EL AREA A REPELLAR CALCULADA EN m3 Y SE MULTIPLICA POR LOS FACTORES SIGUIENTES: SACOS / mts.
espesor area cubcada factor cal
material elemento area m2 a repellar 0.02cm. m3 factor arena REQUERIDOS
MEZCLONES: ESPESOR 8 cm
PROPORCION; 1 DE CAL x 4 DE ARENA AMARILLA CERNIDA CON TAMIZ DE 3/8", AGREGADO 10% CEMENTO
EL AREA A NIVELAR CALCULADA EN m3 Y SE MULTIPLICA POR LOS FACTORES SIGUIENTES: SACOS / mts.
espesor area cubicada factor cal
material elemento area m2 con mezclon 0.08 m3 factor arena REQUERIDOS
CAL MEZCLON 19.38 0.08 1.55 5.72 8.87
ARENA A. MEZCLON 19.38 0.08 1.55 1.16 1.80
CEMENTO MEZCLON 19.38 0.08 1.55 10% 0.16
TABLA DE CALCULO DE CONCRETO, CONCRETOS; PARA 1 m3 CONCRETO DE ALTA RESISTENCIA: 200 a 300 Kg / cm2
TIPO cem. /aren /pied. BOLSAS DE CEMENTO ARENA m3 GRAVA m3 AGUA Lts. Kg / Cms2
8 1" 2 1.3 0 0
9 1 1/8" 1 0 0
10 1 1/4" 1 0 0
DE CUANTIFICACION DE MATERIAL
AREA x UNIDADES m2 resultado del multiplo: multiplo anterio x qq factor 1.33 MTS. ARENA
CANTIDAD DE area a levantar y factor 12 cemento cemento arena 1er. multiplo. x
LADRILLOS factor m3 mortero / m2 determinante necesarios. determinante factor arena
3082.24 1.2406016 12 14.89 1.33 1.65
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
0 0 12 0.00 1.33 0.00
AREA x UNIDADES m2 resultado del multiplo: multiplo anterio x qq factor 1.33 MTS. ARENA
cantidad de area a levantar y factor 12 cemento cemento arena 1er. multiplo. x
blocks factor m3 mortero / m2 determinante necesarios. determinante factor arena
qq cemento
mts. arena
multiplo factor qq
determinante de cemento necesarios
cemento
sacos de cal
mts. arena
7 1.04 % cemento.
qq cemento
sacos de cal
mts. granza
sacos de cal
mts. arena
sacos de cal
mts. arena
qq cemento
mts. arena
multiplo factor qq
determinante de cemento necesarios
cemento
sacos de cal
mts. arena
7 1.09 % cemento.
m3 a calcular qq requeridos factor det. arena mts. requeridos factor det. grava mts. requeridos
3.6 45.36 1.33 2.63 1.15 2.28
1 11.30 1.33 0.64 1.15 0.74
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
4.82 47.24 1.33 3.53 1.15 3.05
0 0.00 1.33 0.00 1.15 0.00
0.6 5.04 1.33 0.38 1.15 0.49
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
0 0.00 1.33 0.00 1.15 0.00
qq factor Libs. ALAMBRE
Largo de varillas cantidad de varillas REQUERIDOS alambre de amarre