANCE WITH 24. MECHANICAL (POKER) VIBRATORS SHALL BE USED THROUGHOUT ALL CONCRETE BM - BEAM
B.S.1377 AND B.S.6031. OPERATIONS.
COL - COLUMN
G.A - GENERAL ARRANGEMENT
6. MACHINE CRUSHED GRANITE COARSE AGGREGATES OF MAXIMUM SIZE 20mm 25. CONCRETE SHALL BE CURED AFTER SETTING WITH MOIST SACKS FOR COLUMNS
GRADED DOWN TO 10mm SHALL BE USED, EXCEPT FOR STRIP FOUNDATIONS R.C. - REINFORCED CONCRETE
AND MOIST SAND AND SACKS FOR BEAMS AND SLABS.
WHERE MAXIMUM SIZE SHALL BE 38mm AND MUST COMPLY WITH B.S.882.
26. NO ADMIXTURES SHALL BE USED WITHOUT PRIOR APPROVAL OF STRUCTURAL 38. ALL DIMENSIONS ARE IN MILLIMETERS OTHERWISE UNLESS SPECIFIED BY
ENGINEER. ARCHITECT/STRUCTURAL ENGINEER.

27. CONSTRUCTION JOINT NOT INDICATED ON THE DRAWINGS SHALL BE SO MADE AND
LOCATED AS NOT TO SIGNIFICANTLY IMPAIR THE STRENGTH OF THE STRUCTURE.

28. CONCRETE COVER TO REINFORCEMENT, MIX DESIGN AND WATER/CEMENT RATIO


AS SHOWN IN THE TABLE (1) :
NOTE
A B C D E F G H
Figured dimensions only are to be
followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
1 1 occur between architectural,
engineering or Sub-Contractors
PORCH
2 600 X 600 PORCELAIN 2 drawings, the Contractor shall
TILE

PORCH immediately contact the Architect for


600 X 600 PORCELAIN

3 KITCHEN
600 X 600 PORCELAIN
TILE
3 clarification.
TILE

4 STORE 4
600 X 600 PORCELAIN
TILE ALL DIMENSIONS ARE IN MILLIMETERS

DINING
5 600 X 600 PORCELAIN
TILE
5
UP

6 CORRIDOR 6
600 X 600 PORCELAIN
TILE
GUEST WC
500 X 500 PORCELAIN
TILE

7 7
8 8

9 9

10 10
LIVING ROOM VISITORS ROOM
600 X 600 PORCELAIN 600 X 600 PORCELAIN
TILE TILE

11 11

12 12
PORCH
600 X 600 PORCELAIN
TILE

13 13 REV DATE REVISION READ UP

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :
A B C D E F G H GROUND FLOOR PLAN
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/01
NOTE
A B C D E E1 F G H
Figured dimensions only are to be
followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
1 1 occur between architectural,
engineering or Sub-Contractors
2 2 drawings, the Contractor shall
WC/BATH immediately contact the Architect for
3 500 X 500 PORCELAIN
TILE
3 clarification.
BEDROOM 3
600 X 600 PORCELAIN

4 TILE
4
ALL DIMENSIONS ARE IN MILLIMETERS
BEDROOM 2
600 X 600 PORCELAIN
TILE

5 5
UP

cf : rendered & painted


ff : porcelain tile
6 CORRIDOR 6
600 X 600 PORCELAIN
TILE

WC/BATH
500 X 500 PORCELAIN
TILE

7 7
8 WC/BATH
8
500 X 500 PORCELAIN
TILE

9 9

10 10
MASTER BEDROOM
600 X 600 PORCELAIN
TILE

11 WARDROBE WARDROBE
11

12 12
BALCONY
600 X 600 PORCELAIN
TILE

13 13 REV DATE REVISION READ UP

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :
A B C D E E1 F G H
FIRST FLOOR PLAN
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/02
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
A B C D E F G H
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

ALL DIMENSIONS ARE IN MILLIMETERS

REV DATE REVISION READ UP

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

ELEVATIONS
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/03
NOTE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

ALL DIMENSIONS ARE IN MILLIMETERS

1 2 3 4 5 6 7 8 9 10 11 12 13 14

REV DATE REVISION READ UP

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

ELEVATION
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/04
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
H
A B C D E E1 F G
drawings, the Contractor shall
immediately contact the Architect for
50x75 H/W PURLING@ 1000 C/C.
clarification.
50X50 H/W CEILING HANGERS@1050 C/C.

