Sei sulla pagina 1di 11

PLANILLA DE CONTRATO MODIFICATORIO Nro.

2
CONTRATISTA : EDWIN JAVIER INGENIEROS SRL

OBRA: OBN-607-2017-MEJORAMIENTO DE BARRIO MUNICIPAL BELLA VISTA

U.E.: ADMINISTRACIÓN PROGRAMA BARRIOS Y COMUNIDADES DE VERDAD

ZONA: BARRIO MUNICIPAL

MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

ACERA DE CONCRETO e = 10 cm DOSIF 1:2:4 S/


GM-O-ACE-001 m2 137.61 211.20 29,063.23 161.80 22,265.30 0.00 0.00 0.00 0.00 161.80 22,265.30
EMPEDRADO
1

ACERA DE CONCRETO e = 4 cm DOSIF 1:2:4 C/


2 GM-O-ACE-002 m2 104.12 67.60 7,038.51 67.60 7,038.51 0.00 0.00 0.00 0.00 67.60 7,038.51
EMPEDRADO

3 GM-O-BAR-027 PROV Y COLOC DE BARANDA FG 2" m 457.41 345.40 157,989.41 228.90 104,701.15 102.55 46,907.40 0.00 0.00 331.45 151,608.54

4 GM-O-BBC-001 PROV Y COLOC DE BARBACANAS DE PVC m 35.26 166.70 5,877.84 164.33 5,794.28 0.00 0.00 0.00 0.00 164.33 5,794.28

CAMARA DE INSPECCION Hº Cº CON CAIDA


5 GM-O-CAM-025 Pza 6,012.39 14.00 84,173.46 11.00 66,136.29 0.00 0.00 0.00 0.00 11.00 66,136.29
HASTA H = 4 m

CORDON DE Hº Cº 40% PIEDRA DESPLAZADORA


6 GM-O-COR-008 m 140.94 979.00 137,980.26 724.00 102,040.56 0.00 0.00 0.00 0.00 724.00 102,040.56
0.30 x 0.20 m fck=180

CUNETA DE PIEDRA C/REVESTIMIENTO e = 4 cm


7 GM-O-CUN-012 m2 208.65 514.50 107,350.43 385.20 80,371.98 0.00 0.00 -107.82 -22,496.64 277.38 57,875.34
DOSIF 1:2:3

8 GM-O-DEM-005 DEMOLICION DE HORMIGON ARMADO m3 434.25 2.32 1,007.46 15.00 6,513.75 0.00 0.00 0.00 0.00 15.00 6,513.75

9 GM-O-DEM-015 DEMOLICION DE HORMIGON CICLOPEO m3 263.82 15.76 4,157.80 212.96 56,183.11 0.00 0.00 0.00 0.00 212.96 56,183.11

10 GM-O-DEM-019 DEMOLICION MAMPOSTERIA DE PIEDRA m3 223.33 8.00 1,786.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 GM-O-DRN-011 DRENAJE TRASDOS MURO m 261.28 40.00 10,451.20 28.50 7,446.48 0.00 0.00 0.00 0.00 28.50 7,446.48

12 GM-O-EMP-005 DESEMPIEDRE m2 9.31 2,644.50 24,620.30 4,181.17 38,926.69 0.00 0.00 -1,472.88 -13,712.51 2,708.29 25,214.18

13 GM-O-ENL-004 ENLUCIDO DE CEMENTO MORT 1:3 e = 0.5 cm m2 52.63 20.61 1,084.70 85.84 4,517.76 0.00 0.00 0.00 0.00 85.84 4,517.76

EXCAVACION 0 - 1 m S/ AGOTAMIENTO
14 GM-O-EXC-007 m3 77.54 183.54 14,231.69 566.20 43,903.15 0.00 0.00 -393.22 -30,490.28 172.98 13,412.87
TERRENO SEMIDURO

EXCAVACION 0 - 2 m S/ AGOTAMIENTO
15 GM-O-EXC-008 m3 93.06 2,525.05 234,981.15 2,142.56 199,386.63 693.37 64,525.01 0.00 0.00 2,835.93 263,911.65
TERRENO SEMIDURO

EXCAVACION 2 - 4 m S/ AGOTAMIENTO
16 GM-O-EXC-010 m3 124.07 233.81 29,008.81 531.65 65,961.82 268.84 33,354.98 0.00 0.00 800.49 99,316.79
TERRENO SEMIDURO

17 GM-O-FEE-001 ACERO DE REFUERZO kg 20.06 6,544.30 131,278.66 9,881.52 198,223.29 1,935.68 38,829.74 0.00 0.00 11,817.20 237,053.03

18 GM-O-GAV-010 DESATE DE GAVIONES m3 62.04 102.00 6,328.08 59.00 3,660.36 0.00 0.00 0.00 0.00 59.00 3,660.36

Pag 1 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

19 GM-O-HDR-002 PRUEBA HIDRAULICA ALCANTARILLADO 8" m 16.13 199.12 3,211.81 266.50 4,298.65 0.00 0.00 0.00 0.00 266.50 4,298.65

20 GM-O-HOR-001 HORMIGON POBRE m3 649.67 132.17 85,866.88 38.73 25,161.72 0.00 0.00 0.00 0.00 38.73 25,161.72

21 GM-O-HOR-020 Hº Sº PARA LOSA LLENA - H21 m3 2,394.98 0.07 167.65 5.07 12,142.55 0.00 0.00 0.00 0.00 5.07 12,142.55

Hº Cº CON 50% DE PIEDRA DESPLAZADORA


22 GM-O-HOR-061 m3 841.97 735.29 619,092.12 302.97 255,091.65 0.00 0.00 0.00 0.00 302.97 255,091.65
DOSIFICACION 1:3:4

Hº Sº FCK=210 kg/cm2 DOSIF 1:2:3 (INCLUYE


23 GM-O-HOR-065 m3 2,090.92 3.02 6,314.58 3.02 6,314.58 0.00 0.00 0.00 0.00 3.02 6,314.58
COLOC)

24 GM-O-HOR-067 HORMIGON SIMPLE P/MUROS m3 1,900.21 76.00 144,415.96 135.05 256,623.36 0.00 0.00 0.00 0.00 135.05 256,623.36

25 GM-O-HOR-068 HORMIGON SIMPLE P/COLUMNA - H21 m3 2,554.98 3.61 9,223.48 3.61 9,223.48 0.00 0.00 0.00 0.00 3.61 9,223.48

