Mine Equipment Selection for Ajabanoko Iron Ore Deposit, Kogi State, Nigeria

Article · January 2013


DOI: 10.11648/j.sr.20130102.13

CITATIONS READS

4 98

3 authors:
R.A Adebimpe Jide Muili Akande
The Federal Polytechnic Ado-Ekiti UNIVERSITY OF NAMIBIA,FACULTY OF ENGG. AND I.T. ONGWEDIVA, CAMPUS.
6 PUBLICATIONS 15 CITATIONS 42 PUBLICATIONS 58 CITATIONS

SEE PROFILE SEE PROFILE

Chinwuba Arum
Federal University of Technology, Akure
24 PUBLICATIONS 68 CITATIONS

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

WORKABILITY AND COMPRESSIVE STRENGTH OF CONCRETE CONTAINING PARTIAL REPLACEMENT OF ORDINARY PORTLAND CEMENT BY SELECTED
SUPPLEMENTARY CEMENTITIOUS MATERIALS View project

All content following this page was uploaded by Jide Muili Akande on 16 October 2015.

The user has requested enhancement of the downloaded file.


Science Research
2013; 1(2): 25-30
Published online April 2, 2013 (http://www.sciencepublishinggroup.com/j/sr)
doi: 10.11648/j.sr.20130102.13

Mine equipment selection for Ajabanoko iron ore deposit,


Kogi State, Nigeria
Adebimpe, R. A.1, Akande, J. M2, Arum C3
1
Dept. of Mineral Resources Engineering. The Federal Polytechnic, Ado-Ekiti, Nigeria
2
Dept. of Mining Engineering. The Federal University of Technology, Akure, Nigeria
3
Dept. of Civil Engineering. The Federal University of Technology, Akure, Nigeria

Email address:
rasheed4u1@yahoo.com(Adebimpe, R. A.)

To cite this article:


Adebimpe, R. A., Akande, J. M, Arum C. Mine Equipment Selection for Ajabanoko Iron Ore Deposit, Kogi State, Nigeria. Science
Research. Vol. 1, No. 2, 2013, pp. 25-30. doi: 10.11648/j.sr.20130102.13

Abstract: Pemilihan peralatan tambang merupakan bagian integral dari perencanaan dan desain tambang. Penelitian ini
dilakukan pemilihan peralatan tambang menggunakan gabungan beberapa atribut pengambilan keputusan metode (MADM).
Berbagai model lima peralatan tambang utama (dump truck, wheel loader, crawler excavator, bulldozer, dan rig pengeboran
lubang ledakan) dipertimbangkan untuk dipilih. Atribut yang dipertimbangkan untuk pemilihan peralatan yang sesuai adalah
biaya / unit, berat operasi, kapasitas muatan, kapasitas bucket, kedalaman penggalian maksimum dan daya. Urutan pemilihan
peralatan tambang untuk dump truck, wheel loader, excavator, bulldozer dan rig pengeboran di deposit bijih besi Ajabanoko
adalah EUCLID R90, CAT IT 62H, TEREX TC 225 LC, HITACHI 2505 dan TEREX SKT-12. Penelitian lebih lanjut
menetapkan pentingnya atribut dalam pemilihan model peralatan tambang yang sesuai .
Keywords: Peralatan Tambang, Atribut, Orde Seleksi, MADM, Model

1. Introduction
keseluruhan rencana tambang. Istilah optimal di sini
Pemilihan peralatan tambang adalah salah satu keputusan mencerminkan bahwa peralatan yang dipilih harus sesuai
penting yang harus diambil selama tahap perencanaan dengan kondisi / keterbatasan penambangan dan memenuhi
tambang baru. Adalah penting untuk mempertimbangkan persyaratan dasar dan preferensi tambang [4, 6]. Banyak
atribut yang akan memiliki kontribusi positif terhadap fitur, pembatasan, dan kriteria perlu dipertimbangkan [7].
keseluruhan kinerja peralatan. Tujuan pemilihan peralatan Oleh karena itu tujuan dari penelitian ini adalah untuk
adalah memilih peralatan optimal dengan biaya minimum memilih beberapa peralatan tambang yang diperlukan
[1]. Biaya peralatan yang dipilih juga harus untuk mengeksploitasi deposit bijih besi Ajabanoko.
mempertimbangkan pemeliharaan yang diharapkan dan
biaya operasional. Namun, faktor spesifik tambang dan
bukan generalitas mendorong peralatan tambang dan 2. Multiple Attribute Decision Making
pemilihan mesin [2]. Pemilihan peralatan yang tepat / Pengambilan Keputusan Atribut
menurunkan biaya penambangan dan bahkan dapat
mengubah batas pit yang dioptimalkan, oleh karena itu
Berganda (MADM)
optimasi peralatan dan optimasi pit sangat terkait erat [3]. Metode MADM adalah prosedur yang menentukan
Pemilihan peralatan tambang adalah proses yang dinamis bagaimana informasi atribut diproses agar dapat mencapai
dan berlanjut sepanjang umur tambang. Peralatan pilihan [8]. MADM berkaitan dengan masalah memilih
mempengaruhi pertimbangan ekonomi dalam desain alternatif dari serangkaian alternatif yang dicirikan dalam hal
lubang terbuka, khususnya batuan sisa batuan penutup dan atribut mereka [4]. Tingkat rekayasa proses MADM
biaya penambangan bijih dan parameter eskalasi biaya menentukan alternatif dan menunjukkan konsekuensi
sebagai fungsi dari lokasi dan kedalaman rencana [4]. memilih salah satu dari mereka dari sudut pandang berbagai
Masalah pemilihan peralatan di tambang adalah kompleks kriteria [9]. MADM mengacu pada pendekatan yang
[5]. Oleh karena itu atribut peralatan tambang perlu digunakan untuk memecahkan masalah yang melibatkan
dipelajari secara hati-hati untuk memilih peralatan yang seleksi dari sejumlah alternatif terbatas [8].
akan beroperasi secara optimal di dalam
26 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 26
26 26

Biasanya terdiri dari satu tujuan, tetapi ini mungkin dari dua 4. Technique for Order Preferences by
jenis yang berbeda: (i) yang pertama adalah di mana untuk
memilih alternatif dari satu set gol yang didasarkan pada nilai-
Similarity to an Ideal Solution/ Teknik Preferensi
nilai dan pentingnya atribut dari masing-masing alternatif (ii) Pesanan oleh Kesamaan dengan Solusi Ideal (TOPSIS)
yang kedua jenis tujuan adalah untuk mengklasifikasikan
alternatif, menggunakan semacam model peran atau kasus TOPSIS pertama kali diusulkan oleh Hwang dan Yoon [16].
serupa [4]. Langkah-langkah utama pembuatan keputusan Solusi ideal adalah solusi yang memaksimalkan kriteria
multi kriteria adalah sebagai berikut [9]. (I) menetapkan manfaat dan meminimalkan kriteria biaya; sedangkan solusi
kriteria evaluasi sistem yang menghubungkan kemampuan ideal negatif memaksimalkan kriteria biaya dan
sistem dengan tujuan (ii) mengembangkan sistem alternatif meminimalkan kriteria manfaat [16]. Alternatif yang optimal
untuk mencapai tujuan (menghasilkan alternatif) (iii) adalah yang paling dekat dengan solusi ideal dan terjauh ke
mengevaluasi alternatif dalam hal kriteria (nilai fungsi solusi ideal negatif [17]. Schinas mengidentifikasi kelebihan
kriteria) (iv) menerapkan normatif metode analisis multi yang ditawarkan oleh algoritma TOPSIS kepada pengambil
kriteria (v) menerima satu alternatif sebagai "optimal" keputusan (i) ia menawarkan solusi Euclidean, yaitu mudah
(disukai) (vi) jika solusi akhir tidak diterima, mengumpulkan dibayangkan (ii) TOPSIS tidak menggunakan skala preferensi
informasi baru dan masuk ke iterasi berikutnya dari optimasi tertentu (iii) semua perhitungan dapat dengan mudah
multi kriteria. dilakukan pada PC normal -Compatibles [18]. TOPSIS lebih
efisien dalam berurusan dengan tangibles [8].

3. Analytical Hierarchy Process (AHP)


5. Location and Geology of Ajabanoko
AHP adalah prosedur pengambilan keputusan multi-kriteria Iron Ore Deposit
(MCDM) yang telah terbukti berkontribusi dalam beberapa
studi penelitian [10]. Cara-cara berikut ini digunakan untuk Wilayah studi untuk proyek ini adalah Ajabanoko, yang
menghasilkan prioritas dalam membuat keputusan: (i) terletak di Okene, Kogi State, Nigeria. Deposit Bijih Besi
Menentukan masalah dan menentukan jenis pengetahuan yang Ajabanoko berada di sepanjang garis panjang 60 15 '50 "N
dicari (ii) Struktur hirarki keputusan dari atas dengan tujuan dan 60 16' 50" N dan garis lintang 70 37 '25 "E dan 70 38'
dari tujuan keputusan dari perspektif yang luas, melalui 35" E. Ajabanoko terletak 4,5 km di sebelah barat laut bukit
perantara tingkat (kriteria yang bergantung pada unsur Itakpe.
berikutnya) ke tingkat terendah (yang biasanya merupakan Kawasan deposit Ajabanoko berada di dalam kompleks
sekumpulan alternatif) (iii) Buat satu set matriks perbandingan ruang bawah tanah Precambria Nigeria, sebuah rangkaian
berpasangan. Masing-masing elemen di tingkat apa pun batu kristal yang terpapar di hampir separuh dari negara
digunakan untuk membandingkan unsur-unsur di tingkat tepat yang membentang ke barat ke Dahomeyan dari Republik
di bawah (iv) Gunakan prioritas yang diperoleh dari Benin dan timur ke Kamerun [19]. Daerah Ajabanoko
perbandingan untuk mempertimbangkan prioritas. Lakukan terdiri dari satu set tiga perbukitan batuan dasar yang terkait
ini untuk setiap elemen. Kemudian untuk setiap elemen di erat di mana beberapa band besar bijih besi muncul. Ketiga
tingkat bawah tambahkan nilainya yang ditimbang dan bukit yang menandai zona-zona bijih selatan, tengah dan
dapatkan berat keseluruhannya. Lanjutkan proses utara ini terdiri terutama dari gneisses migmatit dan biotit
penimbangan dan penambahan ini hingga prioritas akhir dan yang kecenderungan dalam arah timur laut-barat daya dan
alternatif di tingkat paling bawah diperoleh [11]. sebagian besar dip ke arah barat. Satuan lithologic dominan
The AHP struktur masalah keputusan dalam tingkat dari daerah deposit Ajabanoko adalah gneiss dari
yang sesuai dengan yang pemahaman tentang situasi: migmatite, biotit dan granit, kuarsit ferruginous, granit dan
tujuan, kriteria, sub-kriteria, dan alternatif [12]. Dengan pegmatite [19]. Kuarsit ferruginous adalah sumber
memecahkan masalah menjadi level, pembuat keputusan mineralisasi bijih besi di daerah tersebut [20].
dapat fokus pada set keputusan yang lebih kecil. Dalam Sifat deposit bijih besi Ajabanoko dan bebatuan yang
formulasi tradisional AHP, penilaian manusia terkait menunjukkan bahwa mereka adalah konsentrat
direpresentasikan sebagai nilai-nilai renyah [12]. Metode residu yang berasal dari sedimen kaya besi, material
AHP mempertimbangkan penggunaan matriks timbal balik sedimen vulkanogenik [21]. Hal ini menunjukkan bahwa
untuk mengekspos kriteria perbandingan berpasangan dan semua batuan di daerah termasuk yang metamorfik kelas
vektor eigen yang dihasilkan sebagai bobot subjektif [13]. tinggi seperti gneisses dan metamorfik kelas rendah seperti
Kerugian dari teknik AHP adalah bahwa ia berfokus kuarsit mungkin berasal dari bahan sedimen yang pada
terutama pada pengambil keputusan yang harus membuat gilirannya mungkin berasal dari sumber vulkanik kuno
perbandingan berpasangan untuk mencapai keputusan, [22] . Empat lapisan bijih utama telah diidentifikasi untuk
sementara mungkin menggunakan preferensi subjektif zona bijih yang berbeda [23]. Empat pita tebal mulai dari
[14]. AHP adalah unik karena memungkinkan kuantifikasi 1 hingga 5 m dalam ketebalan dan pengukuran
tidak berwujud melalui konstruksi masalah dalam cara 1.22km sepanjang mogok telah diidentifikasi dalam
hierarkis visual [10]. Hal ini memungkinkan hubungan deposit, dan diklasifikasikan sebagai tubuh bijih I, tubuh
antara tujuan akhir, kriteria pilihan dan alternatif untuk bijih II, tubuh bijih III dan tubuh bijih IV seperti yang
secara jelas digambarkan dalam proses pengambilan ditunjukkan pada Tabel 1 [22]. Studi petrologi bijih telah
keputusan [15]. mengungkapkan empat jenis bijih
27 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 27
27 27

komposisi mirip dengan Itakpe Hill: (i) kuarsit magnetit (ii) EQUIPSELECTOR ditulis untuk pemilihan peralatan
kuarsit hematit-hematit (iii) kuarsit hematit-magnetit (iv) berdasarkan prosedur yang ditetapkan oleh Rao [8
hematit-kuarsit. Jumlah total cadangan bijih besi di seluruh Metodologi gabungan TOPSIS (Teknik Preferensi
deposit adalah 62,104 juta ton dalam kategori C1 dan 25,952 Urutan berdasarkan Kesamaan dengan Solusi Ideal dan
juta ton dalam kategori C2 seperti yang ditunjukkan pada AHP (Analytic Hierarchy Process) adalah sebagai berikut
Tabel 2. [8] .:
Langkah 1: Atribut obyektif dan evaluasi ditentukan
Langkah 2: Bentuk matriks dari semua informasi yang
6. Bench Geometry tersedia dari atribut diwakili. Seperti matriks disebut
Kapasitas dump truck yang akan digunakan untuk tambang matriks keputusan seperti yang ditunjukkan dalam
yang diusulkan adalah 100 ton sementara tingkat Persamaan 1. Tabel 4 merupakan penilaian verbal dari
berkelanjutan maksimum untuk jalan akses tambang atribut bila dibandingkan dengan satu sama lain.
adalah 8%. Lebar jalan pengangkutan bervariasi antara 18- Perbandingan berpasangan dari atribut dilakukan
30m, ini cukup untuk memungkinkan pergerakan truk yang menggunakan Persamaan 1 dan 2.
mudah dan peralatan pengangkutan lainnya sebagaimana
Tabel 4. Skala Dasar dari Angka Mutlak
ditunjukkan pada Tabel 3. Kemiringan tanggul pengaman
yang digunakan untuk penelitian ini adalah 300 yang cukup Numerical assessment Linguistic Meaning
untuk menjamin stabilitasnya. Ketinggian tanggul 1 Equal Important
3 Moderately more important
pengaman bervariasi dari 2-3,5m sementara tinggi bangku 5 Strong more important
adalah 15m. 7 Very strongly important
Table 1. Parameters of the Main Ore Layer Of Ajabanoko Iron Ore 9 Extremely more important
Deposit 2,4,6,8 Intermediate values of Importance.
Length along Average Average
Ore layer
strike(m) thickness(m) Fetot
Orebody I 1100 14.7 40.4
Orebody II 925 10 30.3
Orebody III 750 3.6 37.28
Orebody IV - 4.3 34.04

National Steel Raw Material Exploration Agency (1994)

Table 2. Itakpe and Ajabanoko Iron Ore Deposits

% Mineral Composition Itakpe Iron Ore Ajabanoko Iron Ore


Average Fetot 36.00 34.44
Femag 19.90 20.19
SiO2 42.05 41.99
Al2O3 3.20 3.22
P2O5 - 0.17
Ore reserve 200million tons 62.104million tons

Table 3. Parameters of Haulage Road and Catch Bench Design


Langkah 3: Matriks keputusan yang dinormalisasi, Rij,
Parameter Value diperoleh menggunakan Persamaan 3

Minimum bench width 18m


Maximum bench width 30m
Gradient 8%
Height of berm 2-3.5m
Berm slope angle 300
Non-working berm width 3m
Working berm width 15m
Drainage ditch type v-shaped Step 4: The relative of different attributes with respect to
Drainage ditch slope 3:1
Grade of ditch 3%
the following objective was obtained.
Bench height 15m The attribute values were obtained from equipment
Width of safety bench 10m manufacturers and suppliers as shown in Tables 5-9
Width of working platform 27.5m The relative normalized weight (wj) of each attribute was
obtained by (i) calculating the geometric mean of the ith
7. Methodology row, and (ii) normalizing the geometric mean of rows in the
Metodologi TOPSIS dan AHP diadopsi untuk studi ini comparison matrix using Equations 4 and 5.
dan prosedurnya dinyatakan oleh Saaty [24]. dan Rao [8]. N
Program perangkat lunak bernama
GM= aij 0.5 (4)
i 1
28 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 28
28 28

and the column of the matrix Rij with its associated weight wj
using Equation 6. Hence
N
wj = GMi ∕ GM i (5) Vij = Wj Rij (6)
i 1

Step 6: The ideal (best) and negative ideal (worst)


The result obtained from wj is arranged in 4x1 matrix = solutions was obtained using Equations 7 and 8 respectively.
A24X1 .
 min ' 

Vij / j
Matrix A3 and A4 such that A3 = A1.A2 and A4 = V*=  max  /I=1,2,…,M
 i Vij / j 
A3/A2 was calculated   

The maximum eigen value λ max which is the average of


matrix A4 was obtained. The consistency index (I =( Amax – =(v*1,V*2,V*3,…,V*N) (7)
N) / (N-1) was obtained. The smaller the value of CI, the
 min   max ' 

smaller is the deviation from consistency. The Consistency V-=  Vij / j   Vij / j   /i=1,2,…,m

ratio CR = CI/RI was obtained.  i  i 

Table 5. Attribute Values for Dump Truck Selection =(V-1,V-2,V-3,…,V- N) (8)

S/No Model Power(hp)


Operating Payload Cost Where =(j=1,2,…N)/j associated with beneficial
weight(kg) capacity(tons) ($/unit)
attributes and ’=(j=1,2,…N)/j associated with non-

ii CAT 773E 682 39390 100 800000 Sept 7: The separation measure was obtained using
iii EUCLID R90 1050 201110 100 540000
iv TR. 100 1050 166320 100 510000
Equations 9 and 10.


S*i.=  Vij
N
Table 6. Attribute Values for Mid-size Wheel Loader Selection 2 0.5 (9)
j i
v
Vj
Operating Bucket Cost
S/No Model Power(hp)
weight(kg) capacity(m3) ($/unit) S-= 2
0.5 (10)

i CAT IT 38H 180 15055 3.0 365000 N


ii CAT IT 62H 211 19400 4.25 400000  Vij Vi
iii TL 210 162 12500 3.4 360000 j i
iv CAT 962H 211 19369 3.8 420000

Step 8: The relative closeness of a particular alternative


Table 7. Attribute Values for Crawler Excavator Selection to the ideal solution is obtained using Equation 11.
C
S/No Model Power(hp)
Operating Max. digging Cost
* Si
weight(kg) depth(m) ($/unit) i (11)
i TEREX TC 210LC 165 19958 5.6 380000 S i* Si
ii TEREX TC 225LC 156 21682 7.58 410000
iii TEREX TC 260LC 168 24132 7.69 425000
iv CAT 325L 168 25520 5.60 450000
8. Results and Discussion
Table 8. Attribute Values for Bulldozer Selection The attributes used in the selection of mine equipment
for Ajabanoko iron ore deposit are power, operating weight,
Operating Equipment3 Cost($/unit) payload capacity, bucket capacity, maximum digging
S/No Model Power(hp) capacity(m )
weight(kg)
capacity, maximum hole size, maximum hole depth,
i HITACHI 190 5 765 185900 15.0 435,000
ii HITACHI 250 5 1007 242000 16.5 460,000 maximum bit load and cost. The equipment considered in
iii CAT D854 K 904 98101 15 580,000 this study are dump trucks, wheel loaders, bulldozers,
iv CAT 844 H 687 70816 15 520,000 crawler excavators and drilling rigs .The equipment
attributes were evaluated for the equipment identified
29 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 29
29 29

Table 9. Attribute Values for Rotary Drill Selection above. The equipment models identified for dump truck are

Max. TR 100, HITACHI EH 1700-3, CAT 773E and EUCLID


Max. hole Max. bit Cost
S/No Model hole R90 as shown in Table 5. The attributes considered for the
depth(mm) load(kg) ($/unit)
size(mm) dump truck selection are power, operating weight, payload
I ATLAS COPCO DML-SP 251 51500 24500 790000 capacity and cost/unit. The selection order obtained using
ii ATLAS COPCO DML 270 52500 27200 810000 EQUIPSELECTOR is, EUCLID R90, CAT 773E, TR100
iii TEREX SKF-15 269.9 23470 22679.6 780000
and HITACHI EH 1700-3 . The values obtained for this
iv TEREX SKF-12 269.9 55474 22679.6 820000
selection decrease from 0.6590 for EUCLID R90 and
reached a lower limit of 0.4001 for HITACHI EH 1700-3
Step 5: The weighted normalized matrix Vij was as shown in Table 10. This indicates that EUCLID R90 is
obtained. the most acceptable dump truck based on the attributes
This is obtained by the multiplication of each element of listed above while HITACHI EH 1700-3 is the least
30 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 30
30 30

acceptable dump truck as shown in Table 10. The models Table 12. Selection Order for Crawler Excavator

considered for wheel loaders are CAT IT 38H, CAT IT 62H, S/No Model Value
TEREX TL 210 and CAT 962H as shown in Table 6. The i TEREX TC 225LC 0.7947
attributes considered for wheel loaders selection are power, ii TEREX TC 260 LC 0.5699
operating weight, bucket capacity and cost/unit. iii CAT 325 L 0.4494
iv TEREX TC 210LC 0.2670
The equipment selection order obtained from the

EQUIPSELECTOR package are CAT IT 62H, CAT IT Table 13. Selection Order for Bulldozer
38H , TEREX TL 210 and CAT 962H and the
corresponding values attached to the selection order are S/No Model Value

0.8777, 0.8095, 0.7364 and 0.2636 respectively. This i HITACHI 2505 0.5694
ii CAT D854 K 0.5239
indicates that the model CAT IT 62H is the most acceptable iii CAT 844 H 0.5037
loading machine while the least acceptable is CAT 962H as iv HITACHI 1905 0.4554
shown in Table 11 .The attributes values for crawler
excavator are power, operating weight, maximum digging Table 14. Selection Order for Rotary Drill Rig
depth and cost/unit. The models considered for selection
S/No Model Value
are TEREX TC 210LC, TEREX TC 225LC, TEREX TC i TEREX SKT-12 0.8410
260LC and CAT 325L as shown in Table 7. The selection ii ATLAS COPCO DML 0.8276
order obtained for the crawler excavator are TEREX TC iii ATLAS COPCO DML-SP 0.7646
260LC,CAT325L, TEREX TC 210LC,TEREX TC 225LC iv TEREX SKT-15 0.2533
with corresponding values of 0.7947, 0.5699, 0.4494 and

0.2670 respectively as shown in Table 12. Also the 9. Conclusions and Recommendations
maximum digging depths are 7.69m, 5.60m, 5.60m and
7.58m respectively as shown in Table 7. The equipment selection order is EUCLID R90 model
The attribute values for bulldozers considered for this for dump truck; CAT IT 62H model for loading machine;
study are model, power, operating weight, equipment TEREX TC 225 LC model for crawler excavator;
capacity and cost/unit while the models considered are HITACHI 2505 for bulldozer and TEREX SKT-12 for
HITACHI 1905, HITACHI 2505, CAT D854K and CAT rotary drilling rig.
844 H as shown in Table 8. The equipment selection order Mine equipment selection order using their attributes
for bulldozer are HITACHI 2505, CAT D854 K, , CAT 844 should be used when selecting mine equipment for the
H and HITACHI 1905 with values 0.5694, 0.5239, 0.5037 optimal exploitation of the deposit

and 0.4554 respectively as shown in Table 13 . The


attributes values used for rotary drilling rig are maximum
bit load and cost/unit while the models considered for References
selection are ATLAS COPCO DML-SP, ATLAS COPCO
[1] Lizotte, Y. Economic and Technical Relations Between
DML, TEREX SKF-15 and TEREX-SKF-12 as shown in Open Pit Designs and Equipment Selection. Mine Planning
Table 9. However the selection order obtained with the and Equipment Selection. Singhal (Ed). Balkema Rotterdam.
package are TEREX SKT-12, ATLAS COPCO DML, pp. 3-14, 1988.
ATLAS COPCO DML-SP and TEREX SKT-15 with
[2] Akande, J.M and Loto, I.F. Selection of Mine Equipment
corresponding selection values of 0.8410, 0.8276, 0.7646 and Machinery (Loading and Hauling) for Itakpe Iron Ore
and 0.2533. This shows that TEREX SKF-12 is the most Mine. International Research Journal in Engineering
acceptable while TEREX SKT-15 is the least acceptable as Science and Technology. 2(2):57-67, 2005.
shown in Table 14.
[3] Ebrahimi, E.B. Economics of Scale in Surface Mining
Industry. University of British Columbia, Department of
Table 10. Selection Order for Dump Truck
Mining Engineering. pp.1-22, 2002.
S/No Model Value

[4] Bascetin, A. A Decision Support System for Optimal


i EUCLID R90 0.6590
Equipment Selection in Open Pit Mining: Analytical
ii CAT 773E 0.5837 Hierarchy Process. Istanbul University, Engineering Faculty.
iii TR 100 0.5461 Journal for Earth Science. C.16.S.2. pp.1-11, 2003.
iv HITACHI EH 1700-3 0.4001
[5] [5] Burt, C., Caccetta, L. Hill, S and Welgama P. Models for
Table 11. Selection Order for Loading Machine Mining Equipment Selection. Curtin University of
S/No Model
Technology. Perth, Western Australia. pp. 1730-1736, 2004.
Value
i CAT IT 62H 0.8777 [6] Samanta, B., Sarkar,B and Mukherjee,S.K . Selection of
ii CAT IT 38H 0.8095 Open Cast Mining Equipment by Multi-criteria Decision
iii TEREX TL 210 0.7364 Making Process. Mining Technology. 111(2):136-142, 2002
iv CAT 962H 0.2636
31 Adebimpe, R. A et al: Equipment Selection
Science for Ajabanoko
Research 2013; 1(2):Iron Ore Deposit, Kogi State, Nigeria
25-30 31
31 31

[7] Naoum, S and Haidar A. A Hybrid Knowledge Based


30 Adebimpe, R. A et al: Equipment Selection for Ajabanoko Iron Ore Deposit, Kogi State, Nigeria
30
System and Genetic Algorithms for Equipment Selection. Security. 10(1):28-32, 2002.
Engineering Construction and Architectural Management
7(1): 3 – 14, 2000. [16] Hwang, C and Yoon, K. Multiple Attribute Decision Making:
Methods and Application. New York: Springer
[8] Rao, R.V. Machine Selection in a Flexible Manufacturing Publications.259p, 1981.
Cell Using a Combined Multiple Attribute Decision Making
Method. Kumaraguru College of Technology, Coimbatore. [17] Tsai Hui-Yin.,Bao-Huey Huang and An Siou Wang.
pp.76-79, 2005. Combining ANP and TOPSIS Concept for Evaluating the
Performance of Property – Liability Insurance Companies.
[9] Opricovic, S and Tzeng, G.H. Compromise Solution by Journal of Social Sciences. 4(1):56-61, 2008.
MCDM Methods: A Comparative Analysis of VIKOR.
European Journal of Operational Research. Vol.156:445-455, [18] Schinas, O. Examining the Use and Application of Multi-
2004. criteria Decision Making Techniques in Safety Assessment.
Transmart Consulting, Athens, Greece. p.7, 2008.
[10] Ramli, R., Mustafa, A. and Khader, A.T. Evaluation and
Selection of a Nurse Scheduling Method Using AHP. [19] Amigun,J.O and Ako,B.D. Rock Density- A Tool for
MCDM 2004. Whistler B.C Canada. August 6-11, 2004. Mineral Prospection: A Case Study of Ajabanoko Iron Ore
Deposit, Okene SW Nigeria. The Pacific Journal of Science
[11] Saaty,T.L. Decision Making with the Analytic Hierarchy and Technology. 10(2):733-741, 2009.
Process. Int. J. of Services Sciences. 1(1):83—98, 2008.
[20] Olade, M.A. Pre Cambrian Iron Ore Deposits and its
[12] Aghajani, A.B., Osanloo, H. and Soltanmohammadi, H. Environment at Itakpe Ridge, Okene , Nigeria. Institute of
Loading – Haulage Equipment Selection in Open Pit Mines Mining and Metallurgy, February. pp. B1-B9, 1978.

Based on Fuzzy-Topsis Method. GODSPODARKA


SUROWCAMI MINERLNYMI. 24(4/3):87-102, 2008. [21] National Steel Development Authority (NSDA). V/O
Tecchnoexport : On the Prospecting and Exploration of Itakpe
[13] Bitarafan, M.L.,and Ataei, M. Mining Method Selection by Hill Iron Ore Deposit, Okene, Nigeria. NSDA. Kaduna,
Multiple Criteria Decision Making Tools. The Journal of the pp.1-86, 1976.
South African Institute of Mining and Metallurgy, October,
pp.493-498,2004. [22] Nnagha,B.I. Prefeasibility Study of the Central Zone of the
Ajabanoko Hill Iron Deposit. Ecoles des Mines de Paris.
[14] Namin, F.S., Shahriar, K., Ataei-pour, M and Dehghani, H. Paris. pp.60, 1997.
A New Model for Mining Method Selection of Mineral
Deposit Based on Fuzzy Decision Making. The Journal of [23] National Steel Raw Materials Exploration Agency
the South African Institute of Mining and Metallurgy. (NSRMEA). Preliminary Report on Ajabanoko Iron Ore
pp.385-395, 2008. Deposit. NSRMEA, Kaduna. pp.1-79, 1994.
[15] Mamaghani, F. Evaluation and Selection of an Antivirus and [24] Saaty, T.L. The Analytic Hierarchy Process. McGraw Hill,
Content Filtering Software. Information Mgmt & Comput. New York. 364p, 1980.
31 Adebimpe, R. A et al: Equipment Selection for Ajabanoko Iron Ore Deposit, Kogi State, Nigeria
View publication stats
31

Potrebbero piacerti anche