75 X 50 H/W FOR CEILING ALL DIMENSIONS ARE IN MILLIMETERS

350 x 225 ROOF BEAM

BEDROOM 3 WC/BATH
BEDROOM 2

DINING CORRIDOR STORE

150mm Rc. floor slab

300 mm hardcore

350 mm depth earth

225 mm depth fdn


REV DATE REVISION READ UP

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

SECTION CC-CC
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/05
NOTE

Figured dimensions only are to be


A1 A B C C1 D E E1 F G H H1 followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1a 1a
engineering or Sub-Contractors
1 1 drawings, the Contractor shall
2a 2a
immediately contact the Architect for
2 2 clarification.

3 3
ALL DIMENSIONS ARE IN MILLIMETERS
4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12 REV DATE REVISION READ UP

13 13

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :
A1 A B C C1 D E E1 F G H H1
ROOF PLAN
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/06
NOTE

Figured dimensions only are to be


A B C D E F G H
followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1 1 engineering or Sub-Contractors
B3 B3 STRIP FOOTING B3

B3 B3
drawings, the Contractor shall
2 H.C.F 2 immediately contact the Architect for
STRIP FOOTING
H.C.F clarification.
3 3
H.C.F B3
SECTION D-D
B3
4 4 ALL DIMENSIONS ARE IN MILLIMETERS
H.C.F STRIP FOOTING

B3 B3
5 5
B3 B3 B3

STRIP FOOTING
H.C.F
B3
6 6
B3 H.C.F
H.C.F

7 7 SECTION E-E
B3 B3 B3 B3
8 8
B2

STRIP FOOTING
9 9
B3 B3
STRIP FOOTING
STRIP FOOTING

B2
10 10
B3

STRIP FOOTING
H.C.F H.C.F
STRIP FOOTING

''B''
STRIP FOOTING

11 11

12 B1 B1
12
B3 B3
STRIP FOOTING H.C.F REV DATE REVISION READ UP
13 13
B3 B3

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :
A B C D E F G H FOUNDATION PLAN
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/07
NOTE

A B C D E F G H Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1 1
engineering or Sub-Contractors
PORCH drawings, the Contractor shall
2 2 immediately contact the Architect for
PORCH

KITCHEN
clarification.
3 3
ALL DIMENSIONS ARE IN MILLIMETERS
4 STORE 4

DINING
LEGEND
5 5
UP Surface mount light

6 CORRIDOR 6
Semi-flush mount
GUEST WC

7 7 Ceiling fan

8 8
Air Condition

9 9
Water Heater

Two way switch

10 10
LIVING ROOM VISITORS ROOM One way switch

Regulator for air condition

Regulator for ceiling fan


11 11

12 12
PORCH
REV DATE REVISION READ UP
13 13

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

ELECTRICAL LAYOUT ON GROUND FLOOR


A B C D E F G H
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/08
NOTE

A B C D E E1 F G H Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1 1 engineering or Sub-Contractors
drawings, the Contractor shall
2 2 immediately contact the Architect for
WC/BATH

clarification.
3 3
BEDROOM 3

4 4 ALL DIMENSIONS ARE IN MILLIMETERS

BEDROOM 2
LEGEND
5 5
Surface mount light
UP

cf : rendered & painted


ff : porcelain tile
6 CORRIDOR 6
Semi-flush mount

WC/BATH

Ceiling fan
7 7
8 WC/BATH
8
Air Condition

9 9
Water Heater

Two way switch

10 10 One way switch


MASTER BEDROOM

Regulator for air condition

Regulator for ceiling fan


11 WARDROBE WARDROBE
11

12 12
PORCH
REV DATE REVISION READ UP

13 13

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

ELECTRICAL LAYOUT ON FIRST FLOOR


A B C D E E1 F G H
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/09
NOTE

A B C D E F G H Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
100mm dia. waste pipe making any shop drawings.
ic ic
Should any divergence in dimensions

600x600 ic with gully trap


occur between architectural,

100mm dia. waste pipe


1 1
engineering or Sub-Contractors
PORCH drawings, the Contractor shall
2 2
immediately contact the Architect for
PORCH

3 KITCHEN
3 clarification.
ALL DIMENSIONS ARE IN MILLIMETERS
4 STORE 4
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
ic ALL ARCHITECTURAL DRAWINGS.
DINING 1. ALL WASTE WATER PIPES SHALL BE 50mm EXCEPT THE
5 5 OUTGOING FROM THE WASH HAND BASIN WHICH ARE
32mm CONNECTED TO A 50mm MAIN PIPE.

UP 2. ALL SANITARY APPLIANCES AND FLOOR DRAINS SHALL


BE FITTED WITH APPROPRIATE TRAPS.

6 CORRIDOR 6 3. RODDING EYES SHALL BE FITTED AT ALL SUITABLE LOCATIONS


mh GUEST WC IN THE WASTE WATER SYSTEM.
4.

7
ic 7
ALL DIMENSIONS ARE IN mm.
5. WHERE COLD WATER PIPES AND SOIL PIPES CROSS EACH OTHER ,
THE COLD WATER PIPE SHALL BE ON TOP WITH A MINIMUM
8 8
127 mm dia. soil pipe

CLEARANCE OF 200mm.
6. ALL SANITARY APPLIANCES AND ENTRY POINTS SHALL BE FITTED
9 9 WITH APPROPRIATE STOP VALVES AND COUPLINGS.

7. NO WASTE PIPE SHALL JOIN ANOTHER (WASTE OR SOIL) PIPE AT

AN ANGLE OF 900 OR WITH A 'T' JOINT


8. POSITION OF COLD WATER INTAKE AND STORAGE EQUIPMENT
ARE ONLY SHOWN INDICATIVELY. EXACT POSITION OF THESE

10 10
LIVING ROOM VISITORS ROOM LEGEND

mh WASTE PIPE KITCHEN SINK

SOIL PIPE
W C BOWL
MANHOLE
127 mm dia. soil pipe

INSPECTION CHAMBER WASH HAND BASIN

STOP VALVE
11 11 BATH BOWL

12 12
PORCH

13 13
REV DATE REVISION READ UP
mh
14 14

To main sewage
chamber

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
A B C D E F G H DESCRIPTION :

PLUMBING LAYOUT ON GROUND FLOOR

DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/10
NOTE

A B C D E E1 F G H Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1 1
engineering or Sub-Contractors
drawings, the Contractor shall
2 2
WC/BATH immediately contact the Architect for
clarification.
3 3
BEDROOM 3

4 4 ALL DIMENSIONS ARE IN MILLIMETERS

BEDROOM 2
THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
ALL ARCHITECTURAL DRAWINGS.
5 5 1. ALL WASTE WATER PIPES SHALL BE 50mm EXCEPT THE
OUTGOING FROM THE WASH HAND BASIN WHICH ARE
32mm CONNECTED TO A 50mm MAIN PIPE.
UP
cf : rendered & painted
ff : porcelain tile
2. ALL SANITARY APPLIANCES AND FLOOR DRAINS SHALL
BE FITTED WITH APPROPRIATE TRAPS.
6 CORRIDOR 6
3. RODDING EYES SHALL BE FITTED AT ALL SUITABLE LOCATIONS

WC/BATH
IN THE WASTE WATER SYSTEM.
4.
ALL DIMENSIONS ARE IN mm.
7 7 5. WHERE COLD WATER PIPES AND SOIL PIPES CROSS EACH OTHER ,
THE COLD WATER PIPE SHALL BE ON TOP WITH A MINIMUM
8 WC/BATH
8
CLEARANCE OF 200mm.
6. ALL SANITARY APPLIANCES AND ENTRY POINTS SHALL BE FITTED
WITH APPROPRIATE STOP VALVES AND COUPLINGS.
9 9
7. NO WASTE PIPE SHALL JOIN ANOTHER (WASTE OR SOIL) PIPE AT

AN ANGLE OF 900 OR WITH A 'T' JOINT


8. POSITION OF COLD WATER INTAKE AND STORAGE EQUIPMENT
ARE ONLY SHOWN INDICATIVELY. EXACT POSITION OF THESE

LEGEND
10 10
MASTER BEDROOM WASTE PIPE KITCHEN SINK

SOIL PIPE
W C BOWL
MANHOLE

INSPECTION CHAMBER WASH HAND BASIN

STOP VALVE
BATH BOWL
11 WARDROBE WARDROBE
11

12 12
PORCH

REV DATE REVISION READ UP


13 13

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

A B C D E E1 F G H PLUMBING LAYOUT ON FIRST FLOOR


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/11
C1 H1
4557
NOTE
5883

A1 A B C C1 D E E1 F G H H1
664 950 950 775 637 638 950 950 850 664 Figured dimensions only are to be
105
105
0 0 followed.
105
0 105
0 No dimensions are to be scaled;
105
105
0 0 Contractors, Sub-Contractors and
525
525
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
1a 1a occur between architectural,
1 1 engineering or Sub-Contractors
2a 2a drawings, the Contractor shall
2 2 immediately contact the Architect for
TRUSS TYPE 2 clarification.
3 3

TRUSS TYPE 1
ALL DIMENSIONS ARE IN MILLIMETERS
4 4

5 5

6 6

7 7

8 8

9 9

10 10

TRUSS TYPE 1

11 11

12 12
REV DATE REVISION READ UP
13 13

A1 E1
5834
PROJECT :
7161
664 950 950 950 950 950 950 664 PROPOSED THREE(3) BEDROOM ONE STOREY
0 105 RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
105 0
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.
0 105
105 0
CLIENT :
105
050
1 0
BENJAMIN AFAYIZU
525
525
A1 A B C C1 D E E1 F G H H1 DESCRIPTION :

G.A ON ROOF PLAN


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/12
ALL DIMENSIONS ARE IN MILLIMETERS

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
450 clarification.

21338.8
3048 3048 3048 5194.8 7000

REV DATE REVISION READ UP

PROJECT :
PROPOSED THREE(3) BEDROOM RESIDENTIAL BUILDING TO BE
SITUATED AT COMMUNITY 25 EXTENSION,NINGO PRAMPRAM
MUNICIPALITY.

CLIENT :
BENJAMIN AFAYIZU

DESCRIPTION :

FENCEWALL DESIGN

DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/13
A B C D E F G H NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
1 1 making any shop drawings.
350 x 225 GROUND BEAM

350 x 225 GROUND BEAM


Should any divergence in dimensions

350 x 225 GROUND BEAM


2 2 occur between architectural,
350 x 225 GROUND BEAM
engineering or Sub-Contractors
3 3 drawings, the Contractor shall

350 x 225 G-BEAM


350 x 225 GROUND BEAM
immediately contact the Architect for
4 4 clarification.

350 x 225 GROUND BEAM


ALL DIMENSIONS ARE IN MILLIMETERS
5 5

350 x 225 GROUND BEAM


350 x 225 GROUND BEAM

UP

6 6

350 x 225 GROUND BEAM


7 7
8 8

9 9
350 x 225 GROUND BEAM

350 x 225 GROUND BEAM


10 10

350 x 225 GROUND BEAM


350 x 225 GROUND BEAM

11 11

12 12
REV DATE REVISION READ UP
350 x 225 GROUND BEAM
13 13
225 x 225 GROUND BEAM
14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

A B C D E F G H G.A OF GROUND FLOOR PLAN


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/14
NOTE
A B C D E E1 F G H
Figured dimensions only are to be
followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
1 1
400 x 225 RC BEAM 400 x 225 RC BEAM occur between architectural,
engineering or Sub-Contractors
2 2
400 x 225 RC BEAM drawings, the Contractor shall

400 x 225 RC BEAM

400 x 225 RC BEAM


immediately contact the Architect for
3 3
clarification.

