OUTLINE SPECIFICATIONS
This set of specifications shall govern the methods of construction and the
kinds of materials to be used for the proposed building shown in the plans and in the
detailed drawings.
IV.) EXCAVATION
All excavation shall be made to grade indicated in the drawings. Where the
building site is covered with any kind of fill, the excavation for footings should be made
deeper until the stratum for safe bearing capacity of the soil is reached. Whenever
water is encountered in the excavation process, it shall be removed by bailing or
pumping, care being taken that the surrounding, soil particles are not disturbed or
removed.
The following concrete proportions of concrete mixtures shall be used for the
various parts of the building:
FOOTINGS : CLASS B ( 1: 2-1/2: 5 )
WALL FOOTINGS : CLASS B ( 1: 2-1/2 : 5 )
COLUMNS : CLASS A ( 1: 2 : 4 )
CONCRETE SLAB ON FILL : CLASS B ( 1: 2-1/2: 5 )
Class A Concrete shall be a mixture of 1 part cement, 2 parts sand and 4 parts
gravel by volume, plus enough clean water to make the mixture into a pliable paste.
Use 21 liters of water for every bag of cement.
Class B Concrete shall be a mixture of 1 part cement, 2 and one-half parts sand
and 5 parts gravel by volume, plus enough clean of water of 21 liters for every bag of
cement.
Use G-1 gravel for concrete mixtures of concrete slab on fill and footings. While
¾ gravel will be used for beams, columns reinforced second slab and stairways, wall
tie beams.
There shall be only one service drop from the nearest VISAYAN ELECTRIC
COMPANY (VECO) Pole to the proposed buildings. Electric wires for light and power
shall not be smaller than 13.5 mm or (NO.12), 600V insulation. Wires used shall be
THHN type; Electrical materials used for the any type of installation shall be of any
brand of CLASS A quality and the approved type, which are readily available in the
market.
Prepared by: