Document Review Sheet

From: KEIL To: PETROJET


Contract: KEIL/SIBA/2015/C-051
Document Title: MCC for Cold Liquid Drain
Document No.: C-051-390-MCC-GTP-TR2-06-001 Revision:
Touchstone Document No.:
Please respond by: (Refer to Transmittal for Return Date)
The document as listed above has been reviewed and has been found to be:

Reviewed - no comment. Revise and re-submit. Revise and re-submit.


Work may proceed subject to incorporation of Work will NOT proceed.
comments.

*(Tick as appropriate)

Sl. No. Comments (Identify Section/Page/Paragraph) Response


Mechanical/Piping
No Comments

Civil
1 Civil punch list to be attached in the CD. No Civil Punch for This System
2 Backfilling report need to be signed by PTJ QA/QC. Noted and Covered ( See Sec : 5 )

Electrical
No Comments

Instrument

Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response
1 To ensure Loop test sheets for all instruments related in this subsystem
shall be added in ICSS subsystem MCC Dossier. Loop for LT-2492 that
is part of this subsystem missing in the ICSS MCC dossier. ICSS system is already submitted to KEIL for
Review and any comments to add in the ICSS

2 Pressure guage glass for 02-SOV-2533 is missing. Need to change new


one. Covered in MPL point no 8196.

3 02-LT-24292 Capilliary no support. Covered in MPL point no 8197.

Name: Dilio Duque/Zainuddin/Alaa Name: Ehab


Date: 22/05/2018. Date:29/5/2018.
Note: Please add/ insert rows for additional comments/ response(s).Do not add additional column.

Page 2 of 4
Classification: General
1

vise and re-submit. Review not Required - for


ork will NOT proceed. information only.

Conclusion

Closed.
Closed.

Page 3 of 4
Classification: General
Conclusion

Closed.

Closed.

Closed.

Name: Dilio/Alaa
Date: 9/6/2018.

Page 4 of 4