400 x 225 RC BEAM


4 4
ALL DIMENSIONS ARE IN MILLIMETERS

400 x 225 RC BEAM


5 5
UP

cf : rendered & painted


ff : porcelain tile
400 x 225 RC BEAM
6 6

400 x 225 RC BEAM


7 7
8 8

9 9
400 x 225 RC BEAM

400 x 225 RC BEAM


10 10

400 x 225 RC BEAM


400 x 225 RC BEAM
11 11

12 12

13 13
REV DATE REVISION READ UP
350 x 225 RC BEAM
14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
A B C D E E1 F G H DESCRIPTION :

G.A ON FIRST FLOOR PLAN


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/15
NOTE

A B C D E E1 F G H Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
1 1
350 x 225 ROOF BEAM 350 x 225 ROOF BEAM engineering or Sub-Contractors
drawings, the Contractor shall

350 x 225 ROOF BEAM


2 2

350 x 225 ROOF BEAM


350 x 225 ROOF BEAM immediately contact the Architect for

350 x 225 ROOF BEAM


VOID
VOID
clarification.
3 3

350 x 225 ROOF BEAM


4 VOID
4 ALL DIMENSIONS ARE IN MILLIMETERS

350 x 225 ROOF BEAM


350 x 225 ROOF BEAM 350 x 225 ROOF BEAM
5 5

VOID 350 x 225 ROOF BEAM


6 6

VOID
350 x 225 ROOF BEAM
7 7
350 x 225 ROOF BEAM
8 VOID 8

350 x 225 ROOF BEAM


9 9

VOID
10 10

350 x 225 ROOF BEAM

350 x 225 ROOF BEAM


350 x 225 ROOF BEAM
11 11

12 12

REV DATE REVISION READ UP


13 13

14 14

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

A B C D E E1 F G H G.A OF ROOF BEAMS


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/16
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

ALL DIMENSIONS ARE IN MILLIMETERS

REV DATE REVISION READ UP

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

SEPTIC TANK DETAILS


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/17
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
WINDOW SCHEDULE
immediately contact the Architect for
1050 800 800 clarification.

ALL DIMENSIONS ARE IN MILLIMETERS

625
1250
1250
DESCRIPTION W 1 (SECURITY WINDOW) W2 W3

LOCATION BEDROOMS,KITCHEN,DINING AND LIVING ROOM CORRIDOR,VISITORS ROOM,STAIRWELL,MASTERBEDROOM WASHROOMS

NUMBER REQUIRED 9 4 5
DARK GRAY POWDER COATED ALUMINUM FRAME AWNING CLEAR GLASS DARK GRAY POWDER COATED ALUMINUM FRAME CLEAR DARK GRAY POWDER COATED ALUMINUM FRAME CLEAR
MATERIAL WINDOW FIXED GLASS FIXED GLASS

DOOR SCHEDULE 1500 900

2100
2100

DESCRIPTION D1 D2

LOCATION LIVING ROOM,BACK PORCH,BALCONY WASHROOMS,BEDROOMS,KITCHEN,LIVING ROOM,OPEN PORCH ENTR.

NUMBER REQUIRED 3 10

MATERIAL SLIDING ALUMINIUM GLAZED CASEMENT DOOR SOLID TIMBER PANEL DOOR
REV DATE REVISION READ UP

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

DOORS & WINDOWS SCHEDULE


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/18
3800 2510
NOTE
A B C D E E1 F G H
Figured dimensions only are to be
followed.
SECTION P -P
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
2134 3700 3090
25-R1211 @ 150c/c T1 before commencing any work or
28-R1210 @ 150c/c T2
making any shop drawings.
25-R1201 @ 150c/c T1
SECTION Q -Q
Should any divergence in dimensions
1 1 occur between architectural,
engineering or Sub-Contractors
2 2 drawings, the Contractor shall
30-R1202@ 200c/c B1 immediately contact the Architect for
3 3
clarification.
4 4
16-R1203@ 150c/c T2 ALL DIMENSIONS ARE IN MILLIMETERS

5 5
UP

cf : rendered & painted


ff : porcelain tile

6 6 BENDING SCHEDULE
39-R1204@ 150c/c B2

N S

o.

