Background
▪ Fast growing of the variable renewable energy power plant in Sulawesi needs
some flexible power plant to overcome the high intermittency.
▪ Flexible power plant with high ramp rate such as hydro power plant need
some years to build and high cost of capital investment (reservoir or river
treatment)
▪ And other new Flexible power plant is limited due to high fuel cost and
impossible to build only for reserving the variable renewable energy power
plant.
Page 2
Aims and Objectives
▪ To search some alternatives from economical aspect of flexible power
plant
1. Build new gas power plant or
Page 3
Project Methodology
▪ Comparing with using the same system and demand. This demand will be
fulfilled by 3 case study i.e Gas and grid or Battery and grid or Pump Hydro
and Grid.
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Results
Energy (kwh)
CF (%) Component Cost Unit Capacity
PLTG Grid
481.748.928 7.459.191.085 6% Fuel & OM 0,14 usd/KwH 200 MW
Capex 19.930.000 USD/tahun
energy 481.748.000 kwh/tahun
0,041 usd/KwH
0,18137 usd/KwH