Sei sulla pagina 1di 3

CURRICULUM VITAE

ARLINCE A
arlince1@gmail.com Mob: +917718082984
SKYPE:live arlince1

POST APPLIED FOR: FIELD /PRODUCTION OPERATOR


TOTAL ON-SITE EXPERIENCE 4 YEARS

Worked experience as a PRODUCTION OPERATOR” in for CAIRN INDIA oil and


gas offshore platforms in kakinada High offshore field through SUPERIOR
ENERGY SERVICES May 2015 to TILL 2019
Worked experience as a PRODUCTION OPERATOR” in , for GSPC oil and gas
OFFSHORE PLAT FOR MBASSIAN OFFSHORE FIELD thrtho Aarvi Encon PVTl
Company fromFeb2014tomarch2015 .
.
Worked experience as a PRODUCTION OPERATOR in ICP,SHP for ONGC oil
and gas offshore platforms in Mumbai high offshore field RELIANCE
ENGINEERS From June 2013 to December 2013
ACADEMIC RECORD:

QUALIFICATION : DIPLOMA IN MECHANICAL ENGINERING


COMPUTER KNOWLEDGE : MS . Office

ADDITIONAL CERTIFICATIONS :

SAFETY COURSES STCW - 2014

PERSONNEL SURVIVAL TECHNIQUE MUMBAI


FIRE FIGHTING OPERATIONS OIL CHEMICAL & LIQUIFIED GAS TANKER
CARGO OPERATIONS MUMBAI
FIRE PREVENTION AND FIRE FIGHTING MUMBAI
PERSONAL SAFETY AND SOCIALS RESPONSIBILITIES MUMBAI
ELEMENTARY FIRST AID MUMBAI
HELICOPTER UNDER WATER ESCAPE TRINING MUMBAI
DURING THE PAST AND PRESENT CAREER EXPERIENCE IN THE
FOLLOWING AREA.
EXPERIENCED PLANTS:
 Offshore production and Well head operation.
 Chemical injection system, Water injection system.
 Glycol Dehydration Unit
 Crude stabilization unit.
 Platform safety equipment.
 Pig launching and receiving operation.
 Cooling Water treatment plant, Fire water pump house.
 Oil and gas gathering station.
 Gas Compression and Gas plant operation.
WELL HEAD OPERATION:
Well head operation, well testing, wing valve, crown valve, upper/lower master
valve annulus valve, pull plug operation, well maintenance, hand over to wire line
job SSSV operation, SSSV opened up & shutdown-hydraulic pump operation, floor
line panel board operation, choke changing, well equalizing, work over, well
completion, circulating valve operation, drain water pump operation, expansion
joint operation, tubing hanger seal leaking, back pressure valve operation, gas
lifting, water injection, chemical injection changeover familiar with start up &shut
down emergency procedure

OFFSHORE PRODUCTION:
Operation of X-mas tree operating upper and lower master valves, wing valves,
SSV, SSSV, opening and closing and panel board, submersible pumps, phoenix
operations etc. Oil and gas gathering injection oil manifold, gas lift manifold, flow
line choke changing taking reading FTHP and STHP reading, well equalizing of
annulus pressure bleeding etc.
PIG OPERATION:

Pig Launching, Pig Receiving, Operation of Polly pig, Scrubber Pig, Isolation
Valves, Kick of valves, Scrubber tee
EQUIPMENT HANDLED:
Bulk and test separates, Two phase, Three phase separator, gas glycol
contractors, Glycol recovery scrubbers, Condensate surge vessels, Hydrocarbon
flash drum, Cartridge and charcoal filters, Heat exchangers receivers,
Centrifugal and reciprocating gas lift compressors (solar and Ruston) Instrument
air compressors hot oil systems, Furnaces and heaters, damage blowers,
Shipping pumps, Reciprocating and centrifugal pumps, Furnaces and heaters,
Rotor meter, Neislo meter, Surface flow control equipment, Cameron type FL
gate valves, Cameron solid block X-trees etc.
CRUDE OIL PUMPING STATION:
Familiar in oil & Gas processing system main tank- intermediate Tank
operation- changeover- MOV operation-Water disposal- Tank evacuation-
isolation-bottom oil transportation-bottom oil receiving- transfer pump- main
pump operation- lube oil pressure maintenance etc.
WATER TREATMENT & INJECTION PLANT:
To inject high-pressure water into well reservoir for maintaining well pressure.
Lube oil pump, Booster pump, sea water lifting pump, centrifugal & reciprocating
pump operation, bactrocide coagulant, demulsifier, water clarifier, deformer, scale
inhibiter operation.

UTILITIES:
Operating Power Generator & Synchronizing, Flare ignition unit, Operating utility
Air compressors, Following first level maintenance, Issuing the work permit,
Directly involving startup /shutdown/isolation etc. calculating gas flows from
Barton chart Preparing shift status reports to Supervisors & Good Operating
Knowledge of computers and taking reading about the current status.
SAFETY:
Safety systems, ultra violet systems, gas, fire and smoke detector Systems, Fire
eye deluge Valve System etc, issuing all types of work permit and flowing log tag
and try procedure.
PERSONAL PROFILE
NAME : ARLINCEE
FATHER’S NAME : A .ANANTHA RAJ
DATE OF BIRTH : 13 . 05 . 1995
MARITAL STATUS : SINGLE
NATIONALITY : INDIAN
LANGUAGES KNOWN : ENGLISH, HINDI, AND TAMIL
E-MAIL ID : arlince1@gmail.com

PASSPORT DETAILS
Passport Number : M2179421
Date of Issue : 19/09/2014
Date of Expire : 18/09/2024
Place of Issue : MADURAI :
IMIGRATION STATUS : ECNR
Phone Number : +917303918883

Permanent Address : 2/3 N.S , parameswara puram(p.O)


Thirunelveli(d.t) (Tamil Nadu(s.t
– 627111

Place: Tamil nadu

Date: yours faithfully,

(ARLINCE)

Potrebbero piacerti anche