26 GM-O-HOR-069 HORMIGON SIMPLE P/ESCALERA - H21 m3 2,518.58 10.08 25,387.29 2.78 7,001.65 0.00 0.00 -2.78 -7,001.65 0.00 0.00

27 GM-O-HOR-070 HORMIGON SIMPLE P/VIGAS - H21 m3 2,610.25 2.74 7,152.09 2.74 7,152.09 0.00 0.00 0.00 0.00 2.74 7,152.09

28 GM-O-HOR-071 HORMIGON SIMPLE P/ZAPATAS - H21 m3 1,961.64 4.52 8,866.61 3.00 5,884.92 0.00 0.00 0.00 0.00 3.00 5,884.92

INST DE FAENAS Y COLOC DE LETRERO OBRAS


29 GM-O-INS-003 Gl 1,336.87 3.00 4,010.61 3.00 4,010.61 0.00 0.00 0.00 0.00 3.00 4,010.61
MEDIANAS

INSTALACION DE FAENAS CON OFICINA,


30 GM-O-INS-004 Gl 6,301.94 1.00 6,301.94 1.00 6,301.94 0.00 0.00 0.00 0.00 1.00 6,301.94
DEPOSITO DE MATERIALES Y MAQUINARIA

31 GM-O-LET-081 LETRERO DE OBRA DE 2X1 M (TIPO BANNER) Pza 507.17 2.00 1,014.34 2.00 1,014.34 0.00 0.00 0.00 0.00 2.00 1,014.34

32 GM-O-LIM-012 LIMPIEZA Y RETIRO DE ESCOMBROS m3 105.20 770.00 81,004.00 770.00 81,004.00 3,247.29 341,614.91 0.00 0.00 4,017.29 422,618.91

MAMPOSTERIA DE PIEDRA BRUTA TIPO B MORT


33 GM-O-MAM-001 m3 744.17 9.47 7,047.29 9.47 7,047.29 0.00 0.00 -9.47 -7,047.29 0.00 0.00
1:4 C/ 1 CARA ENCOF

MAMPOSTERIA DE PIEDRA CORTADA TIPO A


34 GM-O-MAM-003 m3 1,868.74 4.79 8,951.26 4.79 8,951.26 0.00 0.00 -4.79 -8,951.26 0.00 0.00
MORT 1:4

35 GM-O-MET-020 BASURERO METALICO Pza 1,113.80 5.00 5,569.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

36 GM-O-NIV-001 NIVELACION TERRENO (MANUAL) m3 93.06 758.38 70,574.84 487.20 45,338.83 0.00 0.00 0.00 0.00 487.20 45,338.83

PISO DE CEMENTO CON CONTRAPISO


37 GM-O-PIS-002 m2 114.77 643.14 73,813.18 490.39 56,282.06 0.00 0.00 0.00 0.00 490.39 56,282.06
CARPETA DE Hº 1:3:4 e = 5 cm

PELDAÑOS DE Hº Cº EN GRADERIAS 50%


38 GM-O-PVB-210 PIEDRA DESPLAZADORA FCK=180 AFINADO m3 1,545.99 113.50 175,469.87 78.50 121,360.22 0.00 0.00 -18.76 -29,002.77 59.74 92,357.44
CARAS VISTAS CON ACARREO LIBRE A 30 m.

HºCº 50% PIEDRA DESPLAZADORA FCK=150


Kg/cm2 PARA MUROS MURETES EN VIAS
39 GM-O-PVB-220 m3 1,403.14 848.88 1,191,097.48 658.33 923,729.16 0.00 0.00 0.00 0.00 658.33 923,729.16
PEATONALES, AFINADO CARAS VISTAS, CON
ACARREO LIBRE A 30m.

Pag 2 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

RELLENO Y COMPACTADO DE TIERRA COMUN


40 GM-O-PVB-276 m3 70.48 1,508.27 106,302.87 2,554.74 180,058.08 0.00 0.00 -762.41 -53,734.66 1,792.33 126,323.42
C/COMPACTADOR MECÁNICO

PROV. Y COLOC. DE REJILLA P/SUMIDERO


41 GM-O-REJ-021 m 2,065.12 8.00 16,520.96 8.00 16,520.96 0.00 0.00 0.00 0.00 8.00 16,520.96
C/PLATINO DE 2.5"X1/2" CADA 2 cm.

RELLENO Y COMPACTADO CON TIERRA


42 GM-O-REL-004 m3 167.06 69.98 11,690.86 69.98 11,690.86 0.00 0.00 0.00 0.00 69.98 11,690.86
CERNIDA

RELLENO Y COMPACTADO CON MATERIAL


43 GM-O-REL-012 m3 99.51 14.40 1,432.94 620.03 61,699.19 0.00 0.00 0.00 0.00 620.03 61,699.19
COMUN (C/ PROV DE MATERIAL)

44 GM-O-REL-014 CAMA DE ASIENTO PARA TUBERIA m3 116.87 18.66 2,180.79 18.66 2,180.79 0.00 0.00 0.00 0.00 18.66 2,180.79

45 GM-O-REP-006 REPLANTEO DE VIAS Y GRADERIAS m 19.99 1,376.70 27,520.23 972.60 19,442.27 0.00 0.00 -221.98 -4,437.38 750.62 15,004.89

46 GM-O-REP-008 REPLANTEO Y TRAZADO DE TUBERIAS m 5.16 280.80 1,448.93 209.63 1,081.69 0.00 0.00 0.00 0.00 209.63 1,081.69

FROTACHADO CON CEMENTO e = 1 cm MORT


47 GM-O-REV-007 m2 41.70 26.00 1,084.20 180.00 7,506.00 0.00 0.00 0.00 0.00 180.00 7,506.00
1:3

48 GM-O-SAN-032 MITIGACION AMBIENTAL CATEGORIA 3 @ 51.16 1,043.89 53,405.41 1,043.89 53,405.41 0.00 0.00 0.00 0.00 1,043.89 53,405.41