H
TIO

LN

T
AC

NG
MARK DIA
BENDING SKETCH

CA

TA
.E

LE
LO

TO
No
7 7 R1201 12 25 25 5216 100
1200
3916

8 8 R1202 12 30 30 5847 100


1200
4547
21-R1205@ 150c/c T2
16 1200
R1203 12 16 4378
100 3078
9 9

FIRST FLOOR SLAB DETAILS


R1204 12 39 39 4788 1000 1000
100 2588 100

R1205 12 21 21 5497 1200

(1 No.ONLY)
100 4197

R1206 23 1200
23-R1206@ 200c/c T1 12 23 6105
100 4805

10 10 R1207 12 22
900 900
22 4373 100 2373 100

1200 1200
R1208 12 25 25 7178
100 4578 100

1200
R1209 12 9 9 5716 100 4416

R1210 12 28 28 4454 1200


100 3154

11 11 R1211 12 25 25 6013 100


1200
4713

12 12
22-R1207@ 200c/c T2
13 13 REV DATE REVISION READ UP

14 14
25-R1208 @ 200c/c B1

9-R1209 @ 200c/c B2
PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :
A B C D E E1 F G H
FIRST FLOOR SLAB DETAILS
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/19
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
200 200 225 225
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

ALL DIMENSIONS ARE IN MILLIMETERS

BENDING SCHEDULE

S
ION

o.

TH
H

LN
AC

NG
T
MARK DIA
BENDING SKETCH

CA

TA
.E

LE
LO

TO
No
COMBINED FOOTING DETAILS
R1201 12 24 48 2500 150 2200 150

(2 No. ONLY)
900
900

900

900
R1601 16 12 24 1150 250 min 1000

75mm 75mm 75mm 75mm


KICKER 50
KICKER KICKER KICKER
3 63 50
R1001 10 350
100
150 150 150

BENDING SCHEDULE

4-R1001 @ 225c/c
4-R1001 @ 225c/c

4-R1001 @ 225c/c

N S

o.

TH
6-R1601 6-R1602 6-R1603 6-R1604

TIO

LN
AC

NG
600
MARK DIA
600

600
BENDING SKETCH

CA

TA
.E

LE
LO

TO
900

No
3 3
900

900
1 1 2 2 4 4

BASE DETAILS TYPE 2


R1201 12 12 24 1350 150 1050 150

250
250

250

(2 No. THUS)
R1601 16 6 12 min 2450 250 min 2200
50mm BLINDING 50mm BLINDING 50mm BLINDING
50
(R1201) 4 8 100
(R1201) (R1201) R1001 10 450
100
1150 1150
2300
BENDING SCHEDULE

S
ION

o.

TH
H

LN
AC

NG
MARK

AT
DIA
BENDING SKETCH

TA
.E
C

LE
LO

TO
No
BASE DETAILS TYPE 3
R1201 12 12 240 1350 150 1050 150

(20 No. ONLY)


R1601 16 6 120 min 2450 250 min 2200

50
4 80 50
R1001 10 300
125
500

2x12 - R1201 @ 150 c/c B1 & B2 2x8 - R1201 @ 150 c/c B1 & B2
325

500
(EACH WAY) (EACH WAY) 2x8 - R1201 @ 150 c/c B1 & B2
(EACH WAY)
1150
150
1150

1150
150

150
500
325

500
REV DATE REVISION READ UP

325 200 1250 200 325 462.5 225 462.5 462.5 225 462.5
2300 1150 1150

BASE DETAILS TYPE 2


COMBINED FOOTING DETAILS TYPE 1 (2 No. THUS) BASE DETAILS TYPE 3
(2 No. ONLY) (20 No. THUS)

PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

COLUMN BASE DETAILS


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/20
NOTE

Figured dimensions only are to be


225 225 225 225
followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

ALL DIMENSIONS ARE IN MILLIMETERS


300

BENDING SCHEDULE
14- R1001 @ 225c/c

o.

