5.4 One newly erected BOXN HL wagon was More welders are being upgraded to A & A+
inspected. There is scope of improvement in the Category, which will result in giving better weld
welding quality. quality to works. Also planning is made for having
BOX manipulator for rotating the wagon which
would result in downhand welding of Corner joint
of End wall & Side wall , Crib angle, End angle
etc.
6.0 WRS-III, IV & V:
6.1 The Wagon POH outturn has improved over last 2 Noted. With completion of sanctioned umbrella
years but it needs to be further increased to 600 work it will be possible to achieve Wagon POH
Wagons/month in the near future. target of 550 to 600 wagons/month.
6.2 Proposed Shed extension work of WRS-IV was Wagon POH outturn increased from 375
inspected. While Berthing capacity will further wagons/month in 2017-18 to 439 wagons/month
increase but shop should also strive for complete in 2018-19. This is an increase of 17 % without
utilization of existing berthing capacity and any enhancement in berthing capacity and
reduction of Wagon POH cycle time for increase of without any addition in wagon POH infrastructure.
outturn. Jamalpur workshop will further strive for
improvement.
6.3 Various wagon components were displayed. Noted. Stocking of CBC components as per
Procurement of CBC component of improved improved drawing/specification has already been
drawing (WD-70-BD) needs to be expedited. done. Store Dept. at HQ may be advised
accordingly.
6.4 The work of retro-fitment of Twin Pipe in existing Noted.
wagons which were sanctioned under RSP should
be expedited.
7.0 Pilot Training School :
7.1 During the inspection of PTS, training system for Noted.
Loco Pilot was briefed and also simulator training
was explained.
7.2 Interaction done with trainees. They are satisfied Noted.
with the training and other hostel facilities.
8.0 Meeting with BOs:
8.1 Scrap disposal should be taken up on Mission Noted. 74 Condemned Machines offered to stores
Mode and all available scrap materials should be for sale through as is where is basis. All other
handed over to Stores at the earliest. condemned machines are send to NSY through
SN Shop/Items Compliance/Remarks
NS-11.
8.2 Dy.CMM raised the issue of fencing and isolating Administrative approval of CWM/JMP has already
the scrap yard at South End of the Workshop. been obtained after technical feasibility report.
Amongst JMP, KPA & LLH, JMP is the only Shop DTE/JMP has already been advised to start
which is having the scrap yard inside the Shop construction work vide L.No.F/Stores/Gen.Sec./04
premises. dt 10/04/19.
In the light of recent problems related to scrap
disposal faced by Shop, this is a very important
work and needs to be examined immediately.
Detailed plan to be drawn & proposal should be
initiated.
8.3 With the increase in the Wagon POH Outturn, Noted.
there shall be a need for capacity enhancement of
Exchange Yard at JMP station. This needs to be
examined by MLDT Division.
8.4 PCEE has raised the issue of 9-10 overdue Tower Steps are being taken to immediately liquidate the
Wagons. Jamalpur Workshop should take overdue Tower Car.
immediate steps to liquidate the overdue. POH of one Tower Car completed.
Open Tender of 06 power packs through Works
Contract is under process.
04 Nos. Hydrostatic Power Pack is under
procurement through COS.
8.5 Jamalpur Hospital is in the need of urgent posting Posting order of one paediatrician at Jamalpur
of a Paediatrician. PCMD may look into this. Hospital has been issued from the HQ but he has
not yet joined.
8.6 Immediate and thorough cleaning of all Water On proposal is under preparation for cleaning of
Bodies from Weeds etc. inside Railway premises weeds from water bodies.
should be taken up.
8.7 There were many complaints regarding poor On proposal has been shortlisted in out of turn
condition of roads inside Railway Colony. This basis. The tender will be called after sanction of
should be got attended immediately. competent authority.
9.0 Interaction with Unions:
9.1 Representatives of different unions met and Noted.
handed over their memorandum.
10.0 Railway Main Hospital :
10.1 The Registration time for the patient at 9.00 a.m. A proposal has already been prepared and is
to 1.00 p.m. & 4.00 p.m. to 5.00 p.m. It should be under accounts vetting.
displayed in front of the Registration counter.
10.2 No CCTV is available in the hospital premises. It 03 Nos. CCTV is already commissioned in
should be installed immediately. emergency room and adjacent verandas Kiosk
Ayushman Bharat. In other places the work is in
progress it will be completed in due course.
10.3 One after another, each Ward/Room should be Noted & to be done on priority basis.
thoroughly renovated.
10.4 Electric load of Hospital to be assessed and a new Load analysis has been done & estimate for DG
DG set should be provided. Set of 125 KVA has been uploaded in Law Book
SN Shop/Items Compliance/Remarks
19-20 for kind sanction.
12.6 Incentive Payment: An upward trend of 29.68% Category wise incentive strength for artisan has
has been noticed as compared to the last year in been revised after cadre structuring (vide Rly.
the total incentive paid till end of Jan’19, which is Board letter No. Pc-111/2016/CRC/1 New Delhi
required to be reviewed and analysed. dt. 30.09.2016 and it was implemented in JMPW
w.e.f. 01.10.2017 for incentive purpose after
cadre structuring the highly skilled artisan has
been increased from Oct. 17 (Sr.Tech. 16% to
26%,Tech.I 44% to 51%),hence incentive
payment is more in the year 2018-2019 (Apr’2018
to Jan’2019).
12.7 O.T. Hours: It was found that there is a huge OT of various units was pending due to an error in
increase in OT hours booked as compared to the the work order in the previous Financial year. The
last year. In fact, the increase is 159% over the spending has increased due to the payment of
last year. Accordingly, there is a quantum jump in arrear OT in this Financial year.
expenditure booked on this account. Detailed
analysis should be done to know the reason for
such enhancement.
12.8 Further it was advised to consider the possibility of Turbo ventilators are being provided in the
installation of Skylight/Sun beam at the roof of the workshop as exhaust fan. For better illumination
workshop shed for natural light during day time more transparent sheets are being provided on
like LLH workshop to be done and also Natural air the roof top. The same to be increased in future.
SN Shop/Items Compliance/Remarks
exhaust fan to be provided at roof top of shed.
12.9 Installation of Solar Power Plant using the open Provision of Rooftop Solar PV modules at various
roof of office buildings and IRIMEE buildings to be locations in Jamalpur Workshop has already been
expedited. sent to REMCL vide L.No. F/Dy.CEE/OFF(Data)/
49/76 dtd 12.03.19 & 02 Nos. 10 KWp Solar
Power Plant for IRIMEE building has already
been uploaded in IRPSM in PH-65.
12.10 Provision of 100% LED in service buildings to be 75% LED in service buildings has already been
completed. achieved & the target of 100% will be completed
shortly
12.11 Hanging/undressed haphazardly cables as Cable dressing work is under progress as per
different locations to be dressed. planned shutdown program.
12.12 Installation of standby Pump-motor set for reliable TR for Stand-by Pump–Motor set has been done
water supply to colonies, hospitals, workshop, from this end. The same is under procurement
station etc. process through store.
12.13 One transformer of 3 MVA,(33/11 KV (make Areva Defective transformers are being repaired by
T&D India Ltd. Date of Installation 31.12.11) is outside agencies.
defective since 30.03.15.
(Naresh Kumar)
Chief Works Manager