49 GM-O-SUM-015 SUMIDERO TIPO R I Pza 1,283.72 3.00 3,851.16 7.00 8,986.04 0.00 0.00 0.00 0.00 7.00 8,986.04

PROV Y TENDIDO DE TUBERIA PVC 8" SDR 41


50 GM-O-TUB-093 m 163.81 275.30 45,096.89 187.72 30,750.41 0.00 0.00 0.00 0.00 187.72 30,750.41
ANILLO DE GOMA

EXCAVACION CON RETROEXCAVADORA DE 1


51 GM-O-EXC-012 m3 58.94 232.68 13,714.16 445.61 26,264.25 0.00 0.00 0.00 0.00 445.61 26,264.25
m3 DE CAPACIDAD

52 GM-O-TRN-040 TRANSPORTE DE PIEDRA HASTA 50 m A MANO m3 50.26 340.00 17,088.40 300.00 15,078.00 0.00 0.00 0.00 0.00 300.00 15,078.00

53 GM-O-EMP-001 EMPIEDRE DE CALZADA m2 56.21 4,440.00 249,572.40 3,960.00 222,591.60 0.00 0.00 -1,395.83 -78,459.60 2,564.17 144,132.00

SUMIDERO PARA GRADERIA C/REJILLA


54 GM-O-SUM-047 m 1,480.41 28.00 41,451.48 23.40 34,641.59 0.00 0.00 0.00 0.00 23.40 34,641.59
METALICA 12MM C/4.5 CM

55 GM-O-ALE-001 ALEROS (MALLA ALAMBRE TEJIDO + MADERA) m2 299.48 9.17 2,746.23 9.17 2,746.23 0.00 0.00 0.00 0.00 9.17 2,746.23

PROVISION Y COLOCADO BAJANTE DE PVC 4"


56 GM-O-BAJ-003 m 53.78 41.40 2,226.49 79.53 4,277.12 0.00 0.00 0.00 0.00 79.53 4,277.12
(TUBERIA DE DESAGÜE)

PROV. Y COLOC. CANALETA DE CALAMINA Nº28


57 GM-O-BAJ-018 m 150.43 24.80 3,730.66 27.81 4,183.46 0.00 0.00 0.00 0.00 27.81 4,183.46
CORTE 50 C/ SOLDADURA DE ESTAÑO

58 GM-O-BAR-027 PROV Y COLOC DE BARANDA FG 2" m 457.41 104.50 47,799.35 83.25 38,079.38 0.00 0.00 0.00 0.00 83.25 38,079.38

PROV Y COLOC DE URINARIO CUADRADO A


59 GM-O-BAT-066 Pza 1,568.11 2.00 3,136.22 5.00 7,840.55 0.00 0.00 0.00 0.00 5.00 7,840.55
MEDIA ALTURA

PROVISION Y COLOCADO DE INODORO


60 GM-O-BAT-103 Pza 1,107.67 10.00 11,076.70 12.00 13,292.04 0.00 0.00 0.00 0.00 12.00 13,292.04
BLANCO DE TANQUE BAJO

Pag 3 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

61 GM-O-BOT-001 BOTAGUAS DE Hº Aº m 121.82 131.40 16,007.15 12.70 1,547.11 6.30 767.47 0.00 0.00 19.00 2,314.58

62 GM-O-BRD-002 BARNIZADO DE PUERTAS Y VENTANAS m2 102.47 114.72 11,755.36 106.02 10,863.87 0.00 0.00 0.00 0.00 106.02 10,863.87

PROV Y COLOC DE CAJA INTERCEPTORA DE


63 GM-O-CAJ-008 Pza 279.45 9.00 2,515.05 9.00 2,515.05 0.00 0.00 0.00 0.00 9.00 2,515.05
PVC 25 x 25 cm

CAMARA DE INSPECCION 0.6X0.6X1M HºCº 70%


64 GM-O-CAM-097 Pza 371.08 10.00 3,710.80 8.00 2,968.64 0.00 0.00 0.00 0.00 8.00 2,968.64
PIEDRA DESPLAZADORA

65 GM-O-CAM-019 CAMARA DE REGISTRO 25 x 25 cm Pza 347.27 8.00 2,778.16 8.00 2,778.16 0.00 0.00 0.00 0.00 8.00 2,778.16

66 GM-O-CAM-022 CAMARA DE REGISTRO PLASTICA Pza 173.80 6.00 1,042.80 10.00 1,738.00 0.00 0.00 0.00 0.00 10.00 1,738.00

CARPETA DE Hº Sº e = 13 cm DOSIF 1:2:3 C/


67 GM-O-CAR-007 m2 189.47 210.00 39,788.70 156.60 29,671.00 0.00 0.00 -106.60 -20,197.50 50.00 9,473.50
ENLUCIDO

CIELO FALSO - INCLUYE YESO MADERAMEN Y


68 GM-O-CIE-001 m2 283.24 319.91 90,611.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MALLA

69 GM-O-CIE-002 CIELO RASO SOBRE LOSA DE HORMIGON m2 182.02 124.10 22,588.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

70 GM-O-CRR-008 CORREAS METALICAS 80 x 40 x 15 x 2 mm m 139.19 50.15 6,980.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CUBIERTA DE POLICARBONATO CON


71 GM-O-CUB-018 m2 743.05 29.00 21,548.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ESTRUCTURA METALICA e = 6 mm

CUBIERTA DE CALAMINA CON CERCHA


72 GM-O-CUB-026 m2 710.47 95.40 67,778.84 139.88 99,380.54 0.00 0.00 0.00 0.00 139.88 99,380.54
METALICA

73 GM-O-DEM-010 DEMOLICION DE MURO DE LADRILLO m2 77.54 75.00 5,815.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

74 GM-O-DEM-015 DEMOLICION DE HORMIGON CICLOPEO m3 263.82 141.74 37,393.85 344.81 90,967.77 0.00 0.00 0.00 0.00 344.81 90,967.77

75 GM-O-DIN-001 DINTEL DE LADRILLO DE 6H ARMADO m 95.50 36.20 3,457.10 36.20 3,457.10 0.00 0.00 0.00 0.00 36.20 3,457.10

PROV E INST DE MATERIAL ELECTRICO PARA


76 GM-O-ELC-233 ACOMETIDA MONOFASICA SIN PROVISION DE Gl 632.35 2.00 1,264.70 2.00 1,264.70 0.00 0.00 0.00 0.00 2.00 1,264.70
MEDIDOR

77 GM-O-ENL-004 ENLUCIDO DE CEMENTO MORT 1:3 e = 0.5 cm m2 52.63 77.00 4,052.51 283.50 14,920.61 4.50 236.84 0.00 0.00 288.00 15,157.44

EXCAVACION 0 - 2 m S/ AGOTAMIENTO
78 GM-O-EXC-008 m3 93.06 305.09 28,391.68 1,473.06 137,082.96 0.00 0.00 -192.06 -17,873.10 1,281.00 119,209.86
TERRENO SEMIDURO

EXCAVACION 2 - 4 m S/ AGOTAMIENTO
79 GM-O-EXC-010 m3 124.07 135.37 16,795.36 497.67 61,745.92 0.00 0.00 0.00 0.00 497.67 61,745.92
TERRENO SEMIDURO

80 GM-O-EXC-011 EXCAVACION DE 4 - 6 M S/ AGOTAMIENTO m3 248.14 71.95 17,853.67 69.86 17,335.06 0.00 0.00 0.00 0.00 69.86 17,335.06

81 GM-O-FEE-001 ACERO DE REFUERZO kg 20.06 21,098.41 423,234.10 39,967.25 801,743.04 0.00 0.00 -11,932.25 -239,360.94 28,035.00 562,382.10

82 GM-O-HOR-001 HORMIGON POBRE m3 649.67 7.63 4,956.98 25.94 16,852.44 0.00 0.00 0.00 0.00 25.94 16,852.44

Pag 4 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

Hº Cº CON 50% DE PIEDRA DESPLAZADORA


83 GM-O-HOR-061 m3 841.97 123.45 103,941.20 62.95 53,002.01 1.47 1,237.70 0.00 0.00 64.42 54,239.71
DOSIFICACION 1:3:4

Hº Sº FCK=210 kg/cm2 DOSIF 1:2:3 (INCLUYE


84 GM-O-HOR-065 m3 2,090.92 17.96 37,552.92 3.01 6,293.67 18.74 39,183.84 0.00 0.00 21.75 45,477.51
COLOC)

85 GM-O-HOR-067 HORMIGON SIMPLE P/MUROS m3 1,900.21 109.05 207,217.90 245.45 466,406.54 8.60 16,341.81 0.00 0.00 254.05 482,748.35

86 GM-O-HOR-068 HORMIGON SIMPLE P/COLUMNA - H21 m3 2,554.98 37.20 95,045.26 30.90 78,948.88 0.00 0.00 -7.97 -20,363.19 22.93 58,585.69

87 GM-O-HOR-070 HORMIGON SIMPLE P/VIGAS - H21 m3 2,610.25 89.00 232,312.25 53.83 140,509.76 0.00 0.00 -6.96 -18,167.34 46.87 122,342.42

88 GM-O-HOR-071 HORMIGON SIMPLE P/ZAPATAS - H21 m3 1,961.64 36.65 71,894.11 19.25 37,761.57 0.00 0.00 0.00 0.00 19.25 37,761.57

IMPERMEABILIZACION SOBRE LOSA DE Hº CON


89 GM-O-IMP-001 m2 99.96 118.76 11,871.25 29.70 2,968.81 0.00 0.00 0.00 0.00 29.70 2,968.81
ASFALTO

90 GM-O-IMP-002 IMPERMEABILIZACION CON MANTA DE PVC m2 114.35 588.30 67,272.11 137.46 15,718.55 0.00 0.00 0.00 0.00 137.46 15,718.55

91 GM-O-LIM-012 LIMPIEZA Y RETIRO DE ESCOMBROS m3 105.20 40.00 4,208.00 2,956.81 311,056.41 0.00 0.00 -836.25 -87,973.50 2,120.56 223,082.91

LOSA ALIVIANADA H= 20 cm CON VIGUETA


92 GM-O-PVB-370 m2 352.74 47.00 16,578.78 47.00 16,578.78 0.00 0.00 -47.00 -16,578.78 0.00 0.00
PRETENSADA

PROV Y COLOC LOSA DE HUECA DE HORMIGON


93 GM-O-LOS-012 m2 360.03 94.50 34,022.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRETENSADO H = 10 cm

LOSA DE Hº Aº DOSIF 1:2:3 CON POLIESTIRENO


94 GM-O-LOS-015 EXPANDIDO H = 20 cm NERVADA (10 x 15 cm) EN m2 824.97 28.80 23,759.14 228.80 188,753.14 0.00 0.00 -54.99 -45,365.10 173.81 143,388.04
2 DIRECCIONES

95 GM-O-LUM-008 INST ELECTRICA PUNTOS DE LUMINARIA Pto 305.48 76.00 23,216.48 76.00 23,216.48 0.00 0.00 0.00 0.00 76.00 23,216.48

INST ELECTRICA PUNTOS DE TOMA


96 GM-O-LUM-009 Pto 344.76 38.00 13,100.88 38.00 13,100.88 0.00 0.00 0.00 0.00 38.00 13,100.88
CORRIENTE

LUMINARIA FLUORECENTE C/DIFUSION DE 40W


97 GM-O-LUM-013 Pza 617.47 43.00 26,551.21 5.00 3,087.35 0.00 0.00 0.00 0.00 5.00 3,087.35
x 12 TUBOS

PROV E INST DE CABLE DE Cu MONOPOLAR Nº


98 GM-O-LUM-016 m 21.78 47.00 1,023.66 47.00 1,023.66 0.00 0.00 0.00 0.00 47.00 1,023.66
8 AWG 7 Hilos

99 GM-O-LUM-033 PROV E INST DE LUMINARIAS TIPO SPOT 60 W Pza 63.15 12.00 757.80 12.00 757.80 0.00 0.00 0.00 0.00 12.00 757.80

PROV E INST DE TABLERO DE DISTRIBUCION 20


100 GM-O-LUM-038 Pza 893.31 5.00 4,466.55 5.00 4,466.55 0.00 0.00 0.00 0.00 5.00 4,466.55
x 35 cm

PROV E INST DE TABLERO DE FUERZA PARA


101 GM-O-LUM-052 Pza 589.65 1.00 589.65 1.00 589.65 0.00 0.00 0.00 0.00 1.00 589.65
DUCHA

102 GM-O-LUM-055 SISTEMA DE PUESTA A TIERRA 1 JABALINA Pza 634.00 2.00 1,268.00 4.00 2,536.00 0.00 0.00 0.00 0.00 4.00 2,536.00

PROVISION E INSTALACION DE CABLE DE Cu


103 GM-O-LUM-057 m 30.58 32.00 978.56 36.00 1,100.88 0.00 0.00 0.00 0.00 36.00 1,100.88
MONOPOLAR Nº 6 AWG 7 Hilos

Pag 5 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

PROV E INST DE TUBOS PARA INST ELECTRICA


104 GM-O-LUM-085 m 8.44 19.00 160.36 469.00 3,958.36 0.00 0.00 0.00 0.00 469.00 3,958.36
PVC 3/4"

PROV E INST DE LUMINARIA APLIQUE TIPO


105 GM-O-LUM-086 Pza 80.84 21.00 1,697.64 12.00 970.08 0.00 0.00 0.00 0.00 12.00 970.08
TORTUGA

PROV E INST DE TUBOS PARA INST ELECTRICA


106 GM-O-LUM-107 m 27.28 11.00 300.08 11.00 300.08 0.00 0.00 0.00 0.00 11.00 300.08
PVC 2 1/2"

PROV E INST DE CONMUTADOR SIMPLE


107 GM-O-LUM-143 Pza 85.29 2.00 170.58 10.00 852.90 0.00 0.00 0.00 0.00 10.00 852.90
P/3LINEAS

PROVISION E INSTALACION DE DUCTO DE PVC


108 GM-O-LUM-144 m 27.31 20.00 546.20 61.00 1,665.91 0.00 0.00 0.00 0.00 61.00 1,665.91
1" PARA INSTALACION ELECTRICA

PROV E INST CABLE DE CU MONOPOLAR Nº 10


109 GM-O-LUM-506 m 19.93 66.00 1,315.38 62.00 1,235.66 0.00 0.00 0.00 0.00 62.00 1,235.66
AWG THW 7 HILOS

PROVISION Y COLOCADO DE MALLA OLIMPICA


110 GM-O-MAL-017 m2 244.01 68.00 16,592.68 119.00 29,037.19 308.00 75,155.08 0.00 0.00 427.00 104,192.27
Y TUBOS FG 2" c/2.75 (h=5m)

111 GM-O-MES-001 MESONES DE HORMIGON ARMADO m2 394.02 6.90 2,718.74 6.90 2,718.74 0.00 0.00 0.00 0.00 6.90 2,718.74

PROV. Y COLOC. DE ESTRUCTURA METALICA


112 GM-O-MET-073 PARA BALONCESTO Y FULBITO, TABLERO, Gl 15,146.04 1.00 15,146.04 1.00 15,146.04 0.00 0.00 0.00 0.00 1.00 15,146.04
MALLA (2 PIEZAS)

113 GM-O-MUR-004 MURO DE LADRILLO 6H e = 0.12 m DOSIF 1:5 m2 167.44 680.56 113,952.97 750.00 125,580.00 0.00 0.00 -115.00 -19,255.60 635.00 106,324.40

114 GM-O-PIN-003 PINTURA ANTICORROSIVA m2 46.29 93.35 4,321.17 132.60 6,138.05 0.00 0.00 0.00 0.00 132.60 6,138.05

PINTURA EN EXTERIORES LATEX O SIMILAR


115 GM-O-PIN-005 m2 58.31 328.72 19,167.66 328.72 19,167.66 0.00 0.00 0.00 0.00 328.72 19,167.66
(DOS MANOS)

PINTURA EN INTERIORES LATEX O SIMILARES


116 GM-O-PIN-006 m2 44.75 623.33 27,894.02 623.33 27,894.02 0.00 0.00 0.00 0.00 623.33 27,894.02
(DOS MANOS)

117 GM-O-PIN-015 PINTADO DE LINEAS CANCHA BALONCESTO Pza 927.44 1.00 927.44 1.00 927.44 0.00 0.00 0.00 0.00 1.00 927.44

PINTADO DE LINEAS CANCHA FUTBOL DE


118 GM-O-PIN-016 Pza 832.52 1.00 832.52 1.00 832.52 0.00 0.00 0.00 0.00 1.00 832.52
SALON

119 GM-O-PIN-017 PINTADO DE LINEAS CANCHA VOLIBOL Pza 408.11 1.00 408.11 1.00 408.11 0.00 0.00 0.00 0.00 1.00 408.11

120 GM-O-PIN-024 PINTURA AL OLEO MATE m2 90.32 168.69 15,236.08 55.46 5,009.15 0.00 0.00 0.00 0.00 55.46 5,009.15

PISO DE CEMENTO CON CONTRAPISO


121 GM-O-PIS-002 m2 114.77 130.50 14,977.49 240.91 27,649.24 0.00 0.00 0.00 0.00 240.91 27,649.24
CARPETA DE Hº 1:3:4 e = 5 cm

PISO DE CERAMICA CON COLOR SOBRE LOSA


122 GM-O-PIS-003 m2 215.11 361.95 77,859.06 93.28 20,065.46 0.00 0.00 0.00 0.00 93.28 20,065.46
O PISO FROTACHADO

Pag 6 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

PISOS PARA CANCHAS DE BASQUET e = 7.5 cm


123 GM-O-PIS-016 m2 157.52 550.00 86,636.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
JUNTAS c/2 m

124 GM-O-PIS-024 CONTRAPISO DE CEMENTO S/ LOSA m2 125.59 350.00 43,956.50 341.65 42,907.82 0.00 0.00 -91.65 -11,510.32 250.00 31,397.50

125 GM-O-PUE-009 PUERTA METALICA CON MALLA OLIMPICA m2 964.66 7.98 7,697.99 7.98 7,697.99 0.00 0.00 0.00 0.00 7.98 7,697.99

PUERTA TABLERO DE MADERA PINO MARCO


126 GM-O-PUE-043 m2 977.23 19.74 19,290.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2"*3" COLOCADO EN OBRA

PROV Y COLOC PUERTA CONTRAPLACADA


127 GM-O-PUE-062 m2 1,202.54 38.85 46,718.68 38.85 46,718.68 0.00 0.00 0.00 0.00 38.85 46,718.68
VENESTA CEDRO

128 GM-O-PVB-211 ESCALERA DE HºAº DOSIFICACION 1:2:3 m3 3,966.84 7.65 30,346.33 12.00 47,602.08 0.00 0.00 0.00 0.00 12.00 47,602.08

HºCº 50% PIEDRA DESPLAZADORA FCK=150


Kg/cm2 PARA MUROS MURETES EN VIAS
129 GM-O-PVB-220 m3 1,403.14 40.58 56,939.42 18.22 25,565.21 0.00 0.00 -18.22 -25,565.21 0.00 0.00
PEATONALES, AFINADO CARAS VISTAS, CON
ACARREO LIBRE A 30m.

RELLENO Y COMPACTADO DE TIERRA COMUN


130 GM-O-PVB-276 m3 70.48 529.65 37,329.73 572.01 40,315.26 0.00 0.00 0.00 0.00 572.01 40,315.26
C/COMPACTADOR MECÁNICO

INSTALACION DE AGUA POTABLE DE 1/2" (POR


131 GM-O-PVB-356 Pto 306.05 25.00 7,651.25 35.00 10,711.75 0.00 0.00 0.00 0.00 35.00 10,711.75
PUNTO)

132 GM-O-QIN-002 PROV Y COLOC DE CHAPA EXTERIOR Pza 337.21 4.00 1,348.84 4.00 1,348.84 0.00 0.00 0.00 0.00 4.00 1,348.84

133 GM-O-QIN-003 PROV Y COLOC DE CHAPA INTERIOR Pza 379.26 19.00 7,205.94 19.00 7,205.94 0.00 0.00 0.00 0.00 19.00 7,205.94

134 GM-O-QIN-005 PROV Y COLOC DE PICAPORTES DE 3" Pza 55.62 56.00 3,114.72 56.00 3,114.72 0.00 0.00 0.00 0.00 56.00 3,114.72

135 GM-O-REL-008 RELLENO DE MATERIAL DE DRENAJE m3 248.65 7.36 1,830.06 7.36 1,830.06 125.41 31,183.20 0.00 0.00 132.77 33,013.26

136 GM-O-REM-003 REMOCION DE CUBIERTA m2 31.02 27.00 837.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

REPLANTEO Y TRAZADO DE OBRAS CIVILES


137 GM-O-REP-015 Gl 2,116.66 2.00 4,233.32 2.00 4,233.32 0.00 0.00 0.00 0.00 2.00 4,233.32
CON ESTACION TOTAL

REVOQUE EXTERIOR C/CAL - CEMENTO -


138 GM-O-REV-004 m2 146.89 392.92 57,716.02 392.92 57,716.02 0.00 0.00 0.00 0.00 392.92 57,716.02
ARENA SOBRE MURO DE LADRILLO

FROTACHADO CON CEMENTO e = 1 cm MORT


139 GM-O-REV-007 m2 41.70 61.60 2,568.72 240.35 10,022.60 0.00 0.00 0.00 0.00 240.35 10,022.60
1:3

REVOQUE INTERIOR DE ESTUCO SOBRE MURO


140 GM-O-REV-010 m2 130.73 822.84 107,569.87 822.84 107,569.87 0.00 0.00 -259.78 -33,961.04 563.06 73,608.83
DE LADRILLO

PROV. Y COLOC. DE REJILLA DE PISO DE


141 GM-O-RLL-020 Pza 153.61 10.00 1,536.10 10.00 1,536.10 0.00 0.00 0.00 0.00 10.00 1,536.10
ACERO INOXIDABLE DE 15 X 15 CM

REVESTIMIENTO DE CERAMICA SOBRE PARED


142 GM-O-RVM-011 m2 212.85 56.82 12,094.14 56.82 12,094.14 135.18 28,773.06 0.00 0.00 192.00 40,867.20
DE LADRILLO

Pag 7 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

REVESTIMIENTO DE CERAMICA PARA


143 GM-O-RVM-015 m2 384.18 142.00 54,553.56 142.00 54,553.56 0.00 0.00 -142.00 -54,553.56 0.00 0.00
PERMANENTE EXPOSICION AL AGUA

PROVISION Y COLOCADO LAVAPLATOS DE 1


144 GM-O-SAN-103 Pza 848.53 2.00 1,697.06 2.00 1,697.06 0.00 0.00 0.00 0.00 2.00 1,697.06
DEPOSITO Y 1 FREGADERO CON GRIFERIA

PROVISION Y COLOCADO DE TINA SENCILLA DE


145 GM-O-SAN-071 Pza 2,181.99 1.00 2,181.99 1.00 2,181.99 0.00 0.00 -1.00 -2,181.99 0.00 0.00
FIBRA DE VIDRIO CON ACCESORIOS

PROVISION E INSTALACION DE LAVAMANOS


146 GM-O-SAN-068 BLANCO CON GRIFERIA CROMADA Pza 1,413.45 10.00 14,134.50 15.00 21,201.75 0.00 0.00 0.00 0.00 15.00 21,201.75
AUTOMATICA

147 GM-O-TUB-064 PROV Y TENDIDO DE TUBERIA PVC 2½" C-9 m 53.51 12.19 652.29 21.06 1,126.92 0.00 0.00 0.00 0.00 21.06 1,126.92

148 GM-O-TUB-065 PROV Y TENDIDO DE TUBERIA PVC 2" C-9 m 32.27 12.91 416.61 16.68 538.26 0.00 0.00 0.00 0.00 16.68 538.26

149 GM-O-TUB-074 PROV Y COLOC LLAVE DE PASO DE 1/2" Pza 129.69 2.00 259.38 17.00 2,204.73 0.00 0.00 0.00 0.00 17.00 2,204.73

150 GM-O-TUB-105 PROV Y TENDIDO DE TUBERIA PVC 3/4" E-40 m 24.75 23.38 578.66 26.14 646.97 0.00 0.00 0.00 0.00 26.14 646.97

151 GM-O-TUB-106 PROVISION Y TENDIDO DE TUBERIA PVC 1" E-40 m 40.01 55.89 2,236.16 36.86 1,474.77 0.00 0.00 0.00 0.00 36.86 1,474.77

152 GM-O-TUB-111 PROV Y TENDIDO DE TUBERIA PVC 2" E-40 m 64.38 9.00 579.42 9.00 579.42 0.00 0.00 0.00 0.00 9.00 579.42

153 GM-O-TUB-115 PROV Y COLOC DE YEE DE PVC 4" SDR 35 Pza 350.00 11.00 3,850.00 11.00 3,850.00 0.00 0.00 0.00 0.00 11.00 3,850.00

154 GM-O-TUB-119 PROV Y TENDIDO DE TUBERIA PVC 1 1/2" E-40 m 44.99 13.34 600.17 13.34 600.17 0.00 0.00 0.00 0.00 13.34 600.17

155 GM-O-TUB-136 PROV Y COLOC LLAVE DE PASO DE 1" Pza 127.68 6.00 766.08 9.00 1,149.12 0.00 0.00 0.00 0.00 9.00 1,149.12

156 GM-O-TUB-137 PROV Y COLOC LLAVE DE PASO DE 3/4" Pza 109.66 3.00 328.98 10.00 1,096.60 0.00 0.00 0.00 0.00 10.00 1,096.60

157 GM-O-VEN-004 VENTANAS DE ALUMINIO NO INCLUYE VIDRIO m2 833.07 35.34 29,440.69 42.24 35,188.88 0.00 0.00 0.00 0.00 42.24 35,188.88

PROV Y COLOC DE VIDRIOS TRANSPARENTES


158 GM-O-VID-002 m2 103.84 35.34 3,669.71 42.24 4,386.20 0.00 0.00 0.00 0.00 42.24 4,386.20
DOBLES

159 GM-O-ZOC-002 ZOCALO DE CEMENTO - ARENA m2 122.06 11.73 1,431.76 3.89 474.81 0.00 0.00 0.00 0.00 3.89 474.81

160 GM-O-ZOC-003 ZOCALO DE CERAMICA m 47.05 152.10 7,156.31 152.10 7,156.31 0.00 0.00 0.00 0.00 152.10 7,156.31

SUMIDERO PARA GRADERIA C/REJILLA


161 GM-O-SUM-047 m 1,480.41 3.00 4,441.23 3.00 4,441.23 0.00 0.00 0.00 0.00 3.00 4,441.23
METALICA 12MM C/4.5 CM

PROVISION E INSTALACION DE DUCHA 230V,


162 GM-O-ELC-510 Pza 455.03 1.00 455.03 1.00 455.03 0.00 0.00 0.00 0.00 1.00 455.03
6800W DOBLE RESISTENCIA

PROVISIÓN E INSTALACIÓN DE MICRO


163 GM-O-PVB-308 MEDIDOR DE AGUA DN 20 (1/2 PLG) CHORRO Pza 466.70 2.00 933.40 4.00 1,866.80 0.00 0.00 0.00 0.00 4.00 1,866.80
UNICO

PROV Y TENDIDO DE TUBERIA PVC 4" SDR 41


164 GM-O-TUB-091 m 47.69 148.78 7,095.32 57.38 2,736.45 0.00 0.00 0.00 0.00 57.38 2,736.45
ANILLO DE GOMA

Pag 8 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

PROVISION Y TENDIDO DE TUBERIA PVC SDR


165 GM-O-TUB-374 m 92.31 30.65 2,829.30 30.65 2,829.30 0.00 0.00 0.00 0.00 30.65 2,829.30
41 D=6" ( CON PERFORACIONES )

ITEMS ADICIONALES CM - 1

166 GM-O-CBS-004 PROVISION Y COLOCACION DE CAPA BASE m3 241.06 0.00 0.00 550.00 132,583.00 67.14 16,184.77 0.00 0.00 617.14 148,767.77

CARPETA ASFALTICA (E = 5 CM) C/ PROVISIÓN


167 GM-O-ASF-013 DE CEMENTO ASFALTICO E IMPRIMACIÓN PARA m2 194.24 0.00 0.00 15.00 2,913.60 0.00 0.00 0.00 0.00 15.00 2,913.60
VIAS URBANAS

CUBIERTA DE CALAMINA PLASTICA CON


168 GM-O-CUB-117 m2 866.09 0.00 0.00 7.20 6,235.85 0.00 0.00 0.00 0.00 7.20 6,235.85
CERCHA METALICA

169 GM-O-TUB-104 PROV Y TENDIDO DE TUBERIA PVC 1/2" E-40 m 12.54 0.00 0.00 32.86 412.06 0.00 0.00 0.00 0.00 32.86 412.06

170 GM-O-REP-008 REPLANTEO Y TRAZADO DE TUBERIAS m 5.16 0.00 0.00 131.66 679.37 0.00 0.00 0.00 0.00 131.66 679.37

RELLENO Y COMPACTADO CON TIERRA


171 GM-O-REL-004 m3 167.06 0.00 0.00 21.67 3,620.19 0.00 0.00 0.00 0.00 21.67 3,620.19
CERNIDA

EXCAVACION 0 - 1 m S/ AGOTAMIENTO
172 GM-O-EXC-007 m3 77.54 0.00 0.00 23.53 1,824.52 0.00 0.00 0.00 0.00 23.53 1,824.52
TERRENO SEMIDURO

173 GM-O-REL-014 CAMA DE ASIENTO PARA TUBERIA m3 116.87 0.00 0.00 3.25 379.83 0.00 0.00 0.00 0.00 3.25 379.83

PROVISION Y COLOCACION REJILLA DE PISO


174 GM-O-RLL-017 Pza 170.91 0.00 0.00 9.00 1,538.19 0.00 0.00 0.00 0.00 9.00 1,538.19
DE BRONCE 15X15

175 GM-O-HDR-002 PRUEBA HIDRAULICA ALCANTARILLADO 8" m 16.13 0.00 0.00 141.39 2,280.62 0.00 0.00 0.00 0.00 141.39 2,280.62

PROVISION Y COLOCADO DE TANQUE DE


176 GM-O-BAT-104 Pza 4,155.12 0.00 0.00 1.00 4,155.12 0.00 0.00 0.00 0.00 1.00 4,155.12
POLIETILENO DE AGUA DE 2300LTS.

177 GM-O-TUB-090 PROV Y TENDIDO DE TUBERIA PVC 3" C-9 m 60.23 0.00 0.00 15.00 903.45 0.00 0.00 0.00 0.00 15.00 903.45

178 GM-O-REV-031 FACHADA FLOTANTE m2 747.68 0.00 0.00 32.25 24,112.68 0.00 0.00 0.00 0.00 32.25 24,112.68

179 GM-O-PIS-051 PISO DE PORCELANATO ANTIDESLIZANTE m2 271.34 0.00 0.00 287.69 78,061.80 0.00 0.00 -237.69 -64,494.80 50.00 13,567.00

180 GM-O-PIN-057 PINTURA IMPERMEABILIZANTE PARA TECHOS m2 117.13 0.00 0.00 65.57 7,680.21 0.00 0.00 0.00 0.00 65.57 7,680.21

PROVISION Y COLOCACION PUERTA DE VIDRIO


181 GM-O-PUE-071 m2 2,006.14 0.00 0.00 3.15 6,319.34 0.00 0.00 0.00 0.00 3.15 6,319.34
TEMPLADO e=10 mm

PROV Y COLOC PUERTA DE VIDRIO TEMPLADO


182 GM-O-PUE-088 m2 1,271.26 0.00 0.00 3.36 4,271.43 0.00 0.00 0.00 0.00 3.36 4,271.43
CORREDIZA C/MARCO DE ALUMINIO

CERRAMIENTO VIDRIO TEMPLADO 8 MM CON


183 GM-O-VID-022 m2 1,233.52 0.00 0.00 3.78 4,662.71 0.00 0.00 0.00 0.00 3.78 4,662.71
ESTRUCTURA DE ALUMINIO

REVESTIMIENTO DE CERAMICA CON COLOR


184 GM-O-REV-030 m2 289.19 0.00 0.00 61.48 17,779.40 0.00 0.00 0.00 0.00 61.48 17,779.40
(INCLUYE REVOQUE DE PARED)

Pag 9 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

185 GM-O-PUE-056 PUERTA DE REJA METALICA ABATIBLE m2 440.94 0.00 0.00 2.52 1,111.17 0.00 0.00 0.00 0.00 2.52 1,111.17

186 GM-O-CIE-011 CIELO FALSO ACUSTICO m2 275.17 0.00 0.00 119.52 32,888.32 0.00 0.00 0.00 0.00 119.52 32,888.32

187 GM-O-PUE-026 PROV Y COLOC DE PUERTA DE CEDRO m2 1,220.84 0.00 0.00 25.89 31,607.55 11.49 14,027.45 0.00 0.00 37.38 45,635.00

LOSA DE HORMIGON SIMPLE PARA CANCHAS


188 GM-O-HOR-105 m2 168.08 0.00 0.00 550.00 92,444.00 0.00 0.00 0.00 0.00 550.00 92,444.00
DOSIF. 1:2:3 H=10 CM

PROV E INST LUMINARIA 60x60 cm LED DWL


189 GM-O-ELC-483 Pza 2,187.06 0.00 0.00 15.00 32,805.90 0.00 0.00 0.00 0.00 15.00 32,805.90
40W

PROV E INST LUMINARIA CIRCULAR LED DWL


190 GM-O-ELC-482 Pza 269.82 0.00 0.00 50.00 13,491.00 0.00 0.00 0.00 0.00 50.00 13,491.00
15W

PROVISIÓN E INSTALACIÓN SPOT DE


191 GM-O-LUM-625 Pza 88.53 0.00 0.00 2.00 177.06 0.00 0.00 0.00 0.00 2.00 177.06
EMPOTRAR LED 10 W

PROV E INST DE LUMINARIA CON REJILLA


192 GM-O-LUM-495 Pza 525.09 0.00 0.00 36.00 18,903.24 0.00 0.00 0.00 0.00 36.00 18,903.24
EMPOTRABLE 4x20 W DE 60 cm x 60 cm

ITEMS ADICIONALES CM - 2

ARMADO DE GAVIONES 2x1x1 C/DIAFRAGMA


193 GM-O-GAV-006 m3 614.91 0.00 0.00 0.00 0.00 40.00 24,596.40 0.00 0.00 40.00 24,596.40
(INCLUYE MALLA)

PILOTES DE Ho D=1,0 m incluye excavacion Y


194 GM-O-PIL-017 m 3,450.83 0.00 0.00 0.00 0.00 14.00 48,311.62 0.00 0.00 14.00 48,311.62
POZO AUSTRIACO

PROV Y COLOC DE BARANDA FG 2" y MALLA


195 GM-O-BAR-048 m 997.82 0.00 0.00 0.00 0.00 50.00 49,891.00 0.00 0.00 50.00 49,891.00
OLIMPICA

BARANDA METALICA SEGUN DISEÑO CON


196 GM-O-BAR-062 m 1,223.73 0.00 0.00 0.00 0.00 20.00 24,474.60 0.00 0.00 20.00 24,474.60
PASAMANOS DE METAL

197 GM-O-REJ-030 REJAS PERIMETRALES SEGÚN DISEÑO m2 762.29 0.00 0.00 0.00 0.00 15.00 11,434.35 0.00 0.00 15.00 11,434.35

198 GM-O-PUE-089 JAMBAS DE MADERA PARA PUERTAS 4" X 1/2" m 146.57 0.00 0.00 0.00 0.00 106.00 15,536.42 0.00 0.00 106.00 15,536.42

BOTAGUAS DE LADRILLO GAMBOTE DE CANTO


199 GM-O-BOT-002 m 153.75 0.00 0.00 0.00 0.00 65.50 10,070.63 0.00 0.00 65.50 10,070.63
H = 12 cm MORT 1:4

** 6,985,122.44 Suma Vertical 7,677,957.92

TOTAL HORIZONTAL Contrato ** 6,985,122.44 7,678,055.68 932,638.28 -932,736.01 7,677,957.95

PORCENTAJE 100% 109,92% 13,35% -13,35% 109,92%

MONTO EN INCREMENTO TOTAL RESPECTO AL


Bs. 692,835.48
CONTRATO

PORCENTAJE EN VARIACION RESPECTO AL


9,92%
CONTRATO

Pag 10 de 11
MODIFICACION APROBADA
CONTRATO ORIGINAL INCREMENTO DECREMENTOS REORDENAMIENTO
ANTERIOR
No CODIGO DESCRIPCION UNIDAD P/U
PRECIO PRECIO PRECIO PRECIO
CANTIDAD CANTIDAD CANTIDAD CANTIDAD CANTIDAD PRECIO
TOTAL TOTAL TOTAL TOTAL

Mensaje: * Difiere en -0.03 Bs por verificación Vertical y Horizontal, se considera válido el monto el monto resultado de la verificación vertical.

Mensaje: ** Monto contrato y sumatoria aritmética idénticas.

Arq. Raul Martin Flores Munnoz Ing. PATRICIA ALEJANDRA PLATA CALDERON
CONTRATISTA

FISCAL DE OBRA (Segun corresponda) SUPERVISOR DE OBRA

Pag 11 de 11