ICMH Structural Pending items

Final Detail Design Submission


Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
Site Plan
Pile depth for A1&A2, OB, Existing
1 Pile building & Ball room to be discussed
with ODST. Optimise pile numbers

2 Raft MEP drainage details to be


incorporated/co-ordinated
3 Bottom reinforcement
4 Top reinforcement
5 Column reinft
6 Wall reinft
7 Lower Level layout (-1)
8 Bottom reinforcement
9 Top reinforcement
10 0 Level Layout
11 Bottom reinforcement
12 Top reinforcement
13 Raft sections
14 Lower Level sections
15 0 Level /Landscape sections
16 Beam schedule Punching shear details
17 Ramp Details
18 Staircase details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
Club Tower
19 Raft Reinforcement Raft to be rechecked for MEP drainage
20 Bottom reinforcement
21 Top reinforcement
22 Column
23 Wall reinft
24 Lower Level layout (-1)
25 Bottom reinforcement
26 Top reinforcement
27 5.8 Level Layout
28 Bottom reinforcement
29 Top reinforcement
30 9.4 Level Layout To be modified as per PT drawings
31 1 Level Layout To be modified as per PT drawings
32 2 Level Layout To be modified as per PT drawings
33 3 Level Layout To be modified as per PT drawings
34 4 Level Layout To be modified as per PT drawings
35 5 Level Layout To be modified as per PT drawings
36 6 Level Layout To be modified as per PT drawings
37 7 Level Layout To be modified as per PT drawings
38 5.8 + 0 Level Sections

39 1 Level & Typical sections To be modified as per PT drawings, BMU


and MEP Plinths at roof
40 Beam schedule Punching shear details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
Branded Apartments
41 Raft Reinforcement Raft to be rechecked for MEP drainage
42 Bottom reinforcement
43 Top reinforcement
44 Column
45 Wall reinft
46 Lower Level layout (-1)
47 Bottom reinforcement
48 Top reinforcement
49 0 Level Layout
50 Bottom reinforcement
51 Top reinforcement
52 1 Level Layout To be modified as per PT drawings
53 2 Level Layout To be modified as per PT drawings
54 3 Level Layout To be modified as per PT drawings
55 4 Level Layout To be modified as per PT drawings
56 5 Level Layout To be modified as per PT drawings
57 6 Level Layout To be modified as per PT drawings
58 7 Level Layout To be modified as per PT drawings
59 Lower Level Sections
60 0 Level Sections

61 1 Level & Typical sections To be modified as per PT drawings, BMU


and MEP Plinths at roof
62 Beam schedule Punching shear details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
A3 Building
63 Raft Reinforcement Raft to be rechecked for MEP drainage
64 Bottom reinforcement
65 Top reinforcement
66 Column
67 Wall reinft
68 Lower Level layout (-1)
69 Bottom reinforcement
70 Top reinforcement
71 0 Level Layout
72 Bottom reinforcement
73 Top reinforcement
74 1 Level Layout To be modified as per PT drawings
75 2 Level Layout To be modified as per PT drawings
76 3 Level Layout To be modified as per PT drawings
77 4 Level Layout To be modified as per PT drawings
78 5 Level Layout To be modified as per PT drawings
79 6 Level Layout To be modified as per PT drawings
80 7 Level Layout To be modified as per PT drawings
81 Lower Level Sections
82 0 Level Sections

83 1 Level & Typical sections To be modified as per PT drawings, BMU


and MEP Plinths at roof
84 Beam schedule Punching shear details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
A1 & A2 Building
85 Raft Reinforcement Raft to be rechecked for MEP drainage
86 Bottom reinforcement
87 Top reinforcement
88 Column
89 Wall reinft
90 Lower Level layout (-1)
91 Bottom reinforcement
92 Top reinforcement
93 0 Level Layout
94 Bottom reinforcement
95 Top reinforcement
96 1 Level Layout To be modified as per PT drawings
97 2 Level Layout To be modified as per PT drawings
98 3 Level Layout To be modified as per PT drawings
99 4 Level Layout To be modified as per PT drawings
100 5 Level Layout To be modified as per PT drawings
101 6 Level Layout To be modified as per PT drawings
102 7 Level Layout To be modified as per PT drawings
103 Lower Level Sections
104 0 Level Sections

105 1 Level & Typical sections To be modified as per PT drawings, BMU


and MEP Plinths at roof
106 Beam schedule Punching shear details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
Office Building
107 Raft Reinforcement Raft to be rechecked for MEP drainage
108 Bottom reinforcement
109 Top reinforcement
110 Column
111 Wall reinft
112 Lower Level layout (-1)
113 Bottom reinforcement
114 Top reinforcement
115 0 Level Layout
116 Bottom reinforcement
117 Top reinforcement
118 1 Level Layout To be modified as per PT drawings
119 2 Level Layout To be modified as per PT drawings
120 3 Level Layout To be modified as per PT drawings
121 4 Level Layout To be modified as per PT drawings
122 5 Level Layout To be modified as per PT drawings
123 6 Level Layout To be modified as per PT drawings
124 7 Level Layout To be modified as per PT drawings
125 Lower Level Sections
126 0 Level Sections

127 1 Level & Typical sections To be modified as per PT drawings, BMU


and MEP Plinths at roof
128 Beam schedule Punching shear details
Sl Design Detail Date of
Pending Items Remarks
No. (%) (%) completion
Existing Building
129 Raft Reinforcement Raft to be rechecked for MEP drainage
130 Bottom reinforcement
131 Top reinforcement
132 Column
133 Wall reinft
134 Lower Level layout (-1)
135 Bottom reinforcement
136 Top reinforcement
137 0 Level Layout
138 Bottom reinforcement
139 Top reinforcement
140 Entrance Lobby steel details
141 Ball room steel details
Existing building steel
142
details
143 Beam schedule Punching shear details