TH
ION

LN
AC

NG
MARK DIA
3150

6-R1202 BENDING SKETCH

TA
CA

.E

LE
TO
No
LO
900

COLUMN TYPE 'C1'


R1201 12 6 132 4000 3100

(22 No.THUS)
2 2 R1202 12 6 132 3250 3100 150
900

25
R1001 10 28 616 575 100
175

COLUMN TYPE 'C2'


R1203 12 6 54 3250 3100 150

(9 No.THUS)
450

450

450
50
R1001 10 14 126 575 100
175

COLUMN TYPE 'C3'


R1204 12 6 18 3300 3150 150

(3 No.THUS)
1 1 3 3 4 4 50
100
14- R1001 @ 225c/c

14- R1001 @ 225c/c

14- R1001 @ 225c/c


R1001 10 14 42 575
175
3150

3150

3150
6-R1201 6-R1203 6-R1204
900

900

900
REV DATE REVISION READ UP

COLUMN TYPE C1
(22 No. THUS) PROJECT :
COLUMN TYPE C2(terminated) COLUMN TYPE C3(terminated)
PROPOSED THREE(3) BEDROOM ONE STOREY
(9 No. THUS) (3 No. THUS) RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

COLUMN DETAILS
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/21
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
225 225 225 225 Should any divergence in dimensions
225 225

SECTION 2-2
SECTION 3-3 SECTION 4-4 SECTION 5-5 SECTION 6-6 occur between architectural,
SECTION 1-1

engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.
1 3 5 7 2 6 7 9 10 12 14
ALL DIMENSIONS ARE IN MILLIMETERS

1247 BENDING SCHEDULE


(3-R1201) 865 (3-R1202) (3-R1204) (3-R1205)
1 2

o.
CH
NS

LN

TH
TIO

EA

NG
TA
MARK DIA
BENDING SKETCH

CA

No.

TO

LE
LO
R1201 12 3 3 2957 100 2857
13+13+17-R1001 @ 150 c/c 28+9+10+13+12+21-R1001 @ 150 c/c

BEAMS ON GRID A-A/1-14


785 R1202 12 3 3 3912 3812 100
1 2

1 NO. ONLY
(3-R1203) (3-R1206) (3-R1207) R1203 12 3 3 6696 100 6496 100

50
R1001 10 43 43 1100 175 175
350

BEAM ON GRIDLINE A-A&1-14 BEAM ON GRIDLINE H-H&2-14 R1204 12 3 3 8200 100 8100

1 No. ONLY 1 No. ONLY


R1205 12 3 3 3918 3818 100

BEAMS ON GRID H-H/2-14


1 NO. ONLY
R1206 12 3 3 5039 100
4939

7010 100
R1207 12 3 3 7110

50
R1001 10 93 93 1100 175 175
350

GROUND BEAM ON GRID A-E/5-5


R1208 12 3 3 6132 100 5932 100

1 NO. ONLY
R1219 12 3 3 6132 100 5932 100

50
R1001 10 40 40 850 100 100
300

R1210 12 3 3 5373 100 5273

A C D E 2 4 5 6 8 10 12 14

GROUND BEAMS ON GRID H-H/2-14


R1211 12 3 3 6627 6527 100

1 NO. ONLY
R1212 12 3 3 7143 100
7403

112 R1213 12 3 3 4448 100

(3-R1208) 3 (3-R1210) 4 (3-R1211) 4348


50
R1001 10 93 93 850 100 100
300

15+15+10-R1001 @ 150 c/c 28+9+10+13+12+21-R1001 @ 150 c/c


R1214 12 3 3 6506 100 6406
1283

ROOF BEAM ON GRID H-H/2-12


3 4 R1215 12 3 3 5494 5394 100
(3-R1209) (3-R1212) (3-R1213)

1 NO. ONLY
100
R1216 12 3 3 4676
4576

R1217 12 3 3 7316 7216 100

50
R1001 10 60 60 850 175 175

GROUND BEAM ON GRIDLINE A-E&5-5 GROUND BEAM ON GRIDLINE H-H&2-14 300

1 No. ONLY

ROOF BEAM ON GRID D-D/7-12


1 No. ONLY R1218 12 3 3 6543 100 6343 100

1 NO. ONLY
100 6343 100
R1219 12 3 3 6543

50
R1001 10 42 42 850 175 175
300

REV DATE REVISION READ UP


2 6 7 9 10 12 7 9 12

1035
(3-R1214) 5 (3-R1215) (3-R1218) 6

28+9+10+13+12-R1001 @ 150 c/c 10+32-R1001 @ 150 c/c

922 6
5
(3-R1216) (3-R1217) (3-R1219) PROJECT :

PROPOSED THREE(3) BEDROOM ONE STOREY


ROOF BEAM ON GRIDLINE D-D&7-12 RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
ROOF BEAM ON GRIDLINE H-H&2-12
1 No. ONLY 1 No. ONLY 25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

BEAMS DETAILS
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/22
NOTE

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
2510
before commencing any work or
3 - R1613
making any shop drawings.
Should any divergence in dimensions
2 - R1613
occur between architectural,
12 - R1001 LINKS @ 200 c/c engineering or Sub-Contractors
drawings, the Contractor shall
150X400 LANDING BEAMS
immediately contact the Architect for
7 - TREADS @ = 1400mm 900 150

R1608
R1606
7 - TREADS @200 = 1400mm 900 150 clarification.
R1603
R1601
150

R1613
ALL DIMENSIONS ARE IN MILLIMETERS
200

R1602 200

R1001
R1607 bending schedule
BAR
MARK DIA. QTY. LENGTH SHAPE
R1604 R1613

R1605

R1001 10mm 84 1100 100


R1609 R1609 SECTION 01-01 400
R1609 R1609 SECTION B-B
SECTION A-A 300 75
450 R1601 16mm 42 1050 0

00
R1602 16mm 6 2350 10
400 550
400

600 10
R1603 16mm 42 1600 00

7 - TREADS @200mm = 1400 975


300
R1604 16mm 6 2950 00
24
250
300
24
R1605 16mm 42 3000 00
300

300
18 - 1609@225c/cs R1606 16mm 42 1050 0
75
4 - 1610@225c/cs
10
00 300
R1607 16mm 42 2375 100
975

25 - 1609@225c/cs 300
R1608 16mm 42 2375 0 100
0 975
10

7 - TREADS @ 200mm = 1400 975 R1609 16mm 259 1175

REV DATE REVISION READ UP

PROJECT :
STAIRCASE PLAN
PROPOSED THREE(3) BEDROOM ONE STOREY
GROUND FLOOR TO FIRST FLOOR RESIDENTIAL BUILDING TO BE SITUATED AT COMMUNITY
25 EXTENSION, NINGO-PRAMPRAM MUNICIPALITY.

CLIENT :

BENJAMIN AFAYIZU
DESCRIPTION :

STAIRCASE DETAILS
DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/23
ALL DIMENSIONS ARE IN MILLIMETERS

Figured dimensions only are to be


followed.
No dimensions are to be scaled;
Contractors, Sub-Contractors and
Suppliers must verify all dimensions
before commencing any work or
making any shop drawings.
Should any divergence in dimensions
occur between architectural,
engineering or Sub-Contractors
drawings, the Contractor shall
immediately contact the Architect for
clarification.

LEGEND

80 mm pavement blocks

1
3
Grass
5
7

2
9
Royal palm trees
4
6
PA

8
VE

10 18 Site for future development


M
EN

20
T

11 19
13
15
17 Fencewall columns
22 21

12
14
16
24 23 900 x 150 garden kerbs
25
26
28
30' Road width
27
29

REV DATE REVISION READ UP

PROJECT :

PROPOSED TWO(2) BEDROOM BOYS QUARTERS


RESIDENTIAL BUILDING TO BE SITUATED AT
COMMUNITY 25 EXTENSION,NINGO PRAMPRAM.
BLOCK PLAN SITE PLAN CLIENT :
BENJAMIN AFAYIZU

DESCRIPTION :

BLOCK & SITE PLAN


DESIGNED : DRAWN :
ING. DR. CYPRIAN K. WENYONU EMMANUEL

SCALE : DATE : SHEET No. :


1 : 100 FEB. 2017 TBA/CSHLC/24