Part 3: Equipments / Tools to be used: Hand Tools, Electrical tools & welding machine
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location
Part 5: JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Hot job; welding, grinding & cutting
Step# Describe Job Step Potential Hazards Hazard Controls
1 Hot Job (welding ,grinding / Unskilled welder/grinder man Skilled & trained personnel to perform hot
Cutting, cleaning of shuttering Uninspected tools /welding machine job
plates) Use of appropriate PPE’s for the job
Slip, trip & fall
Sharp edges Use of inspected & right tools for the job
Hydrocarbon fumes Ensure that leads/cables are proper with no
Work near live areas damage
Proper cable/leads management to avoid
tripping hazards
Stop hot job if conditions are abnormal
Ensure proper housekeeping of area
Sharp edges of steel bars should be
properly grinded
Use of proper canopy to avoid naked
sparks and flame
Perform gas test of the area
Fire ,Explosion Ensure proper housekeeping of job place
Remove all combustible material from site
Pressurized Fire extinguisher to be in
placed at job location
Close HSE monitoring of hot job
Personnel injury Use of appropriate PPE’s (face shield, eye
Body contact with hot surface protection, ear plugs etc)
Flying particles Restrict unauthorised personnel movement
Disc broken ,high Noise Ensure proper fixing of disc
JSA No: JOB TITLE: Hot job; welding, grinding & cutting
Step# Describe Job Step Potential Hazards Hazard Controls
2 Working in Live areas Vehicles/equipments striking/hit with Obtain relevant permit before commencing
Structure/live lines of any work
Work in live area Ensure vehicles/equipment movement only
Unaware about hazards of live areas on designated/defined routes
Traffic movement on authorized routes Be highly careful while crossing over the
at plan site culverts/drains
Damaged to underground utilities Avoid sharp turnings of vehicles
(Drains, Culverts, electrical cable ,pipe Banks man should be at site while
lines etc) movement of vehicles/equipments
Ensure use of appropriate PPE’s
Ensure close safety supervision of all work
Deliver TBT & awareness to all of
workforce about area/activity hazards
Mishandling with live Do not mishandle or operate any of live
instruments/valves equipment/valve in the area
Movement of people in unauthorized Unauthorized movement of workers to be
areas restricted in live areas
Fumes of Hydrocarbons in live areas Gas test to be performed in live areas
Flammable ,toxic gases Remove any of combustible material from
Fire/explosion site
Slip , trip & fall Don’t switch off engine once started to
avoid sparking from battery terminals
Maintain good housekeeping at site
Don not left any vehicle/equipment/tool un
attendant in running condition
Prepared By: Hafeez Ullah Khan